HomeMy WebLinkAbout100 Arnold Way (58) The S I L IA I M Collaborative
Architecture August 28, 1997
Planning
Interiors
Engineering
Landscape
Construction Services Mr John Collins
Technology Building Official
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
RE: Timothy Edwards Middle School
Phase One -Portable Classroom Relocation
S/L/A/M Project No. 95040.00
SDE Project No. 132-066 E
Dear Mr. Collins:
In accordance with Section 119.6.1 of the Connecticut State Building Code, and based on
our inspections of the Portable Classroom Building at the above noted school location, it is
our professional opinion that the completed structure is in substantial compliance with the
approved construction documents on file with your office.
Sincerely,
The S/L/A/M Collaborative
Peter S. Sobin, AIA
Project Architect
■
Somerset Square 0 &G Industries, Inc.
80 Glastonbury Boulevard
Construction Manager
Glastonbury
Connecticut 06033-4415
Phone 860 657 8077
Fax 860 657 3141
cc: P. Hankard - SWBOE
281 Farmington Avenue H. Fitts - SW/PBC
Farmington
Connecticut06032-1960
Phone 860 657 8077 1\9500drafts07h240a doc
Fax 860 677 6507
mall@slamcoll.com
http//wwwslamcoll corn/