Loading...
HomeMy WebLinkAbout100 Arnold Way (50) ,Eectric# 14 qyj APPLICATION FOR BUILDING PERMIT Plumbing# -1°5 10 0 ARNOLD WAY HVAC # Dat : 6 !4 9 Sprinkler# No. 2 4 4 2 6 FINAL APPROVALS Estimated Cost $ ;21410,o e v Building AL COMPLETE RED BOXED AREAS Permit Fee $ �,t•�•�c� Engineering �6 TYPE OR PRWT ONLY Occupancy Fee T AffidavitSIGN ON REVERSE SIDE Appr.for CO. Total Fee $ k+AC%Jk TO BULDING,DEPARTMENT,TOWN OF SOUTH WNSOR,CT (Additional Cost) $ The undersigned hereby applies to do work according to the following specifications: Job Location 100 4g&Q Id (42 44 Lot No. Side of Street Zone Applicant O�G -ivy.,srC/ES .0 Z r Tel.#(1(o) 4(89 Address 112 (AA// -,T-R.EET 7—rye/Llnnr4o,,j CT Zip C67�j Lic.# Owner Sour)} to i uLsn2?i Vg i L S&w- sAddress 1-7 37 ly)Lliiv ST 3nu7-rf 601A060k C 1 6607 Architect Iy S(L,ALM G'//eip, -,%&Address eo 61 11g, s"m6v T Sq.Ft.New Area: 1st Fl. 2nd FL 3rd Fl. Total New Area #Rooms #Lavatories #Bathrooms #Garages Purpose of this permit: a&N —P-,9-1aA-"0N OF 'P0zn;& t 0,L4<560or-S AT- City Water ❑ ell ❑ Septic System ❑ Sewer ❑ Ins. H.O. S.P. Cart. V Area Basement Garage Approved by (3 Date&=L6 Group C Construction Typ 5C6 Rwi.d 1/97 I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town of South Windsor and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this permit is asked,and agree that this building is to be located the proper distance from all street lines,side yard lines,and required distances from all other zones and is located in which this building and its allowed. Sign` I hereby apply for a Certificate of Occupancy for the wo ication for the permit. Sign � DO NOT WRITE BELOW THIS LIN INSPECTION COMMENTS Inspection / Approval Date By Appl Code Description Due Whom Code Comment ------------------------------------------------------------------------------- 97-24426-B 2,420,000 BO1 FOOTING 07/01/97 JFH A SEE TODAYS TICKET NOTIFIED THEY ARE POURING AT THIER OWN RISK W/ NO ENGINIERING BO1 FOOTING 07/02/97 JFF D REBAR EAST HALF/DEPTH ALREADY CHECKED/NO DOCUMENTATION FOR REBAR/TALK TO JRC BO1 FOOTING 07/02/97 JFH A DEPTH ONLY ENTIRE EAST HALF B09 OTHER 07/07/97 JFH PROGRESS BO1 FOOTING 07/07/97 JFH A WEST SONOTUBES BO1 FOOTING 07/08/97 JFH A REBAR E02 UNDERGROUND 07/08/97 JFH D NOT READY E03 ROUGH O8/07/97 JFH A BATHROOMS B03 FRAMING (ROUGH) 08/11/97 JFH A BATH & HALL E01 SERVICE 08/11/97 JFH A RELEASED P03 ROUGH 08/12/97 JFF A P03 TEST OK BOYS AN GIRLS BATH INTEGRITY OF WALL FRAMING ALTERED MUST CORRECT B03 FRAMING (ROUGH) 08/13/97 JFH A BATHROOM B10 FINAL 08/28/97 JFH D W/ JRC EXIT & EMERGENCY LIGHTS NOT WORKING B10 FINAL 08/28/97 JFH D EXIT & EMERGENCY LIGHTS NOT WORKING BO1 FOOTING 12/02/97 DCJ A POURING FOOTING AGAINST EXIST. BUILDING. Inspection / Approval Date By Appl Code Description Due Whom Code Comment ------------------------------------------------------------------------------- B01 FOOTING 12/08/97 DCJ A COLUMN FOOTINGS(2) AT SOUTH CORNER OF EXIST. BLDG. (STAIR TOWER) P02 UNDERGROUND 04/08/98 DCJ A ACID WASTE PIPING COL. 8-10 AND R-L B10 FINAL 12/30/98 JRC A APPROVED FOR CLOSEOUT 97-14488-E 2,420,000 97-9973-P 58, 965