Loading...
HomeMy WebLinkAbout100 Arnold Way (42) KAESTLE BOOS A_S_SOCIATES,ING ARCHITECTS August 17, 1995 John A Kaestle Charles\V Boos Mr. David Pernal David W.King Arthur Building Systems, Inc. Mark J Weisman 719 Middle Street Brian W Humes P.O. Box 60 Michael J.Blessing Bristol, CT 06011-0060 Am'r Rustv Malik Michael I ;McKeon Re: Relocatable Music Classroom Addition Brian A.Solywoda to the Jeftery R mcElravy Timothy Edwards School Laura Gilliam-Piersall South Windsor, CT larme L DiPinto KB 494026 Vincent R Amrhein John I Krezel,Ir Dear Mr. Pernal: Christopher M Roof I am in receipt of structural drawings sealed by Mr. Szewczak depicting additional/corrective work to the concrete piers necessary to properly seat and support the modular units. The issuance of these drawings has followed the completion of this work. As discussed,Mr. Szewczak must issue a field inspection report indicating that these piers have been constructed in accordance with his drawings, before this office will issue a Substantial Completion Certificate. Very truly yours, Mark J. Weisman, AIA KAESTLE BOOS ASSOCIATES, INC. MJW:la 416 Slater Road P.O. 0 Box 259 cc: Howard Fitts New Britain,2 Patrick Hankard 06050-2590 (203)229-0361 John Collins Fax(203)229-5303