HomeMy WebLinkAbout100 Arnold Way (42) KAESTLE BOOS
A_S_SOCIATES,ING
ARCHITECTS
August 17, 1995
John A Kaestle
Charles\V Boos
Mr. David Pernal
David W.King Arthur Building Systems, Inc.
Mark J Weisman
719 Middle Street
Brian W Humes
P.O. Box 60
Michael J.Blessing Bristol, CT 06011-0060
Am'r Rustv Malik
Michael I ;McKeon
Re: Relocatable Music Classroom Addition
Brian A.Solywoda to the
Jeftery R mcElravy Timothy Edwards School
Laura Gilliam-Piersall South Windsor, CT
larme L DiPinto KB 494026
Vincent R Amrhein
John I Krezel,Ir Dear Mr. Pernal:
Christopher M Roof
I am in receipt of structural drawings sealed by Mr. Szewczak depicting
additional/corrective work to the concrete piers necessary to properly seat and
support the modular units.
The issuance of these drawings has followed the completion of this work.
As discussed,Mr. Szewczak must issue a field inspection report indicating that these
piers have been constructed in accordance with his drawings, before this office will
issue a Substantial Completion Certificate.
Very truly yours,
Mark J. Weisman, AIA
KAESTLE BOOS ASSOCIATES, INC.
MJW:la
416 Slater Road
P.O. 0 Box 259 cc: Howard Fitts
New Britain,2
Patrick Hankard
06050-2590
(203)229-0361 John Collins
Fax(203)229-5303