Loading...
HomeMy WebLinkAbout100 Arnold Way (35) Electric# APPLICATION FOR BUILDING PERMIT Plumbing# 100 ARNOLD WAY HVAC # 19309) Date: July 14, 1995 Sprinkler# No. 2 2 4 9 8 FINAL APPR V LS Estimated Cost $ `7� Building 6 COMPLETE RED BOXED AREAS Permit Fee 7 $ 464n-j ,iaD Engineering 116109S TYPE OR PRINT ONLY OccuparyEy Fee $ �j tirz p Affidavit SIGN ON REVERSE SIDE `� Appr.for CO. S ) Total Fee $ W 14I v8p TO BUILDING D P RMME4FItOWN OF SOUTH WINDSOR,CT (Additional Cost) $ The undersigned hereby applies to do work according to the following specifications: Job Location Timothy Edwards Sch- 100_ Arnold WayLot No._59 Side of Street s Zone A-30 Applicant Arthur Building Systems. Inc. Tel. # 203-582-6552 Address 719 Middle Street, Bristol, CT Zip 06010 Lic. # 0000408 Owner City of South Windsor Address South Windsor, CT Architect Kaestle Boos Associates Address 416 Slater Road. New Britain, CT 06090-95gn Sq. Ft. New Area: lst FI. 90 2nd A. 101 3rd FI. n/a Total New Area 7,300 # Rooms 10 # Lavatories n/a #Bathrooms n/a #Garages n/a Purpose of this permit: Construct new modular Music Room Addition 0� ZZ3r& FOR Fbtj) - City Water C n/a Well 0 n/a Septic System ❑ n/a Sewer ❑ n/a Use Group_�� Construction Type Area -7 30"- / Basement Garage Approved by 2� Date 7 Lf R.vs.d 6/95 I hereby agree to conform to all the requirements of the Laws of the Slate of Connecticut and the Ordinances of the Town of South Windsor and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this permit is asked, and agree that this building is to be located the proper distance from all street lines,side yard lines and required distances from all other zones and is located in a zo a in w c is ding and its use is allowed Signed �V` ' S�� David P. Pernal, Project Manager I hereby apply for a Certificate of Occupancy for the work described in this application for the permit Signed /./ 4�f r_� David P. Pernal, Project Manager -- DO NOT WRITE BELOW THIS LINE -- INSPECTION COMMENTS Inspection / Approval Date By Appl Code Description Due Whom Code Comment ------------------------------------------------------------------------------- 95-22498-B 587,475 B03 FRAMING (ROUGH) 08/01/95 JFH D NO PIERS UNDR BEAM FOR WLKW B03 FRAMING (ROUGH) 08/04/95 JRC A E03 ROUGH 08/04/95 JRC A B04 INSULATION 08/04/95 JRC A B09 OTHER 08/04/95 JRC ADVICE ON FIRE WALL CONSTR. E01 SERVICE 00/00/00 JFH A RELEASED B09 OTHER 08/14/95 JRC PROGRESS @ FIRE WALL CONNEC E09 OTHER 08/15/95 JRC NO E2 ON JOB-REQUESTED APPR 801 FOOTING 08/22/95 JFH A HANDIAP RAMP E10 FINAL 08/22/95 JFH D CABLES NOT SUPPORTED E10 FINAL 08/23/95 JFH A B10 FINAL 08/28/95 JFH D RAMPS NOT DONE/ALARM NOT WI B10 FINAL 08/30/95 JRC A TCO APPROVED B10 FINAL 09/07/95 JRC A APPROVED FOR CO 95-13549-E 35,925 SITE COMPLIANCE CHECKLIST TOWN of SOUTH WINDSOR, CONNECTICUT 100 ARNOLD WAY LOT_# Reviewed By /�/3'�> (En 1 eering) ARTHUR BUILDING SYSTEMS Date Reviewed Q,9&-9 Approved nied 719 MIDDLE STREET,BRISTOL,CT Reviewed By AJA, Planning) BP_#_22498_ Ph_# (203)582-6552 Date Review yj Approve Denied Date Submitted 09/07/95 ***�� FOR C of 0 *m* As required in the Zoning and/or Subdivison Regulations, no Certificate of Occupancy shall be issued until grading plans have been complied with and approved by the Town Engineer. The minimum requirements shall include: Approved Denied N/A ✓ 1. Approved building permit plan v 2. Finish grading per approved building permit plan Now l� oa/ 3. Site work; i.e. trees, shrubs, / dumpsters, required parking v 4. Utility location; 1/ a. sanitary sewer/septic system b. foundation drain c. electrical & telephone d. water e. other 5. Sewer connection charge paid 6. Appropriate certification 7. Bonding 8. Planning & Zoning/ 41— Inland Wetlands Considerations Sewer Permit No. Pavement Excavation No. COMMENTS: