Loading...
HomeMy WebLinkAbout12 Ahern Drive Application No. ...... . .76.8.................... Permit No. ........35r...o8 ................. TO THE BUILDING INSPECTOR of the TOWN OF SOUTH WINDSOR, CONN. We............ hereby make application for a permit to (erect tnenti— a building according to the following detailed statement of the specifications and plans herewith submitted. (Draw a line through word "erect" or words "make alteration to" as the case may require.) All provisions of the Building By-Laws (Sections 2 to 32 inclusive) shall be complied with in the execu- tion of this work whether specified herein or not. South Windsor, Conn., ......MaY....................................... 19...60.. Signhere .................................................................................................................. Address ...................................................................................................................... Location? .......................East...Side........................................................side of? ..................................,A.he.rxi...D.r.iv.e........................................... Nearestcross street? ........ .............................................................................Street No. .................................................. Lot No. .....9.5....................... Owner of land is? 61.1..11iew..P..ark.A�enue.,....yY_...H.,.... Owner of building is? ..........Address ... ..61.1....Ne.w P..axk..Av.enue.,.W.,.H,.......... Architect is? .. .......G.M....Kraus......................................................Address ? Manche ate r Builders Inc. Address Builder is. .. ...................a........................... 6,11 New Fork..AV.0UU0.......W....H........ II�- Dimensions of building?4X.'S�:`.XZk'8 Veet front? ............... .......... Feet rear? ................ ........... Feet deep? ....... .... ............. Extreme height to highest point of roof? ............ ..... . ..ZJV No. of stories in height? ........1...1 ' 'Purpose of building is? ......Dwe .................................................................... - rp g� �x�,g...............................................No. of stores.? ................................... Howmany families? ........One ...........................No. of rooms? .... ................................................................................................. Distancefrom street line is? .................. 5.1...........................................from building line is? ..................................................................................... ADDITIONS AND ALTERATIONS (Give Brief Description) .................. ............ ......................................................................................................................................................................................................................................................... ......................................................................................................................... .................................................................................................................................................................... ...................................................................................................................................................................................................................................................................... ....................... MapNo. ............................, If of steel frame, what is exterior construction? . .. . . . ......... ..... ..... .................................. .... ......................... What kind of columns used? ................ ......................................Size of columns used? What length of columns used? ....... . .... .... .. ....How protected? ........ .. ................ ...... ................ ............... eA' What kind of beams or girders? ................ . ...........Size of beams or girders? ... .......... .................................................... Longest span of beams or girders? ... ....... ............These rest on? . . ......... ... . ... ................ ....................................... Roofconstruction is? ........................ ........................................................Roof covering is? . ... ... .. ....................................................... The floors ate of ........... .. ................ . .. ... ...... construction and are calculated to carry a safe'load of . ... ... .................... lbs. per square foot. (See Section 14, Building By-Laws.) BRICK CONSTRUCTION. Of what material will walls be constructed? . ................ . ... .... ...... ...................... ..... ......................................... ............... ............... Compositionof mortar? ............ ........ .. ............. ..................................................................................... .... .......................... ............................................ Height and Thickness of Walls Height Stories Front Walls Side Walls Rear Walls Partition Walls Basement, Y _+1 ..................................................................................................................................................................................................................................................................................................... ........ 1st Story ... ..................... .......................................................................... .............................................................................................................................................. ................ ........... ................ 2nd ... ................ .................................I...............................................................................................................I.......................... ............................................... ..................................................... 3rd ................ ..................................................................................................................................................................................................................................................... .......... ..................... 4th ..................... ........... ...................................................................................................................I...................................................................I.......................... ................................ ............... 5th ........................... ..... ................................................................................................................................................................I...................................................................................................... 6th ds ...................... ........................................................................................................................................................................................................................................................................................ 7th ............................ ............. ..................I...................................................................................................................................... ...................................................................... ................................ 8th ..........................................................................................................I............................... .............. ................................................ ................................................................................................... 9th ........................................................................................... .......... ................... .... ............... . ........... ... .. ... ......... ................. ............................................................................... 1(" Material of Front? ............... ....... ....If stone, what kind? . . ......... .. ....................... Thickness of Ashlar? .. . . ... .... . . ............ . ........... ......Thickness of Backing? ............ Backed up with what? Arches or lintels over openings? WOOD CONSTRUCTION. Giv Size, Longest Span and Distance Between Centres, of Joists, Girders and Columns JOISTS GMDMS COLUMNS Floors Size Longest Span Centres Bridging She Longest Span Centres Size Length Centres 1st Floor ...... ................ .Zx8 11r101' 1611 lx3 1016'1 -."..'..... 3..1./2 71 1101611 2nd ..................... ..$'` .. _. ............__..._..._.. 2x8 1212" 16" lx3 _....... ........................................................................................................ _..........._._........................... Size of outside studs? ...........44................... Distance on centres? ....................j.6t.t............ Size of sill? 2,6 ............... Size of rafters? Tx.us.s............ Distance on centres?...................2...'........................... Size of plate? .......................4x4................... Sizeof ledgers or girts? ..............................................................................Size bf deck rafters? ...................................................................... ............... Distance on centres? ........................................................................................Size of studs in bearing partitions? ........ ........................................ MISCELLANEOUS Style of roof, flat, pitch, Mansard, or hipped? ...........Pitch.............. Fireplaces? .......................None Material of roof covering? ...:.210 lb. Asphalt Material of Cornice? ..........Wood & G.I.Gutters ........................................................................ How is building heated? .... ....................... ................................Lining of flues? .. ........... ........8x1.2 Terra G.o.ta............. Thickness of shell of flues? 1"TC4"cinder blk. ,Any elevators or lifts? ......................................................... ...................... Whatkind? ...... ........................ . ......... How many? ............... .. ......... ....... Any hoistw��lrt .................................... Howprotected? ...... ....... ......................................................... .................Total Value of Building ...... . .. ,...... ............... Whenwill work be commenced? ... ............... .................................................................................................................................................................... The applicant warrants that the lot for residential purposes, shown on a plot plan accompanying this appli. cation, has 20,000 square feet, or more, and at least 100 foot frontage on a Town road shown on a map of South Windsor showing Town Roads dated December 1949, or on any other roads officially accepted by the Town of South Windsor since 1949. -\2�- Applicant 3508 BUILDING APPLICATION 3768 ApplicationNo. ............................................................................. on the ........East......................................................... side of .. ......... Ahern Drive .... ...................... ................. ..... ... ................ ....... ...... Street. Street No, #95......................... ........................ I.R. Stich Assoc, Owner . ...................... ................. ................................... ... Applicant . ... Same. . ................ ........ ............... ........ CLASSIFICATION Dwelling 43.-'.-8.-."x2.6j8- 1' . . 1.... . ................ ..................... . ................. ............ . . ...................... ............-........ . .... .............................. ............. ................................... Permit issued on above Application. Date, 3*............... 19.61. TOWN OF SOUTH WINDSOR BUILDING PERMIT Date May 3 1961 15.,000 Fee Paid �$ 60.00' Est. Value $. . . . . . Permit N9 3508 on the East I side of Ahern Drive Street Street No. Lot #95 Owner I.,R.Stich Assoc. Applicant S a me CERTIFICATE OF OCCUPANCY ISSUED: Date No. 21L39 Fee Paid $ 3.00� CLASSIFICATION Dwelling 4318"x2618" BUILDING PERMIT N° 3508 OFFICE OF THE BUILDING INSPECTOR of the Town of South Windsor, Conn. South Windsor, Conn. I'Iay 3g, 1961 94is is to QTrrttfl3, That I,R.Stich Assoc. is hereby granted permission to Lwelling 43#8"X26 t 8" at estimated value of $ L 5T on the East side of Ahern Drive Lot #95 Street on land owned by I.R.Stich Assoc. Said Work to be as described in Application No. 3768 and to conform to specifications and plans filed with said Application, and Building By- Laws of THE TOWN OF SOUTH WINDSOR. Issued Vla y 3• - 1561 Building Inspector. Streets and sidewalks, obstructed by excavations or building materials, must be guarded by barriers during the day and by both barriers and colored lights by night. SECTION 1343, GENERAL STATUTES OF CONNECTICUT: "When any person shall place or keep building materials, or any obstacle in any highway (or any sidewalk) either with or without a license therefor from the city or borough in which such highway may be situated, he shall pay said city, town or borough all costs and damages which it shall sustain, or be compelled to reason therefor."