Loading...
HomeMy WebLinkAbout125 Bidwell Road (4) FINAL INSPFC I N Building a Plumbing APPLICATION FOR BUILDING PERMIT HVAC 125 BIDWELL ROAD Date: Sprinkler Electric013 Zoning / Estimated Costs D 417L Affidavit '3 i3 Permit Fee$ 3 070 00 Eng. Dept. o S NO. 2 S 4 g Occupancy Fee $ Fire Dept. COMPLETE RED BOXED AREAS. Health Dept. TYPE OR PRINT ONLY Total Fee $ 4 73 Approved for CO: SIGN ON REVERSE SIDE. (Additional Cost) $ TO BUILDING DEPARTMENT, TOWN OF SOUTH WINDSOR, CT The undersigned, hereby applies to do work according to the following specifications: Job Location �- D Lot No.— _Side of Street J: Zone - ' Applicant 8,LA_ 'Tcn%cae= Tel. # ?42--85"$6 Address /07 or,a u/..4p,boe. - cam 0 c7' zip �0o� Jt STREET CITY STATE Lic.# Ownerti Address '3 i Architect S am �R �. w •t Address /070co W.w�,�,o �c �I�a►s c T o�z Size New Area: Ft. Front Overall /00 Ft. Deep Overall /3M Total Area Garages Size of Lot /• � +ems Dist. from Street Line 3! Lavatories —Bathrooms Rooms 1st 2nd 3rd Purpose of this Permit 76 C0&jS722&LcT- A. fyrw7 /�,��{_, Q� ��wi'e ,eL�,Q Si P µ a .�,t�- ..�/ C01V5 a.c_7->C*,4 EigST J' Ti91 City Water Well 0 Septic 0 Sewer Use Group Construction Type Approved by J Date BD1A 11/88 I hereby agree to conform to all the requirements of the laws of th State of Connecticut and the Ordinances of the Town of South Windsor and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this permit is asked,and agree that this building is to be located the proper distance from all street lines,side yard lines and required distances from all other zones and is located in a zone in which this building and its use is allowed. Signed — I hereby apply for a Certificate of Occupancy for the work described in this application for permit. Signed- -DO NOT WRITE BELOW THIS LINE— INSPECTION RECORD Footing Framing Foundation Fireplace/Chimney Insulation Plumbing Permit# 9467 Inspections: 15) 4-k2FN-1 HVAC Permit# b-7g Inspections: Electrical Permit# Inspections: Sprinkler Permit# 1063 �d Inspections: Location of job AFFIDAVIT Additional Fee . . .$.12 Q.•Q 0. . . . .. . State of Connecticut ss. County of Hartford I l ' Owner I. . ... .!. . G'�. . . .. . . .. . . .of . . . . ... . . .. . . . . . Agent for building erected under Contractor Permit No. . .2. . . 4 9 . . . . . issued by the Dep't of Building of the Zbwn of South Windsor being duly sworn,make oath and say that the actual cost of the completed work authorized under said permit was. .4.13.,.2 2.3...0.0... . . . . . . . . . .. . . . . . . . . . .. Signed� . . . . . . . ... . .... Subscribed and sworn to before me this .. . .. . d. . 5000st�- Estimate .. . .. day of . . . . . .. . .. . .. A.D.19 Cost.$ 401, 476 .00 11 , 747 . 00 . .... . . ... . `. . .. . . . ... ... Difference. $ Notary `ys1 Inspection / Approval Date By Appl Code Description Due Whom Code Comment ------------------------------------------------------------------------------- 94-21549-B 306,476 BO1 FOOTING 07/20/94 JFH D NOT READY BO1 FOOTING 07/21/94 JFH A BO1 FOOTING 07/26/94 JFF A ALINECOL7T04ENTIRE7LINEGLINECOL7 P02 UNDERGROUND 09/12/94 JRC A B09 OTHER 10/20/94 JFH PROGGRESS E03 ROUGH 11/02/94 JFH D NOT READY B09 OTHER 11/02/94 JFH PROGRESS B09 OTHER 11/03/94 JRC QUESTION ON METAL STUD GAUGE-20 ON HIGH WALL E03 ROUGH 11/03/94 JFH A 1ST FLOOR ONLY E01 SERVICE 11/08/94 JFH D NOT READY B09 OTHER 11/08/94 JFH CHECKED STUD GUAGE CENTER WALL 20 GAUGE PO4 GAS TEST 11/14/94 JFH A AIR TEST P03 ROUGH 11/17/94 JFF D NEEDS NAIL PLATES E03 ROUGH 11/18/94 JFH A 2ND FLOOR P03 ROUGH 11/18/94 JFH A NAIL PLATES E01 SERVICE 11/23/94 JFH A RELEASE ISSUED B10 FINAL 12/07/94 JRC A PARTIAL-WAREHOUSE ONLY-EQUIP SETUP ONLY B10 FINAL O1/04/95 JRC A PARTIAL-1ST FLOOR OFFICE AREAS ONLY 93-1063-S 10,000 94-9078-H 39,000 94-1064-S 15,000 93-9467-P 6,000 94-13249-E 25,000 Total Est Value 401,476 � /-7U' C�s'r COAST- ST*,Q c8 SITE COMPLIANCE CHECKLIST TOWN of SOUTH WINDSOR, CONNECT CUT 125 BIDWELL ROAD LOT_# --- Reviewed B4� (Engin 'n ) JODICE WILLIAM Date Reviewed - - Approve 107 OLD WINDSOR ROAD,BLOOMFIELD,CT Reviewed By (Pla BP # 21549 Ph_#_( 203 ) 242-8586 Date Reviewed l-.• Approved/Denied Date Submitted 12/01/94 ***** FO C of 0 * *** As required in the Zoning and/or Subdivison Regulations, no Certificate of Occupancy shall be issued until grading plans have been complied with and approved by the Town Engineer. The minimum requirements shall include: Appr , ed Denied N/A 1 . Approved building permit plan 2 . Finish grading per approved building permit plan 3 .' Site work; i .e. trees, shrubs , dumpsters, required parking 4 . Utility location; a . sanitary sewer/ m b. foundation drain C . electrical & telephone d. water e. other 5 . Sewer connection charge paid 6 . Appropriate certification 7 . Bonding 8 . Planning & Zoning/ Inland Wetlands Considerations Sewer Permit No. Pavement Excavation No. COMMENTS : 4- a4v !` if /;- '44 b