HomeMy WebLinkAbout125 Bidwell Road (4) FINAL INSPFC I N
Building a
Plumbing APPLICATION FOR BUILDING PERMIT
HVAC
125 BIDWELL ROAD Date:
Sprinkler
Electric013
Zoning / Estimated Costs D 417L
Affidavit '3 i3 Permit Fee$ 3 070 00
Eng. Dept. o S NO. 2 S 4 g Occupancy Fee $
Fire Dept. COMPLETE RED BOXED AREAS.
Health Dept.
TYPE OR PRINT ONLY Total Fee $ 4 73
Approved for CO: SIGN ON REVERSE SIDE. (Additional Cost) $
TO BUILDING DEPARTMENT, TOWN OF SOUTH WINDSOR, CT
The undersigned, hereby applies to do work according to the following specifications:
Job Location �- D Lot No.— _Side of Street J: Zone - '
Applicant 8,LA_ 'Tcn%cae= Tel. # ?42--85"$6
Address /07 or,a u/..4p,boe. - cam 0 c7' zip �0o� Jt
STREET CITY STATE Lic.#
Ownerti Address '3 i
Architect S am �R �. w •t Address /070co W.w�,�,o
�c �I�a►s c T o�z
Size New Area: Ft. Front Overall /00 Ft. Deep Overall /3M Total Area Garages
Size of Lot /• � +ems Dist. from Street Line 3! Lavatories
—Bathrooms Rooms 1st 2nd 3rd
Purpose of this Permit 76 C0&jS722&LcT- A. fyrw7 /�,��{_, Q�
��wi'e ,eL�,Q Si
P µ a
.�,t�- ..�/ C01V5 a.c_7->C*,4 EigST J' Ti91
City Water Well 0 Septic 0 Sewer
Use Group Construction Type
Approved by J Date
BD1A 11/88
I hereby agree to conform to all the requirements of the laws of th State of Connecticut and the Ordinances of the Town of South Windsor
and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this permit is asked,and agree
that this building is to be located the proper distance from all street lines,side yard lines and required distances from all other zones and is
located in a zone in which this building and its use is allowed.
Signed
—
I hereby apply for a Certificate of Occupancy for the work described in this application for permit.
Signed-
-DO NOT WRITE BELOW THIS LINE—
INSPECTION RECORD
Footing Framing
Foundation Fireplace/Chimney Insulation
Plumbing Permit# 9467 Inspections:
15) 4-k2FN-1
HVAC Permit# b-7g Inspections:
Electrical Permit# Inspections:
Sprinkler Permit# 1063 �d Inspections:
Location of job AFFIDAVIT Additional Fee . . .$.12 Q.•Q 0. . . . .. .
State of Connecticut
ss.
County of Hartford
I l ' Owner
I. . ... .!. . G'�. . . .. . . .. . . .of . . . . ... . . .. . . . . . Agent for building erected under
Contractor
Permit No. . .2. . . 4 9 . . . . . issued by the Dep't of Building of the Zbwn of South Windsor being duly sworn,make oath
and say that the actual cost of the completed work authorized under said permit was. .4.13.,.2 2.3...0.0... . . . . . . . . . .. . . . . . . . . . ..
Signed� . .
. . . . . ... . ....
Subscribed and sworn to before me this .. . .. . d. . 5000st�-
Estimate .. .
.. day of . . . . . .. . .. . .. A.D.19 Cost.$ 401, 476 .00
11 , 747 . 00 . .... . . ... . `. . .. . . . ... ...
Difference. $ Notary `ys1
Inspection / Approval Date By Appl
Code Description Due Whom Code Comment
-------------------------------------------------------------------------------
94-21549-B 306,476
BO1 FOOTING 07/20/94 JFH D NOT READY
BO1 FOOTING 07/21/94 JFH A
BO1 FOOTING 07/26/94 JFF A ALINECOL7T04ENTIRE7LINEGLINECOL7
P02 UNDERGROUND 09/12/94 JRC A
B09 OTHER 10/20/94 JFH PROGGRESS
E03 ROUGH 11/02/94 JFH D NOT READY
B09 OTHER 11/02/94 JFH PROGRESS
B09 OTHER 11/03/94 JRC QUESTION ON METAL STUD GAUGE-20 ON HIGH WALL
E03 ROUGH 11/03/94 JFH A 1ST FLOOR ONLY
E01 SERVICE 11/08/94 JFH D NOT READY
B09 OTHER 11/08/94 JFH CHECKED STUD GUAGE CENTER WALL 20 GAUGE
PO4 GAS TEST 11/14/94 JFH A AIR TEST
P03 ROUGH 11/17/94 JFF D NEEDS NAIL PLATES
E03 ROUGH 11/18/94 JFH A 2ND FLOOR
P03 ROUGH 11/18/94 JFH A NAIL PLATES
E01 SERVICE 11/23/94 JFH A RELEASE ISSUED
B10 FINAL 12/07/94 JRC A PARTIAL-WAREHOUSE ONLY-EQUIP SETUP ONLY
B10 FINAL O1/04/95 JRC A PARTIAL-1ST FLOOR OFFICE AREAS ONLY
93-1063-S 10,000
94-9078-H 39,000
94-1064-S 15,000
93-9467-P 6,000
94-13249-E 25,000
Total Est Value 401,476 � /-7U'
C�s'r COAST- ST*,Q c8
SITE COMPLIANCE CHECKLIST
TOWN of SOUTH WINDSOR, CONNECT CUT
125 BIDWELL ROAD LOT_# --- Reviewed B4� (Engin 'n )
JODICE WILLIAM Date Reviewed - - Approve
107 OLD WINDSOR ROAD,BLOOMFIELD,CT Reviewed By (Pla
BP # 21549 Ph_#_( 203 ) 242-8586 Date Reviewed l-.• Approved/Denied
Date Submitted 12/01/94 ***** FO C of 0 * ***
As required in the Zoning and/or Subdivison Regulations, no Certificate of
Occupancy shall be issued until grading plans have been complied with and
approved by the Town Engineer. The minimum requirements shall include:
Appr , ed Denied N/A
1 . Approved building permit plan
2 . Finish grading per approved
building permit plan
3 .' Site work; i .e. trees, shrubs ,
dumpsters, required parking
4 . Utility location;
a . sanitary sewer/ m
b. foundation drain
C . electrical & telephone
d. water
e. other
5 . Sewer connection charge paid
6 . Appropriate certification
7 . Bonding
8 . Planning & Zoning/
Inland Wetlands Considerations