HomeMy WebLinkAbout101 Bidwell Road (6) FOR OFFICE USE ONLY APPLICATION FOR HVAC PERMIT DATE: /2-- 3 —A)
(NO. ) TOWN OF SOUTH WINDSOR EST.COST:
BLDG. PERMIT N0. 1540 SULLIVAN AVENUE FEES .
SOUTH WINDSOR, CT 06074 FEES:
644-2511 - Ext. 230 $ 0 - $19000 - $10.00
/d/ $1000 or fraction
LOCATION OF BUILDING 6 thereof - $10.00
Z4,1 22�
OWNER ADDRESS TOWN PHONE NO.
.,-A/ 95-3
/ft-Lo —94-f LL 6.� n/cJ —6
HVAC CONTRAC OR ADDRESS TIN PHONE NO.
TYPE OF SYSTEM: HEATING TYPE OF BUILDING: RESIDENTIAL
A/C COMMERCIAL
VENTILATION BUSINESS
INDUSTRIAL
IF HEATING: STEAM LOW PRESSURE LIMIT LBS. HIGH PRESSURE LIMIT LBS.
HYDRONIC WARM AIR
UNIT RADIANT HEATER (INCLUDING WOOD/C AL BURNING STOVE)
TYPE OF FUEL: OIL-GPM GAS IN-PUT ELECTRIC KW
WOOD COAL
OIL TANK - SIZE & LOCATION: INSIDE OUTSIDE CAPACITY
LPG TANK - CAPACITY
EXISTING RADIATION ADDITIONAL RADIA ON TOTAL RADIATION
DESIGN TEMP. OUTSIDE OF INSIDE °F DIFFERENCE OF
TOTAL HEAT LOSS (BTUH) 4 (HEAT LOSS SHEET MUST ACCOMPANY APPLICATION)
DESCRIBE ALL HEATING EQUIPMENT (INCLUDING MAKE & MODEL NO.):
ti c
GROSS HEATING CAPACIT (INPUT-BTUH) MV NET RATING (OUTPUT-BTUH)
IF AIR CONDITIONING: DESIGN TEMP. OUTSIDE°F INSIDE21 DIFFERENCE Zr F
TOTAL HEAT GAIN (BTUH)
(HEAT GAIN SHEET MUST ACC ANY APPLICATION)
DESCRIBE ALL COOLING EQUIPMENT (INCLUDING MAKE & MODEL NO.):
Q l - S3
TONNAGE COOLING CAPACITY (BTUH)
IF VENTILATION: DESCRIBE ALL AIR-HANDLING EQUIPMENT (INCLUDING KITC EN EXHAUSE EQUIPMENT):
TOTAL SIZE OF SYSTEM (CFM) FRESH AIR INTAKE (CFM)
(PLAN MUST ACCOMPANY APPLICATION)
The undersigned hereby applies for a permit to perform the following work and is to comply
with all local ordinances and State of Conn. Building Codes in the performance of such work.
FURTHER DESCRIPTION OF WORK: U_5 &-rA1vL Du
s.J 303 l7o/ a.-
STATE LICENSE - NAME & TYPE # DATE IGNATUROW APPLTt#NT
APPROVED DATE
BD 4A 11/88
I - 8- R CALCULATION SHEET IN3 (Modern Method) Copyright 1977 by The Hydronics Institute
OWNER ADDRESS DESIGN TEMPERATURE DIFFERENCE F. DATE
COL.A COL.B COL.C COL.D COL.E COL.F COL.G
1 ROOM Q
O H L W H L I W H L W H L W H L W Design Water Temp.
2 BTUH per F t f
ROOM DIMENSIONS, FT. ~
_ U
3 LENGTH EXPOSED WALLS,FT. A Radiation Selected
4 WINDOW AND OUTSIDE DOOR AREA U.
BTUH BTUH BTUH BTUH BTUH
5 WALL CONSTRUCTION
ROOM LIN.FT.OF
(Table 9, Line 3 x H) TOTALS RADIATION
6 TYPE OF GLASS FROM LINE 12 SELECTED
(Bottom of table used for Line 5)
7 CEILING CONSTRUCTION C
(Table 9. L x W)
L13tFLOOR CONSTRUCTIONt
(Table 9, L x W or Lin. F t) E
9 COLD PARTITION CONSTRUCTION F
(Table 9, L x H)
G
10 c 1 Wall(With Openings) H
=0
2 Wells(With Openings) D X
J 1
3 Walls(With Openings)or Ent.Hall Fe-
11 TOTAL BTUH AT 70F TEMP DIFFERENCE'
12 TOTAL BTUH AT DESIGN TEMP. DIFFERENCE K
_— COL.A — _ — COL.B COL.H COL.I COL.J COL.K COL.L TOTAL BTUH TOTAL
OF BUILDING RADIATION
1 ROOM tL AT SELECTED
O H L W H L W H L I W H L I W H L W DESIGN TEMP.-
2 ROOM DIMENSIONS.FT DIFFERENCE
u - -
3 LENGTH EXPOSED WALLS, FT.
41 WINDOW AND OUTSIDE DOOR AREA U.
BTUH BTUH BTUH BTUH BTUH
5 WALL CONSTRUCTION *INCREASE BATHROOM
(Table 9,Llne 3 x H) TOTAL 20%
II TYPE OF GLASS
(Bottom of table used f r Line 51
7 CEILING CONSTRUCTION tFOR CONCRETE FLOOR ON
( GROUND OR FILL AT
Table 9, L x W)
GRADE LEVEL,USE LINEAR
B 1 FLOOR CONSTRUCTIONt FEET OF EXPOSED EDGE
(Table 9,L x W r Lin Ft.)
9 COLD PARTITION CONSTRUCTION
(Table 9,L x H)
10 -c 1 Wall(With Openings) C
2 Wells(With Openings) O J
X
3 Wells(With Openings)or Ent. Hall
11 TOTAL BTUH AT 70F TEMP DIFFERENCE'
12 TOTAL BTUH AT DESIGN TEMP DIFFERENCE
This form Is available fr m The Hydronlcs Institute,35 Russo Place,Berkeley Heights,N J 07922 FORM 1503 1
STANDARD LOAD OUTPUTS
Company Name: AIRE TECH MECHANICAL INC 08-08-90
Block Load v1 .0 Page 1 of 2
Zone Name: smithwhse
City Name HARTFORD, CONNECTICUT Weight - Wall : 30
Latitude (deg) : 42 (lb/sqf t) Roof : 10
Elevation (ft) : 15 Bldg: 30
Indoor -Summer: 75 F 50 RH Color - Wall. : MEDIUM
-Winter: 68 F M Roof : MEDIUM
________________________________________________________________________
TEMP TOTAL TONS RSH TONS CFM
I . JUN at 9 A.M. 75.6 13.05 6.81 3,716
2. JUL at 9 A.M. 78.6 14.24 7.21 3,932
3. SEP at 10 A.M. 75.4 12.80 6.88 3, 753
4. OCT at 2 P.M. 74.0 13.27 7.75 4,228
S. SEP at 3 P.M. 85.4 17. 32 9. 71 5,294
6. JUL at 4 P.M. 90.0 19.96 11 .01 6,005
7. JUN at 4 P.M. 87.0 18.78 10.63 5,798
Heating Load (Btuh)= 121 ,858 w/Infil . = 276,298 Airflow= 5,980 cfm
------------------------------------------------------------------------
ORIENTATION OF BUILDING N S E W RF
TRANSMISSION FACTORS 0.08 0.08 0.08 0.08 0.08
Glass Fac. :0.55 Lights Fluorescent? N Shade Fac. :0.63 Floors: 1
Length: 100 Width: 108 Height: 20 Vent Air Percent : 19
---- - ----------- ------------- ----------------------------
Number
of',people = 108 Sensible people load = 31 ,860
Total lights = 16,200 Lighting load = 55,291
Other electrical = 0 Other electrical = 0
Area of "N . glass = 0 � North glass solar = 0 �
Area of , S glass = ;� 0 South gla5 solar = 0
Area of`'E glass = � 6 East glass, O
Area of W glass = 0 West glass solar = 0
Total glass area = 0 Total glass solar = 0
Total glass _trans. - 0
Area of ,N wall = ~ .2,000 N wall load ., r = 2,080
Area of S wall -2,000 S wall load ' ' - 3,876 .
Area of E wall 21, 160__�. E wall load 2,31
Area of W wall = 2, 160 W wall load -
= 5,410 ,
Total wall area - . 8,320 Total wall tr1ans." = 13,680 `
Area of roof = 10,800y Roof lo_ad 31 ,271 w_
Saf ty factor = ,:0% Safety l s ]S _
Supply fan hp - 15. 6 ' Fan heat gaz6 '(DT)' = 15,815
Ventilation cfm = 1 ,080„ Vent sensi6 e. load
Vent latent load = 24,591
People latent load = 49, 140
Total cfm-std air= " 6,005 Total latent load ; _ _- 73,731''
Room' sensible = 132, 101 Room latent = 49, 140
Plenum return exhaust 0
--> GRAND TOTAL LOAD = 239,468 Btu/hr or 19.96 tons <--
Load run for # 6. JUL at 4 P.M.
Area (sq f t) - 10,800 Sq f t,/ton .- 541
Total cfm-std air= ' 6,005 Cfm/sq f,t - 0.56,
HE TII�q
__________________________________________________________________
Ventilation load = 77,220 Roof heating load = 56, 160
Glass ' heat load = O r Wall heating -load , - 43,264
Infiltration load'""154'p-440 Warm-up load = 0
Slab heating loa_ d7 22,434 Heat load with vent 199 ^ '��
r1t.} ,...w.1 + y _ ":hr,,-.., ,, ar e.�l. rp�yn• .ryy„ram......«.....«! ,r.. ... .-. - i .- ..r-
/ram •'{ t;y'.Gt
i„
N
7
SRECIAL., LOAD OUTPUTS
Company Name: AIRE TECH MECHANICAL 'INC 08-08-90
Block Load v1 .0 Page 2 of 2
N . Type 1 Wall area = 240 N . Type 1 Wall load = 250
S:- Type-' I Wall--area" = °"' ^240 S Type 1 Wall load 465
W. Type 1 Wall area =" ' 564 W.. Type 1 Wall load -- 1 ,403
Tota1 "'wa11,,�''ar_ea �,�p. � . ',�� 1 ,040 Total���,W.all trans. _ : " � 2,117.,
Pa.rtition 'area `560 "" " Total " part: trans 840 _
Ceiling area - 0 Total ceiling trans = 0
Floor area - 0 Total floor trans - 0
A!,-ea of roof = 2;100 'Roof load
- 6-,080
Safety _fac'tor = h, 0% Safety Load -- 0
Evap fan 'So_ rsepower -t; 2.44 Fan heat- gain (DT) - 7,488
Misc sensible = 0 Misc. sensible load - 0
Ventilation cfm = 426 Vent sensible load = '7,036
Misc. latent = 0 Misc. latent load = 0
Number of.. people = 21,•- Pe6p1-6-Patent- load = 4 '305"
Ventilation cfm = 426 Vent. 'latent load - •'`a '-i2�ti`550�`
Total cfm - std ai r = 2,843 - Total, patent load r 169,955
Total room sensible = b:2 , b,40 Total room latent - 4 , 305
__------------------------------------------------------------------___--
Plenum return exhaust credit: -1 ,848
smith
--> GRAND TOTAL LOAD = 104,498 Btu/hr or 8. 71 tons <--
Load run for # 6. JUL at 4 P. M.
Area (sq f t) - 2, 100 Sq.f t per ton - 241
Total cfm-std air = 2,843 Cfm per sq f t = 1 .35
HEATING LOAD
Partition load = 0 Ceiling4load = 0
Ventilation load = 33,775 Roof heating load = 12,096
Floor heating load= 0 Skylight load - 0
Glass heating load= 20,275 Wall heating load = 5,990
Slab heating load = 7,559 Infil heat load - 0
Warm-up load = 0 Heat load w/vent = 79,695
-----------------------.-----______----------------------_---------------
COIL SELECTION PARAMETERS
Coil in (db/wb) = 80.6 / 64.4 Tot sensible load = 87 , 543
Coil out (db/wb)= 52.6 / 51 .8 Total coil load = 104 ,498
Specified room RH = 50% Resulting room RH = 44%
Term air temp �: =55.0/110.0 Degrees rotated = 0
STANDARD LOAD OUTPUTS
Company Name: AIRE TECH MECHANICAL INC 08-08-90
Blo.ck Load v1 .0 Page 2 of 2
Zone Name: smithwhse
COIL SELECTION PARAMETERS
Coil temp enter = 77.7/ 65.4 Total sensible load = 165,737
Coil temp out = 52.6/ 51 .9 Total coil load = 239,468
Specified room RH= 50% Resul�ing room RH = 52%
------------------------------------------------------------------------
Terminal. air temp=55.0/110.0 Degrees rotated = 0
Supply fan static= 3.00 No ceiling return
Building U-factor= 0.08 watts
--------------------------------------------------- ._--------------------
i