Loading...
HomeMy WebLinkAbout100 Bidwell Road (25) 5 Climax Road Avon, Conn. 06001 Ri CONSTRUCTORS, INC. Telephone (203) 677-6464 f0k] Fax (203) 676-8798 March 8, 1990 Mr. William R. Lanning Fire Chief South Windsor Fire Marshall 1175 Ellington Road P. 0. Drawer R South Windsor , Connecticut 06074 RE : Hartford Builders Finish Office Renovation 100 Bidwell Road South Windsor, Ct. Dear Chief Lanning : I would like to take this opportunity to thank you for reviewing and answering my questions regarding the above captioned project . As we discussed , the existing sprinkler system will be utilized in its present state. We will make no modifica- tions . The offices at the perimeter of the east and west ends of the building will have a ceiling height of 10 '-0" . This will allow us to drop the sprinkler heads through the ceiling tile typical of a standard installation. The remain- ing areas will have a ceiling height of 8'-6" . A foamed plastic ceiling will be used as the sprinkler height will retain at 10 ' -0" . (Above the ceiling . ) Enclosed is some technical data on the tiles which we will use at the 8 '-6" ceiling height . Again we thank you for your help. If you have any questions or comments , please do not hesitate to contact me . V - y r ly urs , ohn P. Garoyan Project Manager JPG/cf Enclosure cc: File