Loading...
HomeMy WebLinkAbout1790 Ellington Road (3) 14( TOWN OF SOUTH WINDSOR, CONNECTICU ., �� PLANNING AND ZONING COMMISSION . waft,, APPLICATION FORM App. No. D� Date Received: 1 IMPORTANT! Action O - y= Planning and Engineeri Dej:499bnV require 14 days to det� a i Receipt No. 1. ce pt of P completeness. To ensure receipt of � complete application by PZC, it is strongly recommended that the application be submitted 14 days prior to the Regular Meeting at which it will be received. APPLICANT: Wapping Ccxrmunity Church ADDRESS: 1790 Ellington Road TELEPHONE: 644_Oq- OWNER OF RECORD ON LAND RECORDS: Same ADDRESS: COMPLETE LOCATION OF PROPERTY: 1790 Elling�ton Road: At "5 Cornp-r,, intersection between Sullivan Ave. & Ellington Rd. ZONE RR NAME, ADDRESS & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: Earle H. Smith Jr. Chairman Building Committee Same address as above gcmP TELEPHONE:r,4,dR91_ THIS APPLICATION IS FOR: (Check one of the following) 1. Zone Change to (public hearing required) 2. Subdivision 3 . Open Space Subdivision (public hearing required) 4. hesubdivision (public hearing required) 5. Special Exception to Article (public hearing required) X 6. Site Plan of Development 7. Earth Filling (Section 10) and/or Earth Removal (Section 9) (public hearing required) 8. General Plan of Development 9 . Regulation Amendment: Zoning Subdivision 10. Other (explain in detail) THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY AND SUBMITTED IN TRIPLICATE WITH SIX SETS OF THE MAPS (7 if public hearing is required) AND ,)OTHER DOCUMENTS (see page 2) Applicant Earle h. &nithl Jr. Owner Selena Blackwell Chairman of Building Committee Church President 1/14/87 (see reverse side) TOWN OF SOUTH WINDSOR, CONNECTICUT PLANNING AND ZONING COMMISSION APPLICATION FORM This application is complete and ready for Planning & Zoning Commission receipt only upon submission of all required documentation, including, but not necessarily limited to, the following items. Not all items are required with every application. See applicable sections of the South Windsor zoning and subdivision regulations for specific requirements. APPLICATION CHECKLIST X 1. Key Map X, 2. Architectural Elevations/Floor Plans �C 3. Completed application form (in triplicate) 4. Required fees 5. Zone Change Site Plan Subdivision, Open Space Improve- ment, and/or eneral Plan of Development maps, in accordance with regulations. (Six sets - seven if public hearing required) _x 6. Plans & Profiles/Drainage Calculations �. 7. Conservation Plan 8. Landscaping Plan 9 . Traffic Engineering r+ 10 . Narrative Statement 11. Sanitary Report 12. Copy of agreement to purchase land (if not the owner) 13. Other ALL PROSPECTIVE APPLICANTS ARE URGED TO CONFER WITH TOWN PLANNING DEPARTMENT AND ENGINEERING BUREAU STAFF PRIOR TO SUBMISSION OF ANY APPLICATION TO THE COMMISSION. CONSULT PLANNING DEPARTMENT FOR FEE SCHEDULE. 1/14/87 CHECKLIST REQUIRED INFORMATION SITE PLANS This checklist must be signed by plan preparer (P.E. /L.S . ) declaring that all required information is provided . Items 1-7 are required for all applications ; items 8-11 required where appropriate. Check mark for each item supplies . ✓_ 1 . On each sheet for plans or maps, title block with the following information : a. Name , address and telephone of applicant . b. Name , address and telephone number of Land Surveyor or Professional Engineer . C. Name of Development . d. Date when drawings were made. 2. Key Map : An overall map drawn to a scale of 1 inch equals 200 feet, which can be used as an overlay on Metropolitan District Maps . This map will show the overall design of the Development and surrounding property within 500 feet. a. Data block which gives needed zoning information such as percentage of lot coverage, acreage of tract, number of apartment units, parking requirements , etc. ✓ b . Layout of buildings ✓ C. Layout of streets and parking . d . Lines indicating proposed drainage system with direction arrows. e. Lines indicating sanitary sewer system with direction arrows. f . Names of surrounding property owners . —NA g . Proposed open spaces and recreation areas. h. Driveway cuts on surrounding properties . 3. Architectural Elevations : Plans of the proposed buildings drawn to a scale of 1/8" = 1 ' - 0" showing the elevations of all sides of the proposed buildings in sufficient detail to show architectural styling . ✓ Architect ' s seal on elevations for buildings in excess of 5000 square feet (per CGS Chapter 390) . Page 2 (Site Plans) CSvfZv�Y LAyOVT P[-AHS? ✓ 4 . Plot Plan: A layout map of the proposed site drawn to a scale of 1 inch equals 40 feet on either of the following size sheets: ( 1) 24" X 36" with a 3/4" ruled margin ; (2) 18" X 24" with a 1/2" ruled margin , containing the following data: a. Distance and bearings of all boundary lines and acreage of site. Iron pins required at all property angle points and shown on map. Je*I Ve s ✓ b. Proposed s - ee 5 tree ts ___ LL ter st-"*""'s- -Irv®-4,aZ-a-t and parking spaces . ✓ C. Building lines in accordance with zoning regulations. ✓ d. Proposed buildings and other structures, including signs, outside lighting, and dumpsters (on concrete pad and screened) 500 f,4AP4 ✓ e. Easements, noting grantors , grantees , and purpose. ✓ f. Names of abutting property owners . g . Monuments will be indicated at corners and angles of all streets and at all points of curvature and tangency. In areas accessible to Metropolitan District Commission points , or other coordinated points, the monumented points within proposed site shall be coordinated . These coordinates shall appear in tabular form on the plot plan. The accessibility of these MDC points shall be determined by the Town Engineer. N A h. All open space or other common or public land uses shall be indicated . ✓ i. A-2 certification ; P .E. /L.S . Seal . V/ 5. Topographic Map : A map drawn to a scale of 1 inch to 40 feet on sheets not exceeding 24 inches by 36 inches , including ruled margins shall in addition to the requirements of the plot plans show the following: ✓ a. All existing and proposed buildings . b. Curb lines and pavement width, sidewalks. C . Existing and proposed sanitary sewers . d. Existing and proposed water systems . e. Present wooded area indicated by foliage lines . Any individual trees to be saved should be shown . . _ Page .3 (Site clans) Lf . Existing and proposed contours shall be shown in not less than two-foot intervals , but in cases of relatively level land , the contours shall be one-foot intervals and spot elevations . v g . Regulated wetlands and 100-year floodP lain or note / that none are present. �/ h. Proposed storm st m drainage s h g system, showing all catch basins, endwalls , manholes , lengths and sizes of pipes. (Minimum distance between catch basins shall be 300 feet and minimum size of storm drain lines shall be 15 inches . ) NA i. Connections of all springs into proposed storm drainage system as needed. j . Location and indications of existing brook channels, and 100-year flood limits. V k. A-2 Certification; P.E. /L.S, Seal. 6. Landscaping plan. _ 7. Drainage calculations - Zero Runoff Increase per attached guidelines . . g ��f/of �o s s��It/scG ♦yarY�- 8. Traffice�-f- Nit 9. Plans and Profiles: A plan and profile of the proposed streets drawn on plan/profile paper of scales 1 inch to 40 feet horizontally , and 1 inch to 4 feet vertically on sheets not exceeding 24 inches by 36 inches , including ruled margins and containing the following: _ a. Layout of streets in sections coordinated by stations with the profile . b. Street plan showing roadways and drainage. C. Sight line at driveway & street intersections. d. Profile of roadway showing existing and finished grades . Roadway profile will show all tangent grade and all vertical curve information . e. Profile will show all catch basins and all drainage lines between catch basins with all invert and top of frame elevations. Drainage lines will be shown and described as to material . f . Where any storm drainage line discharges into an existing brook sufficient profile of this brook will be shown to determine conditions . g. Metropolitan District Commission datum shall be used on all sites accessible to these controls . The Town Engineer shall , based on standard engineering practices , determine the accessibility of these controls . - - - Page 4 (Site Plans) h. Profiles shall show all sanitary sewer lines and : manholes , including elevations , sizes, lengths, and slopes of pipes. Top of foundation elevations for building shall be shown. IVA 10. Open Space Site Improvement Plans: For sites which require or include a provision for open spaces, a plan which contains data for site improvement may be required. This map shall be drawn to a scale of 1 inch equals 40 feet. /UA 11 . Sanitary Report: Where individual sanitary sewage disposal systems are proposed, the final plans shall include a Sanitary Report certified by a Professional Engineer. The report shall demonstrate the feasibility of the proposed individual systems; the report should deal with the area as a whole, discussing the following points: a. General nature and development of surrounding area. b. Topography and natural drainage pattern. C. Subsurface conditions as shown by subsurface investigation, including soil absorption characteristics, ground water level conditions, ledge rock, and general nature of soil . d. General description of type of development contemplated. e. Detailed description of proposed sanitary sewage disposal facilities, indicating sizes for various ground conditions , materials to be used, and the general layout pattern to be used, etc . f . Special precautions that may be necessary to provide proper functioning of the proposed disposal systems. g. Map of general area with locations of all tests shown on proposed layout . h. Flood heights of any nearby streams, brooks, or rivers . i. Test results and engineering evaluation per Section 4. 13. 5. All information required above is included in this application at the time of submission. PLA.1 PREPARER P.E. L. . Novem er , 1987 EASEMENT For good and valuable consideration described hereinafter, We, FRANK N. CAVALIERE and CHERYL A. CAVALIERE, of the Town of South Windsor, County of Hartford and State of Connecticut, hereinafter called the Grantors, hereby grant unto the Wapping Community Church, Inc. , hereinafter called Grantee, a full and perpetual drainage easement 'under, over and across land of the Grantor, situated in the Town of South Windsor, County of Hartford, State of Connecticut, located off the easterly side of Ellington Road, and shown on a map entitled, "Layout Plan, Wapping Community Church, .Earle H. Smith, Jr. , Chairman, Building Committee 644-0933, 1790 Ellington Road, South Windsor, Connecticut 06074, Scale 1"=401 , March 1 , 1988, Fuss & O'Neill, Inc. , Consulting Engineers, Manchester Connecticut. " The within granted easement is described as follows: Commencing at a point located on the westerly boundary of the property of the Grantors herein, which point is located ninety-two and twenty-two one-hundredths (92.22) feet from the southwesterly corner of property of the Grantors herein; thence running easterly a distance of twenty-five (25.0) feet; thence turning and running northerly a distance of twenty ( 20.0) feet; thence turning and running westerly a distance of twenty-five (25.0) feet to a point on the western boundary of the property of the Grantors herein; thence turning and running southerly a distance of twenty (20.0) feet along the westerly boundary of the property of the Grantors herein, to the point of beginning. And the Grantors further grant unto the Grantee a full and perpetual right and privilege to enter upon the said premises by its officers, employees, servants and agents, for the purpose of constructing, building, maintaining, cleaning, repairing, reconstructing and inspecting at all times, a drain or pipe, with appurtenances thereto, upon, over, under and across said easement. In consideration thereo,f,,the Grantee agrees to supply and install materials to overlay the Grantor's driveway at 1833 Ellington Road, South Windsor, as full consideration for the herein-described easement. The overlay shall consist of approximately 2450 square feet of bituminous concrete mixture at an approximate depth of one and one-half ( 1 1/2) inches. The overlay will be applied by the Grantee or its agents, servants, or employees. Grantee agrees to -furnish and install said paving materials when the Grantee is P 9 paving the new , parking lot for the proposed Wapping Church Community House. The Grantee agrees to restore the land within said easement to its present condition, commensurate with the use of the above-described land, and to similarly restore the land at any time that it is necessary to disturb the surface thereof r in connection with servicing, repairing, or replacing said pipe or drain, and to restore and repair any other adjoining property of the Grantors herein which is specifically damaged by the drainage running off from or out of the above- described pipe, drain or any other aspect of the Grantee' s drainage system. This easement shall not run with -the land and is specifically limited to the Grantee rather than. its successors and assigns. The parties agree that the granting of said Easement and Grantee' s agreement to furnish and install paving materials is contingent upon the Grantee' s decision to construct said Community House. ,, The word "Grantors" shall include heirs, executors, administrators, successors and assigns where the context so require or permits. TO HAVE AND TO HOLD the above-described premises unto it , the said Grantee. IN WITNESS THEREOF, the Grantors have hereunto set their hands and seals this. 14h day of May, 1988. Signed, sealed and delivered in the presence 1v&,c-771F r . rA ci9SCrG RANK N. C VALIERE 1 L 7 A-)AA Trt T; r..9 xo Selo CHERYL CAWALURE �ch .T aeiqScja STATE OF CONNECTICUT ) COUNTY OF HARTFORD ) South Windsor, May; 1988 Personally appeared FRANK N. CAVALIERE AND CHERYL' A. CAVALIERE, signers and sealers of the foregoing instrument and acknowledged the same to be their free act and deed, before me. r v /(.J/t f TTt / • 7 /9Ro4a, () Notary Public/ ' t • /�� �C�rnrn,sS,ar� cc-' Grantee' s Mailing Address yiue,�, V-3ijq1 l� /I r- TRAFFIC IMPACT STUDY `BONE CHANGE r WAPPING COMMUNITY CHURCH PROPERTY WAPPING FIVE CORNERS SOUTH WINDSOR, CONNECTICUT r-- r PREPARED FOR : DONALD W. FISH SURVEYORSENGINEERS ARCHITECTS PLANNERS SOIL STS . . . • ARCHITECTSENVIRONMENTAL CONSULTANTS r STORCH ASSOCIATES t� t� _ f TRAFFIC IMPACT STUDY in connection with Zone Change from Zone RR - RC, Restricted Commercial Wapping Community Church Wapping Five Corners South Windsor, Connecticut Prepared for Donald W. Fish Prepared by STORCH ASSOCIATES 161 Main Street Wethersfield, Connecticut 06109 February 4, 1988 STORCH ASSOCIATES TABLE OF CONTENTS Page I. INTRODUCTION. . . . . . . . . . . . 1 Drawing No. 1 - Area Location Drawing No. 2 - Site Location Drawing No. 3 - Site Plan - Office Building Drawing No. 4 - Site Plan - Drive-In Bank II. EXISTING TRAFFIC CONDITIONS . . . . . . . . . . . . 4 A. Site Description and Roadway Geometrics. . . . 4 B. Existing Traffic Volumes . . . . . . . . . . . 6 Table I _ C. Roadway Safety . . . . . . . . . . . . . . . . 7 III. TRAFFIC IMPACT OF PROPOSED FACILITY . . . . . . . . 8 Table II Table III Drawing No. 5 - Directional Distribution - A.M. PK. Drawing No. 6 - Directional Distribution - P.M. PK. IV. CONCLUSION. . . . . . . . . . . . . . . . . . . . . 10 APPENDIX Accident Records Traffic Volume Data Capacity Analysis STORCH ASSOCIATES I. INTRODUCTION This report details the analysis and findings of a traffic impact study which was undertaken in connection with the proposed zone change from zone RR to RC at the northwest corner of the Five Corners intersection in South Windsor, Connecticut. The purpose of this report is to document the probable traffic impact of the proposed new land use and to ensure safe traffic operation subsequent to the completion of the project. This report analyzes both the general office and the drive-in bank land uses which are the most probable use of the site. The existing building will remain in any case. See Drawing No. 1 for the area — location, Drawing No. 2 for the site location, and Drawing No' s. 3 & 4 for the site plans (3 for office, 4 for drive-in bank. ) The scope of the study effort included: 1. traffic observations; 2. placement of traffic recording devices on major streets; 3. obtaining count data and accident data statistics -- from the State of Connecticut Department of Transportation (ConnDOT) for estimation of future traffic generation; 5. performance of capacity analysis; and 6. review of internal site circulation. In order to clarify the meaning of certain specialized _ traffic engineering terms which may be used in this report, the following definitions are offered: Trip is a one-way movement to or from a site. One car entering and leaving a site constitutes two trips. — 1 son IIIIII do oils 4p '(CD off vk�V.., D.W. FISH COMPANY COMMERCIAL DEVELOPMENT 00 SOUTH WINDSOR, CT I AREA LOCATION MAP MONO STOR 161 MAIN STREIT ASSOCIATES WIT SFIF L.D,CT 06,09 i '—' a ,� ♦4�/ \•!• so i 3 Sco` � / t � [IIIMGT RW10 V ' t O4+ .yo , 0 J J/ `4 w v MpNEG�� 1 SITE LO ' 0 0 D.W. FISH COMPANY COMMERCIAL DEVELOPMENT SOUTH WINDSOR CT VALt: NOT TO SCALE SITE LOCATION onr�rK By: + ! c"ec»n: STORCH is, maim sr*aT ASSOCIATES MARCH 19e8 n�T110�sIRLa�CT Os10'! per, NO. 2 f�. I I . I ` dip ' I 0 1 I I a 1 b 1 � I �O I G � ± 4200 S.F. � I O I � � 13 f- 2 I •, \ 1 o 1 I I V 1 I \ I \ i I 1 1 - - -- -- -- -- ELLINGTON ROAD ( ROUTE 30 ) J D.W. FISH COMPANY COMMERCIAL DEVELOPMENT SOUTH WINDSOR CT SITE PLAN NOT LTO SCALE OFFICE BUILDING DRAMIN BY: E.K. CHOCKEp BY: STORCH 161 MAIN STREET DATE: MARCH 1988 ASSOCIATES NETHERSFIELD.CT 06109 ovi NO. 3 1 . 1 1 , I , I I � 1 I 5 Q , I O , I I 1 a < b . a -G I �G 1 I � I � 1 I 4,100 0± s J • C.� I v I I I I cs J I , 1 1 J ELLINGTON ROAD C TE. 30 ) J JD.W. FISH COMPANY COMMERCIAL DEVELOPMENT SOUTH WINDSOR CT. JSITE PLAN NOT TO SCALE BANK DRAWNN: C Q^u cwcl®my: J STORCH 161 MAIM STREET DAT JWFE: MARCH 1986 ASSOCIATES I METNERSFIELD,CT 06109 DWS. MO. 4 STORCH ASSOCIATES Traffic Generation is the actual number of vehicle movements which may reasonably be expected to be attracted by a specific development. Usually, traffic generation is expressed as a number of trips. Average Daily Traffic (ADT) is the total traffic generation of a development on a typical working weekday. Note: These are also one-way movements so the actual number of vehicles is half the ADT generated. Peak Hour Generation is the maximum traffic generation which may be anticipated during the highest volume hour for the particular land use. This analysis parameter may vary as to the time of day, depending on the type of facility proposed. Commercial development normally generates peak volume rates which coincide with the peak volume rates of the surrounding roadway network. Trip Distribution is the process of determining the proportions of the generated trips that can be expected to originate or terminate at any location normally based on the populations and census data available as to trips to work or trips to shopping depending on the land use which is analyzed to provide a percentage of traffic which can be expected to originate from each location, plus the percentages of traffic arriving from each location are determined the most probable route is used to determine the percentage of such generated traffic using each approach to the site. _ 2 STORCH ASSOCIATES Traffic Assignment is the process of assigning the trips which have been distributed from the various points of origin to the roadway system which would provide the most direct route between the points of origin and destination. Capacity and level of Service (LOS) are terms utilized to describe the ability of a roadway intersection to handle its traffic assignment. Level of Service (LOS) at signalized intersections such as those involved in the present study are defined in terms of average vehicular delay time. Definition of LOS vs. average delay time is given in the 1985 Highway Capacity Manual (Special Report 209) and is shown below in the following table: LEVEL-OF-SERVICE CRITERIA FOR SIGNALIZED INTERSECTIONS Average Stopped Delay Expected Delay Level of Service per Vehicle (sec) Due Average Vehicle A < 5. 0 Little or no delay B 5.1 to 15.0 Short traffic delays C 15.1 to 25.0 Average traffic delays D 25.1 to 40.0 Long traffic delays _ E 40.1 to 60.0 Very long traffic delays F > 60.0 Over-capacity Reference: Table 9-1 of the 1985 Highway Capacity Manual. Capacity calculations in this report have utilized the FHWA Software named the Highway Capacity Software distributed by McTrans in Florida. 3 STORCH ASSOCIATES II. EXISTING TRAFFIC CONDITIONS A. Site Description and Roadway Geometrics The proposed site consists of 0. 64 acres of land which presently contains a structure which is an annex building to the Wapping Community Church. However, the church has decided that the use of the annex building is no longer desireable and is planning to do an expansion on the site of the main church location. It is an irregularly shaped quadrangle with parallel top and bottom sides and skewered left and right sides. The site is bounded by three roads: the northeast side is bounded by Sullivan Avenue, the northwest side is bounded by Community Road and the southern side by Ellington Road. The site borders two legs of the five corners intersection in South Windsor. It occupies the northwest fifth of that intersection. The five corners intersection is comprised of Ellington Road which becomes Oakland Road to the east of the intersection, Buckland Road south from the intersection and two southbound approaches which consist of Sullivan Avenue and Ellington Road. The mainline road of Ellington Road/Oakland Road is also known as Connecticut Route 30. Ellington Road in this area is a modern bi-directional roadway with an approximate 40 foot cross-section with two 15 foot lanes with 5 foot shoulders provided. The posted speed limit is 40 mph in the vicinity of the site. -- 4 STORCH ASSOCIATES Buckland is also a modern two lane roadway with a 40 foot — cross-section and a posted speed of 35 mph. Sullivan Avenue and Ellington Road are both modern roadways with 40 foot cross-sections with 15 foot travel lanes, 5 foot shoulders and posted at 35 mph. Buckland Road has the same cross-section as Ellington Road on the eastbound approach. The five corners is controlled by a traffic signal. Proper lineage is provided on Ellington Road at the intersection where it widens to a two-lane approach, where a left lane is provided for vehicles turning left to Sullivan Avenue or left to continue on Ellington Road and the right lane is for through traffic and vehicles turning right onto — Buckland Road. Similarly, Oakland Road approaching westbound has the right lane for turning movements right onto Sullivan Avenue or right onto Ellington Avenue and a left lane for turning movements left onto Buckland Road or through movements to Ellington Road. Sullivan Avenue and Ellington Road both have single lane approaches with all movements made from a single lane while Buckland Road provides for a left turn lane and a through right lane. Community Road is commonly used by vehicles turning left from Ellington Road onto Sullivan Avenue and vehicles making the reverse movement from Sullivan Avenue right to Ellington Road. Continuing north on Sullivan Avenue, are the Town Hall and Library on the right side of the road in the immediate vicinity of the proposed site. North of there, Sullivan Ave. intersects _ 5 STORCH — ASSOCIATES Sand Hill Road at a T-intersection, and continuing north Sullivan Avenue becomes Graham Road in the vicinity of the South Windsor High School and the Wapping Elementary School and Community Center. The general land use in the area is residential with a _ few scattered commercial uses. On the south side of Ellington Road at the five corners intersections there is a 24-hour bank and also a drive-thru bank. South on Buckland Road there are some small commercial land uses with a small strip shopping center and also residential land use. Continuing further south, Buckland Road intersects with I-84 where I-84 provides a full interchange supplying separate ramp movements for each desired movement, both eastbound and westbound and entering and exiting the highway. Traveling north on Ellington Road there are primarily residential land uses with various T-intersections and four-way intersections with an occasional traffic signal. Continuing east on Oakland Road, Route 30 is primarily residential, and continuing approximately four miles it intersects Route 84, again with full ramp movements provided. West of the site on Ellington Road, land use is primarily residential with a few small business uses and a few restaurants. B. Existing Traffic Volumes _ Points of traffic volume data acquisition include: Community Road adjacent to the site drive and Sullivan Road north of Community Road, Ellington Road west of Community Road, Buckland Road south of Five Corners, Route 30 east of Five 6 STORCH — ASSOCIATES Corners, and Ellington Road northeast of Five Corners. A tabular form of all pertinent traffic volume information appears in Table I and is summarized below. The following is a description of the first entry in Table I (the following entries can be interpreted in a similar manner. ) The 1988 Storch Associates 24-hour machine traffic count data for Community Road was recorded at a location on Community Road midway between Sullivan Road and Ellington Road. The bi-directional average daily traffic was recorded at 1700 ( 600 northbound & 1100 southbound. ) The AM and PM peak hour bi-directional counts were 200 (49 northerly, 151 southerly) and 150 (68 north, 82 south) , respectively. C. Roadway Safety In order to fully assess the safety characteristics exhibited by Community Road in the vicinity of the site, the latest available ConnDOT accident statistics (July 1, 1984 - June 30, 1987) were obtained for the full length of Community Road between Sullivan Avenue and Ellington Road. During the three year period of no accidents occurred in the above defined area. The accident rates and types of accidents were analyzed for the intersections of Community Rd. with Sullivan Avenue and with Route 30. These accident rates are not considered excessive (see Appendix for details. ) — 7 TABLE I 24-Hour and Peak Hour Machine Count Data Location ADT A.M. Peak P.M. Peak *Community Road 19700 200 150 (600 NB, 1,100 SB) (49 NB, 151 SB) (68 NB, 82 SB) Route 30 - West of Community Road 109600 997 12019 Route 194 - Northwest of Community Road 149600 19055 19234 Route 74 - Northwest of Route 30 79200 647 756 Route 30 East of Route 74 139000 977 19222 Buckland Road South of Route 30 13,100 935 19161 * Counted by Storch Associates in March 1988 All others - ConnDOT, March 1987 STORCH ASSOCIATES III. TRAFFIC IMPACT OF PROPOSED FACILITY In order to determine traffic impact on an area due to a particular land use, several factors must be considered: 1. total site generated traffic volumes; 2. the directional distribution of site generated traffic; and, 3. the ability of adjacent roadways to accommodate additional new traffic volumes. Traffic volumes generated by the proposed new land use were determined through the utilization of the Institute of Transportation Engineers (ITE) 1987 Trip Generation Manual. Using software prepared by MicroTrans which incorporated all of the equations and generation rates found in the 1987 manual, the trip generation rates were calculated. The results of the ITE traffic generation calculations are presented in Tables II and III. Table II represents the average generation rates and driveway volumes expected from 4,200 square feet of office space. Table III represents the number of generated trips expected from 41100 S.F. drive-in bank. As indicated above, the proposed new facility will generate relatively small volumes in comparison to -- the adjacent roadway system. The directional distribution of site generated traffic was determined using the CRCOG journey to work statistics with South Windsor as the place of work. From the CRCOG statistical information it was determined that 9% of the workers at the new land use will arrive from the east, 26% will come from the west, 13% will come from the north and 17% will come from the south. Approximately 26% of the workers live and work in South Windsor and 9% of workers reside outside of the 8 TABLE II _ 4844 SUMMARY OF TRIP GENERATION CALCULATION FOR 4.2 ,000 GR.SQ.FT. OF GENERAL OFFICE 02/01/88 ------------------------------------------------------- DRIVE AVERAGE ADJUSTMENT WAY RATE FACTOR VOLUME ------------------------------------------------------- AVG WKDY 2-WAY VOL 30.30 1 .00 127 7-9 AM PK HR ENTER 2.72 1 .00 11 7-9 AM PK HR EXIT 0.41 1 .00 2 7-9 AM PK HR TOTAL 3.12 1 .00 13 4-6 PM PK HR ENTER _ 0.54 1 .00 2 4-6 PM PK HR EXIT 2.83 1 .00 12 4-6 PM PK HR TOTAL .9.37 1 .00 14 -------------------------------------------------------- SATURDAY 2-WAY VOL 2.93 1 .00 12 PK HR ENTER 0.17 1 .00 1 PK HR EXIT 0.15 1 .00 1 -- PK HR TOTAL 0.32 1 .00 1 SUNDAY 2-WAY VOL 0.93 1 .00 4 PK HR ENTER 0. 18 1 .00 1 PK HR EXIT 0. 14 1 .00 1 PK HR TOTAL 0.33 1 .00 1 -_.----------------------------------------------------- Note: A zero rate indicates no rate data available ' The above rates were calculated from the following equations : Avg. Wkdy 2-Way Vol . : Ln(T) = 0 .75Ln(A) + 3.77, R'2 - 0.85 7-9 AM PK HR Total : Ln(T) = 0 .86Ln(A) + 1 .34 R'2 = 0.92, 87% Enter , 13% Exit 4-6 PM PK HR Total : Ln(T) - 0 .83Ln(A) + 1 .46 R'2 = 0.868 16% Enter, 84% Exit Sat . 2-Way Vol . : Ln(T) = 0 .90Ln(A) + 1 .22, R'2 = 0.58 Sat. PK HR Total : T = ( (3. 17/A) - 0.0046) '-1 R42 = 0 .86, 54X Enter, 46% Exit Sun. 2-Way Vol . : Ln(T) = 0.98Ln(A) - 0 .04, R42 = 0.52 _ Sun. PK HR Total : T = ( (2.84/A) + 0 .048) '-1 R'2 = 0 .768 56% Enter, AA% Exit Source: Institute of Tran port<<tion Engineers Trip Generation , 4th Edition, 1987. TRIP GENERATION BY MICROTPANS 444 TABLE III SUMMARY OF TRIP GENERATION CALCULATION FOR 4. 1 TH.GR. SQ.FT. OF DRIVE.--IN BANK 03/15/B8 ----------------------------------------------------------- DRIVE AVERAGE ADJUSTMENT WAY RATE FACTOR VOLUME ------------------------------------------------------- AVG WKDY 2-WAY VOL 249.60 1 . 00 1023 7-9 AM PK HR ENTER 3.75 1 . 00 i5 -- 7-9 AM PI< HR EXIT 2.83 1 .00 12 7--9 AM PK HR TOTAL 6.50 1 . 00 27 4-6 PM PK HR ENTER 17.28 1 .00 71 4-6 PM PK HP EXIT 17.99 1 . 00 74 4 6 PM PK HPI TOTAL 35.27 1 .00 IA5 SATURDAY 2--WAY VOL 8.20 1 .00 34 PK 1•413. ENTEP 10.4H 1 . 00 43 PI< HR EXIT 10.48 1 .00 43 PK HR TOTAL 20.96 1 . 00 86 - SUNDAY 2--WAY VOL 11 .51 1 .00 47 PK H174 ENTER 1 .91 1 .00 e PI< Hr,' EXIT 1 .50 1 .00 6 PK HP TO*rf`,I.., 3.41 1 . 00 14 --------------------------------------------------------------- Note: A zero rate indicates: no rate data available The above rates were calculated from these equations : 24-1-•ir . 2--Way Volt.tme: LN(T) _ .A/-ILN(X) + 6.310 R'2 .247 -- 7--9 AM Peak Hr. Total : T = 6. 09(X) + 2 R'2 = .598 , .57 Enter , .43 Exit 4-6 PM Peak Hr. Total : T =- 12.59(X) + 93 R'2 = .356 , .49 Enter , .51 Ex:it AM Gen Pit Hr- . Total : T = ( .013/X + .0044) '--1 P*2 = .331 , .51 Enter, .A9 Exit PM Geri Plc Hr- . Total : T = 17.73(X) + 94 R'2 = . 601 , .5 Enter , .5 Exit Sat. 2-••W,:t.�;) Volt.tme: T = t .04/X + .02) '-1 , �R'2 .= .025 Sat . Plc Hr . Total : T = 24.3*7(X) + -14 R'2 = •78 , .5 Enter- , .5 Exit Sun . 2-Way Volumra: LN(T) = .91LN(X) + 2.57, R'2 = . 154 SLtrn . Pit Hr . Total : T =- -8-36/X + 16 R12 = . 113 , .56 Enter, .AA Exit SOUrce: Institute of Transportation Engineers Trip Generation, qth Edition , 19e7. TRIP GENERATION BY MICROTRANS STORCH ASSOCIATES capitol region. Assigning the above percentages to routes which a commuter would logically traverse results Drawing No' s. 5 and 6 which show the A.M. and P.M. peak hour directional distributions, respectively. Through the utilization of the directional assignments as well as the previously described site generated traffic and area street traffic, it was possible to develop the traffic flow diagrams for the driveway intersection with Community Road and also for Community Road at Sullivan Ave. and at Rte. 30. The traffic flow diagrams were prepared using the above information to develop present background traffic volumes, future 1990 background traffic volumes, site generated traffic and 1990 combined traffic (future background plus site generated traffic) . Note, for ease of analysis, all traffic is assumed to use Community Road. This is a conservative estimate. Level of Service calculations for 1990 combined traffic volume conditions at the site driveway intersection with Community Road were carried out through the utilization of the FHWA HCS software. The HCS software was designed in accordance with the 1985 Highway Capacity Manual. The capacity analysis was done using a worst case scenario, i.e. using P.M. peak hour volumes (the critical peak) with the drive- in bank generator of traffic (higher generation rate than the office building) . Thus, A.M. results or -- an office use would result in bettter Levels of Service. The 1990 Level of Service rating for the PM peak period was found to be at A for the site drive at Community Road. The Level of Service provided at the 9 STORCH ASSOCIATES intersections of Community Road at Sullivan Ave. for the P.M. peak hour was at Level of Service A except for lefts out of Community Road which was D/E due to the heavy southeast bound flow on Sullivan Ave. Community Rd. at Rte. 30 will operate at Level of Service A including the addition of the site traffic. IV. CONCLUSIONS Upon careful review of existing data and projected future conditions, we have determined that no materially adverse traffic impact will occur as a result of the zone change. The anticipated site generated traffic volumes were conservatively estimated. The 1990 Level of Service for the site driveway intersection at Community Road was determined to be Level of Service "A" during the AM and PM peak periods. The L.O.S. at the Community Rd. intersections with Sullivan Avenue and with Rte. 30 were not decreased. Site distances measured at the proposed driveway from a point 15 ft. east were found to be adequate. The review of the latest three-year accident history of Community Road in the vicinity of the proposed site driveway has revealed no major geometric deficiencies. Roadway geometrics adjacent to the site driveway will be improved as a result of the completion of the new facility. The internal traffic circulation and turning radii for the proposed site driveway have been reviewed and have been found to be in accordance with ConnDOT standards. We are recommending that a right turn in right turn out traffic flow be designed and encouraged by proper striping and lineage for Community Road and Route 30. Due to the fact that during AM 10 • f' ..1\Qi 1♦ �I � 1 4 4� S i s � � W •� 4e 1 bo o tuM+Sn tA% I — � sa►o 8 � Oii fho �/ h 0`0 .1 4� fie Al y Arp HE�aA n 4 a i 22 ojO D.W. FISH COMPANY COMMERCIAL DEVELOPMENT SOUTH WI N DSOR CT — DIRECTIONAL DISTRIBUTION OF wa�'scaLE SITE GENERATED TRAFFIC =A �, A.M. PEAK HOUR E.K. TO H CMecm my: ASSOCIATES MARCH 19aB 11�T1�Ot:IRL�,CT Oa10'! s I �h C4 �• • Rpr t . � ♦�` •, off f0'0 `0 e � IV 19 r pd. I I � tILM+:T ROAD� s Off �L or 'M'���c��ti� \ 04 w 1O • � *i 1 ME�•TA R `+ • O • 2S • D.W. FISH COMPANY �. COMMERCIAL DEVELOPMENT i SOUTH WINDSOR CT DIRECTIONAL DISTRIBUTION OF _ KALZ SC c SITE GENERATED TRAFFIC oOT TK. AU P.M. PEAK HOUR E. ' ! cma W.,my: ' STORCH lot uAlm VT*C" i.w.F. MARCH rese ASSOCIATES cr osW ows. ao. STORCH ASSOCIATES and PM peak periods traffic from the Five Corners intersections backs up beyond the intersection of Community Road at Ellington Road which makes completing a left turn from Community Road to Route 30 difficult at best. It is recommended to limit the traffic flow from Community Road at Route 30 to right turns only during peak periods of operation. We also would recommend that — for the drive-in bank case, the Route 30 drive be exit only (to prevent blockage of the drive due to the drive-up window) and that it be right turn out only. For the office case, we recommend a left turn out restriction. We, therefore, conclude that the new land use at the Wapping Community Church property will not have a negative traffic impact on the available Level of Service on area roadways and with the preclusion of left turns from Community Road and from the Route 30 site drive during the peak periods would not endanger the public safety. — 11 APPENDIX I I I I 1 I I I I { I 1 ► I 1 I i I I r � f � CCNNECTICUT DEPARTMENT OF TRANSPORTATION ACCIDENT EXPERIENCE f TOWN OF S 4IV0SO4 ROUTE NL,48:R 30 LOCATION 004.00 JC4.5C PREPARED 02 L9 Sd PERI00 FRO" 07 01 84 TO C6 3U 87 MON OA LIGHT SURF COLLISION INJURIES RAMP TOT MILEAGE ALPHA JESC41PTION OF AZC. LOCATION RJ6Y. FACT. CASE I DAY TH TE YR HOUR CONC CCNO WEATh TYPE K A 6 C TYPE INJ 1 004.10 .1 MI S OF COM►'UNITY RO Mk AT COMM ORVE 114142 aED APR 17 85 1215 OAYLT DRY CLEAR TURN-INTS ORV4 UNABLE TO CODE W/CONO, ORV'l LCST CJAT S3 AUTO PAS VEH TURNING RIGHT FROM PROPER LANE E3 AUTO PAS STOPPc:O FOR TRAFFIC T �004.11 SJO FT S OF COMMUNITY RJ Pit NONE 025370 TUE JUN 30 87 1711 DAYLT DRY CLOY REAR ENO DRIVER FOLLOWING TOO CLOSE Nd AUTO PAS VEHICLE GOING STRAIGHT ( Nd AUTO PAS STOPPED FOR STOPPED VEHICLE N3 AUTO-S: STUPPEC FOR TRAFFIC ( `L004.11 5JO FT S OF COMMUNITY RO PK NONE 126361 TUE JUN 30 87 1745 DAYLT WET RAIN REAR END DRIVER FOLLOWING TOO CLOSE Sd AUTO PAS VEHICLE GOING STRAIGHT S3 AUTO PAS STOPPEC FOR TRAFFIC 4,004.16 .1 MI S OF allCKLAND RD ES AT PVT DRIVE 031357 WEO AUG 15 84 1730 OUSK DRY CLEAR TURN-INTS DRIVERS VIEW 08STRUCTrJ N9 AUTO PAS VEH TURNING LEFT FROM PROPER LAVE Ed AUTO PAS VEHICLE GOING STRAIGHT NOO4.16 .1 MI S OF 4T 194 E RT 74 PC AT PVT DRIVE 063281 THU APR 17 86 1539 DAYLT 07Y CLOY TURN-INTS DRIVER FAILED TO GRANT RIGHT OF WAY W8 AUTO PAS VEHICLE TURNING LEFT FROM DRIVEWAY N3 AUTO PAS VEHICLE GOING STRAIGHT l C �-004.16 2JO FT S OF COMMUNITY R7 JN NONE 133969 SUN SEP 07 86 UlOO DARK/'W ORY CLEAR FIXED OBJ DRIVER UNIJE4 THE INFLUENCE 1 S3 AUTO PAS VEHICLE GOING STRAIGHT ( STRUCK HGHWY SI3N OFF AD RIGHT �00w.17 C.1 MI S OF RT 74 JN NONE 060664 MON MAR 02 87 2332 DARK/'W ICE CLEAR FIXED 09J DRIVING TOO FAST FOR CCNOITIONS S3 AUTO PAS VEHICLE SKIDCING IN ROA06AY STRUCK( DITCH OFF RO RIGHT ( ( l � ( I I I I ► ! I I I i I ! 1 I I 1 I { 1 CONNECTICUT DEPARTMENT OF TRANSPORTATION ACCIDENT EXPERIENCE TOWN OF S aINCSC,t RC'JTE NL44E"R 30 LOCATION C04.00 004.50 PREPAR=D 02 29 63 PE,7100 FROM C 7 01 84 TO, C6 30 87 MON OA LIGHT SURF COLLISION INJURIES RAMP TCT MILEAGE ALPHA JESCRIPTICN OF ACC. LOCATIOA RDWY. FACT. CASE is DAY Th TE YR HOUR CCNO CCNO WEATH TYPE K A B C TYPE IAJ 004.20 INT COMMUNITY R) JN TN RD UNDIV') 009504 THU MAR 21 85 1645 DAYLT DRY CLEAR TURN-INT$ DRI`dER =A ILEO TO ;RANT EIGHT OF WAY E3 AUTO PAS VEH TURNING LEFT FROM PROPER LANE Sd AUTO PAS VEHICLE GOING STRAIGHT 004.2C INT COMMUNITY RO PA TS RD UNDIVO 049026 MON DEC 22 86 0732 DAYLT C?Y CLEAR TUBA-INTS DRIVER FAILEC TO GRANT RIGHT OF WAY E3 TRUCE( ST VEH TURNING RIGHT FROM PROPER LAAE 53 TRUC44 ST VEHICLE GOING STRAIGHT r1004.20 IvT OF COMMUNITY Ru PC TN ND UNDIVJ 06535d FRI MAY 17 85 1540 DAYLT DRY CLOY TURN-INTS CRIVER FAILEC TO GRANT RIGHT OF WAY WS AUTO PAS VEH TURNING LEFT FROM PROPER LANE NJ AUTO PAS VEHICLE GOING STRAIGHT 1 �004.20 AT COMMUNITY RD JN AT PVT DRIVE 07945S FRI NOV 14 86 1446 DAYLT DRY CLEAR ANGLE DRIVER FAILED TO GRANT RIGHT OF WAY W9 AUTO PAS VEHICLE GOING STRAIGHT - - - 1 1 58 AUTO-Sr VEHICLE GOING STRAIGHT 004.20 INT COMMUNITY RI PK TN RD UNDIVO 082716 TUE DEC 31 85 16ZC DUSK DRY CLEAR TURN-INTS DRIVER :A ILEO TO GRANT RIGHT OF WAY � E3 AUTO PAS VEH TURNING RIGHT FRCM PROPER LANE N8 AUTO PAS VEH TURNING LEFT FROM PROPER LANE 1 004.20 INT COMMUNITY RJ PK AT PVT DRIVE 100784 TUE JAN 07 86 1034 DAYLT C.TY CLEAQ ANGLE DRIVER FAILED TO GRANT r?IGHT OF WAY E3 AUTO PAS VEHICLE GOING STRAIGHT N3 AUTO PAS VEHICLE GOING STRAIGHT z 04.20 INT COMMUNITY RD MV TN RD UNDIVO 109531 FRI MAR 07 86 1044 DAYLT DRY CLEAR REAR END DRIVER FOLLO'wING TOO CLOSE Nd AUTO PAS VEHICLE GOING STRAIGHT NB AUTO PAS STCPPEC FOR TURN LEFT iq.4.20 INT OF COMMUNITY RD PC TN RD UNOIVO 135914 TUE SEP 23 86 U735 DAYLT WET RAIN TURN-INTS i DRIVER FAILED TO GRANT RIGHT OF wAY E B AUTO PAS VEH TURNING LEFT FROM PROPER LANE - - - 1 1 53 AUTO PAS VEHICLE GOING STRAIGHT t � l � F � � 1 CCNNECTICUT DEPARTMENT OF TRANSPORTATION ACCIDENT EXPERIENCE 1 TOwN OF S 4INOSOR RCUTE NLMEEF 30 LOCATION C04.00 OC4.50 PREPARED 02 29 83 PERIOD FROM 07 01 84 TO C6 30 87 1 1 MON OA LIGHT SURF COLLISION INJLRIES RAMP TCT MILEAGE ALPHA DESCRIPTIONA OF�1r ACC.A LCCAMTrION RROWY..y FACT. `CASE�yI DAY `+TH TE YR+A HOUR C�O1rNC CCNOyWEATTH` yTY+PE`` aK`A+8 C TY+PEA INJ+ � 115004.20 INT OF COMMUNITY RD PC TN RD UNDIVO 136176 WED OCT 10 84 1718 DAYLT DRY CLEAR TURN-INTS 1 DRIVER FAILED TO GRANT RIGHT OF WAY Sb TRUCK ST VEH TURNING LEFT FROM PROPER LANE E3 AUTO PAS VEHICLE GOING STRAIGHT 1 1 04.20 INT COMMUNITY RJ Mk AT PVT ORIVE 137288 .4E0 OCT 01 86 1690 DAYLT DRY CLEAR ANGLE DRIVER FAILED TO GRANT RIGHT OF WAY T wd AUTO PAS VEHICLE GOING STRAIGHT 1 SO AUTO PAS VEHICLE GOING STRAIGHT f I-�(1004.21 30 FT N OF COMMUNITY RD JN AT PVT DRIVE 024981 THU JUL 18 85 1700 DAYLT DRY CLEAR TURN-INTS 1 DRIVER FAILED TO GRANT RIGHT OF WAY W9 AUTO PAS VEH TURNING LEFT FROM PROPER LANE Nd AUTO PAS VEHICLE GOING STRAIGHT I ,004.21 27 FT N OF COMyUNITY RU jN AT CCMM ORVc 033344 SAT SEP 06 86 1336 DAYLT CRY CLEAR TURN-INTS 11 DRIVER FAILED TO GRANT RIGHT OF tft4Y W6 AUTO PAS VEHICLE TURNING LEFT FROM DRIVEWAY NB AUTO PAS VEHICLE GOING STRAIGHT Nd AUTO PAS STOPPED FOP TRAFFIC ,1D�004.21 27 FT N OF COMMUNITY PL `6 AT PVT DRIVE 140635 TUE NOY OS 85 2125 DARK/W CRY CLOY SIOESWP-SM � I ' IMP40PER PASSING MANEUVER Nd AUTO PAS �_H PASSING SAME DIRECTION ON RIGHT Nd ErRGVCY SLOwI NG FOR TURN RIGHT W•--"1704.22 2JO FT S OF oUCKLANU RD PK AT PVT DRIVE C63SCI THU APR 24 86 1430 DAYLT ORY CLEAR TURN-INTS URIJER FAILED TO ',iRANT RIGHT OF 6AY 63 VAN VEHICLE TURNING LEFT FROM DRIVEWAY Ni3 AUTO PAS VEHICLE GOING STRAIGHT 1 004.22 AT CDR TO SOCIETY FOR SAVINGS SANM4 AT COMM CRVE 123954 THU JUN 11 87 1605 DAYLT DRY CLEAR TURN-INTS DRIVER FAILED TO GRANT RIGHT OF WAY W8 AUTO PAS VE1-ICLE TUPN14G LEFT FROM ORIVEwAY 1 Nd AUTO PAS VEHICLE GOING STRAIGHT 1 1 1 1 � I I I I I 1 I I 1 I I 1 I I 1 i I I CCNNECTICUT DEPARTMENT OF TRANSPORTATION ACCIDENT ExPERIEhCE i� TOwh OF S WINCSOR RCUTE NUMdER 194 LOCATION CO3.40 OC3.69 �1 PR£FARcO 02 29 88 PEPIOD FR3f, 07 01 84 TO C6 30 E7 MON OA LIGHT SURF COLLISION INJLRIES RAMP TCT MILEAGE ALPHA DESCU PTION OF ACC. LCCATION RJWY. FACT. CASE R DAY TH TE YR HOUR CONC CCNO wEATH TYPE K A 8 C TYPE INJ ###+F+#Y#i#####*#####*#iV:**0****0**#ti##i*0** ************1##########O*#O#i#O#i#i<#00##O##i�1###O########40#00###O*ins#*i##i#i0i<*####i#• 003.40 .2 MI W OF COMMUNITY RO Jh NONE 105311 SUN FEB 03 85 0916 DAYLT ICE CLEAR SIDESWP-SM T� DRIVING TOO FAST FOR COVOITIO►IS E6 AUTO-SW SKIDDED SLO:INC FCR STOPPED VEHICLE 1 E3 TRUCK OT SfOPP EO FOR LWKNOWN REIASCN IN TRAFFIC LANE � 003.49 .2 MI W OF RT 3':1 Jh AT COMM ORVE 000207 FRI JAN 03 86 0810 DAYLT WET CLOY NO-Oy TRN DRIVER FAILED TO 3RANT RIGHT OF WAY Ed AUTO PAS VEH TURNING LEFT FROM PROPER LANE 6B TRUCK ST VEHICLE GOING STRAIGHT 003.49 .2 MI W OF RT 74 Jh NONE 1113CB FRI MAR 21 86 2048 DARK/W DRY CLEAR SIDESWP-OP f DRIVER FELL ASLEEP E3 AUTO PAS VEHICLE ON WRONS SIDE OF ROAD 1) W8 AUTO PAS VEHICLE GOING STRAIGHT - - - 2 2 003.49 6JO FT W OF COr,MUNITY RU Jh AT COMM ORVE 142983 SAT NOV 08 86 1146 DAYLT WET RAIN FIXED OBJ DRIVER FOLLOWIN5 TOO CLOSE A EB AUTC PAS AVOIDING STOPPED VEHICLE f) STRUCK( MAIL BOX OFF RD RIGHT E8 NON CONT STOPPED FOR TURN LEFT 003.50 0.1 MI r OF COMMUNITY RU Jh AT PVT DRIVE 018553 WED MAY 13 87 1109 DAYLT CRY CLEAR TURN-INTS � O►TIVER FAILED TO 3RANT RIGHT OF WAY S9 AUTO PAS VEHICLE TURNING LEFT FROM DRIVEWAY ES AUTO PAS VEH TURNING LEFT FROM PROPER LANE 003.54 3'J0 FT W OF COMMUNITY RO PK NO%E 007102 SAT FEB 14 87 1123 DAYLT DRY CLEAR REAR END DRIVER FOLLOwIN3 T03 ".LOSE f) E3 AUTO PAS VEHICLE GOING STRAIGHT Ed VAN STCOPPEC FUR TRAFFIC f� /P C3.56 230 FT w OF COMMUNITY RO PI- NONE 035305 wE0 OCT 02 85 2425 DAYLT DRY CLEAR REAR ENO 3 DRIVER FOLLOWIN5 TOO CLOSE w8 AUTO PAS VEHICLE GOING STRAIGHT �1 68 AUTO PAS VEHICLE GOING STRAIGHT - - - 1 1 wki JEEP-TYP VEHICLE GOING STRAIGHT } f� I l I ! I 1 1 I ) I ) I 1 1 I I { I I CONNECTICUT DEPARTMENT OF TRANSPORTATION ACCIDENT EXPERIENCE TOrN Or S W140504 4CUT: 1048ER 194 LOCATION CO3.40 OC3.59 PREPARED 02 29 88 PER103 FROM 07 01 84 TO 06 30 87 r MON CA LIGHT SURF COLLISION INJURIES RAMP TOT MILEAGE ALPHA OESC4I9TIOA OF ACC. LOCATION ROWY. FACT. CASE M DAY TH TE YR HOUR CONC COND WEATH TYPE K A 8 C TYPE INJ ##%#R########*###Rt*�###it4*#####***t�O*##i#*#*#*#*###*#**#*�####*#*#*iii#i#O#i#*#i*###i#*i#*##**####*#**O#*CO•###t0*ii i#i**#i #*iii i Z-003.59 .1 y1 w OF RT 311 JA NONE 037379 SAT OCT 19 85 1538 OAYLT WET RAIN REAR ENO DRIVER FOLLO.ING TOO CLOSE EB AUTO PAS VEHICLE GOING STRAIGHT E3 AUTO PAS STOPPEC FOR TQSFFIC .j003.59 27 FT W OF COMMUNITY RU JA NONE 129331 TUE AUG 21 84 2214 OARK/'a DRY CLEA9 FIXED 08J DRIVER UNDER THE INFLUENCE E3 AUTO PAS VEHICLE GOING STRAIGHT STRUCK HGHwY S13N OFF RU RIGHT 003.69 IVT RT 30 PH ST RT UNOIVO 012718 WED APR 16 86 1608 OAYLT DRY CLEAR REAR ENO ' DRIVER FOLLOuING TOO CLOSE E9 TRUCE( ST VEHICLE GOING STRAIGHT Ed AUTO PAS STOPPEC FOR TURN LEFT 003.69 INT RT 14 M. ST RT UNOIVJ 013229 MOW APR 06 87 1601 DAYLT WET RAIN HO-ON TRN DRIVER FAILED TO GRANT RIGHT OF WAY ES AUTO PAS VEH TURNING LEFT FROM. PROPER LANE WS AUTO-Sw VEHICLE GOING STRAIGHT t 003.69 AT RT 174 b RT 30 JN ST RT UVOIVO 014665 FRI APR 17 87 3240 DARKfW WET CLEAR HO-ON TRN DRIVER FAILED TO 3RANT RIGHT OF WAY Ed TRUCK OT VEH TURNING LEFT FROM PROPER LANE W3 AUTO PAS VEH TURNING RIGHT FROM PROPER LANE 1 003.69 INT RT 30 Jh ST RT UVOIVO 039771 FRI NOY 01 85 1156 OAYLT DRY CLEAR REAR ENO DRIVER rOLLJisIN-a TOO CLOSE ES TRUCK UT VEHICLE GOING STRAIGHT � Ed AUTO PAS STOPPEC FOR STOPPED VEHICLE 003.69 INT RT 30 M6 ST RT UNDIVO 048191 TUE DEC 18 84 0743 DAYLT DRY CLEAR REAR END FOOT SLIPPED 'OFF CLUTCH OR BRAKE E8 AUTO PAS VEHICLE GOING STRAIGHT Ed AUTO-Sw STOPPED FOR TRAFFIC SIGNALS 003.69 IVT RT 30 ES ST RT UNDIVO 055673 THU JAN 1C 85 1507 DAYLT DRY CLOY HD-CN TRN DRIVER FAILED TO GRANT RIGHT OF WAY 4 Ed AUTO PAS VEH TURNING LEFT'FROr PROPER LAVE W8 AUTO PAS VEHICLE GOING STRAIGHT 1 r l 4 I ! I 1 I I 1 I I 1 I 1 I I I I I 1 I CONNECTICUT DEPARTMENT OF TRANSPORTATION ACCIDENT EXPERIENCE TOWN OF S. 4lIndia.^ ROAD INUPrlER 3035 PREPARED 02 29 88 PERIOU FROM C 101 84 TU 06 30 87 ► MOA OA LIGHT SERF COLLISION INJURIES RAMP TCT MILEAGE ALPHA OESCRIPTION OF ACC. LCCATIOA RORY. FACT. CASE M DAY TH TE YR HOUR CONC CCND 4EATH TYPE K A 8 C TYPE IAJ i NO ACCIDENTS RECORDED01 0184 03 31 87 � Con7Mun��Y Koo��• ► ► -- - --• - -- - - •..�,• -+.... •....n•-.it.r,-rnnr i9 it.cc7one+vo re-CLTo on—itosrc7a or,t7zhcl4?aQm7i4:RATAo i?iur%l.1R fOO*CF0.Nn.noi RT Dir Volume Program with Midnight Totals .. �Ic;It�C�C;K;ic;K;k;lc;ic;Ic�k;Ic;K�ic�c;K�Ic;Mcac;Ic;Ic;K�Ic�c�Ic�c;K�k�K�K*�Mak�K�K�lc;ic�ic�lalalc�Itat:K;Ic;ic�ic�K�Ic�Kac:k;Ic:k�Ic;K�Icalc:�t:IcaK�It�K%k:K�icslc:IcAc:k>It%K�Ic;k:k:fic;lc:k Data File : 03048801 .TRF Position : 1 Station . 1 Ident . 15 Start Date : Mar 1 �1988 End Date : Mar 1 �1988 _ Start Time 11:29 End Time : 24:00 Location : COMMUNITY ROAD AT BUCKLAND STREET L1=NORTHBD L2=SOUTHBD �Ic�Ic;lc*�Ic;lalc�Ic�laic;k*�Fc;k;K plc*plc plc�K;It;K�K sic�K;Ic;K�k;K�K;ic�c*plc:}c;K;Ic�c�Ic�K plc�K;K tic sic*;K�K;Ic plc�K;lc;Ic�Ic�Ic�k%K�lc;Ic�Ic�K%K�F:�K�K�K�c;K plc Talc:K�K:K;Ic slc*�ic;Ic Mar 1 Lane 1 ** ----------------------------------------------------------------------------------- Begin 00 01 02 03 OA 05 06 07 08 09 10 11 -------- __—_ ____ ____ __—_ ____ ____ ____ ___— _____ ____ ____ ---- 00 15 1 30 13 45 9 Hr Total 23 �Ic Xc;K�lc�ic�k;K�k�ic;Kak��K�1c�Nc;K:K�Ic;Icaic�K;lc�IcaK;K*;K�K�K�K�c�Ic�k�K�K�K yk�K�;K�K�K;K�K:K�Icalc;ic;Ic;Ic�Ic;lc;Ic;K�ic�K�lc;lc;laic;lc?k;Ic;Ka1c;K;KXc;Ic�lc�laK?K�Ic�IcXt;ic�c Begin 12 13 1 A 15 16 17 18 19 20 21 22 23 00 13 10 9 13 16 17 .13 10 3 2 1 2 15 11 13 6 7 17 13 7 12 1 6 1 J. 30 12 1:3 10 9 14 16 8 10 0 1 1 1 45 13 5 12 7 20 8 7 A 0 3 2 0 ________ ____ _--- ---- —__— ___— ____ ____ ___— __-- ____ __—_ ---- Hr Total A9 46 37 36 67 54 35 36 4 12 5 A Total volume : A08 AM peak hour begins : 11 :30 AM peak volume : 46 Peak hour factor 0.8F) PM peak hour begins . 16: 15 PM peak volume . 68 Peak hour factor 0.85 �k Xc;lc*aK;Ic xc Xc�Ic�K�c�K�c�K�K�K;Ic�Ic;lc�c�k;k plc�Ic;K;Ic alt;Ic;Ic;K;ic;k�k�Ic;k;Ic;k�c;lc;Ic;K;ic;Ic�c;ic;lc;ic;K*�c;lc�c;Ic aK;k�!c*�K;Ic aK alc;k;Ic�c;k;Ic�c;Ic;K;K;tc;k;K;Ic�c;K;k�fc%9c Mar I ** Lane 2 ** ----------------------------------------------------------------------------------------- Begin 00 01 02 03 OA 05 06 07 08 09 10 11 00 15 0 30 15 -15 110, Hr Total 31. �k;K;lc ait�c%1aK;ic;K�K;ic;lc�Ic;lc;lc Ac;Mc;Ic%4c ac;Ic;Ic;laK;lc ac;lc;K ac%ic:laK�c;lalc%K;k;K;lc�c%K;1c;lc*;ic%K;ic;)c;Ic;K ac>It*��k%K;lc%9c;lc�Ic��k ac;k%ic;Ic;K;,}c;Ic;K;Ic;K;lc;Ic sic�cyc%k:K Begin 12 13 1A 15 16 17 18 19 20 21 22 23 00 18 16 17 12 19 17 6 7 9 17 2 A 15 17 17 1'7 17 18 19 3 A 4 1 3 2 30 23 13 1A 17 21 7 1.1 5 3 A 6 2 45 IS 10 27 2-el 21. 8 10 5 7 5 0 1 Hr Tot:�l 76 56 75 70 79 51 30 21 2c. 27 11 9 Total volume 559 AM peFkl( hour begins 11 :30 AM peak volume . 66 Peak hour •F::ictor• 0 .72 PM peals hour b gins 15:A5 PM peals volume . 82 Peak hour factor 0 .85 RT Dir Volume Program with Midnight Totals — � • - �Ic�lc:4c�lc?K�Ic�ic�tc�K�K�K�It�K�K�Ic�1c�Ic�c�k�it�Ic�K�K�K�K�K�K*�K�K�K�IaK�K�IaK�KaK�K�K�K�K�K�K�k�inK�K�laiaK�K�Ic7K�K�Ic�IaK�K�Ic�Ic�k�K�K�Ic�Ic�K�tc�Ic�Ic�K�K�ic:K�Ic�Ic:ic�c�K Data File : 03048801 .TRF Position : 1 Station . 1 Ident . 15 Start Date : Mar 2 ,1988 End Date : Mar 2 ,1988 — Start Time : 00:00 End Time : 24:00 Location : COMMUNITY ROAD AT BUCKLAND STREET L1=NORTHBD L2=SOUTHBD Talc�Ic*aK�1c�c�1c*�Ic�K�Ic�Ic�Ic�c�K:K�Ic�Ic�K xc�Ic�K�Ic�K�Ic�1c�K:Ic alc�Ic�K�Ic*�K plc alc�c Xc:lc Xc�1c�K alc�1c�1c�Ic�Ic�lalalc�ic:{alc Talc�Ic�Ic�Ic�Ialc Talc Talc Talc plc plc plc�1c sic�Ic�lalaialc%K�: Mar 2 Lane 1 �k:K -------------------------------------------------------------------------------------- Begin 00 01 02 03 04 05 06 07 08 09 10 11 -------- __—_ __-- —___ ____ —_—_ ____ ---- ---- ---- ____ ____ ---- 00 1 0 0 1 0 0 4 5 5 14 14 8 15 2 0 0 0 0 1 2 6 4 6 9 15 30 1 1 0 0 0 5 6 5 7 9 S 11 45 0 1 0 0 0 0 5 5 9 11. 3 E3 Hr Total 4 2 0 1 0 6 17 21 25 40 34 42 �K?k:k�K?K%k��k�ic>K�K>k�K%K�K�ic%K�k%ic�k�K�K�K�K�K�K%K�K%K�K�lcac�K�lc%K:K%ic%K%K�K:K�icalc�K%K%ic�c%K:K'k�1c�Ic�K%K:k%K�K�Ic�Ic%k�K>Oc>k:K:K�ic�c%K�Ic�lc:}c�K:K%K%K�k�K:K%lc Began 12 1J 14 15 16 17 18 19 20 21 22 23 00 15 15 10 15 10 18 1 0 0 0 0 0 15 12 a 10 9 11 11 11 0 0 0 0 0 30 11 7 E3 8 11 14 8 0 0 0 0 0 — 45 12 13 13 12 14 12 5 0 0 O 0 O Hr Total 50 43 Al 44 46 55 25 0 0 0 0 0 Total volume : 496 AM peals hour- begins . 11 : 15 AM peak volume : 49 Peak hour factor- . 0 .82 PM peak hour begins : 16:45 PM peak volume : 57 Peak hour factor- : 0.79 _ aK�K:S:%lc�Icxc�K�c�Ic�lc�K:K?K%K:K�Kric�c�Ic:K��c�K�K�Kak�c�c�calc�ic%9c:KKK}kXc�K�c�lc�K�K�K�Ic�K�K�c�ic�iak�lc�lc�i:��Ic�k�k�K�taK�laiaic�ic�K�K�lc�1c%c�K�lc�laK�k:4c:K�ic�Ic�IcaK Mar 2 Lane 2 �K�c ---------------------------------------------------------------------------------------- Begin 00 01 02 03 0-1 05 06 07 08 09 10 11 00 0 0 0 2 1 1 8 43 31 17 7 5 15 1 0 0 0 0 2 14 Al. 227 14 12 13 30 0 3 0 0 0 3 24 38 19 11 12 17 A.5 0 0 1 0 2 6 28 29 25 19 15 16 ____ _--- —_-- ---- _—__ —__— ____ ____ --__ —___ 1-Ir TatEL3. 1 3 1 2 3 12 74 151 102 61 46 51 �K�k kc�c%K%lc�lc�lc%K�1c�Ic�Oc�K�lc�K�ic�Ialc�K>K:K�IaK�lc>K�k%K%K%K�K�1c:K�c�1c�lc�c�K�k�Ic�lc*�c�k�K�ic�K%K�Ic�K�laic�K�K�Ic:K�k�Kac�icac%K�Ic�K ac�Ic�C�c�lc�K�lalc�lc%K:IC�Ic:K�K�Ic%K "— Begin 12 13 14 15 16 17 18 19 20 21 22 23 00 20 17 21 14 11 19 14 0 0 0 0 0 _ IS 23 20 1s 1 O 22 12 9 0 0 0 0 0 30 22 13 15 15 16 15 . 7 0 0 0 0 0 A5 23 15 21 22 22 12 6 0 0 0 0 0 Hr Total 80 65 75 61 71 58 36 0 0 0 0 0 Total vo1urnc_ 961 AM prNILIC hour begins 07:00 AM PeELk volume . 151. Peals hour factor 0.68 PM pr.7ak hour brac.;J:i.ns 12:00 PM peals volume : eS Peals hour factor 0.96 I l • I I I •.I ! ! I I I . •I• I I I. • I 1 I YEAR 1987 STA NO 132 7 YEAR 1987 STA NO 132 8 STATE OF CONNECTICUT STATE OF CONNECTICUT DEPARTMENT OF 'TRANSPORTATION DEPARTMENT OF TRANSPORTATION BUREAU OF PLANNING AND RESEARCH BUREAU OF PLANNING AND RESEARCH PLANNING INVENTORY` AND DATA PLANNING INVENTORY' AND 'DATA TRAFFIC RECORDER DATA TRAFFIC RECORDER DATA TOWN OF S0. WINDSOR ROUTE 30 DIRECTION 8 TOWN OF SO. WINDSOR ROUTE 194 DIRECTION 8 LOC WEST OF COMMUNITY ROAD LOC N.W. OF COMMUNITY ROAD DAY SUN MON TUES WED THUR FRI SAT DAY SUN MON TUES WED THUR FRI SAT DATE 0 0 0 318 319 0 0 DATE 0 0 0 318 319 320 0 TYPE TYPE HOUR 1987 ADT = 10600 HOUR 1987 ADT = 14600 BEG ############ ### BEG ### ##### ####### MID 0 0 D 0 60 0 D MID 0 0 0 0 121 105 0 IA 0 0 0 0 23 0 0 lA 0 0 0 0 48 67 0 2A 0 0 0 0 33 0 0 2A 0 0 0 0 40 46 0 34 0 0 0 0 15 0 0 3A 0 0 0 0 43 48 0 4A 0 0 0 0 34 0 0 44 0 0 0 0 79 71 0 ' 5A 0 0 0 0 140 0 0 5A 0 0 0 0 204 210 0 6A 0 0 0 0 617 0 D 6A 0 0 0 0 838 825 0 7A 0 0 0 0 997 0 D 7A 0 0 0 0 1055 1056 0 8A 0 0 0 0 700 0 0 RA 0 0 0 0 836 843 0 9A 0 0 0 0 475 0 0 9A 0 0 0 770 691 0 0 1DA 0 0 0 436 D 0 0 IDA 0 0 0 720 692 0 0 11 A 0 0 0 525 0 0 0 11 A 0 0 0 754 727 0 0 12P 0 0 0 593 0 0 0 12P 0 0 0 862 872 0 0 1P n 0 0 553 0 0 0 iP 0 0 0 832 741 0 0 2P 0 0 r) 600 0 0 0 2P 0 0 0 962 947 0 0 3P 0 0 0 814 0 0 D 3P 0 0 0 1060 1035 0 0 4P 0 0 0 1019 0 0 0 4P 0 0 0 1259 1234 0 0 SP 0 0 0 1005 0 0 0 5P 0 0 0 1190 1143 0 0 6P 0 0 0 639 0 0 0 6P 0 0 0 897 925 0 0 7P 0 0 0 391 0 0 0 7P 0 0 0 697 647 0 0 8P D 0 0 276 0 0 0 8P 0 0 0 443 485 0 0 9P 0 0 0 257 0 0 0 9P 0 0 0 439 423 0 0 Inri 0 0 0 153 0 0 0 lop 0 0 0 247' 246 0 0 i1P 0 0 0 110 D 0 D i1P 0 0 0 184 173 0 0 TOT 0 0 U 7371 3099 0 0 TOT 0 0 0 11316 14245 3271 0 RECORDER l_27 24 HR - 10470 r; - 4 RECORDER 225 24 HR = 14580 G - 4 YEAR 1987 STA NO 132 9 YEAR 1987 STA NO 132 10 STATE OF CONNECTICUT STATE OF CONNECTICUT DEPARTMENT OF TRANSPORTATION DEPARTMENT OF TRANSPORTATION BUREAU OF PLANNING AND RESEARCH BUREAU OF PLANNING AND RESEARCH PLANNING INVENTORY' AND DATA PLANNING INVENTORY* AND DATA TRAFFIC RECORDER DATA TRAFFIC RECORDER DATA TOWN OF SO• WINDSOR ROUTE 74 DIRECTION B TOWN OF SO. WINDSOR ROUTE 30 DIRECTION B LOC N.E. OF ROUTE 30 LOC EAST OF ROUTE 74 DAY SUN MON TUES WED THUR FRI SAT DAY SUN MON TUES WED THUR FRI SAT DATE 0 D 0 318 319 0 0 DATE 0 0 0 318 319 0 0 TYPE TYPE HOUR 1987 AOT = 7200 HOUR 1987 ADT - 13000 BEG ### ##### #### BEG ########## ## ## MID 0 0 0 0 50 0 0 MID 0 0 0 0 100 0 0 IA 0 0 0 0 21 0 0 IA 0 0 0 0 51 0 0 2A 0 0 0 0 22 0 0 2A o 0 0 0 44 0 l] 34 0 0 0 0 14 0 0 3A 0 0 0 0 36 0 0 4 A 0 0 0 0 is 0 0 4A 0 0 0 0 76 0 0 5A 0 0 0 0 119 0 0 5A 0 0 0 0 163 0 0 6A 0 0 0 0 517 0 0 6A 0 0 0 0 709 0 0 7A 0 0 0 0 647 0 0 7A 0 0 0 0 977 0 0 8A 0 0 0 0 479 0 0 BA 0 0 0 0 731 0 0 9 A 0 0 0 327 0 0 0 9A 0 0 0 596 0 0 0 IDA 0 0 0 221 0 0 0 10A 0 0 0 590 0 0 0 IIA 0 0 0 286 0 0 0 1 1 A 0 0 0 675 0 0 0 12P 0 0 0 275 0 0 0 12P 0 0 0 742. 0 D 0 1P 0 0 0 280 0 0 0 1P 0 0 0 695 0 0 0 2P 0 0 0 349 l] 0 0 2P 0 0 0 813 0 0 0 3P 0 0 0 553 0 0 0 3P 0 0 0 loll] 0 0 0 4P 0 0 0 756 0 0 0 4P 0 0 0 1200 0 0 0 5P 0 0 0 702 0 0 0 5P 0 0 0 1222' 0 0 0 6P 0 0 0 467 0 0 0 6P 0 0 0 827 0 0 0 7P 0 0 0 322 0 0 0 7P 0 0 0 534 0 0 0 8P 0 0 0 200 0 0 0 8P ❑ 0 0 398 0 0 0 9P ❑ 0 0 225 0 0 0 9P 0 0 0 332 0 l] 0 lop 0 0 0 139 0 0 0 lop 0 0 0 190 0 0 0 lip 0 0 0 97 0 0 0 11P 0 0 0 160 l] 0 0 TOT 0 0 0 5199 1884 0 0 TOT 0 0 0 9984 2887 0 0 RECORDER 220 24 HR = 7083 G - 4 RECORDER 255 24 HR = 12871. G - 4 I I I� I I I I• I I I I I I ' , . I I I• ';., I I I YE AR 1987 ST A NO 132 11 STATE OF CONNECTICUT DEPARTMENT OF TRANSPORTATION BUREAU OF PLANNING AND RESEARCH PLANNING INVENTORY• AND DATA TRAFFIC RECORDER DATA TOWN OF SO. WINDSOR ROUTE DIRECTION B LOC BUCKL AND ROAD - SOUTH OF ROUTE 30 DAY SUN MON TUES WED THUR FRI SAT DATE 0 0 D 318 319 0 0 TYPE HOUR 1987 ADT = 13100 BEGa � �� MID 0 0 0 0 107 0 0 lA 0 0 0 0 29 0 0 2A 0 0 0 0 31 0 0 3A 0 0 0 0 26 0 0 4A 0 0 0 0 35 0 0 5A 0 0 0 0 170 0 0 6A 0 0 0 0 756 0 0 7A 0 0 0 0 935 0 0 8A 0 0 0 0 741 0 0 9A 0 0 0 649 0 0 0 10A 0 0 0 572 0 0 0 11 A 0 0 0 607 0 0 0 12P 0 0 0 706 0 0 0 ' 1P 0 0 0 711 0 0 0 2P 0 0 0 810 0 0 0 3P 0 0 0 986 0 0 0 4P 0 0 0 1161 0 0 0 5P 0 0 0 1131 0 0 0 6P 0 0 0 885 0 0 0 7P 0 0 0 659 0 0 0 8P 0 0 0 405 0 0 0 9P 0 0 0 431 0 0 0 lop 0 0 0 239 0 0 0 11P 0 0 0 170 0 0 0 TOT 0 0 0 10122 2830 0 0 RECORDER 219 24 HR = 12952 G - 4 1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1 IDENTIFYING INFORMATION --------------------------------------------------------------------- AVERAGE RUNNING SPEED, MAJOR STREET. . . . . . . . . . . . . . 30 PEAK HOUR FACTOR. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9 AREA POPULATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 150000 NAME OF THE EAST/WEST STREET. . . . . . . . . . . . . . . . . . . . . Site Drive NAME OF THE NORTH/SOUTH STREET. . . . . . . . . . . . . . . . . . . Community Road NAME OF THE ANALYST. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DLS DATE OF THE ANALYSIS (mm/dd/yy) . . . . . . . . . . . . . . . . . . 03/21/88 TIME PERIOD ANALYZED. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1990 PM - Combined INTERSECTION TYPE AND CONTROL --------------------------------------------------------------------- INTERSECTION TYPE: T-INTERSECTION MAJOR STREET DIRECTION: NORTH/SOUTH CONTROL TYPE WESTBOUND: STOP SIGN TRAFFIC VOLUMES --------------------------------------------------------------------- EB WB NB SB ---- ---- ---- ---- LEFT -- 33 0 39 THRU -- 0 160 82 RIGHT -- 41 32 0 — NUMBER OF LANES --------------------------------------------------------------------- EB WB NB SB ------- ------- ------- ------- LANES -- 1 1 1 ADJUSTMENT FACTORS Page-2 --------------------------------------------------------------------- PERCENT RIGHT TURN CURB RADIUS (ft) ACCELERATION LANE GRADE ANGLE FOR RIGHT TURNS FOR RIGHT TURNS ------- ---------- ---------------- ----------------- EASTBOUND ----- --- --- - WESTBOUND 0.00 90 20 N NORTHBOUND 0.00 90 20 N SOUTHBOUND 0.00 90 20 N VEHICLE COMPOSITION --------------------------------------------------------------------- % SU TRUCKS % COMBINATION AND RV'S VEHICLES % MOTORCYCLES ----------- ------------- ------------- EASTBOUND --- --- --- WESTBOUND 0 0 0 NORTHBOUND 0 0 0 SOUTHBOUND 0 0 0 CRITICAL GAPS --------------------------------------------------------------------- TABULAR VALUES ADJUSTED SIGHT DIST. FINAL -- (Table 10-2) VALUE ADJUSTMENT CRITICAL GAP -------------- -------- ----------- ------------ MINOR RIGHTS WB 5.50 5.50 0.00 5 .50 MAJOR LEFTS SB 5.00 5.00 0.00 5.00 MINOR LEFTS WB 6.50 6.50 0.00 6.50 CAPACITY AND LEVEL-OF-SERVICE Page-3 --------------------------------------------------------------------- POTEN- ACTUAL FLOW- TIAL MOVEMENT SHARED RESERVE RATE CAPACITY CAPACITY CAPACITY CAPACITY MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS p M SH R SH ------- -------- --------- ------------ ------------ --- MINOR STREET WB LEFT 40 613 594 > 594 > 554 > A _ > 730 > 640 >A RIGHT 50 895 895 > 895 > 845 > A MAJOR STREET SB LEFT 48 972 972 972 925 A 1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1 IDENTIFYING INFORMATION --------------------------------------------------------------------- AVERAGE RUNNING SPEED, MAJOR STREET. . . . . . . . . . . . . . 30 PEAK HOUR FACTOR. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9 AREA POPULATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 150000 NAME OF THE EAST/WEST STREET. . . . . . . . . . . . . . . . . . . . . Sullivan Ave. NAME OF THE NORTH/SOUTH STREET. . . . . . . . . . . . . . . . . . . Community Road NAME OF THE ANALYST. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DLS DATE OF THE ANALYSIS (mm/dd/yy) . . . . . . . . . . . . . . . . . . 03/21/88 TIME PERIOD ANALYZED. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1990 PM - Combined INTERSECTION TYPE AND CONTROL --------------------------------------------------------------------- INTERSECTION TYPE: T-INTERSECTION MAJOR STREET DIRECTION: EAST/WEST CONTROL TYPE NORTHBOUND: STOP SIGN TRAFFIC VOLUMES --------------------------------------------------------------------- EB WB NB SB ---- ---- ---- ---- LEFT 0 0 194 -- THRU 452 189 160 -- RIGHT 121 41 4 -- NUMBER OF LANES --------------------------------------------------------------------- EB WB NB SB LANES 1 1 1 -- ADJUSTMENT FACTORS Page-2 --------------------------------------------------------------------- PERCENT RIGHT TURN CURB RADIUS (ft) ACCELERATION LANE GRADE ANGLE FOR RIGHT TURNS FOR RIGHT TURNS ------- ---------- ---------------- ----------------- EASTBOUND 0.00 90 20 N WESTBOUND 0.00 90 20 N NORTHBOUND 0.00 90 20 N SOUTHBOUND ----- --- --- VEHICLE COMPOSITION --------------------------------------------------------------------- % SU TRUCKS % COMBINATION AND RV'S VEHICLES % MOTORCYCLES ----------- ------------- ------------- -- EASTBOUND 0 0 0 WESTBOUND 0 0 0 NORTHBOUND 0 0 0 SOUTHBOUND --- --- --- CRITICAL GAPS --------------------------------------------------------------------- TABULAR VALUES ADJUSTED SIGHT DIST. FINAL (Table 10-2) VALUE ADJUSTMENT CRITICAL GAP -------------- -------- ----------- ------------ MINOR RIGHTS NB 5.50 5.50 0.00 5.50 MAJOR LEFTS WB 5.00 5.00 0.00 5.00 MINOR LEFTS NB 6.50 6. 50 0.00 6.50 CAPACITY AND LEVEL-OF-SERVICE Page-3 --------------------------------------------------------------------- POTEN- ACTUAL FLOW- TIAL MOVEMENT SHARED RESERVE RATE CAPACITY CAPACITY CAPACITY CAPACITY MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS p M SH R SH ------- -------- --------- ------------ ------------ --- MINOR STREET NB LEFT 237 322 322 > 322 > 85 > E > 325 > 83 >E RIGHT 5 577 577 > 577 > 572 > A MAJOR STREET WB LEFT 0 606 606 606 606 A 1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1 IDENTIFYING INFORMATION --------------------------------------------------------------------- AVERAGE RUNNING SPEED, MAJOR STREET. . . . . . . . . . . . . . 30 PEAKHOUR FACTOR. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9 AREA POPULATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 150000 NAME OF THE EAST/WEST STREET. . . . . . . . . . . . . . . . . . . . . Route 30 NAME OF THE NORTH/SOUTH STREET. . . . . . . . . . . . . . . . . . . Community Road NAME OF THE ANALYST. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DLS DATE OF THE ANALYSIS (mm/dd/yy) . . . . . . . . . . . . . . . . . . 03/21/88 TIME PERIOD ANALYZED. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1990 PM - Combined INTERSECTION TYPE AND CONTROL --------------------------------------------------------------------- INTERSECTION TYPE: T-INTERSECTION MAJOR STREET DIRECTION: EAST/WEST CONTROL TYPE SOUTHBOUND: STOP SIGN TRAFFIC VOLUMES --------------------------------------------------------------------- EB WB NB SB ---- ---- ---- ---- LEFT 174 0 -- 1 THRU 803 323 -- 82 RIGHT 121 17 -- 114 — NUMBER OF LANES --------------------------------------------------------------------- EB WB NB SB ------- ------- ------- ------- LANES 1 ADJUSTMENT FACTORS Page-2 --------------------------------------------------------------------- PERCENT RIGHT TURN CURB RADIUS (ft) ACCELERATION LANE GRADE ANGLE FOR RIGHT TURNS FOR RIGHT TURNS ------- ---------- ---------------- ----------------- EASTBOUND 0.00 90 20 N WESTBOUND 0.00 90 20 N NORTHBOUND ----- --- --- - SOUTHBOUND 0.00 90 20 N VEHICLE COMPOSITION --------------------------------------------------------------------- % SU TRUCKS % COMBINATION AND RV'S VEHICLES % MOTORCYCLES ----------- ------------- ------------- EASTBOUND 0 0 0 WESTBOUND 0 0 0 NORTHBOUND --- --- --- SOUTHBOUND 0 0 0 CRITICAL GAPS --------------------------------------------------------------------- TABULAR VALUES ADJUSTED SIGHT DIST. FINAL (Table 10-2) VALUE ADJUSTMENT CRITICAL GAP -------------- -------- ----------- ------------ MINOR RIGHTS SB 5.50 5.50 0.00 5.50 MAJOR LEFTS EB 5.00 5.00 0.00 5.00 MINOR LEFTS SB 6.50 6.50 0.00 6. 50 CAPACITY AND LEVEL-OF-SERVICE Page-3 --------------------------------------------------------------------- POTEN- ACTUAL FLOW- TIAL MOVEMENT SHARED RESERVE RATE CAPACITY CAPACITY CAPACITY CAPACITY MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS — p M SH R SH ------- -------- --------- ------------ ------------ --- MINOR STREET SB LEFT 1 117 95 > 95 > 93 > E > 688 > 548 >A RIGHT 139 729 729 > 729 > 589 > A MAJOR STREET EB LEFT 213 816 816 816 603 A g o FUSS&OTIE1LL consulting engineers February 9, 1988 Ms. Marcia Banach Town Planner Town of South Windsor 1540 Sullivan Avenue South Winsor, CT 06074 RE: Wapping Community Church Construction of 8, 180 Square Foot Addition Dear Ms. Banach: to We hav e examined the traffic impact of the proposed addition and the Wapping Community Church located co nersenintersection in the, Sullivan Ellington Road, north of the five Town of South Windsor. The addition is being constructed adjacent to the existing church building and will provide additional classroom project, the nd meeting space for the church. As part of this p j existing parking lot at the north end of the sitewill bthe restructured to provide 75 parking spaces. A present, P arking lot is serviced by two full movement driveways to Sullivan Avenue, and the proposal shows that rn driveway will be utilized to access the main parking area. he dr y will be changed to reconstructed southerly driveway ate for the purpose of dropping off one way entering traffic only parking spaces handicapped persons or utilizing the handicapped P g P adjacent to the building. The geometrics of the driveway ed entrance have been improved and parking has beenwilllallowtqueues immediately adjacent to the travel way. This to be formed prior to exiting the site to Sullivan Avenue. Access to Ellington Road will remain essentially unchanged, although the driveway providing will be reconstructed, p g a new pavement surface and better curb line definition. Current peak hour generation at the church is minimal, since weekday evenings. church activities occur mainly on weekends and who are There is some usage of the parking lot by the peak hours. There is forming carpools/vanpool group g no change anticipated in the commuter use of the site. 210 MAIN STREET I MANCHESTER, CONN. 06040 / TELEPHONE (203)646-2469 MANAGEMENT•WASTE WATER SYSTEMS•EROSION CONTROL•WATER SYSTEMS•HYDROLOGY aWDRAINAGE KSIMANAGEMENM•S 0 SITE IDROGENNING SOLID WASTE r i •TRANSPORTATION and TRAFFIC - . . .� - nr,:�rc c . ciluvFYING 0 LaNDSCAPE AR.,H,TECTl1RE -�o F,SS&-NBLL In summary, the facility currently generates traffic during off-peak hours, with limited generation during commuter peaks, mainly by formation of carpools by commuters in the parking lot. This usage is expected to continue, with no increase due to the unrelated church addition. The reconstuction of the parking lot will change the Sullivan Avenue access to a single driveway located at the current north driveway location. This driveway will be restructured and provide better geometric access between Sullivan Avenue and the site. The second driveway will become one way inbound, and will be utilized for handicapped access only. The Ellington Road driveway is reconstructed in place. For these reasons, we feel that the construction of the 8, 180 square foot addition to the existing church facility will have a minimal impact on the roadways surrounding the site during the commuter peak hours. During the peak operations of the church, the reconstructed facility provides better access, and therefore favorable impact on the traffic patterns will result. Very truly yours, 4Ste en F. Mitchell, P.E. Director of Traffic Section pig 0209ATRF 87-65 O � e � x 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 R-co �w AREA CODE 203/644-2511 March 17, 1988 Mr. John M. Moran, Jr. , Chairman South Windsor Inland Wetlands Agency/Conservation Commission 1540 Sullivan Avenue South Windsor, CT 06074 RE: WAPPING COMMUNITY CHURCH, APPLICATION REVIEW Dear_ Mr. Moran: The soils within the proposed construction area are of the Manchester Classification, a non wetland soils, as shown. The proposal is for a 15" storm water discharge into Plum Gulley Brook. This would be the regulated activity, Section 5.1, 5 .2 & 5 . 3 . A simplified summary would be that they propose to erect an addition to their existing building and relocate the parking area, about 70,000 sq. ft. disturbed and then made impervious. Their proposal includes picking up the storm and foundation drainage and discharging it into the Plum Gulley Watershed and floodplain without detention. The natural direction of flow would be towards the five corners and down an inadequate system in Ellington Road to the Podunk Watershed. If a permit were to be considered, the following conditions might be appropriate. 1 . All the rights and/or permits from N/F Cavaliere. 2 . An approval from the appropriate agencies to permit the discharge from another watershed. 3 . Modifications to the plans to include a barrier at Ellington Road to prohibit traffic on the driveway until it is paved. Riprap through and across the Plum Gulley Brook in the area of discharge and Item 3 in the construction schedule and E&S notes 'as soon as possible' is too vague. R Mr. John M. Moran, Jr. , Chairman South Windsor Inland Wetlands Agency/Conservation Commission RE: Wapping Community Church Application Review Page 2. 4 . The anti tracking apron shall be as shown. 5 . A $3,000 bond might be adequate to assure compliance with the plans . Very truly yours, A. Bowen Davies Deputy Town Engineer ABD/jsv Enclosure cc: Wapping Community Church Michael J. Gantick, Director of Public Works Marcia A. Banach, Director of Planning IWA/CC File C ~ T-0 S-OUM ?d&&416-0t e � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 ��osoR.CO � AREA CODE 203/644-2511 April 26, 1988 Wapping Community Church 1790 Ellington Road South Windsor, CT 06074 Gentlemen: At the April 25, 1988 meeting, the South Windsor Inland Wetlands Ag ncy/Conservation Commission approved with conditions Application #88016W. The following conditions must be adhered to for this permit to be valid: 1. Consult with the State as to the viability of making the crossing of Ellington Road to Plum Gulley further (north at the Town Hall entrance) where there currently is a crossing. 2 Plans must show a cross section of sewer pipe located on Ellington Road. 3. A more detailed description of the installation of th outlet structure and plunge pool. Also show how the brook will be protected and stabilized on the easterly bank. 4 . Modifications to the plans to include a barrier at Ellington Road to prohibit traf f is on the driveway until it is paved. , Item 3 in the construction schedule and E&S measures notes "as soon as possible" should be defin d. 5 . All the rights and/or permits from N/F Cavaliere. 6 . Approval from the appropriate agencies to permit th discharge from another watershed. 7 . The anti tracking apron shall be as shown with th railroad ti s rr moved. Wapping Community Church 1790 Ellington Road South Windsor, CT 06074 Page Two 8. We recommend a bond in the amount of $3000.00 to be submitted to Planning & Zoning Commission to ensure compliance with Erosion and Sedimentation Control Measures. 9 . Three ( 3) blueprint copies of the approved map with all modifications must be submitted to the IWA/CC within 65 days for review. 10 . Construction activities shall be subject to the approval of the Town Engineer. 11 . The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 12. The permit is valid for one year and shall expire April 25, 1989 . Very truly yours, John M. Mor , Jr. Chairman Inland Wetlands Agency/ Conservation Commission JMMJr. /pmm cc: A.B. Davies, Deputy Town Engineer Raymond Hallowell, Chairman, Planning & Zoning Comm. Building Department Marcia Banach, Director of Planning PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM TO: Karl Reic hle, Mike Cwvlti&, Mel Stead, FYed Shaw, Date: 31a9/�� Ric3�atd J. Sartor, Gary Tyler, Fire John Shemo TROM: Marcia A. Banach, Director of Planning The Planning & Engineering Departments have received plans for the following project: Subdivision .= Site Plan Residential Commercial Industrial Location: Project Description: 7, 170 �p•L /� Gt�G - Future Town-owned property involved? YES �_ NO (a) new streets ( existing frontage also) (b) new open space/recreation area active passive (c) new detention area Planning Department comments : Please let me know by yla9 hy if you will have comments on this application so that I can follow up with your department when I do a Planning Department report. /V v�► Q 4, CG/C t.�Ici�j(a� v C/�". "r� l���J ��u`-l C� S"f.L- Q�/i�� C- �. C�12 b1✓'l n`."' . May 16, 1988 M E M O R A N D U M TO: Marcia A. Banach, Director of Planning FROM: Michael J. Gantick, Director of Public Works RE: Engineering Review Wapping Community Church Addition Attached please find the SEA Engineering review comments pertaining to the subject project. If you have any questions please contact me. Enclosure MJG/jsv cc: Engineering Department PZC Correspondence SEA Consultants Inc. April 19, 1988 Engineers/Architects Principals Arnold B.Goldstein,P.E. Frederick G.Aufiero,P.E. Mr. Michael J. Gantiek, P.E. Robert M.Brandon,A.I.A. Director of Public Works Stephn H.Geribo,P.E. David T. Town of South Windsor David Goodemote,P.E. Bruce E.Soul ,RE. 1540 Sullivan Avenue Kenneth M.Stewart,PE. South Windsor, Connecticut 06074 Anthony J.Zuena,P.E. ,associates Re: Wapping Community Church Addition Steven L.Bernstein,P.E. Job No. 88126.24 Paul F.Gabriel,P.E. Mark Gould,P.E. Task Order No. 24 Michael S.Schultz,P.E. Arthur A.Spruch,PE. Dear Mr. Gantick: Paul C.Ross,P.E. As requested, S E A Consultants Inc. has reviewed the following for the above referenced project: Sheet No. Title Prepared By Date 1 of 7 Property Map Fuss O'Neill Inc. 7-87 2 of 7 Layout Plan it 3-88 3 of 7 Grading & Utility Plan IT It 4 of 7 Profile ►t tt 5 of 7 Landscaping Plan It n 6 of 7 Conservation Plan it tt 7 of 7 Details IT tt Drainage Calculations & Narrative it 2-88 Floor Plans Moser, Pilior, Nelson It Elevations it it This information was reviewed for compliance with the Town of South Windsor and Zoning Regulations dated July 24, 1972, and standard engineer- ing practice. We note the following: 850 Silas Deane Highway Section 4.13.2.3 PLOT PLAN Wethersfield,CT 06109-3412 (203)721-7993 485 Massachusetts Avenue d. All existing and proposed outside lighting should be shown on the lan. Cambridge,MA 02139-4018 p (617)497-7800 Citicorp Park W st 100 Foden Road South Portland,ME 04106-2319 (207)775-2281 r I Mr. Michael J. Gantick, P.E. S E A Consultants Inc. April 19, 1988 Engineers/Architects Page Two e. The proposed drainage easement along Ellington Road should indicate grantor and grantee. g. All monumented points within the site should be coordinated and appear in tabular form on the plan. i. The plot plan appears to be labeled "Layout Plan." In accor- dance with this section the map should be entitled "Plot Plan." Section 4.13.2.4 TOPOGRAPHIC MAP b. Curbing lines should be labeled and pavement widths shown on the map. e. Existing wooded areas indicated by foliage lines should be included. j. This map should be entitled "Topographic Map." Section 4.13.6 CONSERVATION PLAN 1. The following note should be added to the construction sche- dule: "Construction of roadway and all utilities shall conform to standards and specification of the town of South Windsor Department of Engineering." 2. An anti-tracking apron should also be shown at the Ellington Road driveway entrance. 3. Who will be responsible for maintaining the impact basin after construction? 4. Soil types and boundaries should be delineated on the plan. GENERAL COMMENTS 1. The size of the proposed pvc sanitary sewer lateral should be indicated on the topographic map. 2. Grading is proposed onto Town of South Windsor property along the north property boundary. Slope rights will have to be obtained from the Town and should be indicated on the plans. 3. The note regarding the requirement of a state permit along Ellington Road should identify the purpose of the permit. Mr. Michael J. Gantick, P.E. SEA Consultants Inc. April 19, 1988 Englneers/Archit cts Page Three 4. Proposed drainage structures AD #2 and AD #3 indicate less than the Town's minimum requirement of two feet of cover over pipes. 5. Legends indicating drainage structures, pipes, grades etc. should be included on the plans. 6. Riprap type should be identified in the section of the impact basin on the detail sheet. 7. Pre- and post-development peak discharge rates for the site during the 2, 10, 25, 50, and 100 year storm events have not been included in the drainage calculations. Therefore, the drainage design review cannot be completed until these discharge rates are provided. 8. The drainage narrative indicates a discharge increase of 3 efs from the site for the 100 year storm frequency. The narrative also indicates that there are no alternatives on the site which would allow the construction of a detention structure. Also, the high groundwater table prevents the usage of any infiltration system. Therefore, the plan indicates direct discharge into Plum Gulley Brook without detaining proposed flows. The report concludes by comparing the increase of 3 cfs with the 100 year flow of 1500 efs for Plum Gulley Brook as being negligible to the existing drainage system. 9. Since the time of concentration for Plum Gulley Brook is significant- ly longer than the to of the site, the flow increases projected for the 100 year storm frequency should have minimal effect to existing conditions. 10. A typical cross section of the proposed pavement should be shown on the plans. If you should have any questions, please do not hesitate to call me. Very truly yours, S E A Consultants, Inc. 0 am es R. Bancroft, P.E. JRB:mp <011 N a y r 0 `�• o � C U 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074 oe•co AREA CODE 203/644-2511 May 18, 1988 Earle H. Smith, Jr. Wapping Community Church 1790 Elllington Road South Windsor, CT 06074 Re: Application #88-016, Wapping Community Church Site Plan Dear Mr. Smith: Attached is a copy of comments from the Planning and Engineering Departments regarding the above-referenced application. Please make the necessary revisions to the plans and submit 6 complete sets (including architectural elevations, landscaping plans, etc. ) to the Planning Department. If you have any questions regarding the comments or the procedure, please contact me. Very truly yours, Marcia A. Banach Director of Planning cc: Town Engineer WAPPING COMMUNITY CHURCH - PLANNING DEPT. REVIEW COMMENTS Data Block: - Parking formula should reflect office parking requirements as one space per 125 ft2; Parking waiver can be requested if needed Plot plan: Building line at north end of site should be side yard, not rear yard - Has a variance been obtained to add onto a nonconforming building? Show outside lighting on plot plan A-2 Certification needed Topographic map: - show pavement widths - A-2 certification needed Date: May 19, 1988 Raymond F. Hallowell, Chairman Planning and Zoning Commission Town of South Windsor 1540 Sullivan Avenue MAY 19 1988 South Windsor, CT 06074 South Windsor Dear Chairman Hallowell: Planning & Zoning Commission RE: Application #88-016 Name Wapping Community Church The applica t, Wa in CommunityChurch , hereby requests a� extension o e action a e wi respect to the above re erenced application, to June 8. Very T2:Lgru Yours, r Earle Smith, Chairman Building Committee Wapping Community Church ml VdA" ' a 1700 KLLIN TON It AD, SOUTH WINDSOR, C NNUCTICUT 06074 UNITRD CHURCH F CHRIST The Rev. Dr. Melvin G. Williams, Interim Senior Minister CHURCH MOMS The Rev. James R. Kansenj Minister of Christian Education 644-0833 June 2, 1988 Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Attention: Richard Sartor, Town Manager Dear Mr. Sartor: In a letter to us dated May 18, 1988 concerning Wapping Community Church site plans (application #88-016) , Ms. Marcia Ba nach asked us to make revisions to the plans as set forth by SEA Consultants Inc. One of their comments concerns the proposed grading onto the Town property adjacent to our north boundary and notes that slope rights should be obtained from Lhe Town. This letter is a request to the Town of South Windsor for slope rights which would give us permission to grade the 'Town property. Sincerely, Earle H. Smith, Jr. Chairman, Building Committee Wapping Community Church y r Tio 07Sau� T)&U&10t o C V 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 OR•co AREA CODE 203/644-2511 June 2, 1988 6. Wapping Community Church 1790 Ellington Road South Windsor, CT 06074 re: Application #88016W Gentlemen: It has been noted that Modification #1 as limited in our April 26, 1988 approval letter for the above-referenced application is incorrect. Modification #1 of said letter is hereby corrected to read, "Consult with the State as to the viability of discharging to Plum Gulley further (north at the Town Hall entrance) where there currently is a crossing. " We regret any inconvenience this may cause, and appreciate your cooperation in making the necessary revisions. Very truly yours, -117 ohn M. Moran, Jr. , Chairman Inland Wetlands Agency/ Conservation Commission JMMJr. /pmm cc: A.B.Davies, Deputy Town Engineer Raymond Hallowell, Chairman, P&Z John R. Collins, Chief Building Official Marcia A. Banach, Director of Planning Michael Gantick, Director of Public Works SEA Consultants Inc. Engln era/Architects Principals Arnold B.Goldstein,P.E. Fred rick G.Aufiero,P.E. Mr. Michael J. Gantick, P.E. Robert M.Brandon,A.I.A. Director of Public Works Stephen H.Geribo,P.E. Town of South Windsor David T.Goodemote,P.E. Bruce E.Soule,P.E. 1540 Sullivan Avenue Kenneth M.St wart,P.E. South Windsor, Connecticut 06074 Anthony J.Zu na,P.E. Associates Re: Wapping Community Church Addition Steven L.Bernstein,P.E. Job No. 88126.24 Paul F.Gabri I,P.E. Mark Gould,P.E. Task Order No. 24 Micha IS.Schultz,P.E. Arthur A.Spruch,P.E. Dear Mr. Gantick: Paul C.Ross,P.E. As requested, S E A Consultants Inc. has reviewed the following for the above referenced project: Sheet No. Title Prepared By Date 1 of 7 Property Map Fuss O'Neill Inc. 7-87 2 of 7 Layout Plan " 3-88 3 of 7 Grading & Utility Plan 4 of 7 Profile � rt 5 of 7 Landscaping Plan 6 of 7 Conservation Plan 7 of 7 Details " �t Drainage Calculations & Narrative " 2-88 Floor Plans Moser, Pilior, Nelson it Elevations IN it This information was reviewed for compliance with the Town of South Windsor and Zoning Regulations dated July 24, 1972, and standard engineer- ing practice. We note the following: 850 Silas Deane Highway Section 4.13.2.3 PLOT PLAN Wethersfield,CT 06109-3412 (203)721-7993 All existing and proposed outside lighting should be shown on 485 Massachusetts Avenue the plan. Cambridge,MA 02139-4018 (617)497-7800 Citicorp Park West 100 Foden Road South Portland,ME 04106-2319 (207)775-2281 e Mr. Michael J. Gantick, P.E. SEA Consultants Inc. April 19, 1988 Engln rs/Architects Page Two The proposed drainage easement along Ellington Road should indicate grantor and grantee. All monumented points within the site should be coordinated and appear in tabular form on the plan. The plot plan appears to be labeled "Layout Plan." In accor- dance with this section the map should be entitled "Plot Plan." Section 4.13.2.4 TOPOGRAPHIC MAP Curbing lines should be labeled and pavement widths shown l on the map. Existing wooded areas indicated by foliage lines should be included. This map should be entitled "Topographic Map." Section 4.13.6 CONSERVATION PLAN The following note should be added to the construction sche- dule: "Construction of roadway and all utilities shall conform to standards and specification of the town of South Windsor Department of Engineering." An anti-tracking apron should also be shown at the Ellington Road driveway entrance. Who will be responsible for maintaining the impact basin after construction? Soil types and boundaries should be delineated on the plan. GENERAL COMMENTS The size of the proposed pvc sanitary sewer lateral should be indicated on the topographic map. Grading is proposed onto Town of South Windsor property along the north property boundary. Slope rights will have to be obtained from the Town and should be indicated on the plans. The note regarding the requirement of a state permit along Ellington Road should identify the purpose of the permit. w Mr. Michael J. Gantick, P.E. SEA Consultants Inc. April 19, 1988 Engineers/Architects Page 'Three Proposed drainage structures AD #2 and AD #3 indicate less than the Town's minimum requirement of two feet of cover over pipes. �- Legends indicating drainage structures, pipes, grades etc. should be included on the plans. Riprap type should be identified in the section of the impact basin on the detail sheet. Pre- and post-development peak discharge rates for the site during the 2, 109 259 50, and 100 year storm events have not been included in the drainage calculations. Therefore, the drainage design review cannot be completed until these discharge rates are provided. 8. The drainage narrative indicates a discharge increase of 3 cfs from 5� the site for the 100 year storm frequency. The narrative also indicates that there are no alternatives on the site which would allow the construction of a detention structure. Also, the high groundwater table prevents the usage of any infiltration system. Therefore, the plan indicates direct discharge into Plum Gulley C4, Brook without detaining proposed flows. The report concludes by comparing the increase of 3 cfs with the 100 year flow of 1500 cfs for Plum Gulley Brook as being negligible to the existing drainage system. 9. Since the time of concentration for Plum Gulley Brook is significant- ly longer than the tc of the site, the flow increases projected for the 100 year storm frequency should have minimal effect to existing conditions. A typical cross section of the proposed pavement should be shown on the plans. If you should have any questions, please do not hesitate to call me. Very truly yours, S E A Consultants, Inc. `� ��,.` ames R. Bancroft, P.E. JRB:mp PLANNING AND ZONING COMMISSION - 1 - JUNE 71 1988 SPECIAL MEETING SOUTH WINDSOR TOWN HALL MEMBERS PRESENT: Hallowell, Evans, Castro, Rossi, Montana, Sorenson (after 8:25) , and Woodcock ALTERNATES PRESENT: Hart (sitting for Sorenson until 8:25) SPECIAL MEETING CALL TO ORDER PUBLIC PARTI NEW B NESS 1. A 1. #88- P in CommunityChurch Site Plan north side Five Corners The applicant was represented by Earle Smith, Chairman of the Church Building Committee, Project Manager Betsy Kaemmerlen of Fuss and O'Neill Engineers, and Steve Nelson of Moser Pilon Nelson Architects. After an introduction by Mr. Smith, Ms. Kaemmerlen provided data regarding vehicular movements, utility hookups, soil analysis, and grading. She said that the ZBA had approved this addition to a nonconforming building but that a parking waiver was being requested. Mr. Nelson then reviewed drawings and elevations of the proposed addition, commenting that it had been designed with an eye toward blending it in with the existing structure. Attachments A (Wapping Church letter 6/2/88 requesting slope rights from the Town) and B (drainage easement) were presented for the record. Town Planner Marcia Banach presented the following report: 1 . Site size is 3.35 acres; new addition is 8180 sq. feet. Total site building coverage will be 8.7%; 10% is allowed. Proposed building height is 30' by our definition; 30' allowed. 2. The new addition meets all Town setback requirements; however, the existing offices encroach into the front yard setback and a variance was obtained to allow an expansion. 3. Public water and sewer are available. WPCA approval is not required. 4 . As indicated, on-site detention has not been provided as there is no suitable area available and there is a nearby watercourse capable of handling the increased discharge. The proposed increase is 3 cfs during the 100-year storm into a brook already carrying 1500 cfs, so it is anticipated that the impact will be negligible. The Public Works Director has indicated that he doesn't have a problem with this concept but does wish to retain final say over the drainage for the project. PLANNING AND ZONING COMMISSION - 2 - JUNE 7, 1988 5. There are no regulated wetlands on the site. Conservation Commission approval has been granted with the conditions set forth in its April 26, 1988 letter (Attachment C) . 6 . The applicant proposes to provide a total of 85 parking spaces. The parking formula as shown indicates that 166 spaces are needed. The Planning Department suggests the formula might instead show parking at 1 / 250 sq. ft. for the church and the new addition, and 1 / 125 sq. ft. for the 6000 sq. f t. of existing offices, for a total requirement of 107 spaces . (14,900 sq. ft. as place of assembly @ 1 / 250 = 60; 5928 sq. ft. as office @ 1/125 = 47 . ) Thus a waiver of only 22 spaces is requested. 7 . This addition should not result in additional traffic impacts since the use is simply moving across the street. The church generally uses the site at off-peak hours . The more southerly curb cut on Sullivan Ave. will be modified to enter-only for drop-off and handicap access. The main driveway is being modified to a standard 24, driveway with some queueing space available -- a feature which is presently not available on the site. The driveways onto Ellington Road will remain basically where they currently exist. 8 . Slope rights are required from the Town for parking lot reconstruction. We do not anticipate a problem with obtaining the required slope rights. 9 . Drainage rights are required for the drainage outlet as proposed. 10. The landscaping plan is quite attractive and, in combination with the architecture, should provide an attractive finished site. If approved, the Planning Department requests that: 1 . Slope rights be shown on the plot plan when obtained; 2 . The new concrete stairs to the existing office building not encroach on the building line. The only Engineering comment remaining was that the Engineering Department wanted to retain final approval of the drainage system prior to filing of the plot plan. The F. A. Hesketh traffic report (Att. D) was entered into the record. Questions and discussion followed among Commission members regarding vehicular access; curtailing drivers short-cutting through the church parking area; and possible effects of discharging drainage into the nearby brook. Mr. Sorenson returned and was briefed regarding the presentation and reports. Mrs. Evans made a motion to approve the application subject to the following modifications: PLANNING AND ZONING COMMISSION - 3 - JUNE 71 1988 1 . Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permits will be issued until the final mylars have been filed in the Town Clerk's Office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission. 4 . An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 4 . 13 . 10 of the Zoning Regulations. 5 . A landscape bond in the amount of $5000 is required and must be submitted prior to filing of mylars . 6 . All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 7 . Slope rights to be shown on the plot plan when obtained. 8. Concrete stairs to the existing offices should not encroach on the building line. 9 . Drainage is subject to approval of the Town Engineer. 10. Speed bump is to be installed across parking areas at walkways to discourage through traffic. 11 . Additional plantings must be added to the north property boundary abutting Town property as appropriate and as approved by the Town. Black and white transparent mylars of Sheets #1 and 2 with the above modifications, together with three blueprint copies of the entire set of plans, must be submitted to this Commission to be stamped and signed. The letters of approval of this Commission, as well as the Inland Wetlands Agency/Conservation Commission, must be reproduced on the mylars . After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk within 90 days. After filing these plans, a copy of the receipt must be submitted to the Planning Department. Mrs. Montana seconded Mrs . Evans's motion with the above modifications . After some discussion, Mrs. Evans made a motion to amend her original motion to include a requirement that additional plantings be added to the north boundary abutting Town property as appropriate and as approved by the Town. Mrs . Montana seconded, and this motion carried unanimously. The Commission th n voted on Mrs. Evans's original motion with the amendment, which also carried unanimously. �towN aa,� yT OP S_OU� ?d&&46'0t . U . �1� 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074 R•co�'� AREA CODE 203/644-2511 June 8, 1988 Wapping Community Church 1790 Ellington Road South Windsor, CT 06074 Attn: Mr. Earle H. Smith, Jr. Chairman, Building Committee re: Appl . #88-16P - Same - Addition Site Plan Gentlemen: We are pleased to inform you that the Planning and Zoning Commission voted at its June 7, 1988 meeting to approve the captioned application for a Site Plan of Development in accordance with Drawings No. 1 through 7 of 7 prepared by Fuss & O'Neill revised through 6-1-88, Project No. 87-65, and with the following modifications: 1 . Prior to commencement of any site work, a meeting must be held with Town Staff. 2 . No building permits will be issued until the final mylars have been filed in the Toim Clerk's Office. 3 . This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission. 4 . An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 4 . 13 . 10 of the Zoning Regulations. 5 . A landscape bond in the amount of $5000 is required and must be submitted prior to filing of mylars . 6 . All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. Wapping Community Church 2 June 8, 1988 7 . Slope rights to be shown on the plot plan when obtained. 8 . Concrete stairs to the existing offices should not encroach on the building line. 9 . Drainage is subject to approval of the Town Engineer. 10 . Speed bump is to be installed across parking areas at walkways to discourage through traffic. 11 . Additional plantings must be added to the north property boundary abutting Town property as appropriate and as approved by the Town. Black and white transparent mylars of Sheets #1 and 2 with the above modifications, together with three blueprint copies of the entire set of plans, must be submitted to this Commission to be stamped and signed. The letters of approval of this Commission, as well as the Inland Wetlands Agency/Conservation Commission, must be reproduced on the mylars . After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk within 90 days . After filing these plans, a copy of the receipt must be submitted to the Planning Department. Very truly yours, PLANNING AND ZONI G COMMISSION �i V(/ 'Ji(irr R and F. Hallowell, Jr. �- Chairman cc: M. Gantick, Director of Public Works F. Shaw, Supt. of Pollution Control J. Collins, Chief Building Official E. Belleville, Assessor W. Lanning, Fire Marshal M. Banach, Planning Director Inland Wetlands Agency/Conservation Commission Registrar of Voters Architect/Engineer Applicant ,0000PZC File <°VON &C 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 i t�vs AREA CODE 203/644-2511 uk qua TO BE PUBLISHED IN THE JOURNAL INQUIRER SATURDAY,JUNE 11 , 1988 LEGAL NOTICE TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION At the June 7 , 1988 meeting, the Planning and Zoning Commission voted to take the following actions: 1. Approve, with modifications, the application of the Wapping Community Church for a Site Plan of Development for property on the north side of the Five-Corners intersection, west of Ellington Road and east of Sullivan Avenue, RR Zone, 2 . Approve, with modifications, the application of LaCava Construction Company for an Open Space Subdivision of property east of Felt Road and west of Foster Street, AA-30 Zone. 3 . Approve, with modifications, the application of Kevin Minguey for a Site Plan of Development for property on the north side of Sullivan Avenue directly opposite Ann Field Plaza, GC Zone. Dated at South Windsor, Connecticut this 8th day of June, 1988 . PLANNING AND ZONING COMMISSION Raymond F. Hallowell, Jr. , Chairman Marshall Montana, Secretary 66 r CI'. FUSS&O'NSM ItE IVIO consulting engineers ()CT 5 V, Wo d 3L Pat s .September 30, 1988 ,:Victor J. LaBarre Department of Transportation, District One '1107 Cromwell Ave .Rocky Hill, Connecticut 06067 RE: Wapping Community Church, South Windsor Dear Mr. LaBarre: We are proposing to divert 1.8 acres to a positive discharge at Plum Gulley Brook rather than draining to Rte. 194. This will only have a negligible effect on existing drainage structures located downstream of the discharge on Plum Gulley Brook. The drainage area above the discharge consists of approximately 750 acres while our site drainage area is approximately 3.4 acres. Also, since the time of concentration is much larger for the larger watershed than for the on-site drainage area the peak 'for the larger watershed will come alot later than the peak of the on-site drainage area, further negating the effects of the diversion. In conclusion, the effects which the diversion will have on the existing Plum Gulley Brook drainage system is negligible. And finally, the diversion is not irreversible; if and when the state' s project does occur. If you have any questions, please feel free to call me. Sincerely yours, /)I I . 2_1 .ti William D. O'Neill, .E. Dean E. Audet President /Pj g 87-65 Corres. 0927ADEA.3 GC /q; G�4- 146 HARTFORD ROAD / MANCHESTER, CONN. 06040 / TEL. (203) 646-2469, FAX. EXT. 307 SOLID WASTE MANAGEMENT•WASTE WATER SYSTEMS a EROSION CONTROL•WATER SYSTEMS HYDROLOGY and DRAINAGE SYSTEMS SITE PLANNING HIGHWAYS and BRIDGES•SURVEYING•LANDSCAPE ARCHITECTURE TRANSPORTATION and TRAFFIC•PUBLIC WORKS MANAGEMENT•HYDROGEOLOGY O FVSS8c0'NEILL consulting engineers June21, 1988 1 John M. Moran, Jr. Chairman Inland Wetlands Agency D��" Conservation Commission Town-of South Windsor 1540 Sullivan Ave - t South Windsor, CT 06074 Dear Mr. Moran: We are submitting this letter along with our revised plans in order to clarify our response to the conditions in your letter of April 26, 1988. 1. The State will be consulted regarding the discharge to Plum Gulley Brook via the existing culvert when an encroachment f permit is sought. 2. The sewer pipe in Ellington Road is shown on the profile sheet 4 of 7. 3. The impact basin is also shown on the profile and is depicted in grater detail on sheet 7 of 7. The structure will be constructed approximately ten feet from the brook with a double row of haybales to protect it from sedimentation. The rip rap outfall from the basin to the brook has been extended to the opposite easterly bank; even though the erosive forces from the church's discharge will be controlled within the impact basin itself. 4. Barrier has been noted and Item 3 has been defined as within 30 days or as directed, see sheet 6 of 7. 5. Easement has been acquired. 6. Discharge permit to be obtained as necessary. 146 HARTFORD ROAD / MANCHESTER, CONN. 06040 / TEL. (203) 646-2469, FAX. EXT. 307 SOLID WASTE MANAGEMENT•WASTE WATER SYSTEMS•EROSION CONTROL•WATER SYSTEMS•HYDROLOGY and DRAINAGE SYSTEMS•SITE PLANNING HIGHWAYS rd BRIDGES 9 SURVEYING 9 LANDSCAPE ARCHITECTURE•TRANSPORTATION and TRAFFIC•PUBLIC WORKS MANAGEMENT 9 HYDROGEOLOGY -�o FUSSUMELK John M. Moran, Jr. June 21, 1988 Page 2 7. The anti-tracking apron has been shown with ties removed, see sheet 7 of 7. 8-12. Will comply. Very truly yours, William D. O'Neill, PE Betsy A. Kaemmerlen President Landscape Architect /pi g cc: Earl Smith Marcia Banach 87-65 Corres. 0621A88BAK1 t o-P S ?d&zd4ot 4 �v 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 R.CO AREA CODE 203/644-2511 Mr. Earl Smi th Wapping Community Church 1790 Ellington Road South Windsor, CT 06074 RE: Preconstruction Meeting - Wapping Community Church t (C� October 5, 1988 9:30 A.M. IN ATTENDANCE Name Company Telephone # Marcia Banach Town of South Windsor 644-2511 Michael Gantick Town of South Windsor 644-2511 Karl Rei ch1 a Town of South Windsor 64 4-2511 Chris Nelson Conyers Construction 646-5775 work 8 75-4 735 Home Miner C. Friend Wapping Community Church 528-2864 Earl a Smi th Wapping Community Church 64 4-1891 Fred Shaw Town of South Windsor 644-2511 Santo Tudisca Mitchell Trucking 528-4431 The following is a brief summary of points discussed during the meeting. Public Works 1 . All erosion and sedimentation control measures are to be in lace prior to earth moving operations in each area and maintained cleaned out during construction. Call Zoning Wetlands Enforcement Officer for inspection when measures are in place. 2. Four complete sets of approved/revised plans to be provided to Town prior to start of construction. They will be stamped by Planning Department along with plans developer needs. 3. The Public Works Department is to be notified forty-eight (48) hours prior to the start of major construction work with inspections and testing per Developers Checklist required for the following: a) After site is staked out b) All drainage work c) Preparation of subgrade, compaction tests as required by the Town. d) Preparation of subbase, six (6) inch lifts e) Placement of bituminous concrete, 1 112 inch layers. 4. Certification of gravel used as subbase will be required by an approved testing company. 5. No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation. 6. As built plans are to include horizontal and vertical location of all underdrains, footing drains sanitary sewers located by a certified land surveyor. 7. All topsoil stockpile areas to be protected (ringed with haybales or equal) . 8. All pipe and structures to be backfilled with free draining material, compacted in maximum one foot lifts with approved compaction equipment. 9. During construction of the driveway a crushed stone tracking pad is to be installed and maintained to minimize tracking of dirt/gravel onto Foster Street. Calcium chloride is to be used for dust control as required. 10. Any problems and/or questions regarding construction of this project will be directed to Earle Smith or Chris Nelson, in the field. 11 . Driveway to be paved with base course prior to issuance of Certificate of Occupancy. No utility cuts after paving. 12. Developer/Contractor to submit mark-up print of any buryhol e locations. To be shown on as-builts. 13. All filling to be done in accordance with Department of Transportation specifications. To be compacted in maximum lifts and tested as necessary. 14. Weekly job meetings will be held as needed. 15. Forty-eight (48) hours notice needed for Certificate of Occupancy inspection. Two week review period (1 0 working days) needed for all individual site (lot) plans prior to issuance of building permit (may be longer if application is incomplete) . See General Guidelines for Certificate of Occupancy. 16. Only approved copies of lot site plans to be used. Any proposed changes are to be presented to Engineering/Planning & Zoning prior to implementation on change sheet. 17. DOT Permit needed for all work within state road. Copy to P & Z. 18. Grading and transplanting of trees along Town property to b coordinated with Karl Rei ch1 e, Superintendent of Parks and Grounds. 19. No paving after October 15 without written approval from Director of Public Works. 20. Hours of operation 7:00 A.M. - 5:00 P.M. , no work on Sunday. Any pipe/structure work requires inspection prior to backfilling. Planning Department: 1 . Visible site - maintain all construction control measures. 2. Coordinate work near state roads with South Windsor Police Department. W.P. C.A. 1 . Additional connector fee of $400 to be assessed prior to connection to sanitary sewers. SNET/NU 1. Contact utilities for coordination of utilities connection. Fire Marshal 1 . Blasting (if required) to be coordinated with the Fire Marshal. Police Department: 1 . Emergency phone numbers for the duration of the construction must be provided to the Police Department on a company letterhead. If the developer occupies or owns the building/s after construction emergency numbers must be provided to the Police Department. 2. Erect a temporary "Trucks Entering" sign on Sullivan Avenue. Building Department: 1 . Plan review with Building Official/Fire Marshall required prior to application for building permit. Coordinate with Chief Building Official. Very truly yours 0 . Marcia A. Banach Director of Planning MAB/pmm cc: A. Bowen Davies, Deputy Town Engineer Gera 1 d Lewis, SWPD Karl Rei ch1 e, Public Works Mel Stead, Public Works Michael J. Gan ti ck, Director of Public Works Minh V. Le, SNET Hal Clisby, CL&P John R. Collins, Chief Building Official Fred Shaw, Superintendent of Pollution Control John E. McCahi l l, Zoning Enforcement Officer Miner C. Friend, Wapping Community Church Santo Tudisca, Mitchell Trucking Chris Nelson, Conyers Construction Company 4..Alemo from TOWN OF SOUTH WINDSOR TOWN HALL SOUTH WINDSOR, CONN.06074 F TO Richard J. Sartor DATE 10/13/88 Town Manager L FOLD- SUBJECT: Signature card for Wapping Community Church Please sign the attached signature card for two account which have been opened at CBT For the Wapping Community Site Plan. They recieved Planning and Zoning approval on 6/7/88 and have opened accounts in the amounts of: $5, 000. for landscaping $3, 000. for IWA/CC Thank you. By Michele R. Lipe Assistant PLanner 4� emo from TOWN OF SOUTH WINDSOR TOWN HALL SOUTH WINDSOR. CONN. 06074 PZC F TO Wapping Community Church 10-14-88 c/o Barbara Klenke DATE L SUBJECT: Signature card FOLD- Mrs. Klenke, I 'm told the reason for asking you to become involved with this CBT card is that your signature is required (both spaces checked) because fh&seJtjP*, joint accounts of the Church and the Town of South Windsor. Please sign and forward to CBT in the stamped, addressed envelope provided. Thank you. By Toper, Ckmcordinq . Tio�� apSou� ?&-Z� O � G U 1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN. 06074 ���soe•co�'� AREA CODE 203/644-2511 January 17, 1989 Mr. Chris Nelson Conyers Construction Co. Inc. 77 Tolland Turnpike Manchester, CT 06040 RE: Wapping Community Church Construction Dear Mr. Nelson: Last Wednesday, Mr. Gantick, Public Works Director, Mr. McCahill, Zoning Enforcement Officer, and myself visited your site and encountered a condition that shall probably jeopardize consideration of the Certificate of Occupancy for your site. A little over three months ago, you participated in a "Preconstruction Meeting" establishing the basic ground rules expected during construction and inspection routine, to assure compliance, quality control and allow construction to proceed in an orderly manner. I presume your payment for services rendered is probably regulated by acceptance to these standards by your client and appropriate Town Commissions . Our immediate focus was on the storm drain outf all area east of Ellington Road, in and around Mr. Cavaliere's property. Our observation was, the stone being used in Plum Gulley Brook was an improper size, the impact basin was at the wrong elevation and was supported on the 15" storm pipe and the integrity of the unknown structure, damaged due to construction, had not been restored. The items in the October 5, 1988 outline highlight procedures and concerns to be addressed during construction. No. 16 requires approval of changes prior to implementation. There are no requests in our public works or planning file. The Plum Gulley Brook, at this point, probably collects storm water runoff from over 3 ,000 acres and is funneled-through this narrow area. The size of the rip rap was designed to hopefully prevent a scouring effect and eroding Mr. Cavaliere's property further. The impact basin has been constructed without adequate support at the easterly end, which in time will probably cause a failure in the pipe supporting it. Also the bottom of the basin was designed to be about one foot above the brook bed. Mr. Chris Nelson - 2 - January 17 , 1989 r The hole in the unknown structure exposes us all to an unplanned and unnecessary liability. This structure is outside any indicated construction limits and to leave it open to the elements for weeks isn't too clever. Most of the houses in Wapping existed prior to the availability of municipal water and wells were their domestic water supply. Using the worst case scenario, presume, until you know better, that this is someone' s water supply. You have certainly contacted your professional engineer for a detailed report including recommendations and perhaps a schedule for a connection to a municipal system, if required. Ample time has passed to have this report available, we would like a copy please. Also a copy of your daily log when the hole occurred with your recommendation, for our records. Please contact us prior to any restoration. No. 20 in the preconstruction report goes on to require inspection prior to backfilling. Our visit was per chance, not by request. The filling was not being inspected and could raise additional concerns as to what - else was -covered without inspection.- The standard condition of approval by the Planning and Zoning Commission requiring an as built drawing to be submitted for approval prior to the issuance of a certificate of occupancy is reinforced in Item #6 of the preconstruction letter indicating the basic accuracy expected, Locating the buried utilites . This is not a waivable matter. Construction was initiated with this condition in effect, your engineer shall certify to that accuracy. As indicated earlier, searching our files we find no requests for changes or modifications to the approved plans or standards from either your client or yourself, as general contractors, since the October meeting. It seems a safe conclusion would be to expect no deviation up to this point, from the approved site plan. In anticipation of additional work in the area around the outfall at Plum Gulley Brook, please call us prior to this activity, consistent with the October letter, so we can provide suitable inspection. The inspector can be contacted at 644-2511, Ext. 257 . I can be reached at extension 240 . Very truly yours, A. Bowen Davies Deputy Town Engineer ABD/jsv cc: Earle Smith Michael J. Gantick, Director of Public Works Marcia A. Banach, Director of Planning John McCahill, Zoning Enforcement Officer File Enclosure y r T-0 014C S ?d&UlAot o � 9 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 ��~osoR•co��� AREA CODE 203/644-2511 April 12, 1989 Wapping Community Church 1790 El-lington Road South Windsor, CT 06074 Re: Application #88-16P - Conservation plan for proposed addition and parking. Dear Madam/Sir: At the April 10, 1989 meeting, the South Windsor Inland Wetlands Agency/Conservation Commission approved a one year extension of Application #88-16P with all original conditions. In addition to the original conditions you are also required to contact John McCahill, Zoning/Wetlands Enforcement Officer (644- 2511, x229) immediately upon approval notification. This is to re- confirm the contact person for the site and establish a site visit with that person to verify all erosion and sedimentation control measures are in place according to the plan. Application #88-16P becomes effective May 19, 1989 and expires on May 19, 1990. Very truly yours, ohn M. Moran, Jr. , Chairman Inland Wetlands Agency/ Conservation Commission immir. /pmm cc:John E. McCahill, Zoning/Wetlands Enforcement Officer Marcia A. Banach, Director of Planning John R. Collins, Chief Building Official Raymond Hallowell, Chairman, PZC Jerry Iazzetta, Town Engineer Enclosure t 0,0 f q O C V �Cd 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 �'►'osoR.CO AREA CODE 203/644-2511 May 11 , 1989 Earl H. Smith, Jr. , Chairman Building Committee Wapping Community Church 1790 Ellington Road South Windsor, Connecticut 06074 Re: Temporary Occupancy Wapping Community Church 1790 Ellingotn Road South Windsor, CT. Dear Mr. Smith: Please be advised that beneficial occupancy is hereby granted for the use of the Multi-purpose Room at the above mentioned building erected under Building Permit # 17320, May 11, 1989 . No other occupancy is approved at this time, and occupancy of the new area is not to commence until the permanent Certificate of Occupancy has been issued. Si Now John R. Collins Chief Building Official cc: Marcia Banach, Director of Planning Jerry Iazetta, Town Engineer C1 J (729 app uky,, C���� Tim" 1790 ELLINGTON ROAD SOUTH WINDSOR, CONNECTICUT 06074 C RICHARD S.TOSH,SENIOR MINISTER (203)644-0833 2 �� JAMES R.HANSEN,MINISTER OF CHRISTIAN EDUCATION 0c, U n ti : . . i ;.p 117 �RcH° $ „ SEP 20 1989 September 19, 1989 South Windsor Planning & Zoning Commission Planning and Zoning Commission Town of South Windsor South Windsor, CT 06074 Att: Mr. Raymond F. Hal 1 owel1 , Jr. Dear Sir: At thi s time the con structi on at the Wapping Church' s new facility and the related work on the Town property has been completed except for the second replacement of three maple trees on town property. Inasmuch as the value of the trees and the 1 abor to re- place them amount to less than $1500, we are requesting that the bond in the form of a bank account be reduced from $5,000 to $1800 as soon as possible. Yours very truly, " �k, <Sx�� %"�. Earle H. Smith, Jr. Chairman, Building Committee Wapping Community Church EHS:emf UNITED CHURCH OF CHRIST,CONGREGATIONAL 0110 st,<� c If, Tio 0-1 � �• e � 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 4�'SOR.CO AREA CODE 203/644-2511 November 9, 1989 Mr. Earle H. Smith Wapping Community Church 1790 Ellington Road South Windsor, CT 06074 Dear Mr. Smith: RE: Wapping Community Church - $ 3,000 IWA/CC Bond $ 5,000 Landscaping Bond Please be advised that the above referenced bonds were released by the Planning and Zoning Commission at their October 24, 1989 meeting. Please make arrangements with the Planning Department at 644-2511 to pick up the bonds . Very Truly Yours, / Marcia A. Banach Director of Planning cc: IWA/CC file r r' CWT" TD~Umit�t wuwk 1790 ELLINGTON ROAD SOUTH WINDSOR,CONNECTICUT 06074 ,r RICHARD S.TOSH,SENIOR MINISTER (203)6"-0833 2 SANDRA T.BENJAMIN,ASSOCIATE MINISTER LD — et O f✓ CyvRrµ of September 18 , 1991OUR Marsha Banach Town Planner 1540 Sullivan Ave. South Windsor, CT 06074 Dear Ms. Banach: In response to a request from Don Mikkelson, a Property Trustee of Wapping Church , I am writing to inform you that Wapping Community Church will be using a room in the sanctuary wing of our facility to sell SERRV products as an ongoing fundraiser for local church and global mission. SERRV is a nonprofit international mission program sponsored by Church World Service. The products are produced by handcrafters from 44 third world nations. They are marketed by nonprofit churches and organizations worldwide. They will be available for sale to church members and to the general public. If you need further information from the church regarding this project, please contact the Property Trustees through the church office, 644-0833 , or feel free to call me directly. We want to be sure that we are keeping you informed in accordance with town zoning requirements. Sincerely, The Rev. Sandra T. Benjamin STB/af 1 UNITED CHURCH OF CHRIST.CONGREGATIONAL