Loading...
HomeMy WebLinkAbout12 Commerce Way (2) TOWN OF SOUTH WINDSOR, CONNECTICUT PLANNING AND ZONING COMMISSION APPLICATION FORM �3cj . t-� .� App. No. ,� Receive k , IMPORTANT! A�tildn Or Public Hearinq By: planning and Engineering Department staff require 14 days to determine applieati n Receipt NO. 3 completeness. To ensure receipt of a complete application by PZC, it is strongly recommended that the application be submitted 14 days prior to the Regular meeting kt�7 it will be received. WN , , w APPLICANT: JFI Associates , Inc. P. O. Box 1061 ADDRESS: 75 Commerce Way, South Windsnr TELEPHONE: 289-7662 OWNER OF RECORD ON LAND RECORDSIFI Associates, Inc. ra. ti�� Zoning Coma��ss�+� ADDRESS: P.O. Box 1061 75 Commerce Way South Windsor , CT 06074 COMPLETE LOCATION OF PROPERT� Qlts 9 & 10 , John Fitch Industrial Centre , 20 Commerce Way, South Windsor , CT ZONE: I NAME, ADDRESS & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: Raymond J. Alexander, P.O. Box 1061 South Windsor , CT 06074 � T TELEPHONE: 289_76h2 i I THIS APPLICATION IS FOR: (Check one of the following) 1. Zone Change to (public hearing required) 2. Subdivision i 3 . Open Space Subdivision (public hearing required) 4. Resubdivision (public hearing required) 5 . Special Exception to Article (public hearing requir d) x 6 . Site Plan of Development 7 . Earth Filling (Section 10) and/or Earth Removal (Section 9) (public hearing required) 8 . General Plan of Development 9 . Regulation Amendment: Zoning Subdivision 10. Other (explain in detail) PHIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY AND SUBMITTED IN TRIPLICATE WITH SIX SETS OF THE MA (7 � f pu 1 c hearing is required-1 41ND OT it DOCUMENTS (see pa ��J .Jai As o iate ,�� n�� - �. � IFI s ciates , Inc . Agplica Owner 1/14/87 (see revers side) TOWN OF SOUTH WINDSOR, CONNECTICUT PLANNING AND ZONING COMMISSION APPLICATION FORM This application is complete and ready for Planning & Zoning Commission r ceipt only upon submission of all required documentation, including, but not necessarily limited to, the following items. Not all items ar r quired with every application. See applicable sections of the South Windsor zoning and subdivision regulations for specific requirements. APPLICATION CHECKLIST x 1.- Key Map X 2. Architectural Elevations/Floor Plans X 3. Completed application form (in triplicate) X 4 . Required fees X _5. Zone Change, Site Plan, Subdivision, Open Space Improv - ment, and/or General Plan of Development maps, in accordance with regulations. (Six sets - seven if public hearing r quire( 6. Plans & Profiles/Drainage Calculations X 7. Conservation Plan X 8. Landscaping Plan 9 . Traffic Engineering Report 10. Narrative Statement 11. Sanitary Report 12. Copy of agreement to purchase land (if not the owner) 13. Other ALL PROSPECTIVE APPLICANTS ARE URGED TO CONFER WITH TOWN PLANNING DEPARTMENT AND ENGINEERING BUREAU STAFF PRIOR TO SUBMISSION OF ANY APPLICATION TO THE COMMISSION. CONSULT PLANNING DEPARTMENT FOR FEE SCHEDULE. 1/14/87 CHECKLIST REQUIRED INFORMATION SITE PLANS This checklist must be signed by plan preparer (P. E. /L.S . ) declaring that all required information is provided . Items 1-7 are required for all applications ; items 8-11 required where appropriate. Check mark for each item supplies . X_ 1 . On each sheet for plans or maps , title block with the following information : a. Name , address and telephone of applicant . 4 b . Name , address and telephone number of Land Surveyor or Professional Engineer. C . Name of Development . d . Date when drawings were made. 2. Key Map : An overall map drawn to a scale of 1 inch equals 200 feet , which can be used as an overlay on Metropolitan District Maps . This map will show the overall design of the Development and surrounding property within 500 feet . a. Data block which gives needed zoning information such as percentage of lot coverage, acreage of tract , number of apartment units , parking requirements , etc. b . Layout of buildings C . Layout of streets and parking . d . Lines indicating proposed -drainage system with direction arrows. _ e. Lines indicating sanitary sewer system with direction arrows. f . Names of surrounding property owners. _ g . Proposed open spaces and recreation areas. h. Driveway cuts on surrounding properties . 3. Architectural Elevations : Plans of the proposed buildings drawn to a scale of 1/8" - 1 ' - 0" showing the elevations of all sides of- the proposed buildings in sufficient detail . to show architectural styling . - Architect ' s seal on elevations for buildings in excess of 5000 square feet ( per CGS Chapter 390) . Page 2 (Site Plans ) d site drawn to map of the propose 4 . Plot Plan: A layout40 feet on either of the ruled °f 1 inch equals 24,1 X 36" with a 3/ a scale � 1) 2 ruled in , followin(2)118"sXe24s • with a 1/ �� mar8 margin , following data: the containing all boundary lines and a, Distance Iron P and bearings of ins required at all _�— acreage of site . ints and shown on map. property with center line Proposed streets and street lines Prop and p spaces , b . data , pa P stations , curve C . Building lines in accordance with zoning regulations. including other structures, on GOncr to Propose buildings and a signs , nd dumpsters d . Prop lighting , outside pad and screened) e. Easements , noting grantors , grantees , and purpose * ng property owners . f . Names of abuttirop corners and angles indicated at of curvature and Monuments will a points g. and at all P to Metropolitan of all streets accessible In areas or other cOcpos posed site ated tangency . Dints , posed District Commission P points within pro shall points , the monumented These coordinates The shall be coordinat d. on the plot p appear in tabular MDC points shall be accessibility of these determined by the Town Engineer . h. All open space or other common or public land uses �r shall be indicated . A_2 certification; P •E• /L•S • Seal. _�— i . to to a scale of 1 inch A map drawn 36 inches , T„�o ra hic Mom: exceeding 24 inches by 5. �.. addition to the sheets not shall in on feet margins - laps the following. — includingntslOf the plot P show requireme existing and proposed buildings. a, All �- lines and pavement width, sidewalks. b , Curb li SeWers . ro osed sanitary C. Existing and P P and gas main systems , proposed water d, Existing and p are indicated by foliage lines . e . Present wooded ar to be saved should be shown. Any individual trees � L) ILe rLans � Existing and proposed contours shall be shown in not less than two-foot intervals , but in cases of relatively level land , the contours shall be one-foot intervals and spot elevations . _ g . Regulated wetlands and 100-year floodplain or note that none are present . _ h. Proposed storm drainage system, showing all catch basins , endwalls , manholes , lengths and sizes of pipes. (Minimum distance between catch basins shall be 300 feet and minimum size of storm drain lines shall be 15 inches . ) _ i. Connections of all springs into proposed storm drainage system as needed. _ j . Location and indications of existing brook channels , and 100-year flood limits. --- k. A-2 Certification ; P. E. /L. S , Seal . _ 6. Landscaping plan . >_ 7. Drainage calculations - Zero Runoff Increase per attached guidelines . . 8. Traffic report . 9. Plans and Profiles : A plan and profile of the proposed streets drawn on plan/profile paper of scales 1 inch to 40 feet horizontally, and 1 inch to 4 feet vertically on sheets not exceeding 24 inches by 36 inches , including ruled margins and containing the following: a. Layout of streets in sections coordinated by stations with the profile . b. Street plan showing roadways and drainage. C . Sight line at driveway & street intersections. d. Profile of roadway showing existing and finished grades . Roadway profile will show all tangent grade and all vertical curve information. e. Profile will show all catch basins and all drainage lines between catch basins with all invert and top of frame elevations. Drainage lines will be shown and described as to material . f . Where any storm drainage line discharges into an existing brook sufficient profile of this brook will be shown to determine conditions. g . Metropolitan District Commission datum shall be used on all sites accessible to these control$ . The Town Engineer shall , based on standard engineering practices , determine the accessibility of these controls. Page 4 (Site Plans ) h. Profiles shall show all sanitary sewer lines and manholes , including elevations , sizes, lengths , and slopes of pipes. Top of foundation el vations for building shall b shown . 10. Open Space Site Improvement Plans: For sites which require or include a provision for open spaces , a plan which contains data for site improvement may be required . This map shall be drawn to a scale of 1 inch equals 40 feet . 11 . Sanitary Report: Where individual sanitary sewage disposal systems are proposed, the final plans shall include a Sanitary Report certified by a Professional Engineer . The report shall demonstrate the feasibility of the proposed individual systems; the report should deal with the area as a whole , discussing the following points: a. General nature and development of surrounding area. b. Topography and natural drainage pattern. C. Subsurface conditions as shown by subsurface investigation , including soil absorption characteristics, ground water level conditions, ledge rock , and general nature of soil . d . General description of type of development contemplated . e. Detailed description of proposed sanitary sewage disposal facilities , indicating sizes for various ground conditions , materials to be used , and the general layout pattern to be used , etc . f . Special precautions that may be necessary to provide proper functioning of the proposed disposal systems. g . Map of general area with locations of all tests shown on proposed layout . h. Flood heights of any nearby streams , brooks, or rivers . i. Test results and engineering evaluation per Section 4. 13 . 5. All information required above is included in this application at the tim of submission . P N R PA R November , 1987 � � �11111�1� 1 t • Hxtr'.- tD dY: uAi f FUSS&O'NEILL sH. NO of 'Z vv S 3 MANCHESTER. CONNECTICUT CHECKED BY: DATE. °ROB•NO. STORM SEWER SYSTEM TOWN DESIGN C��N -STOIC 5• WItiIDSoZ 'N' HEADWATER FULL CAPACITY AVERAGE VELOCITY �,� M iri l„ a. Ni th SLOPE p d o v a o O o a o o LENGTH OF PIPE . o p 1,� K) c a n- q CL .� `J J PIPE SIZE � _ _ ;4 _c , Qi °- 0 IN SYSTEf: o� c� O RAINFALL 1NTEt1SI Y r � �n �i Sri J Li r SUt; OF Al IN �,,� O �) 1 CI ? M SYSTEM d o O ` n M a a Al ENTERING ' T 1k� ►j cll CATCH BASIN - Q '- O ACCUPULATED T I NE `� O In ofl no �.1 I TII•:E IN PIPE bo T IKE TO 114LET O O a N "s I ri LINE SEGMENT oll / r,;t�SD ar: UAi-� jr FUSS&O'NEILL Sty. NO Z O Z MANCHESTEII. CONNECTICUT CHECKED BY: DATE: DROJ.NO. y STORM SEWER SYSTEM TOWN DESIGN ,N• a 0 HEADWATER FULL CAPACITY N v AVERAGE VELOCITY ri SLOPE 0 o LENGTH OF PIPE . (� CL n- PIPE SIZE .� 0 1 N SYSTEM: Cho M RAINFALL INTENS1 SUH OF A 1 I N SYSTEM Al ENTERING ' CATCH SASIN I O ACCUMULATED TIME M cri T N Tif•:E IN PIPE T I t:E TO 114LET M LINE SEGMENT _ � t _9 O FUSS&O'NEILL PREPARED DATE CHECKED DATE PROJECT NO cow dthg engineers BY BY C-P ff Ao/87 —SUBJECT: D k.Y*Ifx F— COAFt)— SHEET NO. of T'�Z4 Z-00 j 14 �9 tl !V --' -Z-1,S.43 4-5 F 0.&S 4 To rt-- �av c 4 i A 7' -b" D = 03(o ot 4,41>4C>�- A-"I *4� -� FUSSMYNEILL PREPARED DATE CHECKED DATE PROJECT NO O constAtU1g engineers BY BY 3/64/7 SUBJECT: SHEET NO. Z or Ar Ar 19. 74� I d o d - 5 ,+ — — —_ 7 7V- -� _ S�� !— I ' - .p - -`} -�-I- - - I �t, L 44 OLA Al G t + 1+ I - - f-- - �} 7-- 33 ,44 _ :T '----------' -------'- -'---'- --- --'--------' -- -� FL)SS8c0'N8LL PREPARED DATE CHECKED DATE PROJECT NO corsUtirg er-4reers BY BY � ~= ~~~~~C. FM of 13 L I f -� � +~ �,- . �4 VJ!!�ds�•r Pl,nr,�lg & Zoning Gomm!ss!oc JFl ASSOCIATES, INC. CONSERVATION NARRATIVE DRAINAGE COMPUTATIONS FOR CORNERSTONE EAST 20 COMMERCE WAY LOTS S & 10 JMmE J. 1Ltt CONSULTING ENGINEER LAND SURVEYOR SUBDIVISIONS 412 WEST AVON ROAD, AVON, CONNECTICUT 06001 PHONE 673-0446 SURVEYS SITE PLANNING LAND EVALUATION DRAINAGE STUDIES SANITARY SOIL EROSION AND SEDIMENT CONTROL PLAN Lots #9 & #10 Commerce Way Narrative January 1989 A. OVERVIEW: The project is a 22,000 sq. ft. multi-tenant industrial building on a 3.2541 acre parcel. The project site is located on lots 9 & 10 of the John Fitch Industrial Centre Subdivision, Phase I. The parcel is rectangular approximately 360' x 400' and generally flat. The northeast corner of the parcel falls away to a drainage Swale that enters a 54" concrete culvert that passes into the project's comprehensive storm water detention basin. SOIL TYPES; The south 80% of the parcel is well drained soil, (WVA- Windsor Fine Sandy Loam w/ 0-3•� slope with a small area of NnA- Ninigret Fine Sandy Loam w/ 0-3% slope). The remainder of the parcel is fill material from previously granted permit (Made Land) . VBGETATIOI4; The parcel is generally open field. The Sullivan Avenue frontage contains a number of trees, (plotted on Conservation Plan), that are incorporated into the Landscaping Plan. The east side of the parcel contains various vegetation ranging from bushes and vines at the edge to 12" diameter trees farther into the woods. The site contains no wetland type soils and it is not located in a flood plain. However, as part of this site development, we are providing stabilization to the bed of the existing drainage swale. As part of the stabilization system we will be modifying the existing culvert system to provide for a reduction in stream erosion. B. SCOPE: This project consists of the construction of a 22,000 sq. ft. multi-user building area with its required utilities and storm drainage system on the 3.2541 acre site. Of the 3.2541 acre area in this parcel, this project will entail the disturbance of approximately 2.84 acres on 87%. Fill area shown is approximately 2,900 sq. ft. or 5% of the site. The area of tree and brush to be removed is approximately 8,900 sq. ft. or 15% of the site. I r.e. (_� } /r~? -� ��` EXISTING .a .e r fir' FROM TO DRAINAGE AREA TIME RAINFALL DISCHARGE LENGTH SLOPE SIZE OF MEAN PIPE CAP. INTENSITY Q OF OF PIPE VELOCITY FLOWING COMMENTS A A C A C A -5 C A A t -I t I PIPE PIPE FULL ACRESI ACRES ACRES MINS. MINS. IM/HR. C.F.S. FT. FT./FT. IN. F.R S. C.F.S. C CI3 ' � Z a,y 6 0.5 .z.� _-z3 3 o S•2 /-2- a oo !.o% �5 �b o,� C5 GB Z o.2y �.✓ .Iz .�s ; � 5.z ,.8 ao , . �. fs or< GS O k i LUVJ 412 A ROAD q ,`Q� Es J. Tim NU.'J415 'FQSTER0 S I LUZZI ENGINEERING & SURVEYING Sheet--] Of Project Date OcV I _I I I•i l I A l i � j l ( l 1 1 I I j l i ' I7j0 I ; i I• �, I I lV��G - i 1 i jl � l Ililllljlll li � iii � i 1 „ � � I -i '• j- � I � � � 1 I � I � I I I I I i I ,�1 '� •j �. �Q�Q e II Il ; tllil � 1 Ili I lie - - - - ��I � I , � i1111111Ij I ! i ! I � Il � llljl I I ' I I rl � I i I 1 I I I I ;�, 1� � • I0, LI • I - I _I I I � 1 � � 1 1 1 I � I � � ( � I I � � � I i I �� i � �;I � L i � ; 1 �•; l i i • -I - i j I ICI I I I-I I 1 I j i i l ! I 1 ' I ' I I II I I ! i - q i C�1• �� ('i v\ I -,� - III --11 � 1 � i-► � ' , ! II � � I . � I � III , � - .� I • _�� _f� I I I � I I I. I � i I I i I j 1 i i j ��1 (� i _ 1 1 1 II' II Ili ! I 111 li i � 1 � i1 � -I _ III III III 1 I � I I I II 111 I ill illl I I I ; ill l 'j 1 , '' . I .II _ �� IIIIIIII � III ! It � i � jl � � II ' i I I I I H.! LUZZI ENGINEERING & SURVEYING Sheet, Of Project_ QAsocAcA�P-S. Date_ • 'I• ' I_' Illi ' I ' II '" -�-III f ;l � Illl � ii Ii Ilillill -1 � ►IF -;gw ; ; j 'RI BC � .1A?H IT J j I � I I I I I I I it i I I • � 1 � fr � i I IllilI I � I � III I I • Ji- Y I I II � il I I1 ' I 1 I ,_� I �, � III Ijli ! Ijl �xlll III I I ' I I. I —I. IIII iI Ii I � 8 I I i h I i FL-cti -f � I I I a. �-� I I I I I t i ' I Iti1� I • I I I 111 I ' I I - I I •� I I I I I I i l ! �� I C!� I I F30 _ _ � Iliill � II�'i ICI il ,' I I I I � . I IIII I I li I i I I I I I I I I . I I � k I • - I � �- I � '- I_ -i I -r I f- ! i � I i � i I � I I ! � I I I II Iljli ! � I190� 15� fi I ; ( IIII Z70 I • _ I I I l i I I I I I I I I I - _�- _ I I�I � � l i j I•I ' ' I � I I l i l . ,�''�''' nnn� t l i � , , , I- I I II � Ii lijij I ! I I i I I I • � I � � ' I � � � � I I I 1 � I I I i I I I I il'' I I I I LUZZI ENGINEERING & SURVEYING Sheet j of Project 1�r�rn�a�l� ��4,��,��•, `� C-' �,. _ Date • �-�- -iil � ' { III � t i � , � : ; ! i � I � Ii � ; ' � i . . , I i II i i I i I / _ ' ! � i ♦ � ' � I I i ' I � ! I/ its I ' � I 1 I T..�.-, --, I i I I I IMI -IIII I I � I I ' I I i _ I I I II II i � : illl � � , I � I Ilj '' � � II � i � •�4� • - .�.-I I I I � I I ! I I I I I i I i i1 _�. � � I I I I I I I I I 1 I 1 I I I II II ! II � IIII , III � ICI ' I I j I I I i I ' I I - � •r. I I• I t i t I I I It � II i ' I � li � III � lilll � lj III ' , , I � I I � III i II i Ilijl I j F I Associates, Inc. P.O. Box 1061 South Windsor, CT 06074 (203) 289-7662Town` Clerk . CERTIFIED MAIL January 23 , 1989 Town Clerk Town of South Windsor 1540 Sullivan Avenue South Windsor , CT 06074 RE: John Fitch Industrial Centre Lots 9 & 10 , 20 Commerce Way , Cornerstone East Dear Property Owner: On Monday evening, February 13 , 1989 , at 7 :30 p.m. the South Windsor Inland Wetlands Agency/Conservation Commission will hold a public meeting to receive and discuss an application from JFI Associates , Inc . for a site development plan for the referenced location. As an abutting property owner , you are invited to this public meeting for comments . However, you are not required to attend this meeting. Should you have questions concerning this application, please contact the office of the Inland Wetland Agency/Conservation Commission at 644-2511 , Ext . 253 . Sine ely, Raymond J. Alex nder RJA/iba o r Gory K. Tyler y Chief of Police �AV SOR•CO� Police Services SOUTH WINDSOR POLICE DEPARTMENT CONSTRUCTION REQUIREMENTS Project Title: 89-07 P Lots 9 & 10 Date: 13, Febuary 1989 19 1. Developer is responsible for the purchase and installation of all street and traffic signs. Any signs on or intersecting with a State Highway must be cleared through the Department of Trans- portation. All signs must be in place before a c.o. is issued. 2. Developer is responsible for the purchase of all street lighting r through Connecticut Light and Power. CL&P will install all lighting once they have received payment from the developer and the locations of the lights has been reviewed by the Police Department. All lighting must be in place before a c.o. is issued. NIS 3. Developer will submit three (3) 82 x 11 or 82 by 14 maps of the proposed project to the Police Department for the purpose of i identifying and locating all signs. Completed maps will be distributed to the developer, Town Planner and the Police Department. Any changes in road design will require new maps. 4. Temporary street signs must be in place as soon as possible and maintained throughout the project. 5. Emergency phone numbers for the duration of the construction must be provided to the Police Department on a company letter- head. If the developer occupies or owns the building/s after construction emergency numbers must be provided to the Police Department. 6. All buildings located on property which abutts a public highway must be numbered. Such number/s (address) shall be visible from the street. All numbering shall comply with Town Ordinance 6-800 thru 6-802. Barns, garages and outbuilding which are located on the same premises as a numbered structure are excluded. 151 Sond HIII Rood • South Windsor, Connecticut 06074 • (203) 644-2551 AREA CODE 203/644-2511 February 22 , 1989 TO : 1•1arcia A. Eanach , Director of Planning FROM: Michael J . Gantick, Director of Public Works � RE: Engineering Review JFI , Lots 9 & 10 Engineering This Department has reviewed andethebject following plans by emsLarelnoteworthy- and Surveying dated May 198 1 . Sanitary easement to the Town should be provided over the existing sanitary sewer on the lots (on plan with appropriate easement document ) . 2 . Legend should be provided on topo plan . 3 . Additional proposed spot elevations should be provided along rear (west) parking area and along entrance drive . 4 . Spec on filter fabric needed. 5 . Signatures/seal needed per State Statute on final plans . 6 . Star access should be provided for proposed CB on 54 inch RCP . Flow through invert recommended. 7 . Drainage easement over 54 inch RCP to be minimum 6 inch gravel with loam cover, slopes stabilized . 8 . Details needed For CB' s , RCP, roof drain and sanitary sewer. 9 . Wing-wall should be provided for c•:'-ended 54 inch RCP . 10 . Remove debris from along channel/emban ment area . X11 . foliage lirii t Chong channel should be delineated . Flan fc " riprap installation should be providod , i . e . how to bQ PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM TO: Karl Reichle, Mike Gantick, Mel Stead, ��F� red Shaw,' Richard J. Sartor, Gary Tyler, Fire Mars ;11 Lanning, Jim Snow FROM: Marcia A. Banach, Director of Planning The Planning & Engineering Departments have received plans for the following project:# j -C 7 = J Zon Acreage Subdivision Site Plan Residential_ No. of Lots/units Commercial Industrial_ Location Project Description: L ^� {, �_��°E-ten �?' ,� Future Town-owned property involved? Yes No (a)new streets (existing frontage also) (b)new open space/recreation area active passive (c)new detention area Planning Department comments Please let me know by if you will have comments on this application so that I can follow up with your department when I do a Planning Department report. �'-L.C�Y.]— vtt,1�Y.J.�L..,'L:. 04-.1 � cLJ �f��� �,C:.� (�.�c.�-w.�.L,,.� / E'..'v7^�. 7 ✓�^-*.vj�//�2-J'C1.ST�Z -It'c-1 /tA,z-w_.� c "1 r C—�C. a '�'L-...o� cG �t'�-tL� ,.� �"/Lv.c.=e ..� �ell�..n.� _' /I 4.-(_ w^-•'_ �`-�l G. �n.cl��[}-� .L-,5�(-�.z�J� cam._ hcr/cLc�� nP-c..�..� ���- �•,�., {a,i,.,_y J�``��'.��>,• �,��)6st �l o�� J�`"-6 R.J. ALEXANDER, INC. O ���������V �U�� ���D�\QO����O����/J� P. O� Box654 u=�� u u ��uu uuur U uU��uu��uVUu U U6�lu= SOUTH VV|NDSOR. CTO6O74 DATE TO 7 WE ARE SENDING YOU Attached O Undo, separate cover via °- the following items: � � O Shop drawings O Prints O Plans O Samples El yf ��o O Copy of letter O Change order O � COPIES DATE NO. DESCRIPTION THESE ARE TRANSMITTED as checked below: O For approval O Approved as submitted O Reoubmit------uopies for approval o For you, use O Approved as noted O Submit_—_--oopies for distribution -- O As requested O Returned for corrections O Return—correctedprints O For review and comment O O FOR BIDS DUE 19___-__— O PRINTS RETURNED AFTER LOAN TO US REMARKS .3jLj F I Associates, Inc. P.O. Box 1061 South Windsor, CT 06074 (203) 289-7662 March 17 , 1989 Ms . Marcia A. Banach Director of Planning Town of South Windsor 1540 Sullivan Avenue South Windsor , CT 06074 RE: John Fitch Industrial Centre , Lot 9/10 20 Commerce Way, Application #89-07P Dear Marcia: Attached, you will find an executed sewer line easement that corresponds to the easement shown on our revised plans for the referenced application. This is provided to accommodate comment number (1) of the engineering review dated February 22 , 1989 . Sir cere y , Raymond 4exander RJA/iba Attachment SEWER LINE EASEMENT PERMANENT AND TEMPORARY CONSTRUCTION EASEMENTS KNOW ALL MEN BY THESE PRESENTS, that JFI ASSOCIATES, INC. of the Town of South Windsor, County of Hartford and State of Connecticut, ONE DOLLAR AND OTHER VALUABLE CONSIDERATIONS, received to its full satisfaction of THE TOWN OF SOUTH WINDSOR, a municipal corporation chartered under the laws of the State of Connecticut, do give, grant, bargain, sell and confirm unto the said TOWN OF SOUTH WINDSOR, its successors and assigns the right, privilege and authority to construct and to perpetually maintain a sewer line, including the right to lay, install, maintain, inspect, operate, construct, use, alter, repair, replace and remove a sewer line thereto, in, through, upon and over that certain piece of land as described in Exhibit A. Within said parcel described in Exhibit A, the Grantee, its successors and assigns, shall have the right to cut trees and bushes as may be convenient or necessary and to remove structures thereon, and to pass and repass with men and equipment, to operate equipment and install materials incidental to the construction, maintenance or repair of said sewer line, and to excavate and fill. The Grantor herein, for itself, its successors and assigns, shall not erect or allow to be erected any immobile structures on said easements or rights-of-way which may endanger or interfere with the said sewer line. The Grantor herein for itself, its successors and assigns, reserves the right to itself, its successors and assigns, to continue to use the land within which the aforesaid easements or rights- of-way have been granted for any uses and purposes which shall not in any way interfere with the use thereof by the Grantee, its successors and assigns, in fulfilling the purpose for which this/these easements or rights-of-way are granted. The Grantee herein, by accepting this conveyance for itself, its successors and assigns, agrees to restore and maintain said premises in their original condition as nearly as possible commensurate with the above use upon the completion of any maintenance, operation, construction, replacement or repair work in said easement or right-of-way areas. The Grantee by accepting this conveyance agrees to hold the Grantor, its successors and assigns, harmless from and against any and all damage to property caused by the construction and/or maintenance and repair of said sewer line. IN WITNESS WHEREOF, the Grantor has hereunto set its hand and seal this 16th day of March, 1989. Signed, Sealed and Delivered GRANTOR: in the Presence of: JFI ASSOCIATES, INC. By �Q �e �r �JoPF/Luzzi' /L.o Q. .4LffA*^.#aa2. STATE OF CONNECTICUT ) ss. East Hartford March 16, 1989 COUNTY OF HARTFORD ) On this 16th day of March, 1989, before me, , the undersigned officer, personally appeared Joseph F. Luzzi, President of JFI ASSOCIATES, INC., known to me or satisfactorily proved to be the person whose name is subscribed to the within instrument and acknowledged that he executed the same for the purposes therein contained. In Witness Whereof I hereunto set my hand. vlekjl'�,J, X a-4p' r' Commissioner of the Superior Court Notary Public My Commission Expires: Richard J. Sartor Town Manager Date - 2 - SCHEDULE A A certain piece or parcel of land, located on the northerly side of Sullivan Avenue, in the Town of South Windsor, County of Hartford and State of Connecticut, being shown on a map entitled, "PROPERTY OF JFI ASSOCIATES, INC. LOTS NO. 9 & 10 COMMERCE WAY SOUTH WINDSOR, CONNECTICUT SCALE V = 40' MAY 1988 ZONE I PREPARED BY LUZZI ENGINEERING & SURVEYING 412 WEST AVON ROAD AVON, CONNECTICUT 673-0446", further reference to which may be had for a further description, said premises being more particularly bounded and described as follows: Commencing at a merestone at the approximate intersection of the northerly side of Sullivan Avenue with the easterly side of Commerce Way, said merestone being located 334.37 feet westerly from a certain State of Connecticut Highway Department marker, as measured along a course of N 68* 23' 00" W, said course also being along the northerly side of Sullivan Avenue, and said State of Connecticut Highway Department marker being located 5.03 feet from the intersection of the southeasterly corner of the Grantor's land and the southwesterly corner of land now or formerly of the Town of South Windsor and as measured along the northerly side of Sullivan Avenue by a course of N 68° 23' 00" W; Thence by an arc to the right, having an angle of 88 ° 43' 00" and a radius of 20.00 feet, for a distance of 30.97 feet, along the northerly side of Sullivan Avenue and the easterly side of Commerce Way, to a merestone; Thence by a course of N 20° 20' 00" E, for a distance of 19.00 feet, along Commerce Way, to a point; Thence by a course of S 30° 59' 05" E, for a distance of 63.47 feet, to a point; Thence by a course of N 68 ° 23' 00" W, for a distance of 30.00 feet, along the northerly side of Sullivan Avenue, to a merestone and place of beginning. AREA CODE_ 203/64:- 11 February 22, 1989 il_ EMORANDUM Mtvvc•G 30 / 9�5 TO: Marcia A. Eanach, Director of Planning FROM: Michael J . Gantick, Director of Public Works RE : Engineering Revie,.,, JFI , Lots 9 & 10 This Department has reviewed the subject plans by Luzzi Engineering and Surveying dated May 1988 and the following items are noteworthy. xSanitary easement to the To�•.,n should be provided over the ��xis ng sanitary- s ',cr on the lots (on plan with appropriate e. seraent document ) . Legend should be provided on topo plan . A . Additional proposed spot elevations should be provided along rear (west) parking area and along entrance drive . ly. Spec on filter fabric needed. 0 ignatures/seal needed per State Statute on final plans . Li 0 Staor access Elio'ui 1 pZO G�C�' DYOp O� C 3 on 5d inch RCP . Flo�-, through invert recon•,,iiended. Dra-inace easement over 54 inch RCP to be minimum 6 inch gravel with loam cover, slopes sLabiliz,su . ( 8 .� Details neede.l foie-(:�B s , RCP, roof and Sanitary sewer. �,Jing-%- all should be provided for En'_ended 54 inch RCP . 1 U . Re-MOVe (:c L)'-Ls 1a"oiii a long channel/e,!ihankment area . foliage )_il;lit� 4iong channel should be deliiieated . Plan fc p~o�, .idcd , J. . e . how to b(- j F I Associates, Inc. P.O. Box 1061 South Windsor, CT 06074 (203) 289-7662 March 31 , 19891'�'' ,� '' APR Planning & ��:i _; ,:�;t��, Mr . Raymond F. Hallowell, Jr. , Chairman Planning & Zoning Commission Town of South Windsor 1540 Sullivan Avenue South Windsor , CT 06074 RE: Cornerstone East, App.# 89-07P Dear Mr . Hallowell : This is to grant the South Windsor Planning and Zoning Commission the necessary extension .for the referenced application. Sincerely, Raymo d J,fAlexander RJA/iba cc: Marcia Banach Michele Lipe STANDARD APPROVAL MODIFICATIONS FOR SITE PLAN (rev. 2/7/89) PROJECT � r}� C1 5 I C APPL. NO._ jJ-0 7 P ENGINEER/ARCHITECT PROJ. NO. G Cl & DWG. NO. J- _�{ DATE REV. DATE �7k?9 Lll�'d SUBMIT MYLARS OF SHEETS . . . y/ 1 . Prior to commencement of any site work, a meeting must be held / with Town Staff . 2 . No building permits will be issued until the final mylars have been filed in the Town Clerk' s Office. 3 . This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission, including a bond in the amount of 4 . An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 4 . 13 . 10 of the Zoning Regulations . V' 5 . Footing drains are required if the building has a basement: 6 . A landscape bond in the amount of $ 5�0 is required dnd must be submitted prior to filing of mylars . � 7 . All plans used in the field by the developer must bear th stamp and authorized signature of the Town of South Windsor. Black and white transparent mylars of Sheets # with the above modifications , together with three blueprint copies of the entire set of plans must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission, as well as the Inland Wetlands Agency/Conservation Commission, must be reproduced on the mylars . After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk within 90 days . After filing these plans , a copy of the receipt must be submitted to the Planning Department. ),2A,(' n Y,2,r• C C';�'� q ci- _ i,4 rY (;Y'CrylLo Pa JI'tu"r,61 �? C` 1'r�r• 9 ' a, J.F. I . Lot 9 & 10 1 . This proposal is-for---a, 22,E-08---sq. -ft- indu-stria-1 -build-ing which would contain 7, 700 sq. ft of office. Building coverage is 15 . 4%; 50% allowed. Impervious coverage is 62. 5%; 65% allowed. The plan appears to meet all of our regulations . 2 . 75 parking spaces are required; 75 have been provided. 3. The site is not within the 100 year floodplain and there are no regulated wetlands on the site; however the proposal calls for discharge into the existing swale located at the northerly end of the site. Thus both wetlands and conservation approval were required. The applicant received approval 4/17/89 with the following conditions: $10, 000 bond no unusual approval conditions 4 . The site will be serviced by MDC water and town sewers . WPCA approval is not required; however if the daily wastewater flow is greater than or equal to 15,000 ga./day, or if the discharge will involve an industrial process wastewater, a State DEP Discharge permit must be obtained. If there is an industrial discharge to sewers , the Town will require that a manhole be installed in building sewer for monitoring purposes . Q�) 1 5 . The landscaping plan looks a4eq�tarte. Tt;calls for 5 emerald queen maples to be located along the westerly side of Commerce Way, 3 crabapple trees in the front of the building, 4 dogwood trees located close to the building, and a number of azealas and junipers which will be in planting islands. 6 . The architectural of the building shows it to be a variety of stone, stucco, and split rib concrete. It appears that it will be very similar to the building directly across the street. If this application is approved, the planning department that the side yard at the northerly end of the site h. —eelm A - irz+G I---Ghp—QLS.-P,a • 1 {�.4 ";'S ' '� r}, ) J_ ✓- _!c1v'',( V, w ° oj ,O'MN 8f G 9 Town O-P SoaA vt:f'?� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR•CO�� AREA CODE 203/644-2511 April 19, 1989 JFI Associates, Inc . P.O. Box 1061 South Windsor, CT 06074 RE: Application #89-07P - Cornerstone East Dear Madam/Sir: At the April 17 , 1989 meeting, the Inland Wetlands Agency/Conservation Commission approved with modifications an IWA/CC permit for the construction of an industrial subdivision located on the northerly side of Sullivan Avenue and the easterly side of Commerce Way, I zone. This approval is based on plans prepared by Luzzi Engineering & Surveying, 412 West Avon Road, Avon, CT dated 5/88 and revised 3/7/89 . The following modifications must be adhered to for this permit to be valid: 1 . Black and white transparent mylars of sheets # 4 of 5 with the above modifications and this letter reproduced thereon together with two blueprint copies of the entire set of plans, must be submitted to this Commission to be stamped and signed. This must be completed within 65 days of approval prior to any construction activity on the site. 2 . Construction activities shall be subject to the approval of the Town Engineer. 3 . The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 4 . We recommend a bond in the amount of $10,000 to be submitted to Planning and Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures . 5 . The permit is valid for one year and shall expire on April 25, 1990 . 6 . All approvals required must be obtained and submitted prior to any activity on the site. 7 . A contact person shall be identified directly on the plans . 8 . Municipal access to culvert. 9 . Tree protection should be indicated on the plans for the easterly side of the property. 10 . Include narrative or plans for adequate erosion and sedimentation for the building construction site. 11 . Phase the project to reduce the activity taking place at any given time. 12 . A sequence of construction should be indicated on the plans for stream stabilization. 13 . Limits of construction should be indicated on the plans . Very truly yours, John M. Moran, Jr. , C irman Inland Wetlands Agency/ Conservation Commission JMMJr. /pmm Enclosure cc: Jerry Iazzetta, Town Engineer Marcia Banach, Director of Planning John R. Collins, Chief Building Official A. Bowen Davies, Deputy Town Engineer Raymond Hallowell, Chairman, Planning & Zoning Luzzi Engineering & Surveying 412 West Avon Road, Avon, CT 06001 (p,NN see O-Pslo� ?d&UZA01t 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR.co AREA CODE 203/644-2511 27 April 1989 Mr. Raymond J. Alexander P. 0. Box 1061 South Windsor, CT 06074 re: Appl . #89-07P, JFI Lots 9 & 10, Site Plan, 20 Commerce Way Dear Mr. Alexander: We are pleased to advise that the Planning and Zoning Commission voted on April 25, 1989 to approve the above-referenced application for a site plan of development in accordance with Luzzi Engineering Drawings 1-4 of 4 dated 5/88 (revised 3/7/89) , Project No. 88-10D; Patrissi Landscaping drawing dated 12/88; architectural drawings dated 11/21/88; and with the following modifications: 1 . Prior to commencement of any site work, a meeting must be held with Town Staff . 2 . No building permits will be issued until the final mylars have been filed in the Town Clerk's Office. 3 . This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission, including a bond in the amount of $10,000 . 4 . An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 4 . 13 . 10 of the Zoning Regulations . 5 . Footing drains are required if the building has a basement. 6 . A landscape bond in the amount of $5, 000 is required and must be submitted prior to filing of mylars . 7 . All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 8 . Per state statute, live signatures are needed on final plans . 9 . Stair access is needed for proposed CB on 54" RCP. Flow through invert is recommended. Mr. Raymond Al xander -2- 27 April 1989 10. Remove debris from along channel/embankment area. 11 . Side yard at the northerly end of the site to be coincident with the drainage easement. 12. Add 2 dogwoods to Sullivan Avenue frontage. Black and white transparent mylars of Sheet #2 with the above modifications, together with three blueprint copies of the entire set of plans, must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission, as well as the Inland Wetlands Agency/Conservation Commission, must be reproduced on the mylars. After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department. Very truly yours, PLANNING AND ZONING COMMISSION Raymond F. Hallowell, Jr. Chairman cc: J. Iazzetta, Town Engineer F. Shaw, Supt. of Pollution Control J. Collins, Chief Building Official E. Belleville, Assessor W. Lanning, Fire Marshal M. Banach, Planning Director Registrar of Voters 2nland Wetlands Agency/Conservation Commission ZC File Engineer Applicant l Owm 8E7 9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 sOR-CON�� AREA CODE 203/644-2511 TO BE PUBLISHED IN THE JOURNAL INQUIRER SATURDAY, APR. 29 , 1989 LEGAL NOTICE TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION At its Apr. 25, 1989 meeting, the Planning and Zoning Commission voted to take the following action: 1 . Approve, with modifications, Appl . #88-53P, Dart Hill Realty, Inc. , for Phase I ( 20 lots plus 1 parcel) of an Open Space Subdivision on 109 .5 acres of property on the north side of Dart Hill Road, west side of Lawrence Road, east side of Neiderwerfer Road, and southeasterly side of Ellington Road, RR Zone. 2 . Approve, with modifications, Appl . #88-92P, G & R Realty c/o P.A.L. Investment Group for a 13-lot plus 3-parcel Resubdivision of property known as Nutmeg Resubdivision at Nutmeg and South Satellite Road, I Zone. 3 . Approve, with modifications, Appl . #89-07P, JFI Lots 9 & 10, Site Plan, 20 Commerce Way, I---7,one. 4 . Approve, with modifications, Appl . #89-08P, Admira_ & Storage, Inc. , Site Plan, 420 Ellington Road, I Zone. 5 . Deny Appl . #89-09P, Burnham Business Park Associates , proposed amendment to Sections 4 . 7 . 2 . 8, 5 . 2, 8 . 3, and 8 .4 of the Zoning Regulations . 6 . Approve, with modifications, Appl . #89-10P, John Samsel, Jr. , Terry Office Park Site Plan and Subdivision, property west of Buckland Road, south of Ellington Road, RC Zone. Dated at South Windsor, Connecticut this 26th day of April, 1989 . PLANNING AND ZONING COMMISSION Raymond F. Hallowell, Jr. , Chairman Marshall Montana, Secretary )SENDER: Complete Items 1 and 2 when additional services are desired, and complete Items 3 and 4. ,t your address In the "RETURN TO" Space on the reverse side. Failure to do this will prevent this and from being returned to you. The return recelpt fae will provide You the name of the person 211VOrsd to and the date f ve . For additional fees the following services are available. Consult ,3stmaster for fees and check box es for additional servlce(s) requested. ❑ Show to whom delivered,date,and addressee's address. 2. ❑ Restricted Delivery 1(Extra charge)1 1(Extra charge)t Article Addressed to: 4. Article Number �M�N� T ����c r✓nc� 0_�L 5_ t q.�- 3 -7a- T� Type of Service: ❑ 11 gistered ❑ Insured x / o I!J Certified ❑ COD El Express Mail I',{�1lube2 of C&U 7 Always obtain signature of addressee Hy3Lagent and DATE DELIVERED. 5. Sign ure—A^essee �� ddressee's Address(ONLY if 0. X �J uested and fee paid) r 6. Sign ure—Agent ° x 17. Date of Delivery PS Form 3811, Mar.1987 *11111.40I.►O.1987-IM244 DOMESTIC RETURN RECEIPT ru tiC. m ru J� - Er C3 *L LO rL1 F, 1 K. Grp cJ y pi j4 yn J F I Associates, Inc. P.O. Box 1061 RECEIVED South Windsor, CT 06074 .MZL (203) 289-7662 MAY 10 1989 SO. WINDSOR PLANNING DEPL May 9 , 1989 Ms. Marcia A. Banach Director of Planning Town of South Windsor 1540 Sullivan Avenue South Windsor , CT 06074 RE: John Fitch Industrial Centre, Lot 9/10 20 Commerce Way , Application,#89-07P Dear Marcia: We are submitting the names and telephone numbers of the persons to be reached in the event of an emergency in connection with the referenced project: Raymond Alexander 644-2333 or 289-7662 James Slater 528-5252 or 528-1797 The supervising engineer for the project is : Joseph F. Luzzi , P.E. 289-7662 (CT P.E. License #9999 ) If you require additional information concerning this matter please contact us . Sin ly, Raymon J . Al er RJA/iba cc: Gerald Lewis, S.W.P. D. J F I Associates, Inc. P.O. Box 1061 South Windsor, CT 06074 (203) 289-7662 June 9 , 1989 Mr. Raymond F. Hallowell , Jr. , Chairman 189 Planning & Zoning Commission Town of South Windsor mouth b'�; 1540 Sullivan Avenue Planning & Zoe jig Corr.rr;;ss;on South Windsor , CT 06074 RE: John Fitch Centre, Phase II Lot 9/10 , 20 Commerce Way, App. #89-07P Cornerstone East Dear Mr . Hallowell: Attached, for signature and stamping, you will find plan sheets as required by the April 27 , 1989 approval letter for the referenced project . The attached are: Quantity ( 1) Black and white transparent mylar of Sheet #2 ( 3 ) Blueprint copies of the entire set Sin rely, Raymo d J. lexander RJA/iba cc: Michele Lipe attachments -=9LJ F I Associates, Inc. P.O. Box 1061 South Windsor, CT 06074 (203) 289-7662 June 9 , 1989 Mr . Raymond F. Hallowell, Jr. , Chairman Planning & Zoning Commission Town of South Windsor 1540 Sullivan Avenue South Windsor , CT 06074 RE: John Fitch Centre, Phase II Lot 9/10 , 20 Commerce Way, App. #89-07P Cornerstone East Dear Mr . Hallowell: Attached, you will find Landmark Bank Letters of Credit that represent the bonds required as conditions of approval for the referenced project . The Letters of Credit are: Landscape Bond $5 ,000 - Landmark L.C. #8061017 Expiration 6/8/90 Conservation Bond $10 ,000 - Landmark L.C. #8061018 Expiration 6/8/90 We trust that these Letters of Credit satisify the requirements for the stated surety. 2Sicn ly, Raymon J. A e apder RJA/iba cc: Michele Lipe attachments LAN DMA K :.- ,.BANK RECFIVED JUN !'i 1989 0. WHYDSOR PLANNING DEPL June 1._,, 1989 Town of South Windsor 1540 Sullivan (avenue South Windsor, CT 06074 RE: J.F. I . Associates Letters of Credit #8� 61� 17 & 8061018 Gentlemen, Enclosed please find our "acceptance" copies of the above referenced letters of credit. If these letters of credit are acceptable to you, please sign, date and return in the envelope provided. Thank you. Sincerely, Tracy tyl Assistant Credit Analyst tm Enclosures THE LANDMARK BANK •CITY PLACE •HARTFORD,CONNECTICUT 06103-3478 •(203)282-6600 O r Tiov� �S W e .a 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 ��osoR•co�'� AREA CODE 203/644-2511 June 29, 1989 M E M O R A N D U M TO: Marcia A. Banach, Director of Planning FROM: Jerry C. Iazzetta, Town Engineer RE: JFI Lot 9 - Cornerstone East - # -07P We have reviewed the final drawings for the subject project for compliance with approval conditions and have the following comments : 1 . The "20 ' ROW" on north side of property is not defined - i .e. , no bearings, distances, etc. Also it opens up to much more than 20 ' at east end. 2 . The Plot Plan shows two " 10' DROW's" to State of Connecticut not defined. The attached drainage easement doesn't correlate to anything shown on the drawing. 3 . Limits of construction not shown. 4 . Detail of catch basin should show steps - note on profile not sufficient. JCl/jsv cc: Michael J. Gantick, Director of Public Works 4-Memo from TOWN T O N OF SOUTH WINDSOR TOWN HALL . JUN 22 1989 SOUTH WINDSOR, CONN.'06074 SO. WINDSOR PLANNING DER F TO A. Bowen Davies DATE June 21, 1989 Deputy Town Engineer L J SUBJECT: JFI CORNERSTONE EAST FOLD_ Sullivan/Commerce Way There will be a preconstruction meeting on Thursday, July 6, 1989 at 2 : 00 P.M. for the above mentioned project. cc: M. Banac M. Gantick, B. Davies, L. Braddock, F. Shaw, M. Stea , K. Reichle, B. Lanning, J. Collins, J. McCahill By- It ce t O,0' 3f4< e � e �C� 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 �►osoR-coN� AREA CODE 203/644-2511 July 3, 1989 Mr. Raymond Alexander John Fitch Associates P.O. Box 1061 South Windsor, CT 06074 Dear Ray: RE: App. 89-07P .J.F.I . Lot 9 - Cornerstone East Please find enclosed a copy of the outstanding comments on the final plans submitted for compliance with the Planning & Zoning approval. If you have any questions please do not hesitate to contact our office. Very Truly Yours, /�IC416 A+ Michele R. Lipe Assistant Planner cc: PZC file Marcia Banach, Director of Planning Alemo from TOWN OF SOUTH WINDSOR TOWN HALL SOU.TI+WINDSOR.CONN-06074 DATE g-VIy TO Tula yl 61 SUBJECT: JC "d Lol FOLD- V?- "C7 <dpl -7/ 91 Xy -�L2 LANDMARK�L 035541 'SANK s1— 119 HARTFORD,CT November 7 , 19 88 PAY ToORDER OF ::�:� .::: .:�.:'.:�.:L: .:�: Town of South Windsor �'�'�::-;;::-:-::'�':::::::::%�:'::::-:-:-::: $ 5,000.00 ORDER OF ' L ate+L}l.`:''�rC°'�}A� ,J"� '„• .+`. •�,x 1 2( (v_;)Jl'„�•�-,tom' (-'n ('.'1 r MEMO Cornerstone Bond ND.SGa per Au t ye.� TREASURER'S CHECK AUTO ZED SIGNATURE 1100 3 5 54 111' 1:0 1 190408 5': 10-1,000 2 011' NOTICE:in the event this check is lost or 51-57 stolen,an affidavit of loss and indemnity 119 f= THE CONNECTICUT BANK AND TRUST COMPANY, N.A. agreement surety be required may to place a stop payment A surety bond may also be required CASHIER'S CHECK HARTFORD, CONN. October 3, 19 88 No. 61429413 PAY ***Town of South Windsor*** $*4 ,000.00* TO THE ORDER OF• 171 CB T : C; A AUTHORIZED 51GNATUR 1-oeos sirs /LLaA e H �rl 9-- � /�` oal� 11460, 2941311' 1:0 1 1900 5 7 11: 000925 3114 .MZLJ F I Associates, Inc. P.O. Box 1061 South Windsor, CT 06074 (203) 289-7662 August 14 , 1989 Ms . Marcia A. Banachp . Director of Planning Town of South Windsor so.WS n''�►R P 1540 Sullivan Avenue South Windsor , CT 06074 RE: 89-07P, Lot 9/10 , 20 Commerce Way Cornerstone East Dear Marcia: Herewith, you will find the following plan sets and sheets for the referenced project: Disposition Quantity/Type Engineering Department Use 4 Complete Sets Planning Department , for 3 Sheets Revised Topo. Plan replacement in accepted plan sets JFI Use , To receive 4 Complete Sets Planning Dept . Stamp 3 Sheets Revised Topo. Plan Please inform us when the stamped plans and sheets are available. Thank you for your attention to this matter . S ip-C-e`r ell y, Raymond � Alexander RJA/ba cc: Michele Lipe Attachments : i � ; a I � i , -t5 per/ 6yy--?sib 41, i � i . i - �4014 st+`� e D Town oPSotdA ?A a S L 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 4��psoR•co�'�ti AREA CODE 203/644-2511 RE: Preconstruction Meeting - February 1, 1990 JFI, Lots 9 & 10 Application #89-07P IN ATTENDANCE Name Company/Address Telephone # Marcia A. Banach Town of South Windsor 644-2511 John E. McCahill Town of South Windsor 644-2511 Jerry C. Iazzetta Town of South Windsor 644-2511 Joe Luzzi JFI Associates 75 Commerce Way South Windsor 289-7662 Jim Slater J & H Slater Construction Co. , Inc. 528-5252 Lester Braddock Town of South Windsor 644-2511 The following is a brief summary of points discussed during the meeting. Erosion & Sedimentation Control 1 . All erosion and sedimentation control measures are to be in lace prior to earth moving operations in each area and maintained cleaned out during construction. Call Zoning Wetlands Enforcement Officer for inspection when measures are in place, prior to commencement of site work 2. All topsoil stockpile areas to be protected (ringed with haybales or equal) . 3 . During construction of the road/driveway a crushed stone tracking pad is to be installed and maintained to minimize tracking of dirt/gravel onto Commerce Way. Calcium chloride or water is to be used for dust control as required. Public Works 1 . Four complete sets of approved/revised plans to be provided to Town prior to start of construction. They will be stamped by Planning Department along with plans developer needs . Only approved plans are to be used on jobsite. 2. The Public Works Department is to be notified forty-eight (48) hours prior to th start of major construction work with inspections and testing per Developers Checklist requested for the following: a) after site is staked out b) all drainage work c) Preparation of subgrade, compaction tests as requested by the Town and as agreed to by the Developer d) Preparation of subbase, six (6 ) inch lifts e) Placement of bituminous concrete, 2 inch layers . 3. Certification of gravel used as subbase will be required by an approved testing company. 4 . No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation. 5 . All pipe and structures to be backfilled with free draining material, compacted in maximum one foot lifts with approved compaction equipment or approved equal if deep trench is encountered. Any pipe or structure work requires ' inspection prior to backfilling. 6 . Any problems and/or questions regarding construction of this project will be directed to Jim Slater in the field. 7 . All filling to be done in accordance with Department of Transportation specifications. To be compacted in maximum lifts and tested as necessary. 8. Forty-eight (48) hours notice needed for Certificate of Occupancy inspection. Two week review period (10 working days) needed for all individual site (lot) plans prior to issuance of building permit (may be longer if application is incomplete) . See General Guidelines for Certificate of Occupancy and Building Permit. 9 . Any proposed changes are to be presented to the Engineering or Planning Department prior to implementation on change sheet in triplicate. Town will attempt to turn around within 24 hours. 10 . DOT Permit needed for all work within state road. Copy to the Planning Department. 11. No paving after October 15 without written approval from Director of Public Works. The applicant has expressed disagreement with this statement. 12 . Normal hours of operation 7 :00 A.M. - 5:00 P.M. , no work on Sunday. SNET/NU 1. Contact utilities for coordination of utilities connection. Fire Marshal 1 . Blasting (if required) to be coordinated with the Fire Marshal. Police Department: 1 . Emergency phone numbers for the duration of the construction must be provided to the Police Department on a company letterhead. If the developer occupies or owns the building/s after construction emergency numbers must be provided to the Police Department. 2 . All buildings located on property which abuts a public highway must be numbered. Such number/s (address) shall be visible from the street. All numbering shall comply with Town Ordinance 6-800 thru 6-802. 3 . Barns, garages and outbuilding which are located on the same premises as a numbered structure are excluded. 4 . Erect temporary sign on the site during construction identifying the project. 5 . If an alarm is to be installed contact the Police Department. Building Department: 1 . Plan review with Building Official/Fire Marshall required prior to application for building permit. Coordinate with Chief Building Official. Very truly ours, Marcia A. Banach Director of Planning MAB/pmm cc: Jerry C. Iazzetta, Town Engineer Lester A. Braddock, Sr. Engr. Inspector Thomas Hart, SWPD Karl Reichle, Public Works Mel Stead, Public Works Minh V. Le, SNET Hal Clisby, CL&P John R. Collins, Chief Building Official Fred Shaw, Superintendent of Pollution Control John E. McCahill, Zoning Enforcement Officer Joe Luzzi Jim Slater SWON SC+( 70-tim, 0-fe Satzm ?A101&"Alot C, 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 ��yogoR,�o AREA CODE 203/644-2511 March 22, 1990 JFI Associates P. O. Box 1061 South Windsor, CT 06074 Dear Madam/Sir: Re: Application 89-07P - Cornerstone East At the March 19, 1990 meeting, the South Windsor Inland Wetlands Agency/Conservation Commission approved a one year extension of Application #89-07P with all original conditions. Application #89-07P becomes effective April 25, 1990, and expires on April 25, 1991 . Very truly yours, jLs A. Lombardi, Chairman Inland Wetlands Agency/ Conservation Commission JAL/pmm cc:John E. McCahill, Zoning/Wetlands Enforcement Officer Marcia A. Banach, Director of Planning John R. Collins, Chief Building Official Planning & Zoning Commission Jerry Iazzetta, Town Engineer Enclosure o c u y 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR co AREA CODE 203/644-2511 1 28 March 1990 Mr. Raymond Alexander JFI Associates P. 0. Box 1061 South Windsor, CT 06074 Dear Mr. Alexander: re: Expiring Letters of Credit The Planning and Zoning Commission is holding the following Letter(s) of Credit: Project(s) Bank Amount Expiration JFI Lots 9 & 10 Landmark $10,000 6/08/90 JFI Lots 9 & 10 Landmark $ 5,000 6/08/90 In accordance with our policy for accepting Letters of Credit in lieu of surety bonds, we must have an amendment to each expiring Letter of Credit well in advance, extending the term for a one year period from the expiration date. Will you please forward us the amendment promptly. Very truly yours, PLANNING AND ZONING COMMISSION Louise C. Evans Chairman cc: PZC File M. Banach, Director of Planning • I Il S011% •�,` N V /-� V/ slo� C G a 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 ��oSOR-0 AREA CODE 203/644-2511 April 18, 1990 Planning & Zoning Commission 1540 Sullivan Avenue South Windsor, "CT 06074 Dear Madam/Sir: Re: Bonds At the April 16, 1990 meeting of the Inland Wetlands Agency/Conservation Commission, it was voted to release the following bonds : Application #89-19P, Truck Trailers in the amount of $2, 000 . 00 Application #428, Brookside Condominiums in the amount of $15,000. 00 Application #453, Morgan Farms Section II in the amount of $5, 000. 00 Application #403, Strawbridge Condominiums in the amount of $25,000 . 00 Application #89-07P, Cornerstone East - bond reduced to $5,000 . 00 from $10, 000. 00 ry truly yours, a. -aL, James A. Lombardi, Chairma Inland Wetlands Agency/Conservation Commission JAL/pmm cc: Marcia A. Banach, Director of Planning Jerry Iazzetta, Town Engineer Michele Lipe, Ass 't Planner/Analyst 10WM Sf4 y ~ 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 f gpR,Cp AREA CODE 203/644-2511 tiU � April 18, 1990 Mr. Raymond Alexander JFI Associates, Inc. P. O. Box 1061 South Windsor, CT 06074 Dear Mr. Alexander: re: Cornerstone East $10,000 IWA/CC Bond This is to advise that the Planning and Zoning Commission voted on April 17, 1990 to reduce the above-referenced bond from $10,000 to $5, 000 . Please forward an amendment showing this revision as soon as possible. Thank you. Very truly yours, PLANNING AND ZONING COMMISSION r- Louise C. Evans Chairman cc: J. Iazzetta, Town Engineer &A. Banach, Director of Planning PZC File i j F I Associates, Inc. P.O. sox 1061 South Windsor, CT 06074 r V E D (203) 289-7662 REC t MAY 2 00 S&WINDSOR PLANNING DVI\ May 1 , 1990 �^^A �'v v Mrs . Louise C. Evans , Chairman Planning & Zoning Commission Town of South Windsor 1540 Sullivan Avenue South Windsor , CT 06074 RE: John Fitch Centre, Phase I Lot 9/10 , 20 Commerce Way, App. #89-07P Cornerstone East - BONDS Dear Mrs . Evans : Attached, you will find the required amendment and acceptance extending the landscape bond for the referenced project , Landmark Bank L.C. #8061017 , for an additional year . The conservation bond, Landmark L.C. #8061018 , will follow shortly. Subsequent to notification of the required extension we received a notice of reduction in the bond amount. The amendment for L.C. #8061018 will reflect both changes . Sincerely , Raymond J. A nder RJA/iba attachments j r I Associat s, Inc. P.O. sox 1061 South Windsor, CT 06074 (203) 289-7662 May 4 , 1990 Mrs . Louise C. Evans , Chairman Planning & Zoning Commission Town of South Windsor 1540 Sullivan Avenue South Windsor , CT 06074 RE : John Fitch Centre, Phase I Lot 9/10 , 20 Commerce Way , App. #89-07P Cornerstone East - BONDS Dear Mrs . Evans : Attached, you will find the required amendments and acceptance extending the conservation bond for the referenced project , Landmark Bank L.C. #8061018 , for an additional year . Sincerely, 6— Raymond J. Alexander RJA/iba attachments TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMlsISSION Kinutes Page 5 November 27, 1990 15 . Storm pipe from existing catch basin going under the addition must be clarified. 16 . The 2: 1 slope shown within sewer easement is unacceptable because maintenance vehicles cannot utilize the easement. Resolution of this slope must be agreed upon by the Engineering Department. Black and white transparent mylars, of Sheets #1 and #2 with the above modifications, together with four blueprint copies of the entire set of plans must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission, as well as the Inland Wetlands Agency/Conservation Commission, must be reproduced on the mylars . After the mylars have been signed by the Commission, they will b returned to you for filing in the Office of the Town Clerk within 90 days . After filing these plans, a copy of the receipt must be submitted to the Planning Department. Mrs . Montana seconded the motion with the above modifications, and it carried unanimously. 2 . Appl . #90-66P, Ridgefield IV, LaCava Construction Co. , Lots #20, 21, modification to Subdivision, located east rly end Of Krawski Drive, AA-30 zone. Mrs . Evans read a letter from the applicant requesting to table this # item until December 4, 1990, pending the delivery of revis d maps. Mr. Murrin made a motion to table the application until December 4, 1990 - Mrs . Montana seconded the motion and the motion carried 4-0. 3 . Appl . #90-76P, Culbro Land Resources, Inc. , for a 16-lot subdivision of approximately 105.7 acres of property at 199 ' Rye Street, I Zone. Conditional approval requested; Subdivision previously approved. Rodney Morrison, a civil engineer from Lally Associates, asked that the application be moved to later on the agenda as his cli nt, Dr. Giorgio, had not arrived yet. 4 . Ray Alexander Re: JFI sidewalks. Ms . Lipe, Assistant Planner, referred to a topography map of the 23+ acres of land Mr. Alexander has offered to donate to the Town in .lieu of building 1200 feet of sidewalk on Commerce Way. Several people from the Town were asked to look at the property. She ref r nced Mel Stead' s, Sup't. of Streets report describing th property (Attachment ' Go TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION Page 6 November 27,_ 1990 . 1 - On incorrect item pointed out by Ms . Lipe was the abandoned ehicles and trash on the property. Mr. Alexander clarified that .his tr&Sh was not on his property. However, one of the Town's oncerns is that this property could be used as a garbage dump or omeone could get hurt on the property and the Town would be •esponsible. Because of these potential liabilities, it was the ;taff 's f eling that the Town should not take this property. However, .hey felt it would be in the best interest of the Town that it be lonat d to the State for the Scantic River Park. .n addition, in the Town Plan of Development it is stated' that the 'own should acquire land within the 100 year floodplain. trs . Montana asked if we will be getting open space land from the ;hepard/Culbro Subdivision. Ms . Lipe responded that the 22.6 acres )f open space associated with that development was not a requirement )f the subdivision and that at the time the applicant`.had not _ndicated who would control the open space. Ms . Lipe stated that one )f the concerns of donating land to the land trust is that the land :rust does not have to provide access to the public- If the land goes :o the State, there will be public access provided if hiking trails ire ev r developed along the river. irs . Montana questioned the Town's plan was for open space in the 3cantic River area and how will it be managed. Ms. Lipe responded :.hat will be decided for each piece individually. If this piece was nore asily accessed off of Rye Street, the Town might feel iiffer ntly about it as far as developing their own park to get down z�o the Scantic River. The way the Scantic River Plan is written, the foal is for either the Town or the State to try and acquire open space in this area. Ors . Montana foresees a problem with industrial dumping in this area. 4r. Murrin stated it would be lgss likely to get industrial clumping if th Town owns it rather than being privately owned. Mr. Alexander said that the trash that may be there was done a long time ago when it was being utilized and there were farm roads which do not exist anymor that went back into those areas. Mr. Alexander stated that as far 4s future dumping, it would be foolish for people who have Parcels that abut this, to dump stuff over an embankment where it could be identified. There would be very little opportunity for peopl to dump off of Rye Street. Mrs . Evans referred to penalties for do1jW so, whereas previously there were none. Mrs . Evans would like to see it preserved. Mrs. Montana feels if nothing lse, it provides for a very attractive barrier between the industrial areas . Mrs . Montana would like to have the Town acquire this pi ce of property and see what happens in the State's acquisition of the area. This is a natural preservation area. It TOWN OF SOMM WINDSOR PLANNING AMID ZONING COIMSSION Xinutes Page 7 November 27, 1990 should be preserved, but by whom, and what are the advantages and disadvantages of each entity owning the land. Mr. Murrin asked if the 1200 feet of sidewalk is required and do th feel they can do without that or is it to be provided in some other way. Mrs. Evans stated the argument presented was that industrial sites don't need that much sidewalk. Mrs. Evans sees this as a positive contribution on the part of South Windsor toward the Scantic River Park. Mrs. Montana asked what the pr cess was for donating the land to the state. Mr. Alexander noted th re is a specific procedure set up. Mrs. Montana made a motion to waive the sidewalks requirement until such time as the State accepts the open space land. At that time, sidewalks will no longer b required for this subdivision. Tom March seconded the motion and motion carried 4-1 . Voting with the motion to approve were Commissioners Evans, Montana, Castro and Marck. Voting against the notion was Commissioner Murrin. 5. Appl. #90-76P, Culbro Land Resourdes, Inc. , for a 16-lot subdivision of approximately 105.7 acres of property at 19 Rye Street, I Zone. Conditional approval requested; Subdivision previously approved. Dr. Giorgio, representative of Shepard/Culbro, was present to xpla the application. Culbro is applying for a conditional subdivision approval on the Rye Street parcel that the commission awarded final approval on one year ago. Reference was made to the unusual economi tim s . Because of the economic situation, the business and th tenants that Dr. Giorgio would be working with can't get the man y they need to expand. Dr. Giorgio continued on to say that the Rye Street project is a v luable project to the applicant and to the community. The conc Pt tbAt was approved makes sense and the applicant would like very much to do the project. In other communities, the applicant has been abl to file mylars with a note on the plans indicating that no building permits will be issued until the bond is posted or the improvements are concluded. This is not permissible under the South Windsor regulations. It has raised a problem in that after the Town did its ppraisal of what the improvements would cost for Phase I, they wer required to post a $435,000 bond. Posting this type of a bond is a prudent business decision at this point. Subsequent to this, new subdivision regulations were adopted which allow for a conditional approval as an alternative to posting the - bopd before filing the mylars . Under the conditional approval, th is a provision for a three year window to either post a bond or i 10 af'(( -awn O-P S-0� 2v- 9 ` 1540 SULtIVAN AVENUE - SOUTH WINDSOR, CONN. 06074 c, ��tiosoR�0N�� AREA CODE 203/644-2511 March 4, 1991 R. J. Alexander, Inc. J.F. I . Associates P.O. Box 1061 South Windsor, CT 06074 Dear Mr. Alexander: Re: $1 , 000,000 Liability Insurance Policy Please be advised that the insurance policy on file with the Town of South Windsor Planning and Zoning Commission has expired. It is important that we receive a renewal indicating continuous coverage of the Town immediately (per Subdivision Regulations Section 3 . 2 .a and/or Zoning Regulations 4 . 13 .4 ) . Your prompt attention is greatly appreciated. Very Truly Yours, Michele R. Li Assistant Planner ml 10ON at,, c O-P sa M ?d&UJ04-0t � s 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 OR•co AREA CODE 203/644-2511 April 9 , 1991 JFI Associates, Inc. P.O. Box 1061 South Windsor, CT 06074 Dear Madam/Sir: Re: Application #89-07P - Cornerstone East At the April 8, 1991 meeting, the Inland Wetlands Agency/Conservation Commission approved with original and standard conditions Application #89-07P - conservation plan approval for the construction of industrial buildings located on the northerly side of Sullivan Avenue, I zone; as shown on plans prepared by Luzzi Engineering & Surveying, #88-10D and dated May 1988 and revised March 7 , 1989 . 1 . Two blueprint copies of the entire set of plans and this letter reproduced thereon, must be submitted to this Commission . This must be completed within 65 days of approval prior to any construction activity on the site. 2 . Construction activities shall be subject to the approval of the Town Engineer. 3 . The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 4 . The permit is valid for one year and shall expire on April 25, 1992 . 5 . All approvals required must be obtained and submitted prior to any activity on the site. 6 . A contact person shall be identified directly on the plans . 7 . All original approval conditions shall apply to this approval per approval letter dated April 19, 1989 . JFI Associates, Inc. Page Two April 9, 1991 Application #89-07P Very truly yours, Elizabeth A. Warren, Chairman Inland Wetlands Agency/ Conservation Commission EAW/pmm cc: Jerry C. Iazzetta, Town Engineer Marcia A.Banach, Director of Planning Planning & Zoning Commission .,M�CJ F I Associates, Inc. P.O. sox 1061 South Windsor, CT 06074 RECHVE�Q mbft (203) 289-7662 MAY 7 1991 �M-WJNDWR P,,- .41K.G DEPT. May 6 , 1991 Ms. Marcia A. Banach Director of Planning Town of South Windsor 1540 Sullivan Avenue South Windsor , CT 06074 RE: 89-07P, Lot 9/10 , 20 Commerce Way Cornerstone East Dear Marcia: With this letter JFI Associates , Inc. is withdrawing its Planning and Zoning Commission Application #89-07P and relinquishing its accompanying permit . This unfortunate action is the result of the overwhelmingly negative financial and economic conditions that exist in the region. A similar letter has been sent to John McCahill relative to our conservation plan approval for the project . If you have any questions concerning this matter please contact us . S ' cerel , Ray and J /Alexander RJA ' a i J F I Associat s, Inc. P.O. Box 1061 frRN South Windsor, CT 06074 203 289-7662 .� MAY 8 1%1 May 7 , 1991 South Windsor Planning & Zoning i,)mrnissiao Mrs . Louise C. Evans , Chairman Planning & Zoning Commission Town of South Windsor 1540 Sullivan Avenue South Windsor , CT 06074 RE: Application 89-0 P7 , Cornerstone East Dear Mrs . Evans: This is to state our understanding that the referenced application will remain in effect for five (5 ) years from the date approval . However , it is our further understanding that no building permit will be issued for the project until all required landscape and wetlands/ conservation plan bonds have been filed with the Town of South Windsor . The aforementioned is in lieu of the request for withdrawal of the application as stated in our letter of May 6 , 1991 . Sincerely, Ila B. Alexander IBA/ra STATE OF CONNECTICUT ) ss: South Windsor , May 7 , 1991 COUNTY OF HARTFORD ) Personally appeared Ila B. Alexander , individually and as Corporate Secretary of JFI Associates , Inc . , signer and sealer of the foregoing instrument and acknowledged the same to be her f e act and deed, before me. ComJ ss oner the Superior Court Ral J. Alexander W" �� 1 A� v 4ri I OKI I I �� WTI WK FK JR GPOVI RNOR til �IF01 CIINNI.('IKTT I \1(T I-IVE('FIAMBFKS 11 AR I FORD.CONNEC1 ICU T Ilhlllh December 30, 1991 John F. Luzzi , President JFI Associates, Incorporated 75 Commerce Way South Windsor, Connecticut 06074 Re : SCANTIC RIVER STATE PARK PROPERTY SOUTH WINDSOR Dear Mr . Luzzi : On behalf of the people of Connecticut, please accept my gratitude for your generous donation to the State of 23. 2525 acres of land in South Windsor as an addition to Scantic River State Park. Through your generosity, Connecticut will be able to preserve and protect environmentally fragile areas. Your gift honors the State and its rich environmental heritage. Thanks to you future generations of Connecticut residents and visitors will be able bP enjoy the natural beauty of the Scantic River valley. Sinc4rqly,, LOWEL CKER, Governor cc : Ralph J. Alexander, Esquire Brady, Willard & Alexander 330 Roberts Street, Suite 400 East Hartford, Connecticut 06108 .MZLJ F I Associat s, Inc. P.O. Box 1061 South Windsor, CT 06074 (203) 289-7662 RECEIVED January 6, 1992 JAN 9 1992 Ms . Marcia A . Banach SO. WINDSOR PLANNING DEFT. Director of Planning Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: JFI/Commerce Way Sidewalk Requirement Dear Marcia : Attached, for your use, is a copy of item number 4 . , (pages 5, 6 & 7) of the minutes of the November 27, 1990 meeting of the TOWN OF SOUTH WINDSOR - PLANNING AND ZONING COMMISSION, ( the motion to eliminate the sidewalks is in the last paragraph) and a copy of Gov. Weicker 's letter of gratitude for the donation of the parcel to the Scantic River State Park. Now that we have helped to insure that future generations of Connecticut residents and visitors will be able to enjoy the natural beauty of the Scantic River valley, we will appreciate your efforts in insuring that the Commission follows through with the final portion of the motion: "At that time, sidewalks will no longer be required for this subdivision. " For any further legal documentation that may be necessary to complete this matter, please contact Attorney Ralph Alexander at 289-5477 . Thank you for your attention to this undertaking. Since Raymond J -,&3exandPr RJA/iba enclosure cc: Atty. Alexander