Loading...
HomeMy WebLinkAbout14 Parkview Drive Application No. 5002 . Permit No. 473 TO THE BUILDING INSPECTOR of the TOWN OF SOUTH WINDSOR, CONN. hereby make application for a permit to era (make-altereien-to) a building according to the following detailed statement of the specifications and plans herewith submitted. (Draw a line through word "erect" or words "make alteration to" as the case may require.) All provisions of the Building By-Laws (Sections 2 to 32 inclusive) shall be complied with in the execu- tion of this work whether specified herein or not. f South Windsor, Conn., . .... ............ ........... 19.�P 0 Signhere ... ..................................... . ............. _........... Address '.�y.. ............ ......... ... .............. .... ..... r Location? . ... ............................ ..................... ........ ........... ...................side of? e............................................. Nearest cross str treet No. . ' � ............ Lot No. ................ .... ........ ..... ... t J Owner of land is? �7... ... Address>.. ..... .... ....... .. r Owner of building is? . . . ......Address .............................................. .. . . ... iArchitect is? . ... .............. ............ .................................. .......................Address .................................................................................................. ........ Builderis? . ............... .. .......-........................................................Address ............................. ....................................................................... ........... Dimensions of building? .. w,e4............Fat front? ....... .G...... Feet rear? ........6 ........ Feet deep? .. 46 . .. Extreme height to highest point of roof? ...... ......... ......1.71. No. of stories in height?. . is? '.................No. of stores? ...... ................. ... ................................. ..................................... . .............Pu se of building ............ Howmany families? .. .................................................... .... .................No. of rooms? .... ... ..................................................................................... Distance from street line is? .. .... .......... ...... .. .��'rl�......from building line is? .................. ................... .............. A ITIONS AND ALTERATIONS (Give Brief Description) ....................... .... ...... 4,e,.4.&..... ... ..... ...... .............. ..-.............. ........................ ................. ............................................................................................................................. .......... .. ....................... . ................. ..................................................... MapNo. . .................. If of steel frame, what is exterior construction? .. ......... ......... ..................... What kind of columns used? .................................... . .. .......Size of columns used? What length of columns used? ... .................. ....How protected? .. . ......... ............................................ ..... .... ... What kind of beams or girders? ....... .... . .. .. . . .......... Size of beams or girders? .......... ............... .......................... ... Longest span of beams or girders? ................... ........ These rest on? . .................. ................................... Roof construction is. ....................................................................................Roof covering is. ........ .............. . .. . ....................... The floors are of .................................... construction and are calculated to carry a safe load of lbs. per square foot. (See Section 14, Building By-Laws.) BRICK CONSTRUCTION. Of what material will walls be constructed? . ......... ......... ........ ...... ............................ ........................ ..... .......... ... .......... ....... ..... Compositionof mortar? . ....................................................................... ............................................................................................................... .......................... Height and Thickness of Walls He*ht stories Front Walls Side Walls Rear Walls Partition Walls Basement, ..........................................­­........................................................ .................................... ........................................................................................................................................ ......... 1st Story ........................................................................................................... ............................................... ............................................................................................ ....I............. ....................... ..... 2nd " ............................................I....................................................... ................................................................. ........................ ..........................................................................................I........ 3rd " ................I........................................................................................................................................ ........................................... ...I............................................... .............................. ...... ........ 4th 's ............. ......... ..................................................................... ........................................ ................................................................................................... ......... .. ..... .................... 5th is ................................... ............ ..............................................................................................I............................................ .............................................. ..................................................... 6th 'd .... ................................................................................................... .................................................................................................................................................................................................. 7th 4 1 ............... .................................... ............................................... ..................I.............................................I................................................................................................................................. St h ed ................................................................................. .............................................. ........... . ......................................... ..................................I........ ........................ 9th 44 .......................................................................................... .................. .. ........ . .............. ........ .. ....... .................... . ............................................ .............................. 10th Material,of Front? ...If stone, what kind? . .... . ...... Thickness of Ashlar? ....Thickness of Backing? Backed up with what? Arches or lintels over openings? WOOD CONSTRUCTION. Give Size, Longest Span and Distance Between Centres, of Joists, Girders and Columns J0102S aUW=8 OOLUMM Floors Sire LosMt Span centres =1 She span centres Sire IAW4* Centres 1st Floor — .�a........... .............. .................................. ................. ............I....... ......._ ._.............._......... _...__..... ..__...... .............. .......___.._ .. .... .............._.. .................................. ._...._......... ....................... ....._.... .4 ....��..... ............. .................................. .................. .._..__... .........._._....»..... ....... .._.._... _...._........._ Size of outside studs? ........ -r .............. Distance on centres? ................. ................ Size of sill? ...... ................... Size of rafters? ........9?�r.f.............. Distance on centres?........... ....................... Size of plate? ............ V- 41................... Size of ledgers or girts? ...............................................................................Size of deck rafters? .................................................................... ............... Distance on centres? .............. ......................, lQ......"�..................................Size of studs in bearing partitions? ........... .................. MISCELLANEOUS Style of roof, flat,.pitch, Mansard, or hipped? ......I.. ........ Fireplaces? ........................................................ Material 'of roof covering? . . ........ ..........Material of Cornice? ...................................................................................... Howis building heated? ................ ....... ..... .....................Lining of flues? ... .............................................................................................. Thickness of shell ofRues? ......................................................................Any elevators or lifts? ............................................................ ...................... What kind? ................................... ............ How many. .................. .................... ..... Any hoistwa ys? ..................................... ............... . Howprotected? ............ .. ......................................................... .................Total Value of Building ......... .........D...................................... f � r When will work be commenced? .. ....... .............. The applicant warrants that the lot for residential purposes, shown on a plot plan accompanying this application, conforms to the zoning regulations of the Town of South Windsor. el 0 11 �' Applicant 4732 BUILDING APPLICATION Application No. ...5.0.0.2...................................................... .......... on the ............North ...........North........................... ................ Side of ............ ........ Parkview Drive ... ............. ... ............ .. .... ............... .... Street. Street No, .... . ... ... . ......... Owner Aelson...Mavquis........ Same Applicant CLASSIFICATION Portable Tool Shed 6 fx6f ... . . ........... ......... ....... . ........... . .. ... .... .. . ......... .... ......... ..... . .. .. .. ...................... Permit issued on above Application. Date, 4-2764 L ww TOWN OF SOUTH WINDSOR BUILDING PER1V T v` A ri1 6�. ' rt* Date P , 19 Fee Paid $. 2!0.0 Eat. Value s. . ��.' Permit N° 4732 • North - ,X on the side of Parkview Drive Street .: Street No. Owner N 01 BOU Margui• Applicant $ate CERTIFICATE OF OCCUPANCY ISSUED: Date Fee Paid _ CLASSIFICATION Portable Tool 3hac 62a6 r 1 BUILDING PERMIT N° 4'732 OFFICE OF THE BUILDING INSPECTOR of the Town of South Windsor, Conn. South Windsor, Conn. Apr it 2, 19 64 94io to to Terftfil, That is hereby granted permission to at estimated value of y$ 1��' •UU on the North side of 14 Farkvisw Drive Street on land owned by Nelson Marquis Said Work to be as described in Application No. 5002 and to conform to specifications and plans filed with said Application, and Building By- Laws of THE TOWN OF SOUTH WINDSOR. Iss April 2, 64 c� uil g Inspector. Streets and sidewalks, obstructed by excavations or building materials, must be guarded by barriers during the day and by both barriers and colored lights by night. SECTION 1343, GENERAL STATUTES OF CONNECTICUT: "When any person shall place or keep building materials, or any obstacle in any highway (or any sidewalk) either with or without a license therefor from the city or borough in which such highway may be situated, he shall pay said city, town or borough all costs and damages which it shall sustain, or be compelled to reason therefor." w4T i n'i*F Z p"'t f No. ....... ...... ....... MIME -1 rsu"*k "X G WSP UDW Of the TOWN OF SOUTH WINDSOR, CONN. ..)\....,hereby nu&t applicatton for a permit to (erect 0 o a building awarding to the following detailed statenwa of the specifications and plans herewith submitted. (Dmw a line through word "wwt" or words "mak alteration to" as the case may require.) All provisions of the Budding By-laws (Sections 2 to 32 inclusive) shaU be complied with in the awcu- tion of this work whether specified herein or not. South Windsor, Conlin 7 sign here .... ... .. ...... ................ Address ..... ..... .......... ... Location? ... ................................................................................................side of? ..................................................................................................................... r Nearest cross street? �111.4. ...J...Q..n............R.P&A.........Street No. . .......IY ............................... Let No. ...T.................. C. ......A ... .............. ...... Owner of land is? JV4.114AI......X.....NiZ.-I Address 1.4Y.A.r.A.... Owner of building • ......_....Address 1.11-paRA....Vt-'�Ze.....Pripc................................... Architectis? ....................................................................... .....................Address ... ....................................................................................... .................... Builderis? . ....... ....................................................... .....................Adic:lress ............... ...................................................................................... ........... • ensions of building? .) Feet front? .......... Feet teat? ......!1. ........... Feet deep? ....../.o%.......... Extreme height to highest point of roof? .......... No. of stories in height?............. Purpose of building is? ..y..c...r.......hi.h.h.m.-No. of stores? ....................... ...... ............................................... ............- How many families?- --01).-C.................... of rooms? .... .. ��......;PL .............................. .. ........ .. ........ Distance from street line is? .. .... ....... .............................................from building line is? .................. . . ..................... ..... ...... ADDITIONS AND ALTERATIONS (Give Brief Description) .. . . .... ............. . ............................................. ................................................................................................................................................................... ........................................................................................................................ ........................................................................................................................................................... ................ ....... ................................................................................................... . ............... .. .............. . ............ .. ..... .... ... ...... ... ...... . Map No. ........ If of steel frame, what is exterior construction? . What kind of columns used? ...... . ..... .... ..... ..Size of columns used? What length of columns used? ... . How protected? What kind of beams or girders? . Size of beams or girders? . .. Longest span of beams or girders? These rest on? Roof construction is? ...... ......... ..... ....... ..................................Roof covering is? The floors are of ...... construction and are calculated to carry a safe load of lbs. per square foot. (See Section 14, Building By-Laws.) BRICK CONSTRUCTION. Of what material will walls be constructed? .... .... .... ............ ....... Compositionof mortar? . ..... . . .. . ........... ........................... ...... ... . ..................................... Height and Thickness of Walls Height Stories Front Walla Side Walls Rear Walls Partition Walls Basement, ..................... .... ......__....................1st.Story...................... .........._........._................__ ..... _....................... ...... _........ .... ...................... ... . ................ .........2nd.......�..... .............. ............................................. ........................... ............ _......................... .................. . .. . .........__.................._........._..... ................................................_.................................. ... .. ......... ..................... .... ................ ... ................ .. ....... ....... ... 3rd " ............... . _. .... ............................................................................................................................................................._.....,........................... .......... .. ........... ....... .... ... . . 4th " ............... ...... .. . .........._.......................................... ........ ....................................... ... ............................................................................... ................ ........ . . ...... ............ ..... 5th " 6th " .... ............. ...... ... . .._.................._.................. ..................................... .... .. ..................................... .. ..................................... ................................................................................. 7th . ......... ....... ................................ ........... ............ . ... ....................I........... .... ... ........ .......................... ......I......... . ............................................... 8th is .............................................. .................................... .......... ..... ............. .. ....... . ....... . . ......... ..... . ................. ........................ 9th " .. ..... ............._................_.............................. . .. _. .. ............. .... . .......... ... .......... ........... loth " Material,of Front? ..If stone, what kind? . Thickness of Ashlar? .Thickness of Backing? Backed up with what? Arches or lintels over openings? A4 r, i'46 71 -N Y V,��"4N't 9:R IT!, W"O- coullklul'C-10 *ad 180 onosa, of J046aft"-Gkdmvad Jo� moorsLow"g."M 00"M softft gas , Lameld opm 0801M sds 1APS& CW86 ` AIM ..........-- / .z. ..... «.Is ................ ......... ..... ......... .....«_ .:.«.««_«..._....« ............. ....... ..... ....... ................................ ................... .. ......it .. .................. .............1 0-419...... Size of outside studs? ...........Dbtmm an CMM? ....... ...... rue 4A or 0 'k AL Size of rafters? ......... ..jr-C ..............t/I ....... Z.e a.......... Distance on centres?............ ......a........ Size of place? ................. Sizeof ledgers'or 1W. ...............................................................................Sin of deck rafters? .................................................................... Distance on centres? ...................................................................................-....Size of studs in bearing partitions? .............................................. MISCELLANEOUS Style of roof, flat,pitch, Mansard, or hippeR ... ......PA rl*d... ' V......................... Fireplaces? ....................................................... .................................. ......... ........ Material of roof covering? ...... ........ T.,......... .......Material of Cornice? ............ . ................. ......... How is building heated? .. ..... ................................ .. .....Lining of Rues? ... ............................................................................. .............. .4 . . Thicknessof shell of flues? ........................................................................Any elevators or lifts? ........................................................... ...................... Whatkind? ............. .............. ................ How many? .......... . ... ... ................. Any hoistways? .................. ................................ . How protected? ................ ......................................................... ...............Total Value of B" ...Xs,-!q�-C�....�............ do . ... When will work be commenced? . ...... . . .... ................. The applicant warrants that the lot for residential purposes, shown on a plot plan accompanying this application, conforms to the zoning regulations of the Town of South Windsor. Town of South Windsor since 1949. Applicant 7588 BUILDING APPLICATION 7 ApplicationNo. .... . ..888............ ........................................... on the .................... .. ...... ..... side of Parkview Drive Street. Street No, .14 Nelson J. Marquis Owner Same Applicant ... ... . .. CLASSIFICATION Addition to kitchen 191x12l . Permit issued on above Application. Date, - .4-6-72 19 TOWN OF SOUTH WINDSOR BUILDING PERMIT Date Apri 1 6.9 19 72 Fee Paid �$. 18.00 Est. Value �$. 3000.QO Permit N? 7588 on the side of Parkview Drive Street Street No. 14 Owner Nelson J. Marquis Applicant Same CERTIFICATE OF OCCUPANCY ISSUED: Date No. 4142 Fee Paid $ 3.00 CLASSIFICATION Addition to kitchen 191x121 . BUILDING PERMIT N° 7588 OFFICE OF THE BUILDING INSPECTOR of the Town of South Windsor, Conn. South Windsor, Conn. Apri 1 6, 19 72 94i'o to to Tertif1j, That Nelson Jo Marquis is hereby granted permission to Addition to kitchen 19tx 121 at estimated value of $ 3 s 000 on the side of `4 PRrkview Dry ye Street on land owned by Nelson J.Marqui e Said --pork to be as described in Application No. 7388 and to conform to specifications and plans filed with said Application, and Building By- Laws of THE TOWN OF SOUTH WINDSOR. Issued' April 6. 19 72 Building Inspector. Streets and sidewalks, obstructed by excavations or building materials, must be guarded by barriers during the day and by both barriers and colored lights by night. SECTION 1343, GENERAL STATUTES OF CONNECTICUT: "When any person shall place or keep building materials, or any obstacle in any highway (or any sidewalk) either with or without a license therefor from the city or borough in which such highway may be situated, he shall pay said city, town or borough all costs and damages which it shall sustain, or be compelled to reason therefor." INSPECTION EPORT41'6Y'�70 P rmit #E 55 Job • - ---I -Footi n-9l' /T - 2 Foundation 6--.317z _-3 Framing 4 Wiring - - 5 Plumbing b Heating 7 Lathing 8 S ptic system - 9 10 C.O. ---------------—----- --- __— --- - -- - -- 1 t Permit No. TOWN OF SOUTH WINDSOR SOUTH WINDSOR, CONN. t i t t - Permit N 4142 t Certificate of Occupancy t00, THIS IS O CEPgIFY that t at No. the Town of South Windsor Connecticut, has been erected and completed in accordance with the Building Code and Zoning Regulations of the Town of South Windsor, and is hereby approved for occupancy. t t t ' Building Inspector t O er, Builder �o ` Fee Paid - Date t t 1 I Permit No. TOWN OF SOUTH WINDSOR SOUTH WINDSOR, CONN. I I I I I Permit N� 4142 I I I Certificate of Occupancy I THIS IS TO CEPffIFY that )41 at No. ��' � J I the Town of South Windsor, Connecticut, has I been erected and completed in accordance with the Building Code and Zoning Regulations of I the Town of South Windsor, and is hereby approved for occupancy. Bui ing Inspector O er, Builder Fee Paij�'- 1 Date 19 5031 ELECTRICAL APPLICATION 54 ApplicationNo. ... .........3....2................................................................... onthe......................................... . ..................... ................. side of Parkview Drive ...... .............................. .................................................... . Street StreetNo. ... ..14.. ....... ....... .... ................ .................. Owner ..Nelson Ma.rqu.i..s. . ...................... . .... Lane Electric Electrician ...... ...... FILED IN OFFICE OF The Building Inspector 6-26-72 .. ... .......... ...... . .............................. . . . 19 ... ... INSPRMION. ............................................................................................................................................ ............................................................................................................................................... ............................................................................................................................................... &rNo Electrical Work shall be started until a Per. mit is granted by the Building Inspector. In New Buildings no wiring shall be started until the plumbing and heating pipes, and the fire stops (if of wood) are installed, without a special permit from the office of the Building Inspector. APPLICATION FOR PERMIT TO DO ELECTRICAI. WORK. No. ...5................342.................... Permit No. ...5...°3.1.... ............. .. TO THE BUILDING INSPECTOR of the TOWN OF SOUTH W INDSOR, CONN. ................. hereby make application tq perform Electr cal Work according to detailed description below. All , provisions of the Rules for Electrical Installation, Section 48, Building By-Laws, shall be complied with whether specified herein or not. /O f Y.Y�cr South Windsor, Conn., ...... J ... .. ... ... ............. 19 ..?r!5ign here ........................................................ O Address ....�, 'T.. .........../r t L//tr,�,f c ............................�.... Location /G T ........ ................................... ........ Side of ................... �S'!1.. v .`.�...................../.�...................... .................. ............. ............... Natureof Building ....... ........ How many stories ............................................................................................... Newor old Building ........................................ ......................................... How many families ................................................................................................ Kindof Installation .............Rqet ................. ...................... . How many Stores ...................................................................................................... IOwner . ' .5...4..(..Y.................. r '. � .. 1. .........._................. Address /.'�............. ...........� 1'.,....................... rArchitect ........... .............. ........ .. ... Address ..........................................................................................._............................. r Address Builder ................... ........................... ........ .. ....... .......... ......... .... ...... .. ........ ........................................................................................... Electrician ! ?. P/C. �. ...... ./YC Address d ....".. y.,Y.........xl. ...........-So.......�i��'�'e .... /. .... ./...4.. ...../ Size of Main Wires .. ...................................................... No. of Fight Loops ......... .... .. No. of Heat Loops .. ...... ..... . No. of Power Loops ..................... No. of Light Outlets .............. . No. of Heat Outlets ..... No. of Power Outlets .................. ........... No. of Light Circuits ...... .. .. ........... .... No. of Heat Circuits ...... ... . ... ... No. of Power Circuits ....... ..... No. of Sockets ... . No. of Heat Receptacles No. of Motors ............. . ..... ..................... No. of Panels .................................... .... . Size of Heat Circuit No. of Power Receptacles .... .. .............. No. of Switches ...................... Total Wattage Size of Power Circuit ... Total Horsepower . ..... .... . .... ...... No. of Straight Electric Fixtures ... . .. . .................. No. of Combination Fixtures .... ............... ... .. ......... No. of Receptacles ................................. ..... ... . ..... No. of Cord Drops ...... ........................................................... ..... ......... Remarks: For other kind of Installation ..... ........... '............ ,ll'p. ............. . .T.. .!l%........... '.. ................ . .. . . . . .......... ................... .. ....... ....... .................................. ........ ........ ......... ...... .......... . ....................................................................................................... . . .... .......... ........I.... _.................................................................................................................................... ......... ....... ...................................................................................... ... . ...... ......... . ........................................ ............................. . .......... ....... .. ... . .. . .. . .... .......... .. Estimated Cost ....... ...�.. ..4................... 7253 ELECTRICAL APPLICATION Application No. 8267 on the side of Park V i ew Drive Street Street No. 1,4 Owner Nal son Ma—rq i e Electrician C=i rspp s E 1 o r t r i r Co FILED IN OFFICE OF The Building Inspector nc t 3 P 19_$.Q INSPECTION. 11r No Electrical Work shall be started until a Per- mit is granted by the Building Inspector. in New Buildings no wiring shall be started until the plumbing and heating pipes, and the fire stops (if of wood) are installed, without a special permit from the office of the Building Inspector. APPLICATION FOR PERMIT TO DO ELECTRICAI. WORK. No. ....... ......�.6... ..... ....... Permit No. . .... ...7..2 5 3.. ...... TO THE BUILDING INSPECTOR of the TOWN OF SOUTH W INDSOR, CONN. ................ hereby make application tq perform Electr cal Work according to detailed description below. All provisions of the Rules for Electrical Installation, Section 48, Building By- s, s be complied with whether specified herein or not. South Windsor, Conn., �,.�v. . 19 Sign here . . .................. Address �v. /.•fC?�.c�. /. c... .. ..,,1, �..!/_.C' Location I V. Fa a V l.e' .f-u PR d v C Side of Nature of Building .i-i.q'—k...... How many stories .......... d......... ........................................... .... New or old Building .l.�./�. How many families ................. ................................................... ............. .BIZ..✓...�.4..f... `.. �'. .. ..�. How many Stores ..................................................................................................... Kind of Installation A Owner ,�/...{.../.S.D to ....... . �.� (/.�..,,f............ ......._........ Address /.�./. . V ..... ...... ..... ��...�...t.... Architect ......... Address . .............. . .................................................. __..__....._....._._.... Builder //.11.... ...... Address ... ... ... ......................... .................._._._....._.... j... Electrician 4....� .1.. ..� ........ �.�.. ..c.. f�...� s.........`. J. .. Address �?.�1- ..... . ►kr...... .1...: .e..�i..._... .�.. ..d... Size of Main Wires ... .... ......... ... ........._ No. of Light Loops .. ...... ...... No. of Heat Loops ......... No. of Power Loops ......................... No. of Light Outlets No. of Heat Outlets . .. No. of Power Outlets ................ ......... NoP of Light Circuits ... ..... .. ... ... No. of Heat Circuits No. of Power Circuits .. No. of Sockets ..... ... . . . ... .. .. .... . No. of Heat Receptacles No. of Motors No. of Panels ..................................... ... . Size of Heat Circuit No. of Power Receptacles . No. of Switches ........... . .. ..... . Total Wattage Size of Power Circuit .. Total Horsepower N . of Straight Electric Fixtures ........ .. .... .. . .......... .... No. of Combination Fixtures ... . .. ... ........ No. of Receptacles ........................ ....... ....... . ........ ..... . . No. of Cord Drops .... ....... .. ... .. Remarks: For other kind of Installation . . ..........: ........ .... ........Ct.� C� `....•.......... "........ �, .................. .... .. ..... ..._ ,�.................. ................t...o?.....L)......... ,. .... .. ... �I �. ...► r- !............�-a- ............... . ....4.......................... ... Estimated Cost .................. ..... TO THE B iNG iNSPECTOR of the APPLICATION FOR TOE ( F SOUM W WSM COM PLAN EXAMINATION AND BUILDING PERMIT z IMPORTANT — Applicant to complete all items in sections: 1, 11, 111, IV, and IX. O ZONING I• AT (LOCATION) f / �G/G!I �7/^ DISTRICT � LOCATION I (STREET) OF BETWEEN AND BUILDING (CROSS STREET) (CROSS STREET) LOT SUBDIVISION LOT BLOCK SIZE N II. TYPE AND COST OF BUILDING — All applicants complete Parts A — D �v A. TYPE OF IMPROVEMENT D. PROPOSED USE — For"Wrecking" most recent use 1 INNew building Residential Nonresidential 2 Addition(If residential, enter number 12 One family 18 ❑ Amusement, recreational of new housing units added, if any, 13❑ Two or more family — Enter 19❑ Church, other religious in Part D, 13) number of units— — — — --o. 20❑ Industrial 3 ❑ Alteration (See 2 above) 14 Repair, replacement ❑ Transient hotel, motel, 21 ❑ Parking garage 4 ❑ P , P or dormitory — Enter number 5❑ Wrecking (If multifamily residential, of units ——————— — -i 22❑ Service station, repair garage enter number of units :n building in 15 ❑ Garage 23❑ Hospital, institutional Part D, 13) 16 ❑ Carport 24❑ Office, bank, professional 6 ❑ Moving (relocation) 25 Public utility 7 ❑ Foundation only 17❑ Other — Specify ❑ Y 26❑ School, library, other educational B. OWNERSHIP 27❑ Stores, mercantile 8 ❑ Private(individual, corporation, 28 ❑ Tanks, towers nonprofit institution, etc.) 29❑ Other — Specify 9 ❑ Public (Federal, State, or local government) C. COST (Omit cents) Nonresidential — Describe in detail proposed use of buildings, e.g., food processing plant, machine shop, laundry building at hospital, elementary 10. Cost of improvement................ 0 IT school, secondary school, college, parochial school, parking garage for, department store, rental office building, office building at industrial plant. To be installed but not included If use of existing building is being changed, enter proposed use. in the above cost a. Electrical...................... !l//" b. Plumbing ...................... c.Heating, air conditioning......... d. Other(elevator, etc.)............ 11. TOTAL COST OF IMPROVEMENT $ III. SELECTED CHARACTERISTICS OF BUILDING — For new buildings and additions, complete Parts E — L; for wrecking, complete only Part J, for all others skip to IV. E. PRINCIPAL TYPE OF FRAME G. TYPE OF SEWAGE DISPOSAL J. DIMENSIONS 30❑Mas my(wall bearing) 40❑ Public or private company 48• Number of stories................ 31 Wood frame 41 ❑ Private (septic tank, etc.) 49' Total square feet of floor area, all floors, based on exterior 32❑ Structural steel dimensions ..................... 33❑ Reinforced concrete H. TYPE OF WATER SUPPLY 34❑ Other — Specify 42❑ Public or private company `•� Total land area, sq. ft. ........... 43❑ Private(well, cistern) K. NUMBER OF OFF-STREET PARKING SPACES F. PRINCIPAL TYPE OF HEATING FUEL I. TYPE OF MECHANICAL 51. Enclosed ....................... 35❑ Gas Will there be central air 52. Outdoors....................... 36❑ Oil conditioning? L. RESIDENTIAL BUILDINGS ONLY 37❑ Electricity 44❑ Yes 45❑ No 53. Numb r f b drooms.............. 38❑ Coal 39❑ Oth r— Specify Will there be an elevator? 54. Number of Full.......... 46❑ Yes 47❑ No bathr am* Partial....... r NOTES and Data — (For department use) IV. IDENTIFICATION — To b compl t d by all applicants Nam Mailing addr ss — Number, street, city, and State ZIP code Tel. No. Owner or /�L7 Lessee [ 2. Contractor 3. Architect or Engineer The owner of this building and the undersigned agree to conform to all applicable laws of this jurisdiction. Signature of applicant AJAress Application dot La 700 NOT WRITE BELOW THIS LINE V. PLAN REVIEW RECORD — For office use Plan Review Date Plans Date Plans Plans Revi w Required Check Fee Started BY Approved BY Notes BUILDING $ PLUMBING $ MECHANICAL $ ELECTRICAL $ OTHER $ VI. ADDITIONAL PERMITS REQUIRED OR OTHER JURISDICTION APPROVALS Permit or Approval I Check Date Number B Permit or Approval I Check Date Number By pp Obta ined Y pp Obtained BOILER PLUMBING CURB OR SIDEWALK CUT ROOFING ELEVATOR SEWER ELECTRICAL SIGN OR BILLBOARD FURNACE STREET GRADES GRADING USE OF PUBLIC AREAS OIL BURNER WRECKING OTHER OTHER VII. VALIDATION Building Permit number 12148 Bui Iding Permit issu d April 27 19 81 Bui Iding P rmit Fe $ 4.00 App qvedd w TIT • • .. N'..i..w. • Ns .sews. .w . •w.w.w.w sees.. .ww. Y..w.w .w..... ...w. w■.. . . ... a w . • ... �+ r u. a..f ■i a. . .■__=■ .a..a..m. i.rf.i.aes ai. .a r ra s .i.a ri i�rimii■=■■f ■i 0 ._ a■ .a. � .a:Orac.•aiss:elw�" ..: •ss: r■•r.eme�.a:.arl. =' l:N :as ■!!s! m$...= asses• ■mare r■ .s.. •■. a.a aaf �.ueu mr.aa . e■a.a.■ .r■ ■m■•aa. a ■ . ' fy ua■. .'Be somei_i_us■.■ aea tsar■■■ Lot" .■/rN. Yr as • .. .. .. a. m •■:•�.. :a• :.. aN•faa g ••• N• 1� r� af. • • • son an to mom a Is as on • .'i■ ..f �* i%� R �.a!$.• a.:wr N� ■ a�� are�t i_, • i � . •:s �■M s.lyl ■ �� ■ �� xt ■•.■ �■i�i�i ... • onns.e .agar•. * .. as .. a** • . a• f f.l:M...•aNIT,1 •• •� ear oans sue: Ls: �s�!!$ • so . . •.a. •���;_. • 1S.M! Neil a. siii��•�•:as:iii:sls!` aiG` • ZZs 'i i r•�iri�Zi:a .aIs :: 1111"�iiui i r . r.• pi�r•�r login. rw mast w■. arw•p• .�► .. . : i'aa::�'" ! •�ii • lw. one Is"We :ira� ..10: �iai ui:r.sr.::Wrj • �� r now � s •� 8 efa.a fa . ' .!!• sin1 S u. • )a ea •ss *Y ra !u rs � a•: •� • !NZ one �' ' a'l�rN�H� s: ■■la1I1 N N �a..l!•#". .�s.•iii...fH....s.. •!•I�f1 ! . igoat : rr� ■■� tar ■ .s.l. Iowa as adisbusaa ABO#1"6080 ones gm a!sfill �i�l�l 111111 a" am¢ 3 �a��` i�iii�L=! .. :•:: i.smZG`HO ag"i'.iii�HOs�iss$ a r . .. . o.. . .. . sees �� ■ a � . '$.ijQ�:ss s$ ss:�$ ��s■ ss:so $a$:1 s` 's ■�•. as SIts sin" !:' :�aN•��Np1of!�!�•�a ��:$•r�. ! a �q• Uli ! i. ff ;:s is ss is !:!!��_ •:ess !ss!•lssiils •i •s ••:s■ �f• i �•i! MIND" � s t i lee .1: u•l • . uuua.sl� !au i ai •• a. �i = 5==:Sla nowi:$:::::::iliiiiil: �l:iasGi:as . $�.�i" na � . •� ;N '�ii s�_::N ■e!s !• .p:a::t:fMa is: : ream =■ mama _ am ■Homes rse�.. p fm ■ i� t:e ss s:. $s!••$ l!:. s•s..s .as:.::::•:r.::Jose ::.::..::.: ...a:::.�' ssi � ii $$:: _ _ e ;:. es::rems.se!!■ i.a:: .lma...==■mm■■.am■■�i.•.■■.taa..s.ra.rlm.■. aa..■aa.a■ am.si�if.■oss.■•.laf ■ n! ss$ ==!!e:_!_ 's 3:= :::::=a::::::'sS:mCi:os :=� "3t:s:=!Ss;=� 5 �Y ' 3 ;::i•!! •= !a :i!• •=■s.eS.iteme..•rr■.■.ee■■■re■e.e.a■■.e■m...■■l.raser■.a.$3l..a:mem.!l::a:ls. !l.malsr. l Trfaa� ii� : a III �■ : ••:: a•:•■ ::::• a:l. ern• fa....■a.eam■...me..r •.ea.■■ rrm..maeeeem.■eema.a.aae a.■■ ■aa■.a..eeaaf ■. .. ■■ . ■.. . r ;. !•rss:s;:=:$:_:: lssss:: =.Es:::=sss:aa:::::::::::a::a:::e:::::::::::::::l::•s::=:!C•lss:i:::5•'a was ! $sels I I ! s$$s f:s ..� :l . IRHI ._....■.i.::uuaSiil....!l.r.=m.a.a;me��r.=aa•..a.■■....a....a.■.a..e.ma.:. ': ■ S�saif.e■:UNIZ.lfm�iUS aisle, s ;� .L8 •s!= 8 an . is': s==_= s;= ;i�sieee =$:sl $$:$s 3ieeeees eE ea:eese a.:::$ ismsol:stoi$$ $s's=$ ■sm:,i $ s .._s . '$ . s SHE: pia■ = s.=$ i==ai •!!• =1=■s�::••� •!:! =:.=.arsee:�immaai=al:a==r.m..■a..mr.aa..= m.=m==$.am■$==r= �sr. .a�i$.�!•5 � i �tiar■ i• ■■.a• • ■. ■•■■ •me e■. e• • • em�e.■■e■ ■■.■ • ■m r.■e.■e.n■.e■en■ ...a •.■ meta ■ a■ a..f • • ■ as ■: ids==ees'ses=l e�=;$i=='s:e=si:= ===i ==si's=s s:Ws:s 10:13 HUMMOMss e a �e se== ss:: E:=se==as's ss19 .$$s` ' r ass 's p aMuff. :ue!!la..!!ur!=uaml:=u■ll�.mr■N■::mie:rum.sus■■a■...a■rmol.ur■■Nm=■r=■u�i■mral�io .aN!!a•i■ •!=Qi�i$ =:aii�i iris a a a mN■=a �!s'sc'ssss:::iessee=$=$:$see'ssnms s's'sie=esis:�:=:assesesmi$�$i':'da"Hil! '3!=$'s$ i s ' $a sN6$s 1o::: =::::i!=s....._...=...s.. ...._;.......s.Sl.l.lstallicS�lls!•l s:s•� sRUN 11 �••� �S'sS� .seen .we ..a •n mesa ......... a■■ .m■ .. . .. •aa. . .. ;jsij uii�:::e=isssuineases;elimi=ss:$$ss:emaii-asse smogs mass:KING0 agos$'s::='s$'as$$ic�'s$� =s�$E's:s$$i;�i i,'$ ='a$f`==.� gas ;.s:..$sss:.: s::sHESIs:s=::::$9:ll:essssee I I ls3e.as$ . .:$ m ssi •ss:°==s s::=:::: =:l:-s cL'l-:�si ;:::s:=:: �uss: 1 TOWN OF SOUTH WINDSOR BUILDING PERMIT Date April 27 , 1981 Fee Paid 4.00 Est. Value $.SQQ.00 Permit N 1214 8 on the side of Parkview Drive Sava Street No. 14 Owner Nelson Margui s Applicant Ne I sn Mareuig CERTIFICATE OF OCCUPANCY ISSUED: Date No. Fee Paid $ CLASSIFICATION Rhed BURRING PERMIT N° 12148 OFFICE OF THE BUILDING INSPECTOR of the Town of South Windsor, Conn. South Windsor, Conn. April 2 7 1506 94is is to Ciertift, That Nelsen Marquis is hereby granted permission to To o i Shed '1 4 t x 18 s at estimated value of S500.00 on the side of 14- Park view Drive Street on land owned by Nelson Marquis Said Work to be as described in Application No. 12448 and to conform to specifications and plans filed with said Application, and Building By- laws of THE TOWN OF SOUTH WINDSOR. Issued April 2 7 1981 Building Inspector. Streets and sidewalks, obstructed by excavations or building materials, must be guarded by barriers during the day and by both barriers and colored lights by night. SECTION 1343, GENERAL STATUTES OF CONNECTICUT: "When. any person shall place or keep building materials, or any obstacle in any highway (or any sidewalk) either with or without a license therefor from the city or borough in which such highway may be situated, he shall pay said city, town or borough all costs and damages which it shall sustain, or be compelled to reason therefor." Electric# APPLICATION FOR BUILDING PERMIT Plumbing# 14 PARKVIEW DRIVE / Z$/do Lo l HVAC # Date: 6 Sprinkler# No. 23345 r FINALra OV Astimated Cost $ Build in J`'GCOMPLETE RED BOXED AREAS Permit Fee $ -50 Engineers TYPE OR PRINT ONLY Occupancy Fee $ Affidavit SIGN ON REVERSE SIDE Appr.for CO. Total Fee $ TO BUILDING DEPARTMENT, TOWN OF SOUTH WINDSOR,CT (Additional Cost) $ The undersigned hereby applies to do work according to the following specifications: Job Location/A4 J2A A 0-C ! W D A Lot No. Side of Street Zone Applicant 'o _rTM .tl/QD v S Tel. # ; G��'G' Address S h M e Zip Lic. # Owner Address Architect Address Sq. Ft.New Area: 1st Fl. 2nd Fl. 3rd Fl. Total New Area #Rooms # Lavatories #Bathr s #Garages Purpose of this permit: e j Jj City Water Well ❑ Septic System D Sewer Use Group Construction Type if/ Area / Basem pt Garage Approved by LIAE, Date 6 Revisal 6/95 I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town of South Windsor and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this permit is asked,and agree that this building is to be located the proper distance from all street lines,side yard lines and required distances from all other zones and is located in a zone in which this building and its use is allowed. Signed I hereby apply for a Certificate of Occupancy for the work described in this application for the permit Signed -- DO NOT WRITE BELOW THIS LINE -- INSPECTION COMMENTS