HomeMy WebLinkAbout14 Pam Lane V
r 4
0
Appli4tion No. ......
-777
Alum
RUILDING PE- .3
Of the
TOWN OF SOUTH WINDSOR, CONN.
.....We..........hereby make application for a permit to (erect a buil&=
to the following detailed statement of the specifications and plans herewith submitted. (Draw a line dirotgh
word "erect" or words "make alteraLtion to" as the case may requim)
All i i of the Building By-Lawns(Sections 2 to 32 indusive) sW be t-widi in the eau-
c
provisions a
tion of this work whether specified herein or not.
South Windsor, Conn., ............mn............................-- 19...64..
Signhere ..........................................................................................................
Address ......................................................................................................................
Location? ....................East Pam lane
..............................................................................................side of? .........................................................................................................................
Nearestcross street? .......................................................................................Street No. ..................................................... Lot No. .11-9.....................
Owner of land is? j!!R.Stich Assoc-Inc.............Address .......611 New Park Avenue
.......................................................... ......... .................................................................................A ....... ......
Owner of building is? ........ Assocj-mc.Address 611 New Park Avenue, W.H.
........................................... ... .................................................................................. ..............................
Architect is? ................Richard..A.......5hqR9............................Address .......Nqpm. eadow. ..Road.,....Simsbury.......
Builder is? X..AgildgKs Inc. .......Address ........4.1.1-New...Park...Avenue...W....,H.....
.............. .................. ....................... ......•.. .......
Dimensions of building?jj!..81!x2618Peet front? ................. ........... Feet deep? ................................................... . .............. . . ............. Feet rear?
xtreme height to highest point of roof? ...........21.1........................................ ... No. of stories in height?....1....1.112.................
Purposeof building is? .............................. ......................No. of stores? ........................................................................................................
How many families? .......... O
.............. ne............................................No. of rooms? .... ..................................................................................................
..........-
Distance from street line is? 451....... .. from building line is? ......... ................................................................I......
ADDITIONS AND ALTERATIONS
(Give Brief Description)
................. ............. ..................................................................................................................................................................................................................................................
....................................................................................................................... .................................................................................................................................................................
.................................................................................................................................................... ............................................................................. ....................................................
MapNo. ................. .......
If of steel frame, what is exterior construction? . . .......... . ... ........ ......... ......
What kind of columns used? ........... .... . . ....... ......Size of columns used? . ... . .. .. ....
What length of columns used? ... ... ... . ..How protected? ... ... ...
.. .. ... . .... ..... ... . .. ..
What kind of beams or girders? . .. Size of beams or girders? .... ....
Longest span of beams or girders? These rest on? ...... ..... ........... ......................................
Roof construction is? ..................... . ... .... ....................................Roof covering is? ..
The floors are of . . .. .. ....... construction and are calculated to carry a safe load of. ..
lbs. per square foot.
(See Section 14, Building By-Laws.)
BRICK CONSTRUCTION.
Of what material will walls be constructed? .... . . .... ............. . ...... ....... ... ... .......... ..............
Composition of mortar? ....... .. . ..... ......... ...... . ..................... ............ ......... ............... ......... . ........ ..
.
Height and Thickness of Walls
Height Stories Front Walls Side Walls Rear Walls Partition W Us
Basement,
...................... . . ...................................................... ............... .......................................................................................................... ................................................I.......................... .
1st Story
.... ............... .. .. . ................................................... ..............,............. .................................................................................................... . ......... .... ..... ....... ......... .. . ......
2nd "
.. ................ . ............................................................ .................................................................................... ...... .... ..... ........................ ................ ............ ....... ............. ........ .....
3rd '
...................... ......................................................... ............ .................................................................................................................................... .......... ... ...... I........ . ........
....
4th
.. .............. .. .. .................................................. ... ........ ................... ................. ............................................................................ ................... ........... ....... ......... .. .
5th
6th "
. ........... ................................................................................................................................................................................. .............................................................................
7th "
........................ ... ....... ................................... .............. ........................................ ,.......................................... .......................................... ....................................................
8th "
........................................................................................ ................ ............ ............... .... ........, ....................... ...................................................... ............................ ...........................
9th "
.......10th............. .. ... . ............. .. .. . '
Material.of Front? ........... ....... ...If stone, what kind?
Thickness of Ashlar? .Thickness of Backing?
Backed up with what? Arches or lintels over openings?
4
�s-,'.Yr �,•,�- 45 '_ A', a «;�"e,d'+;c�-.a..°"; 'w' :TM,3�P �.�:d �Sa�n��f � 7LL7�� � gs�5,;'i=� .r. ;d.i ;ma ;u� 4':
,n. i« sysw•y ca i.'`'n. "„
"'"� x.',�it; f+.� .� ,g, ,F ><� �e;-.,.,•:5'.rt,.;:�`4�'..
-
[.� °'K,: - �, Fa - n•F.a ..Y, - C'a` 9,�`v;� Via, -
x^4o--
�;. ;� ��N 'i, .'=�` „r.-A .h.,�,ax _ �� f; `.x "r', �a°,• ,t 3�.4 m,xY,�,`-,�*
mm9`n`;ii,''#".�,t' 4�°.s' ,'�+�.`k, `i;; ,�+`� k Y✓� - ;;:a » i- t,.,>. w ,v�,. ;�.,�..'7'.r'i;
mine
404
F�. � � _ > .Jig ,. .. • .Y 's �d� z�;�"`�%�
�l � rta
$nd
...«..r...wM .». ..ems......««........ ....n+.�....w.. .w.w+..«..,...1.r.+.• .....w�............ +.............a.+. }�KOlt
Wd
»•
kwRT..242^v'Q".�-ixu�r,*� ...» .v -v. ,„ _ _ a.m"S. � --•. .� .� n. , � .`�'e r rv, --y..mrr_.n,,'+9.r.'s�. -...R x ..n- -.,a`T"ir:*'.'."4nv.M..c*�^',n""' rnd'-'J=`M - '^..'.' � w.}a^�.s�}pqx n
Size of out $tods?......... " 'At.... .. 106fimim#jL Ceft ? ...........................................y. `'Of �°�.......,......»....»
a '
Size of rafters? ..........Txuxs.......... Disume an centres?.......................A!..................,..Size of plate? .......... ' ......,........
..�...��......_.
Sizeof ledgers or' guts? .................................................................................Size of dedc rafters? ............................................ .................a ....... ......
Distance on centres? .........................................................................................Size of studs in bearing partitions? ..................................................
MISCELLANEOUS
NO"
Style of roof, flat, pitch, Mansard, or hipped? .....pitch.......................... Fireplaces? ................,......................,................ ...............
Material of roof*covering? ....21.01h...AMPhalt.............Material of Cornice? .......Wtmd...& G*1* Ott ra
.........a..........................................
How is building heated? .................. .�..............................................Lining of flues? ... ................Sxl�...T Terra Cota
..........................................................................
Thickness of shell of flues? ..111TG4"cinder blk.Any elevators or lifts? ............................
.................................................. .............................. ......................
Whatkind? ...................................................... How many? ..................................................... Any hoistways? //........................................................
�
How protected. .................. .......................................................... ...............-Total Value of Building �........14
a................................................................
Whenwill work be commenced? .......................... .................................................................................................................................................. .................
The applicant warrants that the lot for residential purposes, shown on a plot plan accompanying this appli-
cation, has 20,000 square feet, or more, and at least 100 foot frontage on a Town road shown on a map of
South Windsor showing Town Roads dated December 1949, or on any other roads officially accepted by the
Town of South Windsor since 1949.
V_'
� u
Applicant
3134
BUILDING APPLICATION
Application No. .5,94..................................................
East
onthe .................. .............. ............ ............................ side of
Pam Lane
... .............. ...... . .......... . . .. ................... ... Street.
Street No, Lot....#11.0. ....... .. ...... .. ... ......... ...
I.R.Stich Assoc.
Owner ................... ......
Applicant . .. .Same ...... . ......
CLASSIFICATION
Dwelling 43,18"x261 81'
. . . . ... . .. . . .. .... ..... ............ ..................
............ . .. . ........ ..... ....................
. ..................... . ..... ... ... ...........................
Permit issued on above Application.
May 2 7., 60
Date, . . ........ .. 19..........
TOWN OF SOUTH WINDSOR
BUILDING PERMIT
�1
Date Ma 27 s 19 60
Fee Paid 60=00 Est. Value $3-40,40
Permit N9 3134
on the East side of
w�
Paz Lan® Stream
ilil ,
Street No. Lot #110 �-I
Owner.
I.R.Stich Az®oe.
a
Applicant Same
CERTIFICATE OF OCCUPANCY ISSUED: il
Date
No1936
Fee Paid $ .00
CLASSIFICATION
Dwelling 43'8"X2618n
J%
BUILDING PERMIT
N° 3134
OFFICE OF
THE BUILDING INSPECTOR
of the
Town of South Windsor, Conn.
South Windsor, Conn. May 27 i 1960
T4io to to Terttf1j, That I.R.S ti Ch ASSOC,
is hereby granted permission to Dwelling 4318"x2 618"
at estimated value of $3
on the East side of Pam Lane Lot—411 0_ Street on land
owned by IeR.StlCh Aesoa.
Said Work _ to be as described in Application
No. 339h and to conform to specifications and plans filed with said Application, and Building By-
Laws of THE TOWN OF SOUTH WINDSOR.
Issued PlaY2?- — 1960
Building Inspector.
Streets and sidewalks, obstructed by excavations or building materials, must be guarded by barriers
during the day and by both barriers and colored lights by night.
SECTION 1343, GENERAL STATUTES OF CONNECTICUT: `When any person shall place
or keep building materials, or any obstacle in any highway (or any sidewalk) either with or without a
license therefor from the city or borough in which such highway may be situated, he shall pay said city,
town or borough all costs and damages which it shall sustain, or be compelled to reason therefor."
Permit No. "� TOWN OF SOUTH WINDSOR
SOUTH WINDSOR, CONN.
Permit N? 1936
Certificate of Occupancy
THIS IS TO CERTIFY that the
at No.C;r �?"J a '- � �' " /%r-j in the Town of !66uth Windsor, Connecticut,
has been erected and completed in accordance with the Building Code and Zoning Regulations of
the Town of South Windsor, and is hereby approved for occupancy.
L
BUILDING INSPECTOR
OWNER, BUILDER
3 '2.f
Fee Paid Date 19
5309
PLUMBING APPUCATION
Appl;ca. N6, 6093
on du_...._.._ .._ aide of
_............
2-a4= -s-, -
Street No. 6Q2 Ae- .
Owner
Plumber
Filed ' of
The
_ Dec. 5 1978
............................_..._......
No person shall construct, add do or after my
portion of the drainage system of aoy bwldmg
(except to repair leaks) until a Be -kips gonad
by the Building Inspector.
on
Application No. ........6.0.9.3 9.3.................. Permit No. -.53-09..................
.............
TO THE BUILDING INSPECTOR
of the
TOWN OF SOUTH WINDSOR, CONN.
............ .... hereby make application to perform plumbing according to detailed description below. All
provisions of the Rules for Sanitation, By-Laws, Sections 33 to 47 inclusive, shall be complied with whether
specified herein or not.
South Windsor, ...... ....... 19 Sign here .................................................. .....
Add ....... ...... -4/. .....a:-
X...........................
........... ....................
Location .......ogff.e�...................................................... side of..........Z�/.... ........ .... ............... . Street
Natureof Build' ................ .... ............................1,........................ How many stories ..........................................................................................
Owner ................ ...... Address ....... ........ ...............................................................
4.�- 1144cz
Architect ............................................ .................................................................. Address .....................................................................................................................
Builder ...... ........ ...... Address ............................ ....................................................................................
Plumber ......................................................................................................................
....... . ............................................... Address
DRAINAGE
CESSPOOLS, How many . ........................................ ............... . Where located .....................................................................................................
Are they water tight .. ....................................................................... Of what materials are they built .....................................................
Sizeof pipe from house to cesspool ............................................... Kind of pipe .............. . .... .............................................................................
MAINDRAIN IN CELLAR, Material ........................ Diameter .................... ........4.......4 ..............
Aboveor below cellar bottom .. ....................................................... ................ ................. ......................................... .. .. .... .......... ..........
SOIL PIPES, Material . ... ... .................... ........................... Diameter ...... ....... .. .. . . ............... . .....
WASTEPIPES, Material ................ ................................................... Diameter ........................... ......... ....... ......................
TRAPS,Type proposed to use is ... ...... ......... ........ . . .. .. . .....................................................................................................................................
RAINWATER LEADERS, where do they run to . ................ ...................................................................................................................
REFRIGERATORWASTES, where do they run to ... ... ....................................................................................................... ...............................
TANKOVERFLOWS, where do they run to .. . ....... ................................................... .............................................................
FIXTURES
WATERCLOSETS, How many ................................................ Where located .... .. .......................................................................................
Distance from trap to vertical soil pipe ........................................ Pattern .. ..... ... .......... . ............................................................
WASHTRAYS, How many ........................................................... Where located . . .. .......................................................................................
SINKS, How many ....................................................................................... Where located .. ................................................................................................
BUTLER'S SINKS, How many ........................................................ Where located. ....................................................................................................
REFRIGERATORSINKS, How many .. ................................... Where located ...................................................................................................
LAVATORIES, How many ............................................................... Where located .....................................................................................................
BATHTUBS,How many........................................................................ Where located .....................................................................................................
URINALS, How many ................................................................................ Where located .....................................................................................................
Are water closets and urinals to be local vented If not, is there a window in outer wall
ofroom where same are to be located ........ .. . . . . ...............................................................................................................................................
Estimated Cost .... .................................
FINAL INSPECTIONS:� ` � C IvJ'u�APPLI ATI N FOR B Building C O O BUILDING PERMIT
Plumbing
HVAC Date:
Sprinkler 14 PAM LANE
Electric Estimated Cost $ S"lp b o
Zoning Permit Fee$
Affidavit NO. 20233 Occupancy Fee $
Eng. Dept. COMPLETE RED BOXED AREAS.
Fire Dept. TYPE OR PRINT ONLY Total Fee $
Health Dept. SIGN ON REVERSE SIDE.
Approved for CO: I (Additional Cost) $
TO BUILDING DEPARTMENT, TOWN OF SOUTH WINDSOR, CT
The undersigned, hereby applies to do work according to the following specifications:
Job Location m CAME Lot No. Side of Street Zone
Applicant QAQL SE 4Ll60 Tel. # raii�t—S6OS
Address 1 q PmA 1-IN-1j E.- Zip 019014 Lic.#
STREET CITY STATE
Owner PRy 1- &ZAt]LIEU Address loam ,
Architect (Str UL%LU Address -rxwVt,►
Size New Area: Ft. Front Overall Ft. Deep Overall Total Area #Garages
Lavatories
No. of Families No. of Stories Construction Bathrooms Rooms 1st 2nd 3rd
Size of Lot Dist. from Street Line Dist. from Side Street Line
Purpose of this Permit 1)FC-]1 ! l'% :2 O Qcf nfA�ui ij t 4
City Water ❑ Well ❑ Septic ❑ Sewer ❑
III It I
Approved by ��- Date BD1A 11/88
I h reby agree to conform to all th requirem nts of th Laws of th Stat of Connecticut and the Ordinanc s of the Town of South Windsor
and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this permit is asked,and agree
that this building is to be located the proper distance from all street lines,side yard lines and required distances from all other zones and is
located in a zone in which this building and its use is allowed.
Signed U)VI-A C1 QA -CL Pr:i�.XLQ k2l
1 hereby apply for a Certificate of Occupancy for the work described in this application for permit.
Signed
—DO NOT WRITE BELOW THIS LINE—
. `INSPECTION RECORD
Footing Framing
Foundation Fireplace/Chimney Insulation
Plumbing Permit# Inspections:
HVAC Permit# Inspections:
Electrical Permit# Inspections:
Sprinkler Permit# Inspections: