HomeMy WebLinkAbout11 Sea Pave Road ,ice ro _14"Al 61#61R-
FINAL INSPECTIONS:
Building APPLICATION FOR BUILDING PERMIT
Plumbing
HVAC Date: 4-3-- 8 9
Sprinkler 11 SEA PAVE ROAD
Electric Estimated Cost $ 4 4/57/
Zoning Permit Fee $ •75%U
Affidavit 'W 444 NO. 176 0 0 Occupancy Fee $ -3
Eng. Dept. �Z"�L'
Fire Dept. COMPLETE RED BOXED AREAS. Total Fee $
Health Dept. TYPE OR PRINT ONLY
Approved for CO:1l'�?� SIGN ON REVERSE SIDE.
(Additional Cost) $
TO BUILDING DEPARTMENT, TOWN OF SOUTH WINDSOR, CT
The undersigned, hereby applies to do work according to the following specifications:
Job Location 1 1 SPa Pave Read Lot No. I Side of Street W Zone I
Applicant Michael H. Delasco Tel. # 282-0811
Address 22 Schweir Rd. South Windsor, CT Zip 06074 Lic.#
STREET CITY STATE
Owner Michael H. Delasco Address 22 Schweir Rd. , South Windsor, CT
P tr c V.. Delasco
Architect1ar11 3orwitz Address 24 Jerome Ave, Bloomfield, CT
Size New Area: Ft. Front Overall Wit. Deep Overall $$ Total Area3 O't 9$6 #Garages 0
Lavatories
No. of Families 0 No. of Stories 1 Construction Mas�Bathrooms a Rooms 1st 7 2nd - 3rd
Size of Lot 1 . 17A. Dist. from Street Line 97 ' + Dist. from Side Street Line 4 0 ' +
Purpose of this Permit Construction of an industrial use masonry building
with associated site improvements .
- L - ' _ _ „ _ - _ _ P6r 0.4 Pt7. APProvoc-
City Water ® Well ❑ Septic ❑ Sewer 19
Approved by jec Date BD1A 11/88
I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town of South Windsor
and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this permit is asked,and agree
that this building is to be located the proper distance from all street lines,side yard lines a d required distances from all other zones and is
located in a zone in which this building and its use is allowed.
Signed
I hereby apply for a Certificate of Occupancy for the work described in this ap cati for per
Signe
—DO NOT WRITE BELOW T S LINE—
�^ G INSPECTION RECORD S—�
Footing �- Framing
Foundation Fireplace/Chimney Insulation
Plumbing Permit# if-515-2, Inspections 7-Z-7-�7 L,"-'QKk C `e u N,0
q 7-
HVAC Permit# Inspections:
Electrical Permit# D nspections:
Sprinkler Permit# Inspections:
Location of job AFFIDAVIT Additional Fee .. . . . . . .
State of Connecticut
ss.
County of Hartford
I M l ab 1 • Owner
.. . . G . ... . . . . . . . . . . . . . .. .. . . . .. . . . . . . . . . . . . . . . for building erected under
Contractor
Permit Na7aDU�l7G issued by the Dep't of Building of the lb f South Windsor being duly sworn,make oath
7
and say that the actual cost of the completed work authorized under said permit was. . . .3��!/. �?�" .. . . . . . .. . . .. .. . . . .. .. . .
sign .. .. . . . . .. .. . . . .. .. .. . . . . . . . ..
�&
Subscr' d and sworn to before me this . . . . . . . . . . . .. . . . . .. . . .day of . . . ..�.. .. .. . ...eE A.D.19 .I.
Es£imate Cost:$ 3 d`r 3 f3"dd
. .. . . . . . . . .. . . . .. . . . .. .. . . . . . . . . . . .. . . . . ... . . .. . .
Difference: $ ��g�`CJ� Notary Public
c' y
BUILDING INSPECTION DEPARTMENT
SOUTH WINDSOR, CONNECTICUT
FEE PAID: $3.00
CERTIFICATE OF OCCUPANCY
ZONE: DATED 10/3 0 1989
This is to certify that 11 SEA PAVE ROAD
i
Erected under permit No. 17600 conforms substantially to the requirements of the building ordinances and the
zoning regulations of the Town of South Windsor and is hereby approved for occupancy as indicated below.
Approved for Occupancy— Industrial building �-
i
i
f Building Official
Notice:If this certificate is lost or destroyed, a duplicate should be obtained immediately from the Building Department.
Any change or extension of the use herein approved requires a new certificate of occupancy.
CERTIFICATE OF OCCUPANCY CHECK LIST r�
Applicant elco A,r Certificate of Occupancy 176vDS
Address Bldg. Permit No. 7bX
Lot No.
„- _o nQQ. Date Submitted 10-26-89
Project Reviewed By
Date
As required in the Zoning Regulations, no certificate-of-occupancy
shall be issued until grading plans--have been complied with and
approved by the Town Engineer. The minimum requirements shall
include:
Approved Denied N/A
1. Approved building permit plan.
2. Finish grading per approved
building permit plan.
3. Site work; i.e. trees, shrubs, dumpsters ,
required parking
4. Utility location 1
a. sanitary sewer
b. foundation drain
c. electrical & telephone
d. water
e. other
✓ 5 . Appropriate certification
6. Bonding
Sewer Permit No.
Pavement Excay . No.
COMMENTS:
�•� -e w:,t nless
?ell
:4 �, � �111,..;G�
lld/,4 06 A,- bcv-lAt
• FINAL INSPE I S:
Building APPLICATION FOR BUILDING PERMIT
Plumbing
HVAC Date: 3 9
Sprinkler 11 SEA PAVE ROAD
Electric Estimated Cost $ 18 00
Zoning Permit Fee $ 1�6
Affidavit NO. 176 01 Occupancy Fee $ 3
Eng. Dept.
Fire Dept. COMPLETE RED BOXED AREAS. Total Fee $
Health Dept. TYPE OR PRINT ONLY
Approved for CO:Z J.rG� SIGN ON REVERSE SIDE. (Additional Cost) $
TO BUILDING DEPARTMENT, TOWN OF SOUTH WINDSOR, CT
The undersigned, hereby applies to do work according to the following specifications:
Job Location R SEA PANE IZOP45 Lot No. Side of Street WZone
Applicant MIC1:46El.. 44. PE,,k AS Ca Tel. # 28Z-0a I
Address ZZ S�Cbk NaS4'Z C-T Zip 0601 4— Lic.#
STREET CITY STATE
Owner lC 1 Z ry
1 'D C.a Address ZGb 0410-- M �..7X IIT W11405M <11
re-t C.Architect — 'L- ---Address-_ ?A 44ME AJE, SLOW►�1F-Ui?�I�
Size New Area: Ft. Front Overall . Ft. Deep Overall Total Area Z VO #Garages d
Lavatories
No. of Families No. of Stories Construction Bathrooms C Rooms 1st 4 2nd —3rd!
Size of Lot Dist. from Street Line 1 } Dist. from Side Street Line 4-o fi
Purpose of this Permit `PE'' �(a&Lr
City Water Well ❑ Septic ❑ Sewer
Approved by Date 11',I BD1A 11/88
I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town of South Windsor
and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this permit is asked,and agree
that this building is to be located the proper distance from all street[in s,side yard lin sand required distances from all other zones and is
located in a zone in which this building and its use is allowed. f
Signed
1 hereby apply for a Certificate of Occupancy for the work described in this ap atio r permit
Signed
—DO NOT WRITE BELOW THIS LINE—
INSPECTION RECORD
Footing Framing
Foundation Fireplace/Chimney Insulation
Plumbing Permit# Inspections:
Ire;& X,--0-'-�4v
HVAC Permit# Inspections:
Electrical Permit# /4 � Inspections:
Sprinkler Permit# Inspections:
BUILDING INSPECTION DEPARTMENT
SOUTH WINDSOR, CONNECTICUT
FEE PAID: $3.00
CERTIFICATE OF OCCUPANCY
ZONE: DATED 10/3 0 1989
This is to certify that 11 Sea Pave Road
Altered under permit No. 17601 conforms substantially to the requirements of the building ordinances and the
zoning regulations of the Town of South Windsor and is hereby approved for occupancy as indicated below.
Approved for Occupancy— Tenant space
_7
Building Official
Notice:If this certificate is lost or destroyed, a duplicate should be obtained immediately from the Building Department.
Any change or extension of the use herein approved requires a new certificate of occupancy.
I
from 1-7&ov
TOWN OF SOUTH WINDSOR
TOWN HALL �y /
SOUTH WINDSOR, CONN. 06074
•
F /
TO
DATE
John Collins 3/31/89
Chief Building Official
L
SUBJECT:
App . # 88-93P Delco Air, Sea Pave Road
FOLD-
Please be advised that a Certificate of Occupancy should not
be granted to the above rerfernced project until such time as
the subdivision buffer has been provided per the approved
subdivision plan. This is by request of the Planning &
Zoning Commission .
Thank you .
By Miehele
Assistant PLanner
• DJJN
y T CJ7 slo�
�'
G V
1540 SULLIVAN AVENUE . SOUTH WINDSOR, CONN. 06074
R.00 AREA CODE 203/644-2511
March 23, 1989
Michael H. Delasco
22 Schweir Road
South Windsor, CT 06074
RE: Preconstruction Meeting - Application #88-93P - Delco Air
March 17, 1989
RE: Regarding amendment to preconstruction letter, please refer to
#20.
IN ATTENDANCE
Name Company Telephone #
Michele R. Lipe Town of South Windsor 644-2511
A.B. Davies Town of South Windsor 644-2511
Fred Shaw Town of South Windsor 644-2511
John E. McCahill Town of South Windsor 644-2511
Michael Delasco Delco Air, Inc. 282-0811
Karen Barber A.B.E. 875-3892
Art Barber A.B.E. 875-3892
Lester Braddock Town of South Windsor 644-2511
Jerry Iazzetta Town of South Windsor 644-2511
The following is a brief summary of points discussed during the
meeting.
Public Works
1. All erosion and sedimentation control measures are to be in
place prior to earth moving operations in each area and
maintained cleaned out during construction.
2 . Three complete sets of approved/revised plans needed prior to
start of construction.
3 . The Public Works Department is to be notified forty-eight (48)
hours prior to the start of major construction work with
inspections and testing per Developers Checklist required for
the following:
a) After road is staked out
b) All drainage work
c) Preparation of subgrade, compaction tests as required by the
Town
d) Preparation of subbase, six (6 ) inch lifts, each lift compacted
Town to mark compaction test locations
e) Placement of bituminous concrete, 1 1/2 inch layers .
4 . Certification of gravel used as subbase will be required by an
approved testing company,
5 . No subgrade formation/base formation in frozen ground/snow.
Same for pipe/structure installation.
6 . As built plans are to include horizontal and vertical location
of all road underdrains/footing drains .
7 . All topsoil stockpile areas to be protected (ringed with
haybales or equal) .
8 . All pipe and structures to be backfilled with free draining
material, compacted in maximum one foot lifts with approved
compaction equipment.
9 . During construction of the building, a crushed stone tracking
pad is to be installed and maintained to minimize tracking of
dirt/gravel onto Sea Pave Road. Calcium Chloride is to be used
for dust control as required.
10 . Any problems and/or questions regarding construction of this
project will be directed to Mike Delasco in the field.
11 . Road is to be paved with base coarse prior to issuance of
Certificate of Occupancy. No utility cuts after paving.
12 . Developer/Contractor to submit mark up print of any buryhole
locations . To be shown on as-builts.
13 . Forty-eight (48) hours notice needed for Certificate of
Occupancy inspection. Two week review period (10 working days)
needed for all individual site (lot) plans prior to issuance of
building permit (may be longer if application is incomplete) .
14 . Only approved copies of subdivision plans and lot site plans to
be used. Any proposed changes are to be presented to
Engineering/Planning & Zoning prior to implementation.
15 . Subdivision improvements have to be done by Subdivider - per
original subdivision/approval.
16 . Landscape plans will have to be modified so that planting is
not in the swales .
17 . Access off of Sea Pave only.
18 . No paving after October 15 without written approval from
Director of Public Works .
19 . Hours of operation 7 :00 A.M. - 5:00 P.M. , no work on Sunday.
Any pipe/structure work requires inspection prior to
backfiring.
20. Prior to the issuance of a Certificate of Occupancy, the
individual site drainage concern for this lot will have to have
been addressed by the applicant and be in conformance with the
approved plan.
Planning Department
1 . Need new mylars - 6 sets of new plans
2 . We need easement document for the land along Burnham Street
3 . Final Plans stamped for the field
Wetlands
1. Mylar - sheets #1 and #4
W.P.C.A.
1 . Letter of approval to be filed with plans .
2 . MDC approval is needed - Art McNeil 278-7850
3 . Outlet charges are due and payable to South Windsor - and sent
to MDC from here
4 . Drain layer permit is needed to lay sewer to connect
Police Department
1 . Site should be identified as Delco Air under construction.
2 . Emergency phone numbers should be submitted.
Building Department:
1 . Plan review with Building Official/Fire Marshall required prior
to application for building permit. Coordinate with Chief
Building Official .
Very truly yours,
Marcia A. Banach,
Director of Planning
MAB/pmm
cc: Jerry Iazzetta, Town Engineer
Karl Reichle, Public Works
Mel Stead, Public Works
Minh V. Le, SNET
Hal Clisby, CL&P
Michele R. Lipe, Assistant Planner
A.B. Davies, Deputy Town Engineer
Fred Shaw, Superintendent of Pollution Control
John E. McCahill, Zoning/Wetlands Enforcement Officer
Karen Barber, A.B.E. , P.O. Box 485, Ellington, CT
Art Barber, A.B.E. , P.O. Box 485, Ellington, CT
Lester Barber, Engineering Department
John R. Collins, Chief Building Official
i
1
PERMIT #
DEPARTMENT DECISION APPLICATION FOR ELECTRICAL PERMIT l
Application is hereby :
TOWN OF SOUTH WINDSOR
APPROVED D P OVE BUILDING INSPECTION DEPT.
- 644-2511 Ext . 230
7,
440 f Date Building Inspe Application must be printed or typed.
I
i 1 . LOCATION OF JOB
FEE SCHEDULE No . Street
$ 0 - $19000 - $10. 00 Floor Apt . No .
Over $1 , 000 - $10 . 00 2 . OWNER �/kC
per $1 , 000 or 1)Z j��CqJCO
fraction thereof 3 . ADDRESS // ��iq �h'(�� APpWd
4 . APPLICANT S/!e-41 C-16c 1°16A tly(
5 . ADDRESS Z11 �Fr
A yzb 7;Dr f-/ � c a
--;G//IQJV C"C d&CH
6 . ESTIMATED COST $ eO, 009
7 . IS THIS A CONTRACT COST
Yes No
p
8 . FEE ENCLOSED ( y
9 . TYPE OF BUILDING: 17�0)
RESIDENTIAL XCOMMERCIAL
10. TYPE OF JOB :
Original Installation
Alteration/Addition/Repair
BD 3A 11/88
APPLICATION FOR ELECTRICAL PERMIT (Continued from Reverse Side)
LOCATION OF JOB
lv Tay11.
NO. STREET APT. NO,
12 . TYPE OF INSTALLATION 'PI P1 f W IQ L
13. SIZE OF MAIN FEEDER ,S'ao 14CW
14. NO. OF LIGHT LOOPS �Q 15 . NO. OF HEAT LOOPS
16 . NO. OF POWER LOOPS 17 . NO . OF LIGHT OUTLETS
18. NO. OF HEAT CIRCUITS 19 . NO . OF POWER OUTLETS
20. NO. OF CONVENIENCE OUTLETS (/;10 21 . NO . OF HEAT CIRCUITS
22 . NO,) OF POWER CIRCUITS I� 23 . NO. OF LIGHT CIRCUITS
24 . SIZE OF HEAT CIRCUITS 25 . NO. OF MOTORS
26 . NO. OF PANELS 3 27 . TOTAL WATTAGE
28 . NO. OF POWER FEEDERS 29 . NO. OF SWITCHES
30. A/C LOAD ,(gyp 4mp 31 . SIZE OF POWER FEEDERS
32 . NO. OF FIXTURES 33 . TOTAL HORSEPOWER
34 . NAME OF SUBCONTRACTORS AND THEIR TRADES
35 . R E M A S :
As -pf,2 �LRr� -1 S�� S _-------- -- --- ----
/®320c�
LICENSE NO . SIGNATURE OF APPLICANT DATE
PHONE NUMBER: b 2 '
Lot No:
Building Permit)7� , tl' D � f tQ
Temporary Seryice
Permanent ServiceL/
Pursuant to Permit No.
This Certifies that the Electrical Work for which the above named Permit was granted
has been duly inspected and is hereby approved.
Owner W1 0a Electricia I C
Street
19 AZ"
BuMing Inspe
PERMIT NO.
DEPARTMENT DECISION A P P L I C A T I O N F O R
APPLICATION IS HEREBY: PLUMBING PERMIT
�. APPROVED DISAPPROVED TOWM OF SOUTH WINDSOR
BUILDING INSPECTION DEPT.
rAC 644-2511 Ext. 230
'DA-Tf PLUMBING INSPECTOR Application must be printed or typed.
1. LOCATION OF JOB:
// SEA. PAvc RD.
2. OWNER: ��L A f R. j O
3. ADDRESS: 4pit scqsvv* RZ,
FEE SCHEDULE �• CU�N,� R. L-T.
0 - $1,000 - $10.00 4. APPLICANT: T/V Fy"W /�/air'>Q6r e0.
Over $1,000 - $10.00 5. ADDRESS:
per $1,000 or
Fraction Thereof
6. EST. COST: $ 1 Z,
7. IS THIS A CONTRACT COST? V*"YES NO
8. FEE ENCLOSED: $ ZQ
17�Qo
9. TYPE OF BUILDING:
RESIDENTIAL __)!�.-COMMERCIAL
10. TYPE OF JOB:
_ORIGINAL ALTERATION
INSTALLATION ADDITION
REPAIR
BD 2A 11/88
APPLICATION FOR PLUMBING PERMIT (Cont. from Reverse Side)
11. LOCATION OF JOB: 1( SCA PAVC '*Rp,
GENERAL PLUMBING
12. KIND OF INSTALLATION: C*lral"AL. 13. SIZE OF MAIN DRAIN ¢p
14. NO. OF TOILETS J!' STYLE S f 15. NO. OF URINALS Z STYLE 1/OW*6ewry
16. NO. OF BATHTUBS 16A. NO. OF SHOWERS 17. NO. OF LAVATORIES
18. NO. OF SINKS / 19. DISPOSAL 19A. DISWASHER
20. NO. OF CONDUCTORS SIZE 21. NO. OF STACKS Z SIZE If*
22. AREA OF ROOF 23. NO. OF CATCH BASINS 24. NO. OF FLOOR DRAINS
25. NO. OF OTHER FIXTURES KIND
26. ARE TOILET COMPARTMENTS VENTILATED TO OUTER AIR BY A WINDOW? )VO
27. SIZE OF WINDOW
28. IF NO WINDOW, WHAT KIND OF VENTILATION IS THERE? Fx FlOW .. Qy tOn& j.
29. SIZE OF DUCTS SM 30. SEWER OR SEPTIC TANK?
31. SIZE OF WATER MAIN /~ 31A. SIZES OF WATER PIPING & RISERS
32. REMARKS AND FURTHER DETAILS
WATER HEATER
LE�T2 i� five $ 34. MANUFACTURER 3A%-ITN33. TYPE
•F 3
TANKS SAFETY DEVICES
TEMPERATURE
35. CAPACITY ��L . 39. RELIEF VALVE
36. TEST PRESSURE z S-b LBS. 40. MANUFACTURER W00j
37. WORKING PRESSURE (Sp LBS. 41. PRESSURE RELIEF VALVE 100 XL r4 p
38. TYPE GLASS-L 1jQ90 5"MO-VO-C 42. MANUFACTURER
uzocZ b z7
LICENSE NO. bATf S GNATURE & APPLICANT
PHONE NO. %Val-2z ro
FOR OFFICE USE ONLY APPLICATION FOR HVAC PERMIT DATE: ?-L
(N0. 79 9 TOWN OF SOUTH WINDSOR EST.COST: 01
BLDG. PERMIT NO. 7600 760I 1540 SULLIVAN AVENUE FEE 70.
SOUTH WINDSOR, CT 06074 FEES:
644-2511 - Ext. 230 $ 0 - $19000 - $10.00
$1000 or fraction
LOCATION OF BUILDING �� ��� thereof - $10.00
a
OWNER ADDRESS TOWN PHONE NO.
HVAC CONTRACTOR ADDRESS TOWN PHONE NO.
TYPE OF SYSTEM: HEATING TYPE OF BUILDING: RESIDENTIAL
A/C K COMMERCIAL
VENTILATION _� BUSINESS
INDUSTRIAL >c
IF HEATING: STEAM LOW PRESSURE LIMIT LBS. HIGH PRESSURE LIMIT LBS.
HYDRONIC WARM AIR X
UNIT RADIANT HEATER (INCLUDING WOOD/COAL BURNING STOVE)
TYPE OF FUEL: OIL-GPM GAS IN-PUT ELECTRIC KW
WOOD COAL
OIL TANK - SIZE & LOCATION: INSIDE OUTSIDE CAPACITY
LPG TANK - CAPACITY
EXISTING RADIATION ADDITIONAL RADIATION TOTAL RADIATION
DESIGN TEMP. OUTSIDE=__OF INSIDE Zo OF DIFFERENCE 75--°F
TOTAL HEAT LOSS (BTUH) s ,3/ _(HEAT LOSS SHEET MUST ACCOMPANY APPLICATION)
DESCRIBE ALL HEATING EQUIPMENT (INCLUDING MAKE & MODEL NO.) :
GROSS HEATING CAPACITY (INPUT-BTUH) JLM
100 NET RATING (OUTPUT-BTUH) 040
IF AIR CONDITIONING: DESIGN TEMP. OUTSIDE� OF INSIDE 77 °F DIFFERENCE 20 OF
TOTAL HEAT GAIN (BTUH)
(HEAT GAIN SHEET MUST ACCOMPANY APPLICATION)
DESCRIBE ALL COOLING EQUIPMENT (INCLUDING MAKE & MODEL NO.) :
4VVR,e ZZ.5 D2 zl Z)YS430� ?>YS0.3 0 �Tllls G'D��Y-vim /�A80 6RVnAo5
TONNAGE COOLING CAPACITY (BTUH)
IF VENTILATION: DESCRIBE ALL AIR-HANDLING EQUIPMENT (INCLUDING KITCHEN EXHAUSE EQUIPMENT) :
C;?- ,Care' cow ,bus - ��:�? � �Civ✓
TOTAL SIZE OF SYSTEM (CFM) FRESH AIR INTAKE (CFM) 6002MA
(PLAN MUST ACCOMPANY APPLICATION)
The undersigned hereby applies for a permit to perform the following work and is to comply,
with all local ordinances and State of Conn. Building Codes in the performance of such work.
FURTHER DESCRIPTION OF WORK:
Z0,
STATE LICENSE - NAME & TYPE # DATE GNATUR APPLICANT
if-e- 74 7 -S
APPROVED DATE
BD 4A 11/88
I = B = R CALCULATION SHEET 1503 (Modern Method) Copyright 1977 by The Hydronics Institute
OWNER ADDRESS DESIGN TEMPERATURE DIFFERENCE F. DATE
COL.A COL.B COL.C COt.D COL.E COL.F COL.G
1 ROOM cr
O H L W H L W H L W H L W H L W Design Water Temp.
2 ROOM DIMENSIONS, FT. ~
U BTUH per F of of
3 LENGTH EXPOSED WALLS, FT. Q Radiation Selected
4 WINDOW AND OUTSIDE DOOR AREA U.
BTUH BTUH BTUH BTUH BTUH
5 WALL CONSTRUCTION
(Table 9, Line 3 x H) ROOM LIN.FT.OF
TOTALS RADIATION
6 TYPE OF GLASS FROM LINE 12 SELECTED
(Bottom of table used for line 5)
7 CEILING CONSTRUCTION
C
(Table 9, L x W)
B FLOOR CONSTRUCT16Nt D
(Table 9, L x W or Lin F t)
_ E
9 COLD PARTITION CONSTRUCTION
F
(Table 9, L x H)
10 c 1 Well(With Openings) G
0 '; H
2 Walls(With Openings) DX
•J i
3 Walls(With Openings) or Ent Hall 1.
11 TOTAL BTUH AT 70F TEMP DIFFERENCE' J
12 TOTAL OTUH AT DESIGN TEMP DIFFERENCE K
L
--------- —
COL A COL.B COL.H COL. I COL.J COL. K COL.L TOTAL BTUH TOTAL
1 ROOM _ ¢ --- --— — ------- ---- OF BUILDING ADIATION
' O H L W H L W H L W H L W H L W DESIGN TEMP.°
2 ROOM DIMENSIONS, FT — DIFFERENCE
3 LENGTH EXPOSED WALLS, FT Q
4 WINDOW AND OUTSIDE DOOR AREA LL
BTUH BTUH BTUH BTUH BTUH
5 WALL CONSTRUCTION *INCREASE BATHROOM
(Table 9, Line 3 x H)
TOTAL 2096
6 TYPE OF GLASS -- ----------- ---- -- ---- --- ----- ------- ------- --
(Bottom of table used for Line 5)
7 CEILING CONSTRUCTION tFOR CONCRETE FLOOR ON
(Table 9, L x W) GROUND OR FILL AT
GRADE LEVEL,USE LINEAR
B FLOOR CONSTRUCTIONt FEET OF EXPOSED EDGE
(Table 9, L x W r Lin Ft)
9 COLD PARTITION CONSTRUCTION
(Table 9, L x H)
10 - 1 Wall(With Openings) -- -- G
C —
4 2 Walls(With Openings) G X --
40
3 Wails(With Openings) or Ent Hall J
11 TOTAL BTUH AT 70F TEMP DIFFERENCE'
12 TOTAL BTUH AT DESIGN TEMP DIFFERENCE
This form is available from The Hydronlcs Institute,35 Russo Place,Berkeley Heights,N J 07922 FORM 1503
'
Job Name : Delco Air Inc - office
Date : 07-24-1989 Serial Number : 61001861 .0
COOLING ESTIMATE
ITEM Exposure Quantity X Factor = BTUH
-----------------------------------------------------------------
Windows North 18 sq ft 19.08 343
East 192 sq ft 49.50 9, 504
South 18 sq ft 43. 20 778
Walls North 128 sq ft 0. 85 109
East 736 sq ft 2.38 1,752
South 128 sq ft 1.87 239
Partitions 736 sq ft 1 . 00 1 ,325
Roof 0 sq ft 2.00 A
Ceiling 1 , 472 sq ft 4. 00 5,888
Floor 0 sq ft 0. 00 0
Electrical & Appliance Load:
Incandescent Lights (W) 120 3. 60 432
Fluorescent Lights (TW) 3,240 4. 50 14,580
Glass Coffee makers (No) 1 900 900
People (total ) 4 persons 465 1 ,860
----------------------------------------------------------------
Room Total Heat (RTH) 37, 710
Outdoor Air (Total ) 300 CFM 46 13, 800
----------------------------------------------------------------
Grand Total Heat (8TH) 51 , 510
Grand Total Heat (8TH) = 4.29 Tons
1. Room Sensible Heat (RSH) = 36, 890
2. Sensible Heat Factor (SHF) = 0. 98 `
3. Total Sensible Heat (TSH) = 43,490
Total CFM 2, 177 Outdoor Air 300
Percent Outdoor Air 13. 78
Outdoor Conditions (DB/WB) 95.00/ 75. 00
Room Conditions (DB/WB) 75. 00/ 62. 55 RH 50.00
Coil Entering Conditions (DB/WB) 77. 76/ 64. 26
Job Dame : De 1 co Air Inc - office
Date : 07-24-1989 Serial Number : 61001861 .0
HEATING ESTIMATE
Items Description Quantity X Factor = BTUH / F
-------------------------------------------------------------------------------
Glass Double Pane 226 sq ft 0. 61 139
Walls -Heavy 8-in brick-plaster finish 992 sq ft 0. 08 79
Roofs -Medium 4-in concrete w/tile ceiling 0 sq ft 0. 04 0
Floors Concrete slab on grade-perimeter 108 lin ft 0. 65 9
Infiltration 1/2 air chg (floor area) 1 ,472 sq ft 0. 10 147
-------------------------------------------------------------------------------
457
Ventilation Outdoor air thru apparatus 200 cfm 1 . 10 220
-------------------------------------------------------------------------------
677
Outdoor Winter Design Temp F -5. c:0
Occupied Room Heating Temp F 70. 00
Unoccupied Roam Heating Temp F 65. 00
Unoccupied Heating Load = 31 ,990 BTUH
Occupied Heating Load = 501' 775 BTUH
Job Name : Del co Air Inc - shop
Date : 07-24-1989 Serial Number 61001861 .0
COOLING ESTIMATE
ITEM Exposure Quantity X Factor - BTUH
-----------------------------------------------------------------
Windows North 36 sq ft 224. 12 868
East 108 sq ft 72. 90 7,873
Walls North 1 ,344 sq ft 1 .80 21419
East 1, i=40 sq ft 5.04 5, 242
South 1 ,344 sq ft 3.96 5,322
West 2, 052 sq ft 5.04 10, 342
Roof 7,82O sq ft 2. 16 16,E391
Ceiling 0 sq ft 0. 00 0 0
Floor 0 sq ft 0.00 0
Electrical & Appliance Load:
Fluorescent Lights (TW) 61400 4.50 28,8OO
Machines (HP) 7 2 v 900 20, 3i O
People (total ) 4 persons 765 3,O6G
----------------------------------------------------------------
Room Total Heat (RTH) 101 , 117
Outdoor Air (Total) 200 CFM 46 9, 200
----------------------------------------------------------------
Grand Total Heat (GTH) 110y 317
Grand Total Heat (GTH) = 9. 19 Tens
1. Room Sensible Heat (RSH) - 99p 297
2. Sensible Heat Factor (SHF) - 0. 138
3. Total Sensible Heat (TSH) 103, 697
Total CFM 5,362 Outdoor Air 00
Percent Outdoor Air 3. 73
Outdoor Conditions (DB/WB) 95.00/ 75. 00
Room Conditions (DB/WB) 75. 00/ 62. 55 RH 50. 00
Coil Entering Conditions (DB/WB) 75.75/ 63. 01
' .
'
Job Name : Delco Air Inc - shop
Date : 07-24-1989 Serial Number : 61001861 . 0
HEATING ESTIMATE
Items Description Quantity X Factor = BTUH / F
-------------------------------------------------------------------------------
Glass Double Pane 144 sq ft 0. 61 Be
Walls -Heavy 8-in brick-plaster finish 59780 sq ft 0. 16 925
Roofs -Medium 4-in concrete NO ceiling 7,820 sq ft 0. 05 391
Floors Concrete slab on grade-perimeter 269 lin ft 0. 85 229
Infiltration 1/2 air chg (floor area) 7'800 sq ft 0. 10 780
-------------------------------------------------------------------------------
2,413
Ventilation Outdoor air thru apparatus 200 cfm 1 . 10 220
----------------------------------------------------------------------------~--
2,633
Outdoor Winter Design Temp F -5. 00
Occupied Room Heating Temp F 68. 00
Unoccupied Room Heating Temp F 60. 00
Unoccupied Heating Load = 156,845 BTUH
Occupied Heating Load = 163,409 BTUH* Light Credit deducted
'
'
' -
Job Name : Delco Tennant - office
Date : 07-24-1989 Serial Number : 61001861 . 0
COOLING ESTIMATE
ITEM Exposure Quantity X Factor = BTUH
-----------------------------------------------------------------
Windows East 48 sq ft 49.50 2,376
South 18 sq ft 43.20 778
Walls East 248 sq ft 2.38 590
South 128 sq ft 1.87 239
Roof 0 sq ft 2.00 0
Ceiling 496 sq ft 4.00 1, 984
Floor 0 sq ft 0.00 0
Electrical & Appliance Load:
Fluorescent Lights (TW) 800 4.50 3,600
People (total ) 2 persons 465 930
----------------------------------------------------------------
Room Total Heat (RTH) 10, 497
Outdoor Air (Total) 100 CFM 46 4,600
----------------------------------------------------------------
Grand Total Heat (GTH) 15,097
Grand Total Heat (GTH) = 1 . 26 Tons
1 . Room Sensible Heat (RGH) = 10,087
2. Sensible Heat Factor (SHF) = 0. 96
3. Total Sensible Heat (TSH) = 12,287
Total CFM 595 Outdoor Air 100
Percent Outdoor Air 16. 80
Outdoor Conditions (DB/WB) 95. 00/ 75. 00
Room Conditions (DB/WB) 75. 00/ 62.55 RH 50. 00
Coil Entering Conditions (DB/WB) 78. 36/ 64. 64
Job Name : Delco Tennant - office
Date : 07-24-1989 Serial Number : 61001861 .0
HEATING ESTIMATE
Items Description Quantity X Factor = BTUH / F
-------------------------------------------------------------------------------
Glass Double Pane 66 sq ft 0. 61 40
Walls -Heavy 8-in brick-plaster finish 376 sq ft 0"08 30
Roofs -Medium 4-in concrete w/tile ceiling O sq ft 0. 04 0
Floors Concrete slab on grade-perimeter 47 lin ft 0.85 40
Infiltration 1/2 air chg (floor area) , 496 sq ft 0. 10 50
-------------------------------------------------------------------------------
160
Ventilation Outdoor air thru apparatus 200 cfm 1 . 10 220
-------------------------------------------------------------------------------
380
Outdoor Winter Design Temp F -5.00
Occupied Room Heating Temp F 70. 00
Unoccupied Room Heating Temp F 65. 00
Unoccupied Heating Load = 11 , 200 BTUH
Occupied Heating Load = 28, 500 BTUH
Job Name : Delco Tennant - shop
Date : 07-24-1989 Serial Number : 61001861 . 0
COOLING ESTIMATE
ITEM Exposure Quantity X Factor = BTUH
----~------------------------------------------------------------
Windows East 36 sq ft 49.50 11782
South 36 sq ft 43.20 1 , 555
Walls East 248 sq ft 2. 38 590
South 1 , 344 sq ft 1.87 2, 513
West 589 sq ft 2.38 1 ,402
Roof 2, 500 sq ft 2. 16 5, 400
Ceiling A sq ft 0. 00 0
Floor 0 sq ft 0. 00 0
Electrical & Appliance Load:
Fluorescent Lights (TW) 1,280 4. 50 5, 760
People (total ) 2 persons 765 11530
-----------~----------------------------------------------------
Room Total Heat (RTH) 20, 532
Outdoor Air (Total) 100 CFM 46 4, 600
----------------------------------------------------------------
Grand Total Heat (GTH) 25, 132
Grand Total Heat (GTH) = 2.09 Tons
1. Room Sensible Heat (RSH) = 19, 622
2. Sensible Heat Factor (8HF) = 0. 96
3. Total Sensible Heat (TSH) = 21 , 822
Total CFM 1 , 060 Outdoor Air 100
Percent Outdoor Air 9. 44
Outdoor Conditions (DB/WB) 95.00/ 75. 00
Room Conditions (DB/WB) 75. 00/ 62. 55 RH 50. 00
Coil Entering Conditions (DB/WB) 76.89/ 63. 72
'
. '
Job Name : Delco Tennant - shop
Date : 07-24-1989 Serial Number : 61001861 .0
HEATING ESTIMATE
Items Description Quantity X Factor = BTUH / F
-------------------------------------------------------------------------------
8lass Double Pane 72 sq ft 0. 61 44
Walls -Heavy 8-in brick-plaster finish 2, 181 sq ft 0. 08 174
Roofs -Medium 4-in concrete NO ceiling 2,500 sq ft 0. 05 125
Floors Concrete slab on grade-perimeter 80 lin ft 0. 85 68
Infiltration 1/2 air chg (floor area) 2,004 sq ft 0. 10 200
-------------------------------------------------------------------------------
611
Ventilation Outdoor air thru apparatus 100 cfm 1 . 10 110
-------------------------------------------------------------------------------
721
Outdoor Winter Design Temp F . -5.00
Occupied Room Heating Temp F 68. 00
Unoccupied Room Heating Temp F 60. 00
Unoccupied Heating Load = 39, 715 BTUH
Occupied Heating Load = 52,633 BTUH
Henry Souther Laboratories, Inc. M no
24 TOBEY ROAD BLOOMFIELD CONN. 06002
TEL. (203) 242-6291 ACCREDITED
FIELD INSPECTION LABORATORY
IENT: De 1 co_Ai r, Inc . _ _ DATE: _September 6, 1989
PROJECT:_ _1 1 Sea Pave Road HSL#: 37,556
INSPECTOR: Louis Sadler
COMPACTION REPORT
Location/ Maximum In-Place % Moisture % Relative
Elevation Dry Density Density Content Compaction
1 . 47 ' East x 25 ' North of South
parking lot 130.0 126.8 2.2 97.5
2. 4 7 ' East x 49' North of South
parking lot 130.0 127.2 2. 1 97.8
3. 86 ' East x 25 ' North of South
parking lot 130.0 129.2 3.0 99.4
4. 86 ' East x 49' North of South
parking lot 130.0 129.7 2.1 99. 7
5. 25 ' West from the East end of
parking lot, in the center 130.0 133.6 1 .8 100 +
6. 60 ' North of previous test in the
center East end of parking lot and
East wall of building 130.0 135.6 2.5 104.3 *
7. 90' North of previous test in the
center of East end of parking lot
and East wall of building 130.0 135.3 1 .8 104. 1 *
8. 24 ' South of the Northeast corner
of building in the center of
parking lot 130.0 130.8 2.6 100 +
9. 69' West of previous test in the
center North wall and North end
of parking lot 130.0 129.4 3.2 99.5
The above test results are based on proctor test HSL 37,215 with a maximum dry density of
130.0 lbs. /ft. 3 and an optimum moisture content of 7.8%.
Very truly yours, * High reading indicates a change in material .
HENRY SOUTHER LABORATORIES, INC. A. Report mu xcept in
full with 1 I aboratory.
B. Test repo ates only soil tested.
Hugh J. 7culIy, P. E. ,CEP 15 1969
Division Manager
Building Materials Laboratory & Engineering South Windsor
BUILDING DEPARTMENT
HJS:sjk
2 - Client, 22 Schweier Road, South Windsor, CT 06074, Att: Michael Delasco
Form 33
- ------- - -