HomeMy WebLinkAbout157 Scantic Meadow Road ..... Permit No. ......... .7�.. ....................
Application No. ........�..7..3.�............ �.
TO THE BUILDING INSPECTOR
of the
TOWN OF SOUTH WINDSOR, CONN.
............: ......hereby make application for a permit to (erect a building according
to the following detailed statement of the specifications and plans herewith submitted. (Draw a line through
word "erect" or words "make alteration to" as the case may require.)
All provisions of the Building By-Laws (Sections 2 to 32 inclusive) shall be complied with in the execu-
tion of this work whether specified herein or not.
South Windsor, Conn., ...........qi...I. ............................... 19. 6..
Signhere ..................................................................................................I.._...........
Address ................................................................................................... .................
Location? ...................................................... ................................side of? ..............South.........................................................................................
Nearest cross street. ....Scantic Meadow Street No. ................... Lot No.5.8............................
Ownerof land is? r '.................... `...................................Address ..........�` ........ .. ...............� . .....'� �!`....
*00
Owner of building is? .�,rr a......................�� .......................Address ... ....... `.�..................... ... !........................ ....' �
Architectis? .............................................................................................................Address .......................................................................................................................
Builder is? #� **Utz.................Address ........................................MWV *140..
.... •
Dimensions of building? �►.......................Feet front? ................................... Feet rear? ................. ........... Feet deep? ............................
Extreme height to highest point of roof? ...................................... .... .. .. . ..... No. of stories in height? ............... ..
Purpose of building is? No. of stores?
lciw
Howmany families? ........................................................................................No. of rooms? .... ..................................................................................................
�iDistance from street line is? ....................................................................from building line is? ......................................................................................
ADDITIONS AND ALTERATIONS
a (Give Brief Description)
........ ......... .....................................................................................................................................................................................................................................................................
......................................................................................................................... ...................................................................................................................................................................
........................................................................................................................................................................................................................................................................ .......................
MapNo. .............................
If of steel frame, what is exterior construction? .. ....... . ................ .... ........................... ..............................................
What kind of columns used? ..............................................................Size of columns used? . . ..... ....... ..................... .......... ..
Whatlength of columns used? ... ...... .............. .........................How protected? . ................................................................... ............... ...
What kind of beams or girders? ..................... . . ... .................Size of beams or girders? ........................................................................
Longest span of beams or girders? ..................... ...... ..........These rest on? .. ....... . ......... ........................................................................
Roofconstruction is? ..................... ................................................................Roof covering is? . ........ ........................................................................
The floors are of .......................................... ........... construction and are calculated to carry a safe load of. ... .........................
lbs. per square foot.
(See Section 14, Building By-Laws.)
BRICK CONSTRUCTION.
Ofwhat material will walls be constructed.? ..................... .................... ............................ ................................................................. .................
Compositionof mortar? ............... ...................................................... ...............................................................................................................................................
Height and Thickness of Walls
Height Stories Front wails Side Walls Bear Walls Partition Walls
Basement
.............................................................................................................. .........................................................................................................................................................................................................
1st Story
............................................................................................................................................................. ......................................................................................................................................I.................
2nd "
.......................................................................................................................................................................................................... ...........................................................................................................
3rd "
.............................................................................................................................................................. ...................................I.......... I...............I..............................................I..........................................
4th "
........................................................................................................................................................................................................... ............................................... ............. .................................
5th 4d
................................................... ..................................................... ...............................................I..............................................I..........................................................................................................
6th 96
.................................................................................................. ..........................................................................................................................................................................................................
7th dd
................................................................................................................................................................................................................................................................................................................
8th ors
...............................I............................................................................................................................................................................ .............................................. ...................................................
9th it
...............................................................10th............................................ ................ ......................................... .............. ....... ............................................... .......................................................
Material of Front? .................................... . . .......... ..............................If stone, what kind.? ............ ................. ...............................
Thickness of Ashlar? .... ............................................... .......................Thickness of Backing? ...... ............... ....................................................
Backed up with what? . . ....... Arches or lintels over openings? .
WOOD CONSTRUCTION.
Give Size, Longest Span and Distance Between Centres, of Joists, Girders and Columns
JOISTS GIRDIMS COLUMNS
Floors Size Longest Span Centres Bridging Size Longest Span Centres, Size Length Centres
1st Floor
....................... ...U.0.......IV....4..................... .....
2nd " ....W........ ........................
......................... ......................................................................................................
3rd 'is
.................. ................................................. ......... .............
Size of outside studs? ............."............................ Distance on centres? .....1.16............................ Size of sill? .......a*.............................
I
Size of rafters?........100............ Distance on centres?............ ..........................Size of plate? .........................."................
Size of ledgers or girts? ................................................................................Size of deck rafters? .....................................................................I ...............
AW4HP4W*
Distance on centres? .........................................................................................Size of studs in bearing partitions? ..................................................
MISCELLANEOUS
4P*"
Style of roof, flat, pitch, Mansard, or hipped? .............................3......................................... Fireplaces? .............Xft*..........................
U A h6ft woo* 00&*
........ QWN"*
Material of roof covering. sib*
..........................................................Material of Cornice? ......................................................................................
a" a"It 1"ft 0"
Howis building heated? .............................................................................Lining of flues? ... ..............................................................................................
1#1019 G*#0 440dw 40��
Thickness of shell of flues? ...........I...................................................US* elevators or lifts? ................................4.................... ......................
1*000mo a0*400
Whatkind? ...................................................... How many? ........................... ........................... Any hois ays? .....................................
040040�w
.............................
How protected? .................. .......................................................... ..................Total Value of Buildin�4w- .....................................
Whenwill work be commenced? ........................... .......................................................................................................................................................................
The applicant warrants that the lot for residential purposes, shown on a plot plan accompanying this appli-
cation, has 20,000 square feet, or more, and at least 100 foot frontage on a Town road shown on a map of
South Windsor showing Town Roads dated December 1949, or on any other roads officially accepted by the
Torn of South Windsor since 1949.
Applicant
2471
BUILDING APPLICATION
Application No.2.7.3.1.............................................................
on the O U t h
.....................:.......................................................... i side of
Scantic i,.,eadow Rd
................................................................................................... 'Street.
StreetNo, ........4 o� �:.`.���:................................ ........................
c;-t-•
Owner .....T-..,t.....:.�:a...... .. ,.G.r..... ....................
Applicant ..........5 M.;".e ... ............................................................
CLASSIFICATION
Dw..7.1 in o 2.�' .'.t.X40-!..81�...........
............ ......t.,..
. ... ....................................... ..........................................................
...................................................... ..................... .....................................
Permit issued on above Application.
Date, .....S Q-P t........1.7..m.... .. 19...5..5.
TOWN OF SOUTH WINDSOR
BUILDING PERMIT
Date _Sept* 17 , 19 58
Fee Paid .49..0 0 w,�, Est. Value $ IO v0 00
Permit N O 2471
}
on the Soilt-ja side of
S c an t i c Pleadow F . Street
Street No. Lot #58 / 7
Owner I_ • R. Stich Assoc ,
Applicant S ame
CERTIFICATE OF OCCUPANCY ISSUED:
Date
No. 1
Fee Paid j$.3.00 v�
CLASSIFICATION
Dwell-ing 24 1 6"x40 1 8"
BUILDING PERMIT
NY 24'71
OFFICE OF
THE BUILDING INSPECTOR
of the
Town of South Windsor, Conn.
South Windsor, Conn. Bela t, 17. 19 i
T4,iis is to Tertifil, That I. Stich As on
is hereby granted permission to DTa a l irg10 6"xh018"
at estimated value of $ 10-000
on the �c..�1'rah side of Saentin Meadow �I3: t-- — Street on land
owned by I RA Assoc.
Said �''�Y' to be as described in Application
No. ?7. and to conform to specifications and plans filed with said Application, and Building By
Laws of THE TOWN OF SOUTH ``UINDSOR.
Issued `'4• l 7 o 19 58
Building Inspector.
Streets and sidewalks, obstructed by excavations or building materials, must be guarded by barriers dur-
ing the day and by both barriers and colored lights by night.
SECTION 1343, GENERAL STATUTES OF CONNECTICUT: "When any person shall place
or keep building materials, or any obstacle in any highway (or any sidewalk) either with or without a license
therefor from the city or borough in which such highway may be situated, he shall pay said city, town or
borough all costs and damages which it shall sustain, or be compelled to reason therefor."
Permit No. .;:.....,�..... TOWN OF SOUTH WINDSOR
SOUTH WINDSOR, CONN.
Permit N? 1494
Certificate of Occupancy
THIS IS TO CERTIFY h the
that t e
at No.-W-1- t.Ld. _'k�- •eLr� in the wn of South Windsor, Connecticut,
has been erected and completed in accordance with the Building Code and Zoning Regulations of
the Town of South Windsor, and is hereby approved for occupancy.,
1� .✓` k ..w � '-+.-emu.
ISUILDING INSPECTOR
OWNER, BUILDER
Fee Paid - y i Date , . , 19
A•
102 , I
1
I '
1
57
I
l � ,
�. o
Lot numbers refer to map
entitl d, "Subdivision Map,
Farnham Estates, Property
l'V I
of I. R Stich, Associates, ` '
Inc., Rye Street, South
Windsor, Conn., Scale In a 40110 I Q�
Sept 19, 195 7, Sheet Of of l
Certified Substantially Correct of
MDrton S. Fine, C.T. & L.S.n
24
4o.67
3 l, RAND H A ,�
�i
, I
7-¢.60 L=25. o
R= 4-oo.00
S CA N T/C M EQ D O W ROAD PROPOSED LAYOUT
C O y FARNHAM ESTATES
I hereby certify that this a ti fCf SCANTIC MANN ROAD
map is substantially por'" * `;,.���; 'c+� SOUTH WINDSOR, CONNe
rest and no zoAing regula- R. * SCALE 1" = 44' OC?. 3 1958
tions have been violated: +� s
Na. zss1 • MORTON S. FIRE, C.E.-L.S.
�_ HARTFORD, CONN.
Application No. 537,10 Permit No. 5100
TO THE BUILDING INSPECTOR
of the
TOWN OF SOUTH WINDSOR, CONN.
hereby make application for a permit to (erect (make vkesssiea'to) a building according
to the following detailed statement of the specifications and plans herewith submitted. (Draw a line through
word "erect" or words "make alteration to" as the case may require.)
All provisions of the Building By-Laws (Sections 2 to 32 inclusive) shall be complied with in the execu.
tion of this work whether specified herein or not.
1-110
South Windsor, Conn., . .... f....... ...: .............. 19. .....
Sign here ..............a7,e.�.4(2.i..46............_...........
Address ,�. . '. .. �� ...
Location? . ...................................... .............._�' !..%Z,�.r.......side of? . ........................................."`.......................................,L.......................✓
Nearestcross street? .................... ...............................................................Street No. . ...... ......... ............................. Lot No. ............................. .
Owner of land is? .......Address
Ownerof building is? . '~ .. ..........................Address ... ....... ......`�...........................................................................................`
Architectis? .. .. ............ - ...................................... .....................Address ...............�....... .................................................`.:`....... ..................`s`
1 uilder is? . T,....."................. A res= .`........ `.
Dimensions of building? . Feet front? ...... ' . .. ..... Feet rear? .. .......... deep? ..�.. '
....... Feet .. .....
JW
Extreme height to highest point of roof? ............/... .. .......... .. ... .. No. of stories in height? .....077? e-7*.
Purposeof building is? ....... ....... d.G. ..................No. of stores? .......................... ........................................................................-
Howmany families? .................................................._..............._..................No. of rooms? .... .. ............................................................................................
Distance from street line is? ... �' r... .....from building line is? ................. ..
ADDITIONS AND ALTERATIONS
(Give Brief Description)
.................................................................................................................................................................................................................
.........................................................................................................._._......... .............._................................................................................................................................................
................ . ... ...................................................................................................................... ............ .............................. ........ ..................................................................
MapNo. . ......................
If of steel frame, what is exterior construction? . .. .... . .. .. ... . ........ .... ...............
What kind of columns used? ................................... .. . .............Size of columns used?
What length of columns used? .. ...... ........... . ............ ........How protected? . ........ .... ....... ...........................
What kind of beams or girders? ....... .............. . ...... ... ... ....Size of beams or girders? .............. ... .... ... .................
Longest span of beams or girders? .. ....................... .. .These rest on? . . . ..... ... .... ....... ... .................. ...........
Roof construction is? ........................... .........................................................Roof covering is? . .. ........ ........................
The floors are of ....................................... ....... . construction and are calculated to carry a safe load of
lbs. per square foot.
(See Section 14, Budding By-Laws.)
BRICK CONSTRUCTION.
Of what material will walls be constructed.? . ... .. ....... . ................. ........................ ............... ... .. ..... ... ..........
Compositionof mortar? . .................................................................................................................................... ................................ ........................................
Height and Thickness of Walls
Height stories Front walls Side Walls Bear Walls Partition Walls
Basement,
..................................................................................................... .................................... .......................................................................................................................................
1st Story
........................................................................................................................................................ ................................................................................................. ........................................ .....
2nd "
............................................................................ ..... ............ ............................................................................ .......... .............................................. ...................... ......... ......
3rd "
......................................................................................................... .............................................. .......................................... ...............................................................................................
4th 'd
................................................................................................. ............................................................................................................................................................ .. .... ............. ........
5th 11
.................................. ............ ............................................................................................... ....................................................................................................................................................
6th 'd
.................... .. ........... .............................................................. ............................................. ....................................................................................................................................................
7th do
................I......................... ......................................................................... ........................................... ...............................................................................................................................
8th 'd
.............................................. ................................ .................. ........................... ........... ........................ ..................................... ....................... .................. .........................
9th to
...........................................................1(hh ..................... ................ ........ ... ............. ................ ............ ....... .........................................................
..*...... ......*........ ......
I
Material.of Front? ....If stone., what kind? . ........
Thickness of Ashlar? ....... .....Thickness of Backing? ........ ..
Backed up with what? Arches or lintels over openings?
WOOD CONSTRUCTION.
Give Size, Longest Span and Distance Between Centres, of Joist:, Girders and Columns
JOINTS GIRDERS OOLUMNS
Floors Size Longest Span Centres BrlBging Size Longest Span Centres Rise Leng* Centres
lat Floor
a41.... ......... ............ .. ........_ ............_.................... .............._. ............_. ..........._ _..._..._....._
.....,,..... ...........m ......... .................... ............. ........................ . _....._..._. .............._ .......... _....._...._
4 .... .... ............. ........... ................... _...__. ............................— _.........
_....
�Ir
Size of outside studs? ..... ...x...�............ Distance on centre? ................................................ Size of sill? ........... .....x..41..........
Size of rafters. ..... jC.... ........ .. Distance on centres. Size of plate? ,�,�k....5j�
,2., ............................ .................... S' a ........ ..................
Size of ledgers or girts? .............................. ...............................................Size of deck rafters? .................................................................... ...............
Distance on centre? .............. ........................................................................Size of studs in bearing partitions? .................................................
MISCELLANEOUS
Style of roof, flat, pitch, Mansard, or hipped? .. .. .. ......%.00� Fireplace? ........................................................
Material of roof covering? ..... ........ . . ....... . ...... ......Material of Cornice? .........e..-(r...9..C.-Ad.............................................
Howis building heated? ....... ................................................................Lining of flue? . ............................................................................. ..............
Thickness of shell of flues? .....................................................................Any elevators or lifts. ........................................................ ..
....................
What kind? .... ...... .... ........ .... .......... How many? ..... .. .. . ..... ....... Any hoistwa
....... ......... . ........................... .
How protected? ... .......... .................. ................................... ... ............ otal Value of Bud ..'.... . .".............................
.. .. . . .................When will work be commenced? .. .... ..�� .. -�,,.... ue-ce.0............. �.....,�.......
The applicant warrants that the lot for residential purposes, shown on a plot plan accompanying this
application, conforms to the zoning regulations of the Town of South Windsor.
Applicant
5100
BUILDING APPLICATION
ApplicationNo. ...........�.3.10..............................................
onthe ......q2u.....t....h.......................................................... " of
Scantic Meqdow Rd.
....... .............. ............................ ........................... .. Street.
Street No, ....157 . . ... ........ ... ..... ......................
Owner ....Gord.q.n.....W.-De..e.b..e............................... ......
Applicant ... ........ S am-e..... ................
CLASSIFICATION
Garage .24.110'fx 211
... ... . ..... .. .............. ............ .....................
. ............ . ...... . . —. ............... .. ...................
. ................... . .. ... . .. .. . ..... .. ..................... ...........
Permit issued on above Application.
11-25-64
Date, . ... . . ........
TOWN OF SOUTH WINDSOR
BUILDING PERMIT
Date
Nov.25, 19 64
,
Fee Paid 0 0 Est. Value 0.0 0
Permit 5100
on the South side of
Scantic Meadow Rd. Street
Street No. 157
i Owner Gordon W.Beebe
Applicant Same
CERTIFICATE OF OCCUPANCY ISSUED:
Date
j No.
I ,
Fee Paid $
i
CLASSIFICATION
Garage 24110"x21i
a m
BUILDING PERMIT
N° 5100
OFFICE OF
S THE BUILDING INSPECTOR
of the
Town of South Windsor, Conn.
South Windsor, Conn. N oV*25, 19 64
Tot" is to Terfif1j, That Gordan W.Beebe
is hereby granted permission to G.@rage 24110"x21!
at estimated value of $ 1200.00
on the South side of 157 Bcentic Meadow Rd. Street on land
owned by Gordan W.Beebe
Said Work to be as described in Application
No. 5370 and to conform to specifications and plans filed with said Application, and Building By-
Laws of THE TOWN OF SOUTH WINDSOR.
Is NOV.25,� � �' 1964
d
Building Inspector.
Streets and sidewalks, obstructed by excavations or building materials, must be guarded by barriers
during the day and by both barriers and colored lights by night.
SECTION 1343, GENERAL STATUTES OF CONNECTICUT: "When any person shall place
or keep building materials, or any obstacle in any highway (or any sidewalk) either with or without a
license therefor from the city or borough in which such highway may be situated, he shall pay said city,
town or borough all costs and damages which it shall sustain, or be compelled to reason therefor."