Loading...
HomeMy WebLinkAbout125 Bidwell Road 0,0 S<4 c TOWN OF SOUTH WINDSOR , CONNECTICUT _ PLANNING AND ZONING COMMISSION ti APPLICATION FORM DSOR•Co�� Application No . : Date Received : 03 Action/Public Hearing by : SEP 24 1991 Receipt No . : South Windsor INLAND WETLANDS AGENCY/ APPLICANT: o, fsCONSERVATION COMMISSION ADDRESS : 107 TELEPHONE : 4 OWNER OF RECORD ON LAND RECORDS : 05� ,,F e --r-51 ADDRESS : 2 I g PeA5 s j--6A-4 COMPLETE LOCATION OF PROPERTY: 4o Ix> Sflt! u.r--�s ZONE: NAME, ADDRESS , & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: 07 CL-2 ' "if !ell'�0011• -yam'—'� �-� TELEPHONE • r7 — THIS APPLICATION IS FOR : (Check one of the following) I . Zone Change to (Public Hearing required ) . 2 . Subdivision . 3 . Open Space Subdivision (Public Hearing required) . 4 . Resubdivision (Public Hearing required) . S . Special Exception to Article (Public Hearing Required) . ✓ 6. Site Plan of Development . 7. Earth Filling [Section 101 and/or Earth Removal [ Section 9 ] (Public Hearing Required) , 8 . General Plan of Development . 9. Regulation Amendment : Zoning Subdivision _10. Other (explain in detail ) : CONSULT PLANNING DEPARTMENT FOR FEE SCHEDULE. THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY AND SUBMITTED IN TRIPLICATE WITH ALL MAPS AND DOCUMENTS REQUIRED 0 ATTACHED CHE KLIST. App icant Owner, r PLANNING AND ZONING COMMISSION APPLICATION , CONT ' D . TIME FRAMES AND PROCEDURES FOR SUBMITTING APPLICATIONS/PLANS 1 . All prospective applicants are urged to confer with Town Planning Department and Engineering Department staff prior to submission of any application to the Commission . 2 . Plans are officially received only on the fourth Tuesday of each month at the Regular Meeting of the Planning & Zoning Commission ( PZC) . 3 . Three ( 3) sets of blueprints are required on the , s�econd Tuesday of the month for review by the Town Planning and Engineering Departments . This deadline must be met if you want to ensure that your application is officially received by PZC . These plans must be submitted as complete plans -- which includes application plus all required information contained on checklist . No plans will be accepted at the counter if checklist is incomplete . It is the applicant ' s responsibility to ensure that all information required on the checklist is submitted in one package at the time of submission -- including landscaping plans , architectural elevations , traffic report , etc . Planning Department staff will not accept checklists with blank spaces , or with "by others" in any space . 4. Town staff will notify the applicant with any changes required to make the plans in complete compliance with our Zoning/Subdivision Regulations . S . All changes requested must be made and new , complete blueprints must be submitted . At this time six sets of plans must be submitted . If a Public Hearing is required ( or optional but likely) then seven sets are required . 6 . Planning Department /Engineering Department staff will review plans only once -- if the resubmissions are not complete/correct , the Town Planner ' s report will reflect that revisions were not made as requested . TOWN OF SORTS WINDSOR SEP 24 1991 CHSCKL ST South Windsor REQUIRED INFORMATION INLAND WETLANDS AGENCY1 SITE PLANS CONSERVATION COMMISSKM APPLICANTizp-+-;� PROJECT NAME p--/E -era t> This checklist must be signed by plan preparer (P.E. /L.S. ) declaring that all required information is provided. Items 1-7 are required for all applications; items 8-11 required where appropriate. Check mark for each item supplies . 1 . On each sheet for plans or maps, title block with th following information: e a . Name, address and telephone of applicant. b. Name, address and telephone number of Land Surveyor or Professional Engineer. C. Name of Development. d. Date when drawings were made. 2 . Key Ma An r overall map drawn to a scale of 1 inch equals 200 feet, which can be used as an overlay on Metropolitan District Maps. This map will show the overall design of the Development and surrounding property within 500 feet. a. Data block which gives needed zoning information such as percentage of lot coverage, acreage of tract, number of apartment units, parking requirements, etc. b. Layout of buildings g C. Layout of streets and parking. d. Lines indicating proposed drainage system with direction arrows . e. Lines indicating sanitary sewer system with direction arrows . f . Names of surrounding owners . g. Proposed open spaces and recreation areas . Nh h. Driveway cuts on surrounding properties . 3 . Architectural Elevations : Plans of the proposed buildings drawn' to a scale of 1/8" = 1 ' - 0" showing the elevations of all sides of the proposed buildings in sufficient detail to show architectural styling. Architect' s seal on elevations for buildings in excess of 5000 square feet (per CGS Chapter 390 ) . 4 . Plot Plan: A layout map of the proposed site drawn to a scale of 1 inch equals 40 feet on either of the following size sheets : ( 1 ) 24" X 36" with a 3/4" ruled margin; ( 2 ) 18" X 24 " with a 1/2" ruled margin, containing the following data: ✓ a . Distance and bearings of all boundary lines and acreage of site. Iron pins required at all property angle points and shown on map. b. Proposed streets and street lines with center line stations, curve data, and parking spaces . C. Building lines in accordance with zoning regulations. d. Proposed buildings and other structures, including signs, outside lighting, and dumpsters (on concrete pad and screened) e . Easements, noting grantors, grantees, and ,purpose. f . Names of abutting property owners . g. Monuments will be indicated at corners and angles of all streets and at all points of curvature and tangency. In areas accessible to Metropolitan District Commission points, or other coordinated points, the monumented points within proposed site shall be coordinated. These coordinates shall appear in tabular form on the plot plan. The accessibility of these MDC points shall be determined by the Town Engineer. A h. All open space or other common or public land uses shall be indicated. i . A-2 certification; P.E. /L.S . Seal . 5 . Topographic Map: A map drawn to a scale of 1 inch to 40 feet on sheets not exceeding 24 inches by 36 inches, including ruled margins shall in addition to the requirements of the plot plans show the following: a . All existing and proposed buildings . '� b. Curb lines and pavement width, sidewalks . C . Existing and proposed sanitary sewers . / d. Existingand proposed water and gas main systems . e. Present wooded area indicated by foliage lines . - Any individual trees to be saved should be shown. Existing and proposed contours shall be shown in not less than two-foot intervals, but in cases of relatively level land, the contours shall be one-foot intervals and spot elevations . g. Regulated wetlands and 100-year f loodplain or note that none are present. h. Proposed storm drainage system, showingall catch basins, endwalls, manholes, lengths and sizes of pipes . (Maximum distance between catch basins shall be 300 feet and minimum size of storm drain lines shall be 15 inches . ) KQA i . Connections of all springs into proposed storm drainage system as needed. #jA. _ J . Location and indications of existing brook channels, and 100-year flood limits . k. A-2 Certification; P. E. /L.S, Seal . 6 . Landscaping plan. 7 . Drainage calculations - Zero Runoff Incre guidelines . ase per attached ILIA 8 . Traffic report. 9 . Plans and Profiles : A plan and profile of the proposed streets drawn on plan/profile paper of scales 1 inch to 40 feet horizontally, and 1 inch to 4 feet vertically on sheets not exceeding 24 inches by 36 inches, including ruled margins and containing the following: NA a. Layout of streets in sections coordinated by stations with the profile. -N�_ b. Street plan showing roadways and drainage. N_ C. Sight line at driveway & street intersectionsNA . d. Profile of roadway showing existing and finished grades . Roadway profile will show all tangent grade and all vertical curve information. "aA e. Profile will show all catch basins and all drainage lines between catch basins with all invert and top of frame elevations . Drainage lines will be shown and described as to material . ,.►A f . Where any storm drainage line discharges into an existing brook sufficient profile of this brook will be shown to determine conditions . g. Metropolitan District Commission datum shall be used on all sites accessible to these controls . The Town Engineer shall, based on standard engineering practices , determine the accessibility of these controls . tit,- h. Profiles shall show all sanitary sewer lines and manholes , including elevations, sizes, lengths, and slopes of pipes . Top of foundation elevations for building shall be shown. L4A,- 10 . Open Space Site Improvement Plans : For sites which require or include a provision for open spaces, a plan which contains data for site improvement may be required. This map shall be drawn to a scale of 1 inch equals 40 feet. IU'1ti 11 . Sanitary Report: Where individual sanitary sewage disposal systems are proposed, the final plans shall include a Sanitary Report certified by a Professional Engineer. The report shall demonstrate the feasibility of the proposed individual systems; the report should deal with the area as a whole, discussing the following points: a . General nature and development of surrounding area. b. Topography and natural drainage pattern. C. Subsurface conditions as shown by subsurface investigation, including soil absorption characteristics, ground water level conditions, ledge rock, and general nature of soil . d. General description of type of development contemplated. e. Detailed description of proposed sanitary sewage disposal facilities, indicating sizes for various ground conditions, materials to be used, and the general layout pattern to be used, etc. f . Special precautions that may be necessary to provide proper functioning of the proposed disposal systems . g. Map of general area with locations of all tests shown on proposed layout. h. Flood heights of any nearby streams, brooks, or rivers . A - i . Test results and engineering evaluation per Section 4 . 13 . 5 . All information required above is included in this application at the time of submission. 1UN PREPARER (P.E. /L.S . ) DATE November, 1987 EAST COAST STAIRS Key Map - must be in accordance with Sec. 8 . 1 . 2 . 1 Zoning Table - parking regulation - the regulation reads "1 space per 700 Sq Ft of GFA or 2/3 employees for the largest shift (whichever is larger) " - according to our calculations that would mean 13 spaces were required for the industrial part of the building (not 8 as shown through the employee figure because you must take the larger of the two figures) therefore requiring 26 spaces Plot/Topo Plan - dimension must be shown from street line to corner of building to demonstrate that it meets the 35' setback requirement - what kind of screening is proposed around the dumpster pad? - the sanitary easement should be defined as to grantor and grantee Landscaping Plan - has there been any consideration given for providing landscaping along the northerly side of the building? WPCA WPCA approval is not required. There should be no paved surfaces or storm drainage structures within sewer easement. What is the depth of the sewer in the area of the drainage structure? What is the intended use of the building; will there be any process industrial discharge to the sewer. If so, a DEP discharge permit must be required. Please advise the Collector of Revenue as to the final approved size (acreage) of development for purposes of sewer assessment calculations . EAST COAST STAIRS 1 . AFd,, tion for a 15,000 square foot industrial building l o4. the northerly end of the cul de sac on Bidwell R zone. / 2 . Proposed building area is 23%; 50% allowed. Proposed impervious coverage is 63%;65% allowed. Under our parking regulations, the requirement is 4 1/2 . space per 1000 sq ft of office and 1 space for each 700 sq ft of industrial/ manufacturing. The applicant is showing 26 spaces required however, I only count 24 spaces on the plan. In addition, 3 of the spaces up close to the building are only 9 ' X 18' in size. Is this a drafting error? or are you requesting to have smaller spaces? Also, we would like to see a breakdown of the sq ftage of office versus industrial. 3 . There are no regulated wetlands, watercourses, or 100 year floodplain on the site. Conservation plan approval is required and the applicant in �.��was— f=n �� IWA/CC last s / night. klj 4 . There is public water and sewer which services the site. WPCA approval is not required. Fred Shaw, Sup't of WPC has questioned the depth of the sewer in the area of the drainage structure. He also stated that if there will be any process which will discharge any industrial waste into the sewer, a DEP discharge permit will be required. The Collector of Revenue should be advised as to the final approved size and developed acreage for the purposes of sewer assessment calculations . 5 . A dumpster has been shown on a concrete pad an will be screened by a six foot high wooden fence. There is very little existing vegetation ,on the site. The landscaping plan proposed shows white pines around the detention area; red maples around the perimeter of the site; and three bermed islands in the front of the site with azaleas, white dogwood and rhodendrons proposed. This sight is somewhat difficult to add additional landscaping to because of the existing sanitary sewer easement which runs the perimeter of north and east sides of the site. 6 . The Architectural and Design Review Board has reviewed these plans (twice) and are satisfied with the architectural style and materials being proposed. If this application is approved, the planning department has the following modifications to request: -The key map should show property owners within 500 ft of the property (across Rte 5) ; should show sanitary sewer arrows; north arrow on the key map -Parking formula and spaces shown should be reconciled with breakdown of the formula. -the grantor/grantee of the sanitary sewer easement must be identified on the plans STANDARD APPROVAL MODIFICATIONS FOR SITE PLAN (rev. 2/7/89) PROJECT Giz-4- 04_� JL,ma APPL. NO. q/- yaIO ENGINEER/ARCHITECT s PROJ. NO. NO. - DATE °�f 1( ��I REV. DATE 101311, DWG ►i�„ ��� SUBMIT MYLARS OF SHEETS . . . off- A a 1 . Prior to commencement of any site work, a meeting must be held with Town Staff . 2. No building permits will be issued until the final mylars have been filed in the Town Clerk's Office. 3 . This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission, including a bond in the amount of $ C-w • 4 . An as-built plan is required prior to issuance of a C rtificate of Occupancy per Section 4 . 13 . 10 of the Zoning Regulations. 5 . Footing drains are required if the building has a basem nt: 6 . A landscape bond in the amount of $ 3 v is required and must be submitted prior to filing of ylars. 7 . All plans used in the field by the developer must bear th stamp and authorized signature of the Town of South Windsor. Black and white transparent mylars of Sheets with the above modifications, together with three blueprint copies of the entire set of plans must be submitted to this Commission within 30 days to be stamped and signed. Th letters of approval of this Commission, as well as the Inland W tlands Agency/Conservation Commission, must be reproduced on the mylars. After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk within 90 days . After filing thes plans, a copy of the receipt must be submitted to the Planning D artment. r P �-end... �h,�.c.� �- 7r�.. ,v� ',C.P Y�k 14,r� �� 'err �YL�_ be s'h,o-tJ ati,,� W`4� 5e-a ; S 1D . 5a-"" 16 LJ V1 V`e,4- 0'�('K`J �' 1 t�'C� le�✓ ✓C. �'` / �/C �� �' L o.,a C L w T' r d d-t" u2 cn ake-fa-, ( v PDS ENGINEERING & CONSTRUCTION, INC.O LJEUTE�D O� T�Q ��rrII e Old Windsor Road ROOM DUMQ. BLOOMFIELD, CONNECTICUT 06002 (203) 242-8586 DAT/O_z_p/ JOB No FAX (203) 242-8587 ATTENTION �� RE TO o ,y o F \A.11t..l J5 a > WE ARE SENDING YOU Attached ❑ Under separate cover via the following items: ❑ Shop drawings 0 Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order ❑ COPIES �y DATE C NO. DESCRIPTION 3 OCT 2 1991 Soutij Windsor THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution > ❑ As requested ❑ Returned for corrections ❑ Return corrected prints $4or review and comment ❑ ❑ FOR BIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS �4 16--�SiJ 4_77S _Z COPY TO SIGNED:, PRODOCT2aa2 a Inc,Gr*n,A1m 01471 If enclosures are not as n ted, kindly notify us at once. LETTER OF TRANSMITTAL r • C � PLANNING DEPARTMENT i TOWN OF SOUTH WINDSOR 1540 SULLIVAN AVE. SOUTH WINDSOR, CT 06074 10 (203) 644-2511 Date �1 TO: 6 G cop a .r WE ARE SENDING YOU: L A 0 P&Z initial plans Q omps 0 P&Z final plans 0 Bond estimate requests O Inland Wetlands plans 0 Bond reduction requests O Final plans for filing O Change order form 0 Oth r C:3 Correspondence Copi s App. No. Project - y THESE ARE TRANSMITTED as checked below: O For review and comment 0 For your file 0 For your use 0 Returned with revisions O As requested 0 Oth r S or 7"-r GG� /0/Z y PLEASE RETURN/COMMENT BY: COMMENTS: ate J41 t�o-it 11A S4&'L& LAY d.� cw x 1 ,�/�I G ''��LE�7�¢v lH�o Dd - lI�y Co�r►�wEr�tJ�- Copy to: From: Z OAACr S 6v w�� Aj � �— �A,�u�6� , oc P� S&u J> wAVA40 - 1eV/ � " AMAy 13F nu 0 � /0 /8/7(� I yp OCT 18 1991 South Windsor Planning & Zosing Commission DRAINAGE STUDY EAST COAST STAIR BIDWELL ROAD SOUTH WINDSOR, CT BORAWSKI ENGINEERING e ^ e No ? _ ✓p8dVc aa OFF -S T-1 1. 5^o ,mac 5 3• T� I of Cou S7L- T �� C��2�►EyS/Sfw oy Soy C- Z./v 2 o t S�c- So TL a o 3.53 -4. off F= z S-x co S T�►� S T57 Dom...I ,4 A.-4 mac- AID I TI o r�L,4....c_.. � �!,dI �.` I I I I I I I i f I I i I i I ! I I 1 I I I { I I �r•1��+a C �� �QQ~ �ff I 1 � • J�L� QG � ' (� �O L� I ­2Z I !22 • I • � "• ��I I i i I i S s4 -� I g �o I �1 . �� - o� I . -mac - -� I z I 2 o}, . •i r I _ • yi { • - •� Soo 8 12 �,7/ �. 1 C7� I '( ( o a �O p �, . -z-2 7•J�vj ,ltny�,/� }..lr7v /% j0 •7145 WvJ-4>- r-JlN'r �►.�r, �d�a �7�r.{- L�3aI'L T+1 [•JhKII7i1•7 ... -•nA 79Yy3A 1.-i Hs-9T{3 5'd� 41 -��vd.��Y ..,`� .1 v,��..a•� Y3YY Y 7 5 1 d �s.rv,y W+i77v ?H 3N'L 7Y7J• ►+,,9 l7xY) aH•or - 71va — ■ axH7 - -'JO '-' •ON Ja2Hf AR ' , �R-55 STORAGE VOLUME FOR DETEN [ION BASINS VERSION 1 . 11 Project : EAST COAST STAIRS User: DAVE Date: 10-18-91 County : HARTFORD State: CT Checked: Date: Subtitle: 3OUTH WINDSOR, CT . DETENTION BASIN SIZlNG Drainage Area: 1 ' 5 Acres Rainfall Frequency: 25 years Rainfall -Type: lII Runoff : 4. 1 inches Peak Inflow: 6. 64 cfs Peak OuLflow: . 8 cfs Detention Basin Storage Volume: 2. 21 inches or 0. 3 acre feet October 21, 1991 M E M O R A N D U M TO: Marcia A. Banach, Director of Planning FROM: Jerry C. Iazzetta, Town Engineer ' RE: East Coast Stair Site Plan We have reviewed the drawings dated 9-16-91 and drainage study received on October 18, 1991 for the proposed East Coast Stair site plan and have the following comments: Drainage Study 1 . Please have applicant provide drainage area map 2 . Design indicates that pipe sizes should be increased. 3 . Detention Analysis a. Analysis is for 25 year storm - 100 year storm should be analyzed. b. Analysis indicates "peak outflow = 0. 8 cfs" . Drawings do not show an outlet. If this is to mean percolation, we need to see results of percolation tests and analysis . c. Analysis does not indicate volume required versus volume proposed. Key Map 1 . Not all properties within 500 feet of proposed site are identified (properties across Route 5) 2 . Items #2b, 2c, 2d, 2e & 2h of the Town of South Windsor Checklist have not been addressed. Site Plan 1 . A-2 Certification is required. 2 . The two entrance driveways are shown on a 1 on 6 slope (17%+) . 3 . Radius of entrance driveways not indicated. 4 . The parking area south of the building does not indicate the proposed 1171" and "72" contours necessary to grade the area. Ms . Marcia A. Banach Page 2 . October 21 , 1991 5 . The retaining wall at the easterly corner of the building creates a pavement grading of a 20% slope along the easterly side of the building. 6 . A spot elevation of 71 . 5 is proposed at the easterly end of the parking lot. This appears to be a low point with no means of draining storm water. 7 . Pavement is proposed over a sanitary sewer easement. 8 . An existing sanitary manhole near the south east corner of the property is not shown. This is proposed in the pavement area - please have this shown and the top of frame elevation identified. 9 . Sanitary sewer easement is shown. Is it existing? To whom is this easement granted? 10 . Minimum cover over the top of storm pipes should be 2'-011 . 11 . The detention pond is shown encroaching substantially onto the sanitary sewer easement. This should be corrected. 12 . Length and slope of pipe from oil separator to detention pond should be identified. 13 . New sanitary manhole should indicate top of frame elevation and invert. 14 . The new sanitary pipe from building to new manhole should indicate length, slope and inverts . 15 . 6" PVC is shown along south side of building. Please have applicant indicate length, slope and inverts of pipe. 16 . There is another Site Plan, sheet 2 of 4, attached to the package of drawings received. a. This plan should be re-numbered. b. This plan indicates test pit data for the site. The test pit information in the detention area would apparently preclude this area for a detention basin - sand & water active at 7 1/2 feet. (The proposed basin has a 71+ cut proposed. ) c. Plan indicates that the perc rate for the detention basin area was "2 1/2 min. /in. " At what depth below existing grade was this observed? Ms . Marcia A. Banach Page 3 . October 21, 1991 Site Detail 1 . Details required for: Handicap (pedestrian) ramp, plunge pool, storm pipe trench, oil separator, curb, retaining wall, concrete pad. 2 . Concrete walk detail needs to indicate expansion joint spacing at 15 ' on center. 3 . Toe wall 42" deep is required under the concrete flared end. 4 . Detail for precast galley is shown. Where are these to be placed? Map Showing Land Owned by Krysinski 1 . This should be labeled and numbered consistent with the rest of the drawings . 2 . Easement shown should indicate to whom they are in favor of . JCl/jsv cc: Michael J. Gantick, Director of Public Works w N aE4 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 !�°SOR•co� AREA CODE 203/644-2511 October 21, 1991 TO: Elizabeth A. Warren, Chairman, IWA/CC FROM: John E. McCahill, Zoning/Wetlands Enforcement Officer � . Re: Application #91-42P, East Coast Stair Company DOCUMENTS REVIEWED: Application form and Site Plan for East Coast Stair Company COMMENTS: 1 . This plan is being submitted for conservation plan approval . Note #2 on sheet #2 of 4 states, "there are no wetlands on this site. ,, Soil type(s) should be identified on the plans . Except for a cluster of young maples in the easterly portion of the lot, this site is currently barren and sandy in appearance. 2 . The primary concerns with the development of this site are the potential for wind erosion and silting of the existing and proposed storm system. The potential for wind erosion does not appear to be adequately addressed on the plans . Additional notes should be included for the control of dust and wind blown sand. 3 . The plans should include a statement indicating all disturbed areas will be dressed with a minimum of 4" of topsoil before permanent seeding is accomplished on the site. 4 . Oil separators are shown but a detail has not been provided. A detail should be added. 5 . Drainage calculations should be submitted with this application. They are proposing an on site retention system. The retention basin should be labeled as such. 6 . The rip-rap channel detail, on sheet #3 of 4, indicates a pond bottom elevation of 63 . 00. The contours on sheet #2 of 4 indicates an elevation of 65 . 00. This should be clarified. 7 . The test pits dug in the area of the proposed basin indicates a very sandy soil . The proposed slopes for the basin are going to be very difficult to stabilize. Additional detail should Elizabeth A. Warren Page Two October 21, 1991 Application #91-42P be provided for the construction of the basin to include appropriate topsoil and seeding. 8 . The application form does not indicate that abutting property owners have been notified that an application is pending. This must be done and a copy of the notification letter, and a list of the names of the abutters, should be submitted to the Agency. 9 . It would seem that the northerly outlet into the basin should have an angle designed into it to align it with the proposed contours in the basin. It currently is shown discharging across the slopes . 10 . A sequence of construction, or narrative, should be provided on the plans . 11 . Details have been provided, on sheet #3 of 4, for a precast galley system. It is unclear as to where this will be used. If it is not intended the detail should be excluded. 12 . Seeding mixtures, pounds per acre, and seeding dates should be provided on the plans for temporary and permanent vegetation. They should consider using a low maintenance grass, or alternate type of vegetation, in the proposed retention basin. (Chapter 6 of Guidelines for Soil Erosion and Sediment Control - CT should be utilized in determining vegetation for the site. ) 13 . The applicant should attempt to protect and save some of the existing young maples in the easterly portion of the site. If this is possible, tree protection should be shown on the plans and the trees to remain should be identified on the plans . IF APPROVAL IS CONSIDERED, SUGGESTED APPROVAL CONDITIONS INCLUDE: 1 . Soil type(s) shall be identified on the plans . 2 . Additional notes shall be included on the plans for the control of dust and wind blown sand. 3 . A note shall be added to the plans stating all disturbed areas will be dressed with a minimum of 4" of topsoil before permanent seeding is accomplished on the site. 4 . A detail shall be provided on the plans for the proposed oil separators . Elizabeth A. Warren Page Three October 21, 1991 Application #91-42P 5 . Drainage calculations shall be submitted. 6 . The proposed retention basin shall be labeled on the plans . 7 . The proposed bottom elevation for the basin shall be consistent on the plans and in the details . 8 . The northerly outlet into the basin shall be aligned so it discharges down the proposed contours, not across . 9 . A sequence of construction, or narrative, shall be provided on the plans . 10 . Seeding mixtures, pounds per acre, and seeding dates shall be provided on the plans for temporary and permanent vegetation. 11 . Tree protection shall be shown on the plans for the young maples in the easterly portion of the site. Trees to remain shall be identified on the plans . JEM/pmm � wMat� c� C TjqaooL� 07401?s �. w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 Soe•coN� AREA CODE 203/644-2511 Ocotber 22, 1991 Mr. Frank Borawski PDS Engineering 107 Old Windsor Road Bloomfield, CT 06002 Re: App. #91-42P, East Coast Stairs Dear Mr. Borawski: Attached is a copy of comments from the Planning and Engineering Departments regarding the above-referenced application. Please make the necessary revisions to the plans and submit 6 complete sets to the Planning Department. If you have any questions regarding the comments or the procedure, please contact me. Very truly yours, Marcia A. Banachl Director of Planning cc: Jerry Iazzetta, Town Engineer PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM TO: Jean Zurbrigen, Karl hle, Michael Gantick, Mel Stead, Fred Shaw, Sgt.� G�aidewiFire Marshall Lanning, James Snow FROM: Marcia A. Banach, Director of Planning The Planning & Engineering Departments have received lans for the following project: # - 2 Zone Acreage I, '� t a,, Subdivision Site Plan „ Residential No. of Lots/Units Commercial Industrial _ Location: Project Description: Cc1t,.it ,� Future Town-owned property involved? Yes No (a) new streets (existing frontage also) (b) new open space/recreation area active passive_ (c) new detention area Planning Department comments IA4 OoLbEMC /F 1107- ?W&JTLV 6K1'fnk1&. Please let me know by I ��I I if you will have comments on this application so that I can follow up with your department when I do a Planning Department report. s . fib\ PLANNING DEPARTMENT -IN-HOUSE REFERRAL FORM TO: Jean Zurbrigen, Karl Reichle, Michael Gantick, Mel Stead, Fred haw, Sgt. Gerald Lewis, Fire Marshall Lanning, James w FROM: Marcia A. Banach, Director of Planning The Planning & Engineering Departments have received lans for the following project: # Zone . Acreage Subdivision Site Plan_ Residential No. of Lots/Units Commercial Industrial_ Location Project Description: Cc1 ,uu1�.a� o�? 5 ,t,�t+L �ti �r ►--, Future Town-owned property involved? Yes Now (a) new streets (existing frontage also) (b) new open space/recreation area active passive_ (c) new detention area Planning Department comments Please let me know by ��1i if you will have comments on this application so that I can follow up with your department when I do a Planning Department report. V PLANNING DEPARTHEZU IN-HOUSE REFERRAL FORM TO: an igen, Karl Reichle, Michael Gantick, Mel Stead, Fred Shaw, Sgt. Gerald Lewis, Fire Marshall Lanning, James Snow FROM: Marcia A. Banach, Director of Planning The Planning & Engineering Departments have received plans for the following project: # l-q.? zone—_ Acreage 1. ":� C�.c Subdivision Site Plan_ Residential No. of Lots/Units Commercial Industrial _ C rr r Location: Project Description: Cil�, ,�_��.�¢c,n� �' T'z`L ✓1x,,Lt,,�:T-r Future Town-owned property involved? Yes_ Now (a) new streets (existing frontage also)_ (b) new open space/recreation area active passive_ (c) new detention area — Planning Department comments Please let me know by '0I ���� I if you will have comments on this application so that I can follow up with your department when I do a Planning Department report. Uv I"• C lJ�� ` �ta.�r�`.'�.G-4x!/� ��l'-<-- �.�/`-'�.. !o tx-a.�c�-l�; ,,,,;�I � � �L-o c,[/j� './l0(-1..}�'N•j•"�1 November 1, 1991 M E M O R A N D U M TO: Marcia A. Banach, Director of Pl ning FROM: Jerry C. Iazzetta, Town Engineer RE: East Coast Stair Site Plan - #9 - 4P We have reviewed the revised drawings dated 9-16-91, received October 24, 1991 for the proposed East Coast Stair site plan and have the f of lowing comments: Drainage Study 1 . Please have applicant provide drainage area map. (Both pre and post development. ) 2 . Design indicates that pipe sizes should be increased. 3 . Detention Analysis a. Analysis is for 25 year storm - 100 year storm should be analyzed. b. Analysis indicates "peak outflow = 0 . 8 cfs" . Drawings do not show an outlet. If this is to mean percolation, we need to see results of percolation tests and analysis. c. Analysis does not indicate volume required versus volume proposed. 4 . The runoff coefficients appear to be too low. Calculation should be shown for each. 5 . Pipe design from oil separator at sound end of retention basin not shown. Key Map 1 . Not all properties within 500 feet of proposed site are identified (properties across Route 5) 2 . Items #2e & 2h of the Town of South Windsor Checklist have not been addressed. Site Plan 1 . A-2 Certification is required. 2 . The two entrance driveways are shown on a 1 on 6 slope (17%+) . Ms . Marcia A. Banach Page 2. November 1, 1991 3 . The retaining wall at the easterly corner of the building creates a pavement grading of 13% & 10% slope along the easterly side of the building. This may create a problem for vehicles . 4 . Pavement is proposed over a sanitary sewer easement. 5 . Sanitary sewer easement is shown. Is it existing? To whom is this easement granted? 6 . Minimum cover over the top of storm pipes should be 2'-0" . It is less than 1' in some locations . 7 . The detention pond North embankment is entirely in the sanitary sewer easement. This should be corrected. 8 . New Sanitary manhole should indicate invert of existing pipe. Will a drop inlet be required? If so it should be an outside drop and a detail provided. 9 . 6" PVC is shown along south side of building. Please have applicant indicate length, slope and inverts of pipe. Site Detail 1 . Details required for: Handicap (pedestrian) ramp & plunge pool . 2 . Detail for oil separator does not appear to be workable for the connections shown on the site plan at the south end of retention basin. 3 . Please have applicant provide information to show that the "1000 gallon grease trap" tank is sufficient for his proposed system. 4 . The detail for the retention basin shows clay placed on the sides of the basin. The percolation information on the site plan indicates that percolation test results were obtained at 3 ' - 10" below existing grade. As this basin's bottom is 61+ below existing grade and the sides are clay, another percolation test should be made at that elevation. The results should then be utilized to recalculate the "discharge rate" and size of the retention basin. These should be forwarded for review. 1 Ms . Marcia A. Banach Page 3 . November 1, 1991 Map Showing Land Owned by Krysinski 1 . This should be labeled and numbered consistent with the rest of the drawings . 2 . Easement shown should indicate to whom they are in favor of. General 1 . Revised drawings should have a revision date. JCl/jsv cc: Michael J. Gantick, Director of Public Works November 18, 1991 M E M O R A N D U M TO: Marcia A. Banach, Director of Planning FROM: Jerry C. Iazzetta, Town Engineer RE: East Coast Stair Site Plan - #91 PAP We have reviewed the revised drawings dated 11-11-91 for the proposed East Coast Stair site plan and have the following comments: Drainage Study 1 . Detention Analysis a. Analysis indicates an outflow of 2 . 66cfs during a 25 year storm. Approximately 1.15 cfs is absorbed and the rest flows over the banks onto the parking lot. b. Analysis does not indicate volume required versus volume proposed. c. Analysis also required for 2 and 10 year storm. Site Plan 1 . A-2 Certification is required. 2 . Sanitary sewer easement is shown. Is it existing? To whom is this easement granted? 3 . Minimum cover over the top of storm pipes should be 2'-011 . It is less than 1' in some locations . 4 . The detention pond North embankment is entirely in the sanitary sewer easement. This should be corrected. 5 . New Sanitary manhole should indicate invert of existing pipe. Will a drop inlet be required? If so it should be an outside drop and a detail provided. Site Detail 1 . Riprap detail should indicate width of riprap to be placed. Also riprap should be designed for reverse filtration (i .e. gravel base over filter fabric) . Map Showing Land Owned by Krysinski 1 . This should be labeled and numbered consistent with the rest of the drawings . 2 . Easement shown should indicate to whom they are in favor of . PDSEngineering & Construction, Inc. 107 Old Windsor Road, Bloomfield,Conn.06002 Phone: (203)242-8586 Fax: (203)242-8587 NX I"T 1113— PDS ENGINEERING November 19, 1991 & CONSTRUCTION Town of South Windsor Planning and Zoning 1540 Sullivan Ave. South Windsor, CT. 06074 RE: East Coast Stair Application South Windsor planning & toning Commission Dear Commission Members, I would appreciate the commission allowing us to table our application to the December 3 , 1991 meeting. This will allow us to complete the items on the town engineers checklist. Very Truly Your Frank Borawski P.E. Vice President PDS Engineering & Construction FB/ad owN sF,`� r aP ?d&zd4ot C � � U s " 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 R•c0 AREA CODE 203/644-2511 November 19 , 1991 Frank C. Borawski PDS Engineering & Construction Company, Inc. 107 Old Windsor Road Bloomfield, CT 06002 Dear Mr. Borawski: Re: Application #91-42P, East Coast Stair Company At the November 18, 1991 regular meeting, the Inland Wetlands Agency/Conservation Commission approved with conditions Application #91-42P - Conservation Plan approval for the construction of an industrial building located on Lot #40, Bidwell Road, I zone as shown on plans prepared by PDS Engineering & Construction, Inc. dated September 16, 1991 as revised October 31, 1991 and November 11, 1991 . This approval is subject to the following conditions . 1 . Two blueprint copies of the entire set of final plans and this letter reproduced thereon, must be submitted to this Commission . This must be completed within 65 days of approval prior to any construction activity on the site. 2 . Construction activities shall be subject to the approval of the Town Engineer. 3 . The applicant shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 4 . The permit is valid for three years and shall expire on November 18, 1994 . 5 . All approvals required must be obtained and submitted prior to any activity on the site. 6 . A contact person shall be identified directly on the final plans . 7 . We recommend a bond in the amount of $5,000 . 00 to be submitted to the Planning & Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures . Frank C . Borawski Page Two November 19 , 1991 Application #91-42P 8 . Seeding mixtures, pounds per acre, and seeding dates shall be provided on the plans for temporary and permanent vegetation. 9 . Tree protection shall be shown on the plans for the young maples in the easterly portion of the site. Trees to remain shall be identified on the plans . Very truly yours, a)e'ZA��� Elizabeth A. Warren, Chairman, IWA/CC EAW/pmm cc: Town Engineer Director of Planning Planning & Zoning Commission December 2, 1991 M E M O R A N D U M TO: Marcia A. Banach, Director of Planning FROM: Jerry C. Iazzetta, Town Engineer RE: East Coast Stair Site Plan - #91 t We have reviewed the revised drawings (4 sheets) dated 11-25-91 for the proposed East Coast Stair site plan and have the following comments : Site Plan 1 . A-2 Certification is required. 2 . Existing sanitary sewer easement is shown. To whom is this easement granted? The detention pond North embankment is entirely in the :j sanitary sewer easement. This should be corrected. 4 . New Sanitary manhole should indicate invert of existing pipe. Will a drop inlet be required? If so it should be an outside drop and a detail provided. 5 . Invert required for 8" PVC pipe at connection with roof leaders . Also a detail of connection at this point, should be provided. d Z-n ` J�( ( J j r•• ,.�[J v►.a,/( �c. .K�v', ca �'` � g J '�!'"�.. .'r_f�vl!J r v"�d-:� �'" �� JCl/jsv cc: Michael J. Gantick, Director of Public Works y / a Saum ?d&U&Ot „ U �v 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 ��osoR-co AREA CODE 203/644-2511 December 4, 1991 CERTIFIED MAIL Frank C. Borawski PDS Engineering & Construction Company, Inc. 107 Old Windsor Road Bloomfield, CT 06002 Dear Mr. Borawski: Re: Appl . #91-42P, East Coast Stair Company We are pleased to advise you that the Planning and Zoning Commission voted at its December 3, 1991 meeting to approve, with modifications, the above-referenced application. This approval is based on plans prepared by PDS Engineering & Construction Company, Inc. dated September 16, 1991 and revised October 3, 1991 and November 11, 1991 and is subject to the following: 1 . Prior to commencement of any site work, a meeting must be held with Town Staff . 2 . No building permits will be issued until the final mylars have been filed in the Town Clerk's Office. 3 . This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission, including a bond in the amount of $5,000 . 00 . 4 . An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8 . 1 . 10 of the Zoning Regulations . 5 . Footing drains are required if the buildings have basements . 6 . A landscape bond in the amount of $3,000 . 00 is required and must be submitted prior to filing of mylars . 7 . All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 8 . The owner must execute a hold harmless agreement between owner and Town regarding the detention basin embankment located within the sewer easement. 9 . Key map must show property owners within 500 ft. (across Rte 5) sanitary sewer arrows, and north arrow. 10 . Parking formula and spaces shown should be reconciled with breakdown of the formula. Frank C. Borawski Page Two December 4, 1991 Application #91-42P 11 . Grantor/grantee of the sanitary sewer easement must be identified on the plans . 12 . New sanitary manhole should indicate invert of existing pipe. Invert required for 8" PVC pipe at connection with roof drain; detail of connection needed. Black and white transparent mylars of Sheet #2 and A-2 Survey with the above modifications, together with four blueprint copies of the entire set of plans, must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission, as well as the Inland Wetlands Agency/Conservation Commission, must be reproduced on the mylars . After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk within 90 days . After filing these plans, a copy of the receipt must be submitted to the Planning Department. V truly urs, Frank Castro Vice Chairman FC/pmm cc: Inland Wetlands Agency/Conservation Commission Director of Planning Chief Building Official Town Engineer Supt. of Pollution Control Assessor Fire Marshal Registrar of Voters ram,. �� 1661 5 �3a ASMTANI T TCVI M CL „( TO BE PUBLISHED IN THE JOURNAL INQUIRER SATURDAY1 DECEMBER 71 1991 LEGAL NOTICE TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION At its December 3, 1991 Special Meeting, the Planning and Zoning Commission voted to take the following action: 1 . Approve with modifications appl. #91-30P, William F. Myette, for a Resubdivision of 7 .4 +/- ac. to create 8 lots, on property located on the northerly side of Sullivan Ave. , westerly of Troy Rd, I zone. 2 . Approve with modifications appl. #91-29P, John Fitch Assoc. dba Fitch Meadow for a Special Exception to 4 .5 .5 .b (formerly 4 . 11 . 5 .b) and Site Plan of Development of 14 . 96 +/- ac. to be known as Fitch Meadow, located on the westerly side of John Fitch Blvd. , northerly of Kimberly Dr. , DR zone 3 . Approve with modifications appl. #91-42P, East Coast Stair Co. Site Plan of Development, Lot #6, Bidwell Rd. , I zone 4 . Approve the reduction of certain bonds . PLANNING AND ZONING COMMISSION Frank Castro, Vice Chairman Bernard Hart, Secretary Castro, Gallicchio, Hart, Murrin, Levack, Montana, and March voted in favor of Items 1, 3, and 4 Castro, Gallicchio, Hart, and Murrin voted in favor of #2 . March voted against #2 . Levack and Montana disqualified themselves from discussing or acting on application #91-29P SENDER: r I also wish to receiv th • Complete items 1 and/or 2 for additional services. Complete items 3, and 4a & b. following services (for an extra • Print your name and address on the reverse of this form so fee): that we can return this card to you. 1. ❑ Addressee's Addr se 0 Attach this form to the front of the mailpiece, or on the back if space does not permit. 2. ❑ Restricted D livery • Write "Return Receipt Requested" on the mailpiece next to the article number. 1 Consult postmaster for fee. 3. Article Addressed to: 4a. Article Number P 094 595 402 4b. Service Type FRANK C,BORAWSZI ❑ Registered ❑ Insured PDS ENG,�. & CONSTR. .COMPANY XI Certified ❑ COD 107 OLD-*INDSOR ROAD Express Mail ❑ M rchand Receipt for BLOOMFI D CT 06002- ' 7 ate f Delivery /3--�- 5. Si ture (ldressee) 8. Addressee's Address( my if requested and fee is paid) 6. Signature (Agent) PS Form 3811, October 1990 *U.S.GM 19 -g73.e, DOMESTIC RETURN RECEIPT United States Postal Service Official Business PENALTY FOR PRIVATE USE, $300 Print your name, address and ZIP Code here P $ Z, TOWN OF SOUTH WINDSOR 1540 SULLIVAN AVENUE SOUTH WINDSOR CT 06074 91-42P i R 1 pow n see o � C V 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074 644-2511 AREA CODE 203 �oSOA,�o� / May 2'3, 1994 Joe Krysinski East Coast Stairs Company 313 Pleasant Valley Road South Windsor, CT 06074 Dear Mr. Krysinski: Re: Preconstruction Meeting - Appl . #91-42P, East Coast Stairs Co. IN ATTENDANCE NAME COMPANY/ADDRESS TELEPHONE A. Bowen Davies Town of South Windsor 644-2511 ext . 240 Joe Krysinski East Coast Stairs, Co. 528-7096 313 Pleasant Valley Rd, SW Frank Borawski PDS Engineering & Construction Co. 242-8586 107 Old Windsor Road, Bloomfield Sgt. Gerald Lewis South Windsor Police Services 644-2551 Michele R. Lipe Town of South Windsor 644-2511 ext . 252 John E. McCahill Town of South Windsor 644-2511 ext. 229 The following is a brief summary of points discussed during the meeting. Erosion and Sedimentation Control 1 . All erosion and sedimentation control measures are to be in place prior to earth moving operations in each area and maintained/cleaned out during construction. Call Zoning/Wetlands Enforcement Officer for inspection when measures are in place, prior to commencement of site work. 2 . All topsoil stockpile areas to be protected (ringed with haybales or equal ) . 3 . During construction of the project a crushed stone tracking pad is to be installed and maintained to minimize tracking of dirt/gravel onto Bidwell Road. Calcium chloride or water is to be used for dust control as required. a Joe Krysinski - 2 - May 23, 1994 Application #91-42P Public Works 1 . Four complete sets of approved/revised plans to be provided to Town prior to start of construction. They will be stamped by Planning Department along with plans developer needs . Only approved plans are to be used on job site. 2 . The Public Works Department is to be notified forty-eight (48 ) hours prior to the start of major construction work with inspections and testing per Developers Checklist requested for the following: a) After site is staked out b) All drainage work c) Preparation of subgrade, compaction tests as requested by the Town d) Preparation of subbase, six ( 6 ) inch lifts e) Placement of bituminous concrete, 2 inch layers 3 . Certification of gravel used as subbase will be required by an approved testing company. 4 . No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation. 5 . As built plans are to include horizontal and vertical location of all underdrains, footing drains, and sanitary sewers located as • per revised as-built checklist. 6 . All pipe and structures to be backfilled with free draining material, compacted in maximum one foot lifts with approved compaction equipment or approved equal if deep trench is encountered. Any pipe or structure work requires inspection prior to backfilling. 7 . Any problems and/or questions regarding construction of this project will be directed to Dave LeBeld in the field. 8 . All filling to be done in accordance with Department of Transportation specifications . To be compacted in maximum lifts and tested as necessary. 9 . Job meetings will be held as needed, and can be called by the developer or Town. r Joe Krysinski - 3 - May 23, 1994 Application #91-42P 10 . Forty-eight (48) hours notice needed for certificate of occupancy inspection. Two week review period ( 10 working days ) needed for all individual site (lot) plans prior to issuance of building permit (may be longer if application is incomplete) . See general guidelines for certificate of occupancy and building permit procedures . 11 . Any proposed changes are to be presented to the -Engineering or Planning Department prior to implementation on change order form in triplicate with 4 copies of the drawing. Town will attempt to turn around within 24 hours . 12 . No paving after October 15 or before April 15 without written approval from Director of Public Works . 13 . Normal hours of operation 7 : 00 a.m. - 5 :00 p.m. , no work on Sunday. 14 . Permit required for work in the Town road. Planning Department 1 . Landscaping is to be installed in accordance with the approved landscaping plan. If there are changes required, contact the Planning Department. Additional landscaping installed on one part of a site will not preclude planting all of the remaining items shown on the landscaping plan. 2 . Final plans to be reviewed; mylar submitted and filed 1,2 A-2 survey. SNET/NU 1 . Contact utilities for coordination of utilities connection. IWA/CC 1 . Two sets of final plans are to be submitted for the IWA/CC. Fire Marshall 1 . Blasting (if required) to be coordinated with the Fire Marshal . Joe Krysinski - 4 - May 23, 1994 Application #91-42P Police Department 1 . Emergency phone numbers for the duration of the construction must be provided to the Police Department on a company letterhead. If the developer occupies or owns the building(s ) after construction . emergency numbers must be provided to the Police Department. 2 . All buildings located on property which abuts a public highway must be numbered. Such number(s ) (address ) shall be visible from the street. All numbering shall comply with Town Ordinance 6-800 thru 6-802 . 3 . Barns, garages and outbuildings which are located on the same premises as a numbered structure are excluded. 4 . Erect temporary sign on the site during construction identifying the project. 5 . If an alarm is to be installed contact the Police Department. Building Department 1 . Plan review with Building Official/Fire Marshal required prior to application for building permit. Coordinate with Chief Building Official . Very truly your Michele R. L-pe Assistant Planner/Analyst MRL/pmm cc: Jerry C. Iazzetta, Town Engineer Gerald Lewis, SWPS Karl Reichle, Public Works Mel Stead, Public Works George Parkhurst, CL&P Minh V. Le, SNET John R. Collins, Chief Building Official Fred Shaw, Superintendent of Pollution Control PDSEngineering & Construction, Inc. 107 Old Windsor Road, Bloomfield,Conn.06002 Phone: (203)242-8586 'Fax: (203)242-8587 IT dlllllllll► ....... ...... "bra 'll 1�51 'I ul 11�m ON d PDS ENGINEERING April 26, 1995 & CONSTRUCTION TOWN OF SOUTH WINDSOR 1540 SULLIVAN AVENUE SOUTH WINDSOR, CT 06074 RE: EAST COAST STAIRS; 125 BIDWELL ROAD, SOUTH WINDSOR ATTN: Michele Lipe Dear Michele This letter is to request that your office perform an inspection of the site to insure the completion and compliance of the landscaping and erosion control. If everything is acceptable, please release the bonds to the Owner for these items. Sincerely William L. Jodice Project Manager �f PDS Engineering & Construction, Inc. WLJ/ab h\v APR 28 1"5 South Windsor Planning & Zorjiig Commissiow �0*N SE, c � .a C. s ` 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 SOR.Co��,w AREA CODE 203/644-2511 June 15, 1995 William L. Jodice, Project Manager PDS Engineering & Construction Company 107 Old Windsor Road Bloomfield, CT 06002 Dear Mr. Jodice: Re: Application #91-42P, East Coast Stairs Landscaping Bond This is to advise you that the Planning and Zoning Commission voted on June 13, 1995 to release the Landscaping bond for the above-referenced project in the amount of $5,000. Advance arrangements should be made to pick up the bond to ensure that the necessary contact person(s) will be available. If you have any further questions contact the Planning Department at 644-2511 , ext 253. Thank you. Very truly yours, PLA NG & ZONING COMMISSION n Ru sell G. Levack, Chairman RGL/pmm cc: Town Engineer ba* s