- Laboratory FIELD REPORT
JAWI,EORSIKI
Project: South Windsor Client: Dicin Electric
Police Department
South Windsor, CT Contractor: DRP Concrete
Project No.: 01810C Weather: Clear,40
Date: December 11, 2001
Purpose: To perform field density testing.
Contractor Activities:
Upon this writer's arrival, Ernie's Crane Service had begun excavation of approximately 30-
inches of native material for the placement of Red-brown, C-F Gravel, C-F Sand, trace Silt to
be used as the parking lot subbase. The native subbase was proofrolled by a vibratory roller
prior to backfilling.
Backfilling began with an 8-inch lift of processed gravel followed by a 6-inch lift of stone.
A compactive effort was applied at the completion of each lift with a vibratory roller.
Density testing was performed with the use of a Humbolt nuclear gauge.
JGI Activities:
Five field density tests were performed on today's earthwork using a nuclear density gauge
in general accordance with ASTM D 2922. The test results indicated that the specified 95%
minimum compaction requirement had been achieved as compared to ASTM D 1557 test
methods. Please refer to the attached Field Density Test Summary for individual test data.
Locations of today's project activities are illustrated on the attached Field Sketch.
Prepared by: S. Doheny
Reviewed bv: V 6 Date: 1/10/02
TEST RESULTS DO DO NOT COMPLY WITH SPECIFICATIONS
ARE NOT COMPLETE OR X ARE NOT APPLICABLE
A DEVIATION REPORT IS ATTACHED X IS NOT ATTACHED HAS BEEN AMENDED AND
IS ATTACHED
OBSERVED CONSTRUCTION X DOES DOES NOT COMPLY WITH SPECIFICATIONS
IS NOT COMPLETE NOT APPLICABLE
The information stated on this report may not be reproduced except in its entirety without the express written consent of
Eastern Materials Testing a division of Jaworski Geotech, Inc. Use of the NVLAP designation does not represent
endorsement by the NIST or NVLAP. Reports are relevant only to items tested and no other attribution may be made.
Ju LGLL ► PIIJL 1 L.rj
Project:
Eastern
- Materials
Project No.: 18/p Date: f - �-a Testing
- Laboratory
Rda Division of✓aworski Geotech incSA &i
100,
ogjx�j
� • r
I
r
1
j
1
A Division of
Eastern �• _._',...-,, fit-,
- Materials
,Testing
Laboratory FIELD REPORT
JAWORSKI
GEOTECH, INC.
Project: SBA Tower 10125-087 Client: Dicin Electric
South Windsor, CT Contractor: DRP Construction
Project No.: 01592C Weather: Cloudy, 51 degrees
Date: December 13, 2001
Purpose: To review concrete construction, fabricate specimens for strength testing, and
observe placement of reinforcing steel.
Contractor Activities:
D.R.P. Construction previously installed concrete forms and reinforcing steel for the pier
column of the proposed cell tower. The steel and forms appeared to have been properly
secured and geometrically correct. Subsequently, 8-cubic yards of 5,000-psi concrete was
supplied to the site by Builders Concrete. The concrete was placed at the prepared locations
by the delivery truck chute, it was mechanically vibrated into place and finished by hand
trowel.
JGI Activities:
One concrete compressive strength test set was fabricated from today's concrete placement
in accordance with ASTM C 31. Refer to the Concrete Strength Test Summary of this date
for details.
Reinforcing steel was reviewed prior to today's concrete placement. The steel was observed
to be placed in general accordance with project drawings.
Locations of today's project activities are illustrated on the attached Field Sketch.
Prepared by: C. Nguyen •�� C� O(� tV
Reviewed by: Date: 1/7/02
s cA • ''✓T
No.22 Ili e
TEST RESULTS DO X DO NOT COMPLY WITH SPECIFICATIONS �,���°•••••°" . '�,
ARE NOT COMPLETE OR ARE NOT APPLICABLE ''�e� O N*P`t'
A DEVIATION REPORT IS ATTACHED X IS NOT ATTACHED HAS BEEN AMENDED AND
IS ATTACHED
OBSERVED CONSTRUCTION DOES X DOES NOT COMPLY WITH SPECIFICATIONS
IS NOT COMPLETE NOT APPLICABLE
The information stated on this report may not be reproduced except in its entirety without the express written consent of
Eastern Materials Testing a division of Jaworski Geotech, Inc. Use of the NVLAP designation does not represent
endorsement by the NIST or NVLAP. Reports are relevant only to items tested and no other attribution may be made.
FIELD SKETCH
Project: Eastern
- Materials
Project No.: �� `� Date- t"s--01 Testing
- Laboratory
a Division of Jaworski Geofech, Inc.
G'
A Division of
Eastern
- Materials - -
Testing FIELD REPORTA,
Laboratory o 0 0
00
JAWORSKI
Project: SBA Tower 10125-087 Client: Dicin Electric GEO ECH, INC.
South Windsor,CT Contractor: DRP Construction
Project No.: 01592C Weather: Cloudy, 40
Date: January 29, 2002
Purpose: To observe structural steel using NDT methods.
JGI Activities:
This writer performed a visual inspection of the above named tower erection. The intent of
this inspection was to verify that the worked performed was completed in general accordance
with project specifications, engineer approved drawings, and applicable building codes.
The remaining carrier platforms had been installed as per project specifications. Bolting had
been torqued and the safety line had been installed. No deviations were open at this time.
No further inspections are scheduled.
Prepared by: D. O'Keefe AWS/CWI 94110511
Reviewed by: ;!%F Date: 2/8/02
i
4�•orCo
JV
A 4•
A • �_•8 lyY • eta
y9� •
•
/ONA;C-00.
TEST RESULTS DO DO NOT COMPLY WITH SPECtFICATfbNS
ARE NOT COMPLETE OR -X ARE NOT APPLICABLE
A DEVIATION REPORT IS ATTACHED X IS NOT ATTACHED HAS BEEN AMENDED AND
IS ATTACHED
OBSERVED CONSTRUCTION X DOES DOES NOT COMPLY WITH SPECIFICATIONS
IS NOT COMPLETE NOT APPLICABLE
The information stated on this report may not be reproduced except in its entirety without the express written consent of
Eastern Materials Testing a division of Jaworski Geotech, Inc. Use of the NVLAP designation does not represent
endorsement by the NIST or NVLAP. Reports are relevant only to items tested and no other attribution may be made.