Loading...
HomeMy WebLinkAbout124 Commerce Way (5) DAVID KAHN,P.E. WILLIAM A.BAYER,P.E. KAHN & BAYER CONSULTING STRUCTURAL ENGINEERS 48 PURNELL PLACE MANCHESTER,CONNECTICUT 06040 TEL.860-646-4440 FAX 860-646-9518 I li ndsor Steel South Windsor, CT Special Inspection #1 Plovv,niber 21, 2000 Visited site to view footing excavation. Generally very sandy, loose Foot nos formed +or azure per i meter walls. Pour to occur latter that day. William. Bayer DAVID KAHN,P.E. WILLIAM A.BAYER,P.E. KAHN & BAYER CONSULTING STRUCTURAL ENGINEERS 48 PURNELL PLACE MANCHESTER,CONNECTICUT 06040 TEL.860-646-4440 FAX 860-646-9518 Windsor Steel South Windsory CT Special inspection ##2 November 22, 2000 Visited site to view foundation progress. Office perimeter footings stripped. Forming Warehouse East wall footings. Blankets on site to cover after pouring. Footing reinforcing on chairs. William Bayer DAVID KAHN,P.E. WILLIAM A.BAYER,P.E. KAHN & BAYER CONSULTING STRUCTURAL ENGINEERS 48 PURNELL PLACE MANCHESTER,CONNECTICUT 06040 TEL.860-646-4440 FAX 860-646-9518 Windsor Steel South Windsor, CT Special Inspection $#y November 29 a 2000 n`►far�::rac�a_rse perimeter f t�oti gs pour ed, except at dock area. P'Ir�t of Office wall poured. some column anchor bolts omitted. Told Mountf ord they must gpt detail from steel erector for corrective action. The type of expansion boltz, embedment etc. must be all included. William Buyer DAVID KAHN,P E. WILLIAM A.BAYER,P.E. KAHN & BAYER CONSULTING STRUCTURAL ENGINEERS 48 PURNELL PLACE MANCHESTER,CONNECTICUT 06040 TEL.860-6464440 FAX 860-646-9518 Windsor Steel Sut.ith Windsor,, CT Special Inspection #4 Dec. 10 2000 Stripping forms at Office foundation walls, front and left sides, Rear Warehouse footings not poured yet. Dock footing at Southwest corner complete. Had discussed with GC the placing of stone under footing due to groundwater at this elevation. This stone was placed. Forming Office foundation walls at right side. Noted loose material in Warehouse area. All must be compacted and tested prior to any slab pouring. William @a • ,. ..... . „r„ .. ,. r,. .. .. r..t..i,. ,..r,..l.'aL,u�I.N..r•.a.n•..•.,..,r4.rl..•6r.rW.aYlrswr,........ ..,......«...». DAVID KAHN,P.E. WILLIAM A.BAYER,P.E. KA H N & BAYER CONSULTING STRUCTURAL ENGINEERS 48 PURNELL PLACE MANCHESTER,CONNECTICUT 06040 TEL.860-646-4440 FAX 860-646-9518 Windsor Steel S,,uth Windsor, CT Special I nspect i Dn #5 Dec, 11, 2000 Visited site to view wall pour. Wall being readied for pour was at West side of Warehouse. Reinforcing steel was in place. Anchor bolts were being set; at about Noon. Pour was schpdul ed for 2:04 P.M. William Bayer r DAVID KAHN,P.E. WILLIAM A.BAYER,P.E. -- KA H N & BAYER CONSULTING STRUCTURAL ENGINEERS 48 PURNELL PLACE MANCHESTER,CONNECTICUT 06040 TEL.860-646-4440 FAX 860-64&9518 Windsor Steel South Windsor, CT Special Inspection #6 January 15, 2001 Major wall pour scheduled. Balance of Warehouse foundation walls. Reinforcing was in place with ties at column piers. Anchor bolts Were partially installed, with balance being set as l watched. William Layer DAVID MHN,P.E. WILLIAM A.BAYER,P.E. KA H N & BAYER CONSULTING STRUCTURAL ENGINEERS 48 PURNELL PLACE MANCHESTER,CONNECTICUT 06040 TEL.860-646-4440 FAX 860-646-9518 Windsor Steel South Windsor} CT Special Inspection #7 February 2, 2001 Office wood trusses being erected. Plywood sheathing at Office being placed right behind truss installation. Office Walls being sheathed. Front canopy at Office being framed. Balance waiting for prefab steel . William Ba r 1 DAVID KAHN,P.E. WILLIAM A.BAYER,P.E. -- KAHN & BAYER CONSULTING STRUCTURAL ENGINEERS 48 PURNELL PLACE MANCHESTER,CONNECTICUT 06040 TEL.860-646-4440 FAX 860-646-9516 Windsor Steel South Windsor, CT Special Inspection #S Feb. 10, 2001 Front office canopy framed and sheathed. Front office roof completely sheathed and closed. Demising wall between Warehouse and Office complete. Wall ties from block to columns in office visible and correct. William' Bayer G ; DAVID KAHN,P.E. WILLIAM A.BAYER,P.E. KAHN & BAYER CONSULTING STRUCTURAL ENGINEERS 48 PURNELL PLACE MANCHESTER,CONNECTICUT 06040 TEL.860-646-4440 FAX 860-646-9518 Windsor Steel South Windsor, CT Special Inspection #9 Feb. 18, 2001 Steel frame erection in Warehouse begun. First bay at North end in place With, frames and one bay of purl i ns erected. William E+ er DAVID KAHN,P.E. WILLIAM A.BAYER,P.E. -- KA H N & BAYER CONSULTING STRUCTURAL ENGINEERS 48 PURNELL PLACE MANCHESTER,CONNECTICUT 06040 TEL.860-646-4440 FAX 860-646-9518 Windsor Steel South Windsor, CT Special Inspection #10 Feb. 225 2001 Warehouse prefab steel progressing. All frames in place. Approximately 90 of purl i ns in place. Approximately 75% of warehouse wall gi Ets installed. Frames being plumbed with cables and guys. William Bayer DAVID KAHN,P.E. WILLIAM A.BAYER,P.E. KA H N & BAY E R CONSULTING STRUCTURAL ENGINEERS 48 PURNELL PLACE MANCHESTER,CONNECTICUT 06040 TEL.860-646-4440 FAX 860-64fr9518 Windsor Steel South Windsor, CT Special Inspection J�11 March 269 2001 Entire steel frame in warehouse has been erected. Frames are being braced temporarily with guy wires, All wall gi its are up and all "all siding has been erected. All roof purl i ns are in place, with approximately 50% of the roof panels in place. The steel framing for the mezzanine has been completed. It appears that bad weather is only reason that roof is not complete. 'The crane runways are all on site, but not erected yet. _ There appears to be little or no frost inside warehouse, so that once enclosed, slab should be able to proceed. This should be verified when slab grading takes place. William Bayer, P.