Loading...
HomeMy WebLinkAbout124 Commerce Way (4) I flOTATE � % Tri-State Materials Testin Lab Inc. � IESTWG Lolac g Connecticut Division 121 "P"North Plains Industrial Road, Wallingford,CT 06492 •(203)949-7733 •Fax(203)949-7735 i f01P•l000 s • IN'! =ION.ENOIIiiONG Client: W.J. Mountford, Co. Report#: 002 170 Commerce Way Date: 03/07/01 South Windsor, CT 06074 Project: Windsor Steel Contractor W.J. Mountford Inspector: Chris Purinton FIELD WOOD TRUSS INSPECTION - Inspector visited site of completed wood frame building as scheduled by client. Builder was not on site. Met w/Paul Hollman. - Visually inspected wood trusses for conformance with MITEK approved approved truss assembly drawings, plan drawing, and conventional use of standard hanging and fastening systems, and found the following: • Trusses were assembled and set as drawn. • Simpson hurricane ties were on 3 exterior walls. • Two Simpson ties one at each connection of 021's to J29's, were not fully fastened as designed. • Two GT hangers one at each connection of J21's to M02's had been bolted to JQ2x8's off center which was compromising the JQ2x8 hanger members. Referring to Quality Stair& Rail fabrication drawing approved by the Lawrence Assoc. as corrected on 1 1-30-00, visually inspected steel interior frame and found it fabricated and erected as drawn. Baseplates were not visible. Report To: W.J. Mountford,The Lawrence Assoc., Kahn&Bayer Structural Eng. Submitted By: Tri-State Materials Testing Lab., Inc Sarni H. Haj P#1}}',,�� Iztn�t��; }`? t.� .•tit The above data is the property of the client No reproduction of the above data without the sole permission of Tri-State Materials Testing `�• �' 9~ Y�•1 Tri-State Materials Testing accepts no liability for work executed by others ; ti•;+w '• "• • ����• ,"i� � � I� of •,• fdo.21345 i�N AL�e� �``• New York City•Long Island Edison,NJ•Wallingford,CT Dover,DE "Put us to the test—and our 20 years of experience" -Ifti-STATE iii, T Tri-State Materials Testin Lab Inc. Connecticut Division 121 "P"North Plains Industrial Road, Wallingford, CT 06492 •(203)949 - 7733 Fax(203) 949-7735 o0 • INIP5=1 li•ENOMEMMG Client: W.J. Mountford, Co. Report 4: 004 170 Commerce Way Date: 03/27/01 South Windsor, CT 06074 Project: Windsor Steel Contractor W.J. Mountford, Co. Inspector: Chris Purinton Page 1 of 1 FIELD STRUCTURAL STEEL INSPECTION - Met with project manager, Paul Hollman at site. Reviewed fabricator CECO drawings. Erector was installing roofing. - Visually inspected mezzanine framing and deck and found the following: • One column was out of plumb at B 1/1 OA • One baseplate was missing a nut at B/11 • Decking and all other connections were completed and acceptable per AWSD1.1, AWSD1.3, AISC, and approved drawings. • Welding of nuts to anchor bolts should be submitted for approval if required to compensate for short bolts or slotted baseplates. - Inspector began visual inspection of main building frame because erector foreman reported all connections completed. Inspector found one loose rod brace at 139/1-2 and marked the column beside the brace. No other discrepancies were found at this time. - Crane beams and hangers were still in progress. Report To: W.J. Mountford,Town of S. Windsor, Kahn& Bayer Structural Eng.,Lawrence Assoc. Submitted By: Tri-State Materials Testing` '[x �n `` ,. SAM, ,1 ar;. w� s L Y.`r ` • `•-r • The above data is the property of the client No reproduction of the above data without the sole pennission of Tri-State Materials Testing � °N - r Tri-State Materials Testing accepts no liability for wort,e\ecuted by others •• �� ,`f •.'CEN ••• ,�,�titi ••••••s New York City• Long Island•Edison,NJ Wallingford,CT•Dover,DE "Put us to the test...and our 20 years of experience"