Client: W.J. Mountford, Co. Report#: 001
170 Commerce Way Date: 11/21/00
South Windsor, CT 06074
Project: Windsor Steel
CONCRETE FIELD DATA(ASTM C31,C143,C231,C173,C1064,C138,)
Truck Ticket Batch Disch. Samp. %Air Slump Conc. Unit WT Field Design
No. No. Time Time Time Cont. Inch Temp, F PCF Set# Strength PSI
120 146018 1:22 2:15 2:35 5.3 3.5 66 1-4 3000
Location(s)of Pour: Footing— 11 A to 11 C
Supplier: Tilcon Contractor: W.J. Mountford Inspector: Jay Thomas TSMTL
Weather: Overcast Air Temp. 40 Total Yardage Placed: 25
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6"D x 12"H)
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq. in.) Load Type (PSI)
Lbs.
1 4757 1 l/21/00 11/22/00 11/28/00 7 28.27 74,000 C 2615 --
2 4758 11/21/00 11/22/00 12/19/00 28 28.27
3 4759 11/2 l/00 11/22/00 12/19/00 28 28.27
4 4760 11/21/00 11/22/00 12/19/00 28 28.27
A B C D E
Reported To: W.J. Mountford,The Lawrence Associates,
Kahn&Bayer Structural Engineers
N00II1180001
CO Nw
��► ••.....• �C 4��
Cone Cone& Cone& Shear Columnar �`���;• �N.NA4/✓.•�j��,G
Split Shear =���,• * .� • ��
aca•�s ,9• �:
s
The above reported data is the property of the client. No reproduction of the
above data without the sole permission of Tri-State Materials Testing Lab,Inc. Sarni H. HaJar,P.E. ,
Q�
T e Materials Testing accepts no liability for work executed by others. O•• NO. 1
•y'��••I CEN&C �2
NVLAP does not endorse the product of this reporta`s000000000
NAL
New York City • Long Island • Edison, NJ • Wallingford, CT • Dover.aUE///lllllf/�l�l,
"Put us to the test. . .and our 20 years of experience"
TRI-STATE
ON.S TESTING 14,& /
�P `' Tri-State Materials Testing Lab Inc.
Connecticut Division
121 "P"North Plains Industrial Road,Wallingford, CT 06492•(203)949-7733 • Fax(203)949-7735
1 98o-z000
10"ANNIVERSARY
INSPECTION-ENGINEERING
Client: W.J. Mountford, Co. Report#: 001
170 Commerce Way Date: 11/21/00
South Windsor, CT 06074
Project: Windsor Steel
CONCRETE FIELD DATA(ASTM C31,C143,C231,C173,C1064,C138,)
Truck Ticket Batch Disch. Samp. %Air Slump Conc. Unit WT Field Design
No. No. Time Time Time Cont. Inch Temp,F PCF Set# Strength PSI
120 146018 1:22 2:15 2:35 5.3 3.5 66 1-4 3000
Location(s)of Pour: Footing— 1 IA to IIC
Supplier: Tilcon Contractor: W.J.Mountford Inspector: Jay Thomas TSMTL
Weather: Overcast Air Temp. 40 Total Yardage Placed: 25
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6"D x 12"H)
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq.in.) Load Type (PSI)
Lbs.
1 4757 11/21/00 1 1/22/00 1 1/28/00 7 28.27 74,000 C 2615 --
2 4758 11/21/00 11/22/00 12/19/00 28 28.27 123,000 D .4380 YES
3 4759 11/21/00 11/22/00 12/19/00 28 28.27 130,000 E 4595 YES
4 4760 11/21/00 11/22/00 12/19/00 28 28.27 132,000 C 4690 YES
A B C D E
Reported To: W.J.Mountford,The Lawrence Associates,
Kahn&Bayer Structural Engineers
,t�lttttttNtsrlt�r
CONN�,r�k
,ems �� .....• � �► f�i
Cone Cone& Cone& Shear Columnar ee��<(, , H�' .• �i*mid•
Split Shear Q-,•'*.�`��J►{` �+ I,'�q-' eti,
' Q' r, •`� 'P'•:'1
The above reported data is the property of the client. No reproduction of the
ab, ye data without the sole permission of Tri-State Materials Testing Lab,Inc. Sarni H.Hajjar,P.E.
:��' s S
to Materials Testing accepts no liability for work executed by others. .���• •1�t
NVLAP does not endorse the product of this reporti�,y���'°-•• �,s'�~
New York City • Long Island• Edison, NJ • Wallingford, CT • Dover, 1) r�J`t,fillsi�'•�tti�
"Put us to the test. . .and our 20 years of experience"
TRI-STATE
TESTING 14e
/4.
Tri-State Materials Testing Lab Inc.
Connecticut Division
121 "P"North Plains Industrial Road,Wallingford,CT 06492 •(203)949-7733 • Fax(203)949-7735
198 -2000
70-ANNIVERSARY �
INSPECTION-ENGINEERING
Client: W.J. Mountford, Co. Report#: 002
170 Commerce Way Date: 11/27/00
South Windsor, CT 06074
Project: Windsor Steel
CONCRETE FIELD DATA(ASTM C31,C143,C231,C173,C1064,C138,)
Truck Ticket Batch Disch. Samp. % Air Slump Cone. Unit WT Field Design
No. No. Time Time Time Cont. Inch Temp,F PCF Set# Strength PSI
132 146096 11:36 12:31 12:49 1.2 3.0 65 1-4 3000
Location(s)of Pour: Front wall footing line A 3.2—8.5
Supplier: Tilcon Contractor: W.J.Mountford Inspector: R.D. Werner TSMTL
Weather: Overcast Air Temp. 40 Total Yardage Placed: 10
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6"D x 12"H)
e
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq.in.) Load Type (PSI)
Lbs.
1 4161 11/27/00 11/28/00 12/04/00 7 28.27 80,000 E 2830 --
2 4162 11/27/00 11/28/00 28 28.27
3 4163 11/27/00 11/28/00 28 28.27
4 4164 11/27/00 11/28/00 28 28.27
A B C D E
Reported To: W.J.Mountford,The Lawrence Associates,
Kahn&Bayer Struc�al ��e rs
�`j`pfr C
Cone Cone& Cone& Shear Columnar a`� .H,�
�;•��N ��.••ri� �
Split Shear v~j;•C2
The above reported data is the property of the client. No reproduction of the *• •
ab9=data without the sole pennission of Tri-State Materials Testing Lab,Inc. Sami H. HaJar,P.E. 0.2194
T e Materials Testing accepts no liability for work executed by others 0�• (� d
NVLAP does not endorse the product of this report �� S ONNLL
New York City • Long Island • Edison, NJ • Wallingford CT • Dover. DE
"Put us to the test. . .and our 20 years of experience"
TRI-STATE
ii
ON, TESTING 4eTri-State Materials Testin Lab In
g c.
Connecticut Division
121 "P"North Plains Industrial Road,Wallingford,CT 06492 •(203)949-7733 - Fax(203)949-7735
0 OIVERSARY
INSPECTION-ENGINEERING
Client: W.J. Mountford, Co. Report#: 002
170 Commerce Way Date: 11/27/00
South Windsor, CT 06074
Project: Windsor Steel
CONCRETE FIELD DATA(ASTM C31,C143,C231,C173,C1064,C138,)
Truck Ticket Batch Disch. Samp. %Air Slump Cone. Unit WT Field Design
No. No. Time Time Time Cont. Inch Temp,F PCF Set# Strength PSI
132 146096 11:36 12:31 12:49 1.2 3.0 65 1-4 3000
Location(s)of Pour: Front wall footing line A 3.2—8.5
Supplier: Tilcon Contractor: W.J. Mountford Inspector: P..D. Werner TSMTL
Weather: Overcast Air Temp. 40 Total Yardage Placed: 10
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6"D x 12"H)
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq.in.) Load Type (PSI)
Lbs.
1 4161 11/27/00 11/28/00 12/04/00 7 28.27 80,000 E 2830 --
2 4162 11/27/00 11/28/00 12/26/00 28 28.27 132,000 B 4670 YES
3 4163 11/27/00 11/28/00 12/26/00 28 28.27 136,000 C 4810 YES
4 4164 11/27/00 11/28/00 12/26/00 28 28.27 150,000 D 5305 YES
A B C D E
Reported To: W.J.Mountford,The Lawrence Associates,
Kahn&Bayer Structural`WgteM111%,..
Cone Cone& Cone& Shear Columnar A`�.e N' ���I�y•,
s ,
Split Shear
The above reported data is the property of the client. No reproduction of the
above data without the sole permission of Tri-State Materials Testing Lab,Inc. Sarni H.Hajjar,P.E. �.�? .i ;• •:
ate Materials Testing accepts no liability for work executed by others. ate'•• Ct~!E 5 �••• �;y
'
•
NVLAP does not endorse the product of this report ��`'l a0N ALt ,��•''`y
New York City • Long Island . Edison, NJ •Wallingford, CT• Dover, DE
"Put us to the test. . .and our 20 years of experience"
TRI-STATE
���`pg TESTING (qe
�P Tri-State Materials TestingLab Inc.
Connecticut Division
121 "P"North Plains Industrial Road,Wallingford,CT 06492•(203)949-7733 • Fax(203)949-7735
1980-20o0
20^-ANNIVERSARY
INSPECTION-ENGINEERING
Client: W.J. Mountford, Co. Report#: 003
170 Commerce Way Date: 11/30/00
South Windsor, CT 06074
Project: Windsor Steel
CONCRETE FIELD DATA(ASTM C31,C143,C231,C173,C1064,C138,)
Truck Ticket Batch Disch. Samp. %Air Slump Conc. Unit WT Field Design
No. No. Time Time Time Cont. Inch Temp,F (PCFL Set# Strength PSI
113 146218 2:43 3:20 3:28 5.4 3.5 66 1-4 3000
i i t i - - - i i I I I
Location(s)of Pour: Footing A line 1 to 2.8; `A-A' is 5'wide 40' long;`BB' is 10'wide,40' long. 1 line A to A.2
Supplier: Tilcon Contractor: W.J. Mountford Inspector: Jay Thomas TSMTL
Weather: Cloudy Air Temp. 40 Total Yardage Placed: 25
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6"D x 12"H)
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq.in.) Load Type (PSI)
Lbs.
1 4765 l 1/30/00 12/01/00 12/07/00 7 28.27 70,000 B 2475 --
2 4766 11/30/00 12/01/00 28 28.27
3 4767 11/30/00 12/01/00 28 28.27
4 4768 11/30/00 12/01/00 28 28.27
A B C D E
Reported To: W.J.Mountford,The Lawrence Associates,
Kahn&Bayer Structural Engineers
�0••F CONS
a p•,•.....,,��,
Cone Cone& Cone& Shear Columnar �`��'� • ��,H,,Jv'••r/�14+
Split Shear
The above reported data is the property of the client. No reproduction of the *0
ae data without the sole permission of Materials Testing Lab,Inc. Sami H.Hajjar, P.E. -p
l)au `
,te Materials Testing accepts no liability for work executed by others.
• �4 a
_--'CEBsS•;C��r��r
NVLAP does not endorse the product of this report '`S, /ONAL
�t�t�uttuu
New York City • Long Island • Edison. NJ • Wallingford CT • Dover. DE
I ut us to the test. . .and our 20 years of experience"
TAI-STATE
TESTING 14e
Tri-State Materials Testing Lab Inc.
Connecticut Division
121 "P"North Plains Industrial Road,Wallingford,CT 06492•(203)949-7733 • Fax(203)949-7735
1980-z000
70`•ANNIVERSARY
INSPECTION-ENGINEERING
Client: W.J. Mountford, Co. Report#: 003
170 Commerce Way Date: 11/30/00
South Windsor, CT 06074
Project: Windsor Steel
CONCRETE FIELD DATA(ASTM C31,C143,C231,C173,C1064,C138,)
Truck Ticket Batch Disch. Samp. % Air Slump Conc. Unit WT Field Design
No. No. Time Time Time Cont. (inch) Temp, F PCF Set# Strength PSI
1 13 146218 2:43 3:20 3:28 5.4 3.5 66 1-4 3000
Location(s)of Pour: Footing A line 1 to 2.8; `A-A' is 5' wide 40' long; `BB' is 10' wide,40' long. 1 line A to A.2
Supplier: Tilcon Contractor: W.J. Mountford Inspector: Jay Thomas TSMTL
Weather: Cloudy Air Temp. 40 Total Yardage Placed: 25
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6" D x 12" H)
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq. in.) Load Type (PSI)
(Lbs.
1 4765 11/30/00 12/01/00 12/07/00 7 28.27 70,000 B 2475 --
2 4766 11/30/00 12/01/00 12/28/00 28 28.27 94,000 E 3325 YES
3 4767 11/30/00 12/01/00 12/28/00 28 28.27 106,000 C 3750 YES
4 4768 11/30/00 12/01/00 12/28/00 28 28.27 124,000 D 4385 YES
A B C D E
Reported To: W.J. Mountford,The Lawrence Associates,
Kahn&Bayer Structural Engineers
,00
♦� •.
Cone Cone& Cone& Shear COIUmnar �R��I•. �� F�'�J/9'•C�r+�
Split Shear a-�•tY- '�•••
The above reported data is the property of the client No reproduction of the
above data Without the sole permission of Tri-State Materials Testing Lab,Inc Sami H. Hajjar, P.E. •• ,, ••
ate Materials Testing accepts no liability for work executed by others 21A�G
NVLAP does not endorse the product of this report ��f•'rs/ON X`� ��`��
p f/4111111101%�1
New York City • Long Island • Edison, NJ • Wallingford CT - Dover. DE
"Put us to the test. . .and our 20 years of experience"
TRI-STATE
TESTING (qQ��
�P `' Tri-State Materials Testing Lab Inc.
Connecticut Division
~ 121 "P"North Plains Industrial Road,Wallingford,CT 06492 •(203)949-7733 • Fax (203)949-7735
19so-z000
20-ANNIVERSARY
INSPECTION-ENGINEERING
Client: W.J. Mountford, Co. Report#: 004
170 Commerce Way Date: 12/11/00
South Windsor, CT 06074
Project: Windsor Steel
CONCRETE FIELD DATA(ASTM C31,C143,C231,C173,C1064,C138,)
Truck Ticket Batch Disch. Samp. % Air Slump Conc. Unit WT Field Design
No. No. Time Time Time Cont. Inch Temp,F PCF Set# Strength PSI
132 146615 1:37 2:15 2:30 5.2 3.75 69 1-4 3000
Location(s)of Pour: Foundation wall
Supplier: Tilcon Contractor: W.J.Mountford Inspector: Jay Thomas TSMTL
Weather: Cloudy Air Temp. 36 Total Yardage Placed:
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6"D x 12"H)
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq.in.) Load Type (PSI)
1391 Lbs.
1 4789 12/11/00 12/12/00 12/18/00 7 28.27 84,000 B 2970 --
2 4790 12/11/00 12/12/00 28 28.27
3 4791 12/11/00 12/12/00 28 28.27
4 4792 12/11/00 12/12/00 28 28.27
A B C D E
Reported To: W.J.Mountford,The Lawrence Associates,
Kahn&Bayer Struc tilti���,.,
Cone Cone& Cone& Shear Columnar w Co tij
.�
Split Shear �,�� '••
-n
The above reported data is the property of the client. No reproduction of the
ab ve data without the sole permission of Tri-State Materials Testing Lab,Inc. Sami H. HaJ ar P.E.
ate Materials Testing accepts no liability for work executed by others. i,��,t' /c eBS�O•:,��ti.`'
NVLAP does not endorse the product of this report
New York City • Long Island- Edison,NJ •Wallingford,CT• Dover, DE
"Put us to the test. . .and our 20 years of experience"
IfIWTATE
I'ESTING *c Tri-State Materials Testing Lab Inc.
Connecticut Division
121 "P"North Plains Industrial Road,Wallingford,CT 06492•(203)949-7733 •Fax(203)949-7735
i��a•s e•
iw�scnoN.■�
Client: W.J. Mountford, Co. Report#: 004
170 Commerce Way Date: 12/11/00
South Windsor, CT 06074
Project: Windsor Steel
CONCRETE FIELD DATA(ASTM C31,C143,C231,C173,C1064,C138,)
Truck Ticket Batch Disch. Samp. %Air Slump Conc. Unit WT Field Design
No. No. Time Time Time Cont. Inch Temp,F PCF Set# Strength PSI
132 146615 1:37 2:15 2:30 5.2 3.75 69 1-4 3000
Location(s)of Pour: Foundation wall
Supplier: Tilcon Contractor: W.J. Mountford Inspector: Jay Thomas TSMTL
Weather: Cloudy Air Temp. 36 Total Yardage Placed:
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6"D x 12"H)
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq. in.) Load Type (PSI)
1391 Lbs.
1 4789 12/11/00 12/12/00 12/18/00 7 28.27 84,000 B 2970 --
2 4790 12/11/00 12/12/00 01/08/01 28 28.27 132,000 D 4670 Yes
3 4791 12/11/00 12/12/00 01/08/01 28 28.27 135,000 C 4775 Yes
4 4792 12/11/00 12/12/00 01/08/01 28 28.27 137,000 E 4845 Yes
A B C D E CON
tr�ee�pAlf f�
Reoorted To: W.J.Mountforc . Faffrenee kc fates,
Kahn&Bay
.'CO •�. Ti `�.i
' ..._•3
Cone Cone& Cone& Shear Columnar Y• •,�
Split Shear O «0. y 946 '�
The above reported data is the property of the client. No reproduction of the ���,�s'•;ENS •. �4�*�«?
-above data without the sole permission of Tri-State Materials Testing Lab,Inc. Sami H.Hajjar,P.E. ���i�j'0 At `'..N4' �
State Materials Testing accepts no liability for work executed by others.
NVLAP does not endorse the product of this report
Kew York City Long Island•Edison,NJ•Wallingford,CT Dover,DE
"Put us to the test...and our 20 years of experience"
IFIRTATE
•% Tri-State Materials Testing Lab Inc.
Connecticut Division
121 "P"North Plains Industrial Road, Wallingford,CT 06492 (203)949-7733 •Fax(203)949-7735
i oro•s000
INlrEGT/0/i•ENOIIi�
Client: W.J. Mountford, Co. Report#: 007
170 Commerce Way Date: 12/21/00
South Windsor, CT 06074
Project: Windsor Steel
CONCRETE FIELD DATA(ASTM C31,C143,C231,C173,C1064,C1380
Truck Ticket Batch Disch. Samp. %Air Slump Conc. Unit WT Field Design
No. No. Time Time Time Cont. Inch Temp,F PCF Set# Strength PSI
127 241887 12:24 1:10 1:25 4.7 4.0 58 1-4 3000
Location(s)of Pour: Foundation wall on line C,columns 3 through 11
Supplier: Tilcon Contractor: W.J. Mountford Inspector: George M. TSMTL
Weather: Clear Air Temp. 28 Total Yardage Placed: 20 yards
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS ASTM C39 6"D x 12" H
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq. in.) Load Type (PSI)
Lbs.
1 5069 12/21/00 12/22/00 12/29/00 7 28.27 53,000 E 1875
2 5070 12/21/00 12/22/00 01/18/01 28 28.27 95,000 D 3360 Yes
3 5071 12/21/00 12/22/00 01/18/01 28 28.27 93,000 C 3290 Yes
4 5072 12/21/00 12/22/00 01/18/01 28 28.27 96,000 C 3395 Yes
A B C D E
Reported To: W.J. Mountford,The Lawrence Associates,
Kahn&Bayer Structural` g} 111PI'l���`l,
Cone Cone& Cone& Shear Columnar � ��' A. HA�'�• /�*
Split Shear 'Crj U �M
above reported data is the property of the client. No reproduction of the .a
data without the sole permission of Tri-State Materials Testing Lab,Inc
Sami H. Hajjar,P.E.
State Materials Testing accepts no liability for wort;executed by others. !CE •
NVLAP does not endorse the product of this report �
New York City•Long Island Edison,NJ Wallingford,CT Dover,DE
q�pl1111H�1N
"Put us to the test...and our 20 years of experience"
TROTATE
Tri-State Materials Testing� g Lab Inc.
Connecticut Division
121 "P"North Plains Industrial Road,Wallingford,CT 06492 •(203)949-7733 Fax(203)949-7735
t 000.:000
Client: W.J. Mountford, Co. Report#: 007
170 Commerce Way Date: 12/21/00
South Windsor, CT 06074
Project: Windsor Steel
CONCRETE FIELD DATA(ASTM C31,C143,C231,C173.C1064,C1383
Truck Ticket Batch Disch. Samp. %Air Slump Conc. Unit WT Field Design
No. No. Time Time Time Cont. Inch Temp,F PCF Set# Strength PSI
127 241887 12:24 1:10 1:25 4.7 4.0 58 1-4 3000
Location(s)of Pour: Foundation wall on line C, columns 3 through 11
Supplier: Tilcon Contractor: W.J. Mountford Inspector: George M. TSMTL
Weather: Clear Air Temp. 28 Total Yardage Placed: 20 yards
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6"D x 12"H)
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq.in.) Load Type (PSI)
S.
1 5069 12/21/00 12/22/00 12/29/00 7 28.27 53,000 E 1875 --
2 5070 12/21/00 12/22/00 28 28.27
3 5071 12/21/00 12/22/00 28 28.27
4 5072 12/21/00 12/22/00 28 28.27
A B C D E �,,�pt��tu�s�ir��P�r��i
Reported To: W.J. M� itiQ;. nce Associates,
Kahn � 1
z D M4 �ers
CO ce
• Fie. �1
Cone Cone& Cone& Shear Columnar
Split Shear •
o
The above reported data is the property of the client. No reproduction of theabove ' {����`•'•���( a �, �����
S .,..•
Stateta without the sole M Materials Testing acceptssion of Tri-State no liability for work erxelcut dting Lab,by others.lnc. Sami H. Hajjar,P.E. ''+�jr/0N j;`�,
J{
NVLAP does not endorse the product of this re ort
IQ York City&Long Island Edison,NJ•Wallingford,CT a Dover,DE
"Put us to the test...and our 20 years of experience"
IRMATE
IESTWG Tri-State Materials Testing Lab Inc.
Connecticut Division
r- 121 "P"North Plains Industrial Road,Wallingford,CT 06492 9(203)949-7733 •Fax(203)949-7735
lee
son
Witte
immancm-armwamG
Client: W.J. Mountford, Co. Report#: 001
170 Commerce Way Date: 01/03/01
South Windsor, CT 06074
Project: Windsor Steel
CONCRETE FIELD DATA(ASTM C31,C143,C231,C173,C1064,C138,)
Truck Ticket Batch Disch. Samp. % Air Slump Cone. Unit WT Field Design
No. No. Time Time Time Cont. Inch Temp,F PCF Set# Strength PSI
110 147051 11:49 12:45 1:00 2.9 4.0 61 1-4 3000
Location(s)of Pour: Foundation wall on line C,columns 1 to 2&on column line 1 from line C to B.
Supplier: Tilcon Contractor: W.J.Mountford Inspector: Habib C. TSMTL
Weather: Clear Air Temp. 23 Total Yardage Placed: 9.5 Yards
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6"D x 12"H)
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq. in.) Load Type (PSI)
Lbs.
1 3321 01/03/01 01/04/01 01/10/01 7 28.27 78,000 E 2760 --
2 3322 01/03/01 01/04/01 01/31/01 28 28.27 104,000 B 3680 Yes
3 3323 01/03/01 01/04/01 01/31/01 28 28.27 106,000 C 3750 Yes
4 3324 01/03/01 01/04/01 01/31/01 28 28.27 108,000 D 3820 Yes
A B C D E
Reported To: W.J.Mountford,The L �� lnce Associates,
Kahn&Bayer Stru � 't��,
O~�` •tom T�.�.t�.J�. 'f�:�
t
Cone Cone& Cone& Shear Columnar -` • �► 'i
Split Shear IL
The above reported data is the property of the client. No reproduction of the
-`,ve data without the sole permission of Tri-State Materials Testing Lab,Inc Sarni H. Hajjar,P.E. 0
r.,
Mate Materials Testing accepts no liability for work executed by others h1 , al��
u f�N At
NVLAP does not endorse the product of thiggW York City•Lon Island•Edison,NJ Wallingford,CT Dover �ctEt�ti"�
g g
"Put us to the test...and our 20 years of experience"
'1Ri•STATE
IESTWG
s�'`a'� � Tri-State Materials TestingLab Inc.
Connecticut Division
121 "P"North Plains Industrial Road,Wallingford,CT 06492•(203)949-7733 •Fax(203)949-7735
1000-=000
r• •
1Nir =CW.ENOIIEWUM
Client: W.J. Mountford, Co. Report#: 001
170 Commerce Way Date: 01/03/01
South Windsor, CT 06074
Project: Windsor Steel
CONCRETE FIELD DATA ASTM C31 C143 C231 C173 C1064 C138
Truck Ticket Batch Disch. Samp. %Air Slump Conc. Unit WT Field Design
No. No. Time Time Time Cont. Inch Temp,F PCF Set# Strength PSI
110 147051 11:49 12:45 1:00 2.9 4.0 61 1-4 3000
Location(s)of Pour: Foundation wall on line C, columns 1 to 2&on column line 1 from line C to B.
Supplier: Tilcon Contractor: W.J. Mountford Inspector: Habib C. TSMTL
Weather: Clear Air Temp. 23 Total Yardage Placed: 9.5 Yards
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6"D x 12"H)
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq.in.) Load Type (PSI)
Lbs.
1 3321 01/03/01 01/04/01 01/10/01 7 28.27 78,000 E 2760 --
2 3322 01/03/01 01/04/01 28 28.27
3 3323 01/03/01 01/04/01 28 28.27
4 3324 01/03/01 01/04/01 28 28.27
A B C D E
Reported To: W.J.Mountford,The Lawrence Associates,
Cot .f�tructural Engineers
�►
Cone Cone& Cone& Shear Columnar y�� :•��� HA`f'�y.'�f�('J
Split Shear : r
The above reported data is the property of the client. No reproduction of the '-p
above data without the sole permission of Tri-State Materials Testing Lab,Inc. S 2194
.State Materials Testing accepts no liability for work executed by others.
NVLAP does not endorse the product of this re ort ! NAL too
I few York City•Long Island•Edison,NJ Walhngi�![t!a Dover,DE
"Put us to the test...and our 20 years of experience"
TRWTATE
,iloo
?� � Tri-State Materials Testing Lab Inc.
gConnecticut Division
121 "P"North Plains Industrial Road, Wallingford,CT 06492 •(203)949- 7733 •Fax(203)949-7735
ee
INMCTION-ENOMMOAG
Client: W.J. Mountford, Co. Report#: 003
170 Commerce Way Date: 03/22/01
South Windsor, CT 06074
Project: Windsor Steel
CONCRETE FIELD DATA (ASTM C31,C143,C231,C173,C1064,C138,)
Truck Ticket Batch Disch. Samp. % Air Slump Cone. Unit WT Field Design
No. No. Time Time Time Cont. (Inch) Tem ,F PCF Set# Strength PSI
l 31 148298 6:34 7:00 7:25 4.7 4.5 64 1-4 3500
Location(s)of Pour: Slab on grade for office building.
Supplier: Tilcon Contractor: W.J. Mountford Inspector: Habib C. TSMTL
Weather: Slight rain Air Temp. 36 Total Yardage Placed: 40 Yards
r' COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C391 (6"D x 12"H)
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq. in.) Load Type (PSI)
268 Lbs.
1 3393 03/22/01 03/23/01 03/29/Ol 7 28.27 89,000 B 3150
2 3394 03/22/01 03/23/01 28 28.27
3 3395 03/22/01 03/23/01 28 28.27
4 3396 03/22/01 03/23/01 28 28.27
A B C D E
Reported To: W.J. Mountford,The Lawrence Associates,
Kahn&Bayer��li � ers
Cone Cone& Cone& Shear Columnar �� ,,a='',.� a;ti��� •: �
Split Shear a '• '-' f' ;�
Tba above reported data is the property of the client No reproduction of the
data without the sole permission of Tri-State Materials Testing Lab.Inc. Sarni H. Hajjar, P.E. ;: ;••, ' '7' 4 �
Ty.�,tate Materials Testing accepts no liability for work executed by others '' C'°• C� ��G�.••�•���'
N v LAP does not endorse the product of thi /pal h`L���*�
SI' WYork City a Long Island Edison,NJ•Wallingford, CT a Dove , 11141N
"Put us to the test...and our 20 years of experience"
TESTING (,qe tic Tri-State Materials Testing� g Lab Inc.
Connecticut Division
121 "P"North Plains Industrial Road,Wallingford,CT 06492• (203)949-7733 Fax(203)949-7735
1 se0•s 00
� '°"""'vet►
INSPEcnoN-ENGINEERING
Client: W.J. Mountford, Co. Report#: 003
170 Commerce Way Date: 03/22/01
South Windsor, CT 06074
Project: Windsor Steel
CONCRETE FIELD DATA(ASTM C31,C143,C231,C173,C1064,C138,)
Truck Ticket Batch Disch. Samp. % Air Slump Conc. Unit WT Field Design
No. No. Time Time Time Cont. Inch Temp,F PCF Set# Strength PSI
131 148298 6:34 7:00 7:25 4.7 4.5 64 1-4 3500
Location(s)of Pour: Slab on grade for office building.
Supplier: Tilcon Contractor: W.J.Mountford Inspector: Habib C. TSMTL
Weather: Slight rain Air Temp. 36 Total Yardage Placed: 40 Yards
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6"D x 12"H)
Field# Seal# Date Date Date Age, Cross-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq. in.) Load Type (PSI)
268 Lbs.
1 3393 03/22/01 03/23/01 03/29/01 7 28.27 89,000 B 3150 --
2 3394 03/22/01 03/23/01 04/19/01 28 28.27 138,000 A 4880 Yes
3 3395 03/22/01 03/23/01 04/19/01 28 28.27 136,000 C 4810 Yes
4 3396 03/22/01 03/23/01 04/19/01 28 28.27 140,000 D 4950 Yes
A B C D E
Reported To: W.J.Mountford,The Lawrence Associates,
Kahn&Bayer Structural Engineer
M N E D T `,t�RZit�ilElfl.kl���/
,%0� CC N�4.�
Cone Cone& Cone& Shear Columnar
Split Shear
, A�•'T ,
• � .,. .may �:
The above reported data is the property of the client. No reproduction of the
above data without the sole pem»ssion of Tri-State Materials Testing Lab,Inc. Sami H. HaJar,P.E.
tate Materials Testing accepts no liability for work executed by others
NVLAP does not endorse the product of tl is re rt
I9ew Vork City •Long Island Edison,NJ Wallingford, CT •Dover,DE f'r%;,,�FtI61e�►t'w�'°
"PUT US TO THE TEST...AND OUR 20 PLUS YEARS OF EXPERIENCE"
�0`14'5G8 Tri-State Materials Testing Lab Inc.
Connecticut Division
121 "P"North Plains Industrial Road,Wallingford,CT 06492•(203)949 -7733 •Fax(203)949-7735
les2000
INSPECTION-ENGINEERING
Client: W.J. Mountford, Co. Report#: 007
170 Commerce Way Date: 04/20/01
South Windsor, CT 06074
Project: Windsor Steel
CONCRETE FIELD DATA(ASTM C31,C143,C231,C173,C1064,C138,)
Truck Ticket Batch Disch. Samp. % Air Slump Conc. Unit WT Field Design
No. No. Time Time Time Cont. Inch Temp,F PCF Set# Strength PSI
125 149144 6:01 6:40 6:50 -- 4.0 67 1-4 3500
434 149155 6:57 7:30 7:42 -- 4.5 65 5-8 3500
122 149168 8:03 8:29 8:35 -- 4.25 60 9-12 3500
Location(s)of Pour: Floor Slab
Supplier: Tilcon Contractor: W.J. Mountford Inspector: Jay Thomas TSMTL
Weather: Sunny Air Temp. 40 Total Yardage Placed: 330
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS(ASTM C39) (6"D x 12"H)
Field# Seal# Date Date Date Age, Cr6ss-Sect. Total Fracture Strength Complies
Cast Received Tested Days Area,(sq. in.) Load Type (PSI)
387 Lbs.
1 7513 04/20/01 04/21/01 04/27/01 7 28.27 106,000 D 3750 --
2 7514 04/20/01 04/21/01 28 28.27
3 7515 04/20/01 04/21/01 28 28.27
4 7516 04/20/01 04/21/01 28 28.27
5 1 7517 04/20/01 04/21/01 04/27/01 7 1 28.27 108,000 C 3820 --
6 7518 04/20/01 04/21/01 28 28.27
7 7519 04/20/01 04/21/01 28 28.27
8 7520 04/20/01 04/21/01 28 28.27
9 7521 04/20/01 04/21/01 04/27/01 7 28.27 112,000 E 3960 --
10 7522 04/20/01 04/21/01 28 28.27
11 7523 04/20/01 04/21/01 28 28.27
12 1 7524 04/20/01 1 04/21/01 1 28 1 28.27
A B C D E
Reported To: W.J.Mountford,The Lawrence Associates,
Kahn&Bayer Structuragi0g �s
O%V,%ak 130 lid V .>ftv
Cone Cone& Cone& Shear Columnar •. �► ^- ,!;
Split Shear co 'nt^� ;: .4' .'.'".
The above reported data is the property of the client. No reproduction of the
Iahaye data without the sole permission of Tri-State Materials Testing Lab.Inc Sami H. Ha jar,P.E. f �;o,���.�,u ,V�
ate Materials Testing accepts no liability for work executed by others '`��� •,(/CF
NVLAP does not endorse the product of'N&WP%rk City •Long Island •Edison,NJ Wallingford,CT •Dover, iarq N
"PUT US TO THE TEST.—AND OUR 20 PLUS YEARS OF EXPERIENCE"