STRUCTURAL STEEL SHOP INSPECTION REPORT
40/c v i
i •
CLIENT: Savings Bank of Rockville PROJECT NO.-?1 1 ; ,:C+�`
PROJECT: Savings Bank of Rockville REPORT NO. : 041
INSPECTOR: Mark Richardson DATE: 06/05/00
SUBJECT: Shop Inspection RE: BOCA PAGE: 1 of 5
Section 1705
A shop inspection was performed on this date at the fabrication
plant, Leo Chasse, Inc . , Manchester, NH, for the purpose of
ascertaining that applicable codes and specifications were being
implemented during fabrication for the project . The following
specifications and codes are being applied on this project :
Project Specifications Division 5-Metals (Structural Steel) ; AISC
Manual of Steel Construction; The American Welding Society Code
D1 . 1 Edition for Structural Welding; ASTM Standards for Metals
Conformance and Non-Destructive Testing; and the (SSPC) Steel
Structures Painting Council, Vols . 1 and 2 for Steel Cleaning and
Painting.
The writer was at the above-stated facility to performed a Part A
Shop Inspection and to monitor shop production, i .e. dimensional
accuracy and welding. The writer met with Mr. Matt LaVoie, Vice
President and Mr. Howe, Manager. Mr. LaVoie and the writer then
met with the shop foreman in the shop. The writer received a set
of prints (shop drawings) from the shop foreman. The writer then
started to go over the questions for the shop evaluation report
which is attached.
The shop is cluttered and poorly lit . Equipment is greasy and
crowded with material, i .e. saw, angle brake both of which were
not in use during this visit . Assorted power and hand tools were
in fair to poor condition.
Dimensional accuracy and welds were checked using shop drawings
(not approved) , fillet weld gauges and AWS D1 . 1, Table 6 . 1 for
visual inspection acceptance criteria.
Shop welders were using Lincoln Ideal Arc DC-400 power source,
runs at 200 DC amps and 30 volts; wire feeder is LN-7, 18-20 ipm;
shielded gas is 75% argon and 25% carbon dioxide and runs at 40
cfm which leaves an excessive amount of splatter.
Test reports may not be reproduced except in full with approval of IMTL. All results relate only to the items tested.
Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government.
TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
Portland Cement Concrete Soils Steel Building Products Bituminous Concr to
Savings Bank of Rockville
Project No. : 4741 Report No. : 041
June 5, 2000 Page : 2 of 5
The writer placed a call to Mr. Dawson of Russell Dawson
Engineering to discuss missing welds on Piecemark 5B12 . Weld
called for was 2" every 6" on SB12 and not in accordance with AWS
D1 . 1, Section S-5 . 13 for compliance with design, size, length and
location. Mr. Dawson was also informed of added welds on
piecemarks and splatter. Mr. Dawson stated that additional welds
were acceptable and welds off location are satisfactory as per a
telephone conversation on June 5, 2000 .
The writer also received copies of welders qualification records.
Reference the attached shop inspection sheet for piecemarks
inspected and the disposition of each.
pc : Joseph Jeamel, Savings Bank of Rockville / Robert Dawson,
Russell Dawson / John Collins, S . Windsor Building Official
bh
LLCi LI'dLJ"IV I
3 =5TlNV _
- -'Irs?--cT_crr or
==1, W_
:ram
CA -
. .
!--am [i s;rd te;cw are in ==E i anca With s;,ec:�1 c3";,n ;•r�i r�n;s
as Chey Perm i n to:
A - Material Preparation
C - (:!!ding C:nfar ma N10,r*+
;
I � IvlLf I
�Jlei ��
I
t I I
II '
7C � I1 V00"Iv-1 I
/01
u
I I I
rZ��,- Imo:�/�i �,. L •1„�
U ,
I � I
C_-{—�;,�„ �)'� ��, c:•�,;,�.:..'C {T�
I I I I
Savings Bank of Rockville
isrr_.ar Project No. : 4 741 Report No. : 041
June 5, 2000 Page : 3 of 5
- SHOP SPECIAL INSPECTION EVALUATION REPORT-
PART"A"
FABRICATION PLANT NAME: Leo P.Chasse, Inc.
DATE: June 5, 2000
LOCATION: 62 Sample St.,2nd Floor,Manchester,NH
PROJECT: Savings Bank of Rockville
1) Does the Company have an in-house Quality Control Manual? NO
2) Does the Shop have any written shop or inspection procedures? NO
Yes they do
I Bolting NO
H Inspection NO
III Receiving NO
IV Painting NO
V Welding NOs
3) What type of welding is performed in the shop?
SMAW GMAW Yes FCAW SAW
4) Are the shop welders AWS certified?
Certifications are not up to date.
I Updated or employment records current every 6 months? NO
5) Do the shop welders have fillet gauges? NO
I Cleaning tools? YES
6) Does the shop have in house inspectors? NO,FOREMAN
I Inspections on fabricated prices are performed by FOREMAN
II Are any type of inspection records maintained? NO
Savings Bank of Rockville
Project No. : 4741 Report No. : 041
June 5, 2000 Page: 4 of 5
-PART"A"CONTII�IUED -
7) Does the shop have painting and sandblasting capabilities? Painting is done with roller and
brush.
8) Are material certifications kept on file? NO
9) How are drawings received and distributed Through the office of the Vice President.
I How are revisions handles on drawing distribution?
Same As Above
10) Are project specifications kept on file? NO
11) Condition of shop tapes, squares,tools,etc: Fair to Poor
12) Does the shop have current issues of the following?
AWS D 1.1 Yes AISC MANUAL 9TH EDITION Yes
ASTM 1.04 Yes AWS A2.4 Yes
13) Is the shop Foreman familiar with basic fabrication attributes?
I Fit up tolerances Yes
II Weld rod controls Yes, but no oven.
III Visual weld quality Yes
IV Material grade markings Yes
V Preheat temperatures Yes,not all welders have temp sticks or knowledge.
VI A572 weld requirements Yes
14) Are shop welders and fit up personnel familiar with above listed attributes (Item 13)? NO
1 5) Are welding procedures made available to the welders? NO
16) Are the shop welding machines calibrated? NO
Reference the attached report.
Savings Bank of Rockville
Project No. : 4741 Report No. : 041
June 5, 2000 Page : 5 of 5
NDEPENDENT MATERIALS TESTING
57 N. WASHINGTON STREET
P.O. BOX 745 LABORATORIES, INC, >-
PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) 747-645.�5 :i
NVLAP Accredited - =
for Construction Testing Services
STRUCTL"R.AL STEEL SHOP INSPECTION REPORT = ~-;= r•. _
CLIENT: Savings Bank of Rockville PROJECT NO. :�'��,, aaL�'����`��
PROJECT: Savings Bank of Rockville REPORT NO. : 042
INSPECTOR: Mark Richardson, CAWI 99080132 DATE: 06/07/00
SUBJECT: Shop Inspection RE: BOCA PAGE: 1 of 2
Section 1705
A shop inspection was performed on this date at the fabrication
plant, Leo Chasse, Inc. , Manchester, NH, for the purpose of
ascertaining that applicable codes and specifications were being
implemented during fabrication for the project . The following
specifications and codes are being applied on this project :
Project Specifications Division 5-Metals (Structural Steel) ; AISC
Manual of Steel Construction; The American Welding Society Code
D1 . 1 Edition for Structural Welding; ASTM Standards for Metals
Conformance and Non-Destructive Testing; and the (SSPC) Steel
Structures Painting Council, Vols . 1 and 2 for Steel Cleaning and
Painting.
The writer was at the above-stated facility to monitor ongoing
work. Mr. Matt Vavoie was informed of the writer' s presence on
site. The writer then met with Mike, the shop foreman, to review
piecemarks rejected on a previous inspection (June 5, 2000) .
During the day dimensional accuracy was checked and welds were
inspected using shop drawings, fillet weld gauges and AWS D1 . 1,
Table 6 . 1 for visual criteria and Section 5, 5 . 13 for compliance
with design. Welds were checked for size, length and location.
Reference the attached shop inspection sheet for piecemarks
inspected and the disposition of each.
pc : Joseph Jeamel, Savings Bank of Rockville / Robert Dawson,
Russell Dawson / John Collins, S . Windsor Building Official
bh
Test reports may not be reproduced except in full with approval of IMTL. All results relate only to the items tested.
Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government.
TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
Portland Cement Concrete Soils Ste I Building Products Bituminous Concrete
1i`avLi G1ldLJL—I V I
_ :NS?-CT:C'r p�
r
I �---- _=�,.'��'�' -V'__�- •�/�_ � �+ (� •� Vic• ; ���;'►l;� - .: -
-�TCT iCC T=Cti
The i: [fisted bet:v are ==L;area w4
as L�eS' ?er=ain to: �n s:•e-:�1c3t:�-s ;ressm•s
A • Xa:ar?at Preparatfen
3 - O i ma i=a t Amara '
cY v-1S'.'?_
C - VeE_irg C:r�fcr:ac�cr
NL:
p.
-- 3 � _ :rs/?"•'*antis
'A
E l f l l
'J ;�C-
I I I E
I
If
I I I I I
I l I I I
! l I I
l l l l l
I I l •
I i I I
I l l l !
I l i I
l l l l l
I E l E
I I I I I
Savings Bank of Rockville
Project No. : 4741 Report No. : 042
June 7, 2000 Page: 2 of 2
NDEPENDENT MATERIALS TESTING
57 N. WASHINGTON STREET
P.O. BOX 745 LABORATORIES,
PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860)
NVLAP Accredited for Construction Testing Services
STRUCTURAL STEEL SHOP _NSPECTICN REPORT
CLIENT: Savings Bank of Rock-,ille PROJECT
PROJECT: Savings Bank of Rockville REPORT NO. : f �j�06 at
INSPECTOR: Mark Richardson, CAWI 99080132 DATE: 06/12/00
SUBJECT: Shop Inspection RE: BOCA PAGE: 1 of 2
Section 1705
A shop inspection was performed on this date at the fabrication
plant, Leo Chasse, Inc . , Manchester, NH, for the purpose of
ascertaining that applicable codes and specifications were being
implemented during fabrication for the project . The following
specifications and codes are being applied on this project :
Project Specifications Division 5-Metals (Structural Steel) ; AISC
Manual of Steel Construction; The American Welding Society Code
D1 . 1 Edition for Structural Welding; ASTM Standards for Metals
Conformance and Non-Destructive Testing; and the (SSPC) Steel
Structures Painting Council, Vols . 1 and 2 for Steel Cleaning and
Painting.
The writer was at the above-stated facility to monitor ongoing
work. The office was informed of the writer' s presence on site.
Upon walking into the shop the writer noticed that splatter on
columns waiting to be loaded was not cleared and members were
painted. Undersized welds were not repaired. The writer asked
the shop foreman if welders have welding gauges . The foreman ask
if they needed them? The writer used the gauge to demonstrate to
the foreman that columns being worked on have undersized welds
according to shop drawings. The foreman was informed that
splatter and undersized welds must be repaired.
Beam 4B3 was detailed to have 2-1/2x2-1/2 angles welded to
underside of flange. The Foreman welded them to the web and
underside of flange. Dimensional accuracy and welds were
inspected during the course of the day using fillet weld gauges,
shop drawings (not approved) and AWS D1 . 1, Table 6 . 1 for visual
criteria and Section 5, 5 .13 for compliance with design, weld
profiles 5.24, --€lush surfaces 5.24 .4 .1. , Section 5, 5 .30 .2
cleaning of completed welds, which was not done. Weld all the
way around are undersized or not complete. Reference the
attached sheet for members inspected and the disposition of each.
pc : Joseph Jeamel, Savings Bank of Rockville / Robert Dawson,
Russell Dawson / John Collins, S . Windsor Building Official
bh
Test reports may not be reproduced except in full with approval of IMTL. All results relate only to the items tested.
Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government.
TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
Portland C ment Concrete Soils Steel Building Products Bituminous Concrete
3�j T IN
i-= C:s;ad het_-w ars in ;:arc= wig as �tr ?�^.�i of t0: '' `• -�-,,'mart t..:
3 Z i mess:.era l Ac=.-3c• _
� I I
i I I La ,
a, C. �3 Z
I
V kJIVLIS .
I - ►z
—
y�z. CM . spt
el _/
lSc s l I f LOO-1 c.,
!
I { ! I
!
! I IV3131
!
ltee-
—Savings Bank of Rockville
Project No. : 4741 Report No. : 047
June 12, 2000 Page: 2 of 2
NDEPENDENT MATERIALS TESTING
57 N. WASHINGTON STREET
P.O. BOX 745 LABORATORIES,
PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860)
NVLAP Accredited for Construction Testing Services _ ✓_=-4 _
STRUCTURAL STEEL SHOP INSPECTION REPORT
CLIENT: Savings Bank of Rockville PROJECT NO.
PROJECT: Savings Bank of Rockville REPORT NO. : 048
INSPECTOR: Mark Richardson, CAWI 99080132 DATE: 06/14/00
SUBJECT: Shop Inspection RE : BOCA PAGE: 1 of 4
Section 1705
A shop inspection was performed on this date at the fabrication
plant, Leo Chasse, Inc. , Manchester, NH, for the purpose of
ascertaining that applicable codes and specifications were being
implemented during fabrication for the project . The following
specifications and codes are being applied on this project :
Project Specifications Division 5-Metals (Structural Steel) ; RISC
Manual of Steel Construction; The American Welding Society Code
D1 . 1 Edition for Structural Welding; ASTM Standards for Metals
Conformance and Non-Destructive Testing; and the (SSPC) Steel
Structures Painting Council, Vols . 1 and 2 for Steel Cleaning and
Painting.
The writer was at the above-stated facility to monitor ongoing
work. During the course of the day dimensional accuracy and
welds were inspected using shop drawings, fillet weld gauges and
AWS D1 . 1 Table 6 . 1 for visual criteria, and 5 . 13 for compliance
with design. Welds were inspected for size, length and location.
The writer again asked Mike, Shop Foreman, to have welders check
weld size. Members inspected have undersized welds . The writer
informed Mr. Matt Lavoie that welds were rejected due to
undersized welds and weld splatter. This matter was discussed
with the shop foreman and Mr. Matt Lavoie on previous
inspections.
Columns 14C1 (2) , 15C4 and 15C5 have an attachment (s) 15M1 which
is a w6x25 . The writer called Mr. Dawson of Russell Dawson
Engineers . Shop drawings show no 15M1 . The writer called Tony
from Steel Fab and was informed that this should have been a T-
shape not a W-shape.
Test reports may not be reproduced except in full with approval of IMTL. All results relate only to the items tested.
Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government.
TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
Portland Cement Concrete Soils Steel Building Products Bituminous Concrete
Savings Bank of Rockville
Project No. : 4741 Report No. : 048
June 14, 2000 Page: 2 of 4
Due to the need to keep the 3" dimension, Mr. Matt Lavoie talked
with Tony from Steel Fab and gave the writer a repair detail
which is awaiting approval (attached) . The writer informed Mike,
Shop Foreman, of what was going on as far as repairs . Mike' s
response was to let them fix it in the field. Mr. Lavoie stated
he would talk to shop personnel .
pc : Joseph Jeamel, Savings Bank of Rockville / Robert Dawson,
Russell Dawson / John Collins, S . Windsor Building official
bh
INDEPENDENT
STING
y
i. a i_=^s Cis;r,cf =e!:v are in Uzi°arca v .
as ;:tey per:a i n "0:
A - Ya_:rial ?re�aCa;iul
3 V mL—Ms i cra t Ac`.-IC - _
.....g Ccn,crrr__ �.,
7 C / f a� f ✓ f ,/ 1 C.iC ;�t1� it �' S: �:re, i�4�.�. � f.1 �4v3
m•an. I.
swc
K h.
I I I E
I
I I a
= I I I ! f
I I I I
I { II f
I l l l f
I I f l f
I l l l f
I I f ! I
I i i I
�/JG',c,,�C �i Savings Bank of Rockville
Project No. . 4741 Report No. : 048
June 14, 2000 Page : 3 of 4
LEO F CHASSE CO . -- . PROJECT kv ^ � 1
,
-
STRUCTURAL AND MISC. STEEL FABRICATION AND ERECTI N Oft
62.4APL.S STREET,2N0 FLOOR PH.(6 )634.5030
MANCHESTER,NH 03103 FAX(6 3)634-3053
�-- -;- -- DATE j
( V
ku
wNC--,W_ _
�x25 tow?(
Savings Bank of Rockville
�— Project No. : 4741 Report No. : 048
June 14, 2000 Page: 4 of 4
NDEPENDENT MATERIALS TESTING
57 N. WASHINGTON STREET
P.O. BOX 745 LABORATORIES, INO
PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) 747_X455:.==
NVLAP Accredited for Construction Testing Services
STRUCTURAL STEEL SHOP INSPECTION REPORT = _
uik
CLIENT: Savings Bank of Rockville PROJECT NO:��,;`' '�4 �,,'-' ,0`�
�''//rl,,111110%
PROJECT: Savings Bank of Rockville REPORT NO. : 049
INSPECTOR: Mark Richardson, CAWI 99080132 DATE: 06/22/00
SUBJECT: Shop Inspection RE: BOCA PAGE: 1 of 2
Section 1705
A shop inspection was performed on this date at the fabrication
plant, Leo Chasse, Inc. , Manchester, NH, for the purpose of
ascertaining that applicable codes and specifications were being
implemented during fabrication for the project . The following
specifications and codes are being applied on this project :
Project Specifications Division 5-Metals (Structural Steel) ; AISC
Manual of Steel Construction; The American Welding Society Code
D1 . 1 Edition for Structural Welding; ASTM Standards for Metals
Conformance and Non-Destructive Testing; and the (SSPC) Steel
-- Structures Painting Council, Vols . 1 and 2 for Steel Cleaning and
Painting.
The writer was at the above-stated facility to monitor ongoing
work. During the course of the day dimensional accuracy and
welds were inspected using shop drawings, -fillet weld gauges and
AWS D1 . 1 Table 6 . 1 for visual criteria and 5 . 13 for compliance
with design. Welds were inspected for size, length and location.
Reference the attached shop inspection sheet for piecemarks
inspected and the disposition of each.
The writer met with the shop foreman and asked if any repairs
were made. Columns were shipped to the field without repairs
being made .
pc : Joseph Jeamel, Savings Bank of Rockville / Robert Dawson,
Russell Dawson / John Collins, S . Windsor Building Official
bh
Test reports may not be reproduced except in full with approval of IMTL. All results relate only to the items tested.
Test reports must not be used by client to claim product endorsem nt by NVLAP or any agency of th US Government.
TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
Portland Cement Concrete Soils Steel Building Products Bituminous Concrete
. • iiL�L_J A—A is•..� �.a r
�-
� iI G
i �
r+�7-7 7n
CAT
v �
T.10 ;s::c: =ej:v are 'arc Wi
as ..a x:-:ain �=�'tcsc:�� rM_
.s
A !1a;sr?al arr,:an;;crs
3 • Ate;;icy
C - w!j si rq C of: =rzaLOOP-
A ! 3 ---
-- C _ ors/?-^arfs
a I s I �I Rom- E., �..
I I
I I I E
! I i
I !
I
I f ! I
I � Co DES 4. rk3 L2Z
IMA
I
I
I
f
I II
I
f l l
Savings Bank of Rockville
Project No. : 4 741 Report No. : 049
June 22, 2000 Page: 2 of 2
NDEPENDENT MATERIALS TESTING
57 N. WASHINGTON STREET
P.O. BOX 745 LABORATORIES, INC.
PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) 747-6r�
NVLAP Accredited for Construction Testing Services .` s __
STRUCTURAL STEEL INSPECTION REPORT
-00 f
CLIENT: Savings Bank of Rockville PROJECT fd y�•�
PROJECT: Savings Bank of Rockville REPORT NO. :
INSPECTOR: Mark Richardson, CAWI 99080132 DATE: 06/26/00
SUBJECT: Field Verification Inspection PAGE: 1 of 2
A field inspection was performed at the above-referenced project
today. The purpose of this inspection was to verify that
completed work was performed utilizing the engineer-approved
drawings, the project specifications, and the American Welding
Society Structural Welding Code D1 . 1.
The writer was on site for a follow-up inspection on members
fabricated in the shop (rejectable) and shipped to the field.
Reference the attached sheet for non-conformities.
At or near the end of the day the QC Inspector for Steel Fab,
Moe, and this writer had a phone conversation. These items may
or may not be repaired by the erector in the field. As soon as
Moe knows IMTL will be advised.
pc: Joseph Jeamel, Savings Bank of Rockville / Robert Dawson,
Russell Dawson / John Collins, S . Windsor Building Official
bh
Test reports may not be reproduced except in full with approval of IMTL All results relate only to the items tested.
Test reports must not be used by client to claim product endorsement by NVLAP or any agency of th US Government.
TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
Portland Cement Concrete Soils Steel Building Products Bituminous Concrete
l
INDEPENDENT MATERIALS TESTING LABORATORIES, INC.
P. O. BOX 745
57 NORTH WASHINGTON STREET
PLAINVILLE, CT 06062
Slaul - 011161a11d1n(j Nmn-Conf'ar1111llos
.1Im Howard
Structural Steal & Weialnu Inspector
CAWI # 99080304
PROJECT: SAV"M?s .6,qh k
c;q"' 2GC.a l,-r t l-C
LOCATION Oil NECEMARK: Awakill(l
Dale 11151lecled Dale a1 nail) Fntlinel)l's Re1uul 110m
Field (F) and Rejected flowwk Accepted Decision Number Number Comillents
-
/�"C f ��•t;c,ksl ✓ S4 olo c ars
(106
a 7 1 k rs t Ji ZG 4i4v
�� C, �_.�./s►tcc-k6t
Savings Bank of Rockville
'-'Project No. : 4 741 Report No. :
050
June 26, 2000 Page : 2 of 2
NDEPENDENT MATERIALS TESTING
57 N. WASHINGTON STREET
P.O. BOX 745 LABORATORIES,
PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) 747
NVLAP Accredited for Construction Testing Services =
STRUCTURAL STEEL INSPECTION REPORT - -
CLIENT: Savings Bank of Rockville PROJECT NO. �'� -
g
a
PROJECT: Savings Bank of Rockville REPORT NO. : 051
INSPECTOR: Mike Brault, CWI 91100111 DATE: 07/07/00
SUBJECT: Field Verification Inspection PAGE: 1 OF 3
A field inspection was performed at the above-referenced project
today. The purpose of this inspection was to verify that
completed work was performed utilizing the engineer-approved
drawings, the project specifications, and the American Welding
Society Structural Welding Code D1.1.
Field verification inspections were performed on structural steel
framing on the Second Floor as follows :
Column plumbness verified for conformance with AISC 1 :500
tolerance on columns from the First Floor/slab on grade to Second
Floor framing from B to M Lines, 1 to 14 . Columns were found
plumb within AISC tolerance.
Column base anchor bolts were surveyed for completion and snug
tight anchor bolt nuts. Several locations were found loose or
incomplete and insufficient thread projection, i.e. short anchor
bolts were noted at E-8 (11C8) and K-11 (16C2) . Both require
engineer-approved field repair.
Visual weld inspections of field welded floor joists on the
Second Floor framing and bridging welds were found acceptable at
this time.
The writer was informed today that while tensioning the Second
Floor framing bolted field connections, i.e. double connection
angle knife connections, about 40% of ASTM A325 high strength
tension control bolts were stripping out. This condition was
occurring in bolts with lengths of 2-1/2" and 2-1/4" . The writer
witnessed several field connections being tensioned and noted the
same results. The erector used three (3) separate tension
control devices (TC guns) and the results were the same. Mr.
Maurice Grenier, Steel Fab' s QC Manager, arrived with their
Skidmore Whilhelm device with results detailed on the attached
sheet .
Test reports may not be reproduced except In full with approval of IMTL All results relate only to the Items tested.
Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government
TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
Portland Cement Concrete Soils Steel Building Products Bituminous Concrete
Savings Bank of Rockville
Project No. : 4741 Report No. : 051
July 7, 2000 Page : 2 of 3
Steel Fab has contacted the manufacturer in regards to this
condition as well as Mr. Bob Dawson of Russell Dawson Engineers
who was informed of results of bolted connections.
This task was performed by Steel Fab and replacement bolts were
fully tensioned and found satisfactory upon visual inspections at
knife connections on a majority of field connections .
pc: Joseph Jeamel, Savings Bank of Rockville / Robert Dawson,
Russell Dawson / John Collins, S . Windsor Building Official
bh
WAAMWAA ssaa aa:v
001
_ Savings Bank of Rockville
..•r•.r•,..•....�J w.�•�w. �Mr1{�1�M1.rKr U�L��t 1�Y�M1�!!1r110iL�.�17
A��: M / �� � � vL7Project No. : 4741 Report No. : 051
July 7, 2000 Page: 3 of 3
STEEL FAB INC. ":_
33 Wtcheli Drive RTMIFIMMIT 1CN
M"HESM,CT 06M
�860y 645�0022 h PRwr NAME RATE RATE TAME
• FAX 1860? 645-688I
1 '
IFA
V I+V W /� cc 47
1 � �
/e. C
Owr �e p
Field Repot!Work Done O L - rc—S 7—
-, t!LE r T' t.J r4X rt 6 To . 1j .-._. .Q. -...._S1 r L _moo comp v c
.._n AJ A 59 TrvSi o C.a
�ise�-roit A ,ram 7rtfr47` So,ti or.-.Ln1., , _.. II,�0T
r —
1
-- . .fir S nr h PPf M!;- . _o�•f wN ... ��T'1', Ri�E C. -
u L Te1V.f f o N
_�... •_- LAt- mL1MC&JC _L 3!!� 8 CA C.16A t��A/
.�..._... �.._.._...Y.�. .__ -ZI.X 0 L7-S
Of I sta.
0. t ry
!2fccr WITH
&r...�c..a —&T—AL. .M.r t: , r v m . . 2$,_000 (-z-z
---.— 'emu .c, CK of re1vU R AJ jCo&
LITRb o cr/�� IA.rC, pcyvn
mac--....12 .1Qs1s. ts-� �` i�,�w S.QN _ 'vG r Alee5e T..
-r v 0 ....&�O__.r S A/A .•. 00 _.P. ... fl �e �Y
a�..
&ter y -r-« )o14 l xl c T"S.
lVON
CRpK1�
i
r
NDEPENDENT MATERIALS TESTING
57 N. WASHINGTON STREET
P.O. BOX 745 LABORATORIES, INC. ►►il�ll,,,,
PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) 747- R lop
5 �c. FCC.
NVLAP Accredited for Construction Testing Services :���
_ o A.
STRUCTURAL STEEL INSPECTION REPORT -
CLIENT: �0
Savings Bank of Rockville PROJECT NO.'I�F.4'
�
PROJECT: Savings Bank of Rockville ��''��tttt►�►►����
REPORT NO. : 053
INSPECTOR: Mike Brault, CWI 91,00111
DATE: 07/07/00
SUBJECT: Field Verification Inspection PAGE:
1 OF 5
A field inspection was performed at the above-referenced
project
today. The purpose of this inspection was to verify
completed work was performed utilizing the engineer-approvedoved
drawings, the project specifications, and the American Welding
Society Structural Welding Code D1.1. Welding
Field verification inspections were performed on structure
framing on the Second Floor as follows: 1 steel
Second Floor 26-gauge metal form deck was inspected f
Lines B to M, 1 to 4 for proper p from Column
conformance with Steel Fab's deck puddle
welding ' spacing and
satisfactory at this time. g Deck was found
Welding of dowels to parameter angles was completed b
erector at the Second Floor framing. Y the
information exist on these dowels as far as a spacing or drawing
welding requirements shown on Steel Fab' s or structural rawings.
drawings.
Seated beam connections: roll clip angles have been field-welded
and are satisfactory at this time. Bottom flange bolts in seate
connections still remain loose at quite a few locations. Columns
J-1 and E-14 are still missing bolts . The Construction Manager
and Erector were shown both locations for remedial work.
Second Floor beam connection of 2B2 and 3B4 bolts were tighten
to a snug-tight condition with plies in full contact g ed
connection) verified by the writer. (bearing
Grenier was on site today. The writerteel Fab' QC Manager, Mr.
beam connections which require an approved 1sketc out field welded
ons
at the Second and Third Floor framing. Mr. Greniero will se expedite
the field weld sketches and submit them through channels
required. as
Test reports may not be reproduced except in full with approval of IMTL. All results relate only to the items tested.
Test reports must not be used by cli nt to claim product endorsement by NVLAP or any agency of th US Government.
TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
Portland C m nt Concrete Soils Steel Building Products Bituminous Concrete
Savings Bank of Rockville
Project No. : 4741 Report No. : 053
July 11, 2000 Page: 2 of 5
The writer generated an ongoing steel items list which details
incomplete and remedial areas which need to be addressed by Steel
Fab.
At Third Floor field bolted connections the writer noted today
that the same situation is occurring with ASTM A325 tension
control bolts. During tensioning by the erector bolts are
continuing to strip prior to the tension control splines snapping
off. Bolts at this elevation will also have to be replaced by
Steel Fab.
pc: Joseph Jeamel, Savings Bank of Rockville / Robert Dawson,
Russell Dawson / John Collins, S . Windsor Building Official
bh
INDEPENDENT MATERIALS TESTING LABORATORIES, INC.
P. 0. BOX 745
57 NORTH WASHINGTON STREET
PLAINVILLE, CT 06062
Steel - Mike
Structural Steel $ Welding Ins ec oir
CWI #9110011 1
PROJECT: Vi
LOCATION
OR PIEA
ARK:
Awaiting
Data Inspected Date of Date Enoineer's Report Item
Field (F) and Rejected Rework Accepted Decision Number Number
Comments
% 7
� U s
Z 7
03
03
------------
Savings Bank of Rockville
Project NO. : 4741 Report No. : 053
July 11, 2000 Page: 3 of 5
4 001
IL
F"�CA*I FAX NO.
Jul. 12 2WO 01:4spM p,
/o : Mrl�E <MTL a `
rw(fM • M o c 6r�2 cvfevz
PENSION CONTROL BOi:LTING , INC .
TEL : 817 1 822 - 6537 FAX :; 603 1 S47-6698
FACSIMILE'I'RANSUITTALAHZET
Tot DRp
+aceroc wog G=c WIl
coje&N►: E72E
SOME ftb,11W. 7/l Q0
FAZE -- - FcT,I.NQ.CPPAG=arc mim covm-
MOMS NV�3s1rs fitlysNta MJ7��:
As I m6ndOmW ding our eaMw telephone=nversed6n,these in not a probiom with any of
the•T C Bolts Ups wed off when lhey WOM hNbUnd In the steei stsueWre
I
AEtl>tougb it may seesms Rlce serious prvbtean,it Is Ohl a vary b*natkW feature of the T C
soft. You can't over tenWon a T C Bolt during lnstalladm if a bait starts to elor4puk either
the lluwads wW amp or the bait will o"iUmm to soafth until id breolat Please tools at the
atbched drawing for a clesrsr>eacplanrrtloEL
With stnulm d A32S aftucttsmi bolls.an�ortgatrd bold eon br sett in it:!conrrv�ion. when
worker SWps 1'l timing with fto kapact tsreae , ire is no%my of imo% tg if a summand
A3?.S has been overtrnraoned vn'Uwut removing it flf 'tfe�a-nR®clian and efieda'ng?t.
The T C Bolt is diffemaL The w0dw has no oottaL Ws a cailbrafed bak if the butasw
-bopped dgitming before the tip ou the bolt had twfslpd off,the p[essnts of the tip would be
an ludic tia n,to the worker,the#the bolt Wd not baWfully d0tatud.
It you iunte any qposftfm or requir+t any addllFonai=jisftncs,Please CWtact we at your
convealtmlo�.
i
; I
I
i
I
I
' I
� I
Savings Ban of Rockville 053
k
Project No. : 4741 Report No. :
July ill 2000 Page: 4 of 5
4 002
• f
RCM FAX NO. Sul. 12 2000 01:S3AM p1
• � � �c 2 0 � 2
The drawing below is a rough graph of the failure curve of an A325 structural bat
Once the bolt reaches its actual ultimate tensile strength[A), If you continue
the tightening,it vall elongates until it breaks or the threads strgp.
�r A
i
' ► I
o
� a
i
. I
1
. 1
Savings Bank Of Rockville
Project No. : 4741
July 11, 2000 Report No. : 053
Paget 5 of 5
NDEPENDENT MATERIALS TESTING
57 N. WASHINGTON STREET
P.O. BOX 745 LABORATORIES, INC.
r_ PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) 747-6455
NVLAP Accredited for Construction Testing Services
STRUCTURAL STEEL INSPECTION REPORT
CLIENT: Savings Bank of Rockville PROJECT NO. : 4741
PROJECT: Savings Bank of Rockville REPORT NO. : 052
INSPECTOR: Mike Brault, CWI 91100111 DATE: 07/10/00
SUBJECT: Field Verification Inspection PAGE: 1 OF 2
A field inspection was performed at the above-referenced project
today. The purpose of this inspection was to verify that
completed work was performed utilizing the engineer-approved
drawings, the project specifications, and the American Welding
Society Structural Welding Code D1.1.
Field verification inspections were performed on structural steel
framing on the Second Floor as follows:
The writer arrived on site to obtain a resolution to the ASTM
A325 high strength tension control bolt issue with 2-1/4" and 2-
1/2" 3/4" bolts, Lot Nos. 981210 and 81119008 noted in field
report dated July 7, 2000 .
Mr. Bob Dawson of Russell & Dawson Engineers and Steel Fab' s QC
Manager, Mr. Maurice Grenier, reached a resolution on field bolts
per our verbal conversations between Mr. Dawson and Mr. Grenier.
Mr. Dawson felt that all bolts that had stripped out during
tensioning should be removed and replaced with new A325 bolts .
This task was performed by Steel Fab and replacement bolts were
fully tensioned and found satisfactory upon visual inspections at
knife connections on a majority of field connections .
Test reports may not be reproduced except in full with approval of iMTL. All results relate only to the items tested.
Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government.
TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
Portland Cement Concrete Soils Steel Building Products Bituminous Concrete
Savings Bank of Rockville
Project No. : 4741 Report No. : 052
July 10, 2000 Page: 2 of 2
Seated connections still require bolts to be installed throughout
the Second Floor framing. The writer informed the erector of
this.
Beam seat stabilizer angles, i .e. roll clips, were being welded
at the Second Floor framing today but were not all completed.
Welding on the Second Floor metal deck was also in progress
today. 26-gauge form deck was being puddle welded to substrate
members with the use of welding washers as required. Spacing was
being adhered to for welding patterns .
Connection of beams, Beams 4B9 to 5B11 just east of K-11, Second
and Third Floors, and at Beams 6B8 to 3B2, Second and Third
Floors were f ield-welded by the erector due to bQ�►�''�', %ci �%
misalignment. Steel Fab is to produce field-weld sketGN6 FTC
final weld inspection process .
i � ��r fF- T -1►.' \
pc: Joseph Jeamel, Savings Bank of Rockville / Robert Dawson,
Russell Dawson / John Collins, S . Windsor Building Official
bh
NDEPENDENT MATERIALS TESTING
57 N. WASHINGTON STREET
P.O. BOX 745 LABORATORIES, INCf,.'�';'"�;
PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) 747-05'5'
NVLAP Accredited for Construction Testing Services
STRUCTURAL STEEL INSPECTION REPORT ~'
CLIENT: Savings Bank o Rockville :�%g f Roc lle PROJECT NO. . � �pI-
rlltttti►����
PROJECT: Savings Bank of Rockville REPORT NO. : 055
INSPECTOR: Mike Brault, CWI 91100111 DATE: 07/12/00
SUBJECT: Field Verification Inspection
A field inspection was performed at the above-referenced project
today. The purpose of this inspection was to verify that
completed work was performed utilizing the engineer-approved
drawings, the project specifications, and the American Welding
Society Structural Welding Code D1.1.
Field verification and visual weld inspections were performed on
column shop-deposited welds found unacceptable and undersized
during shop inspections at Leo Chase Fabrication, Manchester, NH.
Steel Fab, Inc. performed remedial welding in the field to comply
with drawing, specifically weld sizes at the column to base plate
connection.
The following base plates were field repaired by Steel Fab and
reinspected and found acceptable by the writer: Column 14C2,
15C1, 15C5 and 16C2 .
Column base anchor bolt nuts were verified as being installed and
snug-tight at this time except for the following locations:
Column E-8 (118C) and K-11 (16C2) had insufficient thread
projection through plates. Steel Fab has welded anchor
stubs/studs to base plates.
pc: Joseph Jeamel, Savings Bank of Rockville / Robert Dawson,
Russell Dawson / John Collins, S . Windsor Building Official
bh
Test reports may not be reproduced except in Bull with approval of IMTL All results relate only to the items tested.
T st reports must not be used by cli nt to claim product endorsement by NVLAP or any agency of the US Government.
TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
Portland Cement Concrete Soils Steel Building Products Bituminous Concrete
NDEPENDENT MATERIALS TESTING
57 N. WASHINGTON STREET
P.O. BOX 745 LABORATORIES, bT 11 G'Co ,;,' ''
£C�
PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) 74.E a }� F.
NVLAP Accredited for Construction Testing Services = =.
STRUCTURAL STEEL INSPECTION REPORT ,o
CLIENT: Savings Bank of Rockville PROJECT NO.
PROJECT: Savings Bank of Rockville REPORT NO. : 056
INSPECTOR: Mike Brault, CWI 91100111 DATE: 07/17/00
SUBJECT: Field Verification Inspection PAGE: 1 of 2
A field inspection was performed at the above-referenced project
today. The purpose of this inspection was to verify that
completed work was performed utilizing the engineer-approved
drawings, the project specifications, and the American Welding
Society Structural Welding Code D1.1.
Field verification inspections were performed- on structural steel
framing from the Second Level up to the Third Floor framing as
follows :
Column plumbness was verified for conformance with AISC 1 :500
tolerance from the Second Floor to the Third Floor Framing.
Columns were found to be plumb within the above tolerance.
Visual weld inspections were performed on field welded floor joist
to support beams, bridging, seat beam stabilizer angles and roll
clips. Welds were fond to be satisfactory at this time.
ASTM A325 field bolted connections at the Third Floor framing were
visually surveyed for proper installation and tightening. As
noted by the writer in field report dated July 11, 2000, high-
strength bolts are stripping out during tensioning. Steel Fab is
aware that bolts are stripped and will have to be removed and
replaced per Mr. Dawson's instructions.
Several of the connections, i.e. knife connections, seated beam
bolts and beam to beam connections, were noted as loose and/or
incomplete today. The erector was made aware of the locations to
be completed and will rework bolted connections on Tuesday, July
18, 2000.
pc: Joseph Jeamel, Savings Bank of Rockville / Robert Dawson,
Russell Dawson / John Collins, S. Windsor Building Official
bh
Test reports may not be reproduced except in lull with approval of IMTL All results relate only to the Items tested.
Test reports must not be used by cli nt to claim product endorsement by NVLAP or any agency of the US Govern nt.
TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
Portland Cement Concrete Soils Ste I Building Products Bituminous Concrete
Savings Bank of Rockville
Project No. : 4741 Report- 056
July 2000
INDEPENDENT MATERIALS TESTING LAbUHA I uNitb ll%j Page : 2 of 2
P. 0. BOX 745
57 NORTH WASHINGTON STREET
PLAINVILLE, CT 06062
.Steel
Mike Brault
Structural Steel $ Welding Inspector
I '
CWI #91100111
PROJECT: V1
LOCATION O .� R PIECEMARK.
Awaiting
Date Inspected Date of Date Engineer's Report Item
j Field (F) and Rejected Rework Accepted Decision Number Numb�'Y)N er Comments
7 � s
s / a2
03
w D
S;z
403 o y
0i 05
J6
NDEPENDENT MATERIALS TESTING
57 N. WASHINGTON STREET ````��,,,
P.O. BOX 745 LABORATORIES, I N O.\\o� 1 ,4'v4s`j
PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) 74�� ?y� 1F'
� a
NVLAP Accredited for Construction Testing Services
STRUCTURAL STEEL INSPECTION REPORT �0 <�C
X. s
CLIENT: Savings Bank of Rockville PROJECT NO. :
PROJECT: Savings Bank of Rockville REPORT NO. : 057
INSPECTOR: Jim Howard, CAWI 99080304 DATE: 07/18/00
SUBJECT: Field Verification Inspection
A field inspection was performed at the above-referenced project
today. The purpose of this inspection was to verify that
completed work was performed utilizing the engineer-approved
drawings, the project specifications, and the American Welding
Society Structural Welding Code D1.1.
The writer arrived on site to verify size and spacing of Third
Floor puddle welds and to examine bolted connections on the Third
Floor framing.
Puddle welds were of an acceptable size and spaced at 2' on center
as required.
Bolted connections on the Third Floor framing have bolts
installed. At this time there are approximately 15 high-strength
tension control bolts that have not been tightened/snapped due to
their being stripped. The erection foreman stated that these
bolts will be removed and new bolts installation in the near
future.
pc : Joseph Jeamel, Savings Bank of Rockville / Robert Dawson,
Russell Dawson / John Collins, S . Windsor Building Official
bh
Test reports may not be reproduced exc pt in full with approval of IMTL All results relate only to the Items tested.
Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government:
TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
Portland Cement Concrete Soils Steel Building Products Bitumin us Concrete
NDEPENDENT MATERIALS TESTING
57 N. WASHINGTON STREET
P.O. BOX 745 LABORATORIES, INC;,,`,\,` o;J. _ '.r1F�T%�
PLAINVILLE, CONNECTICUT 06062 - � "
(860) 747-1000 FAX (860) 747-6��S5f
NVLAP Accredited for Construction Testing Services = T-
-� _
STRUCTURAL STEEL INS.PECTIC REPORT =
CLIENT: Savings Bank of Rockville PROJECT NO. :��''�,740I�,;.L�,'`7```�
PROJECT: Savings Bank of Rockville REPORT NO. : 059
INSPECTOR: Travis Curtis DATE: 08/07/00
SUBJECT: Field Verification Inspection PAGE: 1 of 2
A field inspection was performed at the above-re=erenced project
today. The purpose of this inspection_ was to verify that
completed work was performed utilizing the engineer-approved
drawings, the project specifications, and the American Welding
Society Structural Welding Code D1 . 1 .
Column plumbness was checked on the Third Floor. Column Locations
D-8 and K-11 were found to be 1/," off RISC 1 :500 tolerance. All
other Third Floor columns were within tolerance. -�
Y." fillet welds 1" in length for roof framing to joist were
inspected and found to be in accordance with AWS D1. 1 and approved
drawings . NOTE: No uplift bridging (not on print) .
Roll clip angles were not installed in accordance with RISC
specifications on the roof level . Not all tension control bolts
were snapped off at the roof level . 5/8" puddle welds were
acceptable thus far. Change is needed for welding in lieu of
bolting at 8B2 to 8B1 and two (2) separate 1OB2 beams to 18B1 .
Steel Fab required to submit approved field weld sketch.
Anchor bolts at A-3 and A-6 were verified as being snug tight .
Columns at A-3 and A-6 were verified for plumbness and conformed
with AISC 1 :500 tolerance at this time. ASTM A325 high-strength
bolts were found to be properly installed and fully tensioned.
pc : Joseph Jeamel, Savings Bank of Rockville / Robert Dawson,
Russell Dawson / John Collins, S . Windsor Building Official
/ Dick Ryan, Ryan Assocs . -�
bh
Test reports may not be reproduced exc pt in full with approval of 1MTL. All results relate only to the items tested.
Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government.
TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
Portland Cement Concrete Soils Steel Building Products Bituminous Concrete
INDEPENDENT MATIAIIALS TESTING I.A13011ATOMES, INC.
V. O. 130 X 711:1
57 N10111l•1 WASI IINGTON S"1'111:l;•I'
PLAINVILLE, CT 06062
Stool - Oulstaltlhtu Noit-t:ut►fomilllos
Structurol Steel & Woklinu Inspector
LOCATION OR PICCEMAnK: Awahloill
0010 111specled Dato of hate Etillhwar's 110110rt Item
Field (FI uiscl 111110wild flowrnk Accepted Ducisirnt Numim Number Cunn��c��ts
I L j
noC'\
i}ran n►� .l� 1 � F_. � � � �.- �`
Io -4�I� -oo 01 �-
Bank of Rockville }
Savings ,
Project No. : 4741 i?���, ,► �
NDEPENDENT MATERIALS TESTING
57 N. WASHINGTON STREET `` `�''''��
,
LABORATORIES III
P.O. BOX 745
PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) 74 -65==` ~1�
NVLAP Accredited for Construction Testing Services
j
STRUCTURAL STEEL INSPECTION REPORT
i
CLIENT: Savings Bank of Rockville PROJECT NO. : �ya'�'�►�
PROJ"-'-C'T: Sav_ncs Bark of Rockville REPC-RT NO. . 060
INSPECTOR: Mike Brault, CWI 91100111 DATE: 08/09/00
SUBJECT: Field Verification Inspection PAGE: 1 of 2
A field inspection was performed at the above-referenced project
today. The purpose of this inspection was to verify that
completed work was performed utilizing the engineer-approved
drawings, the project specifications, and the American Welding
Society Structural Welding Code D1. 1.
Roof deck inspections were performed at the high roof and drive-
thru framing roof for proper puddle welding and spacing to
substrate members and mechanically fastened side laps . Welding
and side lap screws were found satisfactory at both roof deck
locations .
The writer reinspected the incomplete/non-conforming items list
from July 7, 2000 and July 17, 2000 . Item Nos . 01, 02 , 04 and 05
were reinspected and found completed. Item Nos . 03 and 06 require
Steel Fab to submit detailed weld sketches for review and approval
by Dawson Engineers before a final inspection can be per-formed to
remove these items from the outstanding list .
Roof framing seated beam connection bolts were found loose and/or
incomplete during inspection interval were tightened by the
erector to a snug-tight condition which is satisfactory for
bearing-type connections.
pc : Joseph Jeamel, Savings Bank of Rockville / Robert Dawson,
Russell Dawson / John Collins, S . Windsor Building Official
/ Dick Ryan, Ryan Assocs .
bh
Test reports may not be reproduced except in full with approval of IMTL. All results relate only to the Items tested.
Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government.
TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
Portland Cement Concrete Soils Steel Building Products Bituminous Concrete
INDEPENDENT MATERIALS TESTING LABORATORIES, INC.
P. O. BOX 745
57 NORTH WASHINGTON STREET '
PLAINVILLE, CT 06062
Sloel -xkj�'�ol�E,�Q,yn .
Mike Brault
Structural Steel & Welding Inspector
CWI #91 1001 1 1
i
PROJECT: Vi
I � ..00AIION OR PIECEMARK: Awolllrrg
Date Inspected Date of Date Engineer's Report Item
Field (F) and Rejected Rework Accepted Decision Number Number Comments
M:nz �2,el 7/�
Urr)N � s
C)z
T'✓/ �pN
�$ cna 03
-7109
13
l
�5�->� c2�►r
_X�- ;100� yon� dQ4
7117 O5
-7117
Savings Bank of Rockville
Project No. : 4741 Report No. : 060 =
August 9, 2000 Pac1e : 2 of 2