Loading...
HomeMy WebLinkAbout1645 Ellington Road (6) NDEPENDENT MATERIALS TESTING 57 N. WASHINGTON STREET \���„►�t►�,,,�� P.O. BOX 745 LABORATORIES, I R °t'NeCr;;;-;, PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) - NVLAP Accredited for Construction Testing Services STRUCTURAL STEEL SHOP INSPECTION REPORT 40/c v i i • CLIENT: Savings Bank of Rockville PROJECT NO.-?1 1 ; ,:C+�` PROJECT: Savings Bank of Rockville REPORT NO. : 041 INSPECTOR: Mark Richardson DATE: 06/05/00 SUBJECT: Shop Inspection RE: BOCA PAGE: 1 of 5 Section 1705 A shop inspection was performed on this date at the fabrication plant, Leo Chasse, Inc . , Manchester, NH, for the purpose of ascertaining that applicable codes and specifications were being implemented during fabrication for the project . The following specifications and codes are being applied on this project : Project Specifications Division 5-Metals (Structural Steel) ; AISC Manual of Steel Construction; The American Welding Society Code D1 . 1 Edition for Structural Welding; ASTM Standards for Metals Conformance and Non-Destructive Testing; and the (SSPC) Steel Structures Painting Council, Vols . 1 and 2 for Steel Cleaning and Painting. The writer was at the above-stated facility to performed a Part A Shop Inspection and to monitor shop production, i .e. dimensional accuracy and welding. The writer met with Mr. Matt LaVoie, Vice President and Mr. Howe, Manager. Mr. LaVoie and the writer then met with the shop foreman in the shop. The writer received a set of prints (shop drawings) from the shop foreman. The writer then started to go over the questions for the shop evaluation report which is attached. The shop is cluttered and poorly lit . Equipment is greasy and crowded with material, i .e. saw, angle brake both of which were not in use during this visit . Assorted power and hand tools were in fair to poor condition. Dimensional accuracy and welds were checked using shop drawings (not approved) , fillet weld gauges and AWS D1 . 1, Table 6 . 1 for visual inspection acceptance criteria. Shop welders were using Lincoln Ideal Arc DC-400 power source, runs at 200 DC amps and 30 volts; wire feeder is LN-7, 18-20 ipm; shielded gas is 75% argon and 25% carbon dioxide and runs at 40 cfm which leaves an excessive amount of splatter. Test reports may not be reproduced except in full with approval of IMTL. All results relate only to the items tested. Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government. TESTING RESEARCH ANALYSIS INSPECTION CONSULTING Portland Cement Concrete Soils Steel Building Products Bituminous Concr to Savings Bank of Rockville Project No. : 4741 Report No. : 041 June 5, 2000 Page : 2 of 5 The writer placed a call to Mr. Dawson of Russell Dawson Engineering to discuss missing welds on Piecemark 5B12 . Weld called for was 2" every 6" on SB12 and not in accordance with AWS D1 . 1, Section S-5 . 13 for compliance with design, size, length and location. Mr. Dawson was also informed of added welds on piecemarks and splatter. Mr. Dawson stated that additional welds were acceptable and welds off location are satisfactory as per a telephone conversation on June 5, 2000 . The writer also received copies of welders qualification records. Reference the attached shop inspection sheet for piecemarks inspected and the disposition of each. pc : Joseph Jeamel, Savings Bank of Rockville / Robert Dawson, Russell Dawson / John Collins, S . Windsor Building Official bh LLCi LI'dLJ"IV I 3 =5TlNV _ - -'Irs?--cT_crr or ==1, W_ :ram CA - . . !--am [i s;rd te;cw are in ==E i anca With s;,ec:�1 c3";,n ;•r�i r�n;s as Chey Perm i n to: A - Material Preparation C - (:!!ding C:nfar ma N10,r*+ ; I � IvlLf I �Jlei �� I t I I II ' 7C � I1 V00"Iv-1 I /01 u I I I rZ��,- Imo:�/�i �,. L •1„� U , I � I C_-{—�;,�„ �)'� ��, c:•�,;,�.:..'C {T� I I I I Savings Bank of Rockville isrr_.ar Project No. : 4 741 Report No. : 041 June 5, 2000 Page : 3 of 5 - SHOP SPECIAL INSPECTION EVALUATION REPORT- PART"A" FABRICATION PLANT NAME: Leo P.Chasse, Inc. DATE: June 5, 2000 LOCATION: 62 Sample St.,2nd Floor,Manchester,NH PROJECT: Savings Bank of Rockville 1) Does the Company have an in-house Quality Control Manual? NO 2) Does the Shop have any written shop or inspection procedures? NO Yes they do I Bolting NO H Inspection NO III Receiving NO IV Painting NO V Welding NOs 3) What type of welding is performed in the shop? SMAW GMAW Yes FCAW SAW 4) Are the shop welders AWS certified? Certifications are not up to date. I Updated or employment records current every 6 months? NO 5) Do the shop welders have fillet gauges? NO I Cleaning tools? YES 6) Does the shop have in house inspectors? NO,FOREMAN I Inspections on fabricated prices are performed by FOREMAN II Are any type of inspection records maintained? NO Savings Bank of Rockville Project No. : 4741 Report No. : 041 June 5, 2000 Page: 4 of 5 -PART"A"CONTII�IUED - 7) Does the shop have painting and sandblasting capabilities? Painting is done with roller and brush. 8) Are material certifications kept on file? NO 9) How are drawings received and distributed Through the office of the Vice President. I How are revisions handles on drawing distribution? Same As Above 10) Are project specifications kept on file? NO 11) Condition of shop tapes, squares,tools,etc: Fair to Poor 12) Does the shop have current issues of the following? AWS D 1.1 Yes AISC MANUAL 9TH EDITION Yes ASTM 1.04 Yes AWS A2.4 Yes 13) Is the shop Foreman familiar with basic fabrication attributes? I Fit up tolerances Yes II Weld rod controls Yes, but no oven. III Visual weld quality Yes IV Material grade markings Yes V Preheat temperatures Yes,not all welders have temp sticks or knowledge. VI A572 weld requirements Yes 14) Are shop welders and fit up personnel familiar with above listed attributes (Item 13)? NO 1 5) Are welding procedures made available to the welders? NO 16) Are the shop welding machines calibrated? NO Reference the attached report. Savings Bank of Rockville Project No. : 4741 Report No. : 041 June 5, 2000 Page : 5 of 5 NDEPENDENT MATERIALS TESTING 57 N. WASHINGTON STREET P.O. BOX 745 LABORATORIES, INC, >- PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) 747-645.�5 :i NVLAP Accredited - = for Construction Testing Services STRUCTL"R.AL STEEL SHOP INSPECTION REPORT = ~-;= r•. _ CLIENT: Savings Bank of Rockville PROJECT NO. :�'��,, aaL�'����`�� PROJECT: Savings Bank of Rockville REPORT NO. : 042 INSPECTOR: Mark Richardson, CAWI 99080132 DATE: 06/07/00 SUBJECT: Shop Inspection RE: BOCA PAGE: 1 of 2 Section 1705 A shop inspection was performed on this date at the fabrication plant, Leo Chasse, Inc. , Manchester, NH, for the purpose of ascertaining that applicable codes and specifications were being implemented during fabrication for the project . The following specifications and codes are being applied on this project : Project Specifications Division 5-Metals (Structural Steel) ; AISC Manual of Steel Construction; The American Welding Society Code D1 . 1 Edition for Structural Welding; ASTM Standards for Metals Conformance and Non-Destructive Testing; and the (SSPC) Steel Structures Painting Council, Vols . 1 and 2 for Steel Cleaning and Painting. The writer was at the above-stated facility to monitor ongoing work. Mr. Matt Vavoie was informed of the writer' s presence on site. The writer then met with Mike, the shop foreman, to review piecemarks rejected on a previous inspection (June 5, 2000) . During the day dimensional accuracy was checked and welds were inspected using shop drawings, fillet weld gauges and AWS D1 . 1, Table 6 . 1 for visual criteria and Section 5, 5 . 13 for compliance with design. Welds were checked for size, length and location. Reference the attached shop inspection sheet for piecemarks inspected and the disposition of each. pc : Joseph Jeamel, Savings Bank of Rockville / Robert Dawson, Russell Dawson / John Collins, S . Windsor Building Official bh Test reports may not be reproduced except in full with approval of IMTL. All results relate only to the items tested. Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government. TESTING RESEARCH ANALYSIS INSPECTION CONSULTING Portland Cement Concrete Soils Ste I Building Products Bituminous Concrete 1i`avLi G1ldLJL—I V I _ :NS?-CT:C'r p� r I �---- _=�,.'��'�' -V'__�- •�/�_ � �+ (� •� Vic• ; ���;'►l;� - .: - -�TCT iCC T=Cti The i: [fisted bet:v are ==L;area w4 as L�eS' ?er=ain to: �n s:•e-:�1c3t:�-s ;ressm•s A • Xa:ar?at Preparatfen 3 - O i ma i=a t Amara ' cY v-1S'.'?_ C - VeE_irg C:r�fcr:ac�cr NL: p. -- 3 � _ :rs/?"•'*antis 'A E l f l l 'J ;�C- I I I E I If I I I I I I l I I I ! l I I l l l l l I I l • I i I I I l l l ! I l i I l l l l l I E l E I I I I I Savings Bank of Rockville Project No. : 4741 Report No. : 042 June 7, 2000 Page: 2 of 2 NDEPENDENT MATERIALS TESTING 57 N. WASHINGTON STREET P.O. BOX 745 LABORATORIES, PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) NVLAP Accredited for Construction Testing Services STRUCTURAL STEEL SHOP _NSPECTICN REPORT CLIENT: Savings Bank of Rock-,ille PROJECT PROJECT: Savings Bank of Rockville REPORT NO. : f �j�06 at INSPECTOR: Mark Richardson, CAWI 99080132 DATE: 06/12/00 SUBJECT: Shop Inspection RE: BOCA PAGE: 1 of 2 Section 1705 A shop inspection was performed on this date at the fabrication plant, Leo Chasse, Inc . , Manchester, NH, for the purpose of ascertaining that applicable codes and specifications were being implemented during fabrication for the project . The following specifications and codes are being applied on this project : Project Specifications Division 5-Metals (Structural Steel) ; AISC Manual of Steel Construction; The American Welding Society Code D1 . 1 Edition for Structural Welding; ASTM Standards for Metals Conformance and Non-Destructive Testing; and the (SSPC) Steel Structures Painting Council, Vols . 1 and 2 for Steel Cleaning and Painting. The writer was at the above-stated facility to monitor ongoing work. The office was informed of the writer' s presence on site. Upon walking into the shop the writer noticed that splatter on columns waiting to be loaded was not cleared and members were painted. Undersized welds were not repaired. The writer asked the shop foreman if welders have welding gauges . The foreman ask if they needed them? The writer used the gauge to demonstrate to the foreman that columns being worked on have undersized welds according to shop drawings. The foreman was informed that splatter and undersized welds must be repaired. Beam 4B3 was detailed to have 2-1/2x2-1/2 angles welded to underside of flange. The Foreman welded them to the web and underside of flange. Dimensional accuracy and welds were inspected during the course of the day using fillet weld gauges, shop drawings (not approved) and AWS D1 . 1, Table 6 . 1 for visual criteria and Section 5, 5 .13 for compliance with design, weld profiles 5.24, --€lush surfaces 5.24 .4 .1. , Section 5, 5 .30 .2 cleaning of completed welds, which was not done. Weld all the way around are undersized or not complete. Reference the attached sheet for members inspected and the disposition of each. pc : Joseph Jeamel, Savings Bank of Rockville / Robert Dawson, Russell Dawson / John Collins, S . Windsor Building Official bh Test reports may not be reproduced except in full with approval of IMTL. All results relate only to the items tested. Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government. TESTING RESEARCH ANALYSIS INSPECTION CONSULTING Portland C ment Concrete Soils Steel Building Products Bituminous Concrete 3�j T IN i-= C:s;ad het_-w ars in ;:arc= wig as �tr ?�^.�i of t0: '' `• -�-,,'mart t..: 3 Z i mess:.era l Ac=.-3c• _ � I I i I I La , a, C. �3 Z I V kJIVLIS . I - ►z — y�z. CM . spt el _/ lSc s l I f LOO-1 c., ! I { ! I ! ! I IV3131 ! ltee- —Savings Bank of Rockville Project No. : 4741 Report No. : 047 June 12, 2000 Page: 2 of 2 NDEPENDENT MATERIALS TESTING 57 N. WASHINGTON STREET P.O. BOX 745 LABORATORIES, PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) NVLAP Accredited for Construction Testing Services _ ✓_=-4 _ STRUCTURAL STEEL SHOP INSPECTION REPORT CLIENT: Savings Bank of Rockville PROJECT NO. PROJECT: Savings Bank of Rockville REPORT NO. : 048 INSPECTOR: Mark Richardson, CAWI 99080132 DATE: 06/14/00 SUBJECT: Shop Inspection RE : BOCA PAGE: 1 of 4 Section 1705 A shop inspection was performed on this date at the fabrication plant, Leo Chasse, Inc. , Manchester, NH, for the purpose of ascertaining that applicable codes and specifications were being implemented during fabrication for the project . The following specifications and codes are being applied on this project : Project Specifications Division 5-Metals (Structural Steel) ; RISC Manual of Steel Construction; The American Welding Society Code D1 . 1 Edition for Structural Welding; ASTM Standards for Metals Conformance and Non-Destructive Testing; and the (SSPC) Steel Structures Painting Council, Vols . 1 and 2 for Steel Cleaning and Painting. The writer was at the above-stated facility to monitor ongoing work. During the course of the day dimensional accuracy and welds were inspected using shop drawings, fillet weld gauges and AWS D1 . 1 Table 6 . 1 for visual criteria, and 5 . 13 for compliance with design. Welds were inspected for size, length and location. The writer again asked Mike, Shop Foreman, to have welders check weld size. Members inspected have undersized welds . The writer informed Mr. Matt Lavoie that welds were rejected due to undersized welds and weld splatter. This matter was discussed with the shop foreman and Mr. Matt Lavoie on previous inspections. Columns 14C1 (2) , 15C4 and 15C5 have an attachment (s) 15M1 which is a w6x25 . The writer called Mr. Dawson of Russell Dawson Engineers . Shop drawings show no 15M1 . The writer called Tony from Steel Fab and was informed that this should have been a T- shape not a W-shape. Test reports may not be reproduced except in full with approval of IMTL. All results relate only to the items tested. Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government. TESTING RESEARCH ANALYSIS INSPECTION CONSULTING Portland Cement Concrete Soils Steel Building Products Bituminous Concrete Savings Bank of Rockville Project No. : 4741 Report No. : 048 June 14, 2000 Page: 2 of 4 Due to the need to keep the 3" dimension, Mr. Matt Lavoie talked with Tony from Steel Fab and gave the writer a repair detail which is awaiting approval (attached) . The writer informed Mike, Shop Foreman, of what was going on as far as repairs . Mike' s response was to let them fix it in the field. Mr. Lavoie stated he would talk to shop personnel . pc : Joseph Jeamel, Savings Bank of Rockville / Robert Dawson, Russell Dawson / John Collins, S . Windsor Building official bh INDEPENDENT STING y i. a i_=^s Cis;r,cf =e!:v are in Uzi°arca v . as ;:tey per:a i n "0: A - Ya_:rial ?re�aCa;iul 3 V mL—Ms i cra t Ac`.-IC - _ .....g Ccn,crrr__ �., 7 C / f a� f ✓ f ,/ 1 C.iC ;�t1� it �' S: �:re, i�4�.�. � f.1 �4v3 m•an. I. swc K h. I I I E I I I a = I I I ! f I I I I I { II f I l l l f I I f l f I l l l f I I f ! I I i i I �/JG',c,,�C �i Savings Bank of Rockville Project No. . 4741 Report No. : 048 June 14, 2000 Page : 3 of 4 LEO F CHASSE CO . -- . PROJECT kv ^ � 1 , - STRUCTURAL AND MISC. STEEL FABRICATION AND ERECTI N Oft 62.4APL.S STREET,2N0 FLOOR PH.(6 )634.5030 MANCHESTER,NH 03103 FAX(6 3)634-3053 �-- -;- -- DATE j ( V ku wNC--,W_ _ �x25 tow?( Savings Bank of Rockville �— Project No. : 4741 Report No. : 048 June 14, 2000 Page: 4 of 4 NDEPENDENT MATERIALS TESTING 57 N. WASHINGTON STREET P.O. BOX 745 LABORATORIES, INO PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) 747_X455:.== NVLAP Accredited for Construction Testing Services STRUCTURAL STEEL SHOP INSPECTION REPORT = _ uik CLIENT: Savings Bank of Rockville PROJECT NO:��,;`' '�4 �,,'-' ,0`� �''//rl,,111110% PROJECT: Savings Bank of Rockville REPORT NO. : 049 INSPECTOR: Mark Richardson, CAWI 99080132 DATE: 06/22/00 SUBJECT: Shop Inspection RE: BOCA PAGE: 1 of 2 Section 1705 A shop inspection was performed on this date at the fabrication plant, Leo Chasse, Inc. , Manchester, NH, for the purpose of ascertaining that applicable codes and specifications were being implemented during fabrication for the project . The following specifications and codes are being applied on this project : Project Specifications Division 5-Metals (Structural Steel) ; AISC Manual of Steel Construction; The American Welding Society Code D1 . 1 Edition for Structural Welding; ASTM Standards for Metals Conformance and Non-Destructive Testing; and the (SSPC) Steel -- Structures Painting Council, Vols . 1 and 2 for Steel Cleaning and Painting. The writer was at the above-stated facility to monitor ongoing work. During the course of the day dimensional accuracy and welds were inspected using shop drawings, -fillet weld gauges and AWS D1 . 1 Table 6 . 1 for visual criteria and 5 . 13 for compliance with design. Welds were inspected for size, length and location. Reference the attached shop inspection sheet for piecemarks inspected and the disposition of each. The writer met with the shop foreman and asked if any repairs were made. Columns were shipped to the field without repairs being made . pc : Joseph Jeamel, Savings Bank of Rockville / Robert Dawson, Russell Dawson / John Collins, S . Windsor Building Official bh Test reports may not be reproduced except in full with approval of IMTL. All results relate only to the items tested. Test reports must not be used by client to claim product endorsem nt by NVLAP or any agency of th US Government. TESTING RESEARCH ANALYSIS INSPECTION CONSULTING Portland Cement Concrete Soils Steel Building Products Bituminous Concrete . • iiL�L_J A—A is•..� �.a r �- � iI G i � r+�7-7 7n CAT v � T.10 ;s::c: =ej:v are 'arc Wi as ..a x:-:ain �=�'tcsc:�� rM_ .s A !1a;sr?al arr,:an;;crs 3 • Ate;;icy C - w!j si rq C of: =rzaLOOP- A ! 3 --- -- C _ ors/?-^arfs a I s I �I Rom- E., �.. I I I I I E ! I i I ! I I f ! I I � Co DES 4. rk3 L2Z IMA I I I f I II I f l l Savings Bank of Rockville Project No. : 4 741 Report No. : 049 June 22, 2000 Page: 2 of 2 NDEPENDENT MATERIALS TESTING 57 N. WASHINGTON STREET P.O. BOX 745 LABORATORIES, INC. PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) 747-6r� NVLAP Accredited for Construction Testing Services .` s __ STRUCTURAL STEEL INSPECTION REPORT -00 f CLIENT: Savings Bank of Rockville PROJECT fd y�•� PROJECT: Savings Bank of Rockville REPORT NO. : INSPECTOR: Mark Richardson, CAWI 99080132 DATE: 06/26/00 SUBJECT: Field Verification Inspection PAGE: 1 of 2 A field inspection was performed at the above-referenced project today. The purpose of this inspection was to verify that completed work was performed utilizing the engineer-approved drawings, the project specifications, and the American Welding Society Structural Welding Code D1 . 1. The writer was on site for a follow-up inspection on members fabricated in the shop (rejectable) and shipped to the field. Reference the attached sheet for non-conformities. At or near the end of the day the QC Inspector for Steel Fab, Moe, and this writer had a phone conversation. These items may or may not be repaired by the erector in the field. As soon as Moe knows IMTL will be advised. pc: Joseph Jeamel, Savings Bank of Rockville / Robert Dawson, Russell Dawson / John Collins, S . Windsor Building Official bh Test reports may not be reproduced except in full with approval of IMTL All results relate only to the items tested. Test reports must not be used by client to claim product endorsement by NVLAP or any agency of th US Government. TESTING RESEARCH ANALYSIS INSPECTION CONSULTING Portland Cement Concrete Soils Steel Building Products Bituminous Concrete l INDEPENDENT MATERIALS TESTING LABORATORIES, INC. P. O. BOX 745 57 NORTH WASHINGTON STREET PLAINVILLE, CT 06062 Slaul - 011161a11d1n(j Nmn-Conf'ar1111llos .1Im Howard Structural Steal & Weialnu Inspector CAWI # 99080304 PROJECT: SAV"M?s .6,qh k c;q"' 2GC.a l,-r t l-C LOCATION Oil NECEMARK: Awakill(l Dale 11151lecled Dale a1 nail) Fntlinel)l's Re1uul 110m Field (F) and Rejected flowwk Accepted Decision Number Number Comillents - /�"C f ��•t;c,ksl ✓ S4 olo c ars (106 a 7 1 k rs t Ji ZG 4i4v �� C, �_.�./s►tcc-k6t Savings Bank of Rockville '-'Project No. : 4 741 Report No. : 050 June 26, 2000 Page : 2 of 2 NDEPENDENT MATERIALS TESTING 57 N. WASHINGTON STREET P.O. BOX 745 LABORATORIES, PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) 747 NVLAP Accredited for Construction Testing Services = STRUCTURAL STEEL INSPECTION REPORT - - CLIENT: Savings Bank of Rockville PROJECT NO. �'� - g a PROJECT: Savings Bank of Rockville REPORT NO. : 051 INSPECTOR: Mike Brault, CWI 91100111 DATE: 07/07/00 SUBJECT: Field Verification Inspection PAGE: 1 OF 3 A field inspection was performed at the above-referenced project today. The purpose of this inspection was to verify that completed work was performed utilizing the engineer-approved drawings, the project specifications, and the American Welding Society Structural Welding Code D1.1. Field verification inspections were performed on structural steel framing on the Second Floor as follows : Column plumbness verified for conformance with AISC 1 :500 tolerance on columns from the First Floor/slab on grade to Second Floor framing from B to M Lines, 1 to 14 . Columns were found plumb within AISC tolerance. Column base anchor bolts were surveyed for completion and snug tight anchor bolt nuts. Several locations were found loose or incomplete and insufficient thread projection, i.e. short anchor bolts were noted at E-8 (11C8) and K-11 (16C2) . Both require engineer-approved field repair. Visual weld inspections of field welded floor joists on the Second Floor framing and bridging welds were found acceptable at this time. The writer was informed today that while tensioning the Second Floor framing bolted field connections, i.e. double connection angle knife connections, about 40% of ASTM A325 high strength tension control bolts were stripping out. This condition was occurring in bolts with lengths of 2-1/2" and 2-1/4" . The writer witnessed several field connections being tensioned and noted the same results. The erector used three (3) separate tension control devices (TC guns) and the results were the same. Mr. Maurice Grenier, Steel Fab' s QC Manager, arrived with their Skidmore Whilhelm device with results detailed on the attached sheet . Test reports may not be reproduced except In full with approval of IMTL All results relate only to the Items tested. Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government TESTING RESEARCH ANALYSIS INSPECTION CONSULTING Portland Cement Concrete Soils Steel Building Products Bituminous Concrete Savings Bank of Rockville Project No. : 4741 Report No. : 051 July 7, 2000 Page : 2 of 3 Steel Fab has contacted the manufacturer in regards to this condition as well as Mr. Bob Dawson of Russell Dawson Engineers who was informed of results of bolted connections. This task was performed by Steel Fab and replacement bolts were fully tensioned and found satisfactory upon visual inspections at knife connections on a majority of field connections . pc: Joseph Jeamel, Savings Bank of Rockville / Robert Dawson, Russell Dawson / John Collins, S . Windsor Building Official bh WAAMWAA ssaa aa:v 001 _ Savings Bank of Rockville ..•r•.r•,..•....�J w.�•�w. �Mr1{�1�M1.rKr U�L��t 1�Y�M1�!!1r110iL�.�17 A��: M / �� � � vL7Project No. : 4741 Report No. : 051 July 7, 2000 Page: 3 of 3 STEEL FAB INC. ":_ 33 Wtcheli Drive RTMIFIMMIT 1CN M"HESM,CT 06M �860y 645�0022 h PRwr NAME RATE RATE TAME • FAX 1860? 645-688I 1 ' IFA V I+V W /� cc 47 1 � � /e. C Owr �e p Field Repot!Work Done O L - rc—S 7— -, t!LE r T' t.J r4X rt 6 To . 1j .-._. .Q. -...._S1 r L _moo comp v c .._n AJ A 59 TrvSi o C.a �ise�-roit A ,ram 7rtfr47` So,ti or.-.Ln1., , _.. II,�0T r — 1 -- . .fir S nr h PPf M!;- . _o�•f wN ... ��T'1', Ri�E C. - u L Te1V.f f o N _�... •_- LAt- mL1MC&JC _L 3!!� 8 CA C.16A t��A/ .�..._... �.._.._...Y.�. .__ -ZI.X 0 L7-S Of I sta. 0. t ry !2fccr WITH &r...�c..a —&T—AL. .M.r t: , r v m . . 2$,_000 (-z-z ---.— 'emu .c, CK of re1vU R AJ jCo& LITRb o cr/�� IA.rC, pcyvn mac--....12 .1Qs1s. ts-� �` i�,�w S.QN _ 'vG r Alee5e T.. -r v 0 ....&�O__.r S A/A .•. 00 _.P. ... fl �e �Y a�.. &ter y -r-« )o14 l xl c T"S. lVON CRpK1� i r NDEPENDENT MATERIALS TESTING 57 N. WASHINGTON STREET P.O. BOX 745 LABORATORIES, INC. ►►il�ll,,,, PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) 747- R lop 5 �c. FCC. NVLAP Accredited for Construction Testing Services :��� _ o A. STRUCTURAL STEEL INSPECTION REPORT - CLIENT: �0 Savings Bank of Rockville PROJECT NO.'I�F.4' � PROJECT: Savings Bank of Rockville ��''��tttt►�►►���� REPORT NO. : 053 INSPECTOR: Mike Brault, CWI 91,00111 DATE: 07/07/00 SUBJECT: Field Verification Inspection PAGE: 1 OF 5 A field inspection was performed at the above-referenced project today. The purpose of this inspection was to verify completed work was performed utilizing the engineer-approvedoved drawings, the project specifications, and the American Welding Society Structural Welding Code D1.1. Welding Field verification inspections were performed on structure framing on the Second Floor as follows: 1 steel Second Floor 26-gauge metal form deck was inspected f Lines B to M, 1 to 4 for proper p from Column conformance with Steel Fab's deck puddle welding ' spacing and satisfactory at this time. g Deck was found Welding of dowels to parameter angles was completed b erector at the Second Floor framing. Y the information exist on these dowels as far as a spacing or drawing welding requirements shown on Steel Fab' s or structural rawings. drawings. Seated beam connections: roll clip angles have been field-welded and are satisfactory at this time. Bottom flange bolts in seate connections still remain loose at quite a few locations. Columns J-1 and E-14 are still missing bolts . The Construction Manager and Erector were shown both locations for remedial work. Second Floor beam connection of 2B2 and 3B4 bolts were tighten to a snug-tight condition with plies in full contact g ed connection) verified by the writer. (bearing Grenier was on site today. The writerteel Fab' QC Manager, Mr. beam connections which require an approved 1sketc out field welded ons at the Second and Third Floor framing. Mr. Greniero will se expedite the field weld sketches and submit them through channels required. as Test reports may not be reproduced except in full with approval of IMTL. All results relate only to the items tested. Test reports must not be used by cli nt to claim product endorsement by NVLAP or any agency of th US Government. TESTING RESEARCH ANALYSIS INSPECTION CONSULTING Portland C m nt Concrete Soils Steel Building Products Bituminous Concrete Savings Bank of Rockville Project No. : 4741 Report No. : 053 July 11, 2000 Page: 2 of 5 The writer generated an ongoing steel items list which details incomplete and remedial areas which need to be addressed by Steel Fab. At Third Floor field bolted connections the writer noted today that the same situation is occurring with ASTM A325 tension control bolts. During tensioning by the erector bolts are continuing to strip prior to the tension control splines snapping off. Bolts at this elevation will also have to be replaced by Steel Fab. pc: Joseph Jeamel, Savings Bank of Rockville / Robert Dawson, Russell Dawson / John Collins, S . Windsor Building Official bh INDEPENDENT MATERIALS TESTING LABORATORIES, INC. P. 0. BOX 745 57 NORTH WASHINGTON STREET PLAINVILLE, CT 06062 Steel - Mike Structural Steel $ Welding Ins ec oir CWI #9110011 1 PROJECT: Vi LOCATION OR PIEA ARK: Awaiting Data Inspected Date of Date Enoineer's Report Item Field (F) and Rejected Rework Accepted Decision Number Number Comments % 7 � U s Z 7 03 03 ------------ Savings Bank of Rockville Project NO. : 4741 Report No. : 053 July 11, 2000 Page: 3 of 5 4 001 IL F"�CA*I FAX NO. Jul. 12 2WO 01:4spM p, /o : Mrl�E <MTL a ` rw(fM • M o c 6r�2 cvfevz PENSION CONTROL BOi:LTING , INC . TEL : 817 1 822 - 6537 FAX :; 603 1 S47-6698 FACSIMILE'I'RANSUITTALAHZET Tot DRp +aceroc wog G=c WIl coje&N►: E72E SOME ftb,11W. 7/l Q0 FAZE -- - FcT,I.NQ.CPPAG=arc mim covm- MOMS NV�3s1rs fitlysNta MJ7��: As I m6ndOmW ding our eaMw telephone=nversed6n,these in not a probiom with any of the•T C Bolts Ups wed off when lhey WOM hNbUnd In the steei stsueWre I AEtl>tougb it may seesms Rlce serious prvbtean,it Is Ohl a vary b*natkW feature of the T C soft. You can't over tenWon a T C Bolt during lnstalladm if a bait starts to elor4puk either the lluwads wW amp or the bait will o"iUmm to soafth until id breolat Please tools at the atbched drawing for a clesrsr>eacplanrrtloEL With stnulm d A32S aftucttsmi bolls.an�ortgatrd bold eon br sett in it:!conrrv�ion. when worker SWps 1'l timing with fto kapact tsreae , ire is no%my of imo% tg if a summand A3?.S has been overtrnraoned vn'Uwut removing it flf 'tfe�a-nR®clian and efieda'ng?t. The T C Bolt is diffemaL The w0dw has no oottaL Ws a cailbrafed bak if the butasw -bopped dgitming before the tip ou the bolt had twfslpd off,the p[essnts of the tip would be an ludic tia n,to the worker,the#the bolt Wd not baWfully d0tatud. It you iunte any qposftfm or requir+t any addllFonai=jisftncs,Please CWtact we at your convealtmlo�. i ; I I i I I ' I � I Savings Ban of Rockville 053 k Project No. : 4741 Report No. : July ill 2000 Page: 4 of 5 4 002 • f RCM FAX NO. Sul. 12 2000 01:S3AM p1 • � � �c 2 0 � 2 The drawing below is a rough graph of the failure curve of an A325 structural bat Once the bolt reaches its actual ultimate tensile strength[A), If you continue the tightening,it vall elongates until it breaks or the threads strgp. �r A i ' ► I o � a i . I 1 . 1 Savings Bank Of Rockville Project No. : 4741 July 11, 2000 Report No. : 053 Paget 5 of 5 NDEPENDENT MATERIALS TESTING 57 N. WASHINGTON STREET P.O. BOX 745 LABORATORIES, INC. r_ PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) 747-6455 NVLAP Accredited for Construction Testing Services STRUCTURAL STEEL INSPECTION REPORT CLIENT: Savings Bank of Rockville PROJECT NO. : 4741 PROJECT: Savings Bank of Rockville REPORT NO. : 052 INSPECTOR: Mike Brault, CWI 91100111 DATE: 07/10/00 SUBJECT: Field Verification Inspection PAGE: 1 OF 2 A field inspection was performed at the above-referenced project today. The purpose of this inspection was to verify that completed work was performed utilizing the engineer-approved drawings, the project specifications, and the American Welding Society Structural Welding Code D1.1. Field verification inspections were performed on structural steel framing on the Second Floor as follows: The writer arrived on site to obtain a resolution to the ASTM A325 high strength tension control bolt issue with 2-1/4" and 2- 1/2" 3/4" bolts, Lot Nos. 981210 and 81119008 noted in field report dated July 7, 2000 . Mr. Bob Dawson of Russell & Dawson Engineers and Steel Fab' s QC Manager, Mr. Maurice Grenier, reached a resolution on field bolts per our verbal conversations between Mr. Dawson and Mr. Grenier. Mr. Dawson felt that all bolts that had stripped out during tensioning should be removed and replaced with new A325 bolts . This task was performed by Steel Fab and replacement bolts were fully tensioned and found satisfactory upon visual inspections at knife connections on a majority of field connections . Test reports may not be reproduced except in full with approval of iMTL. All results relate only to the items tested. Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government. TESTING RESEARCH ANALYSIS INSPECTION CONSULTING Portland Cement Concrete Soils Steel Building Products Bituminous Concrete Savings Bank of Rockville Project No. : 4741 Report No. : 052 July 10, 2000 Page: 2 of 2 Seated connections still require bolts to be installed throughout the Second Floor framing. The writer informed the erector of this. Beam seat stabilizer angles, i .e. roll clips, were being welded at the Second Floor framing today but were not all completed. Welding on the Second Floor metal deck was also in progress today. 26-gauge form deck was being puddle welded to substrate members with the use of welding washers as required. Spacing was being adhered to for welding patterns . Connection of beams, Beams 4B9 to 5B11 just east of K-11, Second and Third Floors, and at Beams 6B8 to 3B2, Second and Third Floors were f ield-welded by the erector due to bQ�►�''�', %ci �% misalignment. Steel Fab is to produce field-weld sketGN6 FTC final weld inspection process . i � ��r fF- T -1►.' \ pc: Joseph Jeamel, Savings Bank of Rockville / Robert Dawson, Russell Dawson / John Collins, S . Windsor Building Official bh NDEPENDENT MATERIALS TESTING 57 N. WASHINGTON STREET P.O. BOX 745 LABORATORIES, INCf,.'�';'"�; PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) 747-05'5' NVLAP Accredited for Construction Testing Services STRUCTURAL STEEL INSPECTION REPORT ~' CLIENT: Savings Bank o Rockville :�%g f Roc lle PROJECT NO. . � �pI- rlltttti►���� PROJECT: Savings Bank of Rockville REPORT NO. : 055 INSPECTOR: Mike Brault, CWI 91100111 DATE: 07/12/00 SUBJECT: Field Verification Inspection A field inspection was performed at the above-referenced project today. The purpose of this inspection was to verify that completed work was performed utilizing the engineer-approved drawings, the project specifications, and the American Welding Society Structural Welding Code D1.1. Field verification and visual weld inspections were performed on column shop-deposited welds found unacceptable and undersized during shop inspections at Leo Chase Fabrication, Manchester, NH. Steel Fab, Inc. performed remedial welding in the field to comply with drawing, specifically weld sizes at the column to base plate connection. The following base plates were field repaired by Steel Fab and reinspected and found acceptable by the writer: Column 14C2, 15C1, 15C5 and 16C2 . Column base anchor bolt nuts were verified as being installed and snug-tight at this time except for the following locations: Column E-8 (118C) and K-11 (16C2) had insufficient thread projection through plates. Steel Fab has welded anchor stubs/studs to base plates. pc: Joseph Jeamel, Savings Bank of Rockville / Robert Dawson, Russell Dawson / John Collins, S . Windsor Building Official bh Test reports may not be reproduced except in Bull with approval of IMTL All results relate only to the items tested. T st reports must not be used by cli nt to claim product endorsement by NVLAP or any agency of the US Government. TESTING RESEARCH ANALYSIS INSPECTION CONSULTING Portland Cement Concrete Soils Steel Building Products Bituminous Concrete NDEPENDENT MATERIALS TESTING 57 N. WASHINGTON STREET P.O. BOX 745 LABORATORIES, bT 11 G'Co ,;,' '' £C� PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) 74.E a }� F. NVLAP Accredited for Construction Testing Services = =. STRUCTURAL STEEL INSPECTION REPORT ,o CLIENT: Savings Bank of Rockville PROJECT NO. PROJECT: Savings Bank of Rockville REPORT NO. : 056 INSPECTOR: Mike Brault, CWI 91100111 DATE: 07/17/00 SUBJECT: Field Verification Inspection PAGE: 1 of 2 A field inspection was performed at the above-referenced project today. The purpose of this inspection was to verify that completed work was performed utilizing the engineer-approved drawings, the project specifications, and the American Welding Society Structural Welding Code D1.1. Field verification inspections were performed- on structural steel framing from the Second Level up to the Third Floor framing as follows : Column plumbness was verified for conformance with AISC 1 :500 tolerance from the Second Floor to the Third Floor Framing. Columns were found to be plumb within the above tolerance. Visual weld inspections were performed on field welded floor joist to support beams, bridging, seat beam stabilizer angles and roll clips. Welds were fond to be satisfactory at this time. ASTM A325 field bolted connections at the Third Floor framing were visually surveyed for proper installation and tightening. As noted by the writer in field report dated July 11, 2000, high- strength bolts are stripping out during tensioning. Steel Fab is aware that bolts are stripped and will have to be removed and replaced per Mr. Dawson's instructions. Several of the connections, i.e. knife connections, seated beam bolts and beam to beam connections, were noted as loose and/or incomplete today. The erector was made aware of the locations to be completed and will rework bolted connections on Tuesday, July 18, 2000. pc: Joseph Jeamel, Savings Bank of Rockville / Robert Dawson, Russell Dawson / John Collins, S. Windsor Building Official bh Test reports may not be reproduced except in lull with approval of IMTL All results relate only to the Items tested. Test reports must not be used by cli nt to claim product endorsement by NVLAP or any agency of the US Govern nt. TESTING RESEARCH ANALYSIS INSPECTION CONSULTING Portland Cement Concrete Soils Ste I Building Products Bituminous Concrete Savings Bank of Rockville Project No. : 4741 Report- 056 July 2000 INDEPENDENT MATERIALS TESTING LAbUHA I uNitb ll%j Page : 2 of 2 P. 0. BOX 745 57 NORTH WASHINGTON STREET PLAINVILLE, CT 06062 .Steel Mike Brault Structural Steel $ Welding Inspector I ' CWI #91100111 PROJECT: V1 LOCATION O .� R PIECEMARK. Awaiting Date Inspected Date of Date Engineer's Report Item j Field (F) and Rejected Rework Accepted Decision Number Numb�'Y)N er Comments 7 � s s / a2 03 w D S;z 403 o y 0i 05 J6 NDEPENDENT MATERIALS TESTING 57 N. WASHINGTON STREET ````��,,, P.O. BOX 745 LABORATORIES, I N O.\\o� 1 ,4'v4s`j PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) 74�� ?y� 1F' � a NVLAP Accredited for Construction Testing Services STRUCTURAL STEEL INSPECTION REPORT �0 <�C X. s CLIENT: Savings Bank of Rockville PROJECT NO. : PROJECT: Savings Bank of Rockville REPORT NO. : 057 INSPECTOR: Jim Howard, CAWI 99080304 DATE: 07/18/00 SUBJECT: Field Verification Inspection A field inspection was performed at the above-referenced project today. The purpose of this inspection was to verify that completed work was performed utilizing the engineer-approved drawings, the project specifications, and the American Welding Society Structural Welding Code D1.1. The writer arrived on site to verify size and spacing of Third Floor puddle welds and to examine bolted connections on the Third Floor framing. Puddle welds were of an acceptable size and spaced at 2' on center as required. Bolted connections on the Third Floor framing have bolts installed. At this time there are approximately 15 high-strength tension control bolts that have not been tightened/snapped due to their being stripped. The erection foreman stated that these bolts will be removed and new bolts installation in the near future. pc : Joseph Jeamel, Savings Bank of Rockville / Robert Dawson, Russell Dawson / John Collins, S . Windsor Building Official bh Test reports may not be reproduced exc pt in full with approval of IMTL All results relate only to the Items tested. Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government: TESTING RESEARCH ANALYSIS INSPECTION CONSULTING Portland Cement Concrete Soils Steel Building Products Bitumin us Concrete NDEPENDENT MATERIALS TESTING 57 N. WASHINGTON STREET P.O. BOX 745 LABORATORIES, INC;,,`,\,` o;J. _ '.r1F�T%� PLAINVILLE, CONNECTICUT 06062 - � " (860) 747-1000 FAX (860) 747-6��S5f NVLAP Accredited for Construction Testing Services = T- -� _ STRUCTURAL STEEL INS.PECTIC REPORT = CLIENT: Savings Bank of Rockville PROJECT NO. :��''�,740I�,;.L�,'`7```� PROJECT: Savings Bank of Rockville REPORT NO. : 059 INSPECTOR: Travis Curtis DATE: 08/07/00 SUBJECT: Field Verification Inspection PAGE: 1 of 2 A field inspection was performed at the above-re=erenced project today. The purpose of this inspection_ was to verify that completed work was performed utilizing the engineer-approved drawings, the project specifications, and the American Welding Society Structural Welding Code D1 . 1 . Column plumbness was checked on the Third Floor. Column Locations D-8 and K-11 were found to be 1/," off RISC 1 :500 tolerance. All other Third Floor columns were within tolerance. -� Y." fillet welds 1" in length for roof framing to joist were inspected and found to be in accordance with AWS D1. 1 and approved drawings . NOTE: No uplift bridging (not on print) . Roll clip angles were not installed in accordance with RISC specifications on the roof level . Not all tension control bolts were snapped off at the roof level . 5/8" puddle welds were acceptable thus far. Change is needed for welding in lieu of bolting at 8B2 to 8B1 and two (2) separate 1OB2 beams to 18B1 . Steel Fab required to submit approved field weld sketch. Anchor bolts at A-3 and A-6 were verified as being snug tight . Columns at A-3 and A-6 were verified for plumbness and conformed with AISC 1 :500 tolerance at this time. ASTM A325 high-strength bolts were found to be properly installed and fully tensioned. pc : Joseph Jeamel, Savings Bank of Rockville / Robert Dawson, Russell Dawson / John Collins, S . Windsor Building Official / Dick Ryan, Ryan Assocs . -� bh Test reports may not be reproduced exc pt in full with approval of 1MTL. All results relate only to the items tested. Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government. TESTING RESEARCH ANALYSIS INSPECTION CONSULTING Portland Cement Concrete Soils Steel Building Products Bituminous Concrete INDEPENDENT MATIAIIALS TESTING I.A13011ATOMES, INC. V. O. 130 X 711:1 57 N10111l•1 WASI IINGTON S"1'111:l;•I' PLAINVILLE, CT 06062 Stool - Oulstaltlhtu Noit-t:ut►fomilllos Structurol Steel & Woklinu Inspector LOCATION OR PICCEMAnK: Awahloill 0010 111specled Dato of hate Etillhwar's 110110rt Item Field (FI uiscl 111110wild flowrnk Accepted Ducisirnt Numim Number Cunn��c��ts I L j noC'\ i}ran n►� .l� 1 � F_. � � � �.- �` Io -4�I� -oo 01 �- Bank of Rockville } Savings , Project No. : 4741 i?���, ,► � NDEPENDENT MATERIALS TESTING 57 N. WASHINGTON STREET `` `�''''�� , LABORATORIES III P.O. BOX 745 PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) 74 -65==` ~1� NVLAP Accredited for Construction Testing Services j STRUCTURAL STEEL INSPECTION REPORT i CLIENT: Savings Bank of Rockville PROJECT NO. : �ya'�'�►� PROJ"-'-C'T: Sav_ncs Bark of Rockville REPC-RT NO. . 060 INSPECTOR: Mike Brault, CWI 91100111 DATE: 08/09/00 SUBJECT: Field Verification Inspection PAGE: 1 of 2 A field inspection was performed at the above-referenced project today. The purpose of this inspection was to verify that completed work was performed utilizing the engineer-approved drawings, the project specifications, and the American Welding Society Structural Welding Code D1. 1. Roof deck inspections were performed at the high roof and drive- thru framing roof for proper puddle welding and spacing to substrate members and mechanically fastened side laps . Welding and side lap screws were found satisfactory at both roof deck locations . The writer reinspected the incomplete/non-conforming items list from July 7, 2000 and July 17, 2000 . Item Nos . 01, 02 , 04 and 05 were reinspected and found completed. Item Nos . 03 and 06 require Steel Fab to submit detailed weld sketches for review and approval by Dawson Engineers before a final inspection can be per-formed to remove these items from the outstanding list . Roof framing seated beam connection bolts were found loose and/or incomplete during inspection interval were tightened by the erector to a snug-tight condition which is satisfactory for bearing-type connections. pc : Joseph Jeamel, Savings Bank of Rockville / Robert Dawson, Russell Dawson / John Collins, S . Windsor Building Official / Dick Ryan, Ryan Assocs . bh Test reports may not be reproduced except in full with approval of IMTL. All results relate only to the Items tested. Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government. TESTING RESEARCH ANALYSIS INSPECTION CONSULTING Portland Cement Concrete Soils Steel Building Products Bituminous Concrete INDEPENDENT MATERIALS TESTING LABORATORIES, INC. P. O. BOX 745 57 NORTH WASHINGTON STREET ' PLAINVILLE, CT 06062 Sloel -xkj�'�ol�E,�Q,yn . Mike Brault Structural Steel & Welding Inspector CWI #91 1001 1 1 i PROJECT: Vi I � ..00AIION OR PIECEMARK: Awolllrrg Date Inspected Date of Date Engineer's Report Item Field (F) and Rejected Rework Accepted Decision Number Number Comments M:nz �2,el 7/� Urr)N � s C)z T'✓/ �pN �$ cna 03 -7109 13 l �5�->� c2�►r _X�- ;100� yon� dQ4 7117 O5 -7117 Savings Bank of Rockville Project No. : 4741 Report No. : 060 = August 9, 2000 Pac1e : 2 of 2