HomeMy WebLinkAbout1645 Ellington Road (4) NDEPENDENT MATERIALS TESTING
57 N. WASHINGTON STREET
P.O. BOX 745 LABORATORIES, I M
PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860)
a
NVLAP Accredited for Construction Testing Services co
REBAR INSPECTION
to —
CLIENT: Savings Bank of Rockville PROJECT NOS:%;�0,*7,4,
PROJECT: Savings Bank of Rockville REPORT NO. : 001
DATE: April 27, 2000 PAGE: 1 of 2
LOCATION: B-Line and C-Line, 1 Through 14
INSPECTOR: Mark Richardson
Percentage of Completion at Time of Inspection
REBAR: 100% FORMWORK: 100%
1 . Rebar sizes, spacing from each other and formwork:
Deficiencies :
Comments: #5s continuous bottom of footing as 12" on center;
#4s and #6s.
2 . Rebar quality, cleanliness, rust, grease, etc. :
Deficiencies:
Comments:
3 . Positioning of Rebar:
Use of chairs:
Comments: Yes, chaired off ground for 3" coverage.
Adequacy of firm tie offs: Tie off was adequate
Comments:
Are dowels in place now? : No X Yes N/A
Comments:
4 . Rebar splicing:
Diameter of laps: #4 1' -6" ; #5 1' -11410 ; #6 2' -3"
Is wiring adequate?
Comments:
Test reports may not be reproduced except in full with approval of IMTL All results relate only to the Items tested.
Test reports must not be used by client to delm product endorsement by NVLAP or any agency of the US Government
TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
• Portland Cement Concrete Soils Steel Building Products Bituminous Concrete
Savings Bank of Rockville
Project No. : 4741 Report No. : 001
April 27, 2000 Page: 2 of 2
5 . Construction joint quality -- cleanliness, water, etc.
Depth: Width: Shape:
Comments:
6 . General condition of forms in place:
Cleanliness:
Oiled: Yes: No: X
Conditions:
Comments:
7 . Quality of formwork:
Trueness in 3611 : Straight
Plumbness in 3611 : True
Line Straightness: Plumb
Bracing:
Comments:
8 . Formwork inside dimensions, L, H, W.
Measure Dimensions: Various 12" 36"
Comments: .
9 . Is a follow-up inspection necessary just prior to the
concrete placement: Yes X No
If so, for which item numbers:
10 . List discrepancies:
PC: Joseph Jeamel, Savings Bank of Rockville / Robert Dawson,
Russell Dawson / Gene Bowles, Vernon Building Official
bh
NDEPENDENT MATERIALS TESTING
57 N. WASHINGTON STREET
P.O. BOX 745 LABORATORIES, ING.:'111:.,;
0 _..
PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) A7-6455.-
NVLAP Accredited for Construction Testing Services
REBAR INSPECTION
L l 01
CLIENT: Savings Bank of Rockville PROJECT " 4:�4I
PROJECT: Savings Bank of Rockville REPORT NO. .
DATE: May 2 , 2000 PAGE: 1 of 2
LOCATION: Elevator Footing
INSPECTOR: Brian Benson
Percentage of Completion at Time of Inspection
REBAR: 100% FORMWORK: 100%
1 . Rebar sizes, spacing from each other and formwork:
Defic-encies :
Comments : Satisfactory; #5s at 12" on center each way, top_
and bottom; #5 dowels at 12" on center interior face.
2 . Rebar quality, cleanliness, rust, grease, etc. : Satisfactory
Deficiencies :
Comments :
3 . Positioning of Rebar: Satisfactory
Use of chairs : 3-1/21 continuous steel .
Comments :
Adequacy of firm tie offs :
Comments :
Are dowels in place now? : No Yes X N/A
Comments :
4 . Rebar splicing:
Diameter of laps :
Is wiring adequate? Yes
Comments:
Test reports may not be reproduced except in full with approval of IMTL. All results relate only to the items tested.
Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government.
TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
Portland Cement Concrete Soils Steel Building Products Bituminous Concrete
Savings Bank of Rockville
Project No. : 4741 Report No. : 012
May 2, 2000 Page: 2 of 2
5 . Construction joint quality -- cleanliness, water, etc.
Depth: 1-1/2" Width: 3-1/2" Shape: X
Comments : The contractor is to hand-cut keyway.
6 . General condition of forms in place:
Cleanliness : Satisfactory
Oiled: Yes : No: x
Conditions :
Comments :
7 . Quality of formwork:
Trueness in 3611 : Satisfactory
Plumbness in 3611 :
Line Straightness :
Bracing:
Comments :
8 . Formwork inside dimensions, L, H, W.
Measure Dimensions :
Comments : .
9 . Is a follow-up inspection necessary just prior to the
concrete placement : Yes X No
If so, for which item numbers :
10 . List discrepancies : Rebar shopdrawings showed a rubber
waters op, s ructural drawing did not specify a waterstop
The contractor had no waterstop material on site. The
contractor stated he would place Voclay waterstop in keyway
when placing wall .
pc : Joseph Jeamel, Savings Bank of Rockville / Robert Dawson,
Russell Dawson / John Collins, S . Windsor Building Offical
bh
NDEPENDENT MATERIALS TESTING
57 N. WASHINGTON STREET
LABORATORIES,P.O. BOX 745
PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (86000
7`�� =• ' ''���''
--, ':
NVLAP Accredited for Construction Testing Services =
REBAR INSPECTION - ~'= 40
t
PO �• f
CLIENT: Savings Bank of Rockville PROJECT NO-.v sS1a,. �•'��.�`�
illll m0
PROJECT: Savings Bank of Rockville REPORT NO. : 010
DATE: May 4, 2000 PAGE: 1 of 2
LOCATION: Footing from D/1 to M/2
INSPECTOR: Shawn Roberts
Percentage of Completion at Time of Inspection
REBAR: 100% FORMWORK: 100%
1. Rebar sizes, spacing from each other and formwork:
Deficiencies: Clearances to forms required adjustments.
Comments: Rebar sizes and spacing were correct.
2 . Rebar quality, cleanliness, rust, grease, etc. :
Deficiencies:
Comments: Rebar was clean and Grade 60.
3 . Positioning of Rebar: Good
Use of chairs: Continuous high chairs used to support rebar.
Comments:
Adequacy of firm tie offs: Good
Comments: vertical pier dowels tied in place.
Are dowels in place now? : No Yes X N/A
Comments:
4. Rebar splicing: Good
Diameter of laps: 36 bar diameter laps
Is wiring adequate? Yes
Comments:
Test reports may not be reproduced except In full with approval of IMTL All results relate only to the Items tested.
Test reports must not b used by client to claim product endorsement by NVLAP or any agency of the US Government.
• TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
Portland Cement Concrete Solis Steel Building Products Bituminous Concrete
Savings Bank of Rockville
Project No. : 4741 Report No. : 010
May 4, 2000 Page: 2 of 2
5 . Construction joint quality -- cleanliness, water, etc.
Depth: Width: Shape:
Comments: Keyed with continuous horizontal reinforcement.
6. General condition of forms in place:
Cleanliness: Good
Oiled: Yes: No: X
Conditions: Good
Comments:
7. Quality of formwork:
Trueness in 3611 : Good
Plumbness in 3611 :
Line Straightness: Good
Bracing: Good
Comments:
8 . Formwork inside dimensions, L, H, W.
Measure Dimensions: Dimensions were correct.
Comments: .
9. Is a follow-up inspection necessary just prior to the
concrete placement : Yes X No
If so, for which item numbers:
10 . List discrepancies:
pc: Joseph Jeamel, Savings Bank of Rockville / Robert Dawson,
Russell Dawson / Gene Bowles, Vernon Building Official
bh
NDEPENDENT MATERIALS TESTING
57 N. WASHINGTON STREET
P.O. BOX 745 LABORATORIES, 11*q.: ;�A;^
PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) 74:tl
NVLAP Accredited for Construction Testing Services
_ r _
REBAR INSPECTION '; =
.p
CLIENT: Savings Bank of Rockville PROJECT N���S ' C;:J ; •�\��`\
zv .
g r 4�c, `.�
fit
PROJECT: Savings Bank of Rockville REPORT NO. : 014
DATE: May 8, 2000 PAGE: 1 of 3
LOCATION: Walls
INSPECTOR: Shawn Roberts
Percentage of Completion at Time of Inspection
REBAR: 100% FORMWORK: 100%
1. Rebar sizes, spacing. from each other and formwork:
Deficiencies:
Comments: Rebar sizes and spacings were correct.
•— 2 . Rebar quality, cleanliness, rust, grease, etc. :
Deficiencies:
Comments: Rebar was clean and Grade 60.
3 . Positioning of Rebar: Satisfactory
Use of chairs: Used to chair off footings.
Comments:
Adequacy of firm tie offs : Satisfactory
Comments: Top bars hung and tied off.
Are dowels in place now? : No Yes N/A X
Comments:
4 . Rebar splicing: Good
Diameter of laps: 36 bar diameters
Is wiring adequate? Yes
Comments:
O
Test reports may not be reproduced except In full with approval of iMTL All resuHs relate only to the Items tested.
Test reports must not be used by client to claim product endorsem nt by NVLAP r any agency of the US Government.
TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
Portland Cement Concrete Solis Steel Building Products Bituminous Concrete
Savings Bank of Rockville
Project No. : 4741 Report No. : 014
May 8, 2000 Page: 2 of 3
5 . Construction joint quality -- cleanliness, water, etc.
Depth: Width: Shape:
Comments: Keyway was clean. Walls keyed with continuous
rebar.
6. General condition of forms in place:
Cleanliness : Good '
Oiled: Yes: X No:
Conditions: Good
Comments: Steel forms used
7. Quality of formwork:
Trueness in 3611 : Good
Plumbness in 3611 : Good
Line Straightness: Good
Bracing: Good
Comments:
8 . Formwork inside dimensions, L, H, W.
Measure Dimensions: 12" walls
Comments: .
9. Is a follow-up inspection necessary just prior to the
concrete placement : Yes X No
If so, for which item numbers:
10 . List discrepancies: The writer spoke with WJ Mountford about
curing tne waiis per ACI 301, Section 12 . The Engineer has
specified this. WJ Mountford plans to use a curing compound.
pc: Joseph Jeamel, Savings Bank of Rockville / Robert Dawson,
Russell Dawson / John Collins, S. Windsor Building Offical
bh
GJAc.Ls
Savings Bank of Rockville
Project No. : 4741 Report No. : 014
May 8, 2000 Page: 3 of 3
NDEPENDENT MATERIALS TESTING
57 N. WASHINGTON STREET
P.O. BOX 745 LABORATORIES, INC,,�,�'�;�;ar-rr ,
PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) 747,��::'
NVL4P Accredited for Construction Testing Services _
REBAR INSPECTION =
CLIENT: Savings Bank of Rockville PROJECT NO.����s
PROJECT: Savings Bank of Rockville REPORT NO. : 016
DATE: May 9, 2000 PAGE: 1 of 2
LOCATION: Column Footings D-8, 10, 12 and 4
INSPECTOR: Mike Celotti
Percentage of Completion at Time of Inspection
REBAR: 100$ FORMWORK: 100-W
1. Rebar sizes, spacing from each other and formwork:
Deficiencies:
Comments: Satisfactory
2 . Rebar quality, cleanliness, rust, grease, etc. :
Deficiencies:
Comments: Satisfactory
3 . Positioning of Rebar: Per specs.
Use of chairs: Adequate
Comments:
Adequacy of firm tie offs: Adequate
Comments:
Are dowels in place now? : No Yes X N/A
Comments:
4. Rebar splicing: 40+ bar diameters
Diameter of laps:
Is wiring adequate? Yes
• Comments:
Test reports may not be reproduced except In full with approval of IMTL. All results relate ony to the Items tested.
Test reports must not b used by di nt to claim product endorsem nt by NVLAP or any agency of the US Govemm nt.
TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
Portland Cement Concrete Solis steel Building Products Bituminous Concrete
Savings Bank of Rockville
Project No. : 4741 Report No. : 016
May 9, 2000 Page: 2 of 2
5. Construction joint quality -- cleanliness, water, etc.
Depth: Width: Shape:
Comments:
6. General condition of forms in place:
Cleanliness: Clean
Oiled: Yes: X No:
Conditions: Good
Comments:
7. Quality of formwork:
Trueness in 36" : True
Plumbness in 36" : Plumb
Line Straightness: Straight
Bracing:
Comments:
8 . Formwork inside dimensions, L, H, W.
Measure Dimensions:
Comments: .
9. Is a follow-up inspection'necessary just prior to the
concrete placement: Yes X No
If so, for which item numbers:
10 . List discrepancies:
pc: Joseph Jeamel, Savings Bank of Rockville / Robert Dawson,
Russell Dawson / John Collins, S. Windsor Building Offical
r bh
NDEPENDENT MATERIALS TESTING
57 N. WASHINGTON STREET
P.O. BOX 745 LABOR
PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860)?4�--
NVLAP Accredited for Construction Testing Services _ j=
REBAR INSPECTION
CLIENT: Savings Bank of Rockville PROJECT NO.�'����,`4.T1.►� ` `
PROJECT: Savings Bank of Rockville REPORT NO. : 019
DATE: May 10, 2000 PAGE: 1 of 2
LOCATION: Lines 1 and 2 , F to M
INSPECTOR: Curt Phillips
Percentage of Completion at Time of Inspection
REBAR: 100% FORMWORK: 100%
1 . Rebar sizes, spacing from each other and formwork:
Deficiencies :
Comments : Satisfactory; the contractor made adjustments for
clearances from formwork. Reinforcement was consistent with
structural and rebar drawings.
2 . Rebar quality, cleanliness, rust, grease, etc. : Satisfactory
Deficiencies :
Comments :
3 . Positioning of Rebar: Satisfactory
Use of chairs :
Comments :
Adequacy of firm tie offs : Satisfactory
Comments :
Are dowels in place now? : No Yes N/A X
Comments :
4 . Rebar splicing: Satisfactory
Diameter of laps . 36 bar diameters
Is wiring adequate? Yes
Comments:
Test reports may not be reproduced except in full with approval of IMTL. All results relate only to the items tested.
Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government.
TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
Portland Cement Concrete Soils Steel Building Products Bituminous Concrete
Savings Bank of Rockville
Project No. : 4741 Report No. : 019
May 10, 2000 Page : 2 of 2
5 . Construction joint quality -- cleanliness, water, etc.
Depth: 2" Width: 4" Shape: Chamfer
Comments : Keyed with continuous horizontal steel
6 . General condition of forms in place:
Cleanliness : Satisfactory
Oiled: Yes : X No:
Conditions : Satisfactory
Comments :
7 . Quality of formwork: Satisfactory
Trueness in 3611 : Satisfactory
Plumbness in 361177 Satisfactory
Line Straightness : Satisfactory
Bracing: Satisfactory
Comments:
8 . Formwork inside dimensions, L, H, W.
Measure Dimensions : L: 64' 1 H: 4' ; W: 1'
Comments: .
9 . Is a follow-up inspection necessary just prior to the
concrete placement : Yes X No
If so, for which item numbers :
10 . List discrepancies : The writer recommended that pier anchor
o `s Joe piacea prior to pouring the wall The
Superintendent elected to wet set bolts Therefore, these
embedments could not be confirmed during inspection of
reinforcement .
PC : Joseph Jeamel, Savings Bank of Rockville / Robert Dawson,
Russell Dawson / John Collins, S . Windsor Building Offical
bh
NDEPENDENT MATERIALS TESTING
57 N. WASHINGTON STREET
�t�>>>�rrrrrrir,
P.O. BOX 745 LABORATORIES, IN.
PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) '4 _
NVLAP Accredited for Construction Testing Services = _
REBAR INSPECTION ^�` I�{f :f
CLIENT: Savings Bank of Rockville PROJECT NO. 4,, -4741
PROJECT: Savings Bank of Rockville REPORT NO. : 021
DATE: May 15, 2000 PAGE: 1 of 2
LOCATION: Footings at B/2 and M/4 to L/9
INSPECTOR: Shawn Roberts
Percentage of Completion at Time of Inspection
REBAR: 100% FORMWORK: 100%
1 . Rebar sizes, spacing from each other and formwork:
Deficiencies :
Comments : Rebar sizes and spacing were correct .
2 . Rebar quality, cleanliness, rust, grease, etc. :
Deficiencies :
Comments : Rebar was clean.
3 . Positioning of Rebar: Good
Use of chairs : Used to chair rebar 3" off earth.
Comments :
Adequacy of firm tie offs : Good
Comments :
Are dowels in place now? : No Yes X N/A
Comments:
4 . Rebar splicing: Good
Diameter of laps : 36 bar diameters
Is wiring adequate? Yes
Comments :
Test reports may not be reproduced except in full with approval of IMTL. All results relate only to the items tested.
Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government.
TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
Portland Cement Concrete Soils Steel Building Products Bituminous Concrete
Savings Bank of Rockville
Project No. . 4741 Report No. . 021
May 15, 2000 Page: 2 of 2
5 . Construction joint quality -- cleanliness, water, etc.
Depth: Width: Shape:
Comments : Keyed with continuous horizontal steel .
6 . General condition of forms in _place:
Cleanliness : Good
Oiled: Yes : No: X
Conditions : Good
Comments : Soft mud and water removed from bearing surface.
7 . Quality of formwork:
Trueness in 3611 : Good
Plumbness in 3611 :
Line Straightness : Good
Bracing: Good
Comments:
8 . Formwork inside dimensions, L, H, W.
Measure Dimensions : Dimensions met or exceeded drawings .
Comments : .
9 . Is a follow-up inspection necessary just prior to the
concrete placement : Yes X No
If so, for which item numbers :
10 . List discrepancies :
PC : Joseph Jeamel, Savings Bank of Rockville / Robert Dawson,
Russell Dawson / John Collins, S . Windsor Building Offical
bh
NDEPENDENT MATERIALS TESTING
57 N. WASHINGTON STREET
P.O. BOX 745 LABORATORIES, IN,G;
PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860)�,�64�3 -.,=_;`'•••. -
NVLAP Accredited for Construction Testing Services
REBAR INSPECTION
CLIENT: Savings Bank of Rockville PROJECT PA 1,
PROJECT: Savings Bank of Rockville REPORT NO. : 023
DATE: May 16, 2000 PAGE: 1 of 2
LOCATION: Wall from D-2 to 2-4 and from D-14 to I-13
INSPECTOR: Mike Celotti
Percentage of Completion at Time of Inspection
REBAR: 100% FORMWORK: 100%
1 . Rebar sizes, spacing from each other and formwork:
Deficiencies :
Comments : Satisfactory
2 . Rebar quality, cleanliness, rust, grease, etc. :
Deficiencies :
Comments : Satisfactory
3 . Positioning of Rebar: Per specs .
Use of chairs : Adecruate
Comments:
Adequacy of firm tie offs : Adequate
Comments:
Are dowels in place now? : No Yes X N/A X
Comments :
4 . Rebar splicing: 2 ' -6"
Diameter of laps :
Is wiring adequate? Yes
Comments :
Test reports may not be reproduced except in full with approval of IMTL. All results relate only to the items tested.
Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government
TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
Portland Cement Concret Soils Steel Building Products Bituminous Concrete
Savings Bank of Rockville
Project No. : 4741 Report No. : 023
May 16, 2000 Page: 2 of 2
5 . Construction joint quality -- cleanliness, water, etc.
Depth: Width: Shape:
Comments :
6 . General condition of forms in place:
Cleanliness : Clean
Oiled: Yes : X No :
Conditions : Good
Comments :
7 . Quality of formwork:
Trueness in 3611 : True
Plumbness in 3611 : Plumb
Line Straightness : Straight
Bracing: Adequate
Comments :
8 . Formwork inside dimensions, L, H, W.
Measure Dimensions :
Comments : .
9 . Is a follow-up inspection necessary just prior to the
concrete placement : Yes X No
If so, for which item numbers :
10 . List discrer)ancies :
PC: Joseph Jeamel, Savings Bank of Rockville / Robert Dawson,
Russell Dawson / John Collins, S. Windsor Building Offical
bh
NDEPENDENT MATERIALS TESTING
57 N. WASHINGTON STREET
P.O. BOX 745 LABORATORIES,
LABOR ��� " •1"`^•'� +^ ��'
PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) f47=64
NVLAP Accredited for Construction Testing Services
REBAR INSPECTION ,
CLIENT: Savings Bank of Rockville PROJECT NO. :
PROJECT: Savings Bank of Rockville REPORT NO. : 026
DATE: May 17, 2000 PAGE: 1 of 2
LOCATION: Elevator Walls Footings
INSPECTOR: Shawn Roberts
Percentage of Completion at Time of Inspection
REBAR: 100% FORMWORK: 10096
1 . Rebar sizes, spacing from each other and formwork:
Deficiencies : Adjustments to clearances and coverage
required.
Comments : Rebar and spacing were good.
2 . Rebar quality, cleanliness, rust, grease, etc. :
Deficiencies :
Comments : Rebar was clean and Grade 60
3 . Positioning of Rebar: Satisfactory
Use of chairs : Chairs used to support rebar off earth
Comments : Rebar was positioned per drawings .
Adequacy of firm tie offs : Good
Comments : Rebar was secured in place to keep it from moving
during concrete placement .
Are dowels in place now? : No X Yes N/A
Comments : Slab dowels were wet set .
4 . Rebar splicing: Good
Diameter of laps: 36 bar diameters
Is wiring adequate? Yes
Comments : Bars were full length. Corner bars used to make
bars continuous.
Test reports may not be reproduced except in full with approval of IMTL. All results relate only to the items tested.
Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government.
TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
Portland Cement Concrete Soils Steel Building Products Bituminous Concrete
Savings Bank of Rockville
Project No. : 4741 Report No . : 026
May 17, 2000 Page: 2 of 2
5 . Construction joint quality -- cleanliness, water, etc.
Depth: Width: Shape:
Comments : Footings keyed and clean and ready to receive
concrete.
6 . General condition of forms in place:
Cleanliness : Good
Oiled: Yes : X No:
Conditions : Good
Comments :
7 . Quality of formwork:
Trueness in 3611 : Good
Plumbness in 3611 : Good
Line Straightness : Good
Bracing: Good
Comments :
8 . Formwork inside dimensions, L, H, W.
Measure Dimensions : Dimensions were correct .
Comments : .
9 . Is a follow-up inspection necessary just prior to the
concrete placement : Yes X No
If so, for which item numbers:
10 . List discrepancies : W.J. Mountford used a nail on type
wa ers op WHIM was adhered to the footing.
pc : Joseph Jeamel, Savings Bank of Rockville / Robert Dawson,
Russell Dawson / John Collins, S . Windsor Building Offical
bh
NDEPENDENT MATERIALS TESTING
57 N. WASHINGTON STREET
P.O. BOX 745 LABORATORIES,
PLAINVILLE, CONNECTICUT 06062
(860) 747-1000 FAX (860) 4� 41 ,
5
NVLAP Accredited for Construction Testing Services _
000
,00
GENERAL INSPECTION REPORT _ 0�
610.
CLIENT: Savings Bank of Rockville PROJECT NO" -�, 4.`7.4,1-
PROJECT: Savings Bank of Rockville REPORT NO. : 027
INSPECTOR: Shawn Roberts DATE: 05/18/00
SUBJECT: Rebar and Concrete Inspections
IMTL' s Representative arrived on site for scheduled rebar and
concrete inspections . W.J. Mountford' s representatives informed
the writer that the concrete pour was canceled due to rain.
The writer reviewed bottom reinforcement to walls and found it to
be correct . W.J. Mountford will reschedule for concrete
placement .
pc : Joseph Jeamel, Savings Bank of Rockville / Roberc Dawson,
Russell Dawsen / John Collins, S . Windsor Building Official
bh
Test reports may not be reproduced except in full with approval of IMTL. All results relate only to the Items tested.
Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government.
TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
Portland Cement Concrete soils Steel Building Products Bituminous Concrete
NDEPENDENT MATERIALS TESTING
57 N. WASHINGTON STREET
P.O. BOX 745 LABORATORIES, INC.',,'!
PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) =6.465=�
NVLAP Accredited for Construction Testing Services
REBAR INSPECTION = -
490 _
CLIENT: Savings Bank of Rockville PROJECT 1�rlb,:!S,,-;, �4� ��•�`
PROJECT: Savings Bank of Rockville REPORT NO. : 032
DATE: May 22 , 2000 PAGE: 1 of 2
LOCATION: Footings H/5, H/8, H/10, I/5 and Pier E/12
INSPECTOR: Shawn Roberts
Percentage of Completion at Time of Inspection
REBAR: 100% FORMWORK: 100%
1 . Rebar sizes, spacing from each other and formwork:
Deficiencies :
Comments: Rebar sizes and spacing were correct .
2 . Rebar duality, cleanliness, rust, grease, etc. :
Deficiencies :
Comments : Rebar was clean and Grade 60 .
3 . Positioning of Rebar: Per Drawing
Use of chairs : Chairs used to su oort rebar.
Comments :
Adequacy of firm tie offs : Good
Comments :
Are dowels in place now? : No Yes X N/A
Comments :
4 . Rebar splicing:
Diameter of laps: 36 bar diameters
Is wiring adequate?
Comments : Bars were full length.
Test reports may not be reproduced except in full with approval of IMTL. All results relate only to the items tested.
Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government.
TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
Portland Cement Concrete Soils Steel Building Products Bituminous Concrete
Savings Bank of Rockville
Project No. : 4741 Report No. : 032
May 22, 2000 Page: 2 of 2
S . Construction joint quality -- cleanliness, water, etc.
Depth: Width: Shape:
Comments :
6 . General condition of forms in place:
Cleanliness : Good
Oiled: Yes: No : X
Conditions : Good
Comments :
7 . Quality of formwork:
Trueness in 3611 : Good
Plumbness in 3611 : Good
Line Straightness : Good
Bracing: Good
Comments :
r- 8 . Formwork inside dimensions, L, H, W.
Measure Dimensions : Per pier and footing schedule.
Comments : .
9 . Is a follow-up inspection necessary just prior to the
concrete placement : Yes X No
If so, for which item numbers :
10 . List discrepancies :
pc : Joseph Jeamel, Savings Bank of Rockville / Robert Dawson,
Russell Dawson / John Collins, S . Windsor Building Offical
bh
NDEPENDENT MATERIALS TESTING
57 N. WASHINGTON STREET
P.O. BOX 745 LABORATORIES,
PLAINVILLE, CONNECTICUT 06062 (860) 747-1000 FAX (860) 747- 45
NVLAP Accredited for Construction Testing Services = - ,R
s s -
REBA.R INSPECTION
CLIENT:
Savings Bank of Rockville PROJECT
PROJECT: Savings Bank of Rockville REPORT NO. : 033
DATE: May 23 , 2000 PAGE: 1 of 2
LOCATION: Footings J/8, J/10, K/11 and M/9 to I/12
INSPECTOR: Shawn Roberts
Percentage of Completion at Time of Inspection
REBAR: 100% FORMWORK: 1003
1 . Rebar sizes, spacing from each other and formwork:
Deficiencies :
Comments : Rebar sizes ands acing were correct
2 . Rebar quality, cleanliness, rust, grease, etc. :
Deficiencies :
Comments : Rebar was clean and Grade 60 .
3 . Positioning of Rebar: Per Drawing
Use of chairs : Chairs used to support rebar mats
Comments :
Adequacy of firm tie offs : Good
Comments:
Are dowels in place now? : No Yes X N/A
Comments :
4 . Rebar splicing: Good
Diameter of laps: 36 bar diameters
Is wiring adequate? Yes
Comments:
Test reports may not be reproduced except in full with approval of IMTL. All results relate only to the items tested.
Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government.
TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
Portland Cement Concrete Soils Steel Building Products Bituminous Concrete
Savings Bank of Rockville
Project No. : 4741 Report No. : 033
May 23 , 2000 Page: 2 of 2
S . Construction joint quality -- cleanliness, water, etc.
Depth: Width: Shape :
Comments : Footing keyed with continuous rebar.
6 . General condition of forms in place:
Cleanliness : Good
Oiled: Yes : No: X
Conditions : Good
Comments :
7 . Quality of formwork:
Trueness in 3611 : Good
Plumbness in 3611 : Good
Line Straightness : Good
Bracing: Good
Comments :
8 . Formwork inside dimensions, L, H, W.
Measure Dimensions: Good
Comments : .
9 . Is a follow-up inspection necessary just prior to the
concrete placement : Yes X No
If so, for which item numbers:
10 . List discrepancies :
pc : Joseph Jeamel, Savings Bank of Rockville / Robert Dawson,
Russell Dawson / John Collins, S . Windsor Building Offical
bh
NDEPENDENT MATERIALS TESTING
57 N. WASHINGTON STREET
P.O. BOX745 LABORATORIES _
PLAINVILLE, CONNECTICUT 06062 f(860) 747-1000 FAX (860)-T-4�'-
NnAP Accredited for Construction Testing Services
REBAR INSPECTION
CLIENT: Savings Bank of Rockville PROJECT NO.1�.II ,,�``��\\
PROJECT: Savings Bank of Rockville REPORT NO. : 043
DATE: June 7, 2000 PAGE: 1 of 2
LOCATION: Vault Pad
INSPECTOR: Brian Benson
Percentage of Completion at Time of Inspection
REBAR: 100% FORMWORK: 100%
1 . Rebar sizes, spacing from each other and formwork:
Deficiencies :
Comments : Satisfactory; #5s at 4" on center each way, top and
bottom.
2 . Rebar quality, cleanliness, rust, grease, etc. : Satisfactory
Deficiencies :
Comments :
3 . Positioning of Rebar: Satisfactory
Use of chairs : 5-1/2 continuous steel between mats .
Comments :
Adequacy of firm tie offs :
Comments :
Are dowels in place now? : No Yes N/A X
Comments:
4 . Rebar splicing:
Diameter of laps :
Is wiring adequate? Yes
Comments:
Test reports may not be reproduced except in full with approval of IMTL. All results relate only to the items tested.
Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government.
TESTING RESEARCH ANALYSIS INSPECTION CONSULTING
Portland Cement Concrete Soils Steel Building Products Bituminous Concrete
Savings Bank of Rockville
Project No. : 4741 Report No. : 043
June 71 2000 Page : 2 of 2
5 . Construction joint quality -- cleanliness, water, etc.
Depth: Width: Shape:
Comments:
6 . General condition of forms in place:
Cleanliness : Satisfactory
Oiled: Yes: No: X
Conditions :
Comments:
7 . Quality of formwork:
Trueness in 3611 : Satisfactory
Plumbness in 3611 : Satisfactory
Line Straightness : Satisfactory
Bracing: Satisfactory
Comments :
8 . Formwork inside dimensions, L, H, W.
Measure Dimensions :
Comments: .
9 . Is a follow-up inspection necessary just prior to the
concrete placement : Yes X No
If so, for which item numbers :
10 . List discrepancies :
pc: Joseph Jeamel, Savings Bank of Rockville / Robert Dawson,
Russell Dawson / John Collins, S . Windsor Building Offical
bh