HomeMy WebLinkAbout125 Buckland Hills Drive (2) CONCRETE MASONRY, MORTAR, OR Eastern
_ Testing Materials
GROUT COMPRESSIVE TEST SUMMARY Laboratory
Project: Target Project No. : 00141C
A Division of
South Windsor, CT Contractor: Monarca Mason
Cli nt: Target Stores I M
Supplier: mixed on site JAW010M
GBO'I=INC.
PLACEMENT DATA
Date Cast: 5/10/00 Set No. :G 1
Sample Width 3.00 Length 7.00
Test Specimen Type:
— Hollow Masonry Prism L/W Ratio: 2.33 :1
_ Grouted Masonry Prism Required Strength: 3000 psi
X Grout
— Mortar EMTL Technician: J.E. Anderson
Mix Proportions: ,
Quantity: 7 cy
2500 lbs Sand, 700 lbs
Cement, 5.7 oz Air, 157.7 Slump: 4.75"
lbs water Truck No. : 144
Ticket No. : 66288
Specimen Temperature: 68 degrees F
Weather: overcast 50 degrees F
Total Location of Masonry Construction: Foundation J-1 to F-1
Location of Sample Origin: H-1, 5 courses from top of footing
Comments:
Specimen No. G 1 A G 1 B G 1 C G 1 D
Date Cast 5/10/00 5/10/00 5/10/00 5/10/00 •'GONN•o•,,
Date Tested 5/17/00 6/7/00 6/7/00 6/7/00 •� •'•JJAO•C ���
( 7 days) (28 days) (28 days) ( 28 days)
Weight lbs 5.34 5.40 5.52 5.42 :
End Area (sq in) 9.00 10.56 10.56 10.56 01
Load (lbs) 21,298 33,447 31,588 34,910 ����• . • S�••'�,�
Stress (psi) 21370 3,170 21990 31310
R vi wed By Date:Date: /�/c�c. VLAP LAB CODE#10315-0 000
TEST RESULTS aDO [--J DO NOT The above repoaud best results were attained through
COMPLY WITH SPECIFICATIONS pr000dures performed in accordance with ASTM C31,
ARE NOT COMPLETE EIN/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
• Eastern
GROUT COMPRESSIVE TEST SUMMARY - Materials
TafL�
TI bor,t�n
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Monarca Mason
Cli nt: Target Stores ' " ' •
Supplier: mixed on site JA
WORM
PLACEMENT DATA
Dat Cast: 5/10/00 Set No. :G 1
T st Specimen Type:
Sample Width 3.00 Length 7.00
_ Hollow Masonry Prism L/W Ratio: 2.33 :1
_ Grout d Masonry Prism Grout Required Strength: 3000 psi
X _
_ Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
2500 lbs Sand, 700 lbs Quantity: 7 cy
Cement, 5.7 oz Air, 157.7 Slump: 4.75"
lbs wat r
Truck No. : 144
Ticket No. : 66288
Specim n Temperature: 68 degrees F
Weather: overcast 50 degrees F
Total Location of Masonry Construction: Foundation J-1 to F-1
Location of Sample origin: H-1, 5 courses from top of footing
Comm nts:
Specim n No. G 1 A G I B G 1 C G 1 D
Date Cast 5/10/00 5/10/00 5/10/00 5/10/00
Dat T sted 5/17/00 6/7/00 6/7/00 7/5/00
( 7 days) (28 days) (28 days) ( 56 days)
Weight (lbs) 5.34 5.40 5.52 5.42
End Area (sq in) 9.00 9.00 9.00 6.00
Load (lbs) 21,298
Stress (psi) 2,370
Reviewed By• Date: PJVLAP LAB CODE#10315-0
TEST RESULTS [-] DO DO NOT The above reputed test results were attained through
CO LY WITH SPECIFICATIONS procedures performed in ac mdance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY `U Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Monarca Mason
Client: Target Stores is
Supplier: mixed on site JAw0RSIG
GEOIECEL BW.
PLACEMENT DATA
Dat Cast: 5/11/00 Set No. :G 2
Test Specimen Type:
Sample Width 3.00 Length 7.00
— Hollow Masonry Prism L/W Ratio: 2.33 :1
_ Grout d Masonry Prism Grout Required Strength: 3000 psi
X
Mortar EMTL Technician: J.E. Anderson
Mix Proportions: not provided
Quantity: 7 cy
Slump: 8.0"
Truck No. : 130
Ticket No. : 3009
Sp cimen Temperature: 62 degrees F
Weather: overcast 54 degrees F
Total Location of Masonry Construction: E-1 to C.5-1 exterior wall
Location of Sample Origin: Column line D-1, 5th course up from the footing
Comments:
Specimen No. G 2 A G 2 B G 2 C G 2 D
Dat Cast 5/11/00 5/11/00 5/11/00 5/11'/00
Dat T sted 5/18/00 6/8/00 6/8/00 6/8/00
( 7 days) (28 days) (28 days) ( 28 days)
Weight (lbs) 5.66 5.58 5.68 5.76
End Ar a (sq in) 9.00 9.00 9.00 6.00
Load (lbs) 15,859
Stress (psi) 1,760
Revi wed Byr Date: '5 /elW PYVLAP LAB CODE#10315-0
TEST RESULTS DOF-I DO NOT The above reported test results were attained through
CO Y WITH SPECIFICATIONS procedures performed in accordance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C 143,C 172,C 192,C231,C617,C 1231.
CONCRETE MASONRY, MORTAR, OR
GROUT COMPRESSIVE TEST SUMMARY Testing
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Monarca Mason
Client: Target Stores
Supplier: mixed on site JAw0RSIG
GEOTM INC.
PLACEMENT DATA
Date Cast: 5/11/00 Set No. :G 2
Test Specimen Type: Sample Width 3.00 Length 7.00
- Hollow Masonry Prism L/W Ratio: 2.33 :1
Grouted Masonry Prism Required Strength: 3000 psi
X Grout � -
- Mortar EMTL Technician: J.E. Anderson
Mix Proportions: not provided Quantity: 7 cy
Slump: 8.01,
Truck No. : 130
Ticket No. : 3009
Specimen Temperature: 62 degrees F
Weather: overcast• 54 degrees F
Total Location of Masonry Construction: E-1 to C.5-1 exterior wall
Location of Sample Origin: Column line D-1, 5th course up from the )Eooting
Comments:
Specimen No. G 2 A G 2 B G 2 C G 2 D
Date Cast 5/11/00 5/11/00 5/11/00 5/11/00 v%0% GoN�°•a
Date Tested 5/18/00 6/8/00 6/8/00 6/8/00 •l`�• JAW,
� .
{ 7 days) (28 days) (28 days) ( 28 days T
Weight (lbs) 5.66 5.58 5.68 5.76 �
R
i i l
• • 4
End Area (sq in) 9.00 10.56 10.56 10.56 -o,A:• No,1 ��Z
Load (lbs) 15,859 21,792 24,106 27,744 �`'•�� NS
.... .•��tJ�'•�
S� N AI.
Stress (psi) 11760 2,060 21280 2,630
R vi wed By: - Date: (P1'y1QJ 04VLAP LAB CODE#10315-0
TEST RESULTS DO 2 DO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS procedmes performed in accordance with AS•IM C31,
E]ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR zastem
GROUT COMPRESSIVE TEST SUMMARY EMT
m`ta'`�'
Project: Target Project No.: 00141C A Division of
South Windsor, CT Contractor: Monarca Mason
Client: Target Stores Im
Supplier: mixed on site JAG WORM
PLACEMENT DATA
Date Cast: 5/11/00 Set No.:M 1
Test Specimen Type: Sample Width 2.00 Length 2.00
_ Hollow Masonry Prism L/W Ratio: 1.00 :1
_ Grouted Masonry Prism Required Strength: 2500 psi
- Grout
X Mortar - EMTL Technician: J.E. Anderson
Mix Proportions:
Quantity: 1 cy
1 part Cement, 3 part
Sand, 2 part Water, 1/2 Slump: 4"
part Lime Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 64 degrees F
Weather: 60 degrees F
Total Location of Masonry Construction: Column line D-1, 3 courses up from footing
Location of Sample Origin: Column line D-1, 3 courses up from footing
Comments:
�1111111180
CONS,.''
Specimen No. M 1 A M 1 B M 1 C 0'
• ,9•..
Date Cast 5/11/00 5/11/00 5/11/00
* : -•ice
Date Tested 5/18/00 6/8/00 6/8/00 r
( 7 days) (28 days) (28 days) �'•. No. 56p
Weight (lbs) 0.56 0.56 0.56 '�Fs, '. N . '''\a��'`
End Area (sq in) 4.00 4.00 4.00 � saL
Load (lbs) 6,941 14,317 15,958
Str ss (psi) 1,740 31580 31990
Revi wed By: Date: (o �,(/ VLAP LAB CODE#10315-0
TEST RESULTS [:�fDO FIDO NOT The above repaired rest resntts were attained through
COMPLY WITH SPECIFICATIONS peifomied in acoordawe with ASTM C31,
ARE NOT COMPLETE N/A 099 C94,C1439 C172,C192,CB 1,C617,C1231.
CONCRETE MASONRY, MORTAR, OR Ustern
GROUT COMPRESSIVE TEST SUMMARY amft
I rator7
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Monarca Mason
Client: Target Stores
Supplier: mixed on site JAWORW
PLACEMENT DATA
Date Cast: 5/11/00 Set No. :M 1
Test specimen Type: Sample width 2.00 Length 2.00
_ Hollow Masonry Prism L/W Ratio: 1.00 :1
_ Grouted Masonry Prism Grout Required Strength: 2500 psi
_
g Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
1 part Cement, 3 part Quantity: 1 cy
Sand, 2 part Water, 1/2 slump: 4"
part Lime
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 64 degrees F
weather: 60 degrees F
Total Location of Masonry Construction: Column line D-1, 3 courses up from footing
Location of sample origin: Column line D-1, 3 courses up from footing
Comments:
Specimen No. M 1 A M 1 B M 1 C
Date Cast 5/11/00 5/11/00 5/11/00
Date Tested 5/18/00- 6/8/00 6/8/00
( 7 days) (28 days) (28 days)
weight (lbs) 0.56 0.56 0.56
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 6,941
Stress (psi) 19740
Reviewed By: to:
VLAP LAB CODE#10315-0
TEST RESULTS FIDO M DO NOT The above reported test results were attained through
g
Y WITH SPECIFICATIONS procedures paformed in accordance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Y�tai�lt
GROUT COMPRESSIVE TEST SUMMARY a
Project: Target Project No. : 00141C
A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
Supplier: Tilcon JAWORM
GBOTBM
PLACEMENT DATA
Date Cast: 5/12/00 Set No. :G 3
Test Specimen Type: Sample Width 3.00 Length 7.00
Hollow Masonry Prism L/W Ratio: 2.33 :1
_ Grouted Masonry Prism Required Strength: 3000 psi
X Grout
Mortar EMTL Technician: J.E. Anderson
Mix Proportions: .
915 lbs Cement, 2820 lbs Quantity: 8 cy
Sand, 294.6 lbs Water Slump: 6.5"
Truck No. : 934
Ticket No. : 235290
Specimen Temperature: 66 degrees F
Weather: overcast some light rain, 55 degrees F
Total Location of Masonry Construction: 18 course up from floor slab J-1 to F.5-1
Location of Sample Origin: G-1, 18 course
Comments:
Specimen No. G 3 A G 3 B G 3 C G 3 D
Date Cast 5/12/00 5/12/00 5/12/00 5/12/0'0 ��� ....••••••.. �C•".
Date Tested 5/19/00 6/9/00 6/9/00 6/9/00 :,�Q;• JA{�,o9.:CI
•s
( 7 days) (28 days) (28 days) ( 28 dayt)y S�del
Weight (lbs) 5.82 6.04 6.06 5.78
30
End Area (sq in) 9.00 10.56 10.56 10.56 • �0, • NgEO;
Load (lbs) 17,580 43,782 33,618 40,480
QRT
Stress (psi) 1,950 40,150 3,180 31830
Reviewed By. Date:���Y/c.� NVLAP LAB CODE#10315-0
TEST RESULTS O DO NOT 110 above reported test results were attained through
COMPLY WITH SPECIFICATIONS pr000dures paformed in acoordanc a with ASTM C31,
ARE NOT COMPLETE [:] N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR rastem
materias
GROUT COMPRESSIVE TEST SUMMARY am WUng T��
L.bor.tory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
supplier: mixed on site JAWORM
PLACEMENT DATA
Date Cast: 5/12/00 Set No. :M 2
Test specimen Type: sample width 2.00 Length 2.00
_ Hollow Masonry Prism L/W Ratio: 1.00 :1
_ Grouted Masonry Prism Required strength: 1800 psi
_ Grout
x Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
2 Cement, 3 sand, 1 1/2 Quantity: 1 cy
water and 1 Lime slump: 4"
Truck No. : n/a
Ticket No. : n/a
specimen Temperature: 64 degrees F
weather: overcast light rain, 55 degrees F
otal Location of Masonry construction: J-1 to F-5.1 and J-1 to J-4.5
Location of sample origin: H-1, 10 course up
Comments:
specimen No. M 2 A M 2 6 M 2 C
Date Cast 5/12/00 5/12/00 5/12/00
Date Tested 5/19/00 6/9/00 6/9/00
( 7 days) (28 days) (28 days)
weight (lbs) 0.62 0.64 0.62
End Area (sq in) 4.00 4.00 4.00 .
Load (lbs) 14,851
stress (psi) 3,710
Reviewed B . Date: ,..r VLAP LAB CODE#10315.0
TEST RESULTS FIDO n DO NOT The above reported test results were attained through
CO Y WITH SPECIFICATIONS Procedures performed in accordance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C 143,C 172,C 192,C231,C617,C 1231.
CONCRETE MASONRY, MORTAR, OR Eastern
Materids
GROUT COMPRESSIVE TEST SUMMARY EwLaboratory
Project: Target Project No. : 00141C
A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores IM
Supplier: mixed on site JAWORSK[
G®OTBM W.
PLACEMENT DATA
Date Cast: 5/12/00 Set No. :M 2
Test Specimen Type: Sample Width 2.00 Length 2.00
_ Hollow Masonry Prism L/W Ratio: 1.00 :1
- Grouted Masonry Prism
Required Strength: 1800 psi
- Grout
X Mortar - EMTL Technician: J.E. Anderson
Mix Proportions: - Quantity: 1 cy
2 Cement, 3 Sand, 1 1/2
Water and 1 Lime Slump: 4"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 64 degrees F
Weather: overcast light rain, 55 degrees F
''Total Location of Masonry Construction: J-1 to F-5.1 and J-1 to J-4.5
Location of Sample Origin: H-1, 10 course up
Comments:
Specimen No. M 2 A M 2 B M 2 C
Date Cast 5/12/00 5/12/00 5/12/00 o C®tVN�
Date Tested 5/19/00 6/9/00 6/9/00 �!.•'' Jq •.t �`Ed
( 7 days) (28 days) (28 days) .� kp- •
Weight (lbs) 0.62 0.64 0.62 yF ;
End Area (sq in) 4.00 4.00 4.00 'o,A�;• (0
' .17 0 4t
Load (lbs) 14,851 18,648 18,507 �<`''c... E•'.G`V�tI
S� NAIE�-
Stress (psi) 31710 41660 4,630 ""ertR
Revi wed By: Date: �( � VLAP LAB CODE#10315-0
TEST RESULTS [j�fDO [] DO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS procedures pafonned in acoordance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR Ustern
mat"t.i.
GROUT COMPRESSIVE TEST SUMMARY am�«�r,
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
client: Target stores
I M-
supplier: Aiudi Concrete JA j{j
GBOTML INC.
PLACEMENT DATA
Date Cast: 5/13/00 set No. :G 4
Test specimen Type: Sample width 3.00 Length 7.00
_ Hollow Masonry Prism L/w Ratio: 2.33 :1
Grouted Masonry Prism Required strength: 3000 psi
X Grout
Mortar EMTL Technician: I.E. Anderson
Mix Proportions:
1500 lbs sand 1, 1050 lbs Quantity: 6 cy
sand 2, 560 lbs Cement 2, slump: 7.5"
240 lbs Cement 3, 199.9
lbs water Truck No. : 148
Ticket No. : 3050
Specimen Temperature: 72 degrees F
weather: light rain, 54 degrees F
-otal Location of Masonry Construction: F-1 to D-1
Location of sample Origin: Column line E-1, 18th course
Comments:
Specimen No. G 4 A G 4 B G 4 C G 4 D
Date Cast 5/13/00 5/13/00 5/13/00 5/13/00
Date Tested 5/20/00 6/10/00 6/10/00 6/10/00
( 7 days) (28 days) (28 days) ( 28 days)
weight (lbs) 5.42 5.76 5.44 5.56
End Area (sq in) 9.00 9.00 9.00 9.00
Load (lbs) 239334
stress (psi) 2,590
Reviewed By. _ Date: JNVLAP LAB CODE#10315-0
TEST LILTS DO DO NOT The above reported test results were attained through
CO LY WITH SPECIFICATIONS procedures pafomnwd in awordance with AMU C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR Z"tem
GROUT COMPRESSIVE TEST SUMMARYaY rbUrnt
ry
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target StoresMe
Supplier: Aiudi Concrete JAWORM
GBOTWL Me
PLACEMENT DATA
Date Cast: 5/13/00 Set No. :G 4
Test Specimen Type: Sample Width 3.00 Length 7.00
— Hollow Masonry Prism L/W Ratio: 2.33 :1
— Grouted Masonry Prism Required Strength: 3000 psi
X Grout
— Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
1500 lbs Sand 1, 1050 lbs Quantity: 6 cy
Sand 2, 560 lbs Cement 2, Slump: 7.5"
240 lbs Cement 3, 199.9 Truck No.: 148
lbs Wat r
Ticket No. : 3050
Specimen Temperature: 72 degrees F
Weather: light rain, 54 degrees F
Total Location of Masonry Construction: F-1 to D-1
Location of Sample Origin: Column line E-1, 18th course
Comments:
Specimen No. G 4 A G 4 B G 4 C G 4 D
Date Cast 5/13/00 5/13/00 5/13/00 5113/00 o`v O� .ONNF�r•�
Date Tested 5/20/00 6/10/00 6/10/00 6/10/00 �� y 'AwOC
( 7 days) (28 days) (28 days) ( 28 day"
Weight (lbs) 5.42 5.76 5.44 5.56
40
�
End Area (sq in) 9.00 10.56 10.56 10.56 'ql�0 -P `
;0,� ....N'S
Load (lbs) 23,334 36,188 31,146 31,805 D L���?
e� as aaae
Str ss (psi) 20,590 3,430 21950 31010
Reviewed By Date: VLAP LAB CODE#10316-0
TEST RESULTS OODO DO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS pmooedW-ms pafiormed in accordance with ASTM C31,
ARE NOT COMPLETE EIN/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR _
GROUT COMPRESSIVE TEST SUMMARY amt�
Laboratory
Project: Target Project No. : 00141C
South Windsor, CT Contractor: Konover Construction A Division of
Client: Target Stores
Supplier: mixed on site
WORSKI
GE01Pt�I.II11C.
PLACEMENT DATA
Date Cast: 5/13/00 Set No. :M 3
Test Specimen Type: Sample width 2.00 Length 2.00
_ Hollow Masonry Prism L/W Ratio: 1.00 :1
_ Grouted Masonry Prism Required Strength: 1800 psi
_ Grout
X Mortar - EMTL Technician: J.E. Anderson
Mix Proportions:
3 sand, 1 1/2 water, 1 Quantity: 1 cy
Lime and 2 Cement slump: 4.5"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 62 degrees F
weather: light rain, 54 degrees F
,dotal Location of Masonry Construction: Column line B-1 to D-1
Location of sample origin: C-1, 3 course
Comments:
Specimen No. M 3 A M 3 B M 3 C
Date Cast 5/13/00 5/13/00 5/13/00
Date Tested 5/20/00 6/10/00 6/10/00
( 7 days) (28 days) (28 days)
weight (lbs) 0.62 0.62 0.62
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 159049
Stress (psi) 39760
Reviewed By• Date: S'/2�"' VLAP LAB CODE#10315-0
TEST RESULTS EJ4D' 0 R DO NOT The above rq)orbed test results viafe attained ducuo .
COMPLY WITH SPECIFICATIONS pr000dures puibmied in accordance with ASTM C31;
.EJARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR Z"tem
GROUT COMPRESSIVE TEST SUMMARY am T r,
Project: Target Project No. : 00141C
A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores IM
Supplier: mixed on site JAw0RSE
(MT=24C.
PLACEMENT DATA
Date Cast: 5/13/00 Set No. :M 3
Test Specimen Type: Sample Width 2.00 Length 2.00
— Hollow Masonry Prism L/W Ratio: 1.00 :1
— Grouted Masonry Prism
Required Strength: 1800 psi
— Grout
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 1 cy
3 Sand, 1 1/2 Water, 1
Lime and 2 Cement Slump: 4.5"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 62 degrees F
Weather: light rain, 54 degrees F
Total Location of Masonry Construction: Column One B-1 to D-1
Location of Sample Origin: C-1, 3 course
Comments:
Specimen No. M 3 A M 3 B M 3 C ,,,, '�����r�,s��`/
Date Cast 5/13/00 5/13/00 5/13/00 .•CON&
Date Tested 5/20/00 6/10/00 6/10/00 �,, • �1'JA1{'O•'•� `'
( 7 days) (28 days) (28 days) i'
Weight (lbs) 0.62 0.62 0.62
End Area (sq in) 4.00 4.00 4.00 �
•Oil •` S�
Load (lbs) 15,049 25,193 23,137 '�� S' •••*••NC?�
Stress (psi) 31760 6,300 51780
R vi wed By: Date: (V /f y�a�, VLAP LAB CODE#10315-0
TEST RESULTS [�rD�OF-I DO NOT The above reported test results were attained through
. COMPLY WITH SPECIFICATIONS pr000d paformed in acomftwe with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
GROUT COMPRESSIVE TEST SUMMARY '� T u`'
Laboratory
Project: Target Project No. : 00141C
South Windsor, CT Contractor: Konover Construction A Division of
Client: Target stores
supplier: mixed on site
- JA��WO�R K�I
PLACEMENT DATA
Date Cast: 5/14/00 Set No. :M 4
Test Specimen Type: sample width 2.00 Length 2.00
_ Hollow Masonry Prism L/W Ratio: 1.00 :1
_ Grouted Masonry Prism Required strength: 1800 psi
Grout
X Mortar - EMTL Technician. J.E. Anderson
Mix Proportions:
3 Sand, 1 Lime, 1 1/2 Quantity: 1 cy
water, 2 Cement slump: 3.5"
Truck No. : n/a
Ticket No. : n/a
specimen Temperature: 72 degrees F
weather: clear, 65 degrees F
otal Location of Masonry Construction: C-1 to A-2.5, J-1 to J-4
Location of Sample origin: Column line A-1, 3 course from floor
Comments:
specimen No. M 4 A M 4 B M 4 C
Date Cast 5/14/00 5/14/00 5/14/00
Date Tested 5/21/00 6/11/00 6/11/00
( 7 days) (28 days) (28 days)
weight (lbs) 0.62 0.62 0.62
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 12,695
stress (psi) 3,170
Reviewed By: a e: VLAP LAB CODE#10315-0
TEST RESULTS DDO El DO NOT The above roponod test results were attained duough
CO Y WITH SPECIFICATIONS procedurm pelftmied in ac:oordance with ASTM C31;
ARE NOT COMPLETE N/A C390 C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
oratory
GROUT COMPRESSIVE TEST SUMMARY amb
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
Supplier: mixed on site JAW0RM
G®OTECIL II11C.
PLACEMENT DATA
Date Cast: 5/14/00 Set No. :M 4
Test Specimen Type: Sample Width 2.00 Length 2.00
_ Hollow Masonry Prism L/W Ratio: 1.00 :1
Grouted Masonry Prism Required Strength: 1800 psi
- Grout
X Mortar - EMTL Technician: J.E. Anderson
Mix Proportions: I Quantity: 1 cy
3 Sand, 1 Lime, 1 1/2
Water, 2 Cement Slump: 3.51'
Truck No. : n/a
Ticket No. : n/a
Specimen T mperature: 72 degrees F
Weather: clear, 65 degrees F
Total Location of Masonry Construction: C-1 to A72.5, J-1 to J-4
Location of Sample Origin: Column line A-1, 3 course from floor
Comments:
Specimen No. M 4 A M 4 B M 4 C
Date Cast 5/14/00 5/14/00 5/14/00 0*0
OF
Date Tested 5/21/00 6/11/00 6/11/00 #.'v!G•.•• ""'''•••C�
( 7 days) (28 days) (28 days) '� A�O.Q'•��•�"e
co •:G
Weight (lbs) 0.62 0.62 0.62
"�
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 12,695 20,072 20,052 QA`%•..• S .• '�,
ON LE
Stress (Psi) 3,170 5,020 5,010
Revi wed By. Date: (, If y100 INVLAP LAB CODE#10315-0
TEST RESULTS DO n DO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS procedures performed in accordance with ASTM C31;
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
• eastern
GROUT COMPRESSIVE TEST SUMMARY T ng
Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target stores
supplier: Aiudi Concrete J1AGBOTE ��
PLACEMENT DATA
Date Cast: 5/15/00 set No. :G 5
Test specimen Type: sample width 3.00 Length 7.00
_ Hollow Masonry Prism L/w Ratio: 2.33 :1
Grouted Masonry Prism Required strength: 3000 psi
x Grout
Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
not provided Quantity: 8 cy
slump: 10"
Truck No. : 131
Ticket No. : 3062
Specimen Temperature:
weather: clear, 60 degrees
otal Location of Masonry construction:walI C1 to-Al
Location of sample origin:col . line C-1 top course
Comments:
specimen No. G 5 A G 5 B G 5 C
Date Cast 5/15/00 5/15/00 5/15/00
Date Tested 5/22/00 6/12/00 6/12/00
( 7 days) (28 days) (28 days)
weight (lbs) 5.38 5.28 5.32
End Area (sq in) 9.00 9.00 9.00 .
Load (lbs) 23,631
stress (psi) 29630
Revi ewed B - Date: ��� /w 1 VLAP LAB CODE#1 03 5-0
TEST RESULTS DDO n DO NOT The above reported test results were attained through
CO Y WITH SPECIFICATIONS procedures performed in accordance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C 143,C 172,C 192,C231,C617,C 1231.
CONCRETE MASONRY, MORTAR, OR
GROUT COMPRESSIVE TEST SUMMARY m
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
Supplier: Aiudi Concrete JA �GBGT=�
PLACEMENT DATA
Date Cast: 5/15/00 Set No. :G 5
Test Specimen Type: Sample Width 3.00 Length 7.00
_ Hollow Masonry Prism L/W Ratio: 2.33 :1
_ Grouted Masonry Prism Grout Required Strength: 3000 psi
X
Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 8 cy
not provided
Slump: 10"
Truck No. : 131
Ticket No. : 3062
Specimen Temperature:
Weather: clear, 60 degrees
Total Location of Masonry Construction:wall C1 to- Al
Location of Sample Origin:col. line C-1 top course
Comments:
Specimen No. G 5 A G 5 B G 5 C G 5 D 1111188
Date Cast 5/15/00 5/15/00 5/15/00 5/15/00 ,of.C�NN,•��es
JAty,
Date Tested 5/22/00 6/12/00 6/12/00 6/12/00 ;•Q:� 4,9�:,���c
( 7 days) (28 days) (28 days) ( 28 days,)CO Ir : -4
Weight (lbs) 5.38 5.28 5.32 5.40
'. No.17 Q-
End Area (sq in) 9.00 10.56 10.56 10.56 �0; •f gEO,:���.�
Load (lbs) 23,631 31,858 33,374 32,471 S' ON •t FN��
Str ss (psi) 21630 3,020 3,160 3,070
R viewed By. Date: &,//-J'/Up PYVLAP LAB CODE#10315-0
TEST RESULTS &DO DO NOT The above repmW test results were attained through
COMPLY WITH SPECIFICATIONS pmoWmes pafonled in accordance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C 143,C 172,C 192,C231,C617,C 1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY : Tebo `ory
Project: Target Project No. : 00141C
South Windsor, CT Contractor: Konover Construction A Division of
client: Target stores
Supplier: mixed on site • •.�
JAWORSIU
PLACEMENT DATA GPO'IWL INC.
Date Cast: 5/15/00 Set No. :M 5
Test specimen Type: Sample width 2.00 Length 2.00
_ Hollow Masonry Prism L/w Ratio: 1.00 :1
_ Grouted Masonry Prism Required Strength: 1800 psi
_ Grout
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 1 Lime, 1 1/2 Quantity: 1 cy
water, 2 Cement Slump: 4"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature:
weather: clear, 60 degrees
3tal Location of Masonry Construction:C-1 to B-1, J-1 to J-4
Location of Sample origin:B-1 10 course up from first floor wall
Comments:
Specimen No. M 5 A M 5 B M 5 C
Date Cast 5/15/00 5/15/00 5/15/00
Date Tested 5/22/00 6/12/00 6/12/00
( 7 days) (28 days) (28 days)
weight (lbs) 0.60 0.60 0.60
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 89958
Stress (psi) 29240
Reviewed By: Date: 21 � VLAP LAB CODE#10315-0
TEST LILTS DOF-I DO NOT The above reported test results were attained through
CO LY WITH SPECIFICATIONS procedures paformod in accordance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C 143,C 172,C 192,C231,C617,C 1231.
CONCRETE MASONRY, MORTAR, OR
GROUT COMPRESSIVE TEST SUMMARY '�' «�
Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores _
Supplier: mixed on site JAWORM
GBGTML M
PLACEMENT DATA
Date Cast: 5/15/00 Set No. :M 5
Test Specimen Type:
Sample Width 2.00 Length 2.00
- Hollow Masonry Prism L/W Ratio: 1.00 :1
_ Grouted Masonry Prism Required Strength: 1800 psi
Grout
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 1 cy
3 Sand, 1 Lime, 1 1/2
Water, 2 Cement Slump: 4"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature:
Weather: clear, 60 degrees
Total Location of Masonry Construction:C-1 to B-1-1 J-1 to J-4
Location of Sample Origin:B-1 10 course up from first floor wall
Comments:
Specimen No. M 5 A M 5 B M 5 C Qboa0618811a
Date Cast 5/15/00 5/15/00 5/15/00 CONN��` 4
Date Tested 5/22/00 6/12/00 6/12/00 Q- 'JAO ';
s
( 7 days) (28 days) (28 days) COD %
Weight (lbs) 0.60 0.60 0.60
End Area (sq in) 4.00 4.00 4.00 '• �� �Qe
,: 4
Load (lbs) 8,958 14,554 13,888
'� �• ■eaaa�
Stress (psi) 2,240 31640 3,470
R vi wed By: Date: �y �j-'��,�, IVLAP LAB CODE#10315,
TEST RESULTS [aeDO DO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS Inooedmes paformed in avoordanoe with ASTM C31,
EIARE NOT COMPLETE EINIA C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
GROUT COMPRESSIVE TEST SUMMARY .. L.bor.t.,,
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Storesa gas
Supplier: Aiudi Concrete JAWORM
GBOT=II11C.
PLACEMENT DATA
Date Cast: 5/16/00 Set No. :G 6
Test Specimen Type:
Sample Width 2.00 Length 2.00
— Hollow Masonry Prism L/W Ratio: 1.00 :1
— Grouted Masonry Prism Grout Required Strength: 3000 psi
X
_ Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
Quantity: 8cy
not provided
Slump: 7"
Truck No. : 151
Ticket No. : 3076
Specimen Temperature:
Weather: clear, 10 degrees
,Total Location of Masonry Construction:wall and foundation wall A 2.5 to A 6.5
Location of Sample Origin:foundation wall 5.5'
Comments:
Specimen No. G 6 A G 6 B G 6 C G 6 D
Date Cast 5/16/00 5/16/00 5/16/00 5/16/Ob
Date Tested 5/23/00 6/13/00 6/13/00 6/13/00
( 7 days) (28 days) (28 days) ( 28 days)
Weight (lbs) 6.36 6.04 5.98 5.82
End Ar a (sq in) 10.56 10.56 10.56 10.56
Load (lbs) 241,772 28,885 27,131 29,894
Str ss (psi) 2,350 21740 21570 2,830
Reviewed By:---- Date: `�s�� VLAP LAB CODE#10315-0
TEST RESULTS DO ErDO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS prooedores pnformod in a000s,dance with AS7 M C31,
ARE NOT COMPLETE N/A C39,C94,C 143,C 172,C 192,C231,C617,CI 23 1.
CONCRETE MASONRY, MORTAR, OR
- Za,ttrn
GROUT COMPRESSIVE TEST SUMMARY aWLT,"bUo'.t'ry
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target stores
supplier: mixed on site JAG �II G
PLACEMENT DATA
Date Cast: 5/16/00 Set No. :M 6
Test Specimen Type: Sample width 2.00 Length 2.00
_ Hollow Masonry Prism L/W Ratio: 1.00 :1
_ Grouted Masonry Prism Required strength: 1800 psi
_ Grout
g Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
3 sand, 1 Lime, 1 1/2 Quantity: 1 cy
water, 2 Cement Slump:
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 58 degrees
weather: clear
"otal Location of Masonry Construction:col . line A-4.5 to 6.5 foundation wall
Location of sample origin:col . line 5.0 foundation wall
Comments:
Specimen No. M 6 A M 6 B M 6 C
Date Cast 5/16/00 5/16/00 5/16/00
Date Tested 5/23/00 6/13/00 6/13/00
( 7 days) (28 days) (28 days)
weight (lbs) 0.62 0.62 0.60
End Area (sq in) 4.00 4.00 4.00 .
Load (lbs) 159207
Stress (psi) 31800
Revi ewed By: — Date: S'� INVLAP LAB CODE#10315-0
rkRF-4ULTS DOF-I DO NOT The above rcported test results were attained throughWITH SPECIFICATIONS procedures performed in accordance with ASTM C31,
NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR Eastem
GROUT COMPRESSIVE TEST SUMMARY am_« '''
Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target stores
supplier: Aiudi concrete WOR KI
GBOTEaLm
PLACEMENT DATA
Date Cast: 5/16/00 Set No. :G 6
Test specimen Type: sample width 2.00 Length 2.00
_ Hollow Masonry Prism L/w Ratio: 1.00 :1
_ Grouted Masonry Prism
g Grout Required strength: 3000 psi
_ Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
not provided Quantity: 8cy
Slump: 7"
Truck No. : 151
Ticket No. : 3076
Specimen Temperature:
weather: clear, 70 degrees
-otal Location of Masonry Construction.-wall and foundation wall A 2.5 to A 6.5
Location of Sample origin:foundation wall 5.5'
Comments:
specimen No. G 6 A G 6 B G 6 C G 6 D
Date Cast 5/16/00 5/16/00 5/16/00 5/16/06
Date Tested 5/23/00 6/13/00 6/13/00 6/13/00
( 7 days) (28 days) (28 days) ( 28 days)
weight (lbs) 6.36 6.04 5.98 5.82
End Area (sq in) 4.00 4.00 4.00 4.00
Load (lbs) 14,772
stress (psi) 39690
Reviewed By: Date: S' 7" A`0 JNVLAP LAB CODE#10315-0
E
ULTS DO DO NOT The above reported test results were attained through
WITH SPECIFICATIONS procedures Puformed in accordance with ASTM C31,
NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
GROUT COMPRESSIVE TEST SUMMARY l,""'r,
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores IM
Supplier: mixed on site JAWORM
CANnim II1TC.
PLACEMENT DATA
Date Cast: 5/16/00 Set No. :M 6
Test Specimen Type:
Sample Width 2.00 Length 2.00
- Hollow Masonry Prism L/W Ratio: 1.00 :1
- Grouted Masonry Prism Required Strength: 1800 psi
- Grout
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 1 cy
3 Sand, 1 Lime, 1 1/2
Water, 2 Cement Slump:
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 58 degrees
Weather: clear
Total Location of Masonry Construction:col. line A-4.5 to 6.5 foundation wall
Location of Sample Origin:col. line 5.0 foundation wall )
Comments:
Specimen No. M 6 A M 6 B M 6 C
Date Cast 5/16/00 5/16/00 5/16/00
Date Tested 5/23/00 6/13/00 6/13/00 of
•ONN&6 4���`®
( 7 days) (28 days) (28 days) Q.� •JA O�.: o:
Weight (lbs) 0.62 0.62 0.60
End Area (sq in) 4.00 4.00 4.00 �-10 17 Q
Load (lbs) 15,207 18,747 19,735 , , `SS ,, ... •`J�?
LE
Stress (psi) 3,800 41690 4,930 " r.R Rig
Revi wed By.— e: w Ile,-dua JNVLAP LAB CODE#10315-0
TEST RESULTS [�rD�O DO NOT The above repolUd test results were attained through
COMPLY WITH SPECIFICATIONS procedures paf0med in accordance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastam
GROUT COMPRESSIVE TEST SUMMARY - Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target stores
supplier: Aiudi concrete JAW' {I
PLACEMENT DATA
Date Cast: 5/17/00 set No. :G 7
Test specimen Type: Sample width 3.00 Length 7.00
_ Hollow Masonry Prism L/w Ratio: 2.33 :1
_ Grouted Masonry Prism
g Grout Required strength: 3000 psi
_ Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
Not provided Quantity: 8 cy
slump: 7"
Truck No. : 151
Ticket No. : 3105
specimen Temperature: 78 degrees
weather: clear, 80 degrees
-otal Location of Masonry Construction wall col . line A-2 to A 6.5
Location of Sample origin:A.3 top grout lift
Comments:
specimen No. G 7 A G 7 B G 7 C G 7 D
Date cast 5/17/00 5/17/00 5/17/00 5/17/00
Date Tested 5/24/00 6/14/00 6/14/00 6/14/00
( 7 days) (28 days) (28 days) ( 28 days)
Weight (lbs) 5.28 5.28 5.36 5.32
End Area (sq in) 9.00 9.00 9.00 9.00
Load (lbs) 20,746
stress (psi) 2,310
Reviewed By• Date: S 2s- a J VLAP LAB CODE#10315-0
TEST RESULTS DOF-I DO NOT The above reported test results were attained through
CO WITH SPECIFICATIONS procedures pufotined in accordance wih ASTM C31
ARE NOT COMPLETE [:]N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
GROUT COMPRESSIVE TEST SUMMARY a « '''
T=2r tort'
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target stores
supplier: mixed on site 1AAW0�R�I{I
PLACEMENT DATA
Date Cast: 5/17/00 set No. :M 7
Test specimen Type: Sample width 2.00 Length 2.00
_ Hollow Masonry Prism L/W Ratio: 1.00 :1
_ Grouted Masonry Prism Grout Required Strength: 1800 psi
_
g Mortar- EMTL Technician: J.E. Anderson
Mix Proportions:
3 sand, 1 Lime, 1 1/2 Quantity: 1 cy
water, 2 Cement slump: 5"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 60 degrees
weather: clear, 70 degrees
'otal Location of Masonry Construction:col . line 3.7 to 7.5
Location of sample origin:col . line A-7 wall 4 courses up from floor
Comments:
specimen No. M 7 A M 7 B M 7 C
Date Cast 5/17/00 5/17/00 5/17/00
Date Tested 5/24/00 6/14/00 6/14/00
( 7 days) (28 days) (28 days)
weight (lbs) 0.62 0.60 0.62
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 13,407
stress (psi) 39350
Reviewed By: _ Date: Z.�A)
VLAP LAB CODE#10315
TFARE
ULTS E] DO DO NOT The above reported test results were attained through
CWITH SPECIFICATIONS procodiucs performed in accordance with ASTM C31,
NOT COMPLETE [:1N/A 109,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR Eastern
GROUT COMPRESSIVE TEST SUMMARYMaterials
Laboratory
Project: Target Project NO. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target stores M
Supplier: mixed on site JAWMSIG
GBOTOMM
PLACEMENT DATA
Date Cast: 5/17/00 set No. :M 7
Test specimen Type: Sample width 2.00 Length 2.00
_ Hollow Masonry Prism L/W Ratio: 1.00 :1
_ Grouted Masonry Prism Grout Required Strength: 1800 psi
_
g Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 1 Lime, 1 1/2 Quantity: 1 cy
water, 2 Cement Slump: 5"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 60 degrees
weather: clear, 70 degrees
-otal Location of Masonry Construction:col . line 3.7 to 7.5
Location of Sample origin:col . line A-7 wall 4 courses up from floor
Comments:
Specimen No. M 7 A M 7 B M 7 C
Date Cast 5/17/00 5/17/00 5/17/00
Date Tested 5/24/00 6/14/00 6/14/00
( 7 days) (28 days) (28 days)
weight (lbs) 0.62 0.60 0.62
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 13,407
Stress (psi) 39350
Reviewed By: Date: ZS �-�v VLAP LAB CODE#10315-0
TEST RESULTS DO M DO NOT The atx me reported test results wen attained*.ugh .
COMP Y WITH SPECIFICATIONS prowdures performed in a=rdanc a with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR Ustem
GROUT COMPRESSIVE TEST SUMMARY « ry
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores •� � •
Supplier: Aiudi Concrete JAGBOTWORM
PLACEMENT DATA
Date Cast: 5/17/00 Set No. :G 7
Test Specimen Type: Sample Width 3.00 Length 7.00
— Hollow Masonry Prism L/W Ratio: 2.33 :1
_ Grouted Masonry Prism Required Strength: 3000 psi
X Grout
Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 8 cy
Not provided
Slump: 7"
Truck No. : 151
Ticket No. : 3105
Specimen Temperature: 78 degrees
Weather: clear, 80 degrees
Total Location of Masonry Construction:wall col. 'line A-2 to A 6.5
Location of Sample Origin:A.3 top grout lift
Comments:
Specim n No. G 7 A G 7 B G 7 C G 7 D
Date Cast 5/17/00 5/17/00 5/17/00 5/17/00
Date Tested 5/24/00 6/14/00 6/14/00 6/14/00 ��. C...... 4000
( 7 days) (28 days) (28 days) ( 28 daysr ;' �l JA�O'•; ao
Weight (lbs) 5.28 5.28 5.36 5.32 co 9��� -{
End Area (sq in) 9.00 10.56 10.56 10.56 �',.�i• Q,
Load (lbs) 20,746 34,033 35,101 31,255 ';p.�•. C NSE�.��60 e®
Stress (psi) 2,310 3,220 3,320 2,960 °0 i @110 %of.
Reviewed By: Date: (v/j�,/��d VLAP LAB CODE#10315-0
TEST RESULTS ZOODO DO NOT The above repo W test results were attained through
COMPLY WITS SPECIFICATIONS prooed =performed in avoor&=with ASTM C3I
E]ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
GROUT COMPRESSIVE TEST SUMMARY �' «�
Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction 91
Client: Target Stores •• • •
Supplier: mixed on site tlA
PLACEMENT DATA
Date Cast: 5/17/00 Set No. :M 7
Test Specimen Type: Sample Width 2.00 Length 2.00
— Hollow Masonry Prism L/W Ratio: 1.00 :1
_ Grouted Masonry Prism Required Strength: 1800 psi
— Grout
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 1 cy
3 Sand, 1 Lime, 1 1/2
Water, 2 Cement Slump: 5"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 60 degrees
Weather: clear, 70 degrees
Total Location of Masonry Construction:col. line -3.7 to 7.5
Location of Sample Origin:col. line A-7 wall 4 courses up from floor
Comments:
Specimen No. M 7 A M 7 B M 7 C
Date Cast 5/17/00 5/17/00 5/17/00 ♦♦ (`,QN��eeiee
Date Tested 5/24/00 6/14/00 6/14/00 �•�♦ �!.••�I.JAIti�•C���oo
9 �
( 7 days) (28 days) (28 days)
Weight (lbs) 0.62 0.60 0.62
End Area (sq in) 4.00 4.00 4.00 "1 •.. �Q;�
Load (lbs) 13,407 19,696 20,109 ?�� •�� NSE�.•CA���
Stress (psi) 3,350 4,920 51030
R vi wed By: Date:G//ylvv VLAP LAB CODE#10315-0 •
TEST RESULTS EfDO n DO NOT The above reported best results were attained dumigh
COMPLY WITH SPECIFICATIONS prooedt es paf ned in a000rdawe with ASTM C31,
EIARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
' Eastern
GROUT COMPRESSIVE TEST SUMMARY _« ''
Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target stores
supplier: Ai udi Concrete JAWORSE
PLACEMENT DATA
Date Cast: 5/18/00 Set No. :G 8
Test specimen Type: Sample width 3.00 Length 7.00
_ Hollow Masonry Prism L/w Ratio: 2.33 :1
_ Grouted Masonry Prism
X Grout Required strength: 2500 psi
_ Mortar EMTL Technician: I.E. Anderson
Mix Proportions:
2786.2 Sand lbs/cy, 193.1 Quantity: 8 cy
water lbs/cy, 812.5 cement Slump: 10"
lbs/cy, 5.25 ASR oz/cy, 34 REO oz/Cy Truck No. : 148
Ticket No. : 3728
Specimen Temperature:
weather: rain, 54* degrees
Total Location of Masonry Construction:A-8.0 to 9:0 foundation wall
Location of Sample origin:A 9.0 foundation wall col line
Comments:
Specimen No. G 8 A G 8 B G 8 C G 8 D
Date Cast 5/18/00 5/18/00 5/18/00 5/18/06
Date Tested 5/25/00 6/15/00 6/15/00 6/15/00
( 7 days) (28 days) (28 days) ( 28 days)
weight (lbs) 5.66 5.70 5.54 5.54
End Area (sq in) 9.00 9.00 9.00 9.00
Load (lbs) 200645
Stress (psi) 21290
Reviewed By• Date: SIZ�-t-lw V�Ap LAB CODE#10315-0
TEST RESULTS FIDO [:] DO NOT The above reported test results were attained through
TARE
Y WITH SPECIFICATIONS pmcodures performed in accordance with ASTM C31 NOT COMPLETE El
N/A 109,C94,C 143,C 172,C 192,C231,C617,C 1231.
CONCRETE MASONRY, MORTAR, ORoratory
GROUT COMPRESSIVE TEST SUMMARY T
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
client: Target stores . •• • , .
supplier: mixed on site JAWS ORS
TOMM
PLACEMENT DATA
Date Cast: 5/18/00 Set No. :M 8
Test specimen Type: sample width 2.00 Length 2.00
_ Hollow Masonry Prism L/W Ratio: 1.00 :1
_ Grouted Masonry Prism Grout Required strength: 1800 psi
_
g Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 1 Lime, 1 1/2 Quantity: 1 cy
Water, 2 Cement slump: 4.5"
Truck No. : n/a
Ticket No. : n/a
specimen Temperature: 60 degrees
weather: overcast 56 degrees
Total Location of Masonry Construction:footing col . line A8.0 to 9.0
Location of sample origin:A 8.5 footing
Comments:
specimen No. M 8 A M 8 B M 8 C
Date Cast 5/18/00 5/18/00 5/18/00
Date Tested 5/25/00 6/15/00 6/15/00
( 7 days) (28 days) (28 days)
weight (lbs) 0.58 0.58 0.58
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 8,899
stress (psi) 29220
Revi ewed By• Date:-S /Z-# 4�'-J VLAP LAB CODE#10315-0
E
T ULTS DDO DO NOT The above reported test results were attained through
LY WITH SPECIFICATIONS prowdures performed in acoordanc a with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
' =astern
GROUT COMPRESSIVE TEST SUMMARY F ,: «�l,
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores • •� -
Supplier: mixed on site GBOI M
PLACEMENT DATA
Date Cast: 5/18/00 Set No. :M 8
Test Specimen Type:
Sample Width 2.00 Length 2.00
- Hollow Masonry Prism L/W Ratio: 1.00 :1
- Grouted Masonry Prism Required Strength: 1800 psi
- Grout
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 1 Lime, 1 1/2 Quantity: 1 cy
Water, 2 Cement Slump: 4.5"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 60 degrees
[Weather: overcast 56 degrees
Total Location of Masonry Construction:footing col. line A8.0 to 9.0
Location of Sample Origin:A 8.5 footing
Comments:
Specimen No. M 8 A M 8 B M 8 C
Date Cast 5/18/00 5/18/00 5/18/00
Date Tested 5/25/00 6/15/00 6/15/00 F CON/y�c``<<
( 7 days) (28 days) (28 days) J'4wp'•:C) to
9 G :
Weight (lbs) 0.58 0.58 0.58 co -�
End Area (sq in) 4.00 4.00 4.00
4�7 Load (lbs) 8,899 18,826 16,987
� .4
s �
Str ss (psi) 2,220 4,710 4,250 4p N I-
Reviewed By: Date: /lS" c.�V VLAP B CODE#10315-0 t
TEST RESULTS [�fDO [--] DO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS procedures peifnzmed in accordance with ASTM C31;
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
GROUT COMPRESSIVE TEST SUMMARY ;WTI TLI
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores am
Supplier: Aiudi Concrete JA ORM
GBOTOM
PLACEMENT DATA
Date Cast: 5/18/00 Set No. :G 8
Test Specimen Type: Sample Width 3.00 Length 7.00
Hollow Masonry Prism L/W Ratio: 2.33 :1
_ Grouted Masonry Prism Required Strength: 2500 psi
X Grout
_ Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
2786.2 Sand lbs/cy, 193.1 Quantity: 8 cy
water lbs/cy, 812.5 cement Slump: 10"
lbs/cy, 5.25 ASR oz/cy, 34 Truck No. : 148
REO oz/cy
Ticket No. : 3728
Specimen Temperature:
Weather: rain, 54 degrees
Total Location of Masonry Construction:A-8.0 to 9-.0 foundation wall
Location of Sample Origin:A 9.0 foundation wall col line
Comments:
Specimen No. G 8 A G 8 B G 8 C G 8 D
Slits
Date Cast 5/18/00 5/18/00 5/18/00 5/18/00 CNN `•'-
Date Tested 5/25/00 6/15/00 6/15/00 6/15/00 �� :•• �1.JA1y�.,,�•`
( 7 days) (28 days) (28 days) ( 28 daysy•� 'p .•G
Weight (lbs) 5.66 5.70 5.54 5.54 # � *
End Area (sq in) 10.56 10.56 10.56 10.56 10' �' 7b8p ••% �:
O • b
Load (lbs) 20,645 35,496 33,697 40,302 0'+,w •••• •••�G ^.•
pN itsE .,
Stress (psi) 1,960 3,360 3,190 3,820 of
R viewed By:-- Date: �s� VLAP LAB CODE#10315-0
TEST RESULTS DO DO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS pafomwd in accmiance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR mn
Eastern
- Materials
FGROUT COMPRESSIVE TEST SUMMARY _ Testing
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction Aq
Client: Target Stores ..•a - ..
Supplier: Aiudi Concrete JAWORSIQ
GEmm INC.
PLACEMENT DATA
Date Cast: 5/20/00 Set No. :G 9
Test Specimen Type:
Sample Width 3.00 Length 7.00
- Hollow Masonry Prism L/W Ratio: 2.33 :1
- Grouted Masonry Prism Grout Required Strength: 3000 psi
X
Mortar - EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 5 cy
2811 Sand lbs/cy, 171
water lbs/cy, 802 cement Slump: 9"
lbs/cy, 5.6 Air oz/cy,
3 Truck No. : 131
3.6 REO oz/cy
Ticket No. : 3166
Specimen Temperature: 62 degrees
Weather: overcast, 54 degrees
Total Location of Masonry Construction: foundation wall col. line A 9 to 10
Location of Sample Origin: col. line A-9.5 foundation wall
Comments:
Specimen No. G 9 A G 9 B G 9 C G 9 D
Date Cast 5/20/00 5/20/00 5/20/00 5/20/b0RICO
Date Tested 5/27/00 6/17/00 6/17/00 6/17/00y
( 7 days) (28 days) (28 days) ( 28 days)
Weight (lbs) 5.42 5.32 5.38 5.24 *
1
End Area (sq in) 10.56 10.56 10.56 10.56
Load (lbs) 12,913 25,049 23,229 21,054 '' �� 111%
Stress (psi) 1,220 2,370 21200 11990
Reviewed Date: �.�11dJ FVLAP LAB CODE#10315-0
TEST RESULTS DO gDO NOT 'IU above repod ed test results were attained through
COMPLY WITH SPECIFICATIONS p�+ooeduc�es pedocm�ed is a000rdanoe with AS'IM C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C6179 C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY ,: e�tor,
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores ZWOORSIMUSupplier: mixed on site
GBOIBM INC.
PLACEMENT DATA
Date Cast: 5/20/00 Set No. :M 9
Test Specimen Type: Sample Width 2.00 Length 2.00
— Hollow Masonry Prism L/W Ratio: 1.00 :1
Grouted Masonry Prism Required Strength: 2500 psi
— Grout
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 1 cy
3 Sand, 1 Lime, 1 1/2
Wat r, 2 Cement Slump: 5"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 60 degrees
Weather: overcast 56 degrees
Total Location of Masonry Construction:column line A-8.0 to 10.0
Location of Sample Origin:foundation column line A-9.5
Comments:
Specimen No. M 9 A M 9 B M 9 C
Date Cast 5/20/00 5/20/00 5/20/00 ������ 411`� `'1VF
�A�e<' A tti l;
Date Tested 5/27/00 6/17/00 6/17/00
( 7 days) (28 days) (28 days)
z4
Weight (lbs) 0.64 0.64 0.64
__ No.17�0 �•
End Ar a (sq in) 4.00 4.00 4.00
Load (lbs) 16,040 22,715 25,721
� /1 !Illll�fit111�
Stress (psi) 4,010 5,680 61430
Reviewed By: Date: G ZI 6V VLAP LAB CODE#10315-0
TEST RESULTS DO EJD0 NOT The above repmW teat resohs were a0med dmigh
COMPLY WITH SPECMCATIONS FED C 04M paQloaned is awmIam with AS"I'M C3I
ARE NOT COMPLETE EIN/A C39,C94,C1439 C1729 C1929 C2319 C617,C1231.
CONCRETE MASONRY, MORTAR, OR
bmtern
GROUT COMPRESSIVE TEST SUMMARY «nC am
Laboratory
rroject: Target Project No. : 00141C
A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
Supplier: Ai udi Concrete JAORS M- V
GiE01Pt�i.INC.PLACEMENT DATA
Date Cast: 5/20/00 Set No. :G 9
Test Specimen Type: Sample width 3.00 Length 7.00
_ Hollow Masonry Prism L/w Ratio: 2.33 :1
Grouted Masonry Prism Required Strength: 3000 psi
X Grout
Mortar - EMTL Technician: J.E. Anderson
Mix Proportions:
2811 Sand lbs/cy, 171 Quantity: 5 cy
water lbs/cy, 802 cement slump: 9"
lbs/cy, 5.6 Air oz/cy, -truck No. : 131
33.6 REo oz/cy
Ticket No. : 3166
Specimen Temperature: 62 degrees
weather: overcast, 54 degrees
Total Location of Masonry Construction: foundation wall col . line A 9 to 10
Location of Sample origin: col . line A-9.5 foundation wall
Comments:
Specimen No. G 9 A G 9 B G 9 C G 9 D
Date Cast 5/20/00 5/20/00 5/20/00 5/20/06
Date Tested 5/27/00 6/17/00 6/17/00 6/17/00
( 7 days) (28 days) (28 days) ( 28 days)
weight (lbs) 5.42 5.32 5.38 5.24
End Area (sq in) 9.00 9.00 9.00 9.00
Load (lbs) 129913
Stress (psi) 1,430
Reviewed BY:- Date*.Date: Y/"3 1/V V JNVLAP LAB CODE#10315-0 "
TEST RESULTS FIDOF-1 DO NOT The above reported test results were attained through
CO WITH SPECIFICATIONS procedures performed in a000�+danoa with ASTM C31,
ZARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Bastes
GROUT COMPRESSIVE TEST SUMMARY .=tom
T W "UnLaboratory
Project: Target Project No. : 00141C
A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
Supplier: mixed on site ejAWOmid
GEMEM INC
PLACEMENT DATA
Date Cast: 5120100 Set No. :M 9
Test specimen Type: sample width 2.00 length 2.00
_ Hollow Masonry Prism L/w Ratio: 1.00 :1
_ Grouted Masonry Prism Required strength: 2500 psi
_ Grout
X Mortar - Emn Technician: J.E. Anderson
Mix Proportions:
3 Sand, 1 Lime, 1 1/2 Quantity: 1 cy
water, 2 Cement Slump: 5"
Truck No. : n/a
Ticket No. : n/a
specimen Temperature: 60 degrees
weather: overcast 56 degrees
Total Location of Masonry Construction:column line A-8.0 to 10.0
Location of sample origin:foundation column line A-9.5
Comments:
Specimen No. M 9 A M 9 B M 9 C
Date Cast 5/20/00 5/20/00 5/20/00
Date Tested 5/27/00 6/17/00 6/17/00
( 7 days) (28 days) (28 days)
weight (lbs) 0.64 0.64 0.64
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 16,040
Stress (psi) 49010
Reviewed By• ^-te:!!� /71/00 VLAP LAB CODE#10315-0
F
ULTS DDO DO NOT The above repot W test results were attained through
WITH SPECIFICATIONS pr000durrs pabmed in words=with A,�C31
OT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR Eastern
GROUT COMPRESSIVE TEST SUMMARY EmLaboratory
`'
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
m,**%-
supplier: mixed on site JA GBOIBM IG
PLACEMENT DATA
Date Cast: 5/21/00 Set No. :M 10
Test Specimen Type: Sample Width 2.00 Length 2.00
Hollow Masonry Prism L/W Ratio: 1.00 :1
_ Grouted Masonry Prism
Grout Required Strength: 2500 psi
X. Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 1 cy
3 Sand, 1 Lime, 1 1/2
Water, 2 Cement Slump: 4"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 60 degrees
Weather: light rain, 60's
otal Location of Masonry Construction:foundation wall J-4 to J-7
Location of Sample origin:foundation wall J-5.5
Comments:
Specimen No. M 10 A M 10 B M 10 C
Date Cast 5/21/00 5/21/00 5/21/00 �a���0 y�0 NNFc
Date Tested 5/28/00 6/18/00 6/18/00 Aw�9J,=��'G_
( 7 days) (28 days) (28 days)
Weight (lbs) 0.62 0.62 0.64 .o=
End Area (sq in) 4.00 4.00 4.00fi
0'-r
Load lbs 17,026 20,724 20,843 �',r�" AL��\�\\\\
( ) ii an�rn,ai�
Str ss (psi) 40,260 5,180 5,210
R viewed By• Date: 6d/60
NVLAP LAB CODE#10315-0
E
T RESULTS DO DO NOT The above reported test results were attained through
PLY WITH SPECIFICATIONS prooedtff es performed in accordance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C 143,C 172,C 192,C231,C617,C 1231.
CONCRETE MASONRY, MORTAR, OR
GROUT COMPRESSIVE TEST SUMMARY �" T Eastern�
Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
Supplier: mixed on site JAWOISKI
PLACEMENT DATA
Date Cast: 5/21/00 Set No. :M 10
Test Specimen Type: Sample width 2.00 Length 2.00
_ Hollow Masonry Prism L/W Ratio: 1.00 :1
_ Grouted Masonry Prism
_ Grout - - Required Strength: 2500 psi
X Mortar - EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 1 cy
3 Sand, 1 Lime, 1 1/2
water, 2 Cement Slump: 4"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 60 degrees
weather: light rain, 60's
Total Location of Masonry Construction:foundation wall J-4 to J-7
Location of Sample origin:foundation wall J-5.5
Comments:
Specimen No. M 10 A M 10 B M 10 C
Date Cast 5/21/00 5/21/00 5/21/00
Date Tested 5/28/00 6/18/00 6/18/00
( 7 days) (28 days) (28 days)
weight (lbs) 0.62 0.62 0.64
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 179026
Stress (psi) 4,260
Reviewed By: - Date: S-/:3'AJQ VLAP LAB CODE#10315 F
TEST RESULTS DO [--] DO NOT The above reported test results were attained through
CO Y WITH SPECIFICATIONS Procedues r pe=famed in accordance wide ASIM C311
2ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY bury
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores • `• • •
Supplier: mixed on site JAQ
GEOMM INC.
PLACEMENT DATA
Date Cast: 5/22/00 Set No. :M 11
Test Specimen Type: Sample Width 2.00 Length 2.00
Hollow Masonry Prism L/W Ratio: 1.00 :1
Grouted Masonry Prism Required Strength: 1800 psi
Grout
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 1 cy
3 Sand, 1 Lime, 1 1/2
Water, 2 Cement Slump: 4.5"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 62 degrees
Weather: overcast, some light rain, 54 degrees
Total Location of Masonry Construction:wall column line A6 to A8
Location of Sample Origin:wall column line A7
Comments:
Specimen No. M 11 A M 11 B M 11 C
Date Cast 5 22 00 5 22 00 5 22 00
Date Tested 5/29/00 6/19/00 6/19/00
(
7 days) 28 days) 28 days)Y ) ( Y ) ( Y ) z?*;
21
• ,
Weight (lbs) 0.62 0.62 0.62 �+ .173M
End Area (sq in) 4.00 4.00 4.00 , i`
Load (lbs) 17,679 21,930 22,760
Stress (psi) 4,420 51480 51690
Reviewed sy: Date: 2 l/u.. NVLAP LAB CODE1110315-0 •
TEST RESULTS ODO [:J DO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS procedures puformed in accordance with ASTM C31;
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C2319 C617,C1231.
'CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY Testing
Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
Supplier: Aiudi Concrete GEVIVAU INIQ
C.
PLACEMENT DATA
Date Cast: 5/22/00 Set No. :G 10
Test Specimen Type: Sample Width 3.00 Length 7.00
— Hollow Masonry Prism L/W Ratio: 2.33 :1
— Grouted Masonry Prism Required Strength: 3000 psi
X Grout
Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 8 cy
not provided
Slump: 7.5"
Truck No. : 108
Ticket No. : 3758
Specimen Temperature:
Weather: rain, 56- degrees
Total Location of Masonry Construction: foundation wall col. line J-4 to J-7
Location of Sample origin: foundation wall col. line J-6
Comments:
Specimen No. G 10 A G 10 B G 10 C G 10 D
�rrr0iNN ��
Date Cast 5/22/00 5/22/00 5/22/00 5/22/003 A� ,��C�/v
� n
Date Tested 5/29/00 /19/00 6/19/00 6/19/00 � � ' Gtrj'';=
( 7 days) (28 days) (28 days) ( 28 da
Weight (lbs) 5.52 5.36 5.46 5.38
End Area (sq in) 10.56 10.56 10.56 10.56
Load (lbs) 13,289 22,201 25,760 26,334 At-
' y//NN IIIIfN�il
Stress (psi) 11260 2,100 2,440 21490
R viewed By: Date: ///uv PJVLAP LAB CODE#10315-0
TEST RESULTS DO ETDO NOT 'Ile above reported test results were attained through
COMPLY WITH SPECIFICATIONS procedures performed in aa�rdance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C1431 C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY EMTI," �ry
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores - , o
Supplier: Aiudi Concrete JAWORSKI
GMT=INC.
PLACEMENT DATA
Date Cast: 5/22/00 Set No. :G 11
Test Specimen Type: Sample Width 3.00 Length 7.00
— Hollow Masonry Prism L/W Ratio: 2.33 :1
— Grouted Masonry Prism Required Strength: 3000 psi
X Grout
Mortar - EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 6 cy
2815 Sand lbs/cy, 165
water lbs/cy, 820 cement Slump:
lbs/cy, 5.33 Air oz/cy,
3 Truck No. : 160
4.7 REO oz/cy
Ticket No. : 3766
Specimen Temperature:
Weather: overcast, light rain, 54 degrees
Total Location of Masonry Construction: wall col. line location A6 to A8
Location of Sample Origin: wall col. line A7
Comments:
Specimen No. G 11 A G 11 B G 11 C G 11 D
Date Cast 5 22 00 5 22 00 5 22 00 5 22 00 1\�d� CrOiN
Date Tested 5/29/00 6/19/00 6/19/00 6/19/00 A �L;' �JAw09-�.�'°_
( 7 days) (28 days) (28 days) ( 28 daysy
Weight (lbs) 5.38 5.38 5.48 5.50
End Area (sq in) 10.56 10.56 10.56 10.56
ce �
Load (lbs) 15,548 27,343 26,354 28,727 �`%i //N111141
Stress (psi) 11470 21590 21500 2,720
R vi wed By: Date: �, VLAP LAB CODE#10315-0
TEST RESULTS FIDO [2fDO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS pcnc eftes performod in accordance with ASTM C31,
E] ARE NOT COMPLETE EJ N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY �" «ng
Laboratory
. roject: Target Project No. : 00141C
A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target stores
D6226111,11-
supplier: Ai udi Concrete M-
JAWORSIQ
GEOtECN.INC.
PLACEMENT DATA
Date Cast: 5/22/00 set No. :G 10
Test specimen Type: sample width 3.00 Length 7.00
_ Hollow Masonry Prism L/w Ratio: 2.33 :1
Grouted Masonry Prism Required Strength: 3000 psi
y, Grout
Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
not provided Quantity: 8 cy
Slump: 7.5"
Truck No. : 108
Ticket No. : 3758
Specimen Temperature:
weather: rain, 56 degrees
Total Location of Masonry Construction: foundation wall col . line J-4 to J-7
Location of sample origin: foundation wall col . line J-6
Comments:
specimen No. G 10 A G 10 B G 10 C
Date Cast 5/22/00 5/22/00 5/22/00
Date Tested 5/29/00 6/19/00 6/19/00
( 7 days) (28 days) (28 days)
weight (lbs) 5.52 5.36 5.46
End Area (sq in) 9.00 9.00 9.00
Load (lbs) 139289
Stress (psi) 19480
Revi ewed By: - Date:S/3 r�G� VLAP LAB CODE#10315-0
TEST RESULTS DO n DO NOT The above repotted hest results were attained through
CO Y WITH SPECIFICATIONS procedures performed in aocarda�oe with ASI M C31;
ARE NOT COMPLETE N/A IC39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY "� Tesung''
r��
Laboratory
rroj ect: Target Project NO. : 00141C A Division of
south Windsor, CT Contractor: Konover Construction
Client: Target Stores
Supplier: Aiudi Concrete JAWOGecn7j ��
PLACEMENT DATA
Date Cast: 5/22/00 Set No. :G 11
Test specimen Type: Sample width 3.00 Length 7.00
_ Hollow Masonry Prism L/w Ratio: 2.33 :1
Grouted Masonry Prism Required Strength: 3000 psi
X Grout
Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
2815 Sand lbs/cy, 165 Quantity: 6 cy
water lbs/cy, 820 cement Slump:
lbs/cy, 5.33 Air oz/cy, T
34.7 REO oz/cy ruck No. : 160
Ticket No. : 3766
Specimen Temperature:
weather: overcast, light rain, 54 degrees
Total Location of Masonry Construction: wall col . line location A6 to A8
Location of Sample Origin: wall col . line A7
Comments:
Specimen No. G 11 A G 11 B G 11 C
Date Cast 5/22/00 5/22/00 5/22/00
Date Tested 5/29/00 6/19/00 6/19/00
( 7 days) (28 days) (28 days)
weight (lbs) 5.38 5.38 5.48
End Area (sq in) 9.00 9.00 9.00
Load (lbs) 159548
stress (psi) 11730
Reviewed By: Date: 31 ( vv JNVLAP LAB CODE#10315-0
TEST RESULTS DO [:] DO NOT The above reported test results were attained through
CO WITH SPECIPZCATIONS prooed Lus performed in a000r+dance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY "' Testing Materials Laboratory
Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction ROL
Client: Target Stores
Supplier: mixed on site JAWORSKI
GE01EtaL INC.
PLACEMENT DATA
Date Cast: 5/22/00 Set No. :M 11
Test Specimen Type: Sample width 2.00 Length 2.00
_ Hollow Masonry Prism L/w Ratio: 1.00 :1
_ Grouted Masonry Prism Required strength: 1800 psi
_ Grout
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
3 sand, 1 Lime, 1 1/2 Quantity: 1 Cy
water, 2 Cement Slump: 4.5"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 62 degrees
weather: overcast, some light rain, 54 degrees
Total Location of Masonry Construction.-wall column line A6 to A8
Location of sample origin:wall column line A7
Comments:
specimen No. M 11 A M 11 B M 11 C
Date Cast 5/22/00 5/22/00 5/22/00
Date Tested 5/29/00 6/19/00 6/19/00
( 7 days) (28 days) (28 days)
weight (lbs) 0.62 0.62 0.62
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 17,679
stress (psi) 49420
Date. i Reviewed By: ' S 31�W VLAP LAB CODE#10315
TEST RESULTS DO DO NOT Ile above reported test results were attained through '
CO WITH SPECIFICATIONS prooedma perfa med in accozdam with ASTM C319
ARE NOT COMPLETE EINIA C39,C94,C143,C172,C192,C2311 C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
FGROUT COMPRESSIVE TEST SUMMARY Materials
Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction y
Client: Target Stores •••�. o .,
Supplier: Aiudi Concrete coo'[OORiIQ
C.
PLACEMENT DATA
Date Cast: 5/23/00 Set No. :G 12
Test Specimen Type: Sample Width 3.00 Length 7.00
Hollow Masonry Prism L/W Ratio: 2.33 :1
Grouted Masonry Prism Required Strength: 3000 psi
Grout
Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 8 cy
2309 Sand, 815 cement,
188.2 water, 5.2 air, 33.5 Slump: 8"
reo
Truck No. : 174
Ticket No. : 3787
Specimen Temperature: 68 degrees
Weather: overcast, 65 degrees
Total Location of Masonry Construction: foundation wall J7 to 9
Location of Sample Origin: foundation wall J9
Comments:
Specimen No. G 12 A G 12 B G 12 C G 12 D
Date Cast 5/23/00 5/23/00 5/23/00 5/23/00 � 0, ,CN c
ADO
Date Tested 5/30/00 6/20/00 6/20/00 6/20/00�
( 7 days) (28 days) (28 days) ( 28 da �
Weight (lbs) 5.52 5.38 5.50 5.62
End Area (sq in) 10.56 10.56 10.56 10.56
Load (lbs) 13,625 26,255 26,156 25,009
Stress (psi) 11290 2,490 2,480 2,370
Reviewed By: Date: �j/2�/� NVLAP LAB CODE# 10315-0
TEST RESULTS DO OOODO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS prooed�ura pafonmed in accordance with ASTM C31,
E]ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY ma`elia`s
Test
_ Laboratory
)roject: Target Project No. : 00141C
A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
I
Supplier: Ai udi Concrete JAWORSKI
GE07UCII,INC
PLACEMENT DATA
Date Cast: 5/23/00 Set No. :G 12
Test Specimen Type: Sample width 3.00 Length 7.00
_ Hollow Masonry Prism L/w Ratio: 2.33 :1
Grouted Masonry Prism Required Strength: 3000 psi
g Grout -
Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
2309 Sand, 815 cement, Quantity: 8 cy
188.2 water, 5.2 air, 33.5 Slump: 8"
reo
Truck No. : 174
Ticket No. : 3787
Specimen Temperature: 68 degrees
weather: overcast, 65 degrees
Total Location of Masonry Construction: foundati-on wall ]7 to 9
Location of Sample origin: foundation wall 19
Comments:
Specimen No. G 12 A G 12 B G 12 C G 12 D
Date Cast 5/23/00 5/23/00 5/23/00 5/23/00
Date Tested 5/30/00 6/20/00 6/20/00 6/20/00
( 7 days) (28 days) (28 days) ( 28 days)
weight (lbs) 5.52 5.38 5.50 5.62
End Area (sq in) 9.00 9.00 9.00 9.00
Load (lbs) 139625
Stress (psi) 19510
Reviewed Bye Date: 5 3/10oYVLAP LAB CODE#10315
TEST RESULTS FIDO [:] DO NOT The above reported test results were attained dirongh
COrLY WITH SPECIFICATIONS prooedmes P in a000rdanoe with AS M C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY Materials
Testing
Laboratory
rroject: Target Project No. : 00141C
A Division of
South Windsor, CT Contractor: Konover Construction WL
Client: Target Stores 19
supplier: mixed on site JAWORSKI
ceotEcIt,INC
PLACEMENT DATA
Date Cast: 5/23/00 Set No. :M 12
Test Specimen Type: Sample width 2.00 Length 3.00
_ Hollow Masonry Prism L/w Ratio: 1.50 :1
_ Grouted Masonry Prism Required strength: 2500 psi
_ Grout
X Mortar - EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 1 Lime, 1 1/2 Quantity: 1 cy
Water, 2 Cement slump: 5"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 60 degrees
weather: overcast 60 degrees
Total Location of Masonry Construction:foundation wall V to 13
Location of Sample origin: foundation wall J10
Comments:
Specimen No. M 12 A M 12 B M 12 C
Date Cast 5/23/00 5/23/00 5/23/00
Date Tested 5/30/00 6/20/00 6/20/00
( 7 days) (28 days) (28 days)
weight (lbs) 0.58 0.60 0.58
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 109263
Stress (psi) 29570
Reviewed By. Date: S 3�1 VLAP LAB CODE#10315-0
TEST RESULTS EIDO DO NOT The above reported Meet results were attained through
CO Y WITH SPECIFICATIONS proom ures peda med in a000rdan,a with AST'M C3I
ARE NOT COMPLETE E]N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY : Tebo°iory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores . . a
Supplier: mixed on site JAWORSIQ
G801Fd'N.B(C.
PLACEMENT DATA
Date Cast: 5/23/00 Set No. :M 12
Test Specimen Type: Sample Width 2.00 Length 3.00
— Hollow Masonry Prism L/W Ratio: 1.50 :1
— Grouted Masonry Prism
— Grout - Required Strength: 2500 psi
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions: .
3 Sand, 1 Lime, 1 1/2 Quantity: 1 cy
Water, 2 Cement Slump: 5"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 60 degrees
Weather: overcast 60 degrees
Total Location of Masonry Construction:foundation wall J7 to 13
Location of Sample Origin: foundation wall J10
Comments:
Specimen No. M 12 A M 12 B M 12 C
\\IllllllilliGfl /1//�/i��ii�
Date Cast 5/23/00 5/23/00 5/23/00 ��� ` F111#11 C� '
Date Tested 5/30/00 6/20/00 6/20/00
( 7 days) (28 days) (28 days) co
Weight (lbs) 0.58 0.60 0.58 .1 ;` �\
End Area (sq in) 4.00 4.00 4.00
11 11#41,11,���\
Load (lbs) 10,263 15,721 14,416 fill,,1 t`\\\����
Stress (psi) 2,570 3,930 3,600
Reviewed By: ��� Date: �Z d/U v NVLAP LAB CODE#10315-0 ,
TEST RESULTS [�fDo F-1DO NOT The above reporW t W resaltB were attained through
COMPLY WITH SPECMCATIONS pnrkowulwrew pelftmed in a000r b=with ASI M C31,
EIARE NOT COMPLETE El N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
FGROUT COMPRESSIVE TEST SUMMARY Ta'uM`'
Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction }
Client: Target stores JAWORSKI
Supplier: mixed on site
GEOTF"L INC.
PLACEMENT DATA
Date Cast: 5/24/00 Set No. :M 14
Test Specimen Type: Sample Width 2.00 Length 2.00
— Hollow Masonry Prism L/W Ratio: 1.00 :1
Grouted Masonry Prism
Required Strength: 1800 psi
— Grout -
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 1 Lime, 1 1/2 Quantity: 1 cy
Water, 2 Cement Slump: 3.5"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 62 degrees
Weather: clear, 70 degrees
Total Location of Masonry Construction: wall J6 to 12
Location of Sample Origin: wall J10 5th course off floor
Comments:
Specimen No. M 14 A M 14 B M 14 C N`0��
Date Cast 5/24/00 5/24/00 5/24/00 \�� ``�► �t.JAtV, : 0;
Date Tested 5/31/00 6/21/00 6/21/00 cld;�C �7✓G�
( 7 days) (28 days) (28 days) = ? *c
Weight (lbs) 0.60 0.60 0.60
End Area (sq in) 4.00 4.00 4.00 N L�r`'\���
Load (lbs) 11,331 12, 108 11,845
Stress (psi) 2,830 3,030 2,960
Reviewed By• Date: & 14e, AIL' PYVLAP LAB CODE# 10315-0
TEST RESULTS ET
DO DO NOT The above Maned test wage attained
COMPLY WITH SPECIFICATIONS pu oodac+a paf�omW in soomdwm with ASTM C31,
F—IARE NOT COMPLETE 0�
N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
FGROUT COMPRESSIVE TEST SUMMARY Em Materials
Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction }
Client: Target Stores •
Supplier: Aiudi Concrete JAWOURSIG
GEOTB INC.
PLACEMENT DATA
Date Cast: 5/24/00 Set No. :G 13
Test Specimen Type: Sample Width 3.00 Length 7.00
— Hollow Masonry Prism L/W Ratio: 2.33 :1
_ Grouted Masonry Prism Required Strength: 3000 psi
x Grout
Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 6 cy
2990 Sand, 798.3 cement,
160.8 water, 5.5 air, 34.7 Slump: 8.5"
reo Truck No. : 151
Ticket No. : 3819
Specimen Temperature: 68 degrees
Weather: overcast, light rain 62 degrees
Total Location of Masonry Construction: wall column line J4 to 6
Location of Sample Origin: column line J6
Comments:
Specimen No. G 13 A G 13 B G 13 C G 13 D a1111�FiIICOIv/Vk
Date Cast 5/24/00 5/24/00 5/24/00 5/24/00 ��`!��\\\ `� 'f j
JA{p"-.c��
Date Tested 5/31/00 6/21/00 6/21/00 6/21/00
( 7 days) (28 days) (28 days) ( 28 days * *`
Weight (lbs) 5.42 5.36 5.52 5.40
End Area (sq in) 10.56 10.56 10.56 10.56
Load (lbs) 12,390 22,557 25,523 22,399
Stress (psi) 1,170 2,140 21420 2,120
Reviewed By: Date: & 11 4'IQ e INVLAP LAB CODE#10315-0
LTEST RESULTS FIDO DO NOT The above reported test malts were attained through
COMPLY WITH SPECIFICATIONS pmoeftu-performed in or ror�danoe with ASTM C31,
0-ARE NOT COMPLETE N/A 109,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
F-
Em
%�`ls
GROUT COMPRESSIVE TEST SUMMARYLaboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores • -
Supplier: Aiudi Concrete JAWOOGEOTEA ��
PLACEMENT DATA
Date Cast: 5/24/00 Set No. :G 14
Test Specimen Type: Sample Width 3.00 Length 7.00
— Hollow Masonry Prism L/W Ratio: 2.33 :1
— Grouted Masonry Prism Required Strength: 3000 psi
x Grout
Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 6 cy
2785 Sand, 800 cement, 165
water, 34.7 reo, 4.2 air Slump: 8.25"
Truck No. : 134
Ticket No. : 3836
Specimen Temperature: 68 degrees
Weather: clear, 70 degrees
Total Location of Masonry Construction: J6 to 11 wall
Location of Sample Origin: wall J10
Comments:
Specimen No. G 14 A G 14 B G 14 C G 14 D
Date Cast 5/24/00 5/24/00 5/24/00 5/24/00
Date Tested 5/31/00 6/21/00 6/21/00 6/21/00 \�� '�����` JA"'''���';
( 7 days) (28 days) (28 days) ( 28 days .�caQ�` 'Qcr=G
Weight (lbs) 5.40 5.48 5.56 5.50 *= `*
End Area (sq in) 10.56 10.56 10.56 10.56 _0 7--
Load (lbs) 12,980 26,729 26,354 20,625
fill It
Stress (psi) 1,230 21530 21500 1,950
Reviewed By: Date: < �� NVLAP LAB CODE# 10315-0
TEST RESULTSF-1D0 E�J�DO NOT The above repoded test results wac atudnod through
COMPLY WITH SPECIFICATIONS pr000duc+es performed in a000rdawe with ASTM C31,
ARE NOT COMPLETE El N/A IC39,C94,C143,C172,C192,C231,C617,C1231.
- CONCRETE MASONRY, MORTAR, OR
GROUT COMPRESSIVE TEST SUMMARY amEastern
`'
Laboratory
project: Target Project No. : 00141C
A Division of
south Windsor, CT Contractor: Konover Construction
Client: Target stores
supplier: Ai udi Concrete JAWORSKI
Gam.INC.
PLACEMENT DATA
Date Cast: 5/24/00 set No. :G 13
Test specimen Type: Sample width 3.00 Length 7.00
_ Hollow Masonry Prism L/w Ratio: 2.33 :1
_ Grouted Masonry Prism
X Grout - Required Strength: 3000 psi— Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
2990 Sand, 798.3 cement, Quantity: 6 cy
160.8 water, 5.5 air, 34.7 Slump: 8.5"
reo
Truck No. : 151
Ticket No. : 3819
specimen Temperature: 68 degrees
weather: overcast, light rain 62 degrees
Total Location of Masonry Construction: wall column line 14 to 6
Location of Sample origin: column line J6
Comments:
Specimen No. G 13 A G 13 B G 13 C G 13 D
Date Cast 5/24/00 5/24/00 5/24/00 5/24/00
Date Tested 5/31/00 6/21/00 6/21/00 6/21/00
( 7 days) (28 days) (28 days) ( 28 days)
weight (lbs) 5.42 5.36 5.52 5.40
End Area (sq in) 9.00 9.00 9.00 9.00
Load (lbs) 129390
stress (psi) 11380
Reviewed Byr>_�- Date: S�/31 UCHJNVLAP LAB CODE#10315:
TEST RESULTS DOF-] DO NOT The above rgxnW test results were attained through
CO Y WITH SPECIFICATIONS Procedures performed in a�xordanoe with AST It
ARE NOT COMPLETE 0 N/A C390 C94,C 143,C 172,C 192,C231,C617,C 1231.
CONCRETE MASONRY, MORTAR, OR
GROUT COMPRESSIVE TEST SUMMARY `�'
Laboratory
�roject: Target Project No. : 00141C
A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
Supplier: Ai udi Concrete JAWORSKI
CIE011 .INC.
PLACEMENT DATA
Date Cast: 5/24/00 set No. :G 14
Test Specimen Type: Sample width 3.00 Length 7.00
_ Hollow Masonry Prism L/w Ratio: 2.33 :1
Grouted Masonry Prism Required Strength: 3000 psi
X Grout
Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
2785 Sand, 800 cement, 165 Quantity: 6 cy
water, 34.7 reo, 4.2 air Slump: 8.25"
Truck No. : 134
Ticket No. : 3836
Specimen Temperature: 68 degrees
Weather: clear, 70 degrees
Total Location of Masonry Construction: j6 to 11 wall
Location of Sample Origin: wall J10
Comments:
Specimen No. G 14 A G 14 B G 14 C G 14 D
Date Cast 5/24/00 5/24/00 5/24/00 5/24/06
Date Tested 5/31/00 6/21/00 6/21/00 6/21/00
( 7 days) (28 days) (28 days) ( 28 days)
weight O bs) 5.40 5.48 5.56 5.50
End Area (sq in) 9.00 9.00 9.00 9.00
Load (lbs) 12,980
Stress (psi) 1,440
Reviewed By:— Date: 3 /W VLAP LAB CODE#10315-0
TEST RESULTS DO DO NOT The above reponed test results were attained through .
=ARE
H SPECIFICATIONS p performed in accordance with ASTM C31t
NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
- Materials
FGROUT COMPRESSIVE TEST SUMMARY Testia�
_ Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
• •� • . .,
Client: Target Stores �wO�HI
Supplier: mixed on site
GEOTWL INC.
PLACEMENT DATA
Date Cast: 5/24/00 Set No. :M 13
Test Specimen Type: Sample Width 2.00 Length 2.00
— Hollow Masonry Prism L/W Ratio: 1.00 :1
Grouted Masonry Prism
Grout Required Strength: 1800 psi
X. Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 1 Lime, 1 1/2 Quantity: 1 cy
Water, 2 Cement Slump: 4.5"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 60 degrees
Weather: overcast, some light rain, 62 degrees
Total Location of Masonry Construction:wall column line J4 tp 6
Location of Sample Origin: wall column line J5
Comments:
Specimen No. M 13 A M 13 B M 13 C 11 CONNIINIIIIIIIIII/�/��///�/��i/
Date Cast 5 24 00 5 24 00 5 24 00 �'��'��' JA���''.���
Date Tested 5/31/00 6/21/00 6/21/00
( 7 days) (28 days) (28 days) =*
W fight (lbs) 0.62 0.60 0.60 .`Z\
End Area (sq in) 4.00 4.00 4.00 ���
Load (lbs) 10,204 15,938 15,365
Str ss (psi) 21550 31980 3,840
R vi wed By: Dater/mod-�O�c1 NVLAP LAB CODE# 10315-0
TEST RESULTS D DO DO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS pr000du-ea performed in accord=with ASTM C31,
DARE NOT COMPLETE EINIA 109,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY Materials
c�"'
Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
Supplier: mixed on site WeRWORM
GFAtEt�l.II11C.
PLACEMENT DATA
Date Cast: 5/24/00 Set No. :M 13
Test specimen Type: Sample width 2.00 Length 2.00
_ Hollow Masonry Prism L/W Ratio: 1.00 :1
_ Grouted Masonry Prism Required strength: 1800 psi
_ Grout
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 1 Lime, 1 1/2 Quantity: 1 cy
Water, 2 Cement Slump: 4.5"
Truck NO. : n/a
Ticket No. : n/a
Specimen Temperature: 60 degrees
weather: overcast, some light rain, 62 degrees
Total Location of Masonry Construction.-wall column line J4 tp 6
Location of Sample origin: wall column line J5
Comments:
Specimen No. M 13 A M 13 B M 13 C
Date Cast 5/24/00 5/24/00 5/24/00
Date Tested 5/31/00 6/21/00 6/21/00
( 7 days) (28 days) (28 days)
weight (lbs) 0.62 0.60 0.60
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 10,204
Stress (psi) 21550
Reviewed B Date: S 3( C)V INVLAP LAB CODE#10315-0
TEST RESULTS DO DO NOT Mw above repoacd test results were attained through
CO Y WITH SPECIFICATIONS procedures pafomied in a000nb=with ASTM C31,
ARE NOT COMPLETE N/A IC39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY "' Tmata esung'
r«ram
Laboratory
r'roj ect: Target Project NO. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction AWL
Client: Target Stores
supplier: mixed on site JAWORSKI
GEOIWL INC
PLACEMENT DATA
Date Cast: 5/24/00 Set No. :M 14
Test Specimen Type: Sample width 2.00 Length 2.00
_ Hollow Masonry Prism L/W Ratio: 1.00 :1
_ Grouted Masonry Prism Required Strength: 1800 psi
_ Grout
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 1 Lime, 1 1/2 Quantity: 1 cy
Water, 2 Cement Slump: 3.5"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 62 degrees
weather: clear, 70 degrees
Total Location of Masonry Construction: wall J6 to 12
Location of Sample origin: wall J10 5th course off floor
Comments:
Specimen No. M 14 A M 14 B M 14 C
Date Cast 5/24/00 5/24/00 5/24/00
Date Tested 5/31/00 6/21/00 6/21/00
( 7 days) (28 days) (28 days)
weight (lbs) 0.60 0.60 0.60
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 119331
Stress (psi) 29830
Reviewed B Date /3� �
/ VLAP LAB CODE#103154
"
r l
r-
TEST RESULTSF-1D0 [:] DO NOT The above reported test results were mined dmugh
COM H SPECIFICATIONS promhues perk ned in aocordam with ALS7 M C311
[ETARE NOT COMPLETE [:jN/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY Materials
EM TesUng
Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
supplier: mixed on site e1AWORS10
GEO'UaL INC.
PLACEMENT DATA
Date Cast: 5/25/00 Set No. :M 16
Test specimen Type: sample width 2.00 Length 2.00
_ Hollow Masonry Prism L/w Ratio: 1.00 :1
_ Grouted Masonry Prism Required Strength: 1800 psi
_ Grout
g Mortar - EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 1 Lime, 1 1/2 Quantity: 1 cy
water, 2 Cement Slump: 3.75"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 62 degrees
weather: overcast, 70 degrees
Total Location of Masonry Construction: wall J-6•to 8
Location of sample origin: wall J-6 10' off floor
Comments:
specimen No. M 16 A M 16 B M 16 C
Date Cast 5/25/00 5/25/00 5/25/00
Date Tested 6/1/00 6/22/00 6/22/00
( 7 days) (28 days) (28 days)
weight (lbs) 0.58 0.60 0.58
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 5,557
Stress (psi) 1,390
Reviewed By' Date: At-, 04VLAP LAB CODEX 10315-0
kTEST TS DO DO NOT The above repotted test results were attained trough
WITH SPECIFICATIONS procedures perfomed in accordance with ASTM C31,
NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY Materials resting ttn�
Laborator7
project: Target Project No. : 00141C
A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
....._ a ..a
Su.ppl i er: Ai udi Concrete JAWORSKI
Gemm INC`
PLACEMENT DATA
Date Cast: 5/25/00 Set No. :G 15
Test Specimen Type: sample width 3.00 Length 7.00
_ Hollow Masonry Prism L/w Ratio: 2.33 :1
_ Grouted Masonry Prism Required Strength: 3000 psi
g Grout
Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 12 cy
2832 Sand, 802 cement, 162
water, 5.4 air, 33.6 reo Slump: 10"
Truck No. : 108
Ticket No. : 3869
Specimen Temperature: 68 degrees
weather: overcast
Total Location of Masonry Construction: foundation wall col . line 13 1 to F and wall
-6to9
Location of Sample origin: foundation wall 131
Comments:
Specimen No. G 15 A G 15 B G 15 C
Date Cast 5/25/00 5/25/00 5/25/00
Date Tested 6/1/00 6/22/00 6/22/00
( 7 days) (28 days) (28 days)
weight (lbs) 0.60 0.58 0.58
End Area (sq in) 5.18 5.60 5.22
Load (lbs) 6,803
stress (psi) 1,310
Reviewed By' Date: Ile /CX., VLAP LAB CODE#10315-0
TEST RESULTS DO DO NOT The above vVorbed test results were attained through
Y WITH SPECIFICATIONS pr000dtmes performed in amoldam with ASTM C319
coARE NOT COMPLETE
M N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY W_ng
Laboratory
Nroject: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
Supplier: mixed on site JAWORSE
�INC.
PLACEMENT DATA
Date Cast: 5/25/00 Set No. :M 15
Test specimen Type: sample width 2.00 Length 2.00
_ Hollow Masonry Prism L/w Ratio: 1.00 :1
_ Grouted Masonry Prism Required strength: 2500 psi
_ Grout
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
3 sand, 1 Lime, 1 1/2 Quantity: 1 cy
water, 2 Cement slump: 4"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 60 degrees
weather: overcast 60 degrees
Total Location of Masonry Construction: foundation wall column line 13 J to F
Location of sample origin: foundation wall column line 13G
Comments:
specimen No. M 15 A M 15 B M 15 C
Date Cast 5/25/00 5/25/00 5/25/00
Date Tested 6/1/00 6/22/00 6/22/00
( 7 days) (28 days) (28 days)
weight (lbs) 0.60 0.58 0.58
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 109184
Stress (psi) 29550
Revi ewed By• Date: X/(J(J VLAP LAB CODE#10315-0 '
TEST TS DO El DO NOT The above r )oiUd test results were attained ugh
CO Y WITH SPECIFICATIONS Procedures Pafoimod in accordaaoe with ASTM C3 It
ARE NOT COMPLETE ON/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR Eastern
GROUT COMPRESSIVE TEST SUMMARY WlA Te
4ns`'boratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores JAWORSKI
Supplier: mixed on site
GE01FM INC.
PLACEMENT DATA
Date Cast: 5/25/00 Set No. :M 15
Test Specimen Type: Sample Width 2.00 Length 2.00
— Hollow Masonry Prism L/W Ratio: 1.00 :1
— Grouted Masonry Prism
_ Grout Required Strength: 2500 psi
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 1 Lime, 1 1/2 Quantity: 1 cy
Water, 2 Cement Slump: 4"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 60 degrees
[ Weather: overcast 60 degrees
-Total Location of Masonry Construction: foundation wall column line 13 J to F
Location of Sample Origin: foundation wall column line 13G
Comments:
Specimen No. M 15 A M 15 B M 15 C
Date Cast 5/25/00 5/25/00 5/25/00 \ ,4,`" FICd(VN4ej ,,�,�
Date Tested 6/1/00 6/22/00 6/22/00 \��� �� �'JA1y49.
( 7 days) (28 days) (28 days) cc
Weight (lbs) 0.60 0.58 0.58 Q:`
End Area (sq in) 4.00 4.00 4.00S(GO,���``�\
Load (lbs) 10,184 12,240 12,300 `SS N fill,
1
' ..11111
Stress (psi) 2,550 31060 3,080
Reviewed By: Date: 6 124/00 INVLAP LAB CODE# 10315-0
TEST RESULTS E�J'DOF-I DO NOT 110 above repoded test results were attained thro O
COMPLY WITH SPECIFICATIONS provodures pe;fbmwd in aco rdance with ASTM C31,
DARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY F� Materials
ory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
%
Client: Target Stores - a
Supplier: mixed on site eJAWORSiIG
GEOTECK INC.
PLACEMENT DATA
Date Cast: 5/25/00 Set No. :M 16
Test Specimen Type:
Sample Width 2.00 Length 2.00
— Hollow Masonry Prism L/W Ratio: 1.00 :1
— Grouted Masonry Prism
— Grout
Required Strength: 1800 psi
X. Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 1 Lime, 1 1/2 Quantity: 1 cy
Water, 2 Cement Slump: 3.75"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 62 degrees
Weather: overcast, 70 degrees
, Total Location of Masonry Construction: wall J-6 -to 8
Location of Sample Origin: wall J-6 10' off floor
Comments:
Specimen No. M 16 A M 16 B M 16 C
GU N&
Date Cast 5/25/00 5/25/00 5/25/00
Date Tested 6/l/00 6/22/00 6/22/00 `�
( 7 days) (28 days) (28 days) ' =�
Weight (lbs) 0.58 0.60 0.58 _ 7560
U= �
End Area (sq in) 4.00 4.00 4.00 'S
Load (lbs) 5,557 10,678 10,283 �� N
�iiii
Stress (psi) 11390 2,670 2,570
Reviewed By. Date: 111?6 AW NVLAP LAB CODE#10315-0
TEST RESULTS DO n DO NOT Ile above reporW treat results wrre attained
COMPLY WITH SPECIFICATIONS l�peifomied in a000rda=with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY , Tes�go�
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
Supplier: Aiudi Concrete eJAWORSKI
G .INC.PLACEMENT DATA
Date Cast: 5/25/00 Set No. :G 15
Test Specimen Type:
Sample Width 3.00 Length 7.00
_ Hollow Masonry Prism L/W Ratio: 2.33 :1
_ Grouted Masonry Prism Required Strength: 3000 psi
X Grout
_ Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
2832 Sand, 802 cement, 162 Quantity: 12 cy
water, 5.4 air, 33.6 reo Slump: 10"
Truck No. : 108
Ticket No. : 3869
Specimen Temperature: 68 degrees
Weather: overcast
Total Location of Masonry Construction: foundation wall col. line 13 J to F and wall
J-6 to 9
Location of Sample Origin: foundation wall 13J
Comments:
Specimen No. G 15 A G 15 B G 15 C G 15 D �GOIN�iii�ii
Date Cast 5/25/00 5/25/00 5/25/00 5/25/00 ���� �1.JAt�y�''�,�%Cl
�'�P'I e
Date Tested 6/1/00 6/22/00 6/22/00 6/22/00 X a0` ���
( 7 days) (28 days) (28 days) ( 28 days *i
W ight (lbs) 5.18 5.06 5.22 5.16
End Area (sq in 10.56 10.56 10.56 10.56
Load (lbs) 13,833 21,390 22,893 23,453 H/lll it
Stress (psi) 1,310 21030 2,170 21220
R vi wed Date: 6 ) 7►` VLAP LAB CODE#10315-0
TEST RESULTS FIDO ���DO NOT The above reported best results wrre attained through
COMPLY WITH SPECIFICATIONS pnroedm-s Pafocmod in soombwe with ASTM C31,
ARE NOT COMPLETE N/A C399 C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR Eastem
GROUT COMPRESSIVE TEST SUMMARY Mateftas
Project: Target Project No. : 00141C
South Windsor, CT Contractor: Konover Construction A Division of
Client: Target Stores
supplier: mixed on site IM
JAWORSKI
CBOrIEC L Q11C.
PLACEMENT DATA
Date Cast: 5/26/00 Set No. :M 17
Test Specimen Type: sample width 2.00 Length 2.00
_ Hollow Masonry Prism L/W Ratio: 1.00 :1
_ Grouted Masonry Prism Required Strength: 2500 psi
_ Grout
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 1 Lime, 1 1/2 Quantity: 1 cy
water, 2 Cement Slump: 3.25"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 60 degrees
weather: clear, 70 degrees
Total Location of Masonry Construction: foundation wall , column line 13E to D
Location of sample origin: foundation wall column line 13E
Comments:
Specimen No. M 17 A M 17 B M 17 C
Date Cast 5/26/00 5/26/00 5/26/00
Date Tested 6/2/00 6/23/00 6/23/00
( 7 days) (28 days) (28 days)
weight (lbs) 0.62 0.62 0.60
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 129913
Stress (psi) 3,230
Reviewed By• Date:(;;:,//S�uCJ INIVLAP LAB CODE#10315-0
TEST RESULTSF-1DOF-I DO NOT 11c above reposed test results was attained through
CO Y WITH SPECIFICATIONS procedures pafa 3ed in a otdanoe with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Sasteru
'
GROUT COMPRESSIVE TEST SUMMARY ',
Project: Target Project No. : 00141C
South Windsor, CT Contractor: Konover Construction A Division of
Client: Target Stores
supplier: mixed on site IM
JAWORSKI
G807ML INC.
PLACEMENT DATA
Date Cast: 5/26/00 Set NO. :M 18
Test Specimen Type: Sample width 2.00 Length 2.00
_ Hollow Masonry Prism L/W Ratio: 1.00 :1
_ Grouted Masonry Prism Required strength: 1800 psi
Grout
g Mortar _ EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 1 Lime, 1 1/2 Quantity: 1 cy
water, 2 Cement Slump: 4"
Truck No. : n/a
Ticket No. : n/a
specimen Temperature: 62 degrees
weather: clear, 70 degrees
Total Location of Masonry Construction: wall column line J-10 to 13 5' off floor
Location of Sample Origin: column line 7-10 5' off floor
Comments:
Specimen No. M 18 A M 18 B M 18 C
Date Cast 5/26/00 5/26/00 5/26/00
Date Tested 6/2/00 6/23/00 6/23/00
( 7 days) (28 days) (28 days)
weight (lbs) 0.62 0.62 0.60
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 11,726
Stress (psi) 29930
Reviewed By• Date: vo VLqp LAB CODE#10315-0
TEST LILTS DDO [:JDO NOT Mw above repo[ted test results vme attained through
CO LY WITH SPECIFICATIONS procedures perfonned in accordance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
MaterfiRls
GROUT COMPRESSIVE TEST SUMMARY Laboratory
Lorattoo
ry
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Cli nt: Target Stores •
Supplier: Aiudi Concrete JA
WORSIG
PLACEMENT DATA CEDIBM INC.
Date Cast: 5/26/00 Set No. :G 17
Test Specimen Type: Sample Width 3.00 Length 7.00
_ Hollow Masonry Prism L/W Ratio: 2.33 :1
_ Grouted Masonry Prism Required Strength: 3000 psi
X Grout
Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
Quantity: 7 cy
2811 Sand, 185.7 Water,
831.4 Cement, 33.7 Reo, Slump:
5.14 Air
Truck No. : 108
Ticket No. : 3886
Specimen Temperature:
Weather: clear, 70 degrees
Total Location of Masonry Construction: wall col: line J6 to 13, 8' off floor slab
Location of Sample Origin: wall col. line J9
Comments:
of: CO
i tti N I 111 I t Jlllll�i��i�i��j
Specimen No. G 17 A G 17 B G 17 C G 17 D\� Q���y1N.dq�,'%�'j►%
Date Cast 5/26/00 5/26/00 5/26/00 5/26/(
Dat Tested 6/2/00 6/23/00 6/23/00 6/23/a-R'
( 7 days) (28 days) (28 days) ( 28 dam®N
Weight (lbs) 5.18 5.02 5.18 5.22
. ',, AL
End Area (sq in) 10.56 10.56 10.56 10.56 ......
Load (lbs) 13,704 32,043 32,399 31,331
Str ss (psi) 1,300 3,030 3,070 2,970
Reviewed By• Date:,:.,',"(/? 7/0U VLAP LAB CODE# 10315-0 w
TEST RESULTS [:2rDO DO NOT 110 above reported best results were attained through
COMPLY WITH SPECMICATIONS Fir+ooedtmes pahmed in a000rd =with ASTU C31,
E]ARE NOT COMPLETE N/A IC399 C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
Materials
GROUT COMPRESSIVE TEST SUMMARYEmLaboratoryTesUng
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores •••�- e
Supplier: Aiudi Concrete JAWORSE
GE011M INC.
PLACEMENT DATA
Date Cast: 5/26/00 Set No. :G 18
Test Specimen Type: Sample Width 3.00 Length 7.00
— Hollow Masonry Prism L/W Ratio: 2.33 :1
— Grouted Masonry Prism Required Strength: 3000 psi
X Grout
Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 5 cy
2760 Sand, 800 Cement, 177
Water, 5.6 Air, 32.8 Reo Slump: 7"
Truck No. : 134
Ticket No. :
Specimen Temperature: 68 degrees
Weather: clear, 70 degrees
Total Location of Masonry Construction: foundation wall 13F to D
Location of Sample Origin: foundation wall 13E
Comments:
Specimen No. G 18 A G 18 B G 18 C G 18 D
Date Cast 5/26/00 5/26/00 5/26/00 5/26/00
Date Tested 6/2/00 6/23/00 6/23/00 6/23/00 Z z
( 7 days) (28 days) (28 days) ( 28 days*
Weight (lbs) 5.40 5.42 5.36 5.20
End Area (sq in 10.56 10.56 10.56 10.56 s/%//iS �
Load (lbs) 17,956 30,382 30,876 32,003
Str ss (psi) 1,700 2,880 2,920 31030
Reviewed By Date: G��7/0 04VLAP LAB CODE#10315-0
TEST RESULTS DO E8��DO NOT The above reported test remdts were attained through .
COMPLY WITH SPECIFICATIONS piooeftes paf+omwd in a000rdanoe with ASSTM C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY '� T«Ung''
Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction y
Client: Target Stores • ��.• . .
Supplier: mixed on site JAWORSE
PLACEMENT DATA MUM INC.
Date Cast: 5/26/00 Set No. :M 17
Test Specimen Type: Sample Width 2.00 Length 2.00
— Hollow Masonry Prism L/W Ratio: 1.00 :1
— Grouted Masonry Prism
Required Strength: 2500 psi
— Grout
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 1 Lime, 1 1/2 Quantity: 1 cy
Water, 2 Cement Slump: 3.25"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 60 degrees
Weather: clear, 70 degrees
J—'Total Location of Masonry Construction: foundation wall, column line 13E to D
Location of Sample Origin: foundation wall column line 13E
Comments:
Specimen No. M 17 A M 17 B M 17 CAA
Date Date Cast 5/26/00 5/26/00 5/26/00 Co
Date Tested 6/2/00 6/23/00 6/23/00 *� �*
( 7 days) (28 days) (28 days) 00 7 O \
Weight (lbs) 0.62 0.62 0.60 ��'�%, \
�i/�/ ll
L 111����`��
End Area (sq in) 4.00 4.00 4.00 p� 1111111
Load (lbs) 12,913 14,565 14,594
Stress (psi) 3,230 3,640 3,650
R viewed By• Date X-2 `f/G INVLAP LAB CODE#10315-0
TEST RESULTS OOODOF-1 DO NOT The above reposed best results were attsinW through
COMPLY WITH SPECIFICATIONS procedures i - famed in a000rdan,oe with ASTM C31,
ARE NOT COMPLETE EJ NIA C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
FGROUT COMPRESSIVE TEST SUMMARY : Testing r9
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
W. - -F1
Client: Target Stores
Supplier: mixed on site JAWORSKI
Gecnrxn lNC.
PLACEMENT DATA
Date Cast: 5/26/00 Set No. :M 18
Test Specimen Type: Sample Width 2.00 Length 2.00
- Hollow Masonry Prism L/W Ratio: 1.00 :1
- Grouted Masonry Prism Required Strength: 1800 psi
- Grout -
•X Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 1 cy
3 Sand, 1 Lime, 1 1/2
Water, 2 Cement Slump: 4"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 62 degrees
Weather: clear, 70 degrees
Total Location of Masonry Construction: wall column line J-10 to 13 5' off floor
Location of Sample Origin: column line J-10 5' off floor
Comments:
Specimen No. M 18 A M 18 B M 18 C
Date Cast 5/26/00 5/26/00 5/26/00
Date Tested 6 2 00 6 2 3 00 6 23 00
( 7 days) (28 days) (28 days) `\��'��� `*A J,��
Weight (lbs) 0.62 0.62 0.60
End Area (sq in) 4.00 4.00 4.00 = �*
o.
Load lbs 11,726 14,080 14,277
=� �
Stress (psi) 21930 3,520 31570
Reviewed By: Date: ��ZG�dv FVLAP/LAB C E# 10315-0
TEST RESULTS ETDO [:] DO NOT The above reposed best results were attained through
COMPLY WITH SPECIFICATIONS prooed aes performed in a000r&noe with ASTM C31,
0-ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR Z"tem
twiab
GROUT COMPRESSIVE TEST SUMMARY EMT
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores I M.
Supplier: Aiudi Concrete JAWORM
Q®OT=OITC.
PLACEMENT DATA
Date Cast: 5/26/00 Set No. :G 18
Test Specimen Type: Sample Width 3.00 Length 7.00
— Hollow Masonry Prism L/W Ratio: 2.33 :1
_ Grouted Masonry Prism Required Strength: 3000 psi
X Grout - -
— Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
2760 Sand, 800 Cement, 177 Quantity: 5 cy
Water, 5.6 Air, 32.8 Reo Slump: 7"
Truck No. : 134
Ticket No. :
Specimen Temperature: 68 degrees
Weather: clear, 70 degrees
Total Location of Masonry Construction: foundation wall 13F to D
Location of Sample Origin: foundation wall 13E
Comments:
Specimen No. G 18 A G 18 B G 18 C G 18 D
Date Cast 5/26/00 5/26/00 5/26/00 5/26/00
Date Tested 6/2/00 6/23/00 6/23/00 6/23/00
( 7 days) (28 days) (28 days) ( 28 days)
Weight (lbs) 5.40 5.42 5.36 5.20
End Area (sq in) 10.56 10.56 10.56 10.56
Load (lbs) 17,956
Str ss (psi) 1,700
R vi wed By. Date: C� 8��oc� LAP LAB CODE#10315-0
.L
TEST RESULTS FIDOF__J DO NOT The above reported test results was attained through
COMY&V WITH SPECIFICATIONS procedm+es perfumed in acoardance with ASTM C31,
ARE NOT COMPLETE N/A 109,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR wtam
GROUT COMPRESSIVE TEST SUMMARY `«�r,
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
Supplier: Aiudi Concrete JAWORM
GB017M IIITC.
PLACEMENT DATA
Date Cast: 5/26/00 Set No. :G 17
Test Specimen Type:
Sample Width 3.00 Length 7.00
— Hollow Masonry Prism L/W Ratio: 2.33 :1
— Grouted Masonry Prism Required Strength: 3000 psi
X Grout
— Mortar - EMTL Technician: J.E. Anderson
Mix Proportions:
2811 Sand, 185.7 Water, Quantity: 7 cy
831.4 Cement, 33.7 Reo, Slump:
5.14 Air Truck No. : 108
Ticket No. : 3886
Specimen Temperature:
Weather: clear, •70 degrees
Total Location of Masonry Construction: wall col.- line J6 to 13, 8' off floor slab
Location of Sample Origin: wall col. line J9
Comments:
Specimen No. G 17 A G 17 B G 17 C G 17 D
Date Cast 5/26/00 5/26/00 5/26/00 5/26/00
Date Tested 6/2/00 6/23/00 6/23/00 6/23/00
( 7 days) (28 days) (28 days) ( 28 days)
Weight (lbs) 5.18 5.02 5.18 5.22
End Area (sq in) 10.56 10.56 10.56 10.56
Load (lbs) 13,704
Stress (psi) 1,300
R viewed By. Date: W VLAP LAB CODE#10315-0
TEST RESULTS DO DO NOT The above reported teat results were attained through
CO WITH SPECIFICATIONS procedures performed in a000rdance with ASTM C31,
ARE NOT COMPLETE N/A IC39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
Materials
TesUng
FEmLaboratory
GROUT COMPRESSIVE TEST SUMMARY
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction M
Client: Target Stores
Supplier: Aiudi Concrete JAWORSIG
GECTML INC.
PLACEMENT DATA
Date Cast: 5/27/00 Set No. :G 19
Test Specimen Type: Sample Width 3.00 Length 7.00
_ Hollow Masonry Prism L/W Ratio: 2.33 :1
_ Grouted Masonry Prism Required Strength: 3000 psi
X Grout
_ Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
Quantity: 8 cy
not provided
Slump: 7"
Truck No. : 108
Ticket No. : 3921, 3922
Specimen Temperature:
Weather: clear, 70 degrees
Total Location of Masonry Construction: J-10 to 13 and 13J to G
Location of Sample Origin:J-11 bond beam
Comments:
Specimen No. G 19 A G 19 B G 19 C G 19 D ,�,�� `t'�AAk,09
Date Cast 5/27/00 5/27/00 5/27/00 5/27/0(
Date Tested 6/3/00 6/24/00 6/24/00 6/24/00=-0_ *\
( 7 days) (28 days) (28 days) ( 28 day$ .c�
W ight (lbs) 5.22 5.14 5.36 5.06 '%cS'S�'����
End Area (sq i n) 10.56 10.56 10.56 10.56
`��
Load (lbs) 13,229 20,599 21,113 20,718
Stress (psi) 11250 11950 2,000 1,960
Reviewed By• Date: (� �Z �cx� VLAP LAB CODE#10315-0
ITEST RESULTS F-1 DO DO NOT The above repod ed UK mutts were attained through
COMPLY WITH SPECMCATIONS prooedwes perfo med in a000tdame with AS'IM C 31,
EIARE NOT COMPLETE N/A 109,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
GROUT COMPRESSIVE TEST SUMMARY am r,
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
Supplier: Aiudi Concrete �WO
GBOTWL QI1G.
PLACEMENT DATA
Dat Cast: 5/27/00 Set No. :G 19
Test Specimen Type: Sample Width 3.00 Length 7.00
_ Hollow Masonry Prism L/W Ratio: 2.33 :1
_ Grouted Masonry Prism Required Strength: 3000 psi
X Grout
_ Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
not provided Quantity: 8 cy
Slump: 7"
Truck No. : 108
Ticket No. : 3921, 3922
Specimen Temperature:
Weather: clear, -70 degrees
Total Location of Masonry Construction: J-10 to 13 and 13J to G
Location of Sample Origin:J-11 bond beam
Comments:
Specimen No. G 19 A G 19 B G 19 C G 19 D
Date Cast 5/27/00 5/27/00 5/27/00 5/27/00
Date Tested 6/3/00 6/24/00 6/24/00 6/24/00
( 7 days) (28 days) (28 days) ( 28 days)
Weight (lbs) 5.22 5.14 5.36 5.06 -
End Area (sq in) 10.56 10.56 10.56 10.56
Load (lbs) 13,229
Stress (psi) 1,250
Reviewed By Date: Co /�/w VLAP LAB CODE#10315-0
TEST RESULTS DO n DO NOT The above reported test results were attained through
COh
PCY WITH SPECIFICATIONS procodmnes parfoimed in acoordance with AS'I'M C31,
ARE NOT COMPLETE N/A 109,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR rastern
Materials
�m Laoratory
GROUT COMPRESSIVE TEST SUMMARY : Testing
b
Project: Targ t Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
Supplier: mixed on site JAWORM
GBCAn=
PLACEMENT DATA
Date Cast: 5/27/00 Set No. :M 19
Test Specimen Type: Sample Width 2.00 Length 2.00
— Hollow Masonry Prism L/W Ratio: 1.00 :1
_ Grouted Masonry Prism Required Strength: 1800 psi
_ Grout
X Mortar - EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 1 Lime, 1 1/2 Quantity: 1 cy
Water, 2 Cement Slump: 4"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 60 degrees
Weather: clear, 65 degrees
", —Total Location of Masonry Construction: wall column line 13J to G
Location of Sample Origin: wall colummn line 13H 4 feet off floor
Comments:
Specimen No. M 19 A M 19 B M 19 C
Date Cast 5/27/00 5/27/00 5/27/00
Date Tested 6/3/00 6/24/00 6/24/00
( 7 days) (28 days) (28 days)
Weight (lbs) 0.60 0.60 0.60
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 13,467
Stress (psi) 3,370
Reviewed By: Date: (� /�/� INVLAP LAB CODE#10315-0
TEST LILTSFIDO DO NOT 11m above reported test results were attained through
CO LY WITH SPECIFICATIONS procedures performed in accordance with ASTM C31,
ARE NOT COMPLETE EIN/A IC39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
Materia- Teatia�la
GROUT COMPRESSIVE TEST SUMMARY Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores RN.
Supplier: mixed on site JARSIG
PLACEMENT DATA
Date Cast: 5/27/00 Set No. :M 19
Test Specimen Type: Sample Width 2.00 Length 2.00
— Hollow Masonry Prism L/W Ratio: 1.00 :1
— Grouted Masonry Prism
Required Strength: 1800 psi
_ Grout
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 1 Lime, 1 1/2 Quantity: 1 cy
Water, 2 Cement Slump: 4"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 60 degrees
Weather: clear, 65 degrees
Total Location of Masonry Construction: wall column line 13J to G
Location of Sample Origin: wall colummn line 13H 4 feet off floor
Comments:
Specimen No. M 19 A M 19 B M 19 C
�1Mtlfllllllll//Iiii��i��i
Date cast 5/27/00 5/27/00 5/27/00 F CON/�,
Date Tested 6/3/00 6/24/00 6/24/00 Q�` v� ArVp
( 7 days) (28 days) (28 days)
W ight (lbs) 0.60 0.60 0.60 = \
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 13,467 13,961 14,950
flit
Stress (psi) 31370 31490 3,740
Reviewed By Date: &�Iz et tIcA' NVLAP LAB CODE#I�5-0
TEST RESULTS O M DO NOT 11e above reported hest resdts were aVadned through
COMPLY WITH SPECIFICATIONS proccf1m performed in accordance with AS"TM C31,
ARE NOT COMPLETE [—]N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
FGROUT COMPRESSIVE TEST SUMMARY '� Materials
� Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores I• •
Suppli r: mixed on site �JAWORM
GBOM .INC.
PLACEMENT DATA
Dat Cast: 5/30/00 Set No. :M 20
Test Specimen Type: Sample Width 2.00 Length 2.00
Hollow Masonry Prism L/W Ratio: 1.00 :1
Grouted Masonry Prism
Required Strength: 1800 psi
— Grout -
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 1 Lime, 1 1/2 Quantity: 1 cy
Water, 2 Cement Slump: 4"
Truck No. : n/a
Ticket No. : n/a
Specim n Temperature:
Weather: overcast, 50 degrees
Total Location of Masonry Construction: wall 13J -to D
Location of Sample Origin: wall 13E 5' up from floor
Comments:
Specimen No. M 20 A M 20 B M 20 C CON/F�;
Date Cast 5/30/00 5/30/00 5/30/00 y� �.�� 9 ;
QF
Date Tested 6/6/00 6/27/00 6/27/00
( 7 days) (28 days) (28 days) 7 \Q\
Weight (lbs) 0.58 0.60 0.60
End Area (sq in) 4.00 4.00 4.00 ��'%i�i �A,l�' ►��`�'���\
Load (lbs) 71633 81,879 80,119
Stress (psi) 11910 2,220 2,030
Reviewed By. Date:611,,qe/ NVLAP LAB CODE# 10315-0
TEST RESULTS O'DO FIDO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS prooahm performed in accordance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
COMPRESSIVE TEST SUMMARY '� T FateriabGROUT
Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores map -,
Supplier: Aiudi Concrete JAWORSKI
C .INCPLACEMENT DATA
Date Cast: 5/30/00 Set No. :G 20
Test Specimen Type: Sample Width 3.00 Length 7.00
— Hollow Masonry Prism L/W Ratio: 2.33 :1
— Grouted Masonry Prism Required Strength: 3000 psi
X Grout
Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 8 cy
3543.8 Sand, 206.8 Water,
802.5 Cement, 5.1 Air, Slump: 8"
34.0 Reo
Truck No. : 131
Ticket No. : 3933
Specimen Temperature: 68
Weather: overcast, 50 degrees
Total Location of Masonry Construction: Wall 13J -to D
Location of Sample Origin: wall column line 13E 5' up from floor
Comments:
G 20 A G 20 B G 20 C G 20 D \\ lO Ci���/
Specimen No. �� ii
Date Cast 5/30/00 5/30/00 5/30/00 5/30/0���`�� �►y Aq ; C
Dat T sted 6/6/00 6/27/00 6/27/00 6/27/0000
( 7 days) (28 days) (28 days) ( 28 dt?bj
Weight (lbs) 5.30 5.20 5.20 5.26 °'
End Area (sq in) 10.56 10.56 10.56 10.56 01/NS1111
r
Load (lbs) 22,893 29,515 30,560 29,275IfI1111-111
Stress (psi) 21170 21790 21890 21770
Reviewed By: Date � NVLAP LAB CODE#10315-0
TEST RESULTS DDO [�J�DO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS pmoed paf ned in accordance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY �" Materialsting
_ Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
Supplier: Aiudi Concrete JAMMU
GBOIEM INC.
PLACEMENT DATA
Date Cast: 5/30/00 Set No. :G 21
Test Specimen Type: Sample Width 3.00 Length 7.00
_ Hollow Masonry Prism L/W Ratio: 2.33 :1
— Grouted Masonry Prism Required Strength: 3000 psi
X Grout
Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
Quantity: 3.5 cy
not provided
Slump: 8.5"
Truck No. : 108
Ticket No. : 3941
Specimen Temperature: 64 degrees
Weather: clear, 60 degrees
Total Location of Masonry Construction: wall column line J 13J to D 10, off floor
Location of Sample Origin: wall column line 13G 10' off floor
Comments:
Specimen No. G 21 A G 21 B G 21 C G 21 D �011�,Jillllllll!//�ft��
\\��\ F CO+11111//
i
Date Cast 5/30/00 5/30/00 5/30/00 5/30/00 `,``G`(� W JA�j%,C��.
Date Tested 6/6/00 6/27/00 6/27/00 6/27/00 co,��Q'
( 7 days) (28 days) (28 days) ( 28 days * =�=
Weight (lbs) 5.16 5.38 5.34 5.20 -�= .17
n.
End Area (sq in) 10.56 10.56 10.56 10.56 \
Load (lbs) 10,817 22,008 20,421 21,707 �%� „L,,11011100\\\\
Stress (psi) 11020 21080 1,930 21060
Reviewed By: Date: NVLAP LAB CODE# 10315-0
TEST RESULTS FIDO12f DO NOT The above re xwW test results were attained through
COMPLY WITH SPECIFICATIONS pafomod in axordawe with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
• CONCRETE MASONRY, MORTAR, OR
wcw
GROUT COMPRESSIVE TEST SUMMARY matwias
amu r,
Project: Targ t Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores ftm
Supplier: mixed on site JAWORSKI
Man=w.
PLACEMENT DATA
Date Cast: 5/30/00 Set No. :M 20
Test Specimen Type:
Sample Width 2.00 Length 2.00
_ Hollow Masonry Prism L/W Ratio: 1.00 :1
— Grouted Masonry Prism Required Strength: 1800 psi -
— Grout
X Mortar - EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 1 cy
3 Sand, 1 Lime, 1 1/2
Water, 2 Cement Slump: 4"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature:
Weather: overcast, 50 degrees
Total Location of Masonry Construction: wall 13J to D
Location of Sample Origin: wall 13E 5' up from floor )
Comments:
Specimen No. M 20 A M 20 B M 20 C
Date Cast 5/30/00 5/30/00 5/30/00
Date Tested 6/6/00 6/27/00 6/27/00
( 7 days) (28 days) (28 days)
Weight (lbs) 0.58 0.60 0.60
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 7,633
Stress (psi) 11910
Reviewed By:.— Date:41P_AV VLAP LAB CODE#10315-0
:TESTRESULTS FIDOF-1 DO NOT The above reported test results were attained through
WITH SPECIFICATIONS prooedW"S pafonned in accordance with ASTM C31,
RE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR w�
GROUT COMPRESSIVE TEST SUMMARY .: TINUrlry
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores 10
Supplier: Aiudi Concrete JAWORM
G8011 I.INC.
PLACEMENT DATA
Date Cast: 5/30/00 Set No. :G 21
Test Specimen Type: Sample Width 3.00 Length 7.00
— Hollow Masonry Prism L/W Ratio: 2.33 :1
_ Grouted Masonry Prism Required Strength: 3000 psi
X Grout
_ Mortar - EMTL Technician: J.E. Anderson
Mix Proportions:
Quantity: 3.5 cy
not provided
Slump: 8.5"
Truck No. : 108
Ticket No. : 3941
Sp cimen Temperature: 64 degrees
Weather: clear, •60 degrees
Total Location of Masonry Construction: wall column line J 13J to D 10' off floor
Location of Sample Origin: wall column line 13G 10' off floor
Comments:
Specimen No. G 21 A G 21 B G 21 C G 21 D
Date Cast 5/30/00 5/30/00 5/30/00 5/30/00
Date Tested 6/6/00 6/27/00 6/27/00 6/27/00
( 7 days) (28 days) (28 days) ( 28 days)
Weight (lbs) 5.16 5.38 5.34 5.20 -
End Area (sq in) 10.56 10.56 10.56 10.56
Load (lbs) 10,817
Stress (psi) 1,020
Reviewed By: Date: GIs loci NVLAP LAB CODE# 10315-0
TEST RESULTS DOF--J DO NOT The above reported test results were attained through
CO WITH SPECIFICATIONS pTocoduren performed in accordance with ASTM C31,
ARE NOT COMPLETE EIN/A IC39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
GROUT COMPRESSIVE TEST SUMMARY . Latzlry
�:
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores %0
Supplier: Aiudi Concrete JAWORM
G®OTBM II1TC.
PLACEMENT DATA
Date Cast: 5/30/00 Set No. :G 20
Test Specimen Type:
Sample Width 3.00 Length 7.00
— Hollow Masonry Prism L/W Ratio: 2.33 :1
— Grouted Masonry Prism Required Strength: 3000 psi
X Grout
— Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
3543.8 Sand, 206.8 Water, Quantity: 8 cy
802.5 Cement, 5.1 Air, Slump: 8"
34.0 Reo
Truck No. : 131
Ticket No. : 3933
Specimen Temperature: 68
Weather: overcast, 50 degrees
Total Location of Masonry Construction: Wall 13J to D
Location of Sample Origin: wall column line 13E 5' up from floor
Comments:
Sp cimen No. G 20 A G 20 B G 20 C G 20 D
Date Cast 5/30/00 5/30/00 5/30/00 5/30/00
Date Tested 6/6/00 6/27/00 6/27/00 6/27/00
( 7 days) (28 days) (28 days) ( 28 days)
Weight (lbs) 5.30 5.20 5.20 5.26
End Area (sq in) 10.56 10.56 10.56 10.56
Load (lbs) 22,893
Stress (psi) 2,170
Reviewed By: Date: ���� NVLAP LAB CODE#10315-0
TEST RESULTS DO M DO NOT The above reported test results were attained through
CO WITH SPECIFICATIONS provedu&W performed in accordance with ASTM C31,
ARE NOT COMPLETE El N/A C39,C94,C 143,C172,C 192,C231,C617,C 1231.
CONCRETE MASONRY, MORTAR, OR
GROUT COMPRESSIVE TEST SUMMARY
Project: Target Project No. : 00141C
A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores .4
Supplier: mixed on site k;a M_
JAWORM
(i00TEM III1G.
PLACEMENT DATA
Date Cast: 5/31/00 Set No. :M 21
Test Specimen Type: Sample Width 2.00 Length 2.00
— Hollow Masonry Prism L/W Ratio: 1.00 :1
— Grouted Masonry Prism Required Strength: 1800 psi
— Grout
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 1 Lime, 1 1/2 Quantity: 1 cy
Water, 2 Cement Slump: 3 3/41,
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 62 degrees
Weather: clear, -55 degrees
Total Location of Masonry Construction: wall column line 131 to D 18' from top of floor
Location of Sample Origin: wall column line 13F 18' from top of floor
Comments:
Specimen No. M 21 A M 21 B M 21 C
Date Cast 5/31/00 5/31/00 5/31/00
Date T sted 6/7/00 6/28/00 6/28/00
( 7 days) (28 days) (28 days)
Weight (lbs) 0.58 0.58 0.58
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 11,351
Stress (psi) 2,840
Reviewed By: Dater/l'/ VLAP LAB CODE#10315-0
TEST RESULTS DDO [—] DO NOT The above reported test results were attained davugh
=ARE
WITH SPECIFICATIONS procedures perfomied in accoa+dance with ASTM C31,
OT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY �' T=Faterialsg
Laboratory
Project: Targ t Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores ••••-
Supplier: mixed on site JAWORSKI
C�01Et�i.INC
DATA
Date Cast: 5/31/00 Set No. :M 21
Test Specimen Type:
Sample Width 2.00 Length 2.00
_ Hollow Masonry Prism L/W Ratio: 1.00 :1
Grouted Masonry Prism— Grout Required Strength: 1800 psi
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 1 Lime, 1 1/2 Quantity: 1 cy
Water, 2 Cement Slump: 3 3/4"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 62 degrees
Weather: clear, 55 degrees
Total Location of Masonry Construction: wall column line 13J to D 18' from top of floor
Location of Sample Origin: wall column line 13F 18' from top of floor
Comments:
Specimen No. M 21 A M 21 B M 21 C
Date Cast 5/31/00 5/31/00 5/31/00 �11 CC) NIcC''�'�
Date Tested 6/7/00 6/28/00 6/28/00
( 7 days) (28 days) (28 days) co
Weight (lbs) 0.58 0.58 0.58
End Area (sq in) 4.00 4.00 4.00 ".��C �0��``•�s�
Load (lbs) 11,351 13,907 13,989 iii3O A �;.•���\
Stress (psi) 21840 31480 31500
Reviewed By: /68 Date: 61-3a1Lcr VLAP LAB CODE#10315-0
TEST RESULTS O EIDO NOT The above repotted test results were attained duvugh
COMPLY WITH SPECIFICATIONS prooeftes pafaociod in accordance with ASTM C31,
ARE NOT COMPLETE N/A 109,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
GROUT COMPRESSIVE TEST SUMMARYAboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores M
Supplier: Aiudi Concrete JAWORM
GBOTEM OW.
PLACEMENT DATA
Date Cast: 6/l/00 Set No. :G 23
Test Specimen Type: Sample Width 3.00 Length 7.00
Hollow Masonry Prism L/W Ratio: 2.33 :1
_ Grouted Masonry Prism Required Strength: 3000 psi
X Grout
Mortar - EMTL Technician: J.E. Anderson
Mix Proportions:
Quantity: 4 cy
not provided
Slump: 7.51'
Truck No. : 134
Ticket No. : 3992
Specimen Temperature: 68 degrees
Weather: clear, -70 degrees
Total Location of Masonry Construction: foundation wall col. line A-C on 10 line
Location of Sample Origin: column line 10B foundation wall )
Comments:
Specimen No. G 23 A G 23 B G 23 C G 23 D
Dat Cast 6/1/00 6/1/00 6/1/00 6/1/00
Date Tested 6/8/00 6/29/00 6/29/00 6/29/00
( 7 days) (28 days) (28 days) ( 28 days)
Weight (lbs) 5.30 5.32 5.44 5.36
End Area (sq in) 10.56 10.56 10.56 10.56
Load (lbs) 27,092
Stress (psi) 21570
Reviewed By.Byr Date:e,/Q uC/ VLAP LAB CODE#10315-0
TEST RESULTS FIDO n DO NOT The above reported test results were attained through .
CO WITH SPECIFICATIONS procxdures perfommed in ac cordanoe with ASTM C31,
E30IMNOT COMPLETE DMA IC39,C94,C143,C172,C192,C231,C617,C1231.
• CONCRETE MASONRY, MORTAR, OR 9,tem
GROUT COMPRESSIVE TEST SUMMARY «m
- � LaboralIty
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores Im
Supplier: Aiudi Concrete JAWORSE
G®O�l.II11C.
PLACEMENT DATA
Date Cast: 6/l/00 Set No. :G 22
Test Specimen Type: Sample Width 3.00 Length 7.00
_ Hollow Masonry Prism L/W Ratio: 2.33 :1
_ Grouted Masonry Prism Required Strength: na psi
X Grout - -
_ Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
Quantity: .46 cu ft mixed
dayton non-shrink non
metallic sure grip Slump: 2"
Truck No.: na
Ticket No. : na
Specimen Temperature: 72 degrees
Weather: clear, -70 degrees
Total Location of Masonry Construction: baseplate- grout column line A-J on 7 line
Location of Sample Origin: baseplate grout column line 7D )
Comments:
Specimen No. G 22 A G 22 B G 22 C G 22 D
Date Cast 6/1/00 6/1/00 6/1/00 6/1/o6
Date Tested 6/8/00 6/29/00 6/29/00 6/29/00
( 7 days) (28 days) (28 days) ( 28 days)
Weight (lbs)
End Area (sq in) 10.37 10.56 10.56 10.56
Load (lbs) 35,160
Str ss (psi) 31390
Reviewed By:. Date:e � /cx-., VLAP LAB CODE#10315-0 •
TEST RESULTS DO 0 DO NOT The above reported test results were attained through
COMP WITH SPECIFICATIONS procedures performed in accordance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
GROUT COMPRESSIVE TEST SUMMARY
� Labor�lor�
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores ftm
Supplier: mixed on site JAWORSKI
mil,M
PLACEMENT DATA
Date Cast: 6/l/00 Set No. :M 22
Test Specimen Type:
Sample Width 2.00 Length 2.00
_ Hollow Masonry Prism L/W Ratio: 1.00 :1
_ Grouted Masonry Priam— Grout Required Strength: 2500 psi •
_
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 1 Lime, 1 1/2 Quantity: 1 cy
Water, 2 Cement Slump: 4"
Truck No. : n/a
Ticket No.: n/a
Specimen Temperature:
Weather: clear, 75 degrees
Total Location of Masonry Construction: foundation wall column line 10A to C
Location of Sample Origin: foundation wall 10B column line
Comments:
Specimen No. M 22 A M 22 B M 22 C
Date Cast 6/1/00 6/l/00 6/l/00
Date Tested 6/8/00 6/29/00 6/29/00
( 7 days) (28 days) (28 days)
Weight (lbs) 0.58 0.58 0.58
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 7,890
Stress (psi) 11970
Reviewed By: �,: Date: & iwD WLAP LAB CODE#10315-
[:=ARFE
T RESULTS DO [--] DO NOT The above reported best results were attained through
SPECIFICATIONS provodm+es performed in acoordame with pSTM C319
OMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
Materials
TesUns
GROUTF COMPRESSIVE TEST SUMMARY EmLaboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores -
Suppli r: Aiudi Concrete JAVf�ORSKt
G®O'IMI.M
PLACEMENT DATA
Date Cast: 6/1/00 Set No. :G 23
Test Specimen Type: Sample Width 3.00 Length 7.00
- Hollow Masonry Prism L/W Ratio: 2.33 :1
- Grouted Masonry Prism Required Strength: 3000 psi
X Grout
- Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 4 cy
not provided
Slump: 7.5"
Truck No. : 134
Ticket No. : 3992
Specimen Temperature: 68 degrees
Weather: clear, 70 degrees
Total Location of Masonry Construction: foundation wall col. line A-C on 10 line
Location of Sample Origin: column line 10B foundation wall
Comments:
Specimen No. G 23 A G 23 B G 23 C G 23 D
Date Cast 6/l/00 6/l/00 6/l/00 6/l/00 �\\\``\\`,o �uC0�NN��
Date Tested 6/8/00 6/29/00 6/29/00 6/29/00 ��`� `'Q,� J. i�
( 7 days) (28 days) (28 days) ( 28 days) co
Weight (lbs) 5.30 5.32 5.44 5.36 _*=
"a 5120
End Area (sq in) 10.56 10.56 10.56 10.56 = O
Load lbs 27,092 31,876 31,766 31,802 S
Stress (psi) 2,570 3,020 3,010 3,010
Reviewed By: J Date: 7/8/,00 NVLAP LAB CODE# 10315-
TEST RESULTS EJ`DO n DO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS lnocediu�performed in accordance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C 143,C 172,C 192,C231,C617,C 1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY Ma
T�tin`la
Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores , a
Supplier: Aiudi Concrete JAWORSKI
mI.INC.
PLACEMENT DATA
Date Cast: 6/1/00 Set No. :G 22
Test Specimen Type: Sample Width 3.00 Length 7.00
— Hollow Masonry Prism L/W Ratio: 2.33 :1
— Grouted Masonry Prism Required Strength: na psi
X Grout
Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: .46 cu ft mixed
dayton non-shrink non
metallic sure grip Slump: 2"
Truck No. : na
Ticket No. : na
Specimen Temperature: 72 degrees
Weather: clear, 70 degrees
Total Location of Masonry Construction: baseplate grout column line A-J on 7 line
Location of Sample Origin: baseplate grout column line 7D
Comments: 11 C,
r14 E/�ISO
Specimen No. G 22 A G 22 B G 22 C G 22 D?* 1
Date Cast 6/l/00 6/l/00 6/l/00 6/1/0(F--�
Date Tested 6/8/00 6/29/00 6/29/00 6/29/00 ���S;
( 7 days) (28 days) (28 days) ( 28 days) 111+111
,
/llll
Weight (lbs)
End Area (sq in) 10.37 10.56 10.56 10.56
Load (lbs) 351160 44,495 42,300 43,269
Stress (psi) 31390 4,210 4,010 4,100
Reviewed By: Date: 71,/da INVLAP LAB CODE# 10315-0
.LTEST RESULTS [D'DOF-I DO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS procedures perfumed in accordance with ASTM C31,
ET ARE NOT COMPLETE ET N/A 109,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
FGROUT COMPRESSIVE TEST SUMMARY , Tesing
ory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores . •• . .
Supplier: mixed on site JAWORSKI
G®OrlF=INC.
PLACEMENT DATA
Date Cast: 6/l/00 Set No. :M 22
Test Specimen Type: Sample Width 2.00 Length 2.00
— Hollow Masonry Prism L/W Ratio: 1.00 :1
— Grouted Masonry Prism
Required Strength: 2500 psi
— Grout
X Mortar - EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 1 cy
3 Sand, 1 Lime, 1 1/2
Water, 2 Cement Slump: 4"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature:
Weather: clear, 75 degrees
Total Location of Masonry Construction: foundation wall column line 10A to C
Location of Sample Origin: foundation wall 10B column line
Comments:
Specimen No. M 22 A M 22 B M 22 C
Date Cast 6/1/00 6/1/00 6/1/00 �silt JA��''�C
i
Date Tested 6/8/00 6/29/00 6/29/00
( 7 days) (28 days) (28 days) a
Weight (lbs) 0.58 0.58 0.581j=; 7
End Area (sq in) 4.00 4.00 4.00 �%�`'+ '•��� �'
Load (lbs) 7,890 10,147 10,108
Stress (psi) 1,970 2,540 2,530
R viewed By: �j Date: &I3% NVLAP LAB CODE#10315-0
TEST RESULTS ErDO n DO NOT The above repotted test results were attained&on&
COMPLY WITH SPECIFICATIONS procedures performed in amotdance with AMU C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
GROUT COMPRESSIVE TEST SUMMARY T
Project: Target Project No. : 00141C
A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
Supplier: mixed on site t�AwO
CEOrI�I,W.PLACEMENT DATA
Date Cast: 6/2/00 Set No. :M 24
Test Specimen Type: Sample Width 2.00 Length 2.00
— Hollow Masonry Prism L/W Ratio: 1.00 :1
— Grouted Masonry Prism Required Strength: 1800 psi
— Grout
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 1 cy
3 Sand, 2 Cement, 1 Lime,
1 1/2 Water Slump: n/a
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature:
Weather: overcast 90 degrees F
Total Location of Masonry Construction: wall 9A to 10B.5
Location of Sample Origin: wall 10B, up 6' from floor slab
Comments:
Specimen No. M 24 A M 24 B M 24 C
Date Cast 6/2/00 6/2/00 6/2/00
Date Tested 6/9/00 6/30/00 6/30/00
( 7 days) (28 days) (28 days)
Weight (lbs) 0.60 0.60 0.58
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 11,252
Str ss (psi) 21810
Reviewed By. Date.. q/W C9 VLAP LAB CODE#10315-0
TEST RESULTS FIDO n DO NOT The above reported test results were attained though
COMP Y WITH SPECIFICATIONS prooedmes pafocmed in accordance with ASTM C31,
ARE NOT COMPLETE N/A 109,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY Test►ng
''
Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction y
Client: Target Stores •••�. e
Supplier: mixed on site JAWORSIQ
PLACEMENT DATA
Date Cast: 6/2/00 Set No. :M 24
Test Specimen Type:
Sample Width 2.00 Length 2.00
— Hollow Masonry Prism L/W Ratio: 1.00 :1
— Grouted Masonry Prism Required Strength: 1800 psi
— Grout
X Mortar. EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 1 cy
3 Sand, 2 Cement, 1 Lime,
1 1/2 Water Slump: n/a
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature:
Weather: overcast 90 degrees F
Total Location of Masonry Construction: wall 9A to 10B.5
Location of Sample Origin: wall 10B, up 6' from floor slab
Comments:
Specimen No. M 24 A M 24 B M 24 C
Date Cast 6/2/00 6/2/00 6/2/00 0 co
JA{q,
Date Tested 6 9 00 6 30 00 6 30 00 ��``11 09C'
( 7 days) (28 days) (28 days)
Weight (lbs) 0.60 0.60 0.58
_ .17560 \\�
End Area (sq in) 4.00 4.00 4.00
��
Load (lbs) 11,252 11,291 10,797
i rn►r n
Stress (psi) 2,810 2,820 2,700
Reviewed By: J Date: V-;01CV PYVLAP LAB CODE#10315-0
TEST RESULTS DO n DO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS procedures performed in accordance dance wide ASTM C31,
0-ARE NOT COMPLETE MA C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR Eastem
Materials
GROUT COMPRESSIVE TEST SUMMARY amLaboratop
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores IM
Supplier: Aiudi Concrete JAWOLSE
GBOTEM INC.
PLACEMENT DATA
Date Cast: 6/5/00 Set No. :G 25
Test Specimen Type: Sample Width 3.00 Length 7.00
— Hollow Masonry Prism L/W Ratio: 2.33 :1
— Grouted Masonry Prism Required Strength: 3000 psi
X Grout
Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 4 cy
2745 lbs Sand, 1370 lbs
Cement, 191.3 lbs Water, Slump: 7.75"
5.5 oz. Air, 33 oz. Reo
Truck No. : 134
Ticket No. : 4055
Specimen Temperature: 76 degrees F
Weather: overcast 55 degrees F
Total Location of Masonry Construction: wall column line A8.5 to 10, A10 to B.8
Location of Sample Origin: wall 10B, 8' off floor
Comments:
Specimen No. G 25 A G 25 B G 25 C G 25 D
Date Cast 6/5/00 6/5/00 6/5/00 6/5/00
Date Tested 6/12/00 7/3/00 7/3/00 7/3/00
( 7 days) (28 days) (28 days) ( 28 days)
Weight (lbs) 5.42 5.38 5.44 5.46
End Area (sq in) 10.56 9.00 9.00 9.00
Load (lbs) 15,840
Stress (psi) 1,500
Reviewed B Date: �o �j�//moo NVLAP LAB CODE#10315-0 .
TEST RESULTS FIDO [:] DO NOT The above reported test results were attained through
CO WITH SPECIFICATIONS promdures performed in accordance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C 143,C 172,C 192,C231,C617,C 1231.
CONCRETE MASONRY, MORTAR, OR
matnials
GROUT COMPRESSIVE TEST SUMMARY
F
Laboratory
Project: Target Project No. : 00141C
A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
Supplier: mixed on site eAw0RSIQ
G®OTBCEL IIITC.
PLACEMENT DATA
Date Cast: 6/5/00 Set No. :M 25
Test Specimen Type: Sample Width 2.00 Length 2.00
Hollow Masonry Prism L/W Ratio: 1.00 :1
Grouted Masonry Prism Required Strength: 1800 psi
Grout
X Mortar - EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 2 Cement, 1 Lime, Quantity: 1 cy
1 1/2 Water Slump: n/a
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature:
Weather: light rain, 55 degrees F
otal Location of Masonry Construction: wall column line A8.5 to 10, A10 to B.8
Location of Sample Origin: wall 10B, 7' off floor
Comments:
Specimen No. M 25 A M 25 B M 25 C
Date Cast 6/5/00 6/5/00 6/5/00
Date Tested 6/12/00 7/3/00 7/3/00
( 7 days) (28 days) (28 days)
Weight (lbs) 0.60 0.60 0.58
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 8,167
Stress (psi) 21040
R viewed By: ate: b��Y/UU INVLAP LAB CODE# 10315-0 w
TEST RESULTS EJ
DO FIDO NOT The above reported best results were attained through
CO Y WITH SPECIFICATIONS pmceduc+es performed in accordance with ASTM C31,
ARE NOT COMPLETE N/A IC39t C94,C143,C172,C1929,C2313,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Baatern
GROUT COMPRESSIVE TEST SUMMARY �'F-
Materials
Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores M
Supplier: Aiudi Concrete JAWORM
PLACEMENT DATA
Dat Cast: 6/5/00 Set No. :G 25
Test Specimen Type: Sample Width 3.00 Length 7.00
Hollow Masonry Prism L/W Ratio: 2.33 :1
Grouted Masonry Prism Required Strength: 3000 psi
X Grout
Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 4 cy
2745 lbs Sand, 1370 lbs
Cement, 191.3 lbs Water, Slump: 7.75"
5.5 oz. Air, 33 oz. Reo
Truck No. : 134
Ticket No. : 4055
Specimen Temperature: 76 degrees F
Weather: overcast 55 degrees F
Total Location of Masonry Construction: wall column line A8.5 to 10, A10 to B.8
Location of Sample Origin: wall 10B, 8' off floor
Comments:
Specimen No. G 25 A G 25 B G 25 C G 25 D \o\04111111 JI/8
����
Date Cast 6 5 00 6 5 00 6 5 00 6 5 00 <C• �4i`�ii<<��"'� CC, �`��
Date Tested 6/12/00 7/3/00 7/3/00 7/3/00
( 7 days) (28 days) (28 days) ( 28 days) ZZ
Weight (lbs) 5.42 5.38 5.44 5.46
15120
End Area (sq in) 10.56 10.56 10.56 10.56 ��Si FNS,�''�`���������
Load (lbs) 15,840 22,122 20,896 22,458 �/1111 "111`�\`\\\
Stress (psi) 11500 21090 11980 2,130
Reviewed By: Date: //0/66 JNVLAP LAB CODE# 10315-0
TEST RESULTS DO [0 DO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS prooedurm performed in accordance with ASTM C31,
E]ARE NOT COMPLETE NIA C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
Materi
F — Tf Ui,
GROUT COMPRESSIVE TEST SUMMARY _ Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores RE
Supplier: mixed on site eAw0RSE
Gunim Q11G.
- PLACEMENT DATA
Date Cast: 6/5/00 Set No. :M 25
Test Specimen Type: Sample Width 2.00 Length 2.00
— Hollow Masonry Prism L/W Ratio: 1.00 :1
_ Grouted Masonry Prism
Required Strength: 1800 psi
— Grout
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 1 cy
3 Sand, 2 Cement, 1 Lime,
1 1/2 Water Slump: n/a
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature:
Weather: light rain, 55 degrees F
Total Location of Masonry Construction: wall column line A8.5 to 10, A10 to B.8
Location of Sample Origin: wall 10B, 7' off floor
Comments:
Specimen No. M 25 A M 25 B M 25 C
Date Cast 6/5/00 6/5/00 6/5/00 " CON
\�� GEii3O JJ
Date Tested 6/12/00 7/3/00 7/3/00
) (28 days) (28 days)da s 7
( Y Y
;.0
Weight (lbs) 0.60 0.60 0.58 15120
End Area (sq in) 4.00 4.00 4.00 took
Load (lbs) 8,167 8,543 8,862 C,
��''% 111
S�ONAL�//1/111111f11NN N�
Stress (psi) 2,040 2,140 2,220
Reviewed By: Date: 71616 U NVLAP LAB CODE# 10315-0
TEST RESULTS [EfDo DO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS procedures perfvtmed in accordance with ASTM C31,
ARE NOT COMPLETE [:] N/A C39,C94,C 143,C 172,C 192,C231,C617,C 1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY Tmatmials
"Ung
Laboratory
Proj ct: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
Supplier: Aiudi Concrete JA RSE
PLACEMENT DATA
Date Cast: 6/8/00 Set No. :G 26
Test Sp cimen Type: Sample Width 3.00 Length 7.00
- Hollow Masonry Prism L/W Ratio: 2.33 :1
- Grouted Masonry Prism
X Grout Required Strength: 3000 psi
Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
2736 lbs Sand, 816 lbs Quantity: 5 cy
Cement, 192 lbs Water, 5.6 Slump: 6"
oz. Air, 33.6 oz. Reo Truck No. : 134
Ticket No. : 4102
Specimen Temperature: 76 degrees F
Weather: clear, 75 degrees F
Total Location of Masonry Construction: column line wall A-9 to 10, 15' off floor
Location of Sample Origin: wall column line A-9
Comments:
Specimen No. G 26 A G 26 B G 26 C G 26 D
Date Cast 6/8/00 6/8/00 6/8/00 6/8/00
Date Tested 6/15/00 7/6/00 7/6/00 7/6/00 \�\����1a� �ic►O�N���
( 7 days) (28 days) (28 days) ( 28 days)\\\��` 0bNCE�J. �
Weight (lbs) 5.54 5.70 5.62 5.64 ?fA-
49
End Area (sq in) 10.56 10.56 10.56 10.56 '
Load (lbs) 25,589 31,766 34,436 33,684 =� ,�� ,
lilt
Stress (psi) 21420 31010 31260 3,190 /O�NA�1
Reviewed By: Date: �, NVLAP LAB CODE# 10315-0
TEST RESULTS El DOF-I DO NOT The above repotted test results were attained through
COMPLY WITH SPECIFICATIONS proc edu"a performed in accordance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY '� x rstia�ting'
ate
Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores ,
Supplier: Aiudi Concrete �jAWORSKt
GE017M INC.
PLACEMENT DATA
Date Cast: 6/8/00 Set No. :G 27
Test Specimen Type: Sample Width 3.00 Length 7.00
_ Hollow Masonry Prism L/W Ratio: 2.33 :1
— Grouted Masonry Prism Grout Required Strength: 3000 psi
X
Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
Quantity: 5 cy
2742 lbs Sand, 1360 lbs
Cement, 192 lbs Water, 5.6 Slump: 8.5"
oz. Air, 32.8 oz. Reo Truck No. : 134
Ticket No. : 4106
Specimen Temperature: 76 degrees F
Weather: clear, 75 degrees F
LTotal Location of Masonry Construction: wall column line C-D on 13 line, 15' off floor
Location of Sample Origin: column line, wall 13D, 15' off floor
Comments:
Specimen No. G 27 A G 27 B G 27 C G 27 D
Date Cast 6/8/00 6/8/00 6/8/00 6/8/00
Date Tested 6/15/00 7/6/00 7/6/00 7/6/00 X'OF1�CO�NI� �yy
( 7 days) (28 days) (28 days) ( 28 days) `,` 0I E i.
Weight (lbs) 5.70 5.32 5.31 5.30 Q),`� 9=
End Area (sq in) 10.56 10.56 10.56 10.56 -
= 5120
Load (lbs) 23,018 31,707 30,085 32,755 -- - /CENSi�I,����
ONALp\\\����
Stress (psi) 21180 31000 2,850 3,100 '��"''iiurll�lIIIIIN}111
Reviewed By r��-y_ Date: it�cu NVLAP LAB CODE# 10315-0
TEST RESULTS FrD10 n DO NOT The above reported test ressults were al ainod dirough
COMPLY WITH SPECIFICATIONS pr000dures performed in accordanoo with ASTM C31,
DARE NOT COMPLETE EINIA C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR Eastern
GROUT COMPRESSIVE TEST SUMMARY materials
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction 91
Client: Target Stores in
Supplier: Aiudi Concrete
PLACEMENT DATA
Date Cast: 6/8/00 Set No. :G 26
Test Specimen Type: Sample Width 3.00 Length 7.00
Hollow Masonry Prism L/W Ratio: 2.33 :1
_ Grouted Masonry Prism Required Strength: 3000 psi
X Grout
_ Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 5 cy
2736 lbs Sand, 816 lbs
Cement, 192 lbs Water, 5.6 Slump: 6"
oz. Air, 33.6 oz. Reo Truck No. : 134
Ticket No. : 4102
Specimen Temperature: 76 degrees F
Weather: clear, 75 degrees F
Total Location of Masonry Construction: column line wall A-9 to 10, 15' off floor
Location of Sample Origin: wall column line A-9
Comments:
Specimen No. G 26 A G 26 B G 26 C G 26 D
Date Cast 6/8/00 6/8/00 6/8/00 6/8/00
Date Tested 6/15/00 7/6/00 7/6/00 7/6/00
( 7 days) (28 days) (28 days) ( 28 days)
Weight (lbs) 5.54 5.70 5.62 5.64
End Area (sq in) 10.56 10.56 10.56 10.56
Load (lbs) 25,589
Str ss (psi) 21420
Reviewed By Date: /60 PVLAP LAB CODE#10315-0
TEST RESULTS DO [:] DO NOT The above reported test results were attained through
CO WITH SPECIFICATIONS procedmes performed in accordance with ASTM C3 I
ARE NOT COMPLETE N/A C39,C949,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
GROUT COMPRESSIVE TEST SUMMARY TestwWa
boratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction EM
Client: Target Stores t1Aw0.. .��
Supplier: Aiudi Concrete
GEOTI.M
PLACEMENT DATA
Date Cast: 6/8/00 Set No. :G 27
Test Specimen Type:
Sample Width 3.00 Length 7.00
— Hollow Masonry Prism L/W Ratio: 2.33 :1
— Grouted Masonry Prism Required Strength: 3000 psi
X Grout
— Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 5 cy
2742 lbs Sand, 1360 lbs
Cement, 192 lbs Water, 5.6 Slump: 8.5"
oz. Air, 32.8 oz. Reo Truck No. : 134
Ticket No. : 4106
Specimen Temperature: 76 degrees F
Weather: clear, 75 degrees F
Total Location of Masonry Construction: wall column line C-D on 13 line, 15' off floor
Location of Sample Origin: column line, wall 13D, 15' off floor
Comments:
Specimen No. G 27 A G 27 B G 27 C G 27 D
Date Cast 6/8/00 6/8/00 6/8/00 6/8/00
Date T sted 6/15/00 7/6/00 7/6/00 7/6/00
( 7 days) (28 days) (28 days) ( 28 days)
Weight (lbs) 5.70 5.32 5.31 5.30
End Area (sq in) 10.56 10.56 10.56 10.56
Load (lbs) 23,018
Str ss (psi) 2,180
Revi wed By: Date: 1-/�- VLAP LAB CODE#10316-0
TEST RESULTS M DOF] DO NOT The above reponed teat results were attained through .
cowty WITH SPECIFICATIONS promhues puf0awd in s000rdanoe with ASTM C31;
[ilARENOTCOWLETIZ E]N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
. mum
GROUT COMPRESSIVE TEST EV TL",bUrftat,'7llatwisjz
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores Im
Supplier: mixed on site JAWORM
GBOTM II11C.
PLACEMENT DATA
Date Cast: 6/8/00 Set No. :M 26
Test Specimen Type:
Sample Width 2.00 Length 2.00
— Hollow Masonry Prism L/W Ratio: 1.00 :1
— Grouted Masonry Prism Required Strength: 1800 psi
_ Grout
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 2 Cement, 1 Lime, Quantity: 1 cy
1 1/2 Water Slump: 3"
Truck No.: n/a
Ticket No.: n/a
Specimen Temperature: 62 degrees F
Weather: clear, 70 degrees F
Total Location of Masonry Construction: wall 13D
Location of Sample Origin: C-E on 13 line
Comments:
Specimen No. M 26 A M 26 B M 26 C
Date Cast 6/8/00 6/8/00 6/8/00
Date Tested 6/15/00 7/6/00 7/6/00
( 7 days) (28 days) (28 days)
Weight (lbs) 0.62 0.61 0.62
End Ar a (sq in) 4.00 4.00 4.00
Load (lbs) 20,665
Stress (psi) 51170
Reviewed By. Date: ro 114-I VLAP LAB CODE#10315-0
TEST RESULTS DO M DO NOT the above reposed test results w=attained through
CO Y WITH SPECIFICATIONS perfommod in aoomdanoe with ASTM C31;
ARE NOT COMPLETE N/A C399 C94,C143,C172,C192,C2313,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY E La oter rato
als
?sting
Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Cli nt: Target Stores • " ' •
Supplier: mixed on site JA ORSE
GBOPLACEMENT DATA
Date Cast: 6/8/00 Set No. :M 26
Test Specimen Type: Sample Width 2.00 Length 2.00
_ Hollow Masonry Prism L/W Ratio: 1.00 :1
- Grouted Masonry Prism
- Grout
Required Strength: 1800 psi
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 2 Cement, 1 Lime, Quantity: 1 cy
1 1/2 Water Slump: 3"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 62 degrees F
Weather: clear, 70 degrees F
Total Location of Masonry Construction: wall 13D-
Location of Sample Origin: C-E on 13 line
Comments:
Specimen No. M 26 A M 26 B M 26 C
Date Cast 6/8/00 6/8/00 6/8/00
CONN
Date Tested 6/15/00 7/6/00 7/6/00 �,t�.`,1� E J�
( 7 days) (28 days) (28 days)
Weight (lbs) 0.62 0.61 0.62
End Area (sq in) 4.00 4.00 4.00 = _ 15120
Load (lbs) 20,665 25,760 25,049
/ONAfL IE
Stress (psi) 5,170 6,440 61260
Reviewed By: Date: �/v NVLAP LAB CODE# 10315-0
TEST RESULTS [��fDo FIDO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS procedures performed in accordance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
Materiats
GROUT COMPRESSIVE TEST SUMMARY Testing� am Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores . •. . ,
Supplier: mixed on site JAWORSE
GEOTOM INC.
PLACEMENT DATA
Date Cast: 6/9/00 Set No. :M 27
Test Specimen Type: Sample Width 2.00 Length 2.00
— Hollow Masonry Prism L/W Ratio: 1.00 :1
— Grouted Masonry Prism Required Strength: 1800 psi
— Grout
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 1 cy
3 Sand, 2 Cement, 1 Lime,
1 1/2 Water Slump: n/a
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature:
Weather: clear, 75 degrees F
Total Location of Masonry Construction: wall column line C-10 to 13
Location of Sample Origin: wall column line C-11, 5' off floor
Comments:
Specimen No. M 27 A M 27 B M 27 C
Date Cast 6/9/00 6/9/00 6/9/00
CON
Date Tested 6/16/00 7/7/00 7/7/00 \\\�������0���,�,�J �,
( 7 days) (28 days) (28 days) P, Q��
C0:\� G-i
Weight (lbs) 0.58 0.60 0.60
;�c
End Area (sq in) 4.00 4.00 4.00
5120
Load (lbs) 9,314 11,681 11,246
Stress (psi) 2,330 2,920 2,810 Jill
Reviewed By. J Date: olgl INVLAP LAB CODE# 10315-0
TEST RESULTS [ffDO DO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS procbdures performed in accordance with ASTM C319
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
GROUT COMPRESSIVE TEST SUMMARY _«
� L.eur.tur�
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores • •� -
Supplier: mixed on site JAWORSE
G =M
PLACEMENT DATA
Date Cast: 6/9/00 Set No. :M 27
Test Specimen Type:
Sample Width 2.00 Length 2.00
Hollow Masonry Prism L/W Ratio: 1.00 :1
Grouted Masonry Prism- Grout Required Strength: 1800 psi
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 2 Cement, 1 Lime, Quantity: 1 cy
1 1/2 Water Slump: n/a
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature:
Weather: clear, 75 degrees F
Total Location of Masonry Construction: wall column line C-10 to 13
Location of Sample Origin: wall column line C-11, 5' off floor
Comments:
Specimen No. M 27 A M 27 B M 27 C
Date Cast 6/9/00 6/9/00 6/9/00
Date Tested 6/16/00 7/7/00 7/7/00
( 7 days) (28 days) (28 days)
Weight (lbs) 0.58 0.60 0.60
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 91314
Stress (psi) 21330
Reviewed By: — Date4o JNVLAP LAB CODE#10315-0 A
F
LILTS DOF-1 DO NOT The above reported test results wereattainedWITH SPECIFICATIONS provodures peribmiod in a000rdanoa with�'M C31,
OT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY Materials
Testing
Laboratory
F-
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores • •• - .
Supplier: mixed on site JAWORSIG
MUM INC
PLACEMENT DATA
Date Cast: 6/13/00 Set No. :M 28
Test Specimen Type: Sample Width 2.00 Length 2.00
- Hollow Masonry Prism L/W Ratio: 1.00 :1
_ Grouted Masonry Prism
- - Required Strength: 1800 psi
_ Grout
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 1 Cement, 2 Lime, Quantity: 1 cy
1 1/2 Water Slump: 5"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 66 degrees F
Weather: overcast 60's
Total Location of Masonry Construction: C-10 to -13, 12" concrete block, 12' up
from floor
Location of Sample Origin: C-11, 12' up from floor
Comments:
Specimen No. M 28 A M 28 B M 28 C
Date Cast 6/13/00 6/13/00 6/13/00
Date Tested 6/20/00 7/11/00 7/11/00 �`�ei- ��`'•� JA�'Vp'-_�i
( 7 days) (28 days) (28 days) Co`.`
Weight (lbs) 0.58 0.58 0.58 -0\
7
End Area (sq in) 4.00 4.00 4.000
Load lbs 9,196 10,757 10,879
Stress (psi) 2,300 2,690 2,720
Reviewed B Date: �A./ JNVLAP LAB CODE# 10315-0
TEST RESULTS EfDO DO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS procedures performed in accordance with ASTM C31,
EIARE NOT COMPLETE EIN/A C39,C94,C 143,C 172,C 192,C231,C617,C 1231.
CONCRETE MASONRY, MORTAR, OR Eastern
- Testingls
GROUT COMPRESSIVE TEST SUMMARY _ Laboratory
JL
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction r•
Client: Target Stores •••�_-
Supplier: Aiudi Concrete JAA,W R KI
E"L INC
PLACEMENT DATA
Date Cast: 6/13/00 Set No. :G 29
Test Specimen Type: Sample Width 3.00 Length 7.00
— Hollow Masonry Prism L/W Ratio: 2.33 :1
— Grouted Masonry Prism Required Strength: 3000 psi
X Grout -
_ Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
2940 lbs Sand with 5% Quantity: 6 cy
moisture, 748 lbs Cement Slump: 7.0"
206.9 lbs Water, 3.8 oz
Truck No. : n/a
Darex, 30.0 oz. Adva
Ticket No. : n/a
Specimen Temperature: 62 degrees F
Weather: overcast, 60's
Total Location of Masonry Construction: Wall column line 13 E to C top section and
load dock top of doors bond beam
a aeaert•�i,�,•
`-
Location of Sample Origin: wall column line 13E top section �o.••• W"�
Jq 1Vv•
Comments:
� . N
560
Specimen No. G 29 A G 29 B G 29 C G 29 D
Date Cast 6/13/00 6/13/00 6/13/00 6/13/00
Date Tested 6/20/00 7/11/00 7/11/00 7/11/00
( 7 days) (28 days) (28 days) ( 28 days)
Weight (lbs) 5.24 5.36 5.22 5.28
End Area (sq in) 10.56 10.56 10.56 10.56
Load (lbs) 10,777 19,670 22,359 22,596
Stress (psi) 1,020 1,860 2,120 2,140
R viewed By:---;;, Date: Y �✓ VLAP LAB CODE# 10315-0
TEST RESULTS DO [2DO NOT The above reported test results were attained through
. COMPLY WITH SPECIFICATIONS F- -Iures petfamW in accordance widi ASIM C31,
E]ARE NOT COMPLETE N/A 109,C94,C143,C172,C192,C2319 C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY - Te tint:
Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores - a -
Supplier: mixed on site JAB
Na
PLACEMENT DATA
Date Cast: 6/13/00 Set No. :M 28
Test Specimen Type: Sample Width 2.00 Length 2.00
- Hollow Masonry Prism L/W Ratio: 1.00 :1
- Grouted Masonry Prism
- Grout
Required Strength: 1800 psi
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 1 cy
3 Sand, 1 Cement, 2 Lime,
1 1/2 Water Slump: 5"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 66 degrees F
Weather: overcast 60's
Total Location of Masonry Construction: C-10 to -13, 12" concrete block, 12' up
from floor
Location of Sample Origin: C-11, 12' up from floor
Comm nts:
Specimen No. M 28 A M 28 B M 28 C
Date Cast 6/13/00 6/13/00 6/13/00
Date Tested 6/20/00 7/11/00 7/11/00
( 7 days) (28 days) (28 days)
Weight (lbs) 0.58 0.58 0.58
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 91196
Stress (psi) 2,300
Reviewed By: Date: �Z VLAP LAB CODE# 10315-0
E
T RESULTS [-] DO DO NOT Ue above reported test results ware attained through
Y WITH SPECIFICATIONS pafomied in a =da=with ASTM C311
ARE coNOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR Eastern
Materials
FGROUT COMPRESSIVE TEST SUMMARY Tes :ter,
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
MWZA
Client: Target Stores s1AW0
Supplier: Aiudi Concrete RM
NQ
PLACEMENT DATA
Date Cast: 6/13/00 Set No. :G 28
Test Specimen Type: Sample Width 3.00 Length 7.00
- Hollow Masonry Prism L/W Ratio: 2.33 :1
_ Grouted Masonry Prism Required Strength: 3000 psi
X Grout
Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 5 cy
2750 lbs Sand with 7.3%
moisture, 563.75 lbs Slump: 10"
Cement, 240 lbs. New Cem,
Truck No. : 161
198 lbs Water, 6 oz. Air,
32.7 oz. Reo Ticket No. : 196369
Specimen Temperature: 72 degrees F
Weather: overcast 62 degrees F
Total Location of Masonry Construction: J-3 to 6 bond beam
Location of Sample Origin: J-4 bond beam
Comments:
Specimen No. G 28 A G 28 B G 28 C G 28 D
Date Cast 6/13/00 6/13/00 6/13/00 6/13/00
GON)V
Date Tested 6 20 00 7 11 00 7 11 00 7 11 00
/ / l l l l l l ���� JA �i0_
4
( 7 days) (28 days) (28 days) ( 28 da ,9�,` '9ip G�
Weight (lbs) 5.40 5.46 5.70 5.50
End Area (sq in) 10.56 10.56 10.56 10.56 560
Load (lbs) 11,885 24,930 25,746 25,548 '`�C,N,S,S0,\���\
tp 'Al-
Stress (psi) 1,130 2,360 2,440 2,420
Reviewed By Date: 7/// 71c, INVLAP LAB CODE# 10315-0
TEST RESULTS El DO [a-DO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS prowdures performed in accordance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C 143,C 172,C 192,C231,C617,C 1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
Materials
amLaboratory
Testing
FGROUT COMPRESSIVE TEST SUMMARY
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores MO .
Supplier: Aiudi Concrete JAWORSKI
PLACEMENT DATA GEOTSCEL INC.
Date Cast: 6/13/00 Set No. :G 28
Test Specimen Type: Sample Width 3.00 Length 7.00
- Hollow Masonry Prism L/W Ratio: 2.33 :1
- Grouted Masonry Prism Required Strength: 3000 psi
X Grout
Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 5 cy
2750 lbs Sand with 7.3%
moisture, 563.75 lbs Slump: 10"
Cement, 240 lbs. New Cem, Truck No. : 161
198 lbs Water, 6 oz. Air,
32.7 oz. Reo Ticket No. : 196369
Specimen Temperature: 72 degrees F
Weather: overcast 62 degrees F
Total Location of Masonry Construction: J-3 to 6 bond beam
Location of Sample Origin: J-4 bond beam
Comments:
Specimen No. G 28 A G 28 B G 28 C G 28 D
Date Cast 6/13/00 6/13/00 6/13/00 6/13/00
Date Tested 6/20/00 7/11/00 7/11/00 7/11/00
( 7 days) (28 days) (28 days) ( 28 days)
Weight (lbs) 5.40 5.46 5.70 5.50
End Area (sq in) 10.56 10.56 10.56 10.56
Load (lbs) 11,885
Str ss (psi) 1,130
R viewed By: Date: &/246-A'IJ VLAP LAB CODE# 10315-0
TEST RESULTSFIDO DO NOT The above reported test results were attained through
ff
LY WITH SPECIFICATIONS pr000dia+es petformod is aooaa+dan�oc with AS'I'M C31,
RE NOT COMPLETE N/A IC39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY Testing
Laboratory
Project: Target Project No. : 00141C A Division of
Ra
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
Supplier: Aiudi Concrete JAWWORSGBOTECIL E
PLACEMENT DATA
Date Cast: 6/13/00 Set No. :G 29
Test Specimen Type:
Sample Width 3.00 Length 7.00
_ Hollow Masonry Prism L/W Ratio: 2.33 :1
— Grouted Masonry Prism Required Strength: 3000 psi
X Grout
Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
2940 lbs Sand with 5% Quantity: 6 cy
moistur , 748 lbs Cement , Slump: 7.0"
206.9 lbs Water, 3.8 oz
Darex, 30.0 oz. Adva Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 62 degrees F
Weather: overcast, 60's
Total Location of Masonry Construction: Wall column line 13 E to C top section and
load dock top of doors bond beam
Location of Sample Origin: wall column line 13E top section
Comments:
Specimen No. G 29 A G 29 B G 29 C G 29 D
Date Cast 6/13/00 6/13/00 6/13/00 6/13/Ob
Dat Tested 6/20/00 7/11/00 7/11/00 7/11/00
( 7 days) (28 days) (28 days) ( 28 days)
Weight (lbs) 5.24 5.36 5.22 5.28
End Area (sq in) 10.56 10.56 10.56 10.56
Load (lbs) 10,777
Str ss (psi) 1,020
Revi wed By: Date: /2���'`' VLAP LAB CODE# 10315-0
9
TEST RESULTS FIDO DO NOT The above repotted best results were attained through
CO Y WITH SPECIFICATIONS prooedm+es pufacnud in accordance with ASTM C31,
ARE NOT COMPLETE N/A IC39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY am Materials
g
Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Cli nt: Target Stores M-P
Supplier: Aiudi Concrete JAG �D G
PLACEMENT DATA
Date Cast: 6/14/00 Set No. :G 30
Test Specimen Type: Sample Width 3.00 Length 7.00
- Hollow Masonry Prism L/W Ratio: 2.33 :1
- Grouted Masonry Prism Required Strength: 3000 psi
X Grout
Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 6 cy
2733.3 lbs Sand with 6.7%
moisture, 588 lbs Cement, Slump: 10"
240 lbs New Cem, 222.7 lbs
Truck No. : 121
Water, 6 oz Air, 32.7 oz.
Reo Ticket No. : 196457
Specimen Temperature:
Weather: overcast 55 degrees F
Total Location of Masonry Construction: wall column line J-7 to 11 bond beam
Location of Sample Origin: column line J-8 bond beam
Comments:
Specimen No. G 30 A G 30 B G 30 C G 30 D
Date Cast 6/14/00 6/14/00 6/14/00 6/14/00
CON/,*
.Date Tested 6/21/00 7/12/00 7/12/00 7/12/00 \\\,`\ ``<< JA' rC�jj
( 7 days) (28 days) (28 days) ( 28 days ��` '�
Weight (lbs) 5.10 5.22 5.06 5.04
End Area (sq in) 10.56 10.56 10.56 10.56 \�� \
Load (lbs) 110,054 22,888 23,769 23,057
'N �IIIY��11 \
Stress (psi) 1,050 2, 170 2,250 2,180 ',i,rr
Reviewed By:---:7,P Date: v7 1 q10� JNVLAP LAB CODE# 10315-0
TEST RESULTS FIDO DO NOT The above repotted test results were attained through
COMPLY WITH SPECIFICATIONS prowdures peifotmed in accordance with ASTM C31,
ARE NOT COMPLETE N/A 109,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY EmLaboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
Supplier: mixed on site JA RSE
CiPAXE INC.
PLACEMENT DATA
Date Cast: 6/14/00 Set No. :M 29
Test Specimen Type: Sample Width 2.00 Length 2.00
— Hollow Masonry Prism L/W Ratio: 1.00 :1
Grouted Masonry Prism Required Strength: 1800 psi
— Grout
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
3 Sand, 2 Cement, 1 Lime, Quantity: 1 cy
1 1/2 Water Slump: n/a
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature:
Weather: overcast 55 degrees F
Total Location of Masonry Construction: 12" concrete block wall column line C-10 to 13
Location of Sample Origin: wall column line C-11, 15' above floor
Comments:
Specimen No. M 29 A M 29 B M 29 C
Date Cast 6/14/00 6/14/00 6/14/00
Date Tested 6/21/00 7/12/00 7/12/00
( 7 days) (28 days) (28 days)
Weight (lbs) 0.58 0.58 0.58
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 91690
Stress (psi) 2,420
Reviewed By. Date: le Cilvv VLAP LAB CODE# 10315-0
TEST RESULTS EIDO [--] DO NOT MW above IeMW feat nsuhs wen attained
CO Y WITH SPECIFICATIONS pr000dure-pentmwd in aa=da=with ASTM C31,
ARE NOT COMPLETE N/A C399 C949 C143,C172,C1929 C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY E Te'u�`'
Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
M- �
Supplier: Aiudi Concrete JAcEWORSE
OMM INC.
PLACEMENT DATA
Date Cast: 6/14/00 Set No. :G 30
Test Specimen Type: Sample Width 3.00 Length 7.00
— Hollow Masonry Prism L/W Ratio: 2.33 :1
— Grouted Masonry Prism Required Strength: 3000 psi
X Grout
_ Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
2733.3 lbs Sand with 6.7% Quantity: 6 cy
moisture, 588 lbs Cement, Slump: 10"
240 lbs New Cem, 222.7 lbs
Truck No. : 121
Water, 6 oz Air, 32.7 oz.
Reo Ticket No. : 196457
Specimen Temperature:
Weather: overcast 55 degrees F
Total Location of Masonry Construction: wall column line J-7 to 11 bond beam
Location of Sample Origin: column line J-8 bond beam
Comments:
Specimen No. G 30 A G 30 B G 30 C G 30 D
Date Cast 6/14/00 6/14/00 6/14/00 6/14/00
Date Tested 6/21/00 7/12/00 7/12/00 7/12/00
( 7 days) (28 days) (28 days) ( 28 days)
Weight (lbs) 5.10 5.22 5.06 5.04
End Area (sq in) 10.56 10.56 10.56 10.56
Load (lbs) 11,054
Stress (psi) 1,050
Reviewed By: Date: ?G/cK-- INVLAP LAB CODE#10315-0
TEST RESULTS DO DO NOT The above reported test rMIM were attained though .
CO Y WITH SPECIFICATIONS pr000dures peifamed in acooidance with ASTM C31,
[2rARE NOT COMPLETE F-I N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
Materia- Testing
GROUT COMPRESSIVE TEST SUMMARY Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores a.-,.
Supplier: mixed on site JAWORSKI
GE0IBM INC
PLACEMENT DATA
Date Cast: 6/14/00 Set No. :M 29
Test Specimen Type:
Sample Width 2.00 Length 2.00
- Hollow Masonry Prism L/W Ratio: 1.00 :1
- Grouted Masonry Prism Required Strength: 1800 psi
- Grout
K Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 1 cy
3 Sand, 2 Cement, 1 Lime,
1 1/2 Water Slump: n/a
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature:
Weather: overcast 55 degrees F
Total Location of Masonry Construction: 12" concrete block wall column line C-10 to 13
Location of Sample Origin: wall column line C-11, 15' above floor
Comments:
Specimen No. M 29 A M 29 B M 29 C
Date Cast 6/14/00 6/14/00 6/14/00
Date Tested 00 00 6 21 00 7 12 7 12
l l l l l l
( 7 days) (28 days) (28 days)
Weight (lbs) 0.58 0.58 0.58 -off:. " 55o
End Area (sq in) 4.00 4.00 4.00 �'�`• 1 CE Y��c.
Load (lbs) 91690 11,094 11,153
Stress (psi) 2,420 2,770 2,790
Reviewed By. Date: .-��`/O L, INVLAP LAB CODE# 10315-0
TEST RESULTS DO DO NOT The above reported test results we��e attained through
COMPLY WITH SPECMCATIONS prooedu=performed in a000r+danoe with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
FGROUT COMPRESSIVE TEST SUMMARY EmLaboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores �•" ' •
Supplier: Aiudi Concrete JAWORM
C.
PLACEMENT DATA GE01MM IN
Date Cast: 6/15/00 Set No. :G 31
Test Specimen Type: Sample Width 3.00 Length 7.00
— Hollow Masonry Prism L/W Ratio: 2.33 :1
— Grouted Masonry Prism Required Strength: 3000 psi
X Grout
Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
2745 lbs Sand, 1360 lbs Quantity: 8 cy
Cement, 191.3 lbs Water, Slump: 7.5"
5.5 oz Air, 33 oz. Reo
Truck No. : 168
Ticket No. : 4213
Specimen Temperature:
Weather: overcast 60 degrees F
Total Location of Masonry Construction: wall column line C-10 to 13 upper section
Location of Sample Origin: column line C-13 upper section
Comments:
Specimen No. G 31 A G 31 B G 31 C G 31 D
Date Cast 6/15/00 6/15/00 6/15/00 6/15/00
Date Tested 6/22/00 7/13/00 7/13/00 7/13/00
( 7 days) (28 days) (28 days) ( 28 days)
Weight (lbs) 5.54 5.42 5.40 5.36
End Area (sq in) 10.56 10.56 10.56 10.56
Load (lbs) 11,627
Stress (psi) 11100
Reviewed By: Date: &IF-6100 INVLAP LAB CODE#10315-0
TEST RESULTS F1 DO DO NOT The above reported test results were attained through
CO Y WITH SPECIFICATIONS prooedin�ea pafomied in accordance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C 143,C 172,C 192,C231,C617,C 1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY '� Materials
s
Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
5
Client: Target Stores o
Supplier: Aiudi Concrete JAWORSE
GBOTI,INC.
PLACEMENT DATA
Date Cast: 6/15/00 Set No. :G 31
Test Sp cimen Type: Sample Width 3.00 Length 7.00
Hollow Masonry Prism L/W Ratio: 2.33 :1
Grouted Masonry Prism Required Strength: 3000 psi
X Grout
Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 8 cy
2745 lbs Sand, 1360 lbs
Cement, 191.3 lbs Water, Slump: 7.5"
5.5 oz Air, 33 oz. Reo Truck No. : 168
Ticket No. : 4213
Specimen Temperature:
Weather: overcast 60 degrees F
Total Location of Masonry Construction: wall column line C-10 to 13 upper section
Location of Sample Origin: column line C-13 upper section
Comments:
Specimen No. G 31 A G 31 B G 31 C G 31 D
Date Cast 6/15/00 6/15/00 6/15/00 6/15/00 ,p JF'ICO/NN��%����
Date Tested 6/22/00 7/13/00 7/13/00 7/13/00 ��������'��''' Jq �Cj►�%
( 7 days) (28 days) (28 days) ( 28 days-Oho..
Weight (lbs) 5.54 5.42 5.40 5.36 :-:t
End Area (sq in) 10.56 10.56 10.56 10.56 =_ ' �`Q
Load (lbs) 11,627 23,006 24,947 23,995
Stress (psi) 1,100 2,180 2,360 2,270
Reviewed By Date: '2 l 4'/w NVLAP LAB CODE# 10315-0
TEST RESULTS DO [Z[ODO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS procedures performed in accordance with ASTM C31,
ARE NOT COMPLETE El N/A C39,C94,C 143,C 172,C 192,C231,C617,C 1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY vb�gory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction y
Client: Target Stores
Supplier: mixed on site JAWORSM
CAOTWL INC.
PLACEMENT DATA
Date Cast: 6/15/00 Set No. :M 30
Test Specimen Type: Sample Width 2.00 Length 2.00
Hollow Masonry Prism L/W Ratio: 1.00 :1
Grouted Masonry Prism
Grout Required Strength: 1800 psi
—
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 1 cy
3 Sand, 2 Cement, 1 Lime,
1 1/2 Water Slump: 4.25"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 60 degrees F
Weather: overcast 55 degrees F
Total Location of Masonry Construction: wall column line C-10 to 13 upper section
Location of Sample Origin: C-10 column line upper section
Comments:
Specimen No. M 30 A M 30 B M 30 C
Date Cast 6/15/00 6/15/00 6/15/00
Date Tested 6/22/00 7/13/00 7/13/00
( 7 days) (28 days) (28 days)
Weight (lbs) 0.58 0.58 0.58
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 8,622
Stress (psi) 2,160
Reviewed By Date: �,/ 2 G�U� NVLAP LAB CODE#10315-0
TEST RESULTS DO DO NOT The above reported test results were aft6ned through
CO Y WITH SPECIFICATIONS pafotmod in accordance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR Eastern
GROUT COMPRESSIVE TEST SUMMARY E Materials
Testing
Laboratory
Proj ct: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores • "
Suppli r: mixed on site JA
WORM
PLACEMENT DATA
Date Cast: 6/15/00 Set No. :M 30
Test Specimen Type: Sample Width 2.00 Length 2.00
Hollow Masonry Prism L/W Ratio: 1.00 :1
— Grouted Masonry Prism
� Required Strength: 1800 psi
_ Grout
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
Quantity: 1 cy
3 Sand, 2 Cement, 1 Lime,
1 1/2 Water Slump: 4.25"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 60 degrees F
Weather: overcast 55 degrees F
Total Location of Masonry Construction: wall column line C-10 to 13 upper section
Location of Sample Origin: C-10 column line upper section
Comments:
Specimen No. M 30 A M 30 B M 30 C
Date Cast 6/15/00 6/15/00 6/15/00
Date Tested 6/22/00 7/13/00 7/13/00 �� �� JA '-,c�►;
( 7 days) (28 days) (28 days)
09 =OG=
Weight (lbs) 0.58 0.58 0.58NO
End Area (sq in) 4.00 4.00 4.00 =_p.�=
8 6 2 2 12 2 21 12 5 7 7 l"` /���, ����\\\
Load (lbs) , , , i, rr
Stress (psi) 2, 160 3,060 3, 140
Reviewed By: Date:? ;/uv NVLAP LAB CODE# 10315-0
TEST RESULTS [:�TDOF-I DO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS procedures performed in axonb=with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C 143,C172,C 192,C231,C617,C 1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY Materials y
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores Im
Supplier: Aiudi Concrete
aAwoRsxi
GEOTEC*L BW.
PLACEMENT DATA
Date Cast: 6/26/00 Set No• :G 32
Test Specimen Type: Sample Width 3.00 Length 7.00
_ Hollow Masonry Prism L/W Ratio: 2.33 :1
_ Grouted Masonry Prism
X Grout Required Strength: 3000 psi
_ Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 8 cy
2730 lbs Sand, 1360 lbs
Cement, 206.3 lbs Water, Slump: 6.0"
5.5 oz Air, 33 oz. Reo
Truck No. : 151
Ticket No. : 4462
Specimen Temperature: 83 degrees F
Weather: overcast 98 degrees F
otal Location of Masonry Construction: top bond beam wall column line A-2 to 10
Location of Sample Origin: bond beam column line A-3
Comments:
CON
Specimen No. G 32 A G 32 B G 32 C G 32 D pF
Date Cast 6/26/00 6/26/00 6/26/00 6/26/0(3
Date Tested 7/3/00 7/24/00 7/24/00 7/24/00
( 7 days) (28 days) (28 days) ( 28 days) 15120
Weight (lbs) 5.68 5.14 5.50 5.38
End Area (sq in) 10.56 10.56 10.56 10.56 %,///'/0NAL�1�
Load (lbs) 10,836 33,803 35,958 33,621
Stress (psi) 1,030 3,200 3,410 3,180
Reviewed By Date: �' �'Z CJ� NVLAP LAB CODE#10315-0
TEST RESULTS [BeD' O ETDO NOT The above reported test results wexe attained through
COMPLY WITH SPECIFICATIONS procedures performed in accordance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY T��
Laboratory
Proj ct: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores M.
•
Supplier: Aiudi Concrete JAWORSKI
M
PLACEMENT DATA
Dat Cast: 6/26/00 Set No. :G 32
Test Specimen Type:
Sample Width 3.00 Length 7.00
— Hollow Masonry Prism L/W Ratio: 2.33 :1
— Grouted Masonry Prism Required Strength: 3000 psi
X Grout
Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
2730 lbs Sand, 1360 lbs Quantity: 8 cy
Cement, 206.3 lbs Water, Slump: 6.0"
5.5 oz Air, 33 oz. Reo Truck No. : 151
Ticket No. : 4462
Specimen Temperature: 83 degrees F
Weather: overcast 98 degrees F
Total Location of Masonry Construction: top bond beam wall column line A-2 to 10
Location of Sample Origin: bond beam column line A-3
Comments:
Specimen No. G 32 A G 32 B G 32 C G 32 D
Date Cast 6/26/00 6/26/00 6/26/00 6/26/00
Date Tested 7/3/00 7/24/00 7/24/00 7/24/00
( 7 days) (28 days) (28 days) ( 28 days)
Weight (lbs) 5.68 5.14 5.50 5.38
End Area (sq in) 10.56 10.56 10.56 10.56
Load (lbs) 10,836
Stress (psi) 1,030
Reviewed By: Date: 7 /,/w/ NVLAP LAB CODE# 10315-0
TEST RESULTS FIDO M DO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS Proc e&=performed in accordance with ASTM C31,
ARE NOT COMPLETE [-]N/A C39,C94,C143,C172,C192,C231,C617,C1231.
-F CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY �' Testing
`s
Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores IEW
Supplier: mixed on site JAWORSKI
PLACEMENT DATA GBOTEM INC.
Date Cast: 7/12/00 Set No. :M 31
Test Specimen Type:
Sample Width 2.00 Length 2.00
_ Hollow Masonry Prism L/W Ratio: 1.00 :1
_ Grouted Masonry Prism Grout Required Strength: 1800 psi
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
Quantity: 1 cy
3 Sand, 2 Cement; 1 Lime,
1 1/2 Water Slump: 6.0"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 68 degrees F
Weather: clear, 75 degrees F
Total Location of Masonry Construction: B-1 to Ar2 front entrance
Location of Sample Origin: front entrance A-1, 15' above floor slab
Comments:
Specimen No. M 31 A M 31 B M 31 C % 0 op
Date Cast 7/12/00 7/12/00 7/12/00
co .-
Date Tested 7/19/00 8/9/00 8/9/00
( 7 days) (2 8 days) (2 8 days) * No.15120
Weight (lbs) 0.58 0.60 0.58 �� • cE�+sEa•' ;%
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 13,543 17, 184 16,684
Stress (psi) 3,390 4,300 4, 170
Reviewed Date: cF�/v/C/ INVLAP LAB CODE#10315-0
TEST RESULTS 9-1� DO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS procedrres Perfofmed in accordance with ASTM C31,
E]ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
FGROUT COMPRESSIVE TEST SUMMARY TMaterials
esting
Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction N.A'-o
Client: Target Stores % .
Supplier: mixed on site JAWORSKI
GEO�I.INC
DATA
Date Cast: 7/12/00 Set No. :M 31
Test Specimen Type:
Sample Width 2.00 Length 2.00
— Hollow Masonry Prism L/W Ratio: 1.00 :1
Grouted Masonry Prism Required Strength: 1800 psi
Grout
X Mortar EMTL Technician: J.E. Anderson
Mix Proportions: Quantity: 1 cy
3 Sand, 2 Cement, 1 Lime,
1 1/2 Water Slump: 6.0"
Truck No. : n/a
Ticket No. : n/a
Specimen Temperature: 68 degrees F
Weather: clear, 75 degrees F
Total Location of Masonry Construction: B-1 to A-2 front entrance
Location of Sample Origin: front entrance A-1, 15' above floor slab
Comments:
Specimen No. M 31 A M 31 B M 31 C
Date Cast 7/12/00 7/12/00 7/12/00
Date Tested 7/19/00 8/9/00 8/9/00
( 7 days) (28 days) (28 days)
Weight (lbs) 0.58 0.60 0.58
End Area (sq in) 4.00 4.00 4.00
Load (lbs) 13,543
Stress (psi) 3,390
Reviewed By Date:Date: 7/1/174(/ INVLAP LAB CODE# 10315-0
TEST RESULTS DO n DO NOT The above reported test results were attained though
CO LY WITH SPEC CATIONS P1 M II W performed in accordance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
GROUT COMPRESSIVE TEST SUMMARY i�v: "�ng
Laboratory
Project: Target Project No. : 00141C
A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores
Supplier: Aiudi Concrete JAwOHI
GEOIEM M
PLACEMENT DATA
Date Cast: 7/17/00 Set No. :G 33
Test Specimen Type: Sample Width 3.00 Length 7.00
_ Hollow Masonry Prism L/W Ratio: 2.33 :1
_ Grouted Masonry Prism
X Grout Required Strength: 3000 psi
_ Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
2736 lbs Sand, 1360 lbs Quantity: 5 cy
Cement, 197 lbs Water, 5.6 Slump: 6.0"
oz Air, 32.8 oz. Reo
Truck No. : 151
Ticket No. : 4847
Specimen Temperature:
Weather: overcast 78 degrees F
" otal Location of Masonry Construction: front entrance bond beam B-1 to A-2
Location of Sample Origin: column line A-2 bond beam
Comments:
Specimen No. G 33 A G 33 B G 33 C G 33 D
Date Cast 7/17/00 7/17/00 7/17/00 7/17/00
Date Tested 7/24/00 8/14/00 8/14/00 8/14/00
( 7 days) (28 days) (28 days) ( 28 days)
Weight (lbs) 5.50 5.32 5.44 5.38
End Area (sq in) 10.56 10.56 10.56 10.56
Load (lbs) 12, 161
Stress (psi) 1, 150
Reviewed By: Date: �--I?-Ar- JNVLAP LAB CODE#10315-0
1ARE
RESULTS DOEJ DO NOT The above reported test results ere attiedthroLY WITH SPECIFICATIONS proceduresperformed in accordancewith 'M AS G31 NOT COMPLETE EJ-N/A C39,C94,C143,C172,C192,C231,C617,C1231.
CONCRETE MASONRY, MORTAR, OR
Eastern
FGROUT COMPRESSIVE TEST SUMMARY '� T«u ''
� Laboratory
Project: Target Project No. : 00141C A Division of
South Windsor, CT Contractor: Konover Construction
Client: Target Stores ••• . .
Supplier: Aiudi Concrete JA RSGEOTEM E
PLACEMENT DATA
Date Cast: 7/17/00 Set No. :G 33
Test Specimen Type:
Sample Width 3.00 Length 7.00
_ Hollow Masonry Prism L/W Ratio: 2.33 :1
_ Grouted Masonry Prism
X Grout Required Strength: 3000 psi
Mortar EMTL Technician: J.E. Anderson
Mix Proportions:
2736 lbs Sand, 1360 lbs Quantity: 5 cy
Cement, 197 lbs Water, 5.6 Slump: 6.0"
oz Air, 32.8 oz. Reo Truck No. : 151
Ticket No. : 4847
Specimen Temperature:
Weather: overcast 78 degrees F
Total Location of Masonry Construction: front entrance bond beam B-1 to A-2
Location of Sample Origin: column line A-2 bond beam
Comments:
Specimen No. G 33 A G 33 B G 33 C G 33 D rsaK,=s
Date Cast 7/17/00 7/17/00 7/17/00 7/17/00
Date Tested 7/24/00 8/14/00 8/14/00 8/14/00 •,�4 JAIV �
( 7 days) (2 8 days) (2 8 days) ( 28 days)� �cn� c a
Weight (lbs) 5.50 5.32 5.44 5.38
• CC i 1K
End Area (sq in) 10.56 10.56 10.56 10.56 �j" c 75
EN
Load (lbs) 12,161 35, 070 34,455 35,464
�pN"�E�C�
►71f
Stress (psi) 1,150 3,320 3,260 3,360
Reviewed By:,,r-Yl G l� Date: S>//( (0 NVLAP LAB CODE#10315-0
TEST RESULTSEA'150 DO NOT The above reported test results were attained through
COMPLY WITH SPECIFICATIONS procedures performed in accordance with ASTM C31,
ARE NOT COMPLETE N/A C39,C94,C143,C172,C192,C23111 C617,C1231.