HomeMy WebLinkAbout125 Buckland Hills Drive A6/02!2000 10:05 FAX 860 284 1174 KONOVER CONSTRUCTION 0 001/004
Konvver
Constriction Corporation
Pages Foxed: 7
FAX MEMORANDUM
TO: Town of South Windsor/Doug Metheny FAX' 86n-F44r?17R'f
Target Stores/John Eriand FAX; 437-3706
R&S OonstructioniBill Eeaudreau FAX: 203-758-8440
FROM: Robyn Watkins, Project Administrator
DATE: June 2, 2000
RE: Tcrgct Store#T 1249 (899-030-01)
South Windsor, CT
Please find attached, Pre-Roof Meeting Minutes#1 for the above referenced project.
If you have any questions or concerns regarding these minutes, please contact Mark Hopkins 650-284-
7419.
If you have any problems receiving this fax, please contact me immediately at 860-284-7436.
Thank you.
cc: Mike Tighe
Mark Hopkins
Field (Bob Smedley)via fax: 000-040-1030
File
kA990301corrmi5GWi5a001 b„rgw
Mailing Address:P.O.Box 4052.Farmington,CT 06034-4052 Business Office: 16 Munson Road,Farrt±ingron,CT 06032
Phone:860.284.7110 Fax-860.284.1174 www.konovercondru;tion.=m
G'u►7rrc°cGrrir! • IYIwryland • Florida
i
- 06/0,e'2000 10:05 FAX 860 284 1174 KONOVER CONSTRUCTION 2002r004
Kor .XO%W Meeting Minutes
ITV 1
.'onstr etiion Corporation
TARGET STOKE #T-1249
South Windsor, Connecticut Project# F199-030-01
OO
51214/00 06.00 AM Bob Smodlcy KQnover Construction Corporation
Ell 511 IN � � g � �r
Coordination/Communication of Field Gfficeffrailer
Pre-Roof Issues for this Project
s 1llamNI a
Konover Construction Corporation- Bob Smedley Konover Construction Corporation-Michael Tighe
Konover Construction Corporation-Mark Hopkins Town of South Windsor-Doug Metheny
R &S Construction Services, Inc. -bill E3eaudreau
R&S Construction Services, Inc, -Ted Mackey
Target Stores-John Erland
OWN
New Business
1-1 KCC r viewed schedule delivery of materials which will be on site 6/0100; 5124/00
mov up artier if possible.Taare is a"My Merl time nMpdPd by Ray at
Target Roofing. Material to be delivered as a split load-600 SO. ISO and
1,300 SCE. Sheet goods,fasteners, caulk, foam, hatch to be delivered by
LTA.
1-2 Count of materials to be submitted tc Target upon day of delivery. 5/241CIO
1-3 Tarp all materials beinq stored. 5/24100
1-4 Generator exhaust tlue-use tire caulk, field flashed caulk tar storm collar, 5/24/00
►og Nlonager Printed on: 5i3l= N1k;ofpc�data\kcc\projects\b99030o11prologlb99O3001.pmd Page 1 of 3
06/02i2000 10:06 FAX 860 284 1174 KONOVER CONSTRUCTION 2 003/004
Meeting Minutes
i uu,icr i l 1 rS+ 1 r 4r. 7 it ,! e
1-5 All must pay attention to the following details: 5/24/00
PVC pipe for split system;
Scupper flashings;
roof hatch;
wood blocking;
top of parapet(emooth and beveled edge);
Camera Mount-caulk backing plate;
front cntry poropct install wcldod brooch before roofing.
1-e It i;MANDATORY that the Roofor bo on site when roof top unite are 5124100
installed on curbs.
1-7 Skylite curbs to be gasketed with Tek screw at dome, 5/24/00
.s Roofer to provide a protected area for plumbing of gas pipe. 5124/00
1-9 split system: 5/24/00
Provided base by Target-flashed by Roofer.
1-10 bens d ck at perimeter of hatchway. 5124/00
1-11 Walkway pads on all RTU's-none at skylites. 5/24/00
1-12 Specified Systems Group to have Rep on-site at start of roof for 3 days. 5/24/00
1-13 Daily probing-3 times daily 5124100
Test cut samples to be turned into KCC's Superintendent daily.
4og Manager Printed on: 5131100 1VcafpoWgitoUcCG�p►ojacft\bBQ03001 Page 2 of 3
,06/02!20O0 10:07 FAX 860 284 1174 KONOVER CONSTRUCTION 2 004/004
M ting Minutes
SRI
}yR(rlJY1p h LV ,I4 I^IJ I MIIYtIIA'b1'IIM�{I�{��I({1���'1jmY' ^�4�{fYV,fN}1f�{�Q?({}q�{{{rn My
A. 0. 1^I 14, 'sITON .I11�'�/���1i.±u�
1-14 R 8 requested a dedicated circuit for roofing power tools. 5/24100
Anything contained in these minutes not to the exact understanding of those present should ba submitted in
wrl#ing so that corrections, if necessary, can be made and distributed.
dog Manager Printed on! 513160 llkafpc%data\kcclprojectslb99o34oilpro1ogt9903001.pmd Page 3 of 3
GRAIN SIZE DISTRIBUTION TEST REPORT
ASTM D-422
io 0100 o g
'vt
90
�x Pmsh (rd.s•mvi•)
80 -"Mf�t6 P29A (sand Patt.)
•�c speoftedon Yii�asn
...�. spaolloadonon Mo�nun
70
W 60
Z
W 50
9
f,
IL 40
IL
30
20
10
-------------------
1000.000 100.000 10.000 1.000 0.100 0.010 0.001
GRAIN SIZE—mm
%Cobbles %Gravel Crs Mod Fine %Fines
16.7 47.9 35.4 Sitt Clay
0.0 35.7 %Sand 54.1 10.1
Classification: Red brown C-F SAND and C-F GRAVEL,little SILT
Sieve Size Sieve Size Cumulative %Passing %Passing Specification
(mm.) (in./no.) Wt.Retnd (Tot.Sample) (Sand Port.) Minimum Maximum
203.200 8"
125.000 5"
90.000 3.5' 0.00 100.0
57.000 2.25" 1.84 95.8 100 100
50.800 2" 2.84 93.5 95 100
38.100 1.5"
25.400 1"
19.050 3/4" 8.18 81.2 50 75
12.700 1/2"
9.525 3/8"
6.300 1/4" 15.52 64.3 25 45
4.750 #4
2.000 #10 0.16 55.3
1.000 #18
0.425 #40 0.62 29.3 5 20
0.250 #60
0.150 t 100 0.87 15.2 2 12
0.075 #200 0.96 10.1
Total Dry Wt. 43.45
Split Wt. 1.14
Pr ject: Target South Windsor Project No.: 00141 C Date: 4/18/00
South Windsor,CT Specification: CONNDOT M.05.01 Lab No: C693-W
Source: On Site Sampled from: Processed Gravel(Sand Stone)
East rn Mat rials T sting Laborat ry Remarks:
Berlin, Connecticut JNVLAP # 10315-0