HomeMy WebLinkAbout1540 Main Street (5) RFD
SITE COMPLIANCE CHECKLIST NY �+ �
TOWN of SOUTH WINDSOR, CONNECTICU'�Our 2003
'I540 MAIN STR=7, LOT_# Reviewed By W�N�S�RP eering)
FRANK BELLIZZI Date Reviewed / a
249 SILVER LANE,EAST HARTFORD,CT Reviewed By Planni
BP # �*Ul i_ Ph_# s(p� ' �,5 5� Date RevietIB3
YI
Date Submitted 01/02/03 ***** FORNG PER **
Caek at ,7
In accordance with the Zoning and/or Subdivision Regulations, prior to the l
building of any structure on a lot, a Topographic Plot Plan shall be submitted
for approval. The minimum requirements shall include:
Approve Denie N/A
1. Name, address & phone number of owner/applicant
2 . Name, address & phone number of plan preparer
3. Zoning Information - i.e. zone, open space,
floodway, street address.
j./ 4. Plot Plan at 1" = 40' scale
f/ a. Subdivision reference, abutting properties, etc
b. Easements of record
C. Lot description, bearings, building lines,
distances, area, etc.
d. Contours, existing & proposed, 1 or 2 ft.
interval where appropriate
'�� e. Building location with dimensions.
Elevations of proposed finish floor, garage
floor & centerline of road at driveway
f. Elevations of gravity drainage systems, sanitary
�p & foundation drain at the house and the street
g. Tentative utility location (gas, water,
electric, septic system,--etc.)
h. Title block with name and address of preparer,
date, appropriate certification, live seal and live
signature consistent with the Board of Registration
requirements. (P.E. & L.S.)
5. Sedimentation and erosion control
6. Special Planning & Zoning, Inland/Wetlands
considerations (Plans on file w/Town Clerk)
COMMENTS S-4O
�
o emu, /;t�,; RECEIVED
ter'' c1�,ve W 01
J A N 3 2003
�MCL X �r,'..� Gfa d.e S'°o .ev�V,.L�' SOUTH WINOS PT.
i,•ve s�y�a-f � �� �C ,all va ��e, Check vim.
?c Sam. 4 4+ �O� f a'r� �c Seer vice �,o�C v� Cad S�►�'
8�
�C Rw^q D d -ki L TYN� 0 e 5 DV� ?VC,