DEPARTMENT DECISION APPLICATION FOR HVAC PERMIT
TOWN OF SOUTH WINDSOR PERMIT#
Application is hereby: BUILDING DEPARTMENT I
CAPPRO 1540 SULLIVAN AVENUE Bldg.Permit#
15116 z 644-2511 ext. 230
Date Building Inspector
Application must be printed or typed
FEE SCHEDULE Location of Job:_
6f�04-z tic,c \4t .G
$0-$1,000=$15.00 Street No. Street Lot No.
Over$1,000=
$15.00 per$1,000
or any fraction thereof Tenant Designation Apt.No.
APPLICANTG—
APPLICANT ADDRESS
c�'� �SJS�c1
APPLICANT PHONE# k O\t k
010 N S F OWNER ��� �►c��c � ��s— Co c-.�Sr�
OWNER ADDRESSc�a� e�C�
OWNER PHONE
O S �
ESTIMATED COST$ �9 Qj Do
IS THIS A CONTRACT COST? (,�Yes No
i CJ FEE ENCLOSED$ �f S_O
TYPE OF JOB:
ds0 C0
New Installation
Alteration/Addition/Repair
Revised 4/01//2002
APPLICATION FOR HVAC PERMIT (Continued from reverse side)
TYPE OF SYSTEM: TYPE OF BUILDING:
VAEATING ❑RESIDENTIAL
&5VC 0 05MMERCIAL
❑VENTILATION ❑INDUSTRIAL
HEATING
0 STEAM LOW PRESS LIMIT LBS. HIGH PRESSURE LIMIT LBS.
ElHYDRONIC a-*_AARRM AIR ❑UNIT RADIANT HEATER
EXISTING RADIATION ADDITIONAL RADIATION TOTAL RADIATION
DESIGN TEMP. OUTSIDE l 0 OF INSIDE '7 0 OF DIFFERENCE 'a c) °F
TOTAL HEAT LOSS(BTUH)L$L/rF(HEAT LOSS SHEET MUST ACCOMPANY
APPLICATION)
DESCRIBE ALL HEATING EQUIPMENT(INCLUDING MAKE&MODEL NO.)
ZcrAz,
,
GROSS HEATING CAPACITY(INPUT—BTUH) `3OC-k-NET RATING(OUTPUT—BTUH) I E�O�pOb
TYPE OF FUEL
❑ OIL—GPM OIL TANK LOCATION:❑INSIDE❑OUTSIDE CAPACITY
UMAS—INPUT aj:!:jckq0LPG TANK CAPACITY ELECTRIC—KW
AIR CONDITIONING
DESIGN TEMP.OUTSIDE °F INSIDE-7-7°F DIFFERENCE aO OF
TOTAL HEAT GAIN(BTUH) HEAT GAIN SHEET MUST ACCOMPANY APPLICATION)
DESCRIBE ALL COOLING E UIPMENT(INCLUDIMAKE&MODEL NO.)
^4c_lS$C\LC c 6 c7
TONNAGE COOLING CAPACITY(BTUH) kOD
VENTILATION
DESCRIBE ALL AIR HANDLING EQUIPMENT(INCLUDING KITCHEN EXHAUST EQUIPMENT)
TOTAL SIZE OF SYSTEM(CFM) FRESH AIR INTAKE(CFM)
(PLANS MUST ACCOMPANY APPLICATION)
FURTHER DESCRIPTION OF WORK
THE UNDERSIGNED HEREBY APPLIES FOR A PERMIT TO PERFORM THE WORK DESCRIBED AND IS TO
COMPLY WITH ALL LOCAL ORDINANCES AND STATE OF CONNECTICUT BUILDING CODES IN THE
PERFORMANCE OF SUCH WORK.
CONTRACTORS LICENSE NO. TYPE STATE
SIGNATURE OF APPLICANT �+ p eA \DATE
•
HVAC LOAD ANALYSIS
for
Garrier
RHVA RESIDENTIAL AND LIGHT
COMMERCIAL.HVAC LOADS
Prepared By:
John Przybylski
Hi Point Heating&Cooling
71 Edwin Road
South Windsor,CT 06074
(860)291-0181
5/24IO2
x fi
P t, .T ,y gig,, ;- y;, X.�a`4'vru. ,+, F m-m qz_ 'qr,r` i ,�
z h�� a;, ?,'u., +>,; tin ,., 'vim'ice _" .,YFxsnea 4.n,t - F„ y: kw� �`
f z.xk.'s ,,�; 'rk F,„HIMr,4,-v i,�s,, ,n.. T' ti,x Sri xu� +a� ` £r,.-wJ'�,..�.h =e,s.. - n? •vT �.� c' ty,tr�t%b \..,�v4„-a u
<,.,.,r V -.^,,s s. ,.�- �*fv I;s 4 -, „��Sys, ^day_ „_;'.�' „gs,�."��a.,x;':w„dSn-V t �� a
Project: Company: Hi Point H ating&Cooling
Client: WILLOW BROOK GOLF COURSE Representative: John Przybylski
Address: BROOKFIELD ST. Address: 71 Edwin Road
City: SOUTH WINDSOR,CT. City: South Windsor,CT 06074
Phone: Phone: (860)291-0181
Fax: Fax: (860)291-0020
Proj ct Name:
Reference City: Hartford,Connecticut
Daily Temperature Range: Medium
Latitud : 41 Degrees
Elevation: 19 Feet
Elevation Sensible Adj. Factor: 1.000
Elevation Total Adj. Factor: 1.000
Elevation Heating Adj. Factor: 1.000
Outdoor Outdoor Indoor Indoor Grains
Dry Bulb Wet Bulb Rel.Hum. Dry Bulb Difference
Wint r: 7 N/A N/A 72 N/A
Summer: 88 73 50% 75 33
11,11115INEM Ill
Total Building Supply CFM: 2,375 CFM per square foot: 0.884
Square feet of room area: 2,688 Square feet per ton: 361.784
Total heating required with outside air: 60,114 Btuh 60.114 MBH
Total sensible gain: 52,221 Btuh 78 %
Total latent gain: 14,964 Btuh 22 %
Total cooling required with outside air: 67,185 Btuh 5.599 Tons(based on sensible+latent)
7.430 Tons(based on 77%sensible capacity)
1:111!111111m'':!iiiiiiiiiiiiiiiil������,ll
Calculations are based on 7th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
§r f .}
41
ww" ,
Component Area Sen. Lat. Sen. Total
Description Quan Loss Gain Gain Gain
3B Window Double Pane Clear Glass TIM Frame 482 19,079 0 22,732 22,732
1 OD Door Wood Solid Core 105 31140 0 802 802
12H Wall R-19+ 112"Gypsum Board(R-0.5) 1,921 7,493 0 1,912 1,912
16F Ceiling R-26 Insulation 2,640 6,522 0 3,712 3,712
22D Slab on Grade 2"Edge Insulation(R-11) 224 3,058 0 0 0
Subtotals for structure: 5,372 39,292 0 29,158 29,158
Active People: 28 0 6,440 8,400 14,840
Inactive People: 20 0 3,000 5,000 8,000
Appliances: 0 0 41000 0 4,000
Lighting: 0 0 0 0 0
Ductwork: 0 10,019 0 8,703 8,703
Infiltration:Winter CFM: 151.2,Summer CFM:67.2 587 10,803 1,524 960 2,484
V ntilation:Winter CFM:0.0,Summer CFM:0.0 0 0 0 0 0
Sensibl Gain Total: 52,221
Temperature Swing Multiplier: X1.00
Building Load Totals: 60,114 14,964 52,221 67,185
Total Building Supply CFM: 2,375 CFM per square foot: 0.884
Square feet of room area: 2,688 Square feet per ton: 361.784
ONEEMENEW
Total heating required with outside air: 60,114 Btuh 60.114 MBH
Total sensible gain: 52,221 Btuh 78 %
Total latent gain: 14,964 Btuh 22 %
Total cooling required with outside air: 67,185 Btuh 5.599 Tons(based on sensible+latent)
7.430 Tons(based on 77%sensible capacity)
MAN IN
Calculations are based on 7th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
Fs �� z"� 4y A.iM - £ • i i
U
<,s. ar-,. ", `'"�a�"a.'Fs•;. ,S e '£";.`�'-�, r"`��r ,'"-0�' ar7'.E . t, , _ .� a, r "�`,..P - .� •�.s
-
NOW
Htg Htg Run Run Cig Clg Clg Zone Clg Air
Room Area Sens Nom Duct Duct Sens Lat Nom Adj Adj Sys
No Name SF Btuh CFM Size Vel Btuh Btuh CFM Fact CFM CFM
—Zone 1-
1 Grille/bar 840 30,865 401 8-7 585 27,506 13,124 1,251 1.00 1,251 1,251
System 1 Totals 840 30,865 401 27,506 13,124 1,251 1,251 1,251
"Main Trunk Size: 16A 2 in.
"Main Trunk velocity constraints were not met due to duct schedule limitations.
Main Trunk Air Velocity= 1,005 Feet/Minute
Cooling Sensible/Latent Sensible Latent Total
Tons Split Btuh Btuh Btuh
Net Required: 3.386 68%/32% 27,506 13,124 40,630
Recommended: 4.755 77%/23% 43,937 13,124 57,061
2
111'1_ +.���r
-1
4fi7'" "'F + •,f"'$...+`" ��r� , ."S.i.,t' vlT f„ r'' ^si'�pp ,"3`"-'` JIF'a'�4'',',, ;s�<fid :
� �EM.�i
Ell
Htg Htg Run Run Clg Clg Cig Zone Cig Air
Room Area Sens Nom Duct Duct Sens Lat Nom Adj Adj Sys
No Name SF Btuh CFM Size Vel Btuh Btuh CFM Fact CFM CFM
—Zone 1-
2 Pro Shop 840 19,213 250 5-7 636 18,674 1,840 849 1.15 980 849
4 Kitchen 480 3,834 50 1-6 301 1,300 0 59 1.00 59 59
Zone 1 Subtotal 1320 23,047 300 19,974 1,840 909 1,039 909
—Zone 2-
3 Lays/lobby 528 6,202 81 2-6 549 4,741 0 216 1.25 270 216
Zone 2 Subtotal 528 6,202 81 4,741 0 216 270 216
System 2 Totals 1848 29,249 380 24,715 1,840 1,124 1,309 1,124
*Main Trunk Size: 16A 2 in.
*Main Trunk velocity constraints were not met due to duct schedule limitations.
Main Trunk Air Velocity=903 F et/Minut
Cooling Sensible/Latent Sensible Latent Total
Tons Split Btuh Btuh Btuh
Net Required: 2.213 930/o/7% 24,715 1,840 26,555
Recommended: 2.675 77%/23% 24,715 7,382 321097