Loading...
HomeMy WebLinkAbout1735 Ellington Road (4) Electric# /? APPLICATION FOR BUILDING PERMIT Plumbing# /100 Cr 1735 Ellington Road HVAC # 1► "13 Dat Sprinkler# No. 28564 FINAL APPROVA Estimated Cost Building L "fX- COIMPLETE RED BOXED AREAS Permit Fee $ sz Engineering 11 TYPE OR PRWT ONLY Occupancy Fee $ 1`' Affidavit SIGN ON REVERSE SIDE Appr.for CO. Qgee Total Fee $ 5 TO BUILDWG DEPARTMENT,TOWN OF SOUTH WINDSOR,CT (Additional Cost) $ The undersigned h reby applies to do work according to the following specifications: Kam► — Job Location S?dYG 5 Lot No. Side of Street Zone lee-, Applican S . - ( Tel# Address (t cStr C Zip 0 '') Li # ppd d-'79 Own r d Address I nY Architec (, ��r-�t�(, ar1�P.ta /.�- Address in 10604 C- Sq.Ft.N w Area: 1st FL a bo)b 2nd FL 3rd Fl. Total New Area #Rooms #Lavatories A #Bathrooms #Garages Purpose of this permitf e a YA I,".000 4u rDj 5 City Water 2e"' Well ❑ Septic System ❑ Sewer 8--� Ins. H.O. S.P. Cert. Area Basem nt Garage Approved by 3 9k- Date Use Group '3 Construction Type Rov'sed 1/97 I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town of South Windsor and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this permit is asked,and agree that this building is to be located the proper distance from all street lines,side yard lines,and required distances from all other zones and is located in which this building and its us lowed. Signed I hereby apply for a Certificate of Occupancy worhe work de r' in this application for the permit. Signeid� M=I a �4x* DO NOT WR BELOW T IS LINE INSPECTION COMMENTS Inspection / Approval Date By Appl Code Description Due Whom Code Comment ------------------------------------------------------------------------------- **-28564-B 4,000 E03 ROUGH 03/25/02 JFF A WITH CONTRACTOR SCOTT DEMISING WALL P03 ROUGH 03/25/02 JFF A WITH CONTRACTOR SCOTT DEMISING WALL B04 INSULATION 03/26/02 JFF A DEMISING WALL P02 UNDERGROUND 03/28/02 JFF A UNIT 5 WITH CONTRACTOR TOILET SINK MOP SINK E03 ROUGH 04/03/02 JFF A WITH CONTRACTOR SCOTT B10 FINAL 04/16/02 CJD D AIR GAP AT HAND SINKS,NEED TO SEE AGAINCLOSER TO FINISH B10 FINAL 04/24/02 CJD A OK.WILL SEE FIRE MARSHALL B10 FINAL 11/26/02 JRC A B10 FINAL 11/26/02 JRC A CLOSEOUT **-17613-E 2,000 **-11423-H 5,000