HomeMy WebLinkAbout1735 Ellington Road (4) Electric# /? APPLICATION FOR BUILDING PERMIT
Plumbing# /100 Cr 1735 Ellington Road
HVAC # 1► "13 Dat
Sprinkler# No. 28564
FINAL APPROVA Estimated Cost
Building L "fX- COIMPLETE RED BOXED AREAS Permit Fee $ sz
Engineering 11 TYPE OR PRWT ONLY Occupancy Fee $ 1`'
Affidavit SIGN ON REVERSE SIDE
Appr.for CO. Qgee Total Fee $ 5
TO BUILDWG DEPARTMENT,TOWN OF SOUTH WINDSOR,CT (Additional Cost) $
The undersigned h reby applies to do work according to the following specifications: Kam► —
Job Location S?dYG 5 Lot No. Side of Street Zone lee-,
Applican S . - ( Tel#
Address (t cStr C Zip 0 '') Li # ppd d-'79
Own r d Address I nY
Architec (, ��r-�t�(, ar1�P.ta /.�- Address in 10604 C-
Sq.Ft.N w Area: 1st FL a bo)b 2nd FL 3rd Fl. Total New Area
#Rooms #Lavatories A #Bathrooms #Garages
Purpose of this permitf e a YA I,".000
4u rDj
5
City Water 2e"' Well ❑ Septic System ❑ Sewer 8--�
Ins. H.O. S.P. Cert. Area Basem nt Garage
Approved by 3 9k- Date Use Group '3 Construction Type
Rov'sed 1/97
I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town of
South Windsor and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this
permit is asked,and agree that this building is to be located the proper distance from all street lines,side yard lines,and required
distances from all other zones and is located in which this building and its us lowed.
Signed
I hereby apply for a Certificate of Occupancy worhe work de r' in this application for the permit.
Signeid� M=I a
�4x*
DO NOT WR BELOW T IS LINE
INSPECTION COMMENTS
Inspection / Approval Date By Appl
Code Description Due Whom Code Comment
-------------------------------------------------------------------------------
**-28564-B 4,000
E03 ROUGH 03/25/02 JFF A WITH CONTRACTOR SCOTT DEMISING WALL
P03 ROUGH 03/25/02 JFF A WITH CONTRACTOR SCOTT DEMISING WALL
B04 INSULATION 03/26/02 JFF A DEMISING WALL
P02 UNDERGROUND 03/28/02 JFF A UNIT 5 WITH CONTRACTOR TOILET SINK MOP SINK
E03 ROUGH 04/03/02 JFF A WITH CONTRACTOR SCOTT
B10 FINAL 04/16/02 CJD D AIR GAP AT HAND SINKS,NEED TO SEE AGAINCLOSER
TO FINISH
B10 FINAL 04/24/02 CJD A OK.WILL SEE FIRE MARSHALL
B10 FINAL 11/26/02 JRC A
B10 FINAL 11/26/02 JRC A CLOSEOUT
**-17613-E 2,000
**-11423-H 5,000