HomeMy WebLinkAbout105 Buckland Hills Drive (2) SITE COMPLIANCE CHECKLISTt,Y�
TOWN of SOUTH WINDSOR, CONNECTICUT
105 BUCKLAND HILLS DRIVE LOT_# Reviewed By & -d. Oa
r'JOHN MORIARTY & ASSOC, INC Date Reviewed 2 p ppr25 NEW BRITAIN AVENUE,UNIONVILLE,CT Reviewed By
BP_##_28161_ Ph_##_860-675-9809 Date ReviewtFR
c3� 'e
Date Submitted 00/00/00 ***** C o O **
As required in the Zoning and/or Subdivison Regulations, no Certificate of
Occupancy shall be issued until grading plans have been complied with and 3
approved by the Town Engineer. The minimum requirements shall include:
Appro ed Denied N/A
1. Approved building permit plan
2. Finish grading per approved
building permit plan
V— 3. Site work; i.e. trees, shrubs,
dumpsters, required parking
4. Utility location;
a. sanitary sewer/septic system
b. foundation drain
C. electrical & telephone
d. water
e. other
f
5. Sewer connection charge paid
_V/ 6. Appropriate certification
7. Bonding
8. Planning & Zoning/
Inland Wetlands Considerations
A. Lighting
B. Signage
Freestanding Wall
C. Fee in lieu of Open Space
Sewer Permit No.
a Pavement Excavation No.
� Cv'
COMMENTS:
y p
"4"
4
lxecew
OR ® SDK
NE
ENG�N�