HomeMy WebLinkAbout135 Abbe Road (4) SITE COMPLIANCE CHECKLIST
d TOWN of SOUTH WINDSOR, CONNECTICUT of10060
/ h 0
•IFS ABBE ROAD LOT_# 2 Reviewed By
JACQUES CONSTRUCTION LLC Date Reviewe OZ rjAppr�oveed67 RIDGE ROAD,SOUTH WINDSOR,CT Reviewed BBP_##_28543_ Ph # 432-1823 Date Reviewe prove enied
Date Submitted 00/00/00 ***** 0 0
As required in the Zoning and/or Subdivison Regulations, no Certificate of
Occupancy shall be issued until grading plans have been complied with and
approved by the Town Engineer. The minimum requirements shall include:
Approve Denied N/A
1. Approved building permit plan
2. Finish grading per approved
building permit plan
V 3. Site work; i.e. trees, shrubs,
dumpsters, required parking
y 4. Utility location;
J ✓
a. sanitary sewer/septic system
1
C;,rb
b. foundation drain `` J&d`"
�.J
C. electrical & telephone
d. water
e. other 1
5. Sewer connection charge paid q/3g
6. Appropriate certification
7. Bonding
B. Planning & Zoning/
Inland Wetlands Considerations
A. Lighting
B. Signage
Freestanding Wall
C. Fee in lieu of Open Space
Sewer Permit No. Pav Exc #
COMMENTS: �4c k-, ocC,L - —Status:
o u /35r*'
t 4.•�