Loading...
HomeMy WebLinkAbout16 Green Lane (2) RECEIVED TOWN ofTSOUTHPLIANCE CHECKLIST WINDSOR, CONNECTICU MAY 2 8 2003 A 16 GREEN LANE LOT_##12 Reviewed By GZ37SPUT"NOSORPLANN neering) DAN ROULIER & ASSOCIATES Date Reviewed 03 rove enie P.O. BOX 823,SOMERS,CT Reviewed By p a ) BP # 29305 Ph_# 763-3538 Date Reviewe Approve / e Date Submitted 00/00/00 ***** FOR C f O **** G/i As required in the Zoning and/or Subdivison Regulations, no Certificate of Occupancy shall be issued until grading plans have been complied with and approved by the Town Engineer. The minimum requirements shall include: Approved Denied N/A 1. Approved buildingpermit p t plan y 2. Finish grading per approved -- // building permit plan y y 3. Site work; i.e. trees, shrubs, / dumpsters, required parking V 4. Utility location; a. sanitaryse sewer/ ptic system b. foundation drain / C. electrical & telephone d. water e. other 5. Sewer connection charge paid 6. Appropriate certification 7. Bonding 8. Planning & Zoning/ Inland Wetlands Considerations A. Lighting B. Signage Freestanding Wall C. Fee in lieu of Open Space Sewer Permit No. Pav Exc # R �3 COMMENTS: lPL�s/ .S -�� w,� Status: �Lzrez TRANSMISSION VERIFICATION REPORT TIME 05/29/2003 10:08 DATE,TIME 05/29 10:08 FAX NO./NAME 92918757 PACE(S�N �0:00:23 RESULT OK MODE STANDARD ECM