HomeMy WebLinkAbout125 Ellingtion Road (3) 02/27/02 11:43 FAX 8163298602 TranSystems Corp IM002
February 26, 2002
Mr. John R. Collins
Chief Building Inspector
Town of South Windsor
1540 Sullivan Ave.
South Windsor, CT 06074
RE: DST Output Addition &Alterations
Dear Mr. Collins:
Attached is the Building Code information for the proposed Addition and Alterations to
the DST Output Facility located at 125 Ellington Road.
Please let me know if you would like anything further at this time.
Thank you for making a brief cursory review of the proposed project. We expect to have
the final drawings submitted for a plan review in early April.
Thank you.
Sincerely,
Dale H. Meyer
TRANSYSTEMS CORPORATION
2400 Pershing Road,Suite 400 • Kansas City,Missouri 64108 Phone: (816)329-8600 Fax: (816)329-8602
02/27/02 11:43 FAX 8163298602 TranSystems Corp IM 003
BUILDING CODE REVIEW
DST Output- New Addition &Existing Building
125 Ellington Road
Building Code: The BOCA National Building Code/1996
Use Group: - B Office Area,Table 304.2
-S-1 Warehouse&Generator Building,Table 311.2
- F-1 Printing&Mailing,Table 306.2
Construction Type: -2C Table 602 .
Area&Height Limitations: Building to be fully sprinklered
-Nonseparated Use Groups, Sec. 313.1.227
- Unlimited Areas,Sec.507.1
- Fire Separation, Exterior Walls, Sec. 507.2,
Distance> 50 feet=No firerating required
Height<85 feet=O.K.
Building Area:
B: Office Area
First Floor 22,875 s.f.
Mezzanine 39,644 s.f.
Total 62,519 s.f.
S-1: Warehouse 61,907 s.f.
F-1: Printing&Mailing 125,690 s.f.
Total 250,116 s.f.
S-1: Generator Building 2,940 s.f.
Length of Exit Travel: B, F-1,S-1 with Sprinkler System =250 feet maximum=O.K.
Table 1006.5
Occupant Load: See attached sheet from DST Output Facility
Parking Requirements: Parking Calculations to be provided by Design Professionals,Inc.
02/27/02 11:44 FAX 8163298602 TranSystems Corp IM 004
Present work force
DODartment 1 st shift 2nd shift 3rd shift Terrys Total Peak Period temQ adds Peak Pe'od Total
Lettershop 48 38 21 7 114 30 144
Maintenance 2 2 2 0 6 0 6
Print 19 0 19 1 39 20 59
DP/LAN 6 2 2 0 10 0 10
COM/ROM 4 0 0' 0 4 0 4
Whse/Trans 8 2 2 0 12 0 12
HRfrraining 10 0 0 0 10 0 10
All other 165 0 0 0 165 0 166
262 44 46 8 360 50 410
Proposed arowth
Department 1 st shift 2nd shift 3rd shift Temps Total Peak Period teMg adgA Peak Period Total
Lettershop 30 25 15 7 77 30 107
Maintenance 2 2 2 0 6 0 6
Print 19 0 19 1 39 20 59
DP/LAN 0 0 0 0 0 0 0
COM/ROM 0 0 0 0 0 0 0
Whse/Trans 2 1 1 0 4 0 4
HR[Training 2 0 0 0 2 0 2
All other 0 0 0 0 0 0 0
55 28 37 8 128 50 178
GRAND COMBINED TOTAL 317 72 83 16 488 100 588