Loading...
HomeMy WebLinkAbout1739 Ellington Road (6) Frum:I IIS Depwtmerk.203-791-2451 To:John Collins Date '/24/02 Time:9:36:32 Alf Page 3 of Client: Bartlett Brainard EacroLt Inc.,Bloomfield,CT ST L Project: Stop&Shop, Store 699,South Windsor,C."f Contractor: Bartlett Brainard Eacott Inc. SPECLAL TESTING LABORATORIES,?NC. Inspector: L. Smith Po Box 200 Bethel,Connecticut Date July 1 2002 Batch Plant Report 01 Phone�;2U3)743 ,2lSI Fax(203)791 791 2451 : _ ! � PROGRESS OF WORK: Y\n authorized representative ofthis firm was dispatched to the above project site to inspect batch plant operations and the following was noted: 1)Inspected batching procedure at ready mix facility of Tilcon in East Granby CT and Hartford CT which supplied concrete for placement onsite in referenced project. 2)Upon STL i1>spector's arrival,a discrepancy was noted: approved design mixes and cover letter indicate that 3500 psi class material is to be used for slab on grade application. Tilcon staff indicated that 3000 psi class material had been ordered After telephone conversations,Tilcon staff stated that 3000 psi class material with no air entraining agent and additional fibers had been approved. 3)Amounts of the various components(with entraining agent rcmovcd)were in accordance with approved 3000 psi class mix. Fibers were added at amount required for each load. 4)Inspected a total of 120 cubic yards at the East Granby Plant: STL was advised that the balance of the order would be fiirnished by the Tilcon Hartford,CT plant. 5)Inspected batching 50 cu yd(250-300)at the Hartford plant with no fiuther discrepancies noted. REPORTED TO:Client;Building Official;Owner Representative;Landry Architects. Erdman Arithony&.Associates; Appledore Engineering Inc. Respectfully submitted, SPECIAL TESTING LABORATORIES, INC. Richard Spceiale-Director John Hardman, P.E. Vice President Vice President THE RESULTS SHOWN ON THIS REPORT RELATE ONLY TO THE S.*&LES TESTED. THIS REPORT SHALL.NOT BE USED TO CL"PRODUCT ENDORtMNIEEN''T>Y NVLAP OR,',?Y OTHER COVER JXM'NT.'GENCY TIM FOREGCING INFORMATION IS TT E PROPERTY OF'CLIENTS. REPRODUC'IICN OR PUBL.ICAMON ONLY WITH OUR EYXRESS PEF-NI SION. SPECIAL TESTING LABORAY-ORLES,INC.EXCLUDES ALL LLk3MLTY FOR WDRK PERFOPMED BY OTHERS. Rs AREA OFFICES IN DAN13URY-HARTFORD-NF`,V HAVEN-NEW LONDON From:MS Department 203-791-2451 To:John Collins Date:''/29/02 Time:2:28:56PM rage i of FAX COVER SHEET SPECTAL TESTING LABORATORIES, INC. P.O.Box 200,Bethel,Connecticut 06801 Phone(203)743-7281 Fax(203)791-2451 fax t r a n s m i t t a l re: Stop&Shop, South Windsor from: Special Testing Laboratories date: July 29,2002 pages: 1 NOTES: We are expediting the publication of our reports of inspections and tests performed at the above referenced project by "faxing" those reports direct from our computer network. The attached reports have been edited and proofread, but do not bear signatures anti seals. Copies of these reports bearing such signatures and seals will be copied, bound, and sent to the client at the end of the project. The following reports are being faxed immediately following this cover page. Reports Dated: 7-24-02.batch plant From:NUS Department 203-791.2451 To:John Collins Date:',/29/02 Time:2:28:56 PM rage t of Client: Bartlett Brainard EaCOU Inc.,Bloomfield,CT ST L Project: Stop&Shop, Store 699,South Windsor,CT Contractor: Bartlett Brainard Eacott Inc. SPECI.Ai,TESTING LABORATORIES,INC Inspector: L. Smith PO Box 200 Bethel,c Fax(2 3.)o91 2 Date: July 24,2002 Batch Plant Report 1?honc,;2U31743 ,281 Fax{,�U3}791 2451 P PROGRESS OF WORK: An authorized representative ofthis firm was dispatched to the above project site to inspect batch plant operations and the following was noted: 1) Inspected ongoing batch operations at the facility of Tilcon in Hartford, CT which is supplying concrctc to the referenced project. 2)On this occasion a total of 180 cubic_yards of 3000 psi class material was mixed at the IIartford facility. Balance of the total order of 384 cubic yards was supplied by other Tilcon plants. 3)Material supplied was in accordance with the approved design mix,modified as previously noted in STL relxn-t of 7/19/02. Fibers were added by hand to each load during discharge from batching drum. REPORTED TO:Client;Building Official;Owner Representative;Landry Architects, Erdman Anthony&Associates; Appledore Engineering Inc. Respectfully submitted, SPECIAL YESTING LABORA1'URIES, INC. Richard Speciale-Director John Hardman, P.E. Vice President Vice President THE RESULTS SHOWN ON THIS REPORT RELATE ONLY TO THE SAMPLES TESTED. THIS REPORT SHALL NOT BE USED TO CLAW PRODUCT ENDORSEMENT BY NNI AP OR,'4ATY OTHER GOVERNMENT 7GEN CY. FOREGOING INFORMATION IS THE PROPERTY OF r:,'ITENTS. REPRODUCIIGN OR PUBLICATION ONLY NVTTH OUR E7(PRESS PERNUSSION. SPECIAL TESTING LABORATORIES,INC.EXCLUDES ALL U43LZIY FOR WORTS PERFORMED BY OTHERS. Rg AREA OFFICES 24 DANBURY-HARTFORD-NEW HAVEN-NEW LONDON Prom:MIS Departrnent 203-791-2451 To-Johr Collins Date:819/02 Time:2:48:52 PM Page 1 of 4 FAX COVER SHEET SPECIAL TESTING LABORATORIES, INC. P.O.Box 200,Bethel,Connecticut 06801 Phone(4.03)743-7281 FELx(203)791-2451 fax t r a n s m i t t a l re: Stop& Shop, South Windsor from: Special Testing Laboratories date: August 9, 2002 pages: 2 NOTES: We are expediting the publication of our reports of inspections and tests performed at the above referenced project by "faxing" those reports direct from our computer network. The attached reports have been edited and proofread, but do not bear signatures and seals. Copies of these reports bearing such signatures and seals will be copied, bound, and sent to the client at the end of the project. The following reports are being faxed immediately following this cover page. Reports Dated: 8-5-02.batch plant&08-07-02.batch plant From:MIS Department 203-791-2451 To:Joan Collins Date:8/9i02 Tirne 2:48:52 PM Page 2 of 4 Client: Bartlett Brainard Eac.;ot.t Inc.,Bloomfield,CT S T L Project: Stop&Shop, Store 699,South Windsor,C"1' Contractor: Bartlett Brainard Eacott Inc. SPECIAL TESTENG LABORATORIES,INC Inspector: L. Smith PO Box 200 Bethel,Connecticut o9901 2 Date: August ac Phone�;2U3)743 ,2t31 Fax{203)19 1451 � t 6 2002 Batch Plant Report PROGRESS OF WORK: An authorized representative ofthis firm was dispatched to the above project site to inspect batch plant operations acid the following was noted: 1) Inspected ongoing batch operations at the facility of Tilcon in Hartford, CT which is supplying concrctc to the referenced project. 2)Chi this occasion a total of 190 cubic yards of 3000 psi class material was inspected,of which 120 cubic yards was provided by the East Granby CT Facility and 70 cubic yards provided by the Hartford Facility. 3) Amounts of tile, various components, as recorded on the lading tickets, were in accordance with the design mix (altered as previously noted to delete air entraining and to add fibers). No irregularities were observed in the batching operations. REPORTED TO:Client;Building Official;Ch,Nmer Representative;Landry Architects, Erdman Anthony R Associates, Appledore Engineering Inc. Respectfully submitted, SPECIAL TESTING LABORATORIES, INC. Richard Speciale-Director John Itardrnan, P.E. Vice President Vice President THE RESULTS SHOWN ON THIS REPORT RELATE ONLY TO THE SAMPLES TESTED. THIS K"UKI'SHALLNUT3E1JSEV'1U(CLALVIYI?UllUC'1'ENL)UKSEMh1N'1'bINVLAYI)RANYU'I*kIEKWi 'EP.NMErf'I'AUENCY THE FOREGOING INFORMATION IS THE PROPERTY OF CLIENTS. REPRODUCTION OR PUBLICATION ONLY WITH OUR EXPRESS PERIVIISSION. SPECIAL TESTING LABORATORIES,INC.EXCLUDES ALL LIABILITY FOR WORK PERFOMID BY OTHERS. Lf AREA OFFICES IN DANBURY-HARTFCRD-NEW HAVEN-NEW LONDON From:M Department 203-791-2451 To:John Coiling Date:8/9,02 Time-2.48:52 PM. Fage 3 of 4 Client: Bartlett Brainard Eacott Inc.,Bloomfield,CT ST L Project: Stop&Shop, Store 699,South Windsor,CT Contractor: Bartlett Brainard Eacott Inc. SPECIAL TESTING LABORATORIES,INC. Inspector: L. Smith PO Box 200 Bethel,Cormecticut 06801 Phone,;203)743 7281 Fax{203)791 2451 Late: August 5,2002 Batch Plant Report PROGRESS OF WORK: An authorized representative ofthis firm was dispatched to the above project site to inspect batch plant operations and the following was noted: However at approximately 5.20 a.m. STL inspector was advised that scheduled placement on site had been canceled due to predicted rain. REPORTED TO:Clicnt;Building Official;ON-N-ner Rcprescntativc;Landry.Architects, Erdman Anthony& Associatcs, Appledore Engineering Inc. Respectfully submitted, SPECIAL TESTING LABORATORIES, INC. Richard Spccialc-Director John Hardman, P.E. Vice President Vice President THE RESULT S SHOWN ON THIS REPORT RELATE ONLY TO THE SAvIPLES TESTED. THIS REPORT SHALL NOT BE USED TO CLADVI PRODUCT ENDORSEMENT BY N'%Z.AP OR ANY OTHER GOVERNMENT AGENCY, THE FOREGOING INFORMATION IS THE PROPERTY OF CLIENTS. REPRODUCTION OR PUBLICATION ONrLY wITH OUR EXPRESS PERMISSION. SPECIAL TESTING LABORATORIES,INC.EXCLUDES ALL LIABILr1 Y FOR NV ORK PERFORMED BY OTHERS. Lf A.K A UHIa'C S LN DANBUM-HAKI UHD-NEW HAVEN-NEW LONDON