HomeMy WebLinkAbout569 Griffin Road - WPCA SOW -0� 0-119 N SE4 co S_V f ?d&U&at C U w` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 SO CO TELEPHONE (860) 644-2511 November 28, 2018 South Windsor Board of Education C/O The LRC Group Henry Thomas 160 West Street, Suite E Cromwell, CT 06416 RE: 569 Griffin Road — Eli Terry Elementary School WPCA Approval — P&Z Application No. 18-37P Dear Mr. Thomas: The South Windsor Water Pollution Control Authority, at its regular meeting of November 7, 2018, approved the application as presented for connection to the Town's sewerage system for the proposed 66,924 sq. ft. elementary school, on property located at 569 Griffin Road, South Windsor, CT and as more specifically shown on plans entitled "Town of South Windsor, Eli Terry Elementary School, 569 Griffin Road, South Windsor, CT 06074", Prepared by LRC Group, Cromwell, CT. Drawing No. C3.0 "Overall Grading & Utilities Plan", Drawing No. C3.1, C3.2, C3.3 "Grading & Utilities Plan Enlargement", and Drawing No. C5.3 "Site Utility Details", dated 7/3/2018, Revisions: 8114/18, 8/31/18, 9/25/18 and 10/31/18. This approval is subject to the following conditions: 1. Move rip rap away from the sewer line; 2. Technical approval of the Town of South Windsor Engineering Department; and 3. Final Authority approval and acceptance of the sanitary sewerage connection is conditioned upon the installed sewer line having been inspected by the Town staff, and upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans approved by the Authority, and meeting all regulations and appropriate technical specifications relating to sanitary sewer construction. This approval letter must be superimposed on the final approval plans. Sincerely yours, Rich d Aries, Chairman Wat r Pollution Control Authority RA:ead cc: Michael J. Gantick, Director of Public Works Jeff Doolittle, Town Engineer Michelle Lipe, Town Planner Chris Dougan, Chief Building Inspector TOWN OF SOUTH WINDSOR WATER POLLUTION CONTROL AUTHORITY APPLICATION FORM Application No.: Date Received Date Scheduled For Applicant 4�40U-lu Wiwi. ' e Zau, 4GX,&&V> 15012D Or C-D .A'1td,J Address 031 MA VJ ST. SOJN W%^5t 6QfL. Qr- Cka>'kl Telephone No.: S(oo 211 - 1206 Owner of Record on Land Records I Owo or ,7"tl LJ1,y75-0(Z Owner's Address 11540 120tkwAti iiwif lz ii U-%'s; Solt Property Description: Assessor's Map# IS1 Parcel# 11 Vol. �Page 3"l Project Title: Eli -7604H agwienX'qgy SLAG Inquiries to be Directed to: (Name,Address,Telephone No.) 1 iVi2'! -n40M 5 , AA L12C: 6gn%Wi' KeD WC-2r) <J. 020nMWIEUL CT at 41(p 4 35- 20-77 Approvals Previously Received(Check) IWA ✓ P&Z ✓ ZBAl�s Purpose of Application: (Check all that apply) 1. Sewer Extension/Connection - -Residential Use a. Subdivision b. Single Unit c. Other Explain d. Type of Approval: Concept Final 2. Sewer Extension/Connection- - Industrial/Commercial User a. New Connection_V b. Request to Increase Flow Rate c. Change in Nature of Waste Discharge d. Other Explain e. Type of Approval: Concept Final 3. Appeal of Sewer User Charge a. Residential b. Industrial/Commercial 4. Sewer Assessment a. Establish Sewer Assessment b. Appeal of Sewer Assessment c. Change in Use of Property 5. Regulatory Appeal ,Explain 6. Other Explain (� �v�- to[.2(p j(� Applicant's Signature Date - )e Owner's Signature Date p --� LETTER OF TRANSMITTAL Date: November I, 2018 Re: Eli Terry Elementary School LRC job# 17-2144 via Hand Delivery Attn: Town of South Windsor Water Pollution Control Authority Vibert Road South Windsor, CT We are sending: ® Attached ❑ Separate Cover via: E Prints ❑ Correspondence ❑ Permit Apps ❑ Change Order ❑ Shop Drawings ❑ Specifications ❑ Samples Other #Copies Date Sheet No. Description 2 7/3/18 C3.0—C3.3 i Grading& Utility Plans and Construction Details Revised last on &C5.3 10/31/18 2 7/3/18 - ec Projt Narrative revised 9/19/18 Project_ --- - I WPCA Application Form These are transmitted (as checked below): E For Approval Approval as Submitted ❑ Resubmit ❑ Copies for Approval ❑ For Your Use Approval as Noted ❑ Submit ❑ Copies for Distribution As Requested Returned for Corrections ❑ Return ❑ Corrected Prints For Review/Comment For Bids Due: Returned after Loan Remarks: Copy To: Project File From: "4Vn o I de�_ Signed: Land Resource Consultants,Inc. 160 West Street,Suite E LRC Engineering&Surveying,P.C. Cromwell,CT 06416 LRC Environmental Services,Inc. Tel: (860)635-2877 LRC Engineering and Surveying,LLC Connecticut Certified SBE Fax: (860)635-4226 Offices in Connecticut and New York www.Ircconsult.com Land Planning • Civil Engineering 0 Environmental Services 4 Land Surveying • Landscape Architecture ELI TERRY ELEMENTARY SCHOOL Project Narrative July 3, 2018; Revised Sept 6, 2018 Revised Sept 19, 2018 GENERAL DESCRIPTION OF THE SCHOOL AND SITE: The site for the proposed new Eli Terry Elementary School is the existing site of the current Eli Terry Elementary School. The replacement of the school is an element of Phase 2 of the "South Windsor Public Schools Elementary Schools Master Plan" adopted by the South Windsor Board of Education on October 29, 2013. The current school building of 52,296 s.f. (exterior dimensions) will be replaced by a new building of 66,886 s.f. (exterior dimensions) as originally submitted. In order to accommodate changes in enrollment expectation, the proposed building includes 2 classroom spaces as an alternate to the project, which brings the revised footprint and total area of the building to 69,391 square feet The new school building will provide for contemporary standards for space provisions and teaching environments/technologies, as well as modern lighting, mechanical and plumbing systems. Of special note, specific programs include the District's medically fragile program and our district elementary intensive program. The proposed site plan configuration is anchored in the requirement that the existing school building remain in operation while the new building is constructed. The siting of the new building accommodates this constraint and allows for the site to remain occupied during construction. When complete, the school will have increased parking capacity (from 96 to 117 spaces) and new game fields and playgrounds. It should be noted that available parking at the school has not always been 96 spaces, and that in recent years spaces have been striped on existing pavements to bring the existing total up to 96. Access into the site for automobiles, buses and service traffic will continue by way of the property's driveway corridor from Griffin Road. Existing parking spaces along this drive will be removed and accounted for in new parking areas in the site. Parent and medically fragile student drop-off activities will occur along the west side of the new building and all such traffic will exit to Griffin Road as they do today. Bus loading and unloading will occur on the north side of the new building and exit (only) to Graham Road. Buses exiting onto Graham Rd. occurs only twice a day. This allows for separation of traffic and boarding activities. This bus and exit only route to Graham Road will be gated off to restrict the use of the exit to buses and delivery or service vehicles only. A paved firelane (doubling as a pedestrian and bicycle trail) circulates through the back of the school. During school hours,this drive will be gated off to prevent vehicular access. In addition to improvements for vehicular circulation, the property will also be served by walks and multi-modal trails from both Griffin and Graham Roads and connect to proposed town improvements LRC Engineering&Surveying,D.P.C. Land Resource Consultants,Inc. 160 West Street,Suite E LRC Engineering&Surveying,P.C. Cromwell,CT 06416 LRC Environmental Services,Inc. Tel: (860)635-2877 LRC Engineering and Surveying,LLC Connecticut SBE Certified Fax: (860)635-4226 Offices in Connecticut,New York&New Jersey www.Ireconsult.com Land Planning 4 Civil Engineering 4 Environmental Services • Land Surveying • Landscape Architecture to trails and an existing crossing of the Podunk River at the southwest corner of the school site. This connectivity is consistent with the accessible route requirements throughout the school property. PARKING. In regards to parking, the applicant is requesting modification or relief from the parking requirement of Table 6.4.3.13. Using the table's rate of I space per 2S0 s.f. of gross floor area for educational use, the proposed building would require 278 parking spaces. Such a requirement far exceeds the school day need for parking at the site, and beyond the impact to the site and additional impervious coverage, it would be impractical to maintain and costly to construct over twice the amount of parking proposed by the current plan. Faculty and staff currently number 88-90 people, leaving 27 parking spaces available for use by visitors and parents during a typical school day — an increase of 2! spaces over existing conditions. These 27 spaces represent 24% of available parking spaces. Administrative staff believes this is sufficient parking for typical school day needs. The total oermonent parking being provided is also a practical limit when balancing the siting of the building and program requirements such as play, recreational fields and services to the building, .,s well as considerations for the amount of impervious surface and the related stormwater quality management improvements that accompany parking. Overflow parking is accounted for in 3 areas: staff parking (double stacked) on the paved game court adjacent to the cafeteria, and in two turf zones adjacent to the paved parking area - one just off the western edge of the parking lot, and another just off the south edge of the parking lot, both accessible by the provision of sloped curb sections. Similar to existing conditions, additional overflow parking can be provided on the new game field at the west side of the site which is made accessible by means of a sloped curb profile at the northwest most corner of the new parking area. SITE LIGHTING: Site lighting is provided by the use of high performance, full cut-off and low profile (small size) post mounted fixtures with LED lamp sources. The fixtures are mounted primarily at 12' height with some fixtures in the interior of the parking lot being set at 16'height. The nature of the fixture housing, optics and LED lamp source provides for very crisp control of the light patterns and sharp cutoff of back lighting where lights are located on the perimeter of parking areas and drives. Being full cutoff fixtures are "dark sky"friendly and compliant with the zoning requirements. The LED lamps are specified at a color temperature of 3,000K (Kelvin) which is worm and closer to incandescent light temperature. On typical school days, pole mounted lighting will be turned on throughout the site at nightfall by means of light sensors, and will be turned off by timeclock at 11:30 p.m. This schedule accommodates the regular anticipated occupancy of the facility until 1 1:00 p.m. Pole mounted site lighting will be activated at 4:00 a.m. by timeclock controller, and will remain on until turned off by photocell as sufficient daylight breaks. Excepting lighting at the school's main entrance that may be ornamental in nature, all building mounted lighting associated with exit and entrance doors will be full cut-off in nature, design to cost light down onto walking surfaces, and fixtures will not have exposed lamp sources. TRAFFIC CONTROL GATES: Page 2 of 4 I A sliding traffic control gates is installed between the traffic circle or "round about" and the bus loading and unloading zone along the north side of the school. A second swinging pipe gate is installed on the exit drive to Graham Road at the approximately 155' back from the property line at Graham Road. These gates will be closed by school personnel after all busses have discharged students for morning arrival, and will remain closed until school dismissal and bus loading activities begin. Gates will generally remain closed evenings, nights and weekends to prevent automobile or service traffic from passing through the playground area except when specifically opened by school staff to facilitate service and deliveries (generally occurring immediately before or after school hours—see section below regarding service and deliveries). STUDENT LOADING AND UNLOADING: Buses will discharge students on the curbline at the north end of the school as they arrive at the site. Students will be monitored and guided by school staff to ensure that students are kept out of the bus travel lanes, and that students walking to the site use the raised and delineated crosswalks at either end of the bus staging zone. After school student loading will occur when all buses are staged in the two parallel bus lanes. The buses staged in the lane closest to the curbline will be loaded first, and when ready, be released as a group. Only then will students be loaded into the second line of busses in the outside lane. Similar to the first line, when ready, the second line of busses will be released as a group. School staff will be in the bus loading zone to facilitate safe student boarding and dismissal. Parents may discharge students directly to the sidewalk by means of the curbline on the west side of the school. Students will be monitored and guided by school staff to ensure that students are kept out of the travel lanes. Parents may also park and walk students to the front door area. Walking and bike riding students must have written permission to do so from parents. Typically, young students who walk out to Graham are accompanied by their parents. SERVICE AND DELIVERY TRAFFIC: Trash Collection will be scheduled to occur before the bus loading period. Collection of general trash is anticipated to occur 3 times per week during the school year. Collection of recyclables trash is anticipated to occur no more than 2 times per week during the school year. Note that dumpsters are located on a heavy duty concrete pad and enclosed by a solid wood panel fence and gate. Food services and supply deliveries will be made to the school's loading dock before the bus loading period, and at specific times: no earlier than 7:30 am —8:00 am 9-10:30 am and 2-3 pm (this is designated by food services staff hours of operation and planned around arrival/dismissal and recess waves). Mail, UPS and Fed Ex deliveries which are typically made during the school day will arrive at the parent drop off curbline and make deliveries to the Main Office via the school's main entrance. LANDSCAPE TREATMENTS: Landscape plantings shown on the plans are shown with the intent of compliance with the zoning regulations for Landscape and Buffers (Section 6.2) and Parking Lot Landscaping(Section 6.4.6 and table 6.4.6.A). Beyond those requirements, new tree plantings have been included for future shade benefits related to play areas, or for enhancing the school image/entrance experience, however, excessive new planting simply for ornament or decoration has been avoided, particularly around the immediate building perimeter. Plants have Page 3 of 4 been selected for durability and hardiness, and are native or variations on natives to minimize or eliminate requirements for supplemental watering(once established). Proposed plantings are appropriate to the scale of a new public school project and are not excessive or rising to the level of landscape improvements on might find on commercial properties. z:\landresourceconsultants\2017 jobs\17-2144 mpn sw eli terry\docs\permitting\town\draft applications\pzc\et special exception narrative rev 09-19-18.docx Page 4 of 4