Loading...
HomeMy WebLinkAbout07-04P Cusson Enterprises Office Ex TOWN OF SOUTH WINDSOR PLANNING&ZONING COMMISSION ova N se APPLICATION FORM AV Application No: O px _ Official Re ceipt Date: l Z3 7 x Receipt No: JAN 1 6� 07 � 0i-N SOUTH Vvr�q �R P�ANINIP r_ APPLICANT: PROJECT NAME: ADDRESS: 02 li ^ OWNER OF RECORD ON LAND RECORDS: ADDRESS: COMPLETE LOCATION OF PROPERTY: L ASSESSOR'S MAP# PARCEL#Leif 3' ZONE NAME, ADDRESS, TEL 8s FAX# OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: 40 Estimated presentation time: THIS APPLICATION IS FOR: (Check all that apply): ❑ Zone Change to g (Public Hearing required and Certified letter to abutters required) ❑ Subdivision/Resubdivision ❑ Open Space Subdivision (Public Hearing Required) ❑ Subdivision ❑ Minor ❑ Major ❑ Resubdivision (Public Hearing Required) ❑ Minor❑ Major ❑ Conditional Approval ❑ Special Exception to Article (Public Hearing, Certified letter to abutters required) Site Plan of Development ❑ General Plan of Development 0 Earth Filling(Sec. 15) and/or Earth Removal (Sec. 14 - Public Hearing Required) ❑ Regulation Amendment ❑ Zoning ❑ Subdivision (Attach proposed amendment) (Public Hearing Required) ❑ Temporary and Conditional Permit for (Public Hearing.Required) ❑ In Law apartment/Accessory Apartment (Public Hearing Required) ❑ Major Home Occupation for (Public Hearing Required) ❑ Other(explain in detail) An Application Pending sign is required to be posted on the property for all applications ten (10) days prior to being heard by the Commission. Signature of Applicant Signa ure of Property Owner t0y1N SF4 T19v O-P sow ?&U&o�t 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 r�OSOR-CO TELEPHONE (860) 644-2511 CERTIFIED MAIL January 17, 2007 Donald Cusson Cusson Enterprises 29 Mascolo Road South Windsor, CT 06074 Dear Mr. Cusson: Re: App107-04PX, Cusson Automotive Addition We are pleased to advise you that the above referenced application has been approved. This approval is for the construction of a 460 sf office addition on property located at 29 Mascolo Road, I zone, as shown on plans prepared by Messier Associates,dated 12/06, as revised subject to the following: 1. No building permit will be issued until the final mylar have been filed in the Town Clerk's office. 2. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.11 of the Zoning Regulations. 3. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 4. Pavement markings must be maintained in good condition throughout the site drives and parking areas. 5. All free standing signs and/or building signs require the issuance of a sign permit before they are erected. Black and white transparent mylars of Sheet #1 with the above modifications, together with three blueprint copies of the plans must be submitted to this Commission to be stamped and signed. After the mylar have been signed by the Commission,they will be returned to you for filing in the Office of the Town Clerk. Sincerely, a nck Kennedy, Chai Planning and Zoning Commission PK/bmm cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal