1540 SULLIVAN AVENUE a SOUTH WINDSOR, CT 06074
r�OSOR-CO TELEPHONE (860) 644-2511
October 15, 2018
David Lombardo
Seal-Pro,Inc.
721 Burnham Street
East Hartford, CT 06108
RE: 40 Sea Pave Road
WPCA Approval/P&Z Application No. 18-38P
Dear Mr. Lombardo:
The South Windsor Water Pollution Control Authority, at its regular meeting of October 2, 2018, approved the
application as presented for connection to the Town's sewerage system for two proposed industrial buildings,on
a portion of land located east of Sea Pave Road, Industrial (1) Zone, also known as 40 Sea Pave Road, South
Windsor, CT, and as more specifically shown on plans entitled "40 Sea Pave Road, Proposed Site
Improvements, 440 Sea Pave Road, South Windsor, Connecticut". Project No.: 18-149, Dated July 15, 2018,
Revised to August 22, 2018 and prepared by Juliano Associates, Wallingford, CT. Sheet 1 of 8 "Property &
Topographic Survey", Dated 6/14/18 and Sheet No. 3 of 7 "Site Development Plan", dated 6/14/18. This
approval is subject to the following conditions:
1. Payment of the following charges will be due at the time of connection, the rates for which will be in
effect until June 30, 2019:
a. Connection Charge in the amount of$2,930.35 for 1.03 acres;
b. Capacity Charge, in the amount of$6,637.50; and
c. Lateral Charge in the amount of$2,400 for two laterals.
2. Installation of a monitoring sewer manhole between the building sewer and the connection to the sewer
lateral in the road;
3. A copy of a 20' minimum easement allowing the Town access to the private property for sewer
monitoring purpose; the easement must be reviewed, and approved by the Town; and the drawings
presented will be modified to reflect said easements.
4. Technical approval of the Town of South Windsor Engineering Department; and
5. Final Authority approval and acceptance of the sanitary sewerage connection is conditioned upon the
installed sewer line having been inspected by the Town staff, and upon the written verification of the
Town staff that said sanitary sewer line was installed in substantial conformance with the design plans
approved by the Authority, and meeting all regulations and appropriate technical specifications relating
to sanitary sewer construction.
Sincerely yours,
Rich A ies,
Water Po tion Control Authority
RA:ead
cc: Michael J. Gantick,Director of Public Works
Jeff Doolittle,Town Engineer
Michelle Lipe,Town Planner
Chris Dougan, Chief Building Inspector
SOUTH WINDSOR COMMERCIAL/INDUSTRIAL SEWER FEES
1. OWNER INFORMATION 2. PROPERTY INFORMATION
LAST NAME FIRST PLANNING APPLICATION#
LOMBARDO DAVID 18-38P
COMPANY(IF APPLICABLE) ADDRESS
SEAL-PRO, INC. 40 SEA PAVE
STREET ADDRESS SUBDIVISION/COMPLEX NAME
721 BURNHAM ST.
CITY STATE ZIP LOT#(IF APPLICABLE)
E. HARTFORD CT 6108 MAP#7 PARCEL 18-5 VOL.2623 PAGE 230
PHONE: 860.289.0804
EMAIL: DAVE@SEALPRO-INC.COM
3. HAS THE PROPERTY PAID A PREVIOUS ASSESSMENT?
[ ] TOWN INSTALLED SEWER,UNASSESSED PROPERTY - [X] DEVELOPER INSTALLED SEWER-
CONTINUE TO STEP 4 CONTINUE TO STEP 5
[ ] TOWN INSTALLED SEWER,PAID ASSESSMENT- [ ] OTHER
CONTINUE TO STEP 6
4.ASSESSMENT CALCULATION ZONE MINIMUM FRONTAGE
MINIMUM ZONE FRONTAGE I or GC 100'
COST PER FOOT x $80 RC,TS(on Route 5),DC
TOTAL N/A or R5NOZ 150'
GD or RO 200
S. NEW CONSTRUCTION CAPACITY CHARGE
#OF WATER METERS 2- 1.25"
EDU (TOTAL OF EACH METERS EDU) 2.5 EQUIVALENT DWELLING UNIT VALUE TABLE
BASE FEE x $2,655 EDU WATER METER SIZE(inches)
TOTALI $6,637.50 1 < 1
2 1
6.CONNECTION CHARGE(IF APPLICABLE) 3 1.5
BUILDABLE ACRES 1.03 4 2
CONNECTION CHARGE x $3,845 6 3
TOTAL $ 2,930.35 8 4
12 6
7. LATERAL CHARGE(IF APPLICABLE) 16 8
#of LATERALS 2 20 10
LATERAL CHARGE x $1,200 24 12
TOTAL $ 2,400.00
8.TOTAL FEES OFFICE USE ONLY
TOTAL OF STEP 4 N/A NOTES:
TOTAL OF STEP 5 $6,637.50 WPCA APPROVAL ON 10/2/18
TOTAL OF STEP 6 $2,930.35
TOTAL OF STEP 7 $2,400.00
TOTAL FEE $11,967.85 10/16/2018
PRINT AND SIGN DATE
REVISED JULY 2018
TOWN OF SOUTH WINDSOR
WATER POLLUTION CONTROL AUTHORITY
APPLICATION FORM
Application No.:
Date Received
Date Scheduled For
Applicant DRL Realty, LLC
Address 40 Sea Pave Road
Telephone No.:
Owner of Record on Land Records DRL Realty,LLC
Owner's Address 721 Burnham Street, East Hartford, CT 06108
Property Description:
Assessor's Map# 7 Parcel# 18-5 Vol. 2623 Page 230
Project Title: Proposed Use for 40 Sea Pave Road
Inquiries to be Directed to: (Name,Address,Telephone No.) David Lombardo-721 Burnham
Street, East Hartford, CT 06108; 860-289-0804; dave@sealpro-inc.com
Approvals Previously Received(Check) IWA P&Z ZBA
Purpose of Application: (Check all that apply)
1. Sewer Extension/Connection--Residential Use
a. Subdivision
b. Single Unit
c. Other Explain
d. Type of Approval: Concept Final
2. Sewer Extension/Connection- -Industrial/Commercial User
a. New Connection_X
b. Request to Increase Flow Rate
c. Change in Nature of Waste Discharge
d. Other Explain
e. Type of Approval: Concept Final _
3. Appeal of Sewer User Charge
a. Residential
b. Industrial/Commercial
4. Sewer Assessment
a. Establish Sewer Assessment
b. Appeal of Sewer Assessment
c. Change in Use of Property
5. Regulatory Appeal ,Explain
6. Ot Explain
pplican ' store '� Date f
_! Z 7
wn �/er's Signature Date
(See Reverse Side for Application Submittal Procedures)
APPLICATION SUBMITTAL PROCEDURES
1. The Water Pollution Control Authority (W.P.C.A.) meets regularly on the first
Tuesday of each month, except during the months of July and August. Check
with W.P.C.A. Office (644-2511, extension 247) for meeting dates during these
months.
2. All applicants requesting "final" approvals are required to have the prior
approvals of IWA, P&Z and ZBA as appropriate.
3. It is suggested that prospective applicants contact the W.P.C.A. Office prior to
submission of application.
4. Two sets of completed plans must be included, where appropriate, at the time the
application is submitted.
5. Applications must be submitted to the W.P.C.A. Office in the Town Hall, 1540
Sullivan Avenue, South Windsor, Connecticut at least seven (7)working days
prior to the date of the W.P.C.A. meeting.
6. After staff review, the Town will notify applicant if any further information is
required, and the date of the W.P.C.A. meeting at which the application will be
considered by the Town.