Loading...
HomeMy WebLinkAbout40 Sea Pave Road - WPCA Application, Approval Letter y ' r �_OZll1'L O-P siolum ?d&U&1at o C U S � 1540 SULLIVAN AVENUE a SOUTH WINDSOR, CT 06074 r�OSOR-CO TELEPHONE (860) 644-2511 October 15, 2018 David Lombardo Seal-Pro,Inc. 721 Burnham Street East Hartford, CT 06108 RE: 40 Sea Pave Road WPCA Approval/P&Z Application No. 18-38P Dear Mr. Lombardo: The South Windsor Water Pollution Control Authority, at its regular meeting of October 2, 2018, approved the application as presented for connection to the Town's sewerage system for two proposed industrial buildings,on a portion of land located east of Sea Pave Road, Industrial (1) Zone, also known as 40 Sea Pave Road, South Windsor, CT, and as more specifically shown on plans entitled "40 Sea Pave Road, Proposed Site Improvements, 440 Sea Pave Road, South Windsor, Connecticut". Project No.: 18-149, Dated July 15, 2018, Revised to August 22, 2018 and prepared by Juliano Associates, Wallingford, CT. Sheet 1 of 8 "Property & Topographic Survey", Dated 6/14/18 and Sheet No. 3 of 7 "Site Development Plan", dated 6/14/18. This approval is subject to the following conditions: 1. Payment of the following charges will be due at the time of connection, the rates for which will be in effect until June 30, 2019: a. Connection Charge in the amount of$2,930.35 for 1.03 acres; b. Capacity Charge, in the amount of$6,637.50; and c. Lateral Charge in the amount of$2,400 for two laterals. 2. Installation of a monitoring sewer manhole between the building sewer and the connection to the sewer lateral in the road; 3. A copy of a 20' minimum easement allowing the Town access to the private property for sewer monitoring purpose; the easement must be reviewed, and approved by the Town; and the drawings presented will be modified to reflect said easements. 4. Technical approval of the Town of South Windsor Engineering Department; and 5. Final Authority approval and acceptance of the sanitary sewerage connection is conditioned upon the installed sewer line having been inspected by the Town staff, and upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans approved by the Authority, and meeting all regulations and appropriate technical specifications relating to sanitary sewer construction. Sincerely yours, Rich A ies, Water Po tion Control Authority RA:ead cc: Michael J. Gantick,Director of Public Works Jeff Doolittle,Town Engineer Michelle Lipe,Town Planner Chris Dougan, Chief Building Inspector SOUTH WINDSOR COMMERCIAL/INDUSTRIAL SEWER FEES 1. OWNER INFORMATION 2. PROPERTY INFORMATION LAST NAME FIRST PLANNING APPLICATION# LOMBARDO DAVID 18-38P COMPANY(IF APPLICABLE) ADDRESS SEAL-PRO, INC. 40 SEA PAVE STREET ADDRESS SUBDIVISION/COMPLEX NAME 721 BURNHAM ST. CITY STATE ZIP LOT#(IF APPLICABLE) E. HARTFORD CT 6108 MAP#7 PARCEL 18-5 VOL.2623 PAGE 230 PHONE: 860.289.0804 EMAIL: DAVE@SEALPRO-INC.COM 3. HAS THE PROPERTY PAID A PREVIOUS ASSESSMENT? [ ] TOWN INSTALLED SEWER,UNASSESSED PROPERTY - [X] DEVELOPER INSTALLED SEWER- CONTINUE TO STEP 4 CONTINUE TO STEP 5 [ ] TOWN INSTALLED SEWER,PAID ASSESSMENT- [ ] OTHER CONTINUE TO STEP 6 4.ASSESSMENT CALCULATION ZONE MINIMUM FRONTAGE MINIMUM ZONE FRONTAGE I or GC 100' COST PER FOOT x $80 RC,TS(on Route 5),DC TOTAL N/A or R5NOZ 150' GD or RO 200 S. NEW CONSTRUCTION CAPACITY CHARGE #OF WATER METERS 2- 1.25" EDU (TOTAL OF EACH METERS EDU) 2.5 EQUIVALENT DWELLING UNIT VALUE TABLE BASE FEE x $2,655 EDU WATER METER SIZE(inches) TOTALI $6,637.50 1 < 1 2 1 6.CONNECTION CHARGE(IF APPLICABLE) 3 1.5 BUILDABLE ACRES 1.03 4 2 CONNECTION CHARGE x $3,845 6 3 TOTAL $ 2,930.35 8 4 12 6 7. LATERAL CHARGE(IF APPLICABLE) 16 8 #of LATERALS 2 20 10 LATERAL CHARGE x $1,200 24 12 TOTAL $ 2,400.00 8.TOTAL FEES OFFICE USE ONLY TOTAL OF STEP 4 N/A NOTES: TOTAL OF STEP 5 $6,637.50 WPCA APPROVAL ON 10/2/18 TOTAL OF STEP 6 $2,930.35 TOTAL OF STEP 7 $2,400.00 TOTAL FEE $11,967.85 10/16/2018 PRINT AND SIGN DATE REVISED JULY 2018 TOWN OF SOUTH WINDSOR WATER POLLUTION CONTROL AUTHORITY APPLICATION FORM Application No.: Date Received Date Scheduled For Applicant DRL Realty, LLC Address 40 Sea Pave Road Telephone No.: Owner of Record on Land Records DRL Realty,LLC Owner's Address 721 Burnham Street, East Hartford, CT 06108 Property Description: Assessor's Map# 7 Parcel# 18-5 Vol. 2623 Page 230 Project Title: Proposed Use for 40 Sea Pave Road Inquiries to be Directed to: (Name,Address,Telephone No.) David Lombardo-721 Burnham Street, East Hartford, CT 06108; 860-289-0804; dave@sealpro-inc.com Approvals Previously Received(Check) IWA P&Z ZBA Purpose of Application: (Check all that apply) 1. Sewer Extension/Connection--Residential Use a. Subdivision b. Single Unit c. Other Explain d. Type of Approval: Concept Final 2. Sewer Extension/Connection- -Industrial/Commercial User a. New Connection_X b. Request to Increase Flow Rate c. Change in Nature of Waste Discharge d. Other Explain e. Type of Approval: Concept Final _ 3. Appeal of Sewer User Charge a. Residential b. Industrial/Commercial 4. Sewer Assessment a. Establish Sewer Assessment b. Appeal of Sewer Assessment c. Change in Use of Property 5. Regulatory Appeal ,Explain 6. Ot Explain pplican ' store '� Date f _! Z 7 wn �/er's Signature Date (See Reverse Side for Application Submittal Procedures) APPLICATION SUBMITTAL PROCEDURES 1. The Water Pollution Control Authority (W.P.C.A.) meets regularly on the first Tuesday of each month, except during the months of July and August. Check with W.P.C.A. Office (644-2511, extension 247) for meeting dates during these months. 2. All applicants requesting "final" approvals are required to have the prior approvals of IWA, P&Z and ZBA as appropriate. 3. It is suggested that prospective applicants contact the W.P.C.A. Office prior to submission of application. 4. Two sets of completed plans must be included, where appropriate, at the time the application is submitted. 5. Applications must be submitted to the W.P.C.A. Office in the Town Hall, 1540 Sullivan Avenue, South Windsor, Connecticut at least seven (7)working days prior to the date of the W.P.C.A. meeting. 6. After staff review, the Town will notify applicant if any further information is required, and the date of the W.P.C.A. meeting at which the application will be considered by the Town. w:poll.controUshaw/poll.controVadmin./wPcAIWPcA Appt.