Loading...
HomeMy WebLinkAbout17-48P Evergreen Walk LLC General Plan Unit 16 TOWN OF SOUTH WINDSOR PLANNING ds ZONING COMMISSION AFPLICATION FORM RECIP VSP Application Number: ` Official Receipt Date: t z-l z- 1°7 - Munis Application #: 4 SOUTH MNDSM PLANNING DEPT. APPLICANT: Evergreen Walk, LLC A r:4, 9 -)r)3 � PROJECT NAME: Evergreen Walk/GDZone COMPLETE LOCATION OF PROPERTY: 151 Buckland Road OWNER OF RECORD ON LAND RECORDS: ___. Evergreen Walk, LLC OWNER ADDRESS: 1109 Rose Lane, Virginia Beach, VA 23451 GIS PIN#_ r 5-36 0 15, J ZONE rn7: NAME, ADDRESS,TELEPHONE 8s EMAIL ADDRESS OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: Alan F. Lamson, 19 Silver Lane, East Hartford, A 141J 0 Sb8-4030 alamson@flbarch.com @flbarch.com C-07 c„ D q 30 G, Estimated presentation time3o °miry. THIS APPLICATION IS FOR.\(Check all that apply): ❑ Zone Change to (Public Hearing and Certificate of Mailing Required) ❑ Open Space Subdivision/Resubdivision (Public Hearing and Certificate of Mailing Required) ❑ Subdivision ❑ Minor ❑ Major ❑ Resubdivision(Public Hearing Required) ❑ Minor ❑ Major ® Conditional Subdivision ❑ Special Exception to Table (Public Hearing and Certificate of Mailing Required) ❑ Site Plan,of Development ❑ New ❑ Modification Building(s) Sq Ft ® General Plan of Development (Modification) ❑ Dept of Motor vehicle License-State Hearing per Section 14-55 for ❑ Earth Filling(Sec. 7.6)and/or Earth Removal(Sec. 7.16) (Public Hearing and Certificate of Mailing Required) ❑ Regulation Amendment ❑Zoning ❑Subdivision-Attach proposed amendment(Public Hearing Required) ❑ Temporary and Conditional Permit(Public Hearing Required) for ❑ Temporary and Conditional Permit Renewal for ❑ Detached In Law Apartment or❑Accessory Apartment (Public Hearing and Certificate of Mailing Required) ❑ Major Home Occupation (Certificate of Mailing Required)for ❑ Other(explain in detail) *An Ap on Pending Sign is required to be posted on the pro erty far all applications ten{10)days prior to being heard by the Co salon. Signature of Applicant Signature v o Owner John Fingu rra._Evergreen Walk. LLC John F ing terra l EvPrvrP%n Fnl k_ T .Print Name of Applicant it's Member Print Name of Property Owner It's Member Revised 2/2014 FLB Architecture & Planning, Inc. 19 Silver Lane East Hartford CT 06118 (860)568-4030 fax: (860)568-5129 e-mail:flb@fibarch.com web:www.fibarch.com LETTER OF TRANSMITTAL P:\99508.00\General Plan Of Development 2017 HRA\Application Date 12/8/17 Project No. 99508.00 171208\PZC 171208 Application.Dotx Attention Michele Li e To: Planning and Zoning Commission Project Evergreen Walk Town of South Windsor General Plan of Development -- E Modification to Unit 16 We are sending you ® Attached ❑ Under separate cover via the following items: ® Prints ❑ Copy of letter ❑ Shop drawings ❑ Original tracings ❑ Copy of memo ❑ Samples El Specifications p ❑ Change order proposal request ❑ Code modification request ❑ Request for Payment ❑ Change order ® Other as described below Item no. Copies Date No. Description 1 2 12/8/17 Application Form 2 3 12/8/17 S1-S3 General Plan of Development THESE ARE TRANSMITTED as checked below: ❑ As requested ❑ Approved ❑ Resubmit copies for approval ❑ For your use ❑ Furnish as corrected ❑ Submit copies to distribute ❑ For review ❑ Rejected ❑ Return corrected prints &comment ❑ Submit specific item ❑ ® For approval ❑ For bids due ❑ Prints returned after loan to us Remarks: Submitted to reflect chan es in Proposed building laygut on Unit 16 Copy to: file: Evergreen Walk LLC, HRA Alan F. La on,AIA,AICP t If enclosures are not as noted,kindly notify us at once. y i i i #i E 3 t FLB Architecture & Planning, Inc. 19 Silver Lane East Hartford CT 06118 j (860)568-4030 fax: (860)568-5129 e-mail: flb@flbarch.com web:www.fibarch.com i TO: Michele Lipe, Town Planner Town of South Windsor FROM: Alan F. Lamson, AIA AICP 4f 1.."' DATE: December 12, 2017 RE: Evergreen Walk General Plan of Development Project No. 99508.00 On Friday, December 8, 2017 we filed an application for a modification to the General Plan of Development for Evergreen Walk. The purpose of the application is to satisfy a requirement for the approval and sale of Unit 16 at Evergreen Walk (the parcel immediately north of LA Fitness). This modification proposes no change to, or increase in, the previously approved land use types or the amount of proposed development of each land use type. The sole change being proposed is the building layout on the Unit 16 to more closely reflect the layout that will be a part of a subsequent application for that unit for a special exception for assisted living and site plan approval. c: file F:\_FLB\OFFICE FORMS\FLB Templates\FLB Communications\FLB Memo.Doc s PLANNING DEPARMENT IN-HOUSE REFERRAL FORM DATE: 12/11/17 TO: Matt Galligan, Fred Shaw, Michael Gantick, Walter Summers, Jeff Doolittle Ray Favreau, Chris Dougan, Heather Oatis, Kevin Cooney, Tony Manfre, John Caldwell, Andrea Confrancesco, Chris Duchesne, Vincent Stetson FROM: Michele Lipe, AICP, Director of Planning The Planning&Engineering Departments have received plans for the following projects: Appl 17-48P, Evergreen Walk General Plan of Development Update Location: 151 Buckland Road ❑ Site Plan ❑ Subdivision No. Acres 232 ac Zone Buckland Gateway ❑ Industrial ® Commercial ® Residential No. Lots/Units Water: ® Public ❑ Private Well Sewerage: ® Public ❑ Septic System Project Description: Proposed changes to the approved General Plan Future Town-owned property involved? ❑ Yes ®No ❑ new street(s) ❑ new detention area ❑ new open space/recreation area ❑ active ❑passive Planning Department notes: To add an Assisted Living Facility immediately north of LA Fitness Please comment by 12/26/17 and return to the Planning Department. General Plan is in the Planning Department ®146 Hartford Road,Manchester,CT 06040 ❑50 Redfield Street,Ste.100,Boston,MA 02122 FUSS&O NEIT j TEL:(860)646-2469 FAX:(860)533-5143 TEL:(617)282-4675 FAX:(617)282-8253 �-+ �-+1, ❑56 Quarry Road,Trumbull,CT 06611 0317 Iron Horse Way,Ste.204, Providence,RI 02908 TEL:(203)374-3748 FAX:(203)374-4391 TEL:(401)861-3070 FAX:(401)861-3076 ❑78 Interstate Drive,West Springfield,MA 01089 [1717 Lady Street,Suite E,Columbia,SC 29201 TEL:(413)452-0445 FAX:(413)846-0497 TEL:(803)376-6034 FAX:(803)376-6035 Letter of Transmittal To: Date: 12/19/17 Jeffery Foldeer/Michele Lipe,AICP Project No: 2000481.A18 Task No.: 10000 Director of Planning Town of South Windsor Re: Evergreen Walk 1540 Sullivan Avenue South Windsor CT 06074 South Windsor,CT Telephone No: 860-644-2511 x252 We are sending you: ®Attached ❑ Under Separate Cover ®via Courier ❑ Shop Drawings ®Prints ❑Plans ❑ Specifications ❑ Copy of Letter ❑ Change Order ❑Reports ❑ Other Copies Date No. Description 3 Revised 12/18/17 Utility Impact Statement PtAPI►�IN�DEP�. ❑ For approval ❑Returned loaned prints ❑Furnish as submitted ❑As requested ❑Return signed original ❑Furnish as noted ® For your use ❑ For bids due ❑Rejected ❑For review&comment ❑ Submit copies for distribution ❑Resubmit copies for approval If you have any questions please contact Haley Busch at 860-646-2469 x 5508.Thank You. Sign c: �" Sama ass Administrative Assistant F:\P2000\481\A18\Corres\Sent\Town of South Windsor\2017_12_18_Lipcxtf Utility Impact act Statement ' For Evergreen Walk ' South Windsor, Connecticut ' Revised October 2 2015 Revised December 14, 2015 Revised kilay 10, 201? Revised December 1 8, 201 Developer: Evergreen Walk Associates, LLC ' c/o John Finguerra 1109 Rose Lane Virginia Beach,VA 23451 FUSS&O'NEILL Disciplines to Deliver Engineer: Civil and Environmental Fuss & O'Neill 146 Hartford Road Manchester, CT 06040 "OttlI+unHrrp,r f��r CONly V b 22072 'trSI�NAI. �.�"''�, rrrrrrrn�n�««'" FUSS&O'NEILL UTILITY IMPACT STATEMENT ' FOR EVERGREEN WALK SOUTH WINDSOR, CONNECTICUT SECTION PAGE ' I. INTRODUCTION 1 A. Purpose and Scope................................ ........................................................................ 1 B. Site Location..................................................................................................... 1 ' C. Project Description........................................................................................... 1 II. WATER SUPPLY.......................................................................................................2 A. Projected Public Water Supply Requirements....................................................2 ' B. Existing Water System...................................................................................... 3 C. Proposed Improvements...................................................................................4 D. Conclusion........................................................................................................ 4 ' III. SANITARY SEWERS................................................................................................4 A. Projected Sewage Flows from Proposed Project...............................................4 B. Existing Sewerage Facilities............................................................................... 5 C. Proposed Improvements................................................................................... 6 D. Conclusion........................................................................................................ 6 IV. STORMWATER MANAGEMENT 6 ..................................................................... A. Existing Conditions .... 6 B. Proposed Detention and Storm Sewer System.................................................. 7 ' A. Electric Power.................................................................................................. 7 B. Gas................................................................................................................... 7 C. Communications............................................................................................... 7 ' EXHIBITS 1. Site Location Plan 2. Water Supply Exhibit 3. Sanitary Sewer Exhibit ' F:\P2000\481\A18\Genera1 Plan of Development\Utility Statement\UtilityReport_2017-12-18.docx i FUSS&O NEILL ' I. INTRODUCTION ' A. Purpose and Scope This Utility Impact Statement has been prepared in accordance with the most current revisions to the Town of South Windsor Zoning Regulations. Its purpose is to define,in a general way, the projected impact that the proposed land uses and intensities will have on the Town's infrastructure,with particular emphasis on: 1. Water supply and distribution system 2. Sanitary sewers ' 3. Stormwater management B. Site Location . ' The development site is located in the south central part of the Town of South Windsor north of the Manchester town line. It is approximately 243 acres in size and is generally bounded on the north by Deming Street, on the east by Buckland Road, on the south by Smith Street and on the west by Plum Gulley Brook (Exhibit 1). On-site existing topographic elevations range from 70 to 150 ' feet above mean sea level. The major roadway network that provides primary access to this project was reviewed during permitting by the Town and the State Traffic Commission / OSTA and was further discussed in associated Traffic Impact Studies. C. Project Description ' The 243 acre site was used for farming for many years. Currently, the Shoppes at Evergreen Walk (a retail center), ECHN and ECHN II (medical office buildings),LA Fitness (an indoor recreation center), an independently owned ' medical office building,Tempo Apartments, and other retail and restaurant uses have been constructed. An additional project approved for construction is a hotel. Future uses will include additional retail, office uses, and ' residential/institutional. When fully built, Evergreen Walk is anticipated to include the following development: TABLE 1 Land Use Previous Size(1) Proposed Change Proposed Size ' Hotel 108 rooms No Change 108 rooms Indoor recreation 45,000 SF No Change 45,000 SF Office 251,170 SF No Change 251,170 SF ' Retail 600,480 SF No Change 600,480 SF Residential 200 units No Change 200 units Institutional-Residential 290 units No Change 290 units ' The location of Evergreen Walk is shown on the an accomp 5 ying Location Plan (Exhibit 1). The utilities necessary to support the proposed development area ' are shown on Exhibit 2 (Water Supply) and Exhibit 3 (Sanitary Sewer). The storm drainage watershed for the site is shown on Exhibit 1. ' F:\P2000\481\A18\General Plan of Development\Utility Statement\UtifityReport_2017-12-18.docx 1 F ,USS&O NEILL II. WATER SUPPLY ' A. Projected Public Water Supply 1 Requirements Based on the table of uses indicated in Table 1 and as shown on the Land Use Study, a projection of domestic water requirements was prepared. This projection is detailed in Table 2 below: TABLE 2 Size(S.F.)/ Land Use Units/ Unit Flow Average Peak Daily Peak Hourly Peak Hourly Description Bedrooms/ (Gal/Day) Daily Flow Flow(1) Flow(z) Flow Beds (Gal/Day) (Gal/Day) (Gal/Day) (Gal/Min) ' Hotel 108 Rms 150/Rm 16,200 32,400 64,800 45 (No Change)13, (NO Change) (No Change) (No Change) (No Change) tIndoor 45,000 0.15/S.F. 6,750 13,500 27,000 19 Recreation (No change) (No change) (No change) (Ao change) (No Change) rOffice 251,170 0.11/S.F. 27,629 55,258 110,516 77 (No Change) (No Change) (No Change) (No Change) (No Change) Retail 600,480 0.10/S.F. 60,048 120,096 240,192 167 (No Change) (No Change) (No Change) (No Change) (Vo Change) ' Residential 200 150/Rm 45,000 90,000 180,000 Units/300 (No change) (No change) (1\7o change) 125 rooms (No Change) (No change) Institutional— 290 Units/ 150/Rm 65,250 130,500 261,000 181.25 Residential(4) 435 rooms ' (No Change) (No Change) (No Change) (No Change) (No Change) (1)Peak daily flow is 2.0 times the flow demand for an average day. (2)The peak hour demand(gallons per day)is 2.0 times the peak daily flow rate. (3) Quantity in parentheses (typical) from previous report,"Utility Impact Statement for Evergreen Walk", ' revised dated 05/10/2017. (4)The Institutional—Residential category includes independent living units,which are assumed to have similar flow when compared to typical residential sources. In accorda nce with the usual and customary practice, the tabulated flows must ' be available for usage at residual pressures in the ranging from a low of 25 pounds per square inch to a maximum of about 110 pounds per square inch. ' Requirements for water for fire protection purposes were determined based on the proposed development. Relative to retail areas, current standards indicate that a fire flow of 2,000 to 3,000 gpm at a 25 psi minimum residual pressure for F:\P2000\481\A18\Genera1 Plan ofDet-elopmcnt\Utility Statement\UtilityReport_2017-12-18.docx 2 ' FUSS& 'O NEILL up to a three hour period may be required. As necessary, flow tests and ' calculations will be performed for the various phases to confirm adequate fire flow service. ' B. Existing Water System The existing public water system is owned by the Connecticut Water Company (CWC). The system is operated by the CWC Northern Division,with offices at ' 25 North Road, East Windsor, CT 06088. A 12 inch water main fronts the site on three sides, Deming Street on the north,Buckland Road on the east, and Smith Street on the south (Exhibit 2). ' A fire flow test conducted by the CWC on September 24 2014 at a hydrant on p y Tamarack Road (South End) yielded a flow of 1,463 gallons per minute (gpm) with a residual pressure of 72 pounds per square inch (psi). The static pressure was 90 psi. The hydrant tested is located to the south and west of The Shoppes at Evergreen Walk. Additional fire flow tests were conducted b the CWC on September 24 2014 at y p , a hydrant on Tamarack Avenue near the ECHN II medical offices. The hydrant yielded 1,930 gpm with a residual pressure of 54. The static pressure was 96 psi. Currently, one 8-inch water main serves ECHN and ECHN II. It branches off of the 12-inch Deming Street water main and extends south along Tamarack Avenue toward ECHN II. It then continues along the connector road between Evergreen Way at LA Fitness and Tamarack Avenue at ECHNII and connects the 8-inch mains in Evergreen Way and Tamarack Avenue. Additional flow tests should be conducted on this water main, and results analyzed and coordinated with the Fire Marshal. The service for LA Fitness branches off of Buckland ' Road and extends west along Cedar Avenue. The Tamarack Avenue extension at the north end of the site is now connected with the Cedar Avenue stub to create a loop. A 12-inch water main branches off of Buckland Road at the southern end of Evergreen Walk and extends west along Tamarack Avenue. This 12-inch water ' line follows Evergreen Way north for a portion, splits, and then recombines and is capped near the existing Old Navy. This line serves The Shoppes at Evergreen Walk. A 12-inch water main continues down Tamarack Avenue past Evergreen p g Way. The 12-inch main then tees at the intersection of Tamarack Avenue and Longleaf Lane and continues north on Tamarack Avenue and west on Longleaf Lane. The 12-inch main on Tamarack ends just south of the bridge with a fire hydrant and blow-off assembly. The 12-inch main on Longleaf Lane extends down and just past the entrance to the Residences at Evergreen Walk. There are two 8-inch water main connections to the 12-inch main on Longleaf that loop through the residential apartments development. There is also an 8-inch ' main that loops the residential apartments main to the east and connects to the ' I":\P2000\481\A18\General Plan of Development\Utility Statement\UtilityReport_2017-12-18.docx 3 ' f Ir FUSS&O'NEILL ' 12-inch water ma in on Tamarack Avenue. This connection is located to the 1 north of the Hotel development site. C. Proposed Improvements In the future, additional loops between Evergreen Way and Tamarack Avenue will be completed,and the 12-inch water main in Tamarack Avenue will extend from the southern limit of Evergreen Walk to the existing main at ECHNII. The timing and configuration of these connections are dependent upon future development and have not yet been determined. ' The Connecticut Water Company (CWC) and Town of Manchester have executed an agreement that includes the connection of Manchester Water Department's Buckland Hills system to the CWC system in Buckland Road. ' This connection will ensure there is significant and adequate fire protection to the Buckland Road area and Evergreen Walk. ' There are no changes to the projected water demand as a result of the most recent revisions to the General Plan of Development. D. Conclusion With the connection to the Town of Manchester's water system, extensions and future improvements to the water system by Connecticut Water Company,it is our opinion that the existing and proposed water facilities will provide adequate water service for domestic and firefighting purposes in the quantities and pressures required to support the development proposed herein. As necessary, calculations will be performed for the various phases to confirm adequate fire flow service, and the necessary improvements will be proposed to address those needs. III. SANITARY SEWERS ' A. Projected Sewage Flows from Proposed Project This General Plan of Development proposes six land uses: office, hotel, ' recreation,retail, residential, and institutional. It is anticipated that sewage will be generated from this project in the following amounts: ' TABLE 3 Typical Land Use Size(S.F./Units/ Unit Flow(1) Average Daily Description Rooms/Beds) (Gal/Day) Flow(Gal) ' Hotel 108 rooms 150/rm 16,200 (No Changef) (No Change) Indoor Recreation 45,000 0.15/S.F. 6,750 ' (No Change) (No Change) Office 251,170 0.11/S.F. 27,629 (No Change) (No Change) ' F:\P2000\481\A18\Genera1 Plan of Development\Utility Statement\UtilityRcport_2017-12-18.docs 4 ' f Ir FUSS&O'NEILL TABLE 3 Typical Land Use Size(S.F./Units/ Unit Flow(1) Average Daily Description Rooms/Beds) (Gal/Day) Flow(Gal) Retail 600,480(3) 0.10/S.F. 60,048 ' (No Change) (No Change) Residential 200 units/300 rooms 150/rm 45,000 (No Change) (No change) ' Institutional—Residential 290 units/435 rooms 150/rm 65,250 (No Change) (No Change) (1)All units of flow were estimated from data generated by Fuss&O'Neill for similar types of ' establishments/uses. (2) Quantity in parentheses (typical) from previous report,"Utility Impact Statement for Evergreen Walk",revised dated 05/10/2017. (3)Including restaurants The following table summarizes the total average daily flow and includes a ' contribution from groundwater inflow: TABLE 4 ' Contributing Peak Peak Design Sewage Average Daily Peak Daily Area(Acres) Infiltration(2) Flow Source Flow(Gal) Flow(1)(Gal) 243 Ac x 60% Flow(Gal) (gal/day) Project Site 220,877 883,508 146 146,000 1,029,508 (No Changef) (No Change) (No Change) ' (1)Assumes a Peaking Factor of 4.0 for the mixed-use development. (2)Peak Infiltration=acreage x 1000 gallons/day _ ' (3)Quantity in parentheses (typical) from previous report,"Utility Impact Statement for Evergreen Walk", revised dated 05/10/2017. ' B. Existing Sewerage Facilities The Evergreen Walk site lies within the wasteshed area of the Clark Street sewage pump station. Gravity sewers are located in Buckland Road, east of Deming Street (northern boundary of the site), Clark Street(west of the site), Wheeler Road (south of the site) and in Smith Street west of Wheeler Road ' (southwest of the site). The sewers from Clark Street, Smith Street, and Wheeler Road flow by gravity to the Clark Street pump station. The Buckland Road sewer flows by gravity north. Sewage from the Original ECHN building at Buckland Road and Deming Street as well as from Manchester Pediatric Associates currently flows by force main to ' the Buckland Road gravity system. In addition, ECHN II and ECHN III sewage flows southerly by force main to the gravity branch located west of LA Fitness. F:\P2000\481\A18\Genera1 Plan of Dcvelopment\Utility Statement\UtilityReport_2017-12-18.docx 5 FUSS&O NEILL ' In 1995 Weston and Sampsonperformed p p ed a sewer study of the Buckland Road ' wasteshed, and determined the most cost effective sewering plan for the wasteshed. The most cost effective sewer alignment to serve what is now the Evergreen Walk site was found to be a gravity sewer which connected to the ' existing sewer system on Clark Street. Such an alignment included the installation of 1,900 lineal feet of 12 inch sewer from a manhole north of the Clark Street pump station to the western property line of Evergreen Walk, generally as shown on Exhibit 3. From that point, the entire site could be ' served. The new alignment is in place and referred to as the Gateway Trunk Sewer. This alignment required the crossing of wetlands and Plum Gulley Brook. Improvements to the capacity of the Clark Street pump station are not required ' to accommodate sewage flows anticipated by the proposed General Plan of Development. ' C. Proposed Improvements There are no changes to the projected sewer flows as a result of the most recent revisions to the General Plan of Development. There are no additional off-site improvements required for the proposed Evergreen Walk development. ' D. Conclusion The quantity of sewage to be discharged from the uses proposed in the ' development plan can be adequately served by the existing Town of South Windsor sewerage facilities. ' IV. STORMWATER MANAGEMENT A. Existing Conditions ' The proposed project is situated on a parcel of land containing 243 acres located west of Buckland Road, north of Smith Street and south of Deming Street. Plum Gulley Brook flows near the westerly boundary of the project and is actually within the project area for a distance of about 2400 feet. There are two unnamed streams on the site that are tributary to Plum Gulley Brook. One of ' the streams flows along the southerly boundary and originates south of Smith Street. The larger stream flows west to east from Buckland Road about 2,000 feet north of Smith Street. This second stream,which originates on the east ' side of Buckland Road,joins Plum Gulley Brook within the project area. In addition to the stormwater runoff from within the project area, there are ' about 190 acres east of Buckland Road that drain to the project. Part of this flow is from the detention basin constructed as a part of the Lowe's/Target project. It is assumed that any future construction within the drainage area east ' of Buckland Road will include detention facilities that will maintain flow rates equal to existing levels. F:\P2000\481\A18\Genera1 Plan of Development\UriGty Statement\UtifityReport_2017-12-18.docx 6 ' FUSS&O'NEILL All of the stormwater runoff from the site and the area east of Buckland Ro ad ' discharges to Plum Gulley Brook. A little over one mile downstream of the proposed development, Plum Gulley Brook and Whaples Brook join at Vintons Mill Pond to form the Podunk River. ' B. Proposed Detention and Storm Sewer System In order to minimize environmental damage and the possibility of increased runoff overloading downstream drainage facilities, stormwater best management practices (BMPs) will be utilized both during and after construction. A series of sedimentation and detention basins have been and will be constructed to control sediment and peak storm flows. Infiltration of stormwater will be utilized where geologic conditions permit. During the design stage, efforts will be made to ' create detention and infiltration basins that are aesthetically pleasing and nuisance free. The stormwater resulting from the most recent changes to the General Plan of Development (i.e. Harbor Retirement Associates Assisted ' Living Facility) will be discharged to and attenuated in Detention Basin #7, located west of ECHN II and Unit 12. During construction, erosion control measures will be installed to minimize erosion and sedimentation. Haybale erosion checks and silt fence will be installed where needed. Sedimentation basins will be constructed when needed. In some cases, detention basins may be used as temporary sedimentation basins. ' All erosion control measures will be constructed in accordance with the requirements of the latest edition of Connecticut"Guidelines for Soil Erosion ' and Sediment Control". V. OTHER UTILITIES A. Electric Power Past discussions with officials of Eversource indicate that no problems exist relative to the supply of power to the proposed site. New service to the site is and will continue to be underground. ' B. Gas ' Yankee Gas has a main line in Deming Street and Buckland Road that is adequate to serve the proposed development. The Deming Street gas line serves ECHN. The Buckland Road gas line branches off onto the southern Tamarack Avenue by The Shoppes and along Cedar Avenue south of LA ' Fitness. The Cedar Avenue branch currently serves LA Fitness and ECHN 1I. ' C. Communications There is adequate telephone and data service available to the proposed development. F:\P2000\481\A18\General Plan of Development\Utility Statement\UtihtyReport_2017-12-18.docs 7 M M M M M M M . M UCB: MSmEW: LMAfk C,13: File Path:J:1ONKiW2ODW1W10WLAIAt{Report E'%Mhffs120004S1A10 LOC Map ut{dw0,Layout lxation nmp Mon,Jul 09,2007-402 PM User.HOusch Z.. P ' r7i q 1 {•S A' 646>1 NE f 100 35' .701 1(BROAD BROOK) If103 3270". 660000 FELT 105 %wNOSoRWLLc 1•0 Mi. t a 4 rtl •� , '+••�� T pit of i " • , r ,.� �i' ' ' • ••'� • • r •r�Mi�••• \ ` • 7.i 'fit/ i'' '' to •drt ,.. . Of 3f: ' • • • .••••.• .• • '••• ' • •�: v1p • h ��Sf i • • r /T¢%����• '� •!4i +�, isµ q. •. Y ,•.• • ••••••. u . • • •••• ••• , i ••••• + •' •••` •;',f r 1`7.0 1: 1! A. •vF • .p CO\ i to dL wf.� ��•f' .4. � I � _•.f • r�f'1 • '� I • r^ • '''t'"F37'RON • w �. • i� !Lr • •; I. •••.r►�• f • ••• • ,r 1•e i ' , '4i�� ,�,• ••�%� '�' . .•.�. � elan ••, �• y ."~•~ % to PODUNK RIVER " DRAINAGE AREA .••r , '.•�' . ;'�Aoa.ti`. ' [}♦�`\ to b{'rJ • ' , + ; ;�;y• W f' 'yv, { ," PLUM GULLEY `-,,.,,,.--..• .,:"---�� �' 1 '. 77 J{. i�•. c DRAINAGE AREA Ito O Y y�ypFr ,P 1 $g P J , 1—,� I f�. p .. • r w •,• l , � , M r 0,.•�J�r R .,%T,•' ,. h/y1 i. � 0 1'1, +w`O.vr o w. � 'vsa--r�. � ,` •'''PY4�1 �, � •,. 1.,' .. ,J Q " ,p� t\•� '1 .! fir• � • 111 r 55, Dffis 16 p °t• • WALK Q' • . • , . ,^ O �i • ,• ' ''•.;EVERGREEN WALK ° .< ♦ ,�=�'� 1 •'�' a -r''", �(.^ . TO JACQUES POND r to 1 : • '� �^i✓ / A _. .Lu, I ` ]; n z t, • ' ; . BUCKLAND PLAZAC. - •. a +�� e,•' o z r + ANCHESTER INDUSTRIAL.'PARKIJ,C. PENNEY too . ; ••• ... ..Note: Other subareas contained in drainage modc �,( 8` • % haV'e been omitted from this map for clarit} AA A f'lrN1ht/-. c -IMA nn n nirt•Er--.qTFR f:T I M S 0UADRANGL E. REVISED 1992 . •. yD S In X � f g 3 1 FLB Architecture & Planning, Inc. 19 Silver Lane East Hartford CT 06118 (860)568-4030 fax: (860)568-5129 e-mail:fib@flbarch.com web:www.fibarch.com February 8, 2018 Planning and Zoning Commission Town of South Windsor 1540 Sullivan Avenue South Windsor, Connecticut 06074 Re: Evergreen Walk General Plan of Development Application #17-48P Project No. 99508.00 Dear Commissioners, We are requesting that the public hearing on the subject application, scheduled for February 13, 2018, be moved to March 13, 2018 to allow us to have the people there to present the application that we need. To accommodate this request we are authorizing and approving an extension of time in which to hold the hearing of 65 days. Very truly yours, Alan F. Lamson, AIA, AICP Vice President, Duly Authorized Planning Director c: file P:\99508.00\General Plan Of Development 2017 HRA\PZC 180208 Extension Of Time For Hearing.Dotx N S t0'N fq F' 70� O-P SO� V&U&at A wC 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 `tfY°SOR•CO�e� TELEPHONE (860) 644-2511 February 26, 2018 Evergreen Walk, LLC c/o Alan F. Lamson 19 Silver Lane East Hartford, CT 06118 Dear Mr. Lamson: Re: Appl. 17-48P, Evergreen Walk LLC General Plan of Development Modification Please be advised that the above referenced matter has been scheduled on the Planning 8v Zoning Commission Regular Meeting agenda for Tuesday, March 13, 2018 in the Madden Room of the South Windsor Town Hall, 1540 Sullivan Avenue. The Regular Meeting will follow the Public Hearing which begins at 7:30 p.m. Someone must be present at the meeting to represent the application. Four signs advertising the meeting must be posted on the property for ten (10) consecutive days prior to the meeting and must be clearly visible from a town street. The signs must be posted at the entrances drives on Buckland Road and Deming Street by Friday, March 2, 2018. Signs can be obtained in the Planning Department, Monday through Friday, 8:00 a.m. - 4:30 p.m. If you have any questions regarding this letter, please call 860-644- 2511, Ext 253. Sincerely, Lauren Zarambo Administrative Secretary 'p I SOUTH WINDSOR PLANNING DEPT. f as ° FLB Architecture & Planning, Inc. 19 Silver Lane East Hartford CT 0118 (860)568- 30 fax: (860)568-529 e-mail:flb@flbarch.com web:www.flbarch.co LETTER OF TRANSMITTAL P:\99508.00\General Plan Of Development 2017 HRA\SWPZC Date 3/21/18 Project No. 99508.00 180321 Revised GPD.Dotx Attention Michele Li e To: Planning &Zoning Commission Project Evergreen Walk Town of South Windsor Buckland Road We are sending you ® Attached ❑ Under separate cover via the following items: ® Prints ❑ Copy of letter ❑ Shop drawings ❑ Original tracings ❑ Copy of memo ❑ Samples ❑ Specifications ❑ Change order proposal request ❑ Code modification request ❑ Request for Payment ❑ Change order ❑ Other as described below Item no. Copies Date No. Description 1 5 3/15/18 Z-3 1-3 of 3 General Plan of Development THESE ARE TRANSMITTED as checked below: ❑ As requested ❑ Approved ❑ Resubmit copies for approval ❑ For your use ❑ Furnish as corrected ❑ Submit copies to distribute ❑ For review ❑ Rejected ❑ Return corrected prints &comment ❑ Submit specific item ❑ ® For approval ❑ Forbids due ❑ Prints returned after loan to us Remarks: We have modified the submitted General Plan to more accurately reflect the uses approved in the State traffic permit and approvals already received fro the Planning and Zoning Commission. } Copy to: file. Evergreen Walk LLC: Alan F. Lamson,AIA,AICP If enclosures are not as noted,kindly notify us at once. SOW N Sf4 D • w� 1540 SULLIVAN AVENUE •SOUTH WINDSOR, CT 06074 R-Co e� TELEPHONE(860) 644-2511 March 26, 2018 Evergreen Walk, LLC c/o Alan F. Lamson 19 Silver Lane East Hartford, CT 06118 Dear Mr. Lamson: Re: Appl. 17-48P, Evergreen Walk LLC General Plan of Development Modification Please be advised that the above referenced matter has been scheduled on the Planning & Zoning Commission Regular Meeting agenda for Tuesday, April 10, 2018 in the Madden Room of the South Windsor Town Hall, 1540 Sullivan Avenue. The Regular Meeting will follow the Public Hearing which begins at 7:30 p.m. Someone must be present at the meeting to represent the application. Four signs advertising the meeting must be posted on the property for ten (10) consecutive days prior to the meeting and must be clearly visible from a town street. The signs must be posted at the entrances drives on Buckland Road and Deming Street by Friday, March 30, 2018. Signs can be obtained in the Planning Department, Monday through Friday, 8:00 a.m. _ 4:30 p.m. If you have any questions regarding this letter, please call 860-644- 2511, Ext 253. Sincerely, Lauren Zarambo Administrative Secretary Lipe, Michele. From: Summers;Walter Sent: Tuesday,April 10, 2018 8:20 AM To: Lipe, Michele; Galligan, Matthew Subject: FW: CTWater/ Manchester/South Windsor Emergency Valve FYI Walter Summers, Fire Marshal Mail: 1540 Sullivan Ave., South Windsor, CT, 06074 Office: 232 West Rd. 860-282-0669 Ext I www.southwindsor.org Working Smoke Alarms and Carbon Monoxide Alarms Saves Lives Please be advised that all emails to and from the Town of'South Windsor are subject to FOI requests. This e-mail message is intended only for the named recipient(v) above. It may contain confidential information that is privileged or that constitutes official work product. If you are not the intended recipient, you are hereby notified that any use, dissemination, distribution or copying of'this e-mail and any attachments) is strictly prohibited. From: Paul Lowry [mailto:PLowry@ctwater.com] Sent:Tuesday,April 10, 2018 8:14 AM To:Summers,Walter<Walter.Summers@southwindsor.org> Subject: FW: CTWater/Manchester/South Windsor Emergency Valve FYI From: Paul Lowry Sent: Tuesday, April 10, 2018 8:14 AM To: 'Ronald Bomengen'; Gerald McDermott Subject: RE: CTWater/ Manchester/ South Windsor Emergency Valve Ron, We approvals from Manchester Water to install the needed instrumentation in the meter vault,that work is scheduled for this month.After the instrumentation is completed all we have left to do is test the operation of all the moving parts. Paul From: Ronald Bomengen [mailto:rbomengen(Wando.com] Sent: Monday,April 09, 2018 11:04 AM To: Paul Lowry; Gerald McDermott Subject: CTWater/ Manchester/ South Windsor Emergency Valve Good morning Paul, I have a meeting with the Planning and Zoning Commission tomorrow night in South Windsor. They are most likely going to ask about the valve and the status of it. Can you give me any updates? The last update I 1 received,you had said that communication conduits needed to be installed and that would be the final step which should be done by the end of April. Is this still accurate? Ron Bomengen, PE, LEED AP Senior Project Manager Fuss&O'Neill,Inc 1146 Hartford Road I Manchester,CT 06040 860.646.2469 x5253 I rbomenaen@fando.com I cell: 860.794.4988 www.fando.com I twitter I facebook I linkedin -his e m3 1'-7:_,SSo g e a,al tf -8S ans:il+.ed`with t are Me exc1 1sive -I e..tu cfl pro pe,r L � o sa -�O'Neill. . . . ffle s Y av J,Lrir �:v6 this C Ssaa ir 'ror.pease cuutL,h.ai r e :a h cies is ifyf u>p Wleged a,d co f l"CI"<k '�'s to ell t) -e--d l'ng a-eply e-ma e.:ende: o3 ,nI t:.::'.ssage. . 2 Appl. #17-43P, Evergreen Walk General Plan of Development Modification 4-24-2018 Planning Department Report 1. The original general plan approved in 2001 and this plan was renewed in 2014 and modified last year. This is a request for a modification to the General Plan of Development layout to decrease/increase approved square footages/units of certain uses to the following on property located at 151 Buckland Road (within `Evergreen Walk'), on the westerly side of Buckland Road, on the southerly side of Deming Street and northerly of Smith Street, Buckland Road Gateway Development Zone 2. Proposed changes with this modification include: • Location of future assisted living development north of LA Fitness. Assisted Living facilities are permitted in the Buckland Gateway Development zone by special exception. 3. Utility impacts to assess proposed changes were addressed in the report that you received. This report was reviewed by Town Staff and no concerns were expressed. Adequate public water is and sewers are available in the area and details designs would be reviewed at the time of site plan approval. Changes in the traffic volumes have been submitted to OSTA for review and approval. 4. All of the parking proposed for this new facility shows parking distributed around buildings. The Gateway zone regulation notes that it is the intent of this regulation to create off-street parking that is creative and to achieve attractive, innovative parking layouts that will accent and highlight buildings and features of the zone. 5. There are regulated wetlands on the periphery of the proposal. Existing trees and hedgerows must be incorporated into site design and preserved to the maximum extent possible tree and hedgerow preservation must be addressed with the site plan. 6. Pedestrian access is shown throughout the site and is shown connecting to the sidewalk network within the development. At the time of the site plan, we would be looking for connection to the Buckland Road sidewalks as well. 7. A walking trail system proposed along the western portion of the site will be completed up to the new Independent Living Facility with that new construction. As development approvals continue, the Commission will want to continue to ensure that there is a strong pedestrian and bicycle connection between the many facets of the project continue and the internal trail system gets completed. 8. Some improvements required with the last update included: further commitment to complete another section of the walking trail, completion of the final pavement (along Cedar Ave heading south), and requirement to complete the water loop as required by i the Fire Marshal and CT Water. My understanding is from a recent correspondence from CT Water is that the work is scheduled to be completed this month. 9. Some of the remaining items include future phases of the walking trail; removal of structures on site such as the old barns and the vacant houses along Buckland Road. We recently talked with the applicant about the potential of providing a communication easement along the walk way for future fiber or other interconnectivity by the town. 1 O.Prior to any actual building or site construction, a full site plan of development that is in conformance with the approved general plan must be submitted and approved by the Commission as well as the Inland Wetlands Agency and the WPCA. The site plan will include all of the engineering details as well as final building design and site layout. I Llf this General Plan is approved, Planning Dept. requests: All of the conditions of the 2014 general plan approval will remain in effect. Note for the file: In 2016 the PZC • 2016 changes - The addition of a 255,200 sf of continuing care (institutional use) which would include 160 units of independent living; 160 units of assisted living; and 55 units of institutional in a four story facility. • Eliminate 80,000 sf of potential retail and 30,000 sf of potential recreational use Note for the file: In 2017 the PZC • Reduce to 600,480 sf of retail; • Reduce hotel rooms to 208; reduce office to 251,170 • Eliminate the institutional use and increase assisted living units to 290 • No changes to 200 Apartment or 75,000 Recreational use 2 �0,N N Sf4 C * F 7-� Ole�� �• J a 9 � w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 SOR.C� TELEPHONE (860) 644-2511 CERTIFIED MAIL 7014 2120 0003 3214 4013 April 26, 2018 Evergreen Walk, LLC C/o Alan Lamson FLB Architecture &Planning, Inc. 19 Silver Lane East Hartford, CT 06118 Re: Appl. 17-48P, Evergreen Walk LLC, General Plan of Development Modification Dear Mr. Lamson: We are pleased to advise you that the Planning&Zoning Commission voted on April 24,2018 to approve modifications to the General Plan of Development to show the location of a proposed assisted living facility on Unit 16, on property located at 151 Buckland Road(within`Evergreen Walk'), on the westerly side of Buckland Road, on the southerly side of Deming Street and northerly of Smith Street,Buckland Road Gateway Development Zone as shown on plans prepared by FLB Architecture and Planning, Inc., Project No. 99508.00, Sheets Z3-1 through 3, dated 3/15/18 as revised with the following conditions: The Commission notes that this approval is for a General Plan of Development,which does not address all engineering and site design details. 1. A Special Exception and/or Site Plan of Development approval is required prior to construction,per Section 4.2.15.1)of the zoning regulations. 2. At the time of site plan submission,the Commission will review all specific details of the project,including,but not limited to,the following concerns raised during the General Plan of Development update application process: • Timeframe for completion of the walking trail; • Identify mature trees within the undeveloped pieces along the Buckland Road frontage on future site plans and incorporate into the site plan. An arborist report provided if removal of significant trees are proposed to be removed with the 65 foot setback. 3. No building permits will be issued until any required OSTA certificate has been issued (per CGS §14-311). 4. All approval conditions of the March 11, 2014 for Appl. 14-09P,Evergreen Walk General Plan of Development remain in effect. Black and white mylars of Sheets Z3 -1 through 3 of the General Plan of Development, with this approval letter reproduced thereon,must be submitted. After the mylars have been endorsed by the Commission,they will be returned to you for filing in the office of the Town Clerk. Three print copies of the entire set of plans must also be submitted. Sincerely, 2 Bart Pacekonis, Chairman Planning and Zoning Commission BP/llz Cc: Town Engineer Chief Building Official Assessor SOWN SfA w� 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 f�dsox co�'`� TELEPHONE(860) 644-2511 CERTIFIED MAIL 7011 1570 0000 6337 4472 March 13,2014 Mr. Alan Lamson FLB Architecture &Planning,Inc. 19 Silver Lane East Hartford, CT 06118 Re: Appl. 14-09P,Evergreen Walk, General Plan of Development Reapproval Dear Mr. Lamson: At its March 11, 2014, meeting, the Planning and Zoning Commission voted to approve your request for Evergreen Walk, General Plan of Development Reapproval as shown on plans prepared by FLB Architecture&Planning, Inc,Job No. 99508.00,sheets Z3-1 through 3,dated 02/24/2014 as revised. This approval is subject to the following conditions: 1. Site Plan of Development approval is required prior to construction,per Section 4.2.150 of the zoning regulations. Construction phasing must be included on Site Plan of Development if appropriate. 2. No building permits will be issued until any required STC certificate has been issued(per CGS §14-311). 3. The Commission notes that this approval is for a General Plan of Development, which does not address all engineering and site design details.The applicant must submit an application for a site plan of development approval,at which time the Commission will review all specific details of the project,including but not limited to the following concerns raised during the Zone Change/General Plan application process: • The applicant must evaluate modifying the existing intersection at Tamarack and Evergreen Way for consideration of incorporating a four-way stop. _ .- • Any application for approval of a"Final Plan"for the development of an additional area within Evergreen Walk, which area is not as of this date the subject of an approved"Final Plan", shall require submission of a written plan of action to provide adequate water supply for the proposed use. This requirement shall not apply to a modification of any existing "Final Plan"approval for any portions of Evergreen Walk. 3. The Plum Gulley Brook/Podunk River watershed is a highly sensitive watershed and stream corridor,hydrologically,hydraulically and ecologically. Storm drainage design at the site plan stage must thoroughly and adequately address storm water quality and quantity, including both on-site and downstream impacts. 4. Views of parking areas from Buckland Road must be minimized through the use of berms and perimeter landscaping. Parking lot lighting in close proximity to Buckland Road will be pedestrian-style(but may be higher and brighter). 5. Roofs and roof equipment must be screened from Buckland Road, Smith Street and Deming Road. 6. Pedestrian and bicycle interconnection between the lifestyle center("main street"retail center),indoor recreation facilities, office and housing must be provided. 7. Delivery trucks must use routes other than the"main street"to make site deliveries. 8. When details of Buckland Road widening are finalized at the site plan stage, adequate additional right-of-way along Buckland Road must be provided. 9. Trees and hedgerows must be preserved to the maximum extent possible;preservation details to be shown on the site plan. 10.No outdoor storage is allowed in the Gateway zone,per Section 5.8.6.c of the zoning regulations. 11. Construction phasing, including phasing of external roadway improvements, must be shown on the site plan. 12. As additional green space is added,it should include some of the site's existing natural features. Black and white mylars of Sheets Z3 -1 through 3 of the General Plan of Development,with this approval letter reproduced thereon,must be submitted. After the mylars have been endorsed by the Commission,they will be returned to you for filing in the office of the Town Clerk. Three blueprint copies of the entire set of plans must also be submitted. Sincerely, Bart Pacekonis, Chairman Planning and Zoning Commission BP/llz cc: Fuss &O'Neill Town Engineer Chief Building Official Assessor