Loading...
HomeMy WebLinkAbout198 Smith Street Subdivision - WPCA Approval Letter 4O-N N Sf4 a V/ S-0� GV w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 SOR-CO TELEPHONE(860) 644-2511 June 12, 2017 KF Realty, LLC Attn: Andy Kebalo 175 Wheeler Road South Windsor, CT 06074 Re: WPCA Approval — 198 Smith Street subdivision P&Z Application #17-10P Dear Mr. Andy Kebalo: The South Windsor Water Pollution Control Authority, at its regular meeting of June 6, 2017, gave approval for connection to the Town's sewerage system of a proposed two lots subdivision for KF Realty, LLC, on property located on the northerly side of Smith Street,westerly of Wheeler Road, known as 198 Smith Street, South Windsor, CT, and as more specifically shown on plans entitled "Proposed Lot Division Plan, K F Realty, LLC., 198 Smith Street, South Windsor, Connecticut", prepared by BSC Group, Glastonbury, CT; DW:. No.: 83645.00.dwg; Job No.: 83645.00, Sheet EC-1. Dated March 6, 2017; Revisions Dates: 4/20/17 "Engineering Comments". This approval is subject to the following conditions: 1. A draft copy of the existing private easement (178 Wheeler Road) shall be revised to include lots 1 and 2 (Smith Street) and must be reviewed and approved by the Town Attorney; 2. A draft copy of a private easement between the property owners on lot 1 in favor of lot 2 (Smith Street)for the installation and maintenance of the sewer lateral must be reviewed and approved by the Town Attorney; 3. The pump system design for lot 1 must be submitted to the Town Superintendent of Pollution Control and Town Engineer for review and approval. 4. Technical approval of the Town of South Windsor Engineering Department; 5. Final Authority approval and acceptance of the sanitary sewerage connection will be conditional upon the installed sewer line having been inspected by the Town staff, and upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans approved by the Authority, and meeting all regulations and appropriate technical specifications relating to sanitary sewer construction. This approval letter must be superimposed on the final approval plans. Very truly yours, d ichard Aries, Chairman Water Pollution Control Authority cc: Richard Aries, Chairman Michael J. Gantick, Director of Public Works Jeff Doolittle, Town Engineer/Assistant Director of Public Works Michele Lipe, Director of Planning Chris Dougan, Chief Building Inspector