Re: WPCA Approval—Evergreen Crossing Retirement Community
P&Z Application#17-38P
Dear Mr. Grocki:
The South Windsor Water Pollution Control Authority, at its Special Meeting on January 9, 2018, gave
approval for connection to the Town's sewerage system for proposed±183,682 sf senior independent living
facility to be known as the Evergreen Crossing Retirement Community located at 900 Hemlock Avenue,
South Windsor, CT, and as more specifically shown on plans entitled "Site Plans, Evergreen Crossing
Retirement Community,900 Hemlock Avenue,South Windsor", prepared by VHB,Wethersfield,CT; Project
No.:42263.00, dated 9/27/2017; Drawing Title "Utility Plan", Drawing No. C-04.0, Revisions Dates:
11/30/17. This approval is subject to the following conditions:
1. A copy of a 20' access easement from Hemlock Avenue to SMH 2 as depicted on the site utility
plans;
2. The sewer lateral, pump station and force main will be maintained by property owner up to the point
of discharge to the public sanitary sewer;
3. Generator backup for the private pump station;
4. Provide maintenance plans and contact information for pump station and oil/grease separator,
5. Wastewater pollutant levels shall conform to Town discharge limits;
6. Discharge flows shall not exceed 15,000 gpd without WPCA approval;
7. A connection charge of$3,845/buildable acre or applicable rate at time of connection;
8. A lateral charge of$1,167 or applicable rate at time of connection;
9. Technical approval of the Town of South Windsor Engineering Department; and
10. Final Authority approval and acceptance of the sanitary sewerage connection will be conditional
upon the installed sewer line having been inspected by the Town staff, and upon the written
verification of the Town staff that said sanitary sewer line was installed in substantial conformance
with the design plans approved by the Authority, and meeting all regulations and appropriate
technical specifications relating to sanitary sewer construction.
This approval letter must be superimposed on the final approval plans.
Very truly yours,
1 ��
Richa d ries, Ch
z!!��
Water P Ilution Control Authority
RA: ead
cc: Michael J. Gantick, Director of Public Works
Jeff Doolittle, Town Engineer/Assistant Director of Public Works
Michele Lipe, Director of Planning
Chris Dougan, Chief Building Inspector
TOWN OF SOUTH WINDSOR
WATER POLLUTION CONTROL AUTHORITY
APPLICATION FORM
Application No.=
Date Received
Date Scheduled For
Applicant Cameron General Contractors
Address804O Eiger Drive, Lincoln, NE 68516
Telephone No.: (402)420-3149
Owner of Record on Land Records Evergreen Walk,LLC a Connecticut Limited Liability Company
Owner's Address 1109 Rose Lane, Virginia Beach,VA 23451
Property Description:
Assessor's Map# 27-15 Parcel# Vol. Page
Project Title: Evergreen Crossing Retirement Community
Inquiries to be Directed to: (Name,Address,Telephone No.) VHB-c%Mark Grocki, PE
-100 Great Meadow Road,Suite 200, Wethersfield, CT 06109
Approvals Previously Received(Check) IWA X PB&Z X ZBA
Purpose of Application: (Check all that apply)
1. Sewer Extension/Connection--Residential Use
a. Subdivision
b. Single Unit
c. Other Explain
d. Type of Approval: Concept Final
2. Sewer Extension/Connection--Industrial/Commercial User
a. New Connection X
b. Request to Increase Flow Rate
c. Change in Nature of Waste Discharge
d. Other Explain
e. Type of Approval: Concept Final X
3. Appeal of Sewer User Charge _
a. Residential
b. Industrial/Commercial
4. Sewer Assessment
a. Establish Sewer Assessment
b. Appeal of Sewer Assessment
c. Change in Use of Property
5. Regulatory Appeal ,Explain
6. Other Explain
000;-
12/l t12017
ApplicaarlAA-
e D eat
12/27/17
Owner' a Date
{See Reverse Side for pplicAlon Submittal Procedures}
00
September 28, 2017 0
hbo
Ref: 42263.00
Water Pollution Control Authority
Town Hall
1540 Sullivan Avenue
South Windsor, CT 06074
Re: Evergreen Crossing Retirement Community
South Windsor, CT
Preliminary Sanitary Design Flow Memorandum
To Whom it May Concern,
VHB is pleased to submit the design flow calculations for the sanitary sewer system for the Evergreen
Crossing Retirement Community located at Hemlock Avenue and Buckland Road in South Windsor,
Connecticut. The proposed development includes the construction of an approximate ±68,400 SF
Senior Independent Living Facility building with three (3)floors (totaling ±183,682 SF),
supplementary landscaping improvements, parking fields and garages, retaining walls, a stormwater
management system, sewer pump station, and utility improvements to support the use.The building
will be fitted with an emergency generator for the entire site (building &pump station) in case of an
emergency. In addition, pump station will be armed with a dual alarm system in case of failure or in
need of repair (see pump station detail found on 'Site Details 1'sheet C-06 of the planset dated
September 26, 2017).
Sanitary sewer effluent is proposed to exit the building through an 8-inch PVC pipe at a ±1% slope
where it is conveyed to a sewage pump station and valve chamber located at the southern end of
the proposed development. From the pump station, the effluent will be pumped though a 4-inch
force main, approximately 330ft, from an invert elevation of 89.60,to an existing sanitary sewer
manhole within Hemlock Avenue at an outflow elevation of 113.3, roughly a 24ft elevation
difference.
The sewer flows for the proposed development have been estimated based on three sources:TR-16:
Guides for the Design of Wastewater Treatment Works (Source 1), Estimated sanitary flows from a
similar Independent Senior Living Facility located in South Portland, ME (Source 2, attached for
100 Great Meadow Road
Engineers I Scientists I Planners I Designers Wethersfield,Connecticut 06109
P 860.807.4300
\\vhb\proj\Wethersfield\42263.00\docs\VARIOUS\Utilities\Sewer\Preliminary Sanitary Design F 860.372.4570
Flow Meniorandum.doa
Of
Ref:42263.00 j,00
September 28, 2017 �� 0
Page 2
hb
reference), and Connecticut Public Health Code (Source 3). Calculations for approximate total daily
flow and estimated flow in cubic feet per second are included within the tables below:
Total Estimated Flow for Senior Independent Housing
Source 1: TR-16: Guides for the Design of Wastewater Treatment Works
Flow
Units Bedrooms (gpd/�) Total
64 1 70 4,480
62 2 70 8,680
4 3 70 840
Total 130 14,000 GPD
Source 2: Flow's provided by Client for similar Senior Independent
community in South Portland, Maine (see attached)
Units Bedrooms Flow(gpd/ t itr Total
64 1 75 4,800
62 2 75 9,300
4 3 75 900
Total 130 15,000 1 GPD
Source 3: Connecticut Public Health Code: Standards for Subsurface
Sewage Disposal Systems (Hospital/Rest Home/Convalescent
Home/Residential Motel-Hotel)
Units Bedrooms Flow(gpd/bed) Total
64 1 150 9,600
62 2 150 18,600
4 3 150 1,800
Total 130 1 1 30,000 GDP
\\vhb\proj\Wethersfield\42263.00\docs\VARIOUS\Utilities\Sewer\Preliminary Sanitary Design
Flow Memorandum.docx
`0#
Ref:42263.00
September 28, 2017 Vhb
Page 3
Peak Flo7for Senior Independent Housing
Use:Assumed day of 16 hours(8 hours of sleep)
Use: Peaking Factor of 5.6(TR-16 Fig 2-1 "Extreme Flow to Avg. Daily Flow")
(0.1 MGD=5.6 Peaking Factor)
Total
Source GPD 16-Hr Day Peaking Factor Flow
calculated Conversion (cfs)
1 14,000 2.343E-06 5.6 0.184
2 15,000 2.343E-06 5.6 0.197
R
3 30,000 2.343E-06 5.6 0.394 J
We hope the information submitted is satisfactory and look forward to speaking further with the Water
Pollution Control Authority regarding the design flow calculations. Please do not hesitate to contact me
with any questions or concerns.
Sincerely,
Vanasse Hangen Brustlin, Inc.
Mark Grocki, P.E.
Senior Project Engineer
mgrocki@vhb.com
\\vhb\proj\Wethersfield\42263.00\dots\VARIOUS\Utilities\Sewer\Prelimi nary Sanitary Design
Flow Memorandum.docx
S- BAG O JOB RL Communities
T E C H N II C 5 SHEET NO. 1 OF 2
75 John Roberts Road, Suite 1A CALCULATED BY RAM DATE 4/14/2015
South Portland, Maine 04106 CHECKED BY DATE
(207) 200-2100 FAX(207) 856-2206 1 FOR REFERENCE ONLY
Sanitary Sewer Flows
Flows RL Communities
look at:
1. Historical flows from other RL communities suggest a flow of 75 gal/unit.
2. Maine Subsurface Wastewater Disposal rules requires a design flow of 60 gpd/resident.
130 units x 75 gallons/day= 9750 gpd
Peak Day= 1.5 x Average Daily Flow(ADF) = 14625 gpd
Peak Hour=4.2 x ADF/ 1200 min/day (16 hour day) = 42.656 gpm
82 1 bedroom suites x 60 gallons/day= 4920 gpd
44 2 bedroom suites x 120 gallons/day= 5280 gpd
4 3 bedroom suites x 180 gallons/day= 720 gpd
Total 10920 gpd
Peak Day= 1.5 x Average Daily Flow(ADF) = 16380 gpd
Peak Hour=4.2 x ADF/ 1200 min/day(16 hour day) = 47.775 gpm
Historical Peak Monthly Flows obtained from Portland Water District for 2 year period (12/02-12104)
Usage Days Hours Peak Hr
Date (HCF) Days GPD /Day GPM
Dead River(175 Running Hill Road) 5/27/03 344 34 7568 16 33.1
Dead River(82 Running Hill Road) 12/27/04 176 33 3989.3 12 23.3
Maine Crossing (200 Running Hill Road) 8/18/04 321 29 8279.6 12 48.3
Target (240 Running Hill Road) 8/18/04 140 29 3611 12 21.1
6" Force main (minimum flow gpm, 2.5 ft/s) 220.3 gpm
4" Force main (minimum flow gpm, 2.5 ft/s) 97.913 gpm Pump flow to be greater than
125 /o of minimum velocity flow
2" Force main (minimum flow gpm, 2.5 ft/s) 24.478 gpm and/or peak project flow