HomeMy WebLinkAboutApp 17-49P Unique Pavers Site Plan Mod TOWN OF SOUTH WINDSOR
PLANNING &ZONING COMMISSION �'N'
APPLICATION FORM
Application Number:
Official Receipt Date: r 1 �`
Munis Application #: 70 �0/ DEC �017 £�y R a
/ SOUTH WNDSOR PLANNING DEFT.
APPLICANT:
PROJECT NAME: &i'1 A C, f��l !' !',O
COMPLETE LOCATION OF PROPERTY: 79S J 0 4 a Fl Ic i 81 If i0 SO v tA L G' l di V r c r
OWNER OF RECORD ON LAND RECORDS: L C.7 r! cl r'r es,i 79� TO An Fo l cC 8l V 0 LLB
OWNER ADDRESS: 79 5 �c3 AA Fr 7�C�'l� �L�� S n o t h U1 A -iI v it C T
GIS PIN # qYZ 679 5 ZONE X 6"6
NAME, ADDRESS, TELEPHONE & EMAIL ADDRESS OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED:
68 (D�) I
a
Estimated presentation time:
THIS APPLICATION IS FOR: (Check all that apply):
❑ Zone Change to (Public Hearing and Certificate of Mailing Required)
❑ Open Space Subdivision/Resubdivision (Public Hearing and Certificate of Mailing Required)
❑ Subdivision ❑ Minor ❑ Major
❑ Resubdivision (Public Hearing Required) ❑ Minor ❑ Major
❑ Conditional Subdivision
❑ Special Exception to Table (Public Hearing and Certificate of Mailing Required)�Y
❑ Site Plan of Development ❑ New ( Modification Building(s) Sq Ft 000 r
❑ General Plan of Development
❑ Earth Filling (Sec. 7.6) and/or Earth Removal (Sec. 7.16) (Public Hearing and Certificate of Mailing Required)
❑ Regulation Amendment ❑ Zoning ❑ Subdivision - Attach proposed amendment (Public Hearing Required)
❑. Temporary and Conditional Permit (Public Hearing Required) for
❑. Temporary and Conditional Permit Renewal for
❑ Detached In Law Apartment or ❑ Accessory Apartment (Public Hearing and Certificate of Mailing Required)
❑ Major Home Occupation (Certificate of Mailing Required) for
❑ .Other (explain in detail)
PLEASE NOTE: An Application Pending Sign is required to be posted on the property for all applications
ten (10) days prior to being heard by the Commission.
n
Signature of-Appffffh` Signaturg of Property Owner
�G rr l3 a rv,tr i"
Print Name of Applicant Print Name of Property Owner Revised 1/9/2017
SpW N Sp
To� O-P Soa& ?d&U&Ot
m �
• w� 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074
SOR-CO TELEPHONE (860) 644-2511
December 22, 2017
Mr. Carl Barresi
Unique Pavers
785 John Fitch Boulevard
South Windsor, CT 06074
Re: Appl#17-49P,Unique Pavers Site Plan Modification
Dear Mr. Barresi:
We are pleased to advise you that your request for a modification to the existing"Site Plan of
Development has been approved. This approval is for the construction of an additional 1,000
square foot addition on property located at 785 John Fitch Boulevard, I zone as shown on plans
prepared by James Sollmi,P.E.L.S., dated April 2008, as revised. This approval is subject to the
following modifications:
1. Prior to commencement of any site work, a meeting must be held with Town Staff.
2. No building permit will be issued until the final mylars have been filed in the Town Clerk's
office.
3. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.11
of the Zoning Regulations.
4. Footing drains are required if the building has a basement.
5. All plans used in the field by the developer must bear the stamp and authorized signature of
the Town of South Windsor.
6. This approval does not constitute approval of the sanitary sewer, which can only be granted
by the Water Pollution Control Authority.
7. The building street number must be included on the final plan.
8. Pavement markings must be maintained in good condition throughout the site drives and
parking areas.
Black and white transparent mylars of Sheet#1 with the above modifications,together with
three blueprint copies of the entire set of plans (including architectural elevations and
landscaping plans)must be submitted to this Commission to be stamped and signed. The letter
of approval of this Commission as well must be reproduced on the mylars.
After the mylars have been signed by the Commission,they will be returned to you for filing in
the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to
the Planning Department.
Sincerely,
Michele . Lipe,AICP '
Director of Planning
cc: Town Engineer
Chief Building Official
Assessor
Superintendent of Pollution Control
Fire Marshal .
James Sollmi,P.E.L.S.
PAYMENT SUMMARY RECEIPT
TOWN OF SOUTH WINDSOR
1540 SULLIVAN AVENUE
SOUTH WINDSOR CT 06074
DATE: 12/29/17 CUSTOMER#: 000508681
TIME: 11:57 UNIQUE PAVERS LLC
CLERK: laurenlz
RECPT#: 20899733 PREV BAL:
TP/YR: MS/2018 AMT PAID: 160.00
BILL: ADJSTMNT:
EFF DT: 12/29/17 BAL DUE:
PERMITS/INSP PAYMENT
-----------------TOTALS-----------------
PRINCIPAL PAID: 160.00
INTEREST PAID: .00
ADJUSTMENTS: .00
DISC TAKEN: .00
AMT TENDERED: 160.00
AMT APPLIED: 160.00
CHANGE: .00
PAID BY: UNIQUE PAVERS LLC
PAYMENT METH: CHECK
PAYMENT REF: 6512
�O%q N Sf4
t�
�' /ICI►��,�I .. ���C;►���l,�t y �
w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074
r�OsoR-CO TELEPHONE(860) 644-2511
January 2, 2018
Carl Barresi
Unique Pavers
785 John Fitch Boulevard
South Windsor, CT 06074
Dear Mr. Barresi:
Re: Preconstruction Meeting Appl. 17-49P, Unique Pavers Site Plan Modification, 785 John Fitch Blvd
IN ATTENDANCE
Name Company E-MAIL Phone
number
Michele R. Lipe SW Planning michele.li e southwindsor.or 644-2511 x252
Jeffrey Doolittle SW Engineering 'effre .doolittle southwindsor.or 644-2511 x245
Bernie Drabek SW Engineering bernard.drabek south_windsor.or 644-2511 x241
Carl Barresi I Unique Pavers I I 860-798-9305
The following is a brief summary of points discussed during the meeting:
Erosion and Sedimentation Control
1. During construction a crushed stone tracking pad may need to be installed and maintained to minimize
tracking of dirt/gravel on to Mascolo Road. Calcium chloride or water is to be used for dust control as
required.
Public Works
1. Three complete sets of approved/revised plans to be provided to Town prior to start of
construction. They will be stamped by the Planning Department along with plans developer
needs. Only approved plans are to be used on the job site.
2. The Engineering Department is to be notified forty-eight (48) hours prior to the start of major
construction work on site with inspections and testing per Developers Checklist for the following:
a. After site is staked out
b. All drainage work
c. Preparation of subgrade, compaction tests as per Developer's checklist
d. Placement of bituminous concrete,two (2) inch layers maximum
3. No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation.
4. As built plans are to include horizontal and vertical location of all underdrains, footing drains,
and sanitary sewers and house service laterals located as per revised as-built checklist.
5. A$25 Zoning fee is due with the as built plan.
6. Any problems and/or questions regarding construction of this project will be directed to Carl
Baressi in the field at cell phone 860-798-9305.
7. Job meetings will be held as needed, and can be called by the developer or Town.
8. Seventy-two (72) hours' notice needed for certificate of occupancy inspection. A $60
Engineering C.O. inspection fee and a $30 Zoning Compliance C.O. inspection fee is due at that
time.
9. Any proposed changes are to be presented to the Engineering or Planning Department prior to
implementation on change order form in quadruplicate with 4 copies of the drawing. Town will
attempt to turn around within 24 hours.
10. Normal hours of operation 7:00 a.m. —5:00 p.m.,no work on Sunday.
11.No paving after October 15 or before April 15 without written approval from Director of Public
Works.
Planning Department
1. Landscaping is to be installed in accordance with the approved landscaping plan. If there are
changes required, contact the Planning Department. Additional landscaping installed on one part
of a site will not preclude planting all of the remaining items shown on the landscaping plan.
2. Sign permits are required for all temporary and permanent signs.
Utilities
1. Contact utilities for coordination of utilities connection.
Fire Marshal(Commercial Facilities)
1) Documents—Complete set of stamped plans with the following:
a. Plan review paid
b. Code information sheet
c. Exiting plans with travel distances
d. Wall types
e. Door schedule
f. Mechanical,Electrical,reflected ceiling
g. Fire alarm
h. Basic sprinkler layout
** PLAN REVIEW COULD TAKE 30 DAYS FOR APPROVALS **
2) Inspections:
a. Above ceiling
b. Penetrations and separations
c. Sprinkler system
A. Hydraulic calculations and cut sheets
B. Underground flush and hydrostatic test
C. System hydrostatic test
D. Main drain test/inspectors test
E. Outside bell
F. NFPA 13 paperwork
d. Fire Alarm
e. Emergency lighting test
f. Final Inspection
** PLEASE NOTE THE FOLLOWING"
1. Consulting inspection will be welcomed
2. Multiple inspections can be done on the same day
3. Stocking/addition of fixtures to occupancy will only be allowed if the life safety systems are on
line.
Police Services
1. Emergency phone numbers for the duration of the construction must be provided to Police Services on
a company letterhead. If the developer occupies or owns the building after construction emergency
numbers must be provided to Police Services.
2. All buildings located on property that abuts a public highway must be numbered and visible from the
street. All numbering shall comply with Town Ordinance 6-800 through 6-802.
3. Barns, garages, and outbuildings,which are located on the same premises as a numbered structure, are
excluded.
4. Erect temporary sign on the site during construction identifying the project.
5. If an alarm is to be installed contact Police Services.
Building Department
1. Plan review with Building Official/Fire Marshal required prior to application for building permit.
Coordinate with Chief Building Official.
Very truly yours,
Michele R. Lipe,AICP
Director of Planning
MRL/llz
cc: Jeffrey Doolittle, Town Engineer
Bernie Drabek, Engineering Inspector
Michael Gantick, Public Works
Christopher Dougan, Chief Building Official
Tony Manfre, Superintendent of Pollution Control
Walter Summers, Fire Marshal
Utilities
PRECONSTRUCTION MEETING SIGN -IN SHEET
(please print clearly)
NAME COMPANY ADDRESS and / or EMAIL TELEPHONE
V ALt-!ZV'- A t "J Tay, 77 OLV4