PROJECT NAME: EVERGREEN RUN
COMPLETE LOCATION OF PROPERTY: 70 RUCKLAND RQAp SOUTH WIND OR CT 06074
OWNER OF RECORD ON LAND RECORDS: 95 CT LLC&225 CPN LLC
OWNER ADDRESS: 374 MCLEAN AVENUE YONKERS, NY 10705
GIS PIN # 15300070 ZONE GD
NAME, ADDRESS. TELEPHONE&EMAIL ADDRESS OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED:
NORTHEAST RETAIL 360 BLOOMFIELD AVENUE WINDSOR,CT 06095 -r—, I b . 76 Ca O 01
Estimated presentation timer/,*�
THIS APPLICATION IS FOR: (Check all that apple'):
❑ Zone Change to (Public Hearing and Certificate of Mailing Required)
ElOpen Space Subdivision/Resubdivision (Public Hearing and Certificate of Mailing Required)
❑ Subdivision ❑ Minor ❑ Major
❑ Resubdivision (Public Hearing Required) ❑ Minor ❑ Major
❑ Conditional Subdivision
❑ Special Exception to Table (Public Hearing and Certificate of Mailing Required)
(R Site Plan of Development ❑ New ® Modification Building(s) Sq Ft
❑ General Plan of Development
❑ Earth Filling (Sec. 7.6) and/or Earth Removal (Sec. 7.16) (Public Hearing and Certificate of Mailing Required)
❑ Regulation Amendment ❑ Zoning ❑ Subdivision-Attach proposed amendment (Public Hearing Required)
❑ Temporary and Conditional Permit (Public Hearing Required) for
❑ Temporary and Conditional Permit Renewal for
❑ Detached In Law Apartment or❑Accessory Apartment (Public Hearing and Certificate of Mailing Required)
❑ Major Home Occupation (Certificate of Mailing Required) for
❑ Other (explain in detail)
PLEASE NOTE: An Application Pending Sign is required to be posted on the property for all applications
ten (10) days prior to ng he d by the Commission.
Signature of Applicant Signature of Property Owner
Print Name of Applicant PrinPrin N e of Property Owner Revised >/9,?017
p V.++••%..( Ore" `d eu 0 ,,,,,,.V,
P.O. BOX 1 167
21 JEFFREY DRIVE
SOUTH WINDSOR,CT 06074
PHONE: 860.291.8755
--Ran � FAX: 8onalsi .8757
.com
www.designprofessionalsinc.com
CIVIL & TRAFFIC ENGINEERS / PLANNERS / SURVEYORS / GIS ANALYSTS / LANDSCAPE ARCHITECTS
Serving Connecticut, Massachusetts, Rhode Island
•
:
June 5, 2017
Town of South Windsor
Planning&Zoning Commission
1540 Sullivan Ave.
South Windsor, CT 06074
RE: Modification to Permit, appl. #05-34P
Evergreen Run Parking lot expansion
70 Buckland Road
South Windsor, CT 06074
Assessor's Map#27 Lot#11
• Dear Commission,
One behalf of the Applicant,Northeast Retail,property managers for the owners, 95 CT LLC &
225 CPN LLC, we are pleased to submit the attached Application for a Modification to a
previously approved Site Plan that would allow for the construction of a paved 14 space parking
area. The construction of this parking area would require the disturbance of 3,225 S.F. of
wetlands, and 3,940 S.F. of upland review area.
To keep these disturbances to a minimum, the applicant is proposing to construct a block retaining
wall 165' in length. 145' of this wall would range in height from 10'tall where it will tie into an
existing wall, to 14.5' tall. The remaining portion of wall would range in height from 12' to 2.5'
where it would connect at the existing building corner. Guide rails and fencing are proposed
along the entire length of this wall. All trees and stumps that are removed will be truck off site for
disposal. Topsoil and any other unsuitable soil in the area of disturbance will also be trucked off
site.
• Approximately 1,600 C.Ys. of fill would be brought in to bring the parking area up to the required
grades. The parking area will be graded to drain all surface water into existing drainage facilities.
The applicant anticipates the start construction this summer and have the project completed in the
fall.
Alternative parking along the westerly side of the access drive was studied but determined to be
too steep and unsafe as cars would be required to back out into traffic in the access drive. Other
parking lot options on the easterly side of the access drive were also studied but would have a
greater impact on the wetlands. The proposed option has been determined to be the appropriate
layout to address current parking demands while addressing customer safety.
Limit of inland wetlands depicted on the site plans were taken from plans entitled: M/S Town
Line Associates Evergreen Run Topographic Plan, CG.1.3 Dated: 04/29/05 Revised: 10/05/09
Scale: 1" =40' Prepared by Fuss& O'Neill. No portion of the property lies within a 100' flood
zone.
A similar parking area was previously approved by the Town Inland Wetlands Agency/
Conservation Commission July 6, 2005 Appl. #05-34P, and the Planning and Zoning Commission
on August 16, 2005, Appl. #05-34P. Stream stabilization on the property to the north that was part
of the July 6, 2005 approval was completed to mitigate the proposed 3,500+ S.F. of wetland
impact on the previously approved plans, however construction of the parking area was never
• completed.
We ask that you please review the enclosed application and supporting documentation and contact
me should you have any questions or comments.
• Sincerely,
James A. Bernardino, P.E
Director of Engineering
Cc: Northeast Retail
TOWN OF SOUTH WINDSOR CHECKLIST
REQUIRED INFORMATION SITE PLANS
APPLICANT NORTHEAST RETAIL
PROJECT NAME EVERGREEN RUN
This checklist must be signed by plan preparer (P.E./L.S.) declaring that all required information
is provided. Items 1-7 are required for all applications; items 8-11 required where appropriate.
Check mark for each item supplied.
X 1. On each sheet for plans or maps, title block with the following information:
X a. Name, address and telephone of applicant.
X b. Name, address and telephone number of Land Surveyor or Professional
Engineer.
X c. Name of Development.
X d. Date when drawings were made.
X 2. Key Map: An overall map drawn to a scale of 1 inch equals either 100 feet or
200 feet. This map will show the overall design of the Development and
surrounding property within 500 feet.
X a. Data block which gives needed zoning information such as percentage of
lot coverage, acreage of tract, number of apartment units, parking
requirements, etc.
X b. Outline of buildings.
c. Layout of streets.
X d. Surrounding property boundaries-within 500 feet.
X e. Names of abutting property owners.
f. Proposed open spaces and recreation areas.
X g. Driveway cuts on abutting properties and any properties across from
proposed site.
X h. Distance to and name of nearest intersection street.
NA 3. Architectural Elevations: See attached checklist for Architecture and Design
Review.
1
X 4. Plot Plan: A layout map of the proposed site drawn to a scale of 1 inch equals
40 feet on either of the following size sheets: (1) 24" x 36" with a 3/4" ruled
margin; (2) 18" x 24" with a 1/2" ruled margin, containing the following data:
X a. Distance and bearings of all boundary lines and acreage of site. Iron pins
required at all property angle points and shown on map.
b. Proposed streets and street lines with center line station, curve data, and
parking spaces.
X c. Building lines in accordance with zoning regulations.
X d. Proposed buildings and other structures, including signs, outside lighting,
and dumpsters (on concrete pad and screened).
X e. Easements, noting grantors, grantees, and purpose must be shown in
table format, e.g. below
Grantor Grantee Type of Date Filed Vol/Pg
Easement
X f. Names of abutting property owners.
g. Monuments will be indicated at corners and angles of all streets and at all
points of curvature and tangency. The monumented points within
proposed site shall be coordinated. These coordinates shall appear in
tabular form on the plot plan. The accessibility of these CGS points shall
be determined by the Town Engineer.
h. All open space or other common or public land uses shall be indicated.
X i. A-2 certification; P.E./L.S. Seal.
X 5. Topographic Map: A map drawn to a scale of 1 inch to 40 feet on sheets not
exceeding 24 inches by 36 inches, including ruled margins shall in addition to
the requirements of the plot plans show the following:
X a. All existing and proposed buildings.
X b. Curb Lines and pavement width, sidewalks.
X c. Existing and proposed sanitary sewers.
X d. Existing and proposed water and-all existing utilities.
2
X e. Present wooded area indicated by foliage lines. Any trees to be saved
should be shown.
X f. Existing and proposed contours shall be shown in not less than two-foot
intervals, but in cases of relatively level land, the contours shall be one-
foot intervals and spot elevations.
X g . Regulated wetlands and 100-year floodplain or note that none are
present.
h. Proposed storm drainage system, showing all catch basins, endwalls,
manholes, lengths and sizes of pipes and elevations of structures.
(Maximum distance between catch basins shall be 300 feet and minimum
size of storm drain lines shall be 15 inches, within Town ROW.) If
plan/profile sheet is provided all of this does not need to be shown. Only
top of frame elevations and inverts of open discharge pipe shall be shown
on this plan.
i. Connections of all springs into proposed storm drainage system as
needed.
X j. Location and indications of existing brook channels, and 100-year flood
limits.
X k. A-2 &T-2 Certification; P.E & L.S. Seals.
6. Landscaping plan
X 7. Drainage calculations: - Zero Runoff Increase per attached guidelines.
8. Traffic Report
9. Site Lighting Plan
NA 10. Plans and Profiles: A plan and profile of the proposed streets drawn on
plan/profile paper of scales 1 inch to 40 feet horizontally, and 1 inch to 4 feet
vertically on sheets not exceeding 24 inches by 36 inches, including ruled
margins and containing the following:
a. Layout of streets in sections coordinated by stations with the profile.
b. Street plan showing roadways, drainage, sanitary sewer (including house
sewer), foundation drains, lot lines, buildings including all utilities with
elevations (top frame and inverts), size, type, length, slopes of pipes.
c. Sight line at driveway&street intersections.
3
d. Profile of roadway showing existing and finished grades. Roadway profile
will show all tangent grade and all vertical curve information.
e. Profile will show all catch basins and all drainage lines between catch
basins with all invert and top of frame elevations, sizes, lengths and
slopes of pipes.
f. Where any storm drainage line discharges into an existing brook sufficient
profile of this brook will be shown to determine conditions.
g. CGS datum shall be used on all sites accessible to these controls. The
Town Engineer shall, based on standard engineering practices, determine
the accessibility of these controls.
h. Profiles shall show all sanitary sewer lines and manholes, including
elevations, (inverts, top of frame) sizes, lengths, and slopes of pipes.
Top of foundation elevations for building shall be shown.
NA 11. Open Space Site Improvement Plans: For sites which require or include a
provision for open spaces, a plan which contains data for site improvement
may be required. This map shall be drawn to a scale of 1 inch equals 40
feet.
NA 12. Sanitary Report: Where individual sanitary sewage disposal systems are
proposed, the final plans shall include a Sanitary Report certified by a
Professional Engineer. The report shall demonstrate the feasibility of the
proposed individual systems.
6-5-2017
LAN PREPARER (P.E./L.S.) DATE
February 2002; Rev. 4-04
4
. .
Jig
41
VA
. ; A2Hal
A.
= .
d Md
.
. I
i
Via: # � .�, : � , � t
1 r
Y
_....... ... .... .._ . .. ....... ......_..._.... .... .. ...., ....... ........,. .. .... ....... ..
Caigd W fir 24)
�s.a� •�t,�su�8du
Am.00 i g �,�r
t
v¢�c4�tato:; ��•
z�. sec
:�acesia�•
A
eLs pa: 41. �lo vo.0
otli
e dtlbfl�i BQoi.iw- X
-�! :'s�x- 'o��t•�^�;.
tr x��a4b•Line By cam,4ta:mvil x,,:ems;CAP .. .o:• m:
NEW
. :.
. �ook:}S31,PSg�;B2
ymf 1931pnE. $6
boU bw4W CvaMft tim
and ait tltkaat s1r o acf w Oli A"
aar 'cold"
brae r flie E*A Y pia agog aii''Mo' mi0od 4a 81e [dual
0.0 df .Of.dw: t
M P o ilur. �"m bd ivAtGd AN
' Wtellditn� l4hela> Arc► Uyxtiw
11. '00 Ave mm WIM006 by And ;Id.oftatiodo.-Vili-ft
am6velavvststit 5�e
:a�tl�aoa�aad�> 'daam�nt.
��: 11A�3��av�od.oe,�,all�sdo�ct .
[�ate.8f4 aue�dlmra►Il�,pd .
ova
Book"1831,Yag8:$2
r
- -
VOL 18-3I.F16E 87
ems: URANT :
Ewa MM'Tow9 me LM
my- X LUC,a
' Mmt�iaG �� Y•� -
. .
n. 5- lfa
:sue. i •
I- n-foom• Lid
nook.IS i,rage:a2
ta•�.Mr e•wc ss�
VOL PA9 $$
= MAN=—
nebislra
a�paay,�r �'• •
1
; 9�, aYd 1i�4til,•i ilk t
,
&WOOD w VYakLL
i
. E
. �boo0C:3.63#,pAgb:82
f
{
I
Banc ,7eF. a
t
800k:16ss,rAge:sz i
i
i
•i 1
VOL i� 9
•oww,cff vowy
*IN •wet- � ma.
, +imI.:aLabowleOr- c ;
4 ats.,4410 Miember•and
' •' • .. . . ���in�ta�l8.�d�arial�e�iea�iocmddpoa
Una
_ � •. ,}:
• �c
•....��.•' ._ ,. '� -p` ��:�.�:.�'� o6:noQy ado•�taoa• . .
�tq1 tears a ,�• otd of it, oowt*d
.tqimx *a
y�`na�;arer�
• BQOh:38S3.D7tgA:'82 '
i
IF4sw-%QLv9r 24).
SY��A'f`�,y2',6pfrJ�
a lto It t get :t (Paw m owl fp['dw Oy9nfyr end.it�6 J
day
AV
`r d' � , ,..f 9�;$l4�Il• r 1�Yea kAid, ;
. :� pa$W�.af'a�'•.doBmplB�y e3Ylf�hs�sitlA• ;
•"�►.�.
r' .•_.__..a`Autyk adw is 4W&Ir dw N*0•slap
Igrr me. xr?tdy' y N
aa+r�ti�b �r�ann:aeea�'�at�a � .
• �iaar�dnrd�zh�ks�G!u�aotsc�f.�'.t�.�SrQ�° �i'..�- G f •
i
i
I!
' �oalc:18�2,Page�B�
VOL 188DRE •82
L .o mom A-NWY'P.ubiic fa wd far�
lr ' xy .rz�aw 'tud0
,.d i
to on !
4 � d say ,
It-
f. as 1(Glaerd— LDS H ►2I�G i
rr�r:eru.fio�r. y.ab,�;y,.,ma� I
NO
j
i
800k:2831tPaga:R1�
i
kill.U-31—PAGE 43
A•a WS*ah."V .O of*$ M*IDRAWAGR ►x ap
�9; 87 Si}I.•% ';)^�a:4 a kd°C31LiSIIiTAti Al .1 .ti°�ND AQ�D
4:t1 �" PRAT 4�Tip ' 6I.1&4K.W6:7&6 05,18n-Mitad.Vie _
�•'��1}�B AR&b$LuA��.OA3l f30T':T�H Rlt,�7()I31+t�t";
7' •'1' =`em .s . �t+C W ➢sod 3tI&K i�:1�,- by*w
lid,wid, ` Rat 1'4vPA• �C"I'pip110�
�'cu�i�"nd9o1; .woe)'b�iaSo�fap�tic6ieiiya�'6;od Ae��. 6
$°l °>�+t�FR�: Pt be�aB)ot�e��'1�b'ag •�oc:o�Jmtd
nxti?aaclYfifi :afSdath 4 '&�id.: puebeia8�Y1J6.tww4ac4f
•�4: y�d, QI:�.Raul.atd'9.�1ideCsoutL tH;ti�e. �ur.�gf
_1,6m�'i�i►'�: edgc�Nra.&b�tlX�,1 .iA� .�4gDc�� nd',�roi•
Byrn iif k s tlt •try.$ 9mi ss"W:3.4.I5
�•�'9°i!T!'0�`;ai�T9.1.a:£�-�bq•3 P.�'tha�Da�t$2"�2'?.�`^W,27Z+4o•Seef
:�� :1t �r � tpi i .t�xq •art•s�°�8'�v~�n', c�o:g -
:�: � t�"'�,�fs9-.�1: to.a poudk:tl �r '�+���r•��.�
:.8 lbist'-.to s,pig3i ;tl poa to tAno 9".'W,. §- ?•$eem a `
• . - °�"!8" �9�1.�aeEta:•a polat;• �191°S8'S8"•�t►,l.�i.8.�6•>�at^ta t►°
i �lt" O**
�1 °�.�it9'�f +.'VK;'1.7�Fi,8 '�a Pai�N•1�"42'S3cg$�9.T6'�fR•� '
6 ::AE• 7.'+F8'•'�£,:BSI:� it. � 0�83�°2T'03"1?,.1''.1P�148�itrr.poi�;:Bxiabro:
` d"�•F 13 i8 dt�q a i$la t3 7515'WA 1111 hk tQ �.1 atee 5
d1S°!hi'48"` ,!{ t% :a. 0 5'$6°11+'S2" 4$ fa..4a 4:p ;thma�oa i
10
o..r..19, . qs ii*gigs&iiftf lw'$30 $�6:�413 •4.Pft.fha�Ae•7fT
`•$. 4w'#,`. ?1�"20';+1?$:i<8.7z tdi•a' C9$h�. de S
6ftM s 74
WS-IL-IVAL: IL'tq:�,x4*000 s
fd#" es:titi set,or li' :d►e�a�!-V,4,3'A t :2Q*4.to.p s
8'tp"�$87�Q: :to�q Dleautt tS 73�'S&"'$.•?�1,8��e�t,to a. tlu�
• -''�,,#�:?A.�ewq tQ 9�:�N 37�A: 1?.�:d1 �.to.a: •dux 9 -
p
i
1
I _ _
00
r ire
i
S
J
i
i
s 4
`I a
4
i
p
9
I
' �400
� � ],
�i 3i ��i!l�f1i
c �
i
fie' ;3
s
{Y�I�d a96�ot lay
VOL Iasi-fie 1:68
QIiPk+�ctledc S�"�drid'mde�ea��+OI�Q�aq,
�eadrA� .gat��.�,�cr��:a� a�.�e► a�s..od�a�.
► �
ar itleealilSeeo.q, I NEW
4� "dW
rt
f
i
C 4
F �
p
i
� y
i i
I
F
g
i
9
� � � � �
� .
� � .
3� v3
C �
� ,w.-,w. sw
- -- J•-� -.•--
Y�..:i�3��:t�s� 1��
�� � i�
.`__,2 X �,,�i
.-
`'.
� �
eaok:tssi,raye:92 j .
..
a
Irxyu v°r.•'•oL w7
v�.1,8"UPAGE
AA :oaf L•
powm-f&, ti 24mbd i; 29.1
:iS.C� 1�na�ecic!{sfidsmGitl?n'�:1. ..
• oLv6 i�i '
Hook:1891,k+ga:82
I
i -
I
i
f
I
June 1,2017
ill
To Whom It May Concern:
I
I hereby authorize Northeast Retail Leasing and Management Company, LLC and Design Professionals,
f Inc.to act as an authorized agent in the pursuit of land use permits and approvals with respect to the
property known as Evergreen Run, located at 70 Buckland Road in South Windsor,Connecticut.
i
Since ,
i
j 95 CT LLC
t .374 Mclean Avenue
4
Yonkers, NY 10705
i
I
i
t _
{
I
I
I
3
I
7
I
PLANNING DEPARMENT
IN-HOUSE REFERRAL FORM
DATE: 6/7/17
TO: Matt Galligan, Michael Gantick, Walter Summers, Jeff Doolittle
Ray Favreau, Chris Dougan, Heather Oatis, Kevin Cooney, Tony Manfre,
John Caldwell, Andrea Confrancesco, Chris Duchesne, Vincent Stetson
FROM: Michele Lipe,AICP, Director of Planning
The Planning &Engineering Departments have received plans for the following projects:
Appl 17-23P, Evergreen Run Parking Lot expansion
Location: 70 Buckland Road
® Site Plan ❑ Subdivision No. Acres Zone BGD
❑ Industrial ® Commercial ® Residential No. Lots/Units
Water: ® Public ❑ Private Well Sewerage: ® Public ❑ Septic System
Project Description: Addition of 14 spaces to the rear of 90 Buckland Road
Future Town-owned property involved? ❑ Yes ®No
❑ new street(s) ❑ new detention area
❑ new open space/recreation area ❑ active ❑passive
Planning Department notes:
Please comment by 6/23/17 and return to the Planning Department.
MEMORANDUM
To: Michele Lipe, Director of Plannning
From: Jeff Doolittle, P.E., Town Engineer
Date: June 26, 2017
Re: App 17-23P Parking Lot Expansion, 70 Buckland Rd
I have reviewed the Plan for the above application and I have the following
comments:
1. The proposed wall is over 14 feet high which will make it very difficult and
expensive to extend this driveway to the property to the north as required
by PZC. Any future driveway extension should be designed at a
maximum 10% slope. The height of the wall should be reduced to 10-11
feet by grading the proposed parking lot expansion down at 2-3%to the
north from the existing driveway. A catch basin could be installed in the
expanded parking lot and piped to the existing CB in Buckland Road to the
west, behind the existing building to handle storm water drainage from this
parking area. Grading the parking lot down to the north.will require a
lower wall and less fill.
Please let me know if you have any questions.
1 .
r;
P.O. BOX 1 167
21 JEFFREY DRIVE
SOUTH WINDSOR,CT 06074
PHONE:-860-29"753
FAX: 860.291.875 7
LS www.designprofessionalsinc.com
CIVIL & TRAFFIC ENGINEERS / PLANNERS / SURVEYORS / GIS ANALYSTS / LANDSCAPE ARCHITECTS
Serving Connecticut, Massachusetts, # Rhode Island
:
July 10, 2017
Michele Lipe,Director of Planning
Town of South Windsor
1540 Sullivan Ave.
South Windsor, CT 06074 RECEIVED
• RE: Appl. #17-23P
Evergreen Run Parking lot expansion JUL 112017
70 Buckland Road
South Windsor, CT 06074 SWTH"WSM A ANWNG Off
Assessor's Map#27 Lot#11
Dear Ms. Lipe;
Northeast Retail,property managers for the owners, 95 CT LLC &225 CPN LLC, is in receipt of
the Memorandum to you from Jeff Doolittle, PE, Town Engineer, dated June 26, 2016 (attached
hereto for reference. On their behalf, we offer the following in response.
The Applicant has explored the option of lowering the retaining wall and pitching the proposed
parking area to the north and collecting and conveying the storm water generated from this area
westward behind the existing building with a connection to the catch basin within Buckland Road.
This option results in an increase in impervious area(0.10 acres) draining towards the Buckland
Road drainage system. With this consideration, the capacity of that portion of the Buckland Road
drainage system in which the noted connection would affect was evaluated to assure its capacity to
accept additional flows.
• Attached you will find and exhibit and calculation delineating the areas flowing to the Buckland
Road drainage systems in question as well as calculated flows to for the 10-year storm event. The
Buckland Road drainage system is comprised of 15"concrete pipes which accepts flow from the
roadway from a highpoint just south of the site to a low point in Buckland Road several hundreds
of feet to the north of the site where it combines with a 36"culvert and discharges to a wetland
system.
A shown of the attached drainage exhibit and calculations,the existing 15"pipe has a limiting flow
capacity within its last segment of the system which has a slope of 1.44%. This slope yields a
flowing full capacity of 8.02 cfs. Based upon the existing contributing area to this point(3.06
acres), the existing flow To this point is 10.65 cfs which exceeds the existing drainage systems
capacity by—33%. If the proposed parking area(0.10 acres)was to be added to this system,the
:
limning capacity(8.02 cfs) of the Buckland road drainage systems would be exasperated to 48%
above it capacity.
To avoid this impact,the proposal is to construct the parking area to allow for surface discharge
and collection to the existing drainage system onsite. As part of the properties Connection and Use
Agreement(attached hereto)with Evergreen Walk(west of subject property), the property can
discharge up to 12.5 cfs to its drainage system. The site is currently connected to said system and
currently discharges 2.10 acres or 10.23 cfs of flow. The proposed parking expansion will add
0.10 acres to this discharge raising the peak rate to 10.72 cfs, which falls within the allowed
: drainage considerations of the Site and Evergreen Walk.
In consideration of the cross-access driveway with a maximum 10% slope, we have prepared an
exhibit(attached)that demonstrates that a driveway with said slope can be constructed while still
providing reasonable building envelopes on the adjacent parcel. The exhibit considers the
originally proposed grading scenario and not a reduced wall height which would require a drainage
connection to the Buckland Road system which has been determined to be of insufficient capacity.
• We ask that you please review the enclosed application and supporting documentation and contact
me should you have any questions or comments.
:
Sincerely,
ames A. Bernardino, P.E
Director of Engineering
: Cc: Northeast Retail
Date 7/10/17
Page of
Project 36 S 2 F VF fL R E&A-1 R v4.)
PA12
pi
"07
_17
J
TH
C-`.Y ST
C 0 AJi Via I t-;V 27 r-,YT
T� at
1A.i) TO-
riz A h 'Oflu Sri)
AO rF
PAP f.<TIY ,1-
CJ
S
_Y
. .............CLJ
?0 ,2 cp 1
..... ......
4
I LO
J
f -T
AF
®R
J
jci 10
acep
54
e. Via -7 Aco' si
P-4-p
";4
T h� P. 01
DesignProfessionalsinc.com • 21 Jeffrey Drive 0 South Windsor,Connecticut,06074 9 860-291-8755
MEMORANDUM
To: Michele Lipe, Director of Plannning
From: Jeff Doolittle, P.E., Town Engineer '\Ny?�
Date: June 26, 2017
Re: App 17-23P Parking Lot Expansion, 70 Buckland Rd
have reviewed the Plan for the above application and I have the following
comments:
1. The proposed wall is over 14 feet high which will make it very difficult and
expensive to extend this driveway to the property to the north as required
by PZC. Any future driveway extension should be designed at a
maximum 10% slope. The height of the wall should be reduced to 10-11
feet by grading the proposed parking lot expansion down at 2-3% to the
north from the existing driveway. A catch basin could be installed in the
expanded parking lot and piped to the existing CB in Buckland Road to the
west, behind the existing building to handle storm water drainage from this
parking area. Grading the parking lot down to the north will require a
lower wall and less fill.
Please let me know if you have any questions.
i
SEWN 6r
C�
a �
1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074
SOR-CO TELEPHONE (860) 644-2511
August 2, 2017
Northeast Retail
360 Bloomfield Avenue
Windsor, CT 06095
To Whom It May Concern:
RE: Appl. 17-23P, Evergreen Run Site Plan Modification - request for site plan
modification for a parking lot expansion, on property located at 70 Buckland Road,
Buckland Gateway Development zone
Please be advised that the above referenced matter has been scheduled on the
Planning & Zoning Commission Regular Meeting agenda for Tuesday, August 15,
2017 in the Madden Room of the South Windsor Town Hall, 1540 Sullivan Avenue.
The Regular Meeting will follow the Public Hearing which begins at 7:30 p.m.
Someone must be present at the meeting to represent the application.
One sign advertising the meeting must be posted on the property for ten (10)
consecutive days prior to the meeting and must be clearly visible from a town street.
The sign must be posted on Buckland Road by Friday, August 4, 2017.
Signs can be obtained in the Planning Department, Monday through Friday, 8:00
a.m. - 4:30 p.m. If you have any questions regarding this letter, please call 860-644-
2511, Ext 253.
Sincerely,
Lauren Zarambo
Administrative Secretary
P.O.BOX 1167
21 JEFFREY DRIVE
SOUTH WINDSOR,Cr 06074
PHONE:860.291.8755
FAX:860.291.875 7
www.designprofessionalsinc.com
CIVIL & TRAFFIC ENGINEERS / PLANNERS / SURVEYORS / GIS ANALYSTS / LANDSCAPE ARCHITECTS
Serving Connecticut, Massachusetts, $Rhode Island
•
•
•
• LETTER OF TRANSMITTAL
To: Ms. Michele Lipe Date: 8/14/2017 DPI Project No. 3652
Town of South Windsor Re: Evergreen Run Parking lot expansion
: 70 Buckland Road
South Windsor, CT 06074
Assessor's Map#27 Lot#11
: WE ARE SENDING YOU: ® Attached ❑ Under separate cover via the following items:
❑ Shop Drawings ® Prints ❑ Renderings ❑ Specifications
: ❑ Copy of Letter ❑ Change Order ❑
COPIESDATE NO. DESCRIPTION
3 7/13/17 1 Revised Site palns dated 7/13/17
5 7/13/17 2 Revised Site palns dated 7/13/17(11 x 17)
These are transmitted as checked below:
® For Approval ❑ No exceptions taken ❑ Resubmit copies for approval
❑ For your use ❑ Make corrections
❑ Submit copies for distribution
❑ As requested ❑ Revise and Submit
❑ Return corrected prints
: ® For review and comment ❑ Forbids due
• ❑ Prints returned after loan to us
REMARKS:
• C Y D
AUG 14 Z017
SOM WINDSOR PLANNING DEPT.
SIGNED: i' , (_ / CC:
: Daniel H.Jar0eson,ElT.
• 4.
•
•
•
Appl. 17 2-3P, Ever-green--Run marking Exparrs on
August 15, 2017
Planning Department Report
l. Request for site plan approval to add additional parking at for the retail
buildings at 70-90 Buckland Road, Buckland Gateway Development zone.
2. The provisions of access management apply to this site and the original
development complied by having the driveway connect to the Lowe's driveway
rather than to Buckland Road, and by making provisions for a future
interconnection with the abutting property to the north. With this proposal, the
applicant is maintaining the original approved grades for this interconnection.
3. When this site was originally approved the parking requirement for this site is
112 spaces, 135 spaces have been provided with this new layout.
4. There are regulated wetlands on this site. The IWA/CC approved this
application on Wednesday, Jul 19 with the following approval conditions: a
bond for installation and maintenance of erosion controls of$5,000 and a bond
for the construction of the stormwater system of an additional $5,000.
5. If this application is approved, the Planning Department has no additional
requested modifications
OWN Sf4
Tov� O-P S_0� 6Z()&U&0t
m �
• 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074
I�aSOR-CO TELEPHONE (860) 644-2511
CERTIFIED MAIL 7014 2120 0003 3214 3603
August 17, 2017
Northeast Retail
360 Bloomfield Avenue
Windsor, CT 06095
To Whom It May Concern:
Re: Appl. 17-23P, Evergreen Run Site Plan Modification
We are pleased to advise you that the Planning &Zoning Commission voted on August 15, 2017
to approve with modifications the above referenced application for a site plan modification.
This approval is for a site plan modification for a parking lot expansion on property located at 70
Buckland Road, Buckland Gateway Development zone, as shown on plans prepared by Design
Professionals, Inc., Project # 3652, dated May 22, 2017 as revised. This approval is subject to
the following modifications:
1. Prior to commencement of any site work, a meeting must be held with Town Staff.
2. This application is subject to the conditions of approval of the Inland Wetlands
Agency/Conservation Commission, including bonds in the amount of$5,000 for erosion
and sedimentation control and $5,000 for stormwater structures.
3. All bonds must be in one of the forms described in the enclosed Bond Policy.
4. An as-built plan is required prior to issuance of a Certificate of Zoning Compliance per
Section 9.1.3 of the Zoning Regulations.
5. All plans used in the field by the developer must bear the stamp and authorized signature
of the Town of South Windsor.
6. Pavement markings must be maintained in good condition throughout the site drives and
parking areas.
7. If a certificate is required from the Office of the State Traffic Administration, no building
permits will be issued until the certificate has been issued.
8. At such time as a site plan is approved for the property to the immediate north, an
interconnection shall be constructed in the area shown on the subject site plan OR as
agreed by the two property owners and further approved by the Planning and Zoning
Commission. Failure to construct the site interconnection shall be construed as a zoning
violation and shall be pursued via the remedies available to the Town of zoning
violations.
Black and white transparent mylar of Sheet# C-SP 1 with the above modifications,together with
three blueprint copies of the entire set of plans with-live signae�ar►si�aiscd_seals-nust_be
submitted to this Commission to be stamped and signed. The letter of approval of this
Commission and the Inland Wetlands Agency / Conservation Commission must be reproduced
on the mylars.
After the mylars have been signed by the Commission, they will be returned to you for filing in
the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to
the Planning Department.
Sincerely,
Gary Bazzano, Chairman
Planning and Zoning Commission
GB/llz
Cc: Town Engineer
Chief Building Official
Assessor
Superintendent of Pollution Control
Fire Marshal
Design Professionals, Inc.
P.O.BOX 1167
21 JEFFREY DRIVE
SOUTH WINDSOR,CT 06074
PHONE:860.291.8755
MINN FAX:860.291.8757
www.designprofessionalsinc.com
CIVIL & TRAFFIC ENGINEERS / PLANNERS / SURVEYORS / GIS ANALYSTS / LANDSCAPE ARCHITECTS
Serving Connecticut, Massachusetts, *Rhode Island
• LETTER OF TRANSMITTAL
To: Michele Lipe Date: 8/21/2017 DPI Project No. 3652
Town of South Windsor Re: Evergreen Run
• i
WE ARE SENDING YOU: ® Attached ❑ Under separate cover via the following items:
❑ Shop Drawings ® Prints ❑ Renderings ❑ Specifications
❑ Copy of Letter ❑ Change Order ❑
' COPIES DATE NO.
1 8-18-2017 Mylat Title Sheet"Parking Lot Expansion Evergreen Run"
1 8-18-2017 Mylar Site Plan C-SP1
4 8-18-2017 Full size paper sets"Evergreen Run"
Bond Checks
W-9
• These are transmitted as checked below:
❑ For Approval ❑ No exceptions taken ❑ Resubmit copies for approval
• ® For your use ❑ Make corrections
El Submit copies for distribution
® As requested ❑ Revise and Submit
❑ Return corrected prints
❑ For review and comment ❑ For bids due ❑ Prints returned after loan to us
• REMARKS:
SIGNED•x CC:
_��,•
Barry D. 61arke L.S.
BOND TRANSMITTAL
DATE: 8/21/17
APPLICANT NAME 225 CPN LLC
ADDRESS 270 Madison Avenue, Suite 1503
New York, NY 10016-0601
PROJECT LOCATION/ADDRESS LOT Evergreen Run / 70 Buckland Road
SUBDIVISION
P&Z OR IWA/CC APPLICATION NUMBER 17-23P
AMOUNT & TYPE OF BOND $ 5,000 . E&S Bond Check # 293522
$ 5,000 Stormwater Structures # 293523
DEPARTMENT PLANNING
SUBMITTED BY Lauren Zarambo 8/21/17
NAME DATE
PROCESSED BY FINANCE $
NAME DATE
SUB ACCOUNT NUMBER 0 7 67
MUNIS APPLICATION 201700663
WAPlanning Admin\PZC\Bonds\2017 Bonds\17-23P Evergreen Run Bond Trans.doc
PAYMENT SUMMARY RECEIPT
TOWN OF SOUTH WINDSOR
1540 SULLIVAN AVENUE
SOUTH WINDSOR CT 06074
DATE: 08/21/17 CUSTOMER#: 000697156
TIME: 13:58 95 CT LLC &
CLERK: laurenlz
RECPT#. 20898010 PREV BAL:
TP/YR: MS/2018 AMT PAID: 5000.00
BILL: l ADJSTMNT:
EFF DT. 08/21/17 BAL DUE:
PERMIT /INSP PAYMENT
------ ----------TOTALS-----------------
PRINCIPAL PAID: 5000.00
INTEREST PAID: .00
ADJUSTMENTS: .00
DISC TAKEN: .00
AMT TE;ERED: 5000.00
AMT APPLIED: 5000.00
CHANGE: .00
PAID B�: 95 CT LLC &
PAYMENT METH: CHECK
PAYMENT REF: 293523
S0* SfCID
S �
I C� 1540.SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074
sos•co TELEPHONE (860) 644-2511
August 23, 2017
Northeast Retail
360 Bloomfield Avenue
Windsor, CT 06095
Dear To Whom It May Concern:
Re: Preconstruction Meeting for Appl. 17-23P,Evergreen Run Site Plan Modification, 70 Buckland Road
IN ATTENDANCE
Name Company E-MAIL Phone
number
Jeffrey Folger SW Planning 'effre .fol er southwindsor.or 644-2511 x229
Jeffrey Doolittle SW Engineering 'effre .doolittle southwindsor.or 644-2511 x245
Bernie Drabek SW'Engineering bernard.drabek southwindsor.or 644-2511 x241
Christopher Duchesne SW Police Dept. christo her.duchesne southwindsor.or 860-648-6273
Mark Koss Koss Construction kossconstructionllc@gmail.com 860-933-4557
Ben Wheeler DesignProfessionals bwheeler desi n rofessionalsinc.com 860-291-8755
JP Pechie Groundscapes roundsca esct.com 860-465-6467
The following is a brief summary of points discussed during the meeting:
Erosion and Sedimentation Control
1. All erosion and sedimentation control measures are to be in place prior to earth moving operations in
each area and maintained/cleaned out during construction. Call Jeffrey Folger, Senior Environmental
Planner for inspection when measures are in place, prior to commencement of site work or if any
problems/concerns arise during construction at 860-644-2511 Ext. 229.
2. All topsoil stockpile areas to be protected(ringed with haybales or equal).
3. During construction a crushed stone tracking pad may need to be installed and maintained to minimize
tracking of dirt/gravel on to Lowes driveway and Buckland Road. Calcium chloride or water is to be
used for dust control as required.
4. Install and stabilize the detention basin and swale on site first.
Public Works
L Three complete sets of approved/revised plans to be provided to Town prior to start of
construction. They will be stamped by the Planning Department along with plans developer
needs. Only approved plans are to be used on the job site.
2. The Engineering Department is to be notified forty-eight (48) hours prior to the start of major
construction work in (Road Name) with inspections and testing per Developers Checklist for the
following:
a. After site is staked out
b. All drainage work
c. Placement of bituminous concrete,two (2)inch layers maximum
3. Certification of gravel used as subbase and processed stone for base will be required from an
approved testing company
4. Certification of all products used -- storm pipe, structures, pavement, oil/grit separator and sewer
grinder pump system shall be presented to the Town Engineer prior to installation.
5. No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation.
6. An as built plan will be required for the improvements to the site. A separate as built plan will be
required.
7. As built plans are to include horizontal and vertical location of all underdrains, footing drains,
and sanitary sewers and house service laterals located as per revised as-built checklist.
8. All pipe and structures to be backfilled with free draining material compacted in maximum one
foot lifts with approved compaction equipment or approved equal if deep trench is encountered.
Any pipe or structure work requires inspection prior to backfilling.
9. Any problems and/or questions regarding construction of this project will be directed to Mark
Kossin the field at cell phone 860-933-4557 or in the office at 860-537-9792.
10. All filling to be done in accordance with Department of Transportation specifications. To be
compacted in maximum lifts and tested as necessary.
11. Job meetings will be held as needed,and can be called by the developer or Town.
12. Seventy-two (72) hours' notice needed for certificate of occupancy inspection and a $35 C.O.
inspection fee is due at that time.
13. Any proposed changes are to be presented to the Engineering or Planning Department prior to
implementation on change order form in quadruplicate with 4 copies of the drawing. Town will
attempt to turn around within 24 hours.
14.Normal hours of operation 7:00 a.m.—5:00 p.m.,no work on Sunday.
15.No paving after October 15 or before April 15 without written approval from Director of Public
Works.
16. Extra care must be taken when compacting around structures such as catch basins and manholes.
These spots often become problem areas in the future due to settling, therefore, the town
stafFinspectors will be requesting additional compaction tests in these areas.
Planning Department
1. Landscaping is to be installed in accordance with the approved landscaping plan. If there are
changes required, contact the Planning Department. Additional landscaping installed on one part
of a site will not preclude planting all of the remaining items shown on the landscaping plan.
2. All bonds required; mylar to go on file prior to issuance of building permit.
3. All easements must be submitted for review prior to filing of mylars.
4. Sign permits are required for all temporary and permanent signs.
Utilities
1. Contact utilities for coordination of utilities connection.
Police Services
1. Emergency phone numbers for the duration of the construction must be provided to Police Services on
a company letterhead. If the developer occupies or owns the building after construction emergency
numbers must be provided to Police Services.
Building Department
1. Plan review with Building Official/Fire Marshal required prior to application for building permit.
Coordinate with Chief Building Official.
Very truly yo ,
Mic ele R. Lippe,AICP
Director of Planning
MRL/llz
cc: Jeffrey Doolittle, Town Engineer
Bernie Drabek, Engineering Inspector
Michael Gantick,Public Works
Christopher Dougan, Chief Building Official
Tony Manfre, Superintendent of Pollution Control
Walter Summers, Fire Marshal
Vincent Stetson, Town Garage
Scott Yeomans, Town Garage
Utilities
PRECONSTRUCTION MEETING SIGN —IN SHEET
(please print clearly)
NAME COMPANY ADDRESS and / or EMAIL TELEPHONE
0` -T!J
is
p irscJl� S't,�►�Q CttR���Pr�Ek �VESiJF�S��,,��,�r,� 17
�{t.SS s l red r-1otnj�-v- &---�,Oil,CCw, r173 3
C
J w�IEEL�R DP 1 13t�ruEE�Eq @OES�t,►JnRo�E55�a.+,ot s,uc F60 aal ?SS
P