June 8,2017
RUKH Construction
Paul Fick
3000 Hadley Road
South Plainfield,NJ 07080
Dear Mr. Fick:
Re: Preconstruction Meeting for Appl. 11-24P, Cambria Suites, 107 Room Hotel at Evergreen Walk
IN ATTENDANCE
Name Company E-MAIL Phone
number
Michele R. Lipe SW Planning michele.li e southwindsor.or 644-2511 x252
Jeffrey Doolittle SW Engineering 'effre .doolittle southwindsor.or 644-2511 x245
Bernie Drabek SW Engineering bemard.drabek southwindsor.or 644-2511 x241
Walter Summers SW Fire Marshal walter.summers southwindsor.or 644-2511 x217
Tony Manfre SW Pollution anthony.manfre@southwindsor.org 644-2511 x247
Control
Diane Collelo SW Health Dept. diane.collelo southwindsor.or 860-644-6182
Bob Jacobsen Butler Company jacobsen thebutlerco.com 860-688-8024
Anthony Gabriele RUKH South anthoLiy.jzabriele@rukhdevelopment.com 908-447-8123
Windsor
Paul Fick RUKH Paul.fick,@arukhdevelopment.com 732-710-9498
Construction
Ron Bomengen Fuss & O'Neill rbomengen@fando.com 860-646-2469
Gary McDermott CT Water Co. gmcdermott@ctwat-e-r.com 860-664-6125
Jack Cannone Eversource—gas 'ohn.cannone eversource.com 860-292-2270
Jim Corbett Frontier 'ames.s.corbett ftr.com 860-725-4509
Brian Withycombe I Frontier brian.t.with combe ftr.com 860-725-1276
The following is a brief summary of points discussed during the meeting:
Erosion and Sedimentation Control
1. All erosion and sedimentation control measures are to be in place prior to earth moving operations in
each area and maintained/cleaned out during construction. Call Jeffrey Folger, Senior Environmental
Planner for inspection when measures are in place, prior to commencement of site work or if any
problems/concerns arise during construction at 860-644-2511 Ext. 229.
2. All topsoil stockpile areas to be protected(ringed with haybales or equal).
3. During construction a crushed stone tracking pad may need to be installed and maintained to minimize
tracking of dirt/gravel on to Long Leaf Lane from the site. Calcium chloride or water is to be used for
dust control as required.
4. Install and stabilize the detention basin and swale on site first.
5. Erosion controls currently at the northern stock pile site have been compromised by the weather and
animals and need to be re-installed.
6. An earthen berm needs to be placed along the western edge of the construction site. Top soil to be
used from the perimeter final turf seeding can be used and spread with the time comes.
7. All areas of soil open for more than a month must be seeded with annual rye grass seed.
8. A perimeter construction fence must be installed to keep the general public away from the active
construction site.
Public Works
1. Three complete sets of approved/revised plans to be provided to Town prior to start of
construction. They will be stamped by the Planning Department along with plans developer
needs. Only approved plans are to be used on the job site.
2. The Engineering Department is to be notified forty-eight (48) hours prior to the start of major
construction work in Long Leaf Lane with inspections and testing per Developers Checklist for
the following:
a. After site is staked out
b. All drainage work
c. Preparation of subgrade, compaction tests as per Developer's checklist
d. Placement of bituminous concrete,two (2)inch layers maximum
3. A sewer permit is needed for installation of the sewer lateral for the hotel.
4. Certification of gravel used as subbase and processed stone for base will be required from an
approved testing company
5. Certification of all products used -- storm pipe, structures, pavement, oil/grit separator and sewer
grinder pump system shall be presented to the Town Engineer prior to installation.
6. No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation.
7. Progress As Built Plans are to be submitted to the Town Engineer for approval prior to paving
and after subgrade formation. Show elevations and location of all storm drainage and sanitary
sewer.
8. An as built plan will be required for the improvements to Long Leaf Lane. A separate as built
plan will be required.
9. As built plans are to include horizontal and vertical location of all underdrains, footing drains,
and sanitary sewers and house service laterals located as per revised as-built checklist.
10. All pipe and structures to be backfilled with free draining material compacted in maximum one
foot lifts with approved compaction equipment or approved equal if deep trench is encountered.
Any pipe or structure work requires inspection prior to backfilling.
11. Any problems and/or questions regarding construction of this project will be directed to Bob
Jacobson in the field at cell phone 860-982-0715.
12. All filling to be done in accordance with Department of Transportation specifications. To be
compacted in maximum lifts and tested as necessary.
13. Job meetings will be held as needed, and can be called by the developer or Town.
14. Seventy-two (72) hours' notice needed for certificate of occupancy inspection and a $35 C.O.
inspection fee is due at that time.
15. Any proposed changes are to be presented to the Engineering or Planning Department prior to
implementation on change order form in quadruplicate with 4 copies of the drawing. Town will
attempt to turn around within 24 hours.
16.Normal hours of operation 7:00 a.m.—5:00 p.m., no work on Sunday.
17.No paving after October 15 or before April 15 without written approval from Director of Public
Works.
18. Extra care must be taken when compacting around structures such as catch basins and manholes.
These spots often become problem areas in the future due to settling, therefore, the town
staff/inspectors will be requesting additional compaction tests in these areas.
19. Sanitary lateral locations should be tied down to existing structures and shown on the progress as
built.
20. During construction of individual sanitary sewer house laterals, the contractor shall prepare an as-
built sketch on standard form provided by the Engineering Department. This form should be
submitted to the design engineer/surveyor for their use in preparing the as-built plan. The
Engineering Department suggests that the contractor also show locations of foundation drains and
water laterals on this form.
21. Any unfinished site work will be bonded prior to Engineering and Planning Department sign-offs
for a Certificate of Occupancy.
Planning Department
1. Landscaping is to be installed in accordance with the approved landscaping plan. If there are
changes required, contact the Planning Department. Additional landscaping installed on one part
of a site will not preclude planting all of the remaining items shown on the landscaping plan.
2. All bonds required;mylar to go on file prior to issuance of building permit.
3. All easements must be submitted for review prior to filing of mylars.
4. Sign permits are required for all temporary and permanent signs.
Utilities
1. Contact utilities for coordination of utilities connection.
Fire Marshal(Commercial Facilities)
1) Documents—Complete set of stamped plans with the following:
a. Plan review paid
b. Code information sheet
c. Exiting plans with travel distances
d. Wall types
e. Door schedule
f. Mechanical, Electrical,reflected ceiling
g. Fire alarm
h. Basic sprinkler layout
** PLAN REVIEW COULD TAKE 30 DAYS FOR APPROVALS **
2) Inspections:
a. Above ceiling
b. Penetrations and separations
c. Sprinkler system
A. Hydraulic calculations and cut sheets
B. Underground flush and hydrostatic test
C. System hydrostatic test
D. Main drain test/inspectors test
E. Outside bell
F. NFPA 13 paperwork
d. Fire Alarm
e. Emergency lighting test
f. Final Inspection
** PLEASE NOTE THE FOLLOWING**
1. Consulting inspection will be welcomed
2. Multiple inspections can be done on the same day
3. Stocking/addition of fixtures to occupancy will only be allowed if the life safety systems are on
line.
Police Services
1. Emergency phone numbers for the duration of the construction must be provided to Police Services on
a company letterhead. If the developer occupies or owns the building after construction emergency
numbers must be provided to Police Services.
2. All buildings located on property that abuts a public highway must be numbered and visible from the
street. All numbering shall comply with Town Ordinance 6-800 through 6-802.
3. Barns, garages, and outbuildings, which are located on the same premises as a numbered structure, are
excluded.
4. Erect temporary sign on the site during construction identifying the project.
5. If an alarm is to be installed contact Police Services.
Building Department
1. Plan review with Building Official/Fire Marshal required prior to application for building permit.
Coordinate with Chief Building Official.
Very truly yours,
4
�f
1
Michele R. Lipe, AICP
Director of Planning
MRL/llz
cc: Jeffrey Doolittle, Town Engineer
Bernie Drabek,Engineering Inspector
Michael Gantick,Public Works
Christopher Dougan, Chief Building Official
Tony Manfre, Superintendent of Pollution Control
Walter Summers,Fire Marshal
Utilities
PRECONSTRUCTION MEETING SIGN —IN SHEET
(please print clearly)
7 x
n^ ... i..... Fy.„S 1,t...,, 1j 4 4k}.:,;.F ,� .,:5+ 4 y(:, .. .., i .,.�.. ♦ ..,. .....r ,..,... „ : N..n' r1.G, " � h5 .NS`
?�,,, ^;.
,,S as 1. „r�.�,.... .:..__ ✓-jn.,, ..: ,a ,, -.j -r fR.Y r>wa;.. / ..,., ,. .. A,��2� t �
-s„� ,ra.,o �$. :?:: ,. � ,rz-,y,.,.,xr' s'.,r�`,-�•. :r „_ ,.;�.c A� ,?: -.:. :.+ ,. ",,.�5" :.. v.� 1.'ai:'. .5y,. r +. ec.< C`�.`F.',-.;, ar� 'y`pnt,° t :'C:.
,:.a ,,•. �+� ..: ,�<.,a..�.,;•a�.,m.:,., ��`. z. �.u4,'�. ,�, ''n�.. .,ram, 'u�.' ��x �+. �_rr3 s
r C,dd e Tel-0��i e1K-
r/A+3J�lt`2t 010 �ir' VIA?)ftj %n- q4/7 �IZ�
v -9 9
PrA K C4,gAbd WX evexsoame E C*4-CD vkn. �a�han� �v{rsa�o���oN•c P��-z 9 2-aZ�
If
� rvl► r'c , � t !� �j Lac,
C S raw,;:,ddo- Z�1
�r✓� fbGtLh f-ro P� JaMe3 S. eo��et� @ f' r.c0 Sao
�j21Q�1 �� (�ir1 7-rL GN f{✓ b✓i4�1 , T , LU��'h Coen t(? .
. IGiP✓ /vim!%-r1a--� �VSGC/ �aG av� c,r�lwt�vs .s�L`�,,�. _ �v�-®?.�Z- ��� �l
emoraxldum
To: Michele Lipe,Director of Planning
CC: Jeff Doolittle,Town Engineer
From: Jeff Folger,Environmental Planner
Date: 6/5/2017
Re: Hotel preconstruction meeting
The following items must be incorporated into the site plan and be implemented as part of the site
work in addition to the approved erosion control plan.
Erosion controls currently at the northern stock pile site have been compromised by the weather and
animals and need to be re-installed.
An earthen berm needs to be placed along the western edge of the construction site. Top soil to be
used for the perimeter final turf seeding can be used and spread when the time comes.
All areas of soil open for more than a month must be seeded with annual rye grass seed.
A perimeter construction fence must be installed to keep the general public away from the active
construction site.
1
BOND TRANSMITTAL
DATE: 6/8/17
APPLICANT NAME RHD South Windsor LLC
ADDRESS 3000 Hadley Road
South Plainfield, NJ 07080
PROJECT LOCATION/ADDRESS LOT Cambria Suites Hotel
SUBDIVISION Evergreen Walk
P&Z OR IWA/CC APPLICATION NUMBER 11-24P
AMOUNT & TYPE OF BOND $ 10,000 E&S Bond
CHECK NUMBER 10044172
DEPARTMENT PLANNING
SUBMITTED BY Lauren Zarambo 6/8/17
NAME DATE J
PROCESSED BY FINANCE 6113117
NAME DATE
SUB ACCOUNT NUMBER o 3 3
MUNIS APPLICATION 201100908
W:\Planning Admin\PZC\13onds\2017 Bonds\11-24P Cambria Suites E&S BondTrans.doc
PAYMENT SUMMARY RECEIPT
TOWN OF SOUTH WINDSOR
1540 SULLIVAN AVENUE
SOUTH WINDSOR CT 06074
DATE: 06/13/17 CUSTOMER#: 000706628
TIME: 08:51 RUKH CONSTRUCTION
CLERK: laurenlz
RECPT#: 20897095 PREV BAL:
TP/YR: MS/2017 AMT PAID: 10000.00
BILL: ADJSTMNT:
EFF DT: 06/13/17 BAL DUE:
PERMITS/INSP PAYMENT
-----------------TOTALS-----------------
PRINCIPAL PAID: 10000.00
INTEREST PAID: .00
ADJUSTMENTS: .00
DISC TAKEN: .00
AMT TENDERED: 10000.00
AMT APPLIED: 10000.00
CHANGE: .00
PAID BY: RUKH CONSTRUCTION
PAYMENT METH: CHECK
PAYMENT REF: 10044172
Change Order No: 10
TOWN OF SOUTH WINDSOR
STAFF SITE CHANGE
FOR SITE & SUBDIVISION
GENERAL:
Change Order Contact Person: Ronald Bomengen Phone No.: 860-646-2469
Address: Fuss &O'Neill, 146 Hartford Rd., Manchester, CT 06040
Site Name: Town Square at Evergreen Walk P&Z No: 11-24P
Owner: Radius Hospitality (Scott Yaeger) Phone No: (330) 526-5000
Contractor: TBD
Signature of Owner's Rep. ` r Date: 7 26/2017
— --
Signature of Design Engineer: Date: 7/26/2017
CHANGE: (Describe location and nature of change. Include four(4) copies of plan/profile of change.)
Site Utility Plan —CU-101: The water service supplying the Cambria Suites Hotel has been updated to,
show a domestic service and fire service connecting to the existing water main in Longleaf Lane. The
connection is shown southeast of Unit 7F. The proposed water main, which was previously proposed
extending up Sedona Circle from Longleaf Lane, has been removed from the project. The proposed fire
hydrant on the northeast corner of the hotel has been relocated to be within Unit 7F.
REASON FOR THE CHANGE: (Why change is required)
Sedona Circle was recently paved. CTWater required the water main be installed within the limits of the
roadway. To avoid trenching and patching a newly paved roadway, the rerouted water service will reduce
the amount of disturbance to the newly constructed site.
APPROVALS:(as required)
Dir. of Planning Date: -7 ,�-
Town Engineer Date: ' � ! / -
Dir. of Public or Date:
Other: t . l Date:
STAFF COMMENTS: r
C fis.-
c: Town Engineer Attachments: