Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Application Pleasant Meadows SRD (2)
P.O.BOX 1167 425 SULLIVAN AVENUE SOUTH WINDSOP,CT 06074 PHONE:860.291.8755 � � FAX:8onalsi c.com N'ww.designprofessionalsinc.com CIVIL A TRAFFIC ENGINEERS / PLANNERS /SURVEYORS / GIS ANALYSTS / LANDSCAPE ARCHITECTS • LETTER OF TRANSMITTAL To: Ms.Tricia Schuiten Date: 11/12/2007 DPI Project No. 1272 Realty Connection Re: Pleasant Meadow,Asbuilt Plans 49 Windsor Ave. Vernon, CT 06066 WE ARE SENDING YOU: ® Attached ❑ Under separate cover via the following items: ❑ Shop Drawings ® Prints ❑ Renderings ❑ Specifications ❑ Copy of Letter ❑ Change Order ❑ • COPIES DATE . DESCRIPTION 5 7/30/2001 1272 Revised 10/25/07-Improvement Location Plan, Record Asbuilt, Pleasant Meadow Senior Residence Development, 1140 Pleasant Valley Road South Windsor, CT These are transmitted as checked below: ❑ ForApproval ❑ No exceptions taken ❑ Resubmit copies for approval • ® For your use ❑ Make corrections El Submit copies for distribution ® As requested ❑ Revise and Submit ❑ Return corrected prints ❑ For review and comment ❑ For bids due • ❑ Prints returned after ban to us REMARKS: /Zlf e • � 17 " • SIGNED: CC: Lawrence R.Geissler,Jr. TOWN OF SOUTH WINDSOR STAFF SITE CHANGE FOR SITE & SUBDIVISION GENERAL: CHANGE ORDER CONTACT PERSON ae trnn;e. Phone No. � Address Site Name P&Z No. Owner Phone No. Contractor Signature of Owner Q Date: Signature of Design Engr. Date: CHANGE: (Describe location and nature o change. Include Four (4 ) copies of plan/profile of Change. ) mLl,14--v t /1C ,4C rL�ii < h a� frs � r'ndu'd.e n n Reason for Change: (Why is change required) -�� - i� PROVALS: (As Required) D r. Of Planning AA A Date: lou Town Engineer F Date: Dir. of Public Works Date: Other: Date: STAFF COMMENTS: R-ECEIVED SOUTh ONDSOR ENG EERIN DEPT. White - Town Engineer Yellow - Appican Pink - Director of Planning Goldenrod - Engineering Department O'NN Se O-P sot� ?d&U&O-t 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 f�OSOR-CO TELEPHONE (860) 644-2511 October 25, 2007 Mr. Bill Martin South Windsor Estates, LLC 84 Willow Brook Road Longmeadow, MA 01101 Dear: Mr. Martin Re: Appl 00-07P, Pleasant Meadows This is to advise you that the Planning and Zoning Commission voted on 10/23/07 to reduce the site bond for the above mentioned application from$36,100 to $5,000. Advance arrangements should be made to pick up the bond to ensure that the necessary contact person(s) will be available. If you have any further questions contact the Planning Department at 644-2511, ext. 252. Thank you. Very truly yours, C Patrick Kennedy, Chairman Planning and Zoning Commission PK/mrl cc: Town Engineer Chief Building Official NOv L ui SOUTH WINDSOR ENGINEERING DEPT. TOWN OF SOUTH WINDSOR STAFF SITE CHANGE FOR SITE & SUBDIVISION GENERAL: ,,,rr� CHANGE ORDER O ACT PERSON lel� NBC.(/��iP� one No. Address A/ s ,✓ 7 d Site me r �� &Z No. Owne /' Phone No. Contracto Signature of Date: Signature of Desi n Engr. Date: CHANGE: (Describe location and nature of change. Include Four (4 ) copies of plan/profile of Change. ) i/ j , f 1 Reason for Change: (Why is change required) APP ALS: (As Required) 6 Dir. Of Planning a Date: 10 d c7 Town Engineer 1 14 Date: Dir. of Public Wol& Date: Other: Date: STAFF COMMENTS: White - Town Engineer Yellow - Applicant Pink - Director of Planning Goldenrod - Engineering Department 00 NIF "PURR MEADOW 1 40 loc%ax soh 7�2 - '`OX105.77- 9 106, X105.6 EX. BLDG TOW = 112.03 �.=s4.�o IFF BLDG 113.03TIFF GAR 111.94 Y 7 (OUT) 7,> 10 a'A 101�5 /A/ 12. 05' 70 7.1 - -- ------ 6 /*C04 -4 CB#� CY hQ DETENTI (T E 11 =110 4 Jil, BASIN NV 10 AQ, X110. W,(-3, EX.SMH#5 FE 18 TF=111.30 FL 101.94 INV.=103.71 1018 BIT. PAVEMENT sm 3 TRAN �'AD LEAN—OUT T 109.96 Yp.) I .=95.56 CB 110�63 F=108.60 =1 02. 1 V.(18 101 N 90 0 .109.40 04.29 0 Ii21 l a ty Patricia A.Schuiten 49 Windsor Ave. (Rt.83) Broker/President on ne c t to Vernon,Cr 06066 Private Paralegal Services (860) 875-1155 September 18,2007 Michele R. Lipe,AICP Assistant Director of Planning Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: Pleasant Meadow Estates/SDR Landscaping Garden Circle, South Windsor, CT Dear Michele; As per our meeting and discussions of Sept 7, 2007 the following items have been addressed and completed on the site at Pleasant Meadow Estates. 1. The missing plants on the west side of unit#18 (also known as unit#306)have been installed along with a mulch bed. (See enclosed photo#1) 2. The area that was disturbed on the Burr Meadow property was addressed by the original developer of Units#1-#12. I obtain a copy of the agreement from the attorney.The agreement states after the initial fill in by the developer,Burr Meadow's obligation was to maintain the walkway in perpetuity at their expense after that period. It does not appear that anything has been done to this walkway in years.However,for the sake of showing good faith, we installed several inches of stone dust that was then compacted in the area you required and we extended that area farther to repair the deep rut damage caused from someone riding a dirt bike through the path. Several inches of topsoil on each side of the walkway was installed and graded to meet the existing lawn area. Grass seed was installed,tamped,and hydrated.The enclosed pictures numbered(#2) &(#3) show the repaired area.Picture(#4) shows the condition of the path outside our area of repair.This is included just to demonstrate that Burr Meadow has done nothing to maintain the rest of the path. Also visible in photo's numbered(#2) & (0) are plantings that had already been installed as required on the border of the two properties as per the Landscaping plan. 3. The additional mulch to be placed around the groupings of shrubs behind building (#3)has been completed. See photo's (#5)& (#6).I am however also enclosing a copy of the minutes from the Association's July and August 2007 meetings. "Our integrity is the only thing we take from this world." Upon that cornerstone we seek to establish our relationship with you. As I have previously stated the minutes (see Exhibit#1-July 20tb)clearly indicate that the Association and the Property Manager, Steve Cabanis were aware that South Windsor Estates had completed the proper landscaping but wanted them to foot the bill for items not originally required by the Town. See July minutes highlighted paragraph begins with"Landscaping". 4. Photo's (#7) &(#8)-(#8A) show the grading and seeding of the area around the gas boxes located behind unit#12 building two and unit#15-#16 building number three.This is the second time these areas were done.(The association's lawn crew damaged these areas because of the way they drive over the areas when mowing). 5. Photo's (0)& (#10)-(#l0A) show repairs and re-stoning of the two corners of the Detention basin. One is adjacent to building(#2),the other is adjacent to building(0). 6. Unit#302 does not have a stone bed in front of it and has never gotten water in the basement as per the unit owner.The stone bed was constructed between units#303 İ. This was as requested by the town and per the plan. It was completed prior to the first CO being issued and a extension drain was placed in the center to insure all water run off would flow away from the building and down to the drain located on the opposite side of the parking lot.This worked very well until the association's snow-plow contractor shoved all the snow into this corner and torn out the extension drain. Photo's number(#11412413)show the stone bed between the units in question.This has been repaired and the drain extended(again). Upon the installation of this drain I spoke with the owners of both unit#303/#304.Both unit owners verified that they have never had water in their basements.The owner of unit#303 said the water back up into the corner when the torrential rain fell in May. He admitted he never called me and I showed him where someone had removed the extension drain that had been installed there last December 2006. He said he felt the gutter should be tied to the drain in front of his driveway.I advised him that is not how the professional gutter installers determined the best flow for the water, and that in the winter time the water could freeze in front of his driveway and if the drain was left in place correctly there would be no issues. I also asked the owner of unit#303 if he remembered my crew removing all the packed ice and snow last winter from this corner and from his front step.He stated he did know that we had tried to keep everything clear and that the snow plow company had not done the correct job. Additionally last week after the day of rain,I inquired of the owners of these two units if there had been any water problems.Nicky Smith the owner of unit#304 told me she paid very close attention to this area and all the water flowed directly to the storm drain and not one drop of water entered the corner or her unit. 7. Drainage causing water into the unit#102. Photo (#14) shows the way the downspouts and splash blocks were installed by South Windsor Estates August 2006. Exhibit(0)dated August 22,2006 is letter to all unit owners of buildings one and two informing them of the grading, stoning, down spouts, splash blocks,and planting issues that would be addressed in the next couple weeks.All this work was completed and inspected.This can be evidenced in Exhibit(#4) a letter requesting a reductions of the site bond for completion of the work required by the Town of South Windsor. Photo (#15) shows the downspout and splash block is now missing from this unit, and someone else has now placed a long black drain there .There are three other places on building one and two where someone has removed the extension of the downspouts placed there by South Windsor Estates last August 2006. Someone in the complex continues to push the splash block up against the foundation instead of leaving them overhang at the end of the down spouts and extending into the stone area where they are intended to drain the water away from the building. We do not feel we should be held responsible for the acts of the unit owners after the job has been completed to Town specification. 8. Photo's number(#16 through#22) show damage being done by the Association lawn maintenance crew to all the plantings that were installed by South Windsor Estates. I am including these so if these plantings do not thrive,we are not held responsible for the negligence of the association's contractors. 9. Also included are copies of e-mails between myself,the president of the association, and Steve Cabanis the property manager. Snow plowing issues,issues regarding the proper areas that need snow removal and lighting issues all brought to their attention during the past year of 2006. Please read the association minutes from July and August of 2007. You will see that areas of blacktop that were completed last May 2006 by South Windsor Estates have been re- paved by someone hired by the association just last week.I was at the site today and verified that this paving has been done. I do not know if the Town needs to check the paving job that was just completed on building two.We certainly do want to be held responsible for any water issues etc.,that may occur and were caused by someone paving over what was completed by South Windsor Estates LLC and approved by the Town last year. 10. On September 7t1'and 8`i'2007,I spoke to each owner of units 301 through units 305. There are no punch lists of items from any owner and each owner has indicated they are very happy with their unit,the workmanship of the unit, and my response to any questions or concerns they have had during the time I have been associated with the site.If the Town needs confirmation of this each owner said the Town might call them if they wish too. We believe we have successfully met all the obligations of the site requirements as per the plan as well as all additional request of the Town.To our knowledge the site has been inspected. Therefore we respectfully request the Bond in the amount of Thirty-Six Thousand One-Hundred ($36,100.00)and no/100t''Dollars be released. Xnrely y2or Sc South Windsor Estates,LLC Enclosures CC/Attorney William Bresleau William Martin --�' Pleasant Meadow Board Minutes, July 20, 2007 Meeting called to order by Rich Wilson at 2:05 pm. In attendance were Gilmay Bouchard-Frechette and Steve Cabaniss, Property Manager. Motion by Rich, seconded by Gilmay to accept the June minutes. Motion carried. Motion by Gilmay, seconded by Rich to accept the budget report. Motion carried. We have receive estimates for the sealing of driveways,repairing the darnage done by the snow removal contractor. The estimate is $475.00 for sealing 7 Units, 202 - 208. The board is looking for the contractor to pay 50% of this cost. The contractor will do the whole driveway as opposed to just doing the 8-10 feet that is Steve will r� that1ni e d 1 11 .C) 1 B i• i t St � �.t, Clul;St t.iilt 201, b Cie SC that aii Ct �Li11C1illg % 'dJCuid be complete. L��)11Clllig 1 WI11 be done in 2008 and building 3 in 2009. We have a new insurance company for next year for our master plan- Philadelphia Insurance Company. Our present carrier no longer insures condominiums. The cost for next year, including building 3 will be $5,278. Tentatively approved, subject to the deductible being the same as the expiring policy. The MDC saga continues. They have promised to resolve our situation by January. In the meantime, the association continues to pay $250 a month until resolved. 1 gutters have been cleaned. We have received a quote of$2200 for power washing all three buildings. We will include in next year's budget.. Burr Meadows has indicated that they will address the issue of the dead tree situated by our property line besides Unit 301,after the plantings, due from South Windsor Estates, are installed and their walking path is restored. Steve will advise Michelle at Town Hall that this should also be completed before they consider ns� releasing the bond. L r -eaping s almost done, however, additional mulching will be needed between the plants because of mo b sues. Steve will talk to Michelle at Town Hall to see if changes can be made to the "plan" to require additional mulching so the developer would be charged for this instead of the association.. We are waiting for a feu more bids to come in, for next year's landscaping & snow removal contract. Meeting adjourned at 3:30 pm. Next meeting will be Friday, August 24°' cu 2 pm. REMINDER: Please don't forget to respond to Gilmay at 860 644-0234 by "August Is " for the complex Summer Cookout, Sunday,August 26"' at noon. Looking forward to seeing you all. Gilmay Bouchard Frechette j f PI�FASANTMEADO—W HC)AR1)MTN_rTTRC _ 1F.&%d �,, i=august 24, '�07 s s�;sL 6 The meeting was called to order at 2:10 PM by Louise Shaheen,via telephone: in attendance were Gilmay Bouchard Frechette,Rich Wilson and Steve Cabaniss,Property Manager. MOTION BY GJILMAY TO ACCEPT THE JULY MINUTES,SECONDED BY RICH: MOTION CARRIED. MOTION BY GILMAY,SECONDED By RiCH TO,ACCEPT THE BUDGET DEPORT. MOTION CARRIED. New Business. Decision on landscaper/snow removal contract is postponed till September so Steve can gather additional contractors and information. Since bi-annual cleaning of catch basins were not included in proposal requests, Steve will ask contractors to include this in their fee_ Burr Meadows will not remove dead tree neat to Unit 3 eve landscaper has restored walking path and installed chnihs nromicPfl to them, Resealing of damaged driveways and common areas will be done after Labor Day. Snow removal company responsible for damage will.contribute 50%of the cost_ in advance. Steve will give speck date to unit owners who will be resealed so they can move cars until job is completed. The Master insurance plan will now have a$2500 deductible. This affects_ Part A,Building coverage of unit owners HO6 policy. Unit owners may want to inform_your insurance company of this change. Also, all unit owners are.strongly encourage to carry an HO6 potiry for their unit- Drain pipes that are not attached to buildings will be removed and stored for us by Advanced Property. Steve has one quote of$2226 to power was our b1,il gs: Gilmay a for comparison. sked him to obt in additional hide Building-3 unit-owners are reminded that the developer has one year to correct any issues on owner's punch list. Unit owners are strongly encouraged to submit their punch list to their attorney to insure that work is completed. Any incomplete issues that are the responsibility of the develo will not become the responsibility of the association. per Next meeting will be.on Monday, September 24 at 2 RM. in Unit 104_ Motion by Rich,seconded by Gilmay to adjourn. Motion carried. Sincerely; Louise Shaheen Chair 4 alty' . Patricia A.Sehuiten " --�" 49 Windsor Ave.(Rt.83) Broker f Pide%# , O n n e c��� Veraon,CT 06066 res )delivered in hand. "B"ngxng People fr Properties Together" August 22,2006. (860) 875-1155 • '(860) 872-5975 Fax Pleasant Meadow Estates Residents 102-104 Gardcti Circle. 201-208 Garden Circle South Windsor, CT 06084 RE:Re-grading of Building Site Dear Residents:. Please be advised. Staving August 23,2006 my Landscaping crew and my _ construction supervisor will be doing rc-grading,installing stone,grading back lawn areas in both front and back and pouring sidewalk areas as per site plan requirements. Unfortunately in our initial walk over of the building site we have discovered that there are plants,personal items, and patio blocks located in the common areas that are not permitted per my site plan requirements from the Town.of South Windsor. These items will need to be removed immediately.Mulch presently located on the site may-have to be removed in order to accommodate the grading process and level lawn areas: Y would suggest any plants you wish to keep should be placed in pots and placed on the decks or patios.The re-grading will involve work under some of the present decks, and any items under these decks will be removed and disposed of by the landscaping crew.Additionally some air conditioning units may have to be disconnected. s p are trying to avoid this taking place however if your unit becomes involved in this process we anticipate no more than two days of shut off time and will give you as much advanced notice as possible. I am sorry for any inconvenience this creates,but it is necessary to comply with the required site plan. We Dope to complete this work within two weeks,weather pennitting,and not including holiday schedules. 'f hank you in advance for your co- operation. . Co .ially y ur , ricia Schur en Realty Connection CC/Dr.William Martin(via fax) Advanced Property Management (via fax) "Rrsr ststegrity rt the only thing we take from'this world." Upon char cornetscone we seek to establish our relationship with you. 70117A N3iInHOS i NIdJR10 Q SLGSZL8098 ZO:ZZ 900Z/ZZ/80 • SOW N Sf4 o 0-PS-`0� �• y � �r w` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 �dsoR.co`' TELEPHONE (860) 644-2511 October 16,2006 South Windsor Estates LLC 84 Willowbrook Road Longmeadow, MA 01106 Cc- ' � U o Dear Madam/Sir: Re: APPI#00-07P,Pleasant Meadows bonds This is to advise you that the Planning and Zoning Commission voted on 10/10/06 to reduce the site bond from$80,990 to $36,100 and to also reduce the IWA/CC bond from$3,000 to$0. Please forward an amendment to the bonds we are currently holding showing the reductions at your earliest convenience. Very truly yours, Patrick Kennedy, Chairman M Planning and Zoning Commission KMcC/bmm cc: Town Engineer Chief Building Official 11'he low SS boo A h am k, I-ee-el krc,( 7'e-P be,,,k&e�v-n/� w`,rfh X h/,--14 'r��rss Y .SOW N Sf4 yd/ < Ole siot� �f w` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 OU c 1°sox•co TELEPHONE (860) 644-2511 October 26, 2006 William Martin South Windsor Estates, LLC 84 Willow Brook Road Longmeadow, MA 06110 Dear Mr. Martin: Re: Appl 00-07P Pleasant Meadow Estates SRD This is to advise you that the Planning and Zoning Commission voted on October 24, 2006 to release the remaining money required by the IWA/CC. Enclosed please find the surety bonds that were posted. Very truly yours, `�:;41Gt Patrick Kennedy, Chairman Planning and Zoning Commission PK/bmm cc: Town Engineer Chief Building Official AT&T Yahoo! Mail -pjs@snet.net Page 1 of 1 M A[L Print-Close 11linriow Date: Tue, 20 mar 2007 01:40:59'-0700 (PDT) From.' "Patricia Schuiten" <pjs@snet.net> Subject: Snow removal To; "Louise" <weazie266@cox.net> Dear Louise,the information givent to you by Steve Cabanis regarding snow removal and the two lights that are not lit was incorrect according to our attorney. I am sending you a copy of the attorneys letter.What he has advised us is what we are representing to purchasers.Also,the snow plowing people are still plowing snow into the corner between units 303&304.Again,they need to stop doing this.There is a drain there that is intended to drain all water from the roofs and this corner to prevent any water back up or ice accumulation in front of these driveways or their walkway.Please have someone advise them of this issue. Thank you Tricia Schuiten COPY http://us.f830.mail.yahoo.com/ym/ShowLetter?box=Sent&MsgId=59_34674485_50905 6... 3/20/2007 ealt Patricia A. Schuiten 49 Windsor Ave. (Rt. 83) Broker/President ✓ on ne et io Vernon,CT 05066 e "Bringing People &Properties Together" (860) 875-1155 February 22, 2007 Attorney Bill Breslau Attorney Vicky Juliano , Kahan, Kerensky, & Capossela cc,. 45 Hartford Turnpike Vernon, CT 06066 RE: South Windsor Estates,LLC Condo Association Issues Dear Bill, Attached please find copies of a-mails between myself, Louise the president of the Association, and Steve Cabannis the property manager. Most important to me are the issues(1) concerning the egress stairs from the rear of each of the six ranch units and as well as their refusal to clear them(2)their refusal to repair the lights that are immediately at the curve to the entry of our portion of the parking lot. Is Steve Cabannis correct in his statement regarding the condo documents and snow removal? Since the Town of South Windsor required the lights are they not obligated to keep them in proper working order? If it is true that these elderly people need to clear their own staircase to have a safe exit in case of fire etc.,I need to make sure this is disclosed to them. I have never heard of this as a requirement, nor have I ever seen where a path from the rear of the buildings is not open for the same reason. This issue is very critical to the potential Buyer we have for unit#304. He is in a wheel chair and his wife works to support them. She is up there in age also. I want to be very honest with any Buyer and this requirement is news to me. The snow removal is a real issue here and Steve has once again passed it off the improper snow removal in the parking lot on our contractors. This is not true. He is also advising the Assocaition without having them obtain proper legal advise. I am therefore asking you to clarify both these issues for South Windsor Estates,LLC. "Our integrity is the only thing we take from this world." Upon that cornerstone we seek to establish our relationship with you. 7� I do not want to be held liable for these items and if the Town Planner and or inspectors have any issues I need to be very clear on both of these items. We cleared the front areas this past weekend and I have instructed my painter and one other contractor to clear the rear staircases and landings today to avoid any immediate problems. I will be away from February 22 through March 2, 2007. Could you please forward your response in writing to me. I do not want there to be even the appearance of negligence on my part for not attending to these issues. I would like to have something in my file should any questions arise during the forth coming CO inspections. Unit#305 looks like it should close between March 20th -30 ' Bill thank you for your attention to this matter. Best Regards, Tricia Schuiten U CC/Bill& Andy Martin AT&T Yahoo! Mail -pjs(csnet.net Page 1 of 1 MAIL. I Print-Close Window Date: Sat, 17 Feb 2007 06:27:08 -0800 (PST) From: "Patricia Schuiten" <pjs@snet.net> Subject: Parking Lot To: "Louise" <weazie256@cox.net> CC: "Steve Canbannis" <advancedproperty5@sbcglobaLcom> Good morning Lousie, We have a problem with the snow removal.Who ever is plowing is not placing the snow in proper locations and not clearing as they should.They back bladed the garages at 301 & 302 and never scrapped down to the pavement. I have at least two inches of hard packed snow and ice. I have a gentleman coming today in a wheel chair to take a second look at 302 and he will never be able to get up into the unit.They never cleared the snow away from the landing either,They have piled all the now in front of 301 and that cannot be.Those are to remain open as two additional parking spaces by town requirement.They have also plowed all the snow in front of 306. The walk area to the unit is maybe 1 foot wide and is always covered in ice.They did not shovel the rearstairs and pads to all the units either. Unit#306 is buried right up to the door.These are the second egresses to the units and need to be cleared.There needs to be a path all the way round the building in the event someone needs to get out. Please have them come today and correct this. Especially unit#302 and#301. 1 have showings going on and cannot get in to these units.Thank you for your help. I left a message for Steve last evening also but I will forward this on to him. Tricia Schuiten C� Opp http-//us.f830.mail.yahoo.coin/ym/ShowLetter?box=inbox&Msgld=5914 22145889_3'784... 2/20/2007 AT&T Yahoo! Mail -pjs@snet.net Page 2 of 3 Subject: FW: Parking Lot -----Original Message----- From: Patricia Schuiten [ma Hto:pjs@snet.net] Copy Sent: Saturday, February 17, 2007 10:44 PM To: Louise Subject: RE: Parking Lot Louise,so you are aware. I had to have my painters help me crop and clear all the ice and snow piles and I had to clear in front of all the garages and units. I could not get the wheel chair client into these units without my having done this work myself today so I notified South Windsor Estates I am sending a bill for my time and the painters time.Also your board must change your contract.The second egree stairs for all the units need to be open and clear.That is a requirement to safety and it is not the responsibility of the unit owners to clear those stairs and patios.You need to meet with Steve and have your contract amended. I am telling you this information for your safety. If something happens to someone the board could be liable for neglience. I would speak with your attorney for your own protection.You also need to get the lights fix,the entry to the driveway and parking area are required to lit.My electrician replaced the lights in our sections in less than one week. Steve has known of this issue for over a month and told me directly he would get it taken care of. It still is not done. I am sending a drawing to you of where the snow is NOT supposed to be plowed, especially where it was shoved between units 303& 304. There is a special roof drain there that they have now blocked totally. If the gutters back and causes roof leaking inside this will be the responsilibity of the association to repair. Best Regards,Tricia Louise<weazie256@cox.net>wrote: e are aware of the snow plowing issues and have addressed them with the endor. Rear shovelingof the is not part contract for any of the units. I'm ' ure Steve will get back to you but it won't be today. -----Original Message----- From: Patricia Schuiten [mailto:pjs@snet.net] Sent: Saturday, February 17, 2007 9:27 AM To: Louise Cc: Steve Canbannis Subject: Parking Lot Good morning Lousie, We have a problem with the snow removal.Who ever is plowing is not placing the snow in proper locations and not clearing as they should.They back bladed the garages at 301 &302 and never scrapped down to the pavement. I have at least two inches of hard packed snow and ice. I have a gentleman coming today in a wheel chair to take a second look at 302 and he will never be able to get up into the unit. They never cleared the snow away from the landing either.They have piled all the now in front of 301 and that cannot be.Those are to remain open as two additional parking spaces by town requirement.They have also plowed all the snow in front of 306.The walk area to the unit is maybe lfoot wide and is always covered in ice.They did not shovel the rearstairs and pads to all the units either. Unit#306 is buried right up to the door.These are the second egresses to the units and need to be cleared.There needs to be a path all the way round the building in the event someone needs to get out. Please have them come today and correct this. Especially unit#302 and#301. 1 have showings going on and cannot get in to these units.Thank you for your help. I left a message for Steve last evening also but I will forward this http://us.f830.mail.yahoo.com/ym/ShowLetter?box=Inbox&MsgId=1632 32112084 4796... 2/20/2007 AT&T Yahoo! Mail - pjs(c�snet.net Page 1 of 1 C D [ . � u j�' Print-Close Window From: "Steve Cabaniss" <advancepropertyS@sbcglobaLnet> To: "Louise " <weazie256@cox.net>, "'Patricia Schuiten"' <pjs@snet.net>, GilmayBouchard@aol.com, "'Dick& GraceMarie— <rjhayner@snet.net> Subject: RE: Parking Lot Date: Mon, 19 Feb 2007 11:30:45 -0500 I received a message from Tricia on Friday regarding this. I got a hold of Pete Fleming who said he would a out on Saturday morning to address the driveways. Pete Fleming advised me that he tried to do these driveways on Friday but they were occupied by contractors working on the units. When he approached one o; them to ask them to move their vehicles, they just walked away with no response. Pete thinks that they did not understand or speak English. Steve -----Original Message----- From: Louise(mailto:weazie256@cox.net] Sent: Saturday, February 17, 2007 9:54 AM To: 'Patricia Schuiten'; GlimayBouchard@aol.com; 'Dick&GraceMarie' Cc: Advanceproperty5 Subject: RE: Parking Lot we are aware of the snow plowing issues and have addressed them with the vendor. Rear shoveling is not part of the contract for any of the units. I'm sure Steve will get back to you bW- it won't be today. -----Original Message----- From: Patricia Schuiten [mailto:pjs@snet.net] Sent: Saturday, February 17, 2007 9:27 AM To: Louise Cc: Steve Canbannis Subject: Parking Lot Good morning Lousie, We have a problem with the snow removal. Who ever is plowing is not placing the snow in proper locations and not clearing as they should.They back bladed the garages at 301 & 302 and never scrapped down to the pavement. I have at least two inches of hard packed snow and ice. I have a gentleman coming today in a wheel chair to take a second look at 302 and he will never be able to get up into the unit. They never cleared the snow away from the landing either. They have piled all the now in front of 301 and that cannot be.Those are to remain open as two additional parking spaces by town requirement. They have also plowed all the snow in front of 306. The walk area to the unit is maybe 1foot wide and is always covered in ice. They did not shovel the reamtairs and pads to all the units either. Unit#306 is buried right up to the door.These are the second egresses to the units and need to be cleared.There needs to be a path all the way round the building in the event someone needs to get out. Please have them come today and correct this. Especially unit #302 and#301. 1 have showings going on and cannot get in to these units.Thank you for your. help. I left a message for Steve last evening also but I will forward this on to him. Tricia Schuiten http://us.f830.mail.yahoo-com/ym/ShowLetter?box=Inbox&MsgId=7891 30732169 4411... 2/20/2007 AT&T Yahoo! Mail -pjs(a7snet.net Page 1 of 2 " M A 1 L Print-Close Window From: "Steve Cabaniss" <advanceproperty5@sbcglobal.net> To: "Louise " <weazie256@cox.net>, pjs@snet.net Subject: RE: Parking Lot ( 0 1 Date: Mon, 19 Feb 2007 17:29:53 -0500 gip) Tricia. The Association does not reimburse unit owners or others for work unless prior authorization is given by the --� Board of Directors. This work would have been done by the contractor on Friday but was prevented from doing so by vehicles parked in the way. The contractor made an attempt to address the situation with the contractor I but was ignored (I think a non-English speaking person). With regard to the patios and balcony areas, the Association declaration, article VI, section 6.3 requires the unit owner to be responsible for snow removal in these areas,therefore for the safety of your workers and for liability reasons, the developer will need to pay someone to shovel these areas. The Association will have the lights repaired shortly. Please note that an inspection by a lighting professional revealed that the parking lot is lit well above the standards required for elderly housing so having a light out from time to time should not impact the residents. Steve Cabaniss -----Original Message----- From: Louise(mailto:weazie256@cox,net] Sent: Monday, February 19, 2007 5:08 PM To: Advanceproperty5 Subject: FW: Parking Lot -----Original Message----- From: Patricia Schuiten [mailto:pjs@snet.net] Sent: Saturday, February 17, 2007 10:44 PM To: Louise Subject: RE: Parking Lot Louise,so you are aware. I had to have my painters help me crop and clear all the ice and snow piles and I had to clear in front of all the garages and units. I could not get the wheel chair client into these units without my having done this worts myself today so I notified South Windsor Estates I am sending a bill for my time and the painters time.Also your board must change your contract. The second egree stairs for all the units need to be open and clear. That is a requirement to safety and it is not the responsibility of the unit owners to clear those stairs and patios.You need to meet with Steve and have your contract amended. 1 am telling you this information for your safety. If something happens to someone the board could be liable for neglience. I would speak with your attorney for your own protection.You also need to get the lights fix,the entry to the driveway and parking area are required to lit.My electrician replaced the lights in our sections in less than one week. Steve has known of this issue for over a month and told me directly he would get it taken care of. It still is not done. I am sending a drawing to you of where the snow is NOT supposed to be plowed, especially where it was shoved between units 303& 304.There is a special roof drain there that they have now blocked totally. If the gutters back and causes roof leaking inside this will be the responsilibity of the association to repair. Best Regards,Tricia Louise<weazie256@cox.neri wrote: we are aware of the snow plowing issues and have addressed them with the http://us,f830.mail.yahoo.com/ym/ShowLetter?box=Inbox&Msgld=9435_31385544 4644... 2/20/2007 AT&T Yahoo! Mail -pjs(a�snet.net Page 1 of 3 A$L Print-Close XN/indow Date: Tue, 20 Feb 2007 08:16:01 -0800 (PST) From: "Patricia Schuiten" <pjs@snet.net> Subject: RE: Parking Lot To: "Steve Cabaniss" <advanceproperty5@sbcglobal.net> CC: "Louise" <weazie256@cox.net> . Steve,thank you for your e-mail.As I addressed in my other e-mail.The clearing of the snow was done on Sunday when no one came to fix the situation.This was done to accommodate an individual in a wheel chair. The snow plow person has plowed the snow up against the building between unit#303İ.This blocked the front access sidewalk to both units,does not allow the special drain the town required us to put there to drain the water away,thus the driveway for unit#304 and the walk between the two units remains covered in ice. My crew removed as much snow&ice from there as possible. He has plowed the snow up against the model front entry and blocked that drain.Also the people in#303 could not access there front walk and we cleared that for them on Sunday.These issues had nothing to do with my contractors on site.Your snow plow crew has not done a proper job. I was on site all day Sat and Sun and no one came to fix these problems. As far as the cost to do this, please speak to Andy Martin, she is the one who pays the bills. I am here to oversee the site and the safety of the people who come here to view the site. If something is not done it is my responsibility to make sure it gets done. I will speak with gill Bresleu regarding the condo documents to make sure he has them in compliance with any town regulations regarding the clearing of egress stairs. The landings for the rear staircases are not considered patios. They are mearly the landing area. I will have Bill Bresleau review this and advise any Buyer as to their responsibility vs that of the association. With regards to the lights. Since the Town put us through tremendous scrutiny regarding the correct lights(a member of the associations advised them we had not installed the proper lights)and the correct amount of light...I will pass your name and number on to the inspector when he comes for the CO inspection. I will advise him as to what you have advised us. He can then take the issue up with you and the association. My efforts here are to prevent any problems from occuring not create more problems. It is also my responsiblity to advise someone if an item left undone may create a problem, otherwise I can be held responsible. So this information is being passed on to both you and Louise. I have done all I can it eliminate the situation,what the board chooses to do now is up to them. Tony is the man on site that the snow plow person should ask for if I am not there.Please advise them to ask for him, he will have anything moved they may need.Thank you Tricia Schuiten Steve Cabanfss<advanceproperty5@sbcgtobat.net>wrote: Tricia, The Association does not reimburse unit owners or others for work unless prior authorization is given by the Board of Directors. This work would have been done by the contractor on Friday but was prevented from doing so by vehicles parked in the way. The contractor made an attempt to address the situation with the contractor but was ignored (I think a non-English speaking person). With regard to the patios and balcony areas,the Association declaration, article VI, section 6.3 requires the unit owner to be responsible for snow removal in these areas,therefore for the safety of your workers and for liability reasons, the developer will need to pay someone to shovel these areas. The Association will have the lights repaired shortly. Please note that an inspection by a lighting professional revealed that the parking lot is lit well above the standards required for elderly housing so having a light out from time to time should not impact the residents. Steve Cabaniss -----Original Message----- From: Louise [mailto:weazie256@cox.net] Sent: Monday, February 19, 2007 5:08 PM To: Advanceproperty5 http://us.f830.mail.yahoo.com/ym/ShowLetter?box=lnbox&Msgld=1632 32112084 4796... 2/20/2007 f Kahan Kermsky & Caposse a LLP February 28, 2007 Michael A.Bars William E.Breslau Patricia A. Sehuiten Joseph P Capossela William J.Dakin Realty Connection Dorian Reiser Famiglietti 49 Windsor Avenue (Rt. 83) (�/ O FV Victoria Juliano Vernon, CT 06066 Solomon Kerensky Michael J.Kopsick Justin L.Murphy Dear Trish, Kristen B.Prout Stephen F.Sutton James J.Ni calker Gregory C.Weaver I am writing in response to your letter regarding a couple of issues you have Jeffrey M.winnick* encountered with the South Windsor Estates condominium association. I have reviewed Of Counsel the provisions of the Declaration dealing with maintenance, repair and replacement of the Oliver S.Chappell common elements and limited common elements. Robert F.Kahan (1922-1996) Your initial concern is whether snow removal from the stairs and stoops at the rear of the units is the responsibility of association or the Unit Owner. In Section 6.1,the Declaration provides that Unit Owners are only responsible for the maintenance of those portions of the limited common elements required by the Declaration to be maintained by the Unit Owners. According to Section 6.3 of the Declaration,the Unit Owners are 45 Hartford Turnpike responsible for snow removal from patios and balconies. Steps and stoops are listed P.O.Box K separately from patios and balconies in Article 5(c) of the Declaration, and the \,crnon.CT 06066-2181 Declaration does not provide for Unit Owners to be responsible for snow removal from Telephone steps and stoops. Consequently, such snow removal would most likely be the (860) 646-1974 responsibility of the association. Facsimile (860) 647-8302 Please note, however, that snow removal from stairways and stoops may not be a 205 Storrs Road service generally included in most snow plowing packages. Requiring that the Reservoir Commons association provide such a service for the benefit of Unit Owners may significantly Mansfield Center,CT 06250 increase the association's expenses. Telephone (860) 4.56-9494 Additionally, you inquired as to the maintenance of the lights at the entry to the Facsimile parking lot. These lights would fall under the definition of limited common elements in (860) 423-8410 Section 1.5 of the Declaration as they are for the benefit of all Unit Owners. Again, attorneys@kkc-law.com pursuant to Section 6.1 of the Declaration, maintenance of all of the common elements is the responsibility of the association. Accordingly, the association should be responsible w«,�vad.-c-law.aam for any repair to such lights, unless, of course, they are able to convince the power company or town to make any repairs. I hope I have been helpful, and feel free to contact me with any other questions or concerns. It is always a pleasure working with you. OL IL Kahan Kerens Very truly yours, Caposse a L>uP Victoria Juliano Michael A.Bars vjuliano@kke-law.eom William E.Breslau Joseph P.Capossela William J.Dakin Dorian Reiser Famiglietti Victoria Juliano Solomon Kerensky Michael J.Kopsick O Justin L.Murphy Kristen B.Prout Stephen F.Sutton James J.Walker Gregory C.Weaver Jeffrey M.Winnick* Of Counsel Oliver S.Chappell Robert E Kahan (1922-1996) "also adrnirted in MA 45 Hartford Turnpike RO.Box K Vernon,CT 06066-2181 Telephone (860) 646-1974 Facsimile (860) 647-8302 205 Storrs Road Reservoir Commons Mansfield Center,CT 06250 Telephone (860) 456-9494 Facsimile (860) 423-8410 attorneys@kkc-law.com u°ww.ld.-c-law.com e08/342007 FRI 14:48 FAX 860 644 7280 South Windsor Town Hall 0001/001 s i • Post-it"Fax Note 7671 Date pages To �Yl From Memo Co./Dept. Co. Phone# Phone# To: Tricia Schuiten Fax# � �,�'�� Fax# From: Michele R. Lipe,AICP - Assistant Director of Planning Date: 8/31/2007 Re: App.#00-07P, Pleasant Meadows SRD landscaping inspection As a result of the landscaping inspection this past week, we are requesting the following items be addressed: Required Plantings in front of the ornamental fence on the west side of unit #18 must be planted(this grouping appears to have been missed); • The area that was disturbed on the Burr Meadows property should be restored per the agreement; amd • The association has requested that the mulch beds containing the groupings of shrubs(along the perimeter areas) be connected as shown on the plans for ease of maintenance. If you have any questions, please contact me at 644-2511,ext. 252. COPY 0 Page t 4OFrom: "Steve Cabaniss"<Steve@advanceco.net> -To: <lipe@southwindsor.org> Date: 9/6/071:25PM 1 Subject: South Windsor Estates Punch list i Michele, Thanks for your phone message regarding the punch list items at the Pleasant Meadow Condominium. Please forward a copy of this e-mail to the appropriate person in the engineering department. Regarding your comments about the planting that were left on the perimeter of the property. Many of these planting may have been the property of an individual unit owner but these were removed and discarded along the perimeter by the landscaper hired by the developer and therefore should be cleaned up by them. The Following non-landscaping items still need attention: I am copying this letter to members of the Pleasant Meadow Board of Directors. They may be aware of some punch list items not noted below. 1. Gutters and downspouts were never installed on the first building in the front of the center units. You will see similar gutters and downspouts that were installed in similar areas in building 2. 2. All three building should be powerwashed. the need to powerwash is due to the dust and dirt resulting from the construction activity for building 3. 3. There is paint remaining on several exterior windows of buildings 1 and 2. 4. The door frames and kick plates of the front and rear exterior doors were never painted. Can you advise us if the original building plan called for a maintenance free exterior, i.e.was this trim supposed to be wrapped? 5. At least 2 of the entry steps in building 3 have risers that exceed 9.5"and are therefore out of co e. There are a couple of areas of erosion around the detention basin that need repair. Can the town confirm that both detention basins have the proper sidewall slope(some areas seem extremely steep and dangerous)and that the elevation of the bottom of the basin meets the require ent of the plan. N. r 8 The gas curb boxes in the rear of unit 306 and 208 are above grade. Is the lawn elevation in these areas correct or do the curb boxes need to be lowered. 0 The grading behind unit 101 creates a situation where water does not flow away from the building resulting in basement water in this unit. (10 The stone bed in front of unit 302 was constructed in such a manner where water pools against fife foundation and allows water into the basement. ti/11. The Burr Meadow Condominium Association has advised me that South Windsor Estates was required to install some planting on their property and well as restore the walking path that was damaged when they did the utility tie-in. 12. There were a number of unit owners in buildings 1 and 2 that had interior punch list items that may or may not have been resolved. I hope the town would contact each of these residents to determine the status. It is my understanding that the developer has no assets remaining even when the final site and landscape bonds are released. . 13. The Association has not been made aware of outstanding punch list items for any of the units in building 3, other than those noted above. They may have communicated these items directly to the developer or to their attorney. Can the Town confirm with these unit owners that there issues have been resolved before releasing the bond? Please confirm receipt of this e-mail and let me know if there is any other information that you require. I am willing to meet with the engineering department if there are any additional questions. Sincerely, Steve Cabaniss O © � �� ealt Patricia A. Schuiten "" 49 WindsopAve. (Rt.83) Broker/President o n n e c t i o Verno ,CT 06066 � f Private Paralegal Services (860) 875-1155 September 18,2007 Michele R.Lipe,AICP Assistant Director of Planning Town of South Windsor 1540 Sullivan Avenue ' South Windsor,CT 06074 RE: Pleasant Meadow Estates/SDR Landscaping Garden Circle,South Windsor,CT Dear Michele; As per our meeting and discussions of Sept 7,2007 the following items have been addressed and completed on the site at Pleasant Meadow Estates. 1. The missing plants on the west side of unit#18(also known as unit#306)have been installed along with a mulch bed. (See enclosed photo#1) 2. The area that was disturbed on the Burr Meadow property was addressed by the original developer of Units#1-#12.I obtain a copy of the agreement from the attorney.The agreement states after the initial fill in by the developer,Burr Meadow's obligation was to maintain the walkway in perpetuity at their expense after that period. It does not appear that anything has been done to this walkway in years.However, for the sake of showing good faith, we installed several inches of stone dust that was then compacted in the area you required and we extended that area farther to repair the deep rut damage caused from someone riding a dirt bike through the path. Several inches of topsoil on each side of the walkway was installed and graded to meet the existing lawn area. Grass seed was installed,tamped, and hydrated.The enclosed pictures numbered(#2) &(#3)show the repaired area.Picture(#4) shows the condition of the path outside our area of repair.This is included just to demonstrate that Burr Meadow has done nothing to maintain the rest of the path. Also visible in photo's numbered (#2) & (#3) are plantings that had already been installed as required on the border of the two properties as per the Landscaping plan. 3. The additional mulch to be placed around the groupings of shrubs behind building (#3)has been completed. See photo's (#5) &(#6).I am however also enclosing a copy of the minutes from the Association's July and August 2007 meetings. "Our integrity is the only thing we take from this world." Upon that cornerstone we seek to establish our relationship with you. .,' Photo (#15)shows the downspout and splash block is now missing from this unit, and someone else has now placed a long black drain there.There are three other places on building one and two where someone has removed the extension of the downspouts placed there by South Windsor Estates last August 2006. Someone in the complex continues to push the splash block up against the foundation instead of leaving them overhang at the end of the down spouts and extending into the stone area where they are intended to drain the water away from the building.We do not feel we should be held responsible for the acts of the unit owners after the job has been completed to Town specification. .8. Photo's number(#16 through#22)show damage being done by the Association lawn maintenance crew to all the plantings that were installed by South Windsor Estates.I am including these so if these plantings do not thrive,we are not held responsible for the negligence of the association's contractors. 9. Also included are copies of e-mails between myself,the president of the association, and Steve Cabanis the property manager. Snow plowing issues,issues regarding the proper areas that need snow removal and lighting issues all brought to their attention during the past year of 2006. Please read the association minutes from July and August of 2007.You will see that areas of black top that were completed last May 2006 by South Windsor Estates have been re- paved by someone hired by the association just last week. I was at the site today and verified that this paving has been done. I do not know if the Town needs to check the paving job that was just completed on building two.We certainly do want to be held responsible for any water issues etc.,that may occur and were caused by someone paving over what was completed by South Windsor Estates LLC and approved by the Town last year. 10. On September 7"'and 8`I'2007, I spoke to each owner of units 301 through units 305.There are no punch lists of items from any owner and each owner has indicated they are very happy with their unit,the workmanship of the unit, and my response to any questions or concerns they have had during the time I have been associated with the site. If the Town needs confirmation of this each owner said the Town might call them if they wish too. We believe we have successfully met all the obligations of the site requirements as per the plan as well as all additional request of the Town.To our knowledge the site has been inspected. Therefore we respectfully request the Bond in the amount of Thirty-Six Thousand One-Hundred ($36,100.00)and no/100th Dollars be released. jinc re�yrs,ricia S South Windsor Estates,LLC Enclosures CC/Attorney William Bresleau William Martin PIFASAN-T MEADO—W-ROARrn ter M TTFS The meeting was called to order at 2:10 PM by Louise Shaheen,via telephone: In attendance were Gilma_v Bouchard Frechette,Rich Wilson and Steve Cabaniss,Property Manager. MOTION BY GILMAY TO ACCEPT THE JULY MINUTES,SECONDED BY RICH. MOTION CARRIED. MOTION BY GIUMAY,SECONDED BY WCH TO ACCEPT THE BUDGET REPORT, MOTION CARRIED. New Business: Decision on landscaper/0-now removal contract is postponed till September s9 Steve can gather additional contractors and information. Since bi-annual cleaning of catch basins were not included in proposal requests, Steve will ask contractors to include this in their fee. N Burr Meadows will not remove dead tree next to Unit 3 eve landscaper has restored walking path and installed shrubs promised to them, r Resealing of damaged driveways and common areas will be done after Labor Day. Snow removal company responsible for damage will contribute 50%of the cost. In advance, Steve will give specific date to unit owners who will be resealed so they can move cars until job is completed. The Mister Insurance plan wilt now have a$2500 deductible, This affects Part A,Building coverage of unit owners H06 policy. Unit owners may want to inform your insurance company of this change. Also, all unit owners are strongly encourage to carry an H06 policy for their unit_ Drain pipes that are not attached to buildings will be removed and stored for us by Advanced Property. Steve has one quote of$2226 to power wash our buildings, Gilmay asked him to obtain additional bids for comparison. Building 3 unit owners are reminded that the developer has one year to correct any issues on owner's punch list. Unit owners are strongly encouraged to submit their punch list to their attorney to insure that work is completed. Any incomplete issues that are the responsibility of the developer will not become the responsibility of the association. Next meeting will be on Monday, September 214 at 2 P.M.in Unit I04_ Motion by Rich,seconded by Gilmay to adjourn. Motion carried. Sincerely> Louise Shaheen Chair .,pyi H Sf4 C� Ole sou� 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 °SOR.00 TELEPHONE(860) 644-2511 October 16,2006 South Windsor Estates LLC 84 Willowbrook Road Longmeadow, MA 01106 CO Dear M adam/Sir: Re: Appl#00-07P,Pleasant Meadows bonds This is to advise you that the Planning and Zoning Commission voted on 10/10/06 to reduce the site bond from$80,990 to$36,100 and to also reduce the IWA/CC bond from$3,000 to $0. Please forward an amendment to the bonds we are currently holding showing the reductions at your earliest convenience. Very truly yours, Patrick Kennedy, Chairman M Planning and Zoning Commission KMcC/bmm cc: Town Engineer Chief Building Official �hr Li a s A-t-AL I-ee c/ be X boll AT&T Yahoo! Mail -pjs(asnet.net Page 1 of 1 MAIL Print-Close Window Date: Tue, 20 Pear 2007 01:40:59 -0700 (PDT) From "Patricia Schuiten" <pjs@snet.net> Subject: Snow removal To: "Louise" <weazie256@cox.net> Dear Louise,the information givent to you by Steve Cabanis regarding snow removal and the two lights that are not lit was incorrect according to our attorney. I am sending you a copy of the attorneys letter.What he has advised us is what we are representing to purchasers.Also,the snow plowing people are still plowing snow into the corner between units 303&304.Again,they need to stop doing this.There is a drain there that is intended to drain all water from the roofs and this corner to prevent any water back up or ice accumulation in front of these driveways or their walkway. Please have someone advise them of this issue. Thank you Tricia Schuiten COPY http://us.f830.mail.yahoo.com/ym/ShowLetter?box=Sent&MsgId=59_34674485_50905 6... 3/20/2007 I do not want to be held liable for these items and if the Town Planner and or inspectors have any issues I need to be very clear on both of these items. We cleared the front areas this past weekend and I have instructed my painter and one other contractor to clear the rear staircases and landings today to avoid any immediate problems. I will be away from February 22 through March 2, 2007. Could you please forward your response in writing to me. I do not want there to be even the appearance of negligence on my part for not attending to these issues. I would like to have something in my file should any questions arise during the forth coming CO inspections. Unit#305 looks like it should close between March 20, 7-3e Bill thank you for your attention to this matter. Best Regards, Tricia Schuiten Li CC/Bill 8& Andy Martin AT&T Yahoo! Mail -pjs(asnet.net Page 2 of 3 Subject: FW: Parking Lot -----Original Message-----From: Patricia Schuiten [mailto:pjs@snet.net] Copy Sent: Saturday, February 17 2 ry 007 10:44 PM To: Louise Subject: RE: Parking Lot Louise,so you are aware. I had to have my painters help me crop and clear all the ice and snow piles and I had to clear in front of all the garages and units. I could not get the wheel chair client into these units without my having done this work myself today so I notified South Windsor Estates I am sending a bill for my time and the painters time.Also your board must change your contract.The second egree stairs for all the units need to be open and clear.That is a requirement to safety and it is not the responsibility of the unit owners to clear those stairs and patios.You need to meet with Steve and have your contract amended. I am telling you this information for your safety. If something happens to someone the board could be liable for neglience. I would speak with your attorney for your own protection.You also need to get the lights fix,the entry to the driveway and parking area are required to lit. My electrician replaced the lights in our sections in less than one week. Steve has known of this issue for over a month and told me directly he would get it taken care of. It still is not done. I am sending a drawing to you of where the snow is NOT supposed to be plowed, especially where it was shoved between units 303 & 304.There is a special roof drain there that they have now blocked totally. If the gutters back and causes roof leaking inside this will be the responsibbity of the association to repair. Best Regards,Tdcia Louise<weazie256@cox net>wrote: e are aware of the snow plowing issues and have addressed them with the endor. Rear shoveling is not part of the contract for any of the units. I'm ,lure Steve will get back to you but it won't be today. -----Original Message----- From: Patricia Schuiten [mailto:pjs@snet.net] Sent: Saturday, February 17, 2007 9:27 AM To: Louise Cc: Steve Canbannis Subject: Parking Lot Good morning Lousie, We have a problem with the snow removal.Who ever is plowing is not placing the snow in proper locations and not clearing as they should.They back bladed the garages at 301 &302 and never scrapped down to the pavement. I have at least two inches of hard packed snow and ice. I have a gentleman coming today in a wheel chair to take a second look at 302 and he will never be able to get up into the unit. They never cleared the snow away from the landing either.They have piled all the now in front of 301 and that cannot be.Those are to remain open as two additional parking spaces by town requirement.They have also plowed all the snow in front of 306.The walk area to the unit is maybe 1foot wide and is always covered in ice.They did not shovel the rearstairs and pads to all the units either. Unit#306 is buried right up to the door.These are the second egresses to the units and need to be cleared.There needs to be a path all the way round the building in the event someone needs to get out. Please have them come today and correct this. Especially unit#302 and#301. 1 have showings going on and cannot get in to these units.Thank you for your help. I left a message for Steve last evening also but I will forward this http://us.f830.mail.yahoo.com/ym/ShowLetter?box=Inbox&Msgld=1632 32112084 4796... 2/20/2007 AT&T Yahoo! Mail -pjs(asnet.net Page 1 of 2 ` � °° Print-Close Window From: "Steve Cabaniss" <adva nceproperty5@sbcgloba Lnet> To: "Louise" <weazie256@cox.net>, pjs@snet.net Subject: RE: Parking Lot ` o 0 Date: Mon, 19 Feb 2007 17:29.53 -0500 Tricia. The Association does not reimburse unit owners or others for work unless prior authorization is given by the Board of Directors. This work would have been done by the contractor on Friday but was prevented from doing so by vehicles parked in the way. The contractor made an attempt to address the situation with the contractor l but was ignored (I think a non-English speaking person). 1 With regard to the patios and balcony areas,the Association declaration, article VI,section 6.3 requires the unit owner to be responsible for snow removal in these areas,therefore for the safety of your workers and for liability Iy reasons,the developer will need to pay someone to shovel these areas. The Association will have the lights repaired shortly. Please note that an inspection by a lighting professional revealed that the parking lot is lit well above the standards required for elderly housing so having a light out from time to time should not impact the residents. Steve Cabaniss -----Original Message----- From: Louise[mailto:weazie256@cox.net] Sent: Monday, February 19, 2007 5:08 PM To: Advanceproperty5 Subject: FW: Parking Lot -----Original Message----- From: Patricia Schuiten [mailto:pjs@snet.net] Sent: Saturday, February 17, 2007 10:44 PM To: Louise Subject: RE: Parking Lot Louise, so you are aware. I had to have my painters help me crop and clear all the ice and snow piles and I had to clear in front of all the garages and units. I could not get the wheel chair client into these units without my having done this work myself today so I notified South Windsor Estates I am sending a bill for my time and the painters time.Also your board must change your contract. The second egree stairs for all the units need to be open and clear.That is a requirement to safety and it is not the responsibility of the unit owners to clear those stairs and patios.You need to meet with Steve and have your contract amended. I am telling you this information for your safety. If something happens to someone the board could be liable for neglience. I would speak with your attorney for your own protection.You also need to get the lights fix,the entry to the driveway and parking area are required to lit.My electrician replaced the lights in our sections in less than one week. Steve has known of this issue for over a month and told me directly he would get it taken care of. It still is not done. i am sending a drawing to you of where the snow is NOT supposed to be plowed, especially where it was shoved between units 303& 304.There is a special roof drain there that they have now blocked totally. If the gutters back and causes roof leaking inside this will be the responsibbity of the association to repair. Best Regards,Tricia Louise<weaz1e256@cox.nef>wrote: we are aware of the snow plowing issues and have addressed them with the http://us.f830.mail.yahoo.com/ym/ShowLetter?box=Inbox&MsgId=9435 31385544 4644... 2/20/2007 A ell Kahan Kffimsky & Caposse a LL.P February 28, 2007 Michael A.Bars William E.Breslau Joseph P Capossela Patricia A. Schuiten William J.Daldn Realty Connection Dorian Reiser Famiglietti 49 Windsor Avenue (Rt. 83) O �` McroriaJuliano Vernon, CT 06066 Solomon Kerensky Michael J.Kopsick Justin L.Murphy Kristen B.Prout Dear Trish, Stephen E Sutton James J.Walker Gregory C.Weaver I am writing in response to your letter regarding a couple of issues you have Jeffrey M.Winnick* encountered with the South Windsor Estates condominium association. I have reviewed Of Counsel the provisions of the Declaration dealing with maintenance, repair and replacement of the Oliver S.Chappell common elements and limited common elements. Robert E Kahan (1922-1996) Your initial concern is whether snow removal from the stairs and stoops at the `also admitted in MA rear of the units is the responsibility of association or the UnitOwner:In Section 6.1,the Declaration provides that Unit Owners are only responsible for the maintenance of those portions of the limited common elements required by the Declaration to be maintained by the Unit Owners. According to Section 6.3 of the Declaration,the Unit Owners are 45 Hartford Turnpike responsible for snow removal from patios and balconies. Steps and stoops are listed P.O.Box K separately from patios and balconies in Article 5(c) of the Declaration, and the Vernon,CT 06066-2181 Declaration does not provide for Unit Owners to be responsible for snow removal from Telephone steps and stoops. Consequently, such snow removal would most likely be the (860) 646-1974 responsibility of the association. Facsimile (860) 647-8302 Please note, however, that snow removal from stairways and stoops may not be a 205 Storrs Road service generally included in most snow plowing packages. Requiring that the Reservoir Commons association provide such a service for the benefit of Unit Owners may significantly Mansfield Center,CT 06250 increase the association's expenses. Telephone (860) 456-9494 Additionally, you inquired as to the maintenance of the lights at the entry to the Facsimile parking lot. These lights would fall under the definition of limited common elements in (860) 423-8410 Section 1.5 of the Declaration as they are for the benefit of all Unit Owners. Again, attorneysCilkkc-lawcom pursuant to Section 6.1 of the Declaration, maintenance of all of the common elements is v:v,%akkc-lawcoyn the responsibility of the association. Accordingly,the association should be responsible for any repair to such lights,unless, of course, they are able to convince the power company or town to make any repairs. 08✓31 '2007 FRI 14:48 FAX 860 644 7280 South Windsor Town Hall [a001/001 • • iI al Of Post=it°Fax Note 7671 Date ` pages Memo ' TO —TY! w From >C Co./Dept. Co. ; �kJ Phone# Phone# To: Tricia Schuiten Fax# �,. , -�; Fax# From: Michele R. Lipe,AICP Assistant Director of Planning Date: 8/31/2007 Re: App.#00-07P, Pleasant Meadows SRD landscaping inspection As a result of the landscaping inspection this past week, we are requesting the following items be addressed: • Required Plantings in front of the ornamental fence on the west side of unit #18 must be planted(this grouping appears to have been missed); , z • The area that was disturbed on the Burr Meadows property should be restored per the agreement;amd + The association has requested that the mulch beds containing the groupings of shrubs(along the perimeter areas)be connected as shown on the plans for ease of maintenance. If you have any questions, please contact me at 644-2511,ext.252. Copy •Page 1 From: "Steve Cabaniss"<Steve@advanceco.net> To: <lipe@southwindsor.org> Date: 9/6/07 1:25PM Subject: South Windsor Estates Punch list Michele, Thanks for your phone message regarding the punch list items at the Pleasant Meadow Condominium. Please forward a copy of this e-mail to the appropriate person in the engineering department. Regarding your comments about the planting that were left on the perimeter of the property. Many of these planting may have been the property of an individual unit owner but these were removed and discarded along the perimeter by the landscaper hired by the developer and therefore should be cleaned up by them. The Following non-landscaping items still need attention: I am copying this letter to members of the Pleasant Meadow Board of Directors. They may be aware of some punch list items not noted below. 1. Gutters and downspouts were never installed on the first building in the front of the center units. You will see similar gutters and downspouts that were installed in similar areas in building 2. 2. All three building should be powerwashed. the need to powerwash is due to the dust and dirt resulting from the construction activity for building 3. 3. There is paint remaining on several exterior windows of buildings 1 and 2. 4. The door frames and kick plates of the front and rear exterior doors were never painted. Can you advise us if the original building plan called for a maintenance free exterior, i.e.was this trim supposed to be wrapped? 5. At least 2 of the entry steps in building 3 have risers that exceed 9.5"and are therefore out of co There are a couple of areas of erosion around the detention basin that need repair. Can the town confirm that both detention basins have the proper sidewall slope(some areas seem extremely steep and dangerous)and that the elevation of the bottom of the basin meets the requirf the plan. The gas curb boxes in the rear of unit 306 and 208 are above grade. Is the lawn elevat10 . these areas correct or do the curb boxes need to be lowered. 9 �? The grading behind unit 101 creates a situation where water does not flow away from the building Iting in basement water in this unit. 10. The stone bed in front of unit 302 was constructed in such a manner where water pools11 �• again .foundation and allows water into the basement. ..__.,..:.� The Burr Meadow Condominium Association has advised me that South Windsor Estates was required to install some planting on their property and well as restore the walking path that was _ damaged when they did the utility tie-in. PO 12. There were a number of unit owners in buildings 1 and 2 that had interior punch list items �� that may or may not have been resolved. I hope the town would contact each of these residents to determine the status. It is my understanding that the developer has no assets remaining even when the final site and landscape bonds are released. 13. The Association has not been made aware of outstanding punch list items for any of the units in building 3, other than those noted above. They may have communicated these items directly to the developer or to their attorney. Can the Town confirm with these unit owners that there issues have been resolved before releasing the bond? Please confirm receipt of this e-mail and let me know if there is any other information that you require. I am willing to meet with the engineering department if there are any additional questions. Sincerely, Steve Cabaniss * �-OWn 0.1 � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 SOR-CO TELEPHONE (860) 644-2511 July 25, 2001 Mr. Mark Kislyuk South Windsor Estates LLC 84 Willowbrook Road Longmeadow, MA 01106 Dear Mr. Kislyuk: This letter is to inform you of a number of items that remain to be addressed before the Engineering department will issue approval to issue a certificate of occupancy for any units at the Pleasant Meadows site. The following is a partial list of items to be addressed: 1. Compaction test results have not been received for the base course of pavement. Pavement is not accepted until compaction test results are received 2. Grading around building is not acceptable—swale to be formed around building- may require slabs in rear to be replaced 3. Site remains to have turf established on disturbed area around first building. 4. Sanitary sewer is not approved a) Sanitary main connection to existing Burr Meadow SMH was not placed at correct elevation and brought in above brickshelf. Brickshelf to be knocked out and new invert formed as remediation. b) New sanitary sewer permit is required for above work. 5. Detention basin remains to be built a) Grading not completed b) Turf not established c) Retaining walls remain to be constructed. d) Detention basin outlet structure remains to be raised 1.29' per change order 10 and approved plans. e) Berm on north side of detention basin is to provide a minimum of 1' of freeboard above proposed outlet structure top of frame—to elev. 105.50'min or revised drainage calculations to be submitted. f) As-built of detention areas is required to show that basins are built to proper grades and capacities. 6. As-built required showing grading around first building and for entire detention basin areas to show that grading conforms to approved plans. This is a preliminary list of outstanding items that remain to be addressed from the Engineering department review. Additional items may be required to be addressed pending review of the as-builts when submitted and further site inspections. Furthermore, approvals for issuance of certificates of occupancy are required to be obtained from the Planning and Building departments. Respectfully, Mr. Tracy A. LaPiene Project Engineer tal cc: Michael Gantick, Director of Public Works Marcia Banach, Director of Planning John Collins, Chief Building Official Karen Isherwood, Design Professionals SAENGINEER1Proj.-P&Z Wetland ApplicationslPleasant Meadowsneasant Meadows Kislyuk 072501 tal.doc August 3, 2006 Mr. William Martin/ Member South Windsor Estates, LLC 84 Willow Brook Road Longmeadow, MA 06110 Re: Punch List for Pleasant Meadows Dear Mr. Martin, The South Windsor Engineering Division has inspected the site improvements to the Pleasant Meadows SRD and found the following items need to be corrected or completed so the site work conforms to the approved plans: 1. Two (2) temporary light poles need to be replaced with permanent light poles, one in front of unit #12 and one next to the detention basin. 2. A Guide rail (approx 25 feet long) needs to be installed at the end of the parking spaces in front of unit #13. 3. A split rail fence (approx 75 feet long) needs to be installed along the retaining wall above the detention basin near unit #13. 4. Line striping needs to be completed in the parking areas. 5. Handicap signs need to be installed by the handicap parking spaces. 6. Finish grading and seeding where disturbed. For example topsoil needs to be added around the rear of units 204, 205, 206 and 208, including under decks, to slope the ground away from the foundations. 7. Erosion near the north corner of unit #12 needs to be repaired, seeded and stabilized to prevent further erosion. 8. A stop sign and white painted stop bar need to be installed at the end of Garden Circle where it meets Pleasant Valley Road. 9. A Four foot high stockade fence needs to be installed along east side of parking area across from units #1-4 (approx 120 feet long). 10. The Town needs to receive a letter from a licensed surveyor stating that pins and monuments are set according to the approved plans. 11. Install gazebo, benches, etc. to approved site plan (see revised landscape plan approved as a change order). Page 2 Mr. William Martin August 3, 2006 12. Straighten the water and gas gate valve boxes and set them to be flush with the finished grade in front of units 101. 102. 201, 208 and anywhere else necessary 13. Concrete walks and steps need to be installed from the driveway to the concrete steps in front of all units, ie units 202 and 203. Also, install a cement landing at the base of the steps from the deck of unit 208. 14. Complete the site landscaping per the most recently approved plan. 15. There are places where curbs were not installed per the plans such as in front of the second building. This should be discussed with the owners association as it affects drainage and maintenance of the grass areas in front of the units. If an agreement is reached between the developer and owners association to eliminate the curb, a change order needs to be submitted to the Town for this revision. 16. The As-built plans need to be revised as follows: Show contours and the way the ground is graded to the rear of units 13 through 16. Show all line striping and handicap signs. Show all finish grading. Show all site lighting. Show sewer clean-outs. Show guiderRail, fences, stop sign, stop bar, gazebo, walkways, etc. Please call our office at the above number, ext 244 when this work is done so we can verify that the site work is completed according to the approved plans. When all the site work is complete the bond can be reduced to the maintenance level (10% of the original amount) and that will be held for one additional year. Sincerely, Jeffrey Doolittle, P.E. Town Engineer cc: Marica Banach, Director of Planning Bernie Drabek Mike Covensky, Coven Construction Patrica Schuiten, General Contractor engineering/molloy/punchlist pleasant meadow — srd From: "Steve Cabaniss"<Steve@advanceco.net> To: <lipe@southwindsor.org> Date: 9/6/07 1:25PM Subject: South Windsor Estates Punch list Michele, Thanks for your phone message regarding the punch list items at the Pleasant Meadow Condominium. Please forward a copy of this e-mail to the appropriate person in the engineering department. Regarding your comments about the planting that were left on the perimeter of the property. Many of these planting may have been the property of an individual unit owner but these were removed and discarded along the perimeter by the landscaper hired by the developer and therefore should be cleaned up by them. The Following non-landscaping items still need attention: I am copying this letter to members of the Pleasant Meadow Board of Directors. They may be aware of some punch list items not noted below. 1. Gutters and downspouts were never installed on the first building in the front of the center units. You will see similar gutters and downspouts that were installed in similar areas in building 2. 2. All three building should be powerwashed. the need to powerwash is due to the dust and dirt resulting from the construction activity for building 3. 3. There is paint remaining on several exterior windows of buildings 1 and 2. 4. The door frames and kick plates of the front and rear exterior doors were never painted. Can you advise us if the original building plan called for a maintenance free exterior, i.e. was this trim supposed to be wrapped? 5. At least 2 of the entry steps in building 3 have risers that exceed 9.5"and are therefore dJl, out of co e. SJAKJ -- There are a couple of areas of erosion around the detention basin that need repair. Can the town confirm that both detention basins have the proper sidewall slope(some areas seem extremely steep and dangerous)and that the elevation of the bottom of the basin meets the requireWnt of the plan. The gas curb boxes in the rear of unit 306 and 208 are above grade. Is the lawn elevation in these areas correct or do the curb boxes need to be lowered. _ (D The grading behind unit 101 creates a situation where water does not flow away from the � �building resulting in basement water in this unit. 5j,•�� �o 10. The stone bed in front of unit 302 was constructed in such a manner where water pools against foundation and allows water into the basement. The Burr Meadow Condominium Association has advised me that South Windsor Estates was required to install some planting on their property and well as restore the walking path that was damaged when they did the utility tie-in. 12. There were a number of unit owners in buildings 1 and 2 that had interior punch list items that may or may not have been resolved. I hope the town would contact each of these residents to /({ol determine the status. It is my understanding that the developer has no assets remaining even when the final site and landscape bonds are released. 13. The Association has not been made aware of outstanding punch list items for any of the units in building 3, other than those noted above. They may have communicated these items directly to N the developer or to their attorney. Can the Town confirm with these unit owners that there issues have been resolved before releasing the bond? Please confirm receipt of this e-mail and let me know if there is any other information that you require. am willing to meet with the engineering department if there are any additional questions. Sincerely, Steve Cabaniss Michele Lipe- Re South Windsor Es111tates Punch list Page 1 j From: Chris Dougan To: Steve Cabaniss Date: 9/7/07 8:28AM Subject: Re: South Windsor Estates Punch list Hi Steve, I will look at#'s 5, 9 and 10 for Building Code compliance in the next week. I will be in touch with you after that. Thanks, Chris >>>"Steve Cabaniss"<Steve@advanceco.net>09/06/07 01:33PM >>> Michele, Thanks for your phone message regarding the punch list items at the Pleasant Meadow Condominium. Please forward a copy of this e-mail to the appropriate person in the engineering department. Regarding your comments about the planting that were left on the perimeter of the property. Many of these planting may have been the property of an individual unit owner but these were removed and discarded along the perimeter by the landscaper hired by the developer and therefore should be cleaned up by them. The Following non-landscaping items still need attention: I am copying this letter to members of the Pleasant Meadow Board of Directors. They may be aware of some punch list items not noted below. 1. Gutters and downspouts were never installed on the first building in the front of the center units. You will see similar gutters and downspouts that were installed in similar areas in building 2. 2. All three building should be powerwashed. the need to powerwash is due to the dust and dirt resulting from the construction activity for building 3. 3. There is paint remaining on several exterior windows of buildings 1 and 2. 4. The door frames and kick plates of the front and rear exterior doors were never painted. Can you advise us if the original building plan called for a maintenance free exterior, i.e.was this trim supposed to be wrapped? 5. At least 2 of the entry steps in building 3 have risers that exceed 9.5"and are therefore out of code. 6. There are a couple of areas of erosion around the detention basin that need repair. 7. Can the town confirm that both detention basins have the proper sidewall slope( some areas seem extremely steep and dangerous)and that the elevation of the bottom of the basin meets the requirement of the plan. 8. The gas curb boxes in the rear of unit 306 and 208 are above grade. Is the lawn elevation in these areas correct or do the curb boxes need to be lowered. 9. The grading behind unit 101 creates a situation where water does not flow away from the building resulting in basement water in this unit. 10. The stone bed in front of unit 302 was constructed in such a manner where water pools against the foundation and allows water into the basement. 11. The Burr Meadow Condominium Association has advised me that South Windsor Estates was required to install some planting on their property and well as restore the walking path that was damaged when they did the utility tie-in. 12. There were a number of unit owners in buildings 1 and 2 that had interior punch list items that may or may not have been resolved. I hope the town would contact each of these residents to determine the status. It is my understanding that the developer has no assets remaining even when the final site and landscape bonds are released. 13. The Association has not been made aware of outstanding punch list items for any of the units in building 3, other than those noted above. They may have communicated these items directly to the developer or to their attorney. Can the Town confirm with these unit owners that there issues have Michele Lipe Re South Windsor Estates Punch list Page 2 been resolved before releasing the bond? Please confirm receipt of this e-mail and let me know if there is any other information that you require. am willing to meet with the engineering department if there are any additional questions. Sincerely, Steve Cabaniss Property Manager Pleasant Meadow Condominium Association 860-657-8981 Ext. 109 860-657-8970 fax steve(a)advanceco.net CC: Michele Lipe Dec 14 06 04: 05p Design Professionals 860-291 -8757 p. l DESIGN PROFESSIOT�IA.LS, INC. civil engineers ♦ planners ♦ sumeyors landscape architects ♦ gis ♦ r;ps December 14, 2006 Jeffrey Doolittle, P.E., Town Engineer Town of South Windsor 1540 Sullivan Ave South Windsor, CT 06074 DPI Project No. 1272 RE: Pleasant Meadow SRD Garden Circle South Windsor, Connecticut Dear Mr. Doolittle, On December 14, 2005, we completed the monutr.eni.ation of the above-referenced lot. All of the iron pins and monuments are set. Thank you. [respectfully submitted, DESIGN PROFESSIONALS INC. By: Lawrence R. Geissler, Jr., L.S. Director of Surveying CC: Pleasant Meadow RECEIVE® DEC 14 2006 SOUTH WINDSOR ENGINEERING D&T. 165 South Satellite Road,South Windsor. Connecticut 06074 Tel:(860)291-8755•Fax:(360)291-8757 Email:dpicivd@aol.com DESIGN PROFESSIONALS, INC. civil engineers ♦ planners ♦ surveyors landscape architects ♦ gis ♦ gps December 14, 2006 Jeff ey Doolittle, P.E., Town Engineer Town of South Windsor 1540 Sullivan Ave South Windsor, CT 06074 DPI Project No. 1272 RE: Pleasant Meadow SRD Garden Circle South Windsor, Connecticut Dear Mr. Doolittle, On December 14, 2005, we completed the monumentation of the above-referenced lot. All of the iron pins and monuments are set. Thank you. Respectfully submitted, DESIGN PROFESSIONALS INC. By: 44',A� kve.�& Lawrence R. Geissler, Jr., L.S. Director of Surveying CC: Pleasant Meadow Ry aVpn DEC 18 2006 ENG/NEER;NI��GR Epr. 165 South Satellite Road, South Windsor,Connecticut 06074 Tel: (860)291-8755•Fax: (860)291-8757 Email:dpicivil@aol.com ,SOW N SC4 � fi Tiov� OP s-ou� ?d. m �1 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 SOR•co TELEPHONE (860) 644-2511 October 26, 2006 William Martin RECEIVED South Windsor Estates, LLC OCT 2 6 2006 84 Willow Brook Road Longmeadow, MA 06110 SOUTH WiNDSOR ENGINEERING DEPT, Dear Mr. Martin: Re: Appl 00-07P Pleasant Meadow Estates SRD This is to advise you that the Planning and Zoning Commission voted on October 24, 2006 to release the remaining money required by the IWA/CC. Enclosed please find the surety bonds that were posted. Very truly yours, ?'�4 41Gt Patrick Kennedy, Chairman Planning and Zoning Commission PK/bmm cc: Town Engineer Chief Building Official Memorandum To: Marcia A. Banach, Director of Planning From: JeffreyDoolittle P.E. Town Engineer g Date: 10/10/06 YP Re: Pleasant Meadows Site Bond Reduction (00-07P) The developer for the Pleasant Meadows Project has requested a reduction in their bond. This reduction is mainly for the final pavement course, driveway to the third unit, last two street lights and some loam and seed. Based on the work completed to date I recommend the bond for this project be reduced to $36,100. Please call me if you have any questions. SAENGINEERTOOLIT\Planning Reviews\PleasantMeadows Bond Red uction2.doc Jeff Doolittle- RE: Pleasant Meadow Page 1 From: "Andrea M. Momnie"<amomnie@design profess ionalsinc.com> To: "'Jeff Doolittle"'<doolit@southwindsor.org>, "'Marcia Banach"' <banach@southwindsor.org>, "'Michele Lipe"'<lipe@southwindsor.org> Date: 10/10/06 12:49PM Subject: RE: Pleasant Meadow Karen did that reduction in Bond Reduction#2.A substantial amou of R,, ()—kLL ? landscaping has occurred to-date, as can be seen in the field. There is ans additional $3,000 landscaping bond that is also being held by the Town for this work. In reality you have$21,000 for strictly landscaping even after this reduction, which we feel is more than sufficient to cover the outstanding work. Please note that I did not take the "full"reduction we discussed and agreed to at your office($35,000). 1 feel I have definitely taken a relatively conservative approach to this reduction, but of course, I am always open to adjusting things if you feel it is imperative. The irony is the more money we free up in the bond release, the more money our clients have to complete the remaining work, especially the landscaping. -----Original Message----- From: Jeff Doolittle [mailto:doolit@southwindsor.org] Sent: Tuesday, October 10, 2006 12:27 PM To: amomnie@designprofessionalsinc.com; Marcia Banach; Michele Lipe Subject: Re: Pleasant Meadow Hi Andrea, Thanks for the bond reduction information for Pleasant Meadows. We are currently reviewing this and expect to have a bond reduction to the PZC tonight. One question, how was the landscaping bond reduction (25,000 to 18,000) determined? I would think this number should be left at 25,000 until the revised landscape plan is completed and accepted by the association and Town. Thanks Jeff Doolittle, P.E. Town Engineer >>> "Andrea M. Momnie"<amomnie@designprofessionalsinc.com> 10/10/0612:22PM Jeff, Marcia&Michele, This email is just confirming that the Pleasant Meadow site bond reduction and wetlands bond release are on for PZC tonight. Please respond to confirm.As an aside, the landscape change order is done and we are just awaiting our meeting with the association on 10/23 to secure their sign-off before we submit it to the Town.Thank you, Andrea Andrea M. Momnie Executive Coordinator f� ; DESIGN PROFESSIONALS, INC. civil engineers ♦ planners ♦ surveyors landscape architects ♦ gis ♦ gps October 5,2006 Ms.Marcia Banach,Director of Planning Town of South Windsor 1540 Sullivan Avenue South Windsor,CT 06074 RE: App: 00-007P-Pleasant Meadow SRD ' . DPI Proj.No. 1272 Pleasant Valley Road South Windsor,Connecticut On behalf of our client, South Windsor Estates,L.L.C.,more specifically,Dr. William Martin,we are requesting a reduction in the remaining bond for Pleasant Meadow. Attached for your review are 2 copies of a revised bond estimate form. The reduction is essential in order to finance the completion of this project. The applicant is snaking a good-faith attempt to finalize this project and is seeking a third bond reduction,as we discussed at your office on September 27,2006 with Jeffrey Doolittle,P.E., Town Engineer,and Michele Lipe,Deputy Director of Planning.This reduction credits, for example,the installation of the pavement and curbing for the street,remaining sanitary sewer structures,the retaining wall, and remaining street lights.Please find a copy of the as-built survey attached(revised to 10/2/06). Also as discussed at the 9/27/06 meeting, Richard Boston,Director of Landscape Architecture, is working on a landscape change order. We are pursuing a meeting with the condominium association to secure their endorsement and expect to submit a plan to the Town in the near term. An opinion of probable cost will be included in the change order. We would like the Planning and Zoning Commission to be able to consider this request at the next available meeting. Please let me know if you require any additional information. Respectfully submitted, D SIGN PROFESSIONALS INC. �t Andrea M.Momnie Executive Coordinator CC w/enclosures: Jeffrey Doolittle,P.E.,Town Engineer R��EI vieo William&Andrea Martin Dan Martin OCT 0 5 2006 425 SullivanSouth Windsor, �074 N�N T1:(860)291-8755 Fax: 860)298757 / F�R�zlv'Ds OR www.designprofessionalsine.com �� 08/03/2006 THU 12:49 FAX 860 644 7280 South Windsor Town Hall 14001 ********************* *** FAX TX REPORT *** ********************* TRANSMISSION OK JOB NO. 1807 DESTINATION ADDRESS 92893119 PSWD/SUBADDRESS DESTINATION ID ST. TIME 08/03 12:48 USAGE T 00' 32 PGS. 2 RESULT OK SAWN Sfq - y � • w° 1540 SULLIVAN AVENUE•SOUTH WINDSOR,CT 06074 �l�OSOR•co�'� TELEPHONE(860)644-2511 August 3 2006 #of g � Post-it'Fax Note 7671 Date pa�,� 96► To From C'G Co./Dept. Co. Mr. William Marian/ Member Phone# Pane# South Windsor Estates, LLC Fax# FaX# 84 Willow Brook Road "0l4°4.- 3 l 1 Longmeadow, MA 06110 Re: Punch List for Pleasant Meadows Dear Mr. Martin, The South Windsor Engineering Division has Inspected the site improvements to the Pleasant Meadows SRD and found the following items need to be corrected or completed so the site work conforms to the approved plans: 1. Two (2)temporary light poles need to be replaced with permanent light poles,one in front of unit #12 and one next to the detention basin. 2. A Guide rail (approx 25 feet long) needs to be installed at the end of the parking spaces in front of unit#13. 3. A split rail fence (approx 75 feet long) needs to be installed along the retaining wall above the detention basin near unit #13. 4. Line striping needs to be completed in the parking areas. 5. Handicap signs need to be installed by the handicap parking spaces. 6. Finish grading and seeding where disturbed. For example topsoil needs to be added around the rear of units 204, 205, 206 and 208, including under decks, to slope the ground away from the foundations. 7. Erosion near the north corner of unit#12 needs to be repaired, seeded and stabilized to prevent further erosion. 8. A stop sign and white painted stop bar need to be installed at the end of Garden Circle where it meets Pleasant Valley Road. Q_ A Poi Er font hinh SfnrkarlP fPnrn nPpis to hp. imfallp.d Anna east.side of ,SOW N se., C� x E' Town O-P SaatA ?d&&'40t 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 sOR�cO TELEPHONE (860) 644-2511 August 3, 2006 Mr. William Martin/ Member South Windsor Estates, LLC 84 Willow Brook Road Longmeadow, MA 06110 Re: Punch List for Pleasant Meadows Dear Mr. Martin, The South Windsor Engineering Division has inspected the site improvements to the Pleasant Meadows SRD and found the following items need to be corrected or completed so the site work conforms to the approved plans: 1. Two (2) temporary light poles need to be replaced with permanent light poles, one in front of unit #12 and one next to the detention basin. 2. A Guide rail (approx 25 feet long) needs to be installed at the end of the parking spaces in front of unit #13. 3. A split rail fence (approx 75 feet long) needs to be installed along the retaining wall above the detention basin near unit #13. 4. Line striping needs to be completed in the parking areas. 5. Handicap signs need to be installed by the handicap parking spaces. 6. Finish grading and seeding where disturbed. For example topsoil needs to be added around the rear of units 204, 205, 206 and 208, including under decks, to slope the ground away from the foundations. 7. Erosion near the north corner of unit #12 needs to be repaired, seeded and stabilized to prevent further erosion. 8. A stop sign and white painted stop bar need to be installed at the end of Garden Circle where it meets Pleasant Valley Road. 9. A Four foot high stockade fence needs to be installed along east side of parking area across from units #1-4 (approx 120 feet long). 10. The Town needs to receive a letter from a licensed surveyor stating that pins and monuments are set according to the approved plans. 11. Install gazebo, benches, etc. to approved site plan (see revised landscape plan approved as a change order). Page 2 Mr. William Martin August 3, 2006 12. Straighten the water and gas gate valve boxes and set them to be flush with the finished grade in front of units 101. 102. 201, 208 and anywhere else necessary 13. Concrete walks and steps need to be installed from the driveway to the concrete steps in front of all units, ie units 202 and 203. Also, install a cement landing at the base of the steps from the deck of unit 208. 14. Complete the site landscaping per the most recently approved plan. 15. There are places where curbs were not installed per the plans such as in front of the second building. This should be discussed with the owners association as it affects drainage and maintenance of the grass areas in front of the units. If an agreement is reached between the developer and owners association to eliminate the curb, a change order needs to be submitted to the Town for this revision. 16. The As-built plans need to be revised as follows: Show contours and the way the ground is graded to the rear of units 13 through 16. Show all line striping and handicap signs. Show all finish grading. Show all site lighting. Show sewer clean-outs. Show guiderRail, fences, stop sign, stop bar, gazebo, walkways, etc. Please call our office at the above number, ext 244 when this work is done so we can verify that the site work is completed according to the approved plans. When all the site work is complete the bond can be reduced to the maintenance level (10% of the original amount) and that will be held for one additional year. Si cerely, ��� _.__ J ffrey Doolittle, P.E. Town Engineer cc: Marica Banach, Director of Planning Bernie Drabek Mike Covensky, Coven Construction Patrica Schuiten, General Contractor engineering/molloy/punchlist pleasant meadow — srd k Jeff Doolittle-Pleasant Meadow Condominium, Garden Circle Page 111 L From: "Steve Cabaniss"<advanceproperty5@sbcglobal.net> To: <Doolit@southwindsor.org>, <Lipe@southwindsor.org> Date: 7/20/06 1:01 PM Subject: Pleasant Meadow Condominium, Garden Circle Jeff and Michelle, Attached are some outstanding issues regarding the site work at Pleasant Meadow Condominium. some of these issues may be resolved, but most are not. The Pleasant Meadow Condominium Association would appreciate the opportunity to conduct a site inspection with the Town of South Windsor prior to the release of the site or landscape bonds. Thank you for your help in this matter. Steve Cabaniss Property Manager Pleasant Meadow 860-657-8981 �[ CC: <weazie256@cox.net> RECEIVED JUN 2 12006 $QUTH WINDSOR PLANNING DEPT. June 21, 2006 Marcia A. Banach Director of Planning 1540 Sullivan Avenue South Windsor, CT 06074 RE: Pleasant Meadow Estates,301-306 Garden Circle Site Bond,E&S Bonds,Landscaping Bond. Dear Ms. Banach: Enclosed please find two copies of the final site plan-map prepared by Design Professional, Inc. for Pleasant Meadow Estates located at 301-306 Garden Circle. The final phase of the development and the required site work has been completed. I am requesting the release of the following bonds presently being held by the Town of South Windsor: 1. Site Bond in the approximate amount of$80,990.00 plus accrued interest being held in passbook. 2. E& S Bond in the amount of $4000.00 3. E& S Bond in the amount of $4000.00 4. Landscaping Bond in the amount of $3000.00 It is my understanding that approximately 10% of the original Site Bond shall be held back and kept in the passbook account for a period of one year. If you have any questions, please contact me at the enclosed address and telephone number. Sincerely ours, illiam Martin/Member South Windsor Estates,LLC 84 Willow Brook Road Longmeadow, MA 06110 (413) 531-1919 CC/Attorney William Bresleau File 1Y June 20,2006 Richard Norris MDC Water Authority 550 Main Street P.O. Box 800 Hartford, CT 06142 RE: Pleasant Meadow Estates, Garden Circle, South Windsor Private Hydrant Dear Mr. Norris: It is my understanding that MDC shall remove the public hydrant located adjacent to the entrance to Pleasant Meadow Estates, Garden Circle, South Windsor, CT. In doing so MDC will take the private hydrant owned by Pleasant Meadow Estates at the entrance to Garden Circle, South Windsor, CT. and convert it to public ownership. It is also my understanding that the annual maintenance fee for the hydrant shall be assumed by the Town of South Windsor, and the line item on the water bill for Pleasant Meadow Estates shall no longer contain a charge for hydrant maintenance. Therefore, I agree to surrender what ever ownership South Windsor Estates,LLC may have in the hydrant located at the entrance to Pleasant Meadow Estates, Garden Circle, South Windsor, CT . Sin erely yours, illiam Martin/Member South Windsor Estates, LLC 84 Willow Brook Road Longmeadow, MA 06110 CC/Attorney William Bresleau Town of South Windsor RECEIVED JUN 2 12006 SOUTH ANDSOR ENGINEERNG DEPT. REPORT OF FIELD COMPACTION TESTS OUR REPORT NO,: CLIENT: Coven Construction Co. Inc. DATE: 5- 4- PROJECT; Garden 'Circle 72-1291 NUCLEAR GAUOE INFORMATION AND DAILY STANDARD CAIBRATION NUMBERS VARIATION,PEACENT,♦1• OAUOE ADJUSTMENT CALIBRATION COUNTS •- FROM SHEETS - %VARIATION FROM - LASF USE OAUOE TYPE:TROXlER/CAMPBELI MOISTURE: MOISTURE: MOISTURE: MOISTURE: 691 --0.9 MODEL NO.: DENSITY: DENSITY: I DENSITY: DENSITY: 2 2 5 6 0.5 R _ R N- MA ION SOIL ID H VISUAL CLASSIFICATION OF SOIL MAX. DRY DENSITY, PCF OPTIMUM MOISTURE. % B Asphalt Class 2 159. 1 COMPACTION MOISTURE GENERAL LOCATION: REQUIREMENTS,% REQUIREMENTS, TEST READING QUOTIENT/ SOIL TEST ELEVATION FrS015'iliRE WET DRY PERCENT NO, PCF ID NO. DEPTH.IN OF TEST CONTENT, DENSITY, DENSITY, COMPACTION NO. % PCF PCF M- 4 D- 149.9 B B S _ M=6 .2 unit 30 %=4 / 94. 2 . 3 5 D- „ " M=6 . 3 148 . 1 93. 1 unit 30 0-4.4 6 M- " M=5 . 3 unit D- %=3 .7 147.0 92.4 306 P1/1- 7 II D- M=5 .6 cul-de- c: =3 . 9 150. 7 94.7 cjL 8 II II �� M=5 . 9 D- 148 .0 93 .0 150 , =4.2 R/L 9 M- 11 , D- M=6.6 150. 1 II %=4.6 4.4 250 , L/L T�CIiiYIC1AN: �f�tFHT�; I L _ 2 - 9ACKFILL ' UL MPLY WITH SPECIFICATIONS 3 - BASE COURSE B COMP PERCENTAGE DOES NOT COMPLY WITH SPECIFICATIONS 4.. - SUBBASE C - RETEST OF PREVIOUS TEST - S - SOIL CEMENT D - MOISTURE IN EXCESS OF SPECIFICATIONS 6 - OTHER E - MOISTURE BELOW SPECIFICATIONS REPORT OF FIELD COMPACTION TESTS OUR REPORT NO.: CLIENT: Coven Cons.truction Co. Inc. DATE:—L--2-4-0 6 PROJECT; arden ':Circle NUCLEAR GAUGE INFORMATION AND -CALIBRATION DAILY STANDMO CAIBRATION NUMBERS VARIATION,PERCENT,♦ FROM /• EN T COUNTS •• - GAUGE ADJUSTMT %VARIATION FROM OM SHEETS - LASF USE QAUOE TYPE:TROXLERICAMPBELL MOISTURE: MOISTURE: - ti/OISTURE: MOISTURE: 691 . 9 -- MODEL NO.: DENSFTY: DENSITY; - OENSITY: D�ENSFTY; 2 2 5 6 `� 0.�rj R h N� MA ION ' SOIL ID N VISUAL CLASSIFICATION OF SOIL MAX. DRY DENSITY, PCF OPTIMUM MOISTURE. yo B Asphalt Class 2 159. 1 COMPACTION MOISTURE GENERAL LOCATION: REQUIREMENTS,% REQUIREMENTS, TEST READING QUOTIENT/ SOIL TEST ELEVATION MOISTURE NO. PCF ID NO. DEPTH,IN OF TEST CONTENT, DENSITY, DENSITY, COMPACTION DRY PERCENTCOMMENTS % PCF PCF 10 M- 151 .3 - B B/S - M=5 . 7 350 ' D- %=3 .9 95. 1 R/L 8 ' 0 S entranc D- M- D- fV1- D- 1� D- ne- D- L 2 - BACK.FILL ` L MPLY WITH SPECIFICATIONS J - BASE COURSE B COMPACTION'PERCENTAOE DOES NOT COMPLY WFTH SPECIFICATIONS <.- SUBBASE C - RETEST OF PREVIOUS TEST 5 - SOIL CEMENT D - MOISTURE IN EXCESS OF SPECIFICATIONS 6 - OTHER E - MOISTURE BELOW,SPECIFICATIONS I REPORT OF FIELD COMPACTION TESTS OUR REPORT NO.: CLIENT: Coven Construction CO. inc. DATE: 5-23-06 PROJECT: Garden. Circle NUCLEAR GAUGE INFORMATION AND DAILY STANDARD CAIBRATION NUMBERS VARIATION,PERCENT,+/• GAUGE ADJUSTMENT %VARIATION FROM CALIBRATION COUNTS FROM SHEETS LAST USE GAUGE TYPE:TROXLER/CAMPBELI MOISTURE: MOISTURE: MOISTURE: MOISTURE: 696 -0. 5 MODEL NO.: DENSITY: DENSITY: DENSITY: DENSITY; 2249 O. 3 R Fl N MA ION SOIL ID N VISUAL CLASSIFICATION OF SOIL MAX. DRY DENSITY,PCF OPTIMUM MOISTURE. % A Asphalt Class 1 163 . 8 COMPACTION MOISTURE GENERAL LOCATION: REQUIREMENTS,% REQUIREMENTS, TEST READING QUOTIENT/ SOIL TEST ELEVATION F-OISTURE WET DRY PERCENT COMMENTS NO. PCF ID NO. DEPTH,IN OF TEST CONTENT, DENSITY, DENSITY, COMPACTION % PCF _ PCF M- 1 A =- .M35 unit301 D- B/S 155. 3 94.8 front =2 .4 M- 2 II " M=4.0 unit 30 D- %=2 . 7 156 . 1 95. 3 front M- 3 M=3 . 8 p_ 157.7 96. 2 unit 30 %=2 . 6 front Odge of roa M- D- D- RIf- D- TE-CIiiV 2fF�TiFF113: I _ - BACKF UL MPLY WITH SPECIFICATIONS J - BASE COURSE B - COMPACTION PERCENTAGE DOES NOT COMPLY WITH SPECIFICATIONS 4 - SUBBASE C - RETEST OF PREVIOUS TEST 5 - SOIL CEMENT D - MOISTURE IN EXCESS OF SPECIFICATIONS 6 - OTHFR E - MOISTURE BELOW SPECtFICATIONS f 5/12/05 PLEASANT MEADOW EXTERNAL PUNCH LIST *Stone work on exterior of building 2 needs to be installed *Cement Work: Sidewalks needed in front of all townhouses in building 2 Fix sunken FRONT entrance step in Units 202&203 Put cement at base of deck steps of Unit 208 *Power wash all completed units *Wash exterior windows in all units & remove paint on external windows *Complete landscaping per plan submitted to Town of South Windsor *Final resurfacing of driveways and common area road—There is recent damage to the new driveway from developer equipment and there are areas where curbs were not installed and backfilled. *Complete installation of exterior lamp poles *Paint around all door frames that have only primer or no paint *Are support beams needed outside rear of units 204&205? Please inspect the height of the first step from the driveway for the new units. Some areas exceed 9.5 inches *Use brackets to attach water drainers to down spouts. Some are attached with tape. *The long white extension drains should be buried and not just be left lying on the lawn 5/12/05 PLEASANT MEADOW EXTERNAL PUNCH LIST *Stone work on exterior of building 2 needs to be installed *Cement Work: s- Sidewalks needed in front of all townhouses in building 2 Fix sunken FRONT entrance step in Units 202 &203 Put cement at base of deck steps of Unit 209 *Power wash all completed units *Wash exterior windows in all units &remove paint on external windows *Complete landscaping per plan submitted to Town of South Windsor *Final resurfacing of driveways and common area road—There is recent damage to the new driveway from developer equipment and there are areas where curbs were not installed and backfilled. /`Complete installation of exterior lamp poles *Paint around all door frames that have only primer or no paint �7 *Are support beams needed outside rear of units 204&205? Please inspect the height of the first step from the driveway for the new units. Some areas exceed 9.5 inches Use brackets to attach water drainers to down spouts. Some are attached with tape. t4he long white extension drains should be buried and not just be left lying on the lawn r nJJ !— D -, r r Memorandum To: Marcia A. Banach, Director of Planning From: Jeffrey Doolittle, P.E. Town Engineer Date: 11/23/04 Re: Pleasant Meadows Site Bond Reduction (00-07P) 9,� The developer for the Pleasant Meadows Project has requested a reduction in their bond. This reduction is mainly for the installation of street lights and some landscaping. Based on the work completed to date I recommend the bond for this project be reduced to $80,990. Please call me if you have any questions. az�3 YOO \\townhall-do\vo12\ENGINEERTOOLITTLANN1-1TleasantMeadowsSiteBondReduction.doc FAX COVER SHEET "pW N 6 ENGINEERING DEPARTMENT TOWN OF SOUTH WINDSOR c 1540 SULLIVAN AVENUE SOUTH WINDSOR, CT 06074 (860) 644-2511 FAX (860) 644-7280 f`��soR•co�`'� Date: January 23, 2004 TO: Jean-Marc Jacques COMPANY: JMJ Construction FAX NO.: 528-7889 FROM: Jeffrey Doolittle TITLE: Town Engineer x 245 MESSAGE: Mark Kislyuk is the developer for Pleasant Meadows SRD on Pleasant Valley Road. His partner is Dr. Bill Martin. Attached is a copy of a letter that was sent to Mr. Kisyluk with his phone numbers and those for Dr. Martin. Design Professionals is the engineer for this project and they have the latest plan. The last building remains to be constructed and I believe it has 6 or 8 units in it. Perhaps you can work out something with these gentlemen. Regards Jeff If you did not receive all 2 pages (including the cover), or if you have any questions, please call 644-2511 as soon as possible. tpr1M at 03 T_0� O-P Sou,[./ L ?d&U&Ot a ' 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 '�OsoR-Cv'- TELEPHONE(860) 644-2511 CERTIFIED MAIL-7000 1670 0007 75519584 M(A✓1c December 9, 2003 '—1 j 3 " 3I)-3- J )m Mr. Mark Kislyuk South Windsor Estates n a 72 Mountain View Drive Ar YU' In& " vVia-' . Belchertown, MA 01007-9341 Re: Appl#00-07P,Pleasant Meadows �i 1 �(vtGL✓h it Dear Mr. Kislyuk: � LIL3 S 31 ! +� (v►c� The Planning and Zoning Commission is holding the following Letters of Credit: _S�'rr•c Projects Bank Amount Expiration 1 , Pleasant Meadows RB $101,240.00 2/23/04 -1(OSI In accordance with our policy for accepting Letters of Credit in lieu of surety bonds, we must have an amendment to each expiring Letter of Credit well in.advance, extending the term for a one-year period from the expiration date. Would you please forward us the amendment promptly. Very truly yours, Michele R. Lipe,AICP Assistant Director of Planning MRL/kak South • • Planning Department Memo To: Gray Bujnowski, President, The Gray Zone Inc. From: Marcia A. Banach, Director of Planning CC: Jeffrey Doolittle, Town Engineer John Collins, Chief Building Official Date: 03/04/03 Re: Pleasant Meadow Senior Residence Development I received your fax correspondence dated March 3, 2003, regarding the 2 streetlights that need to be installed. The Town Engineer and I concur that street lighting cannot be installed now due to weather conditions. Therefore, as suggested in your letter, the outside building lights can be temporarily set to remain on all night until the 2 street lights are installed. The Certificate of Occupancy for unit 205 will not be withheld on the basis of lack of street lighting. Please note, however, that a C.O. for your remaining unit will not be granted until the permanent street lighting has been installed. Please contact me if you have any further questions. 1540 Sullivan Avenue,South Windsor,CT 06074 PH 860-644-2511,ext.253 Fax 860-644-7280 e-mail banachna southwindsor om 0 Page 1 T E GRAY ZONE INC 1860642395e P. 01 '[ I i I y1..* t' I '960Fx J II i I iA Iross{rne - ,I I Phan 6a4�4¢3- i :,•Y: - , I I i •� +I•, q CE 1• '�ami Banac!h MAR D1,C t r f>�lan�iing WIN 540t livan Avenues' Sduth indsor,fit. 06f) 4 I I X ?ls 'I I I I � � 1• �: i1! roia RaitaCh, i ]�s'[:c In intte on;with tlti, project, (Garden Circle),T find myseiffacitzt;many trial it; ctu will, My eyes eta a beers ` e! '. s to ho�v the oti� ess t ly 4�?CYate, af!)Twc the luck ones. An I I Y Anyway, I ► a small situaftrio th t I n e i y s y�kir h.I with. As we g clos r to finishing up unit 245,I have t)CCrl tryiztg to gt' I r outdoor lightiti ► u' cd i f lighting i . a�uy, avc ntn into the'usltal but have finally gotten.a chick and have Placed der for two morelstr et li�htl ► ` [Te'i a is► 'here the full be ns� 1. Rosa electric card just short ofplasting he cannot i trench to cozen t t e I ici ► ' I.Klurj, ther also happei t¢b 4 ft snow banks Il around the fight line. 2. Th 'll poles will IV a%:♦il3lale I '. d ys;u�t oriunalty the fig't f�'xt res are a custom Tuiade fixtur8 that will take 6-8 w.l. k o get , My qucslio to u' ' 4 yp sett ttp Ic�ntpora cs of ome sort or can We , h I , r sc l c.ax�crior lights on the lding,rnoditied to iW .n rY 4fn d sk to awn, An otherlsug stions? ► ' s' Y pg I look fpt�vard to talking with you on this crtt. i 1 Tbh nk-, u, a I csid4*it 7ite Gray Zon 1.nC. 46 .560$ 'I y}. •.-'b I I I I I I J. .- �r �,r i 7 i ' � I '� 1, I •�-• �I�r 3 �o !- Fax Note 7671 oars �y �' Fpages :1 rom I i` I i ► i Co t. I ' co. 1 P"t'e (oYY Zrf phone�N• I i t ; d '; I Fa N O Fait N .I I I ;e 10/11/2002 15:57 8602-933483 FISHER INT PAGE 01 a ,.,aober 11,02 f e Dudille, I am reees in ropy of Mark Kusl&ks f le cons zlnin�all corrresPondenee rolafiNs to Pleaxant Meado;v project. RECEIVim OCT 16 2002 Taus SOUTH WiNDSOR Aldlctaraiam Deuz m T^F C ENGINEERING DEPT. �o•NN Sf,`� 7101u� 01fe slau� e � � v 6 ` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 soe•ca�'�� AREA CODE 860 / 644-2511 Mark Kislyuk South Windsor Estates LLC 72 Mountain View Drive Belchertown, MA 01007 June 24, 2002 Re: Pleasant Meadows SRD list of concerns Dear Mr. Kislyuk The South Windsor Engineering Department has reviewed the "as-built" drawing submitted for Building 2 at Pleasant Meadows SRD. The following items need to be corrected on this drawing and a revised plan submitted for review and approval before we can sign off on any Certificates of Occupancy for this building. 1. The street addresses listed on this drawing need to be corrected to show units 201 through 208. 2. The sanitary sewer manholes need to be numbered as they are on the approved plans. 3. The sanitary sewer manhole in front of the middle of building 2 (SMH#5?) has 5 pipes in and out of it. These need to be accurately shown on the plans and the inverts checked and accurately recorded. 4. Swing ties need to be provided for the sewer cleanouts in front of building 2. 5. The storm drain pipe from CB8 to CB9 is shown as flat (0% slope). This needs to be checked and repaired if necessary. Storm drainage pipes should have a minimum 0.5% slope. 6. Show the electrical, telephone, cable, and gas connections to building 2. 7. The foundation drain from building 2 was not found in the detention basin outlet. Verify the location and show the actual field location and elevation on this drawing. All the other items in my letter of May 29 remain to be completed, except for the construction fence around the excavation for building 3 foundation. All site improvements need to be completed according to the approved plans and approved change orders. Please call me at 644-2511 x 245 if you have any questions. Sincerely, If _/ Post-its Fax Note 7671 Date _ pages Jeffrey Doolittle, P.E. To � MCA f �,Q From 06 Town Engineer ` Co. Co./Dept. �y'"IV- cc. Marcia Banach, Director of Planning Phone# Phone# Barry Guliano, Town Attorney Fax# Attorney William Breslau Millenium Designs design Prof siohals y r 7blvn 01/eslou � o c � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 9 soR•co AREA CODE 860 / 644-2511 Mark Kislyuk South Windsor Estates LLC 72 Mountain View Drive Belchertown, MA 01007 June 24, 2002 Re: Pleasant Meadows SRD list of concerns Dear Mr. Kislyuk The South Windsor Engineering Department has reviewed the "as-built' drawing submitted for Building 2 at Pleasant Meadows SRD. The following items need to be corrected on this drawing and a revised plan submitted for review and approval before we can sign off on any Certificates of Occupancy for this building. ✓1. The street addresses listed on this drawing need to be corrected to show units 201 through 208. The sanitary sewer manholes need to be numbered as they are on the approved plans. The sanitary sewer manhole in front of the middle of building 2 (SMH#5?) has 5 pipes in and out of it. These need to be accurately shown on the plans and the inverts checked and accurately recorded. Swing ties need to be provided for the sewer cleanouts in front of building 2. 5. The storm drain pipe from CB8 to CB9 is shown as flat (0% slope). This needs to be checked and repaired if necessary. Storm drainage pipes should have a minimum 0.5% slope. ,A. Show the electrical, telephone, cable, and gas connections to building 2. ,�,/7. The foundation drain from building 2 was not found in the detention basin outlet. Verify the location and show the actual field location and elevation on this drawing. All the other items in my letter of May 29 remain to be completed, except for the construction fence around the excavation for building 3 foundation. All site improvements need to be completed according to the approved plans and approved change orders. Please call me at 644-2511 x 245 if you have any questions. Sincerely, Jeffrey Doolittle, P.E. Town Engineer cc. Marcia Banach, Director of Planning Barry Guliano, Town Attorney Attorney William Breslau Millenium Designs Design Professionals "Owe 8 �- 0—/c �. w` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 Y�SOR•CON� TELEPHONE (860) 644-2511 Mark Kislyuk South Windsor Estates LLC ° 72 Mountain View Drive Belchertown, MA 01007 May 29, 2002 Re: Pleasant Meadows SRD list of concerns Dear Mr. Kislyuk The South Windsor Engineering Department has reviewed our files and visitied the Pleasant Meadows SRD site. As a result, we have developed the following list of construction items to be corrected and finished with the Pleasant Meadows SRD. This list is not complete and should not be taken as a final punch list, but is a list of concerns with this project to date. The first group of items need to be completed before Engineering can approve any Certificate of Occupancy requests. 1. The Swale behind the buildings needs to be graded, loamed and seeded. This Swale needs to be graded to drain to the detention basin and should not hold water. As previously stated, some of the concrete slabs for the deck stairs may need to be replaced in conjunction with this re-grading. 2. Soil stockpiles need to be removed or secured and stabilized. The soil stockpile behind the second building should be removed. The other piles need to be secured with silt fence and'hay bales and stabilized by hydroseeding to prevent further erosion. 3. The area of the third building where the foundation hole is dug and soil stockpiles are located needs to be secured with construction fence. This fence must run around this entire area and tie into the natural barrier on the south side and the retaining wall on the north side. 4. The catch basin and sediment structure near the inlet to the detention basin needs to be uncovered (soil removed) and ringed with silt fence and/or hay bales so it does not get buried again. 5. The detention basin outlet structure elevation needs to be raised per change order 10 and the plans. This needs to be shown and certified at the correct elevation on a revised as-built plan. 6. The berm on the north side needs to be constructed to the design elevation, to provide 1 foot minimum freeboard above the outlet structure elevation. This needs to be shown and certified at the correct elevation on a revised as-built plan. 7. The brick and mortar inverts in the sanitary manholes must be rebuilt to function properly. A new sanitary sewer permit is required for this work. 8. A revised as-built plan is needed for review and approval before a C.O. can be issued for the second building. This needs to include the grading and elevations on the site around the first and second buildings and the detention basins. Locations and elevations must be shown for the detention basins, drainage structures, sanitary sewer manholes, retaining walls, roads, driveways and all other site improvements completed. 1pv1M at+ o * r 0 a u -0 soe.ca• 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 �'`� TELEPHONE (860) 644-2511 Other items that must be corrected or completed as soon as possible are: 9. The storm drainage and sanitary sewer pipes on Burr Meadow Condominium property need to be checked for settlement and damage near where the storm drainage pipes and sanitary sewer pipes from this project were connected to existing pipes. Any damage must be repaired to the satisfaction of the property owner. 10. The catch basin sumps must all be cleaned 11. The drainage pipes in the catch basins must be cut flush and mortared to blend in with the inside walls. 12. The 15" pipe between CB8 and CB9 has no pitch according.to the as-built plan for the first building. This must be re-laid so it has at least 0.5% slope or certified that it has at least 0.5% slope on a revised as-built plan. 13. The cast iron frames on the sanitary manholes must be grouted in place. 14. The lifting holes in the sanitary manholes must be filled with mortar. 15. The CB tops must be grouted in place. 16. The retaining wall between the detention basin and third building must be built according to the approved engineering plans. We are concerned because this was built and then disturbed by the excavation for the foundation of the third building. Engineering needs to inspect this wall and its final construction. Additional inspections may also be necessary 17. The pavement top course must be 2"thick Class II (after compaction). The compaction of this top course must conform with Town Standards as verified by an approved testing laboratory. 18. The large detention basin needs to be cleaned of soil from the stockpile, and debris, regraded and seeded as necessary. This is not a complete list of outstanding items but includes the items identified by the Engineering Department to date. All site improvements need to be completed according to the approved plans and approved change orders. Additional items may need to be addressed based on further site inspections prior to Engineering signing-off on future certificates of occupancy or building permits. We can arrange to meet on the site with you and/or the contractors to review these items. Please call me at 644-2511 x 245 if you have any questions. We look forward to a successful completion of this project. Sincerely, Jeffrey Doolittle, P.E. Town Engineer cc. Marcia Banach, Director of Planning Barry Guliano, Town Attorney Attorney William Breslau Millenium Designs t""M •C4 9 � • �� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 SOR.co TELEPHONE (860) 644-2511 Mark Kislyuk South Windsor Estates 84 Willowbrook Avenue East Longmeadow, MA 0116 May 23, 2002 Dear Mr. Kislyuk: Based on an inspection of the site on May 23, 2002 these are a list of improvements needed to erosion & sediment controls and stormwater structures at Pleasant Meadow SRD. The soil stockpile behind building#2 must be removed. Silt fencing north of the stockpile has been buried and sediment is migrating off site. Silt fence north of the stockpile must be re-installed. The large soil stockpile south of building #2 is impacting the efficiency of the existing detention basin. Sediment has been allowed to spill into the basin. The basin must be protected from sediment migrating into the basin. Hydrology in the basin is suspect. This structure must function as a wetland. Prior to the release of any bonds, the basin must be inspected and the function approved by the original consulting biologist/soil scientist. All perimeter erosion controls must be properly maintained or rebuilt. Grading around building #2 must be re-done. The drainage swale must be re-built and vegetatively stabilized. The area immediately north of the detention basin between the building and the basin must be re-graded and stabilized by vegetative establishment. Questions concerning this correspondence can be addressed to this office at 644-2511 x229. Sincerely, ow -f 0 Jeffrey H. Folger Environmental Planner/Conservation Officer CC. Town Attorney Director of Planning Town Engineer Atty. William Breslau 3 le t0W N SFq ya/ 1540 SULLIVAN AVENUESOUTH WINDSOR, CONN. 06074 OA•CO AREA CODE 860/644-2511 February 1, 2002 Mr. Peter DeMallie Design Professionals, Inc. 165 South Satellite Road South Windsor, CT 06074 Dear Mr. DeMallie: Re: Appl 00-07P—Pleasant Meadow This is to advise you that the Planning and Zoning Commission voted on January 29, 2002, to set the bond for Pleasant Meadow at $293,000.00, and it has been reduced to $101,240.00 based on the work completed to date. A bond or letter of credit in this amount must be posted prior to the filing of mylars and issuance of building permits. Sincerely, Kevin McCann, Chairman Planning and Zoning Commission KMcC/kag cc: Town Engineer V/ Chief Building Official Design Professionals, Inc. RECEIVE- FEB 4 5 SOUTH�t. ENGINE':: • r 4 MEMORANDUM ' M TO: Jeffrey B. Doolittle, P.E., Town Engineer FROM: Ed Beale DATE: 01/31 RE: spection Summary and DS;RD Pleasant Meadows/Garden This is a memo for your information and review about the status of the project referenced above and some of the situations that we should anticipate being a problem in the future. I will start from 06/12/01 which was the date of an inspection summary I left for Francis Costanza who took over inspections when I. was at National Guard training for 2 weeks. After addressing enough of the major items required before paving, the entrance road and driveways to the first building were paved on 6/22/01. The density tests submitted by the contractor's testing company were not acceptable. Remediation of this problem was proposed by Mr. IGslyuk as stated in a letter from Michael I Gantick; P.E. dated August 23, 2001. This would require that 2" instead of 11/2"of Class I be used when paving the final course over the Class II that was put down on June 12, 2001. Certificate of occupancies have been granted to the 4 units in the first building and a site bond has been posted for completion of work on the remainder of the project. The final three items listed in my memo of 6/12/01 have not been done as of this date. These items are listed below: 1. Cleaning of Catch Basin sumps. 2. Cutting drainage pipes in Catch Basins flush with walls. 3. Acceptance of invert construction in sanitary manholes. The brick inverts in the Sanitary Manholes will have to be rebuilt as an inspection on 1/24/02 showed that they were not functioning as required. In addition this inspection showed that some of the cast iron tops have not been grouted down and the lifting holes have not been filled with mortar as required.. Additional money was held with the bond reviewed on 1/28/02 to cover the cost of these items. . M h'{ The status of permits, fees, installation and changes to approved design for the laterals to units 201-208 must be resolved immediately. These laterals were installed some time in the fall of 2001 with out permits or inspection by our staff. When permits were .taken out in October and November of 2002 and an inspection requested, I found that the laterals were not installed in accordance with change order dated 2/20/01. As buiits have not been provided by the contractor. The location of the existing lateral connections should be verified by the design engineer and a request for a change order be submitted for approval or rejectidn. I recommend that if the. present location is accepted a test to guarantee that-there are no leaks in the system be done since the laterals were exposed for a considerable period prior to the contractor acquiring permits or requesting an inspection. Possibly a static head water test could be done. Another major item is the reconstruction of the versa lock retaining wall that was compromised when excavation was done for the adjacent foundation. This work will not be minor and the requirements and scope must be agreed upon prior to starting the work. IT WP E ward K. Beale, Engineer Assistant MEMORANDUM To: Marcia Banach, Director of Planning From: Jeffrey B. Doolittle, P.E., Town Engineer Date: 1/28/02 RE: Pleasant Meadow Bond The Engineering Division has reviewed the bond for the Pleasant Meadow SRD and recommends the initial bond be set at$293,000 for this project. We recommend that the bond for the Pleasant Meadow SRD be reduced to $101,240 based on the work completed to date 1 (�4 p G,q-PST Fp PROJECT: 01 TOWN OF SOUTH WINDSOR Sa �U�T16>v STREET:6W _G199:f,_ BOND ESTIMATE FORM P&Z I.D.: 1999 CALENDAR YEAR / ENGINEER: Al CI I�IOz) DATE: I 02 Bond Bond 604 Reduction Reduction Pod��c (n Item Description Unit Quantity Unit Price Cost No_ 1 No_2 i. Clearing &Grubbing LS / i GYM L S .60 r32_ Strip&Stockpile Topsoil CY 240 2.00 co-00 Earth Excavation (Excluding Roadway& Trench) CY 10.00 4_ Roadway Excavation CY 12.00 5. Earth Trench Exc_ 0-4 CY 300 10.00 3,000,00 6. Earth Trench Exc_0-10 CY 80U 12.00 9r( t.OD :* 7_ Earth Trench Exc.0-15 CY Soo 15.00 7 Scoxc) 8_ Earth Trench Exc. 0-20 CY 18.00 9_ .Roadway Exc.(Rock) CY 50.00 10. Rock Trench Exc.0 4 CY 50.00 11_ Rock Trench Exc_0-10 CY 75.00 12. Rock Trench Exc. 0-15 -ICY% 100.00 i3_ Rock Trench Exc. 0-20 CY 150.00 Z �S7u•00 14_ ✓ Formation of Subgrade SY /� 1.50 31 So.DU :4�D, 15: Subbase Gravel CY 350 20.00- `) 000.0O SO:6O 'Piucessed Aggregate TONS Coco 16.00 la � %• Ou, 17. Z Common Borrow CY -100 10.00 4)OW.4D t900• 600. 18_ Gravel Borrow. CY 17co 15.0.0 1 S60tdD I 5 S .GO 1575•DO j t-5' Bit. Concrete . 19 (Class 1) TONS ISO 50.00 7 S 00. 0i3 1 25• DD 1-6, Bit. Concrete 10&'772,00 2 .2 i (Class ll) [TONS 150 55.00 10 97 varies Sub-Total S 7A STWPP RC-VIS ION (1/07) Page 1 of 6 Bond Bond Reduction Reduction R�dackj� Item Description Unit Quantir3-.0 Price Cost No. 1 No_ 2 No.3 21_ 6"Asphalt Lip Curbing LF Z475.G�D 47S•47 Z �S•0� 22_ Road Widening Complete SY 50.00 23_ Conc Sidewalk 4'Wiide LF F 30.00 STORM DRAINAGE SYSTEM COMPONENTS 24: 60'RCP Class IV,In Place LF 130.00 25. 54"RCP Class IV In Place LF 100.00 26_ - 48"RCP Class IV In Place LF 75.00 27. 42"RCP Class IV In Place LF 65.00 28. 36"RCP Class IV In Place LF 60.00 29_ 30"RCP Class IV In Place LF 50.00 30. 24"RCP Class 1V In Place LF 42.00 31. 18"RCP Class IV in Place LF j$ 35.001 3d 19 32_ 15"RCP.Class IV In Place 30.00 33. POLYETHYLENE PIPE 34_ 8"ADS-N-12 or Equal 21.0.0 35_ 10"ADS-N-12 or Equal 22.50 36.. 12"ADS-N-12 or Equal LF 40 24.00 %&C>D. 3T ADS-N-12 or Equal LF 3(08 25.50 38_ 18"ADS-N-12 or Equal LF 3(q7 28.00 1 O 27 bA to Sub-Total S Page 2 bl 6 Bond Bond Reduction Reduction Item Description Unit Quantity Unit Price Cost No. 1 No_ 2 UNDERDRAINS 39. 6"PVC SDR 35 In Place LF 15.00 40_ 8'PVC SDR 35 In Place LF 20_00 RIPRAP 41. Modified Riprap CY IO 45.00 4!w 42. Intermediate Riprap CY 45.00 43: Standard Riprap CY 45.00 DRAINAGE STRUCTURES 44: Type"C"Catch Basin EA 6 1500.00 Cl,ON,00 45_ Type"C"Double Grate EA 2000.00 'Z Coo,00 to- 46, Type"C-L"Catch Basin EA 1500.00 l $ap 47. Manhole EA 1500.00 1 5-60.00 48. Manhole w/Drop Inlet EA 2500.00 49_ Manhole Over Ten Feet EA _ 2000.00 50_ Headwall EA 51. Endwall EA ( 75pGj� 52_ Box Culvert LF 53. 15"Flared End . EA 456_00 SO, 54. 18"Flared End EA 500-601 sm.00 55. 24"Flared End EA 550.00 156, 136-Flared End 1EA 850_00 Sub-Total$ ;-t�sa'L� Page 3 of 6 Bond Bond Reduction Reduction Item Description Unit Quantity Unit Price Cost No. 1 No. 2 nI0_J 57. Detention Outlet Structure EA 250Q_00 Z,Soo.6 10'Wide Gravel Access 58, Road LF 15.00 59. Reset M_H_ or C.B_ EA 550.00 60. c6 u1 Jsa ST>?t>G7v� 3 ! z ,dq Z 0b.Co DeTe1TO) &IS t,k) E34 2 5 ODD.co I cw-00 r - SANITARY SEWER COMPONENTS 61. 12"PVC In Place SDR 35 LF 40.00 62. 10"PVC In Place SDR 35 LF 37.00 63. 8"PVC In Place SDR 35 LF 97D 35.00 So„ 64. 16"PVC in Place SDR 35 LF j 30.00 SANITARY SEWER STRUCTURES 65_ Sanitary Manhole EA Z�(b.o� 1,SOQ.00 Opp, Sanitary Manhole w/Drop 66. inlet EA 2,500.00 Sanitary Manhole over 10 16M OD / 6-7. FT. 3 2,000.00 gyp, Z, 68. 69, STRUCTURES 8 MISC, ITEMS 0- 'Retaining Wall LF 35 cp 5�70 5 .op S PUT 5.60 tc 71_ Fence Rype Wit- ) LF 103 5/$.6D 515.,E 515,Old E1,� .0 Guide Rail /S 72. (Type_ ) LF ZS 375•0o 375zD 375..E Sub-Total TAFF ROCS 1 oN (I k) 4 g� Page 4 of 6 Bond Bond Reduction Reduction Item Description Unit Quantity Unit Price Cost No. 1 No. 2 j 0.5 End Anchorage 73_ (Type: ) EA ' 74_ Guide Post EA 100.00 75. Pavement Marking LF ISO 1-50 Z?p. CO Z70.00 Z70�Coa b 610 76_ Street Signs EA 75.00 7 Su 00 77. Traffic signs EA 75.00 7'5 ,co 7S.D 75-CO W 78 Street Lights EA 1,000.00 9, 00. 60 9 600.Iv - 1 65op.QD �9 Fumishing/Piacing Topsoil SY 3160 2.50 . 7 750,4D .6 Fertilizing, Seeding and Mulching Sy 3)Go 65a0, (2 Sop, O 2.50 -7 7S �-- — r 81. Trees EA 150.00 �. �0°b Maintenance/Protection of r 82. Traffic LS 83, Construction Staking LS • 84. As Guilts LS ,d) Z OCb-66 t UDD:cb 000.6 85. Iron Pins EA 3 100.00 300,E D•pp 306, 3( 86. Concrete.Monuments EA 250.00 Driveway-Bit. Conc_ SY ZZv 20.00 4)4 0&oD 6 60.D 88_ Lh,,iUscN)#3G- LS ql- 254MO ZS oo&db Z 000.0 . 89_ F :41 STocKhIDF, L F IZo .5.00 OM,01D ( .op (000,to 90. 'Mies Sub-Total$ � J s TIFF iZ,EN IS 16N 61/02 a (, I qv Page 5 of 6 Original Estimat Bond Reduction 1 Bond Reduction#2 .q�aict "3 42z.�� - Sub-Total Page 1 $ 73,2,60,CD S $ 17, 422-IT Sub-Total Page 2 a 23,725.E $ 75.0 Co Sub-Total Page 3' $ =1(011S64D 3 $ . l0� Sub-Total Page 4 $ M404S Cp 0 40) R9 6.(7� Sub-Total Page 5 $ 574.2M•60$ -� $ 377 065-Co a, — Sub-Total S Z39�32o.ws '88- S 641-792-6D 8a�95Z.oa *�NuM STRFf= Rr nS►0 ()/02,) 250%tontingencies x Sub-Total: $ 5�� 580.00 01 Zo)2<t0,CD TOTAL $ Z92a7--WM $ s $ 30,99a6o 3(D M3'-7, 9 000.00 standard forms/bonds/bond estimate form Q" -L9, Z 2— Page 6 of 6 DESIGN PROFESSIONALS, INC. civil engineers . planners . surveyors . gis LETTER OF TRANSMITTAL TO: r I DATE: } _ /� a L �s4o_ vu vim... - v _-- --------- -- RE: � J.T........ IEI�/'._...�. ..__. DPI PROD. NO.: 0A)b I A-TC- . ..... . .................. .... .............. . WE ARE SENDING YOU: ❑for your use ❑ at your request for approval ❑for your files for review and comment ❑other THE FOLLOWING: .......... - - —...._ ._.._..- -- ---------------------..... ... DESIGN PROF- SIONALS, INC. By: ...._._.._ .._. '.__ 9/99 165 South Satellite Road, South Windsor, Connecticut 06074 Tel: (860)291-8755 .Fax: (860)291-8757 oWN se-4 f4Go '.. C 7own ap s-oa& ?A U s . 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 soR•co� AREA CODE 860 / 644-2511 January 23, 2002 CERTIFIED MAIL 7000 1670 0001 8922 0540 Millennium Designs LLC 12 Spoonwood Drive Canton, CT 06019 ATTN: Cathy Janes Dear Ms. Janes, This letter is to inform you that the Engineering Department in the Town of South Windsor is in possession of two returned checks belonging to your company Millennium Designs LLC. The check numbers are 1331 in the amount of$546.72for sewer user fees for units 205-208 and 1486in the amount of$715,04for sewer user fees and permit fees for units 201-204. Several attempts were made to contact you via telephone when the checks were returned the first time on January 2, 2002, but we never received a response back. Therefore, we re- deposited the checks on January 15, 2002, they were returned by the bank on January 22, 2002. The Town is requesting that you bring cash or a bank check in the amount of$1,301.76 to cover the returned checks and the fees associated with them which is $20.00 per returned check. These fees must be received before any C.O. can be issued to these units. If you have any questions regarding this matter please feel free to contact me at 644-2511, extension 245. Thank you for your cooperation in this matter. Sincerely, Affrey B. Doolittle, P.E. Town Engineer JBD/cm cc: Linda Barker, Financial Analyst Barry Guliano, Town Attorney Michael J. Gantick, P.E., Director of Public Works • � ��,,ITT � PROJECT: ~r P164,j TOWN OF SOUTH WINDSOR $6-9D R-mucnotj • STREET: 6AQD6n1 GIPUC BOND ESTIMATE FORM P&Z I.D.: 1999 CALENDAR YEAR ENGINEER:_ N DATE: /&3 10Z- LI`231OZ} Bond Bond Reduction Reduction Item Description Unit Quantitv Unit Price Cost No. 1 No. 2 1. Clearing &Grubbing LS SGI� l 5760.a0 2. Strip&Stockpile Topsoil CY ZO(} 2.00 00.00 Earth Excavation, (Excluding Roadway& 3. Trench) CY 10.00 4. Roadway Excavation CY 12.00 5. Earth Trench Exc. 0-4 CY 3co 10.00 3 000,00 6. Earth Trench Exc. 0-10 CY $oU 12.00 Wo,cD 7. Earth Trench Exc. 0-15 CY Soo 15.00 7 Soo.cn 8. Earth Trench Exc. 0-20 CY 18.00 9. Roadway Exc. (Rock) CY 50.00 10. Rock Trench Exc. 0-4 CY 50.00 11. Rock Trench Exc. 0-10 CY 75.00 12. Rock Trench Exc. 0-15 CY 100.00 13. Rock Trench Exc. 0-20 CY 150.00 v 14. Formation of Subgrade SY Z100 1.50 3, 156 oo 4 op 15. Subbase Gravel CY 350 20.00 9,060.60 In So,4 16. Processed Aggregate TONS &Q0 18.00 /a .00 1-y-G20-00 17. Common Borrow CY `foo 10.00 47 0w.4D (900,00 18. Gravel Borrow CY . 900 15.00 10,Seo.CD 1-5" Bit. Concrete 0 19. ) TONS ISO 50.00 77 500. S.OD 1.5"J Bit. Concrete /0971_ elo 120. (Class II) TONS /50 55.00 8 ZSSo-,00 varies N f v Sub-Total Page 1 of 6 Bond Bond Reduction Reduction Item Description Unit Quantity Unit Price Cost No. 1 No-2 21. 6"Asphalt Lip Curbing LF 3.00 2-f75.60 475 OD 22. Road Widening Complete SY 50.00 23. lConc Sidewalk 4'Wide ILF 1 30.00 - STORM DRAINAGE SYSTEM COMPONENTS 24. 60"RCP Class IV,In Place LF 130.00 25. 54"RCP Class IV In Place LF 100.00 26. - 48"RCP Class IV In Place LF 75.00 27. 42" RCP Class IV In Place LF 65.00 28. 36"RCP Class IV In Place LF 60.00 29. 30" RCP Class IV In Place LF 50.00 30. 24"RCP Class IV In Place LF 42.00 31. 18" RCP Class IV In Place LF 18 35.00 3d,ep 32. 15"RCP Class IV In Place 30.00 33. POLYETHYLENE PIPE 34. 8"ADS-N-12 or Equal 21.00 35. 10"ADS-N-12 or Equal 22.50 36. 12"ADS-N-12 or Equal LF QU 24.00 966,00 0 37, 15"ADS-N-12 or Equal LF 3(o$ 25.50 9 36 ,co 38. 18"ADS-N-12 or Equal LF 3(07 28.00 10 2-7 to,tO Sub-Total $ Page 2 of 6 Bond Bond Reduction Reduction Item Description Unit Quantity Unit Price Cost No. 1 No-2 UNDERDRAINS 39. 6"PVC SDR 35 In Place LF 15.00 40. 8"PVC SDR 35 In Place LF 1 20.00 RIPRAP 41. Modified Riprap CY 10 45.00 450.60 42. Intermediate Riprap CY 45.00 43. Standard Riprap ICY 1 45.00 DRAINAGE STRUCTURES 44. Type"C"Catch Basin EA 6 1500.00 %60,00 45. Type"C"Double Grate EA 2000.00 '1)000,00 46. Type"C-L"Catch Basin EA ( 1500.00 ! 5a0,00 47. Manhole EA 1 1500.00 Scn-00 95 48. Manhole w/Drop Inlet EA `' 2500.00 49. Manhole Over Ten Feet EA 2000.00 50. Headwall EA ' v 51. Endwall EA ( 75DGU 52. Box Culvert LF 53. 115"Flared End EA 450.004.50.,Cp y/ �54. 118" Flared End EA 500.00 57oo.00 55. 24"Flared End EA 550.00 56. 36"Flared End EA 850.00 Sub-Total $ +(V7� X� Page 3 of 6 Bond Bond Reduction Reduction Item Description Unit Quantity Unit Price Cost No. 1 No. 2 57. Detention Outlet Structure EA 2500.00 Z,500s0o 10'Wide Gravel Access 58. Road LF 15.00 59. Reset M.H. or C.B. EA 550.00 60. c8 w/56D_S7 XTL)JE6 e* I Z ,do 2 5ob,oD UeTeNTIOM &�S/k) E:A 2 5 oW:c tC 0c,00 SANITARY SEWER COMPONENTS 61. 12"PVC In Place SDR 35 LF 40.00 62. 10"PVC In Place SDR 35 LF 37.00 63. 8"PVC to Place SDR 35 LF I 67a 1 3.5.00 3 SQ, 64. 16"PVC In Place SDR 35 ILF 1 1 30.00 SANITARY SEWER STRUCTURES 65. Sanitary Manhole EA 1,500.00 z'y°D ���vEcZ Sanitary Manhole w/Drop 66. Inlet EA 2,500.00 Sanitary Manhole over 10 67. FT. 3 2,000.00 68. 69. STRUCTURES& MISC. ITEMS 70. Retaining Wall LF 1(03 5)705.00 5 PU7 71. Fence (Type: EtL ) LF 103 S S�5•co 515.,60 Guide Rail 72. (Type. ) LF ZS 375,E Sub-Total $ 64-649-09- gg0'Co 2- Page 4 of 6 Bond Bond Reduction Reduction Item Description Unit Quantity Unit Price Cost No. 1 No. 2 End Anchorage 73. (Type: ) EA 74. Guide Post EA 100.00 75. Pavement Marking LF 18o 1.50 Z 1& CO 76. Street Signs EA - 75.00 -7.5,00 77. Traffic signs EA l 75.00 7 5 ,00 75-4 78. Street Lights EA 9 1,000.00 9, 00,On 9 6w.ev 6500•� 79. Fumishing/Placing Topsoil SY 3!6D 2.50 7) 750,OD Fertilizing, Seeding and 80. Mulching SY 3 CO 2.50 7 �$ 81. Trees EA 150.00 Maintenance/Protection of 82. Traffic LS • 83. Construction Staking LS 84. As-Builts LS Z OCO•� (T(X7,lp 85. Ilron Pins EA 3 100.00 .360,Ob •Op 86. Concrete.Monuments EA 250.00 87. Driveway-Bit. Conc. SY ZZo 20.00 1 4 100,oD l 7(00,OD 88. LA-oDscff 14& LS 25 6W4 ZS 00A6b Z 000.0 89. :4'StoGKAOE LF I Z,O 5.00 60p.aD (�00.oD 90. 'varies Sub-Total $ �- Page 5 of 6 Original Estimat Bond Reduction#1 Bond Reduction#2 Sub-Total Page 1 $ 73,LQD�CO ` $ /:4 70O.OD $ Sub-Total Paget $ ZZ ,7ZS<00 $ Z,475,60 $ Sub-Total Page 3 $ 1(011 ►SUD - $ J $ /0 ,O90 Sub-Total Page 4 $ ( ,4045 00 $ 690,aJ $ S/I Sub-Total Page 5 $ $ 8r/ 992' Sub-Total $ 25 A Contingencies x Sub-Total: $ 5g58aoo $ I5,S17.50 $ TOTAL $?9Z,900,M $ 77x587,50 $ 29 3�o0d o0 76,DOD.60 standard forms/bonds/bond estimate form J Page 6 of 6 PROJECT: ftr M _ TOWN OF SOUTH WINDSOR STREET: 6iQ&jC-1kaZ BOND ESTIMATE FORM P&Z I.D.: 1999 CALENDAR YEAR ENGINEER: Poi DATE: / oL Bond Bond Reduction Reduction Item Description Unit Quantitv Unit Price Cost No. 1 No. 2 1. Clearing &Grubbing LS / G>!1 5760,60 2. Strip&Stockpile Topsoil CY 260 2.00 Cb,oa Earth Excavation (Excluding Roadway& 3. Trench) CY 10.00 4. Roadway Excavation CY 12.00 5. Earth Trench Exc. 0-4 CY 3ob 10.00 [..,31060,00 6. jEarth Trench Exc.0-10 CY 800 12.00 7. Earth Trench Exc. 0-15 CY Sob 15.00 7 5coxv 8. Earth Trench Exc. 0-20 CY 18.00 9. Roadway Exc. (Rock) CY 50.00 10. Rock Trench Exc. 0-4 CY 50.00 11. Rock Trench Exc. 0-10 CY 75.00 12. Rock Trench Exc. 0-15 CY 100.00 13. Rock Trench Exc. 0-20 CY 150.00 14. Formation of Subgrade SY Z/OD 1.50 3 150,00 15. Subbase Gravel CY 350 20.00 7 00j).60 16. Processed Aggregate TONS &00 18.00 !o SOD 17. Common Borrow CY -100 10.00 41 ow,eo 18. Gravel Borrow CY 9z 15.00 1 560,d0 1.5" Bit. Concrete 19. (Class 1) TONS 150 50.00 7 50a.Co 1.5" Bit. Concrete 20. (Class 11) TONS 150 55.00 8150�00 varies Sub-Total $ 732240, 70 Page 1 of 6 Bond Bond Reduction Reduction Item Description Unit Quantitv Unit Price Cost No. 1 No. 2 21. 16"Asphalt Lip Curbing LF 3.00 Z'f75,60 22. Road Widening Complete SY 50.00 23. Conc Sidewalk 4'Wide ILF 1 1 30.00 STORM DRAINAGE SYSTEM COMPONENTS 24. 60" RCP Class IV In Place LF 130.00 25. 54"RCP Class IV In Place LF 100.00 26. - 48" RCP Class IV In Place LF 75.00 27. 42" RCP Class IV In Place LF 65.00 28. 36" RCP Class IV In Place LF 60.00 29. 30" RCP Class IV In Place LF 50.00 30. 24" RCP Class IV In Place LF 42.00 31. 18" RCP Class IV In Place LF 6 35.00 (oRA ep 32. 15"RCP Class IV In Place 30.00 33. POLYETHYLENE PIPE 34. 8"ADS-N-12 or Equal 21.00 35. 10"ADS-N-12 or Equal 22.50 36. 12"ADS-N-12 or Equal LF 40 24.00 960.ao 37. 15"ADS-N-12 or Equal L-F 3(08 25.50 93 � 38. 18"ADS-N-12 or Equal LF 307 28.00 10 27 b.,49 Sub-Total $ 23-) 725'Co Page 2 of 6 Bond Bond Reduction Reduction Item Description Unit Quantitv Unit Price Cost No. 1 No. 2 UNDERID INS 39. 6" PVC SDR 35 In Place LF 15.00 40. 8" PVC SDR 35 In Place ILF 1 20.00 RIPRAP 41. Modified Riprap CY 10 45.00 45a oo 42. Intermediate Riprap CY 45.00 43. Standard Riprap CY 1 45.00 DRAINAGE STRUCTURES 44. Type"C" Catch Basin EA 1500.00 9 600,00 45. Type"C" Double Grate EA 2000.00 'Z 600,00 46. Type"C-L"Catch Basin EA ( 1500.00 1,540,60 47. Manhole EA ) 1500.00 Scn•00 48. Manhole w/Drop Inlet EA `' 2500.00 49. Manhole Over Ten Feet EA - 2000.00 50. Headwall EA 51. Endwall EA ( 750,dp 52. Box Culvert LF 53. 15" Flared End EA 450.00 Sp, 54. 18" Flared End EAE 500.00 5700.00 55. 24" Flared End EA 550.00 56. 136" Flared End EA 1 850.00 Sub-Total $ LSO, 150.00 Page 3 of 6 Bond Bond Reduction Reduction Item Description Unit Quantity Unit Price Cost No. 1 No. 2 57. Detention Outlet Structure EA 2500.00 2,.501) 00 10'Wide Gravel Access 58. Road LF 15.00 59. Reset M.H. or C.B. EA 550.00 60. G6 W/Sa-S71bZTVeZ e* I Z ,Or) 2 500'to DI✓ erNT100 &1-6 w E44 2 5 000;Ln 16,000,00 SANITARY SEWER COMPONENTS 61. 12" PVC In Place SDR 35 LF 40.00 62. 10" PVC In Place SDR 35 LF 37.00 63. 8" PVC M Place SDR 35 LF 35.00 64. 16" PVC In Place SDR 35 ILF 30.00 SANITARY SEWER STRUCTURES 65. Sanitary Manhole EA 1,500.00 Sanitary Manhole w/Drop 66. Inlet EA 2,500.00 Sanitary Manhole over 10 67. FT. Era 3 2,000.00 68. 69. STRUCTURES & MISC. ITEMS 35-OD 70. Retaining Wall LF lfn3 5)-705.db 5PUT S,t� 71. Fence (Type: LM ) LF 103 515-6D Guide Rail 172. 1(Type: ) ILF 1 25 ' 37S•�b Sub-Total $ (�4 3 O45�op Page 4 of 6 Bond Bond Reduction Reduction Item Description Unit Quantity Unit Price Cost No. 1 No. 2 End Anchorage 73. (Type: ) EA 74. Guide Post EA 100.00 75. Pavement Marking LF $ 1.50 76. Street Signs EA 75.00 7,5, 77. Traffic signs EA l 75.00 7 5 ,OD 78. Street Lights EA 1,000.00 % 00,60 79. Furnishing/Placing Topsoil SY 3 t bD 2.50 7.) 750,00 Fertilizing, Seeding and 80. Mulching SY 3 2.50 '7 75 81. Trees EA 150.00 Maintenance/Protection of 82. Traffic LS 83. Construction Staking LS �cw,m 84. As-Builts LS Z 000•00 85. Iron Pins EA 3 100.00 360,Ob 86. Concrete.Monuments EA 250.00 87. Driveway-Bit. Conc. SY ZZv 20.00 4 100,OD ss. Ln A�rJDsc Cv► L 25 CW Z5 ooA6t� 89. Faocg:4'STo(,K*06 L.F IZd 5.00 OW16D 90. 'varies Sub-Total $ S7) 2,00 .� Page 5 of 6 r Original Estimat Bond Reduction#1 Bond Reduction#2 Sub-Total Page 1 $ 73,Ldp,4D ` $ $ Sub-Total Page 2 $ Z3,72510D $ $ Sub-Total Page 3 $ 6b? 15a6D $ $ Sub-Total Page 4 $ (044 045 00 $ $ Sub-Total Page 5 $ 57? 4o$ $ Sub-Total $ Z 34,no.op$ $ 25% Contingencies x Sub-Total: $ TOTAL $ Z9Z1900-M $ $ _ 293�oobbo standard forms/bonds/bond estimate form Page 6 of 6 S C'NN Sf4 7own oie S-ouiA ?40t;nd4at a m 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR-CO `v AREA CODE 860/644-2511 December 31,2001 Mr. Mark Kislyuk South Windsor Estates LLC 84 Willowbrook Road Longmeadow,MA 01106 Dear Mr. Kislyuk: RE: PLEASANT MEADOWS SRD Section 4.1.12.m of the South Windsor Zoning Regulations requires that a site bond guaranteeing completion of the development's infrastructure be posted prior to issuance of a .Certificate of Occupancy in any SRD development. The regulation also has a provision for reduction of this bond for completed site work; and for a 10% maintenance bond for a one-year period after completion of the development(copy enclosed). In order to satisfy this zoning requirement, please have your site engineer complete the enclosed Bond Estimate Form, return it to us, and we will have the Engineering Dept. set a bond amount for approval by the Planning and Zoning Commission. Your engineer can use the same form to estimate the value of the improvements already completed, so that the bond amount can be reduced at the same time the original amount is established. After the reduced bond amount is established, please forward to us either a letter of credit or cash (passbook, certified check) in accordance with the enclosed bonding policy. Your earliest attention to this matter is appreciated, so that Certificates of Occupancy can continue to be granted without interruption. Thank you for your cooperation. Sincerely, a sa�� Marcia A. Banach,AICP Director of Planning MB/sf cc: Design Professionals, Inc. /Jeff Doolittle,Town Engineer John Collins, Chief Building Official a " ~ ��CJr 01, 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 '~OsoR-c°`' TELEPHONE (860) 644-2511 Subject: Permit fees SENT BY FAX Fax: 1-413-436-7668 September 14, 2001 Mr. Robert J. Fijol R. J. Fijol Inc. P O Box 396 600 Old West Warren Road West Warren, MA 01092 Dear Mr. Fijol: For each unit there is required the following fees to be paid prior to the issuance of sanitary sewer permits for connection of the building to the sanitary main lines and laterals; connection charge of$850.00, permit fee of$25.00 and a prorated sewer user charge ranging from $205.00 to $17.12 depending on the date. The connection fees for units 201, 202, 203 & 204 of$850.00 each has been paid. The remaining fees that need to be paid prior to issuing permits for units 201-208 are the following: Connection charges for units 205-208 4 x$850.00 = $3400.00 Permit fees for units 201-208 8 x $25.00 = $200.00 Prorated sewer user fees for units 8 x$170.84 = $1366.72 201-208 for dates 9/01/01-09/30/01 Total due $4,966.72 The connection charges may be paid in advance. The permit fees and prorated sewer user fees can only be accepted at the time of permit issuance. Please note that the prorated sewer user fees will change after 09/30/01. If you have any questions please call Edward Beale at 860-644-2511 ext 241. Respectfully, Mr. Tracy A. LaPiene Project Engineer tal cc: Edward Beale, Engineering Assistant C. Fred Shaw, Superintendent of Pollution Control SAENGINEER\Proj.-P&Z Welland Applications\Pleasant Meadows\LaPiene\Pleasant Meadows RJDF 091401 TL.doc Y 4 TRANSMISSION VERIFICATION REPORT TIME 09/14/2001 09:28 DATEJIME 09/14 09:27 FAX NO./NAME 914134367668 PAGE(S) N 00:00:40 01 RESULT OK MODE STANDARD i 3 i i r i. i !i ii i' 9 � A �� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 NasoR-CO TELEPHONE (860) 644-2511 RE: R.J. Fijol Report 007 August 23, 2001 Mr. Sami H. Hajjar P.E. Tri-State Materials Testing Lab Inc. 121 "P"North Plains Industrial Road Wallingford CT 06492 Dear Mr. Hajjar, We have received a letter with a revision to a report by your office written on 06/22/01, report#007 for your client R.J. Fijol. The revised report cover letter from Bill Antonetti of j our office states that"The inspector that was at the job site for compaction of binder and was given the wrong specification by the contractor. After review of his inspection report it was determined that changes were to be made to this report to reflect the actual results. This report has been rewritten with the specifications supplied." On 07/31/01, Mr. Tracy LaPiene had a conversation with your office regarding the Min. Comp. Req. stated on your report.At this time your staff had stated that Fijol had instructed Jay Thomas, your testing inspector, that the minimum compaction required was to be 90% of the maximum density.As a result locations 1,2,4,5,6,10 & 11 on your report failed to meet the required specification of the Town of South Windsor of 92-97% compaction. At subsequent meetings between the Town, Fred of Fijol and Mark Kislyuk, Fred had stated that-he-had given the incorrect specification of 90% compaction to Jay Thomas. Furthermore Kislyuk had agreed to have his engineer review the results and proposed placing an additional V of Class I down when placing the surface course as remediation. The Town has a concern with the revisions made to this report.The report submitted to the Town on 07/30/01 stated the Min. Comp. Req: 90% and a Max.Wet Density: 159.8. The revised report submitted 08/22/01 states the Min. Comp. Req. 92-97%and Max.Wet Density of 157.2. In previous conversations with the Gallasso labs, Gallasso has stated that the specific gravities of Class II usually run between 2.58 and 2.60 thus maximum densities of between 161.0 and 162.2. The maximum density of Class II pavement placed on other projects in the Town had a max. density of 161.4, which is between the normal range stated by Gallasso. The Town is requesting further documentation on the revision to the Max.Wet Density stated on this revised &reissued report. Very truly yours, Michael J. Gantick, P.E. Director of Public Works enc.: 3 cc: Tracy LaPiene, Project Engineer Edward Beale, Engineering Assistant Robert Fijol, R.J. Fijol Inc. Mark Kislyuk, Creative Developers Karen Isherwood, Design Professionals, Inc. SAENGINEEMProj.-P&Z wetland Applications0easant Meadows\LaPiene\TriState report tal 082301.doc 7i,t ii iiii i ! iiu ► Iir , R.J. Fijol 600 Old W. Warren Rd. P.O. Box 396 West Warren Ma. 01092 Re: Pleasant Meadows South Winsor Ct Sir this letter is for a correction of a report written on 6/22/01 Report# 007. The inspector that was at the job site for compaction of binder and was given the wrong specification by the contractor. After review of his inspection report it was determined that changes were to be made to this rcport to reflect the actual results. This report has been rewritten with the specifications supplied. Bill Antonetti Branch Manager RECt AUG2 �, SOUTH ENGINEEki 4i,.; T. �lsT�Sma �`�' ` � 'I' -jtatc Materials TectYn Lab Inc. Connecticut 1?ivlsion 121 "P"North Plains Industtial Road, Wallingford, CT 06492 0(203)949.7733 +Fax(203)949-7735 �ii0-lt000 J. • 600 01d W. Warren Rd. P.O. Box 396 Report# 007 Page 1 of 1 Date: 06/22/01 West Warren,MA 01092 Inspector: Jay Thomas Project: Pleasant Meadow,~ Contractor: Galasso Paving Sample: Bituminous Revised &Reissued dl �p1pgPs Mr {t1l gfpf Nfr ryAw r a t'c��l ild M1tif} 1dY d ,• rpfJyf �� }}(( jj��y$$¢p�` p li 8 y{� } t F war: 7 S� +NAi7�ly�Ff/PIIY MB ,`I} T fp 6 AY Maln Rd In Coivcrsat w/n u /.Camp w/u Comp w/Ij %Coin k 1 end of ColversAt 144,0 P W/D /.Cam 2 Middle of Colversat 145.2 91,G 144.9 9A.7 �' w/p /•Comp 92.3 3 Top of colversat 145.Z 145.E 9z.G 92.3 14S,S 4 Ba,' top of colversat 144,8 94 146.3 93.0 92.5 5 100ft'west 14$,0 94.1, 145.4 92.4 6 MiddIe basin 146.2 93,0 145,3 92.4 7 100ft west 147.4 93.7 146.7 93.3 8 By road at basin 145,5 92,S 147.0 93.5 9 Top of road 144.9 92,1 148.0 94.1 l 0 30ft nonh of road 144.8 92,1 147.5 J3.3 11 30ft south of road 145.2 92.3 146.2 93.0 Parking area 146.5 93.1 145.$ 927 Remarks: Material 'Type: 1 binder Item 4 Marshall Dated: 06/22/01 . Min- Comp, Req, 92-97 4o Max.Wet Density: 157,2 Complies: yes Reported To: R.-T. Pijol The above repunal data l the PN eny.Xll,of1ha uliulll. Nu Kilt Niltolloll ofgle fllwwe dale willtnn[dtetole Vauliledb n1he-yU1ul:{eteriele'fpAlblliLRb„tor. y'r�RtaleAieteriala Teuinyettepunoliohiliryfinle Submitted B executed by ntheAa, y: Tri-State Materials Testing Lab., Inc, Sami H, Hajjar P.E New York City. Long Lslnnd t. F_likon 'NrT•W611,'"n4'._.1 err. ii ir- .ii-:'iii►i ► �iU1 ► 01 R.J. FiJol 600 Old W. Warren Rd. P.O. Box 396 West Warren Ma. 01092 Re: Pleasant Meadows South Winsor Ct Sir this letter is for a correction of a report written on 6/22/01 Report# 007. The inspector that was at the job site for compaction of binder and was given the wrong specification by the contractor. Alter review of his inspection report it was determined that changes were to be made to this report to reflect the actual results. This report has been rewritten with the specifications supplied. Bill Antonetti Branch.Manager RECF AUG2 � SOUTH ENGINEEktd4( Jam . rt04TATE lama T>e�-'tato Materia1� Testing Lab Inc. ConnectiFut Div>SSOA 121 'Prr North.Plains Industrial Road,Wallingford, CT 06492►(203)949-7733 +Fax(203)949.7735 �ssaspoe �AACAi:�ox•� .t�J. t'ljol RCp41"t# 007 600 Old W. Warren Rd. P.O. Box 396 Date: 06/22/01 Page 1 of 1 Inspector: Jay Thomas West Warren,MA 01092 . Project: Pleasant Meadow;; Contractor: Galasso Paving Sample: Bituminous Revised &Reissued 1 i ;1i..1 1--hill#��hP VMI r�OdNr'41 1 �8 ! �G�f(flJl ��R.� 0111,11111 1 ��{Z9>k d89E�67i Q1 S bf �b t�4plia Main Rd In Colversat wli� u/a Camp W/u u�a Comp W/p %,Colnp W/D �/n Comp w/p 1 End of Colversat 144,0 91,6 �"Comp 144, 94.7 2 Middle of Colversat 145.2 92.3 145,2 92.3 3 Top of colversat 145,E 92.6 y 45rS 92.5 146.3 93.0 4 Basin/top of colversat 144.8 94.4 1 145.4 92.4 5 100ft west 148.0 94.1 145.3 92.4 410oftwest Middleasin 146.E 93.0 146.7 93.3 st 147.4 93,7at basin 145r5ad 144.9 92,1147.5 g3.8 h of road 144.8 92,1 146.2 93.0 h of road 145.2 92.3 146.5 93.1 Parking area 145.8 92.7 Remarks: Material'iType: 1 binder Marshall Dated: 06/22/01 Item #Min. Camp. Req. 92-97% Max.Wet Density: 157,2 Complies: Yes Reported To: R.J. rijol Tha abure repurted dela is Ilre prupeny urllie e'lielll. Nu IGpIMI„OII011 Arils p„nve dais wblhnnr the sale minivalmul'Trl-SwoMelerialeTruLtltLeh„t„e. ra-sisia Materials Taringocaeptsnoliabilityforwork Submitted By: Tri-State extroled by nlhera. Materials Testing Lab.,Inc. Sarni H. Hajjar P.E New York City+bong Lsltcnd• Edison NIT*W�Ib111M1�M1Ta r-r . +,•_ -- r, UUgi UU4 P Af %4TATE OL 't1=q7'1NIG ` + � Tri-State Materials Testing Lab Inc. CanneCgcut Division 121 "P"North Plains Industrial Road, Wallingford,CT 06492•(203) 949.7733 •Fax(203)949-7735 �fa0.iooe IGM•■ • Icn : "T"ijol 600 Old W. Warren Ind. P.O. Box 396 Date: # 007 Page 1 of 1 Date: 06/22/01 Inspector: Jay Thomas West Warren, MA 01092 Pr Contractor: Galassa Paving oject: Pleasant Meadows Sslmple, Blttnninous �� �` ���` a w`I. ,.,�, ���� �tw� �4����Y.r@ .. ��b��yy,, �$ '� ' � �" S l •k��fl ,�1�•���4rw .�s ;''"��fl�i4 i �k Mrin Rd in Colversat W/D "/e Comp 1V/U e/" e A "" ,. Gump W/D /e comp WIU %Cou►p W/U %Camp 90 1 End of�ulversat 144,0 911.1 2 Middle of Colversat 145.2 144.9 91.0 '9 3 Top of colversat 145.6 91.1 145.2 9019 145.5 91.0 4 Basin/top df colvcrsat 144.8 90.6 146.3 92.0 5 10011 west 148.0 92.6 145.4 91.0 6 Middlo basin 146.2 91.4 145.3 91.0 8 7 100ft west 147.4 92.2 I46.7 91. 8 By road at basin 145.5 91.1 147.0 92.0 9 Top ol'road 144.9 91.0 148,0 92.6 10 301.1 north of-road 147.5 92.3 144,8 91.0 146.2 91.4 11 30ft south of road 145.2 91.0 Parking area 146.5 91.G 145.8 91.2 Remarks: Material Type: 1 binder Marshall Dated: 06/22/01 Item#Mih- Cornp. Rcq. 90% Max. Wet Density: 159.$ ComPlics: Yes Reported To: R.J. l:ijol The Pbu�e repurted dela ie We properly of the client Nu reYroduoliud of Ihu el+ove.1410 whhow Iba tole V�ntllielUll ul'T,1-Sttlto MeledPle Ttelhll{Lnb.,lII4. '1'fl-84A,C htelorlP lP'I'Sp,{ny"enp�,p"liohiliry fhr wnrlt Submitted 1,1y xeeule�hyrnl,pra, •. Tri-State Materials Testing Lab., Inc., Sarni YI. Hajjar RE S�wM •F� O-P SotdA Vzovzdt�at 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 ~�so1.co�' TELEPHONE (860) 644-2511 July 24,2001 Mr. Mark Kislyuk South Windsor Estates LLC 84 Willowbrook Road Longmeadow, MA 01106 Dear Mr. Kislyuk: This letter is to inform you of a number of items that remain to be addressed before the Engineering department will issue approval to issue a certificate of occupancy for any units at the Pleasant Meadows site. The following is a partial list of items to be addressed: 1. Compaction test results have not been received for the base course of pavement. Pavement is not accepted until compaction test results are received 2. Change Order is required for Garden Circle realignment 3. Grading around building is not acceptable—swale to be formed around building-may require slabs in rear to be replaced 4. Site remains to have turf established on disturbed areas. 5. Sanitary sewer is not approved a) Sanitary main connection to existing Burr Meadow SMH was not placed at correct elevation and brought in above brickshelf. Brickshelf to be knocked out and new invert formed as remediation. b) New sanitary sewer permit is required for above work. 6. Detention basin remains to be built a) Grading not completed b) Turf not established c) Retaining walls remain to be constructed. d) Detention basin outlet structure remains to be raised 1.29' per change order 10 and approved plans. e) Berm on north side of detention basin is to provide a minimum of 1'of freeboard above proposed outlet structure top of frame—to elev. 105.50'min or revised drainage calculations to be submitted. f) As-built of detention areas is required to show that basins are built to proper grades and capacities. 7. As-built required showing grading around first building and for entire detention basin areas to show that grading conforms to approved plans. 'this is a preliminary list of outstanding items that remain to be addressed from the Engineering department review.Additional items may be required to be addressed pending review of the as-builts when submitted and further site inspections. Furthermore, approvals for issuance of certificates of occupancy are required to be obtained from the Planning and Building departments. Respectfully, Mr.Tracy A. LaPiene Project Engineer tal cc: Michael Gantick, Director of Public Works Marcia Banach, Director of Planning John Collins, Chief Building Official Karen Isherwood, Design Professionals v \\TOWN HALL\VOL2\ENGINEER\Prof.-P8Z Wetland Applicadons\Pleasant Meadows\Pleasant Meadows Kislyuk 072401 tal.doc TRANSMISSION VERIFICATION REPORT t TIME 07/24/2001 15:34 DATE DIME 07/24 15:33 FAX NO. /NAME 92918757 DURATION 00:00:37 PAGE(S) 02 RESULT OK MODE STANDARD ECM FAX COVER SHEET TOWN OF SOUTH WINDSOR 1540 SULLI"N AVENUE SOUTH WINDSOR, CONNECTICUT 06074-2786 TELEPHONE: 860 644-2511 FAX: 860 644-7280 DATE: PLEASE DELIVER THE FFOLLOWING PAGES TO: NAME: G' COMPANY: FAX # FROM: NAME: TITLE: MESSAGE: If you did not receive all pages (including the cover), or if you have any questions, please call 644-2511 as soon as possible. JUL 19 2001 13:52 FR SNET HARTFORD e60 549 1100 TO 6447280 P.01 SNff Mr,Mark Kislyuk South Windsor Estates LLC 84 Willowbrook Road Longmeadow,MA 01106 Dear Mr.Kislyuk We have left numerous messages for Mr.Ted Bukowski about Pleasant Valley Senior Residence Development to no avail. Please be advised that telephone cable cannot be tun at this development in South Windsor,Conn.,because of the following reasons. 1. PVC nced to be exposed and cut off at 3'below ground level for us to be able to pull our cable in. 2_ A pit around the transformers needs to be opened so we can bond and ground per the National Electrical Safety Codes 3. A letter explaining the different types of telephone interfaces available to you must be signed and returned to us. This is required of us by the DPUC. Please contact Cathy Hoggatt at 860-725-4433 as soon as possible so we may provide service to this Development_ •-S%�cerely, Douglas ilbert Engineering Supervisor SNET 40 Brainard Rd Hartfor cc: Joseph.Perna,Town of South Windsor Project Engineer ** TOTAL PAGE.01 Hankard Management Company P.O. Box 521 South Windsor, CT. 06074 CT. Lic#005 July 14, 2001 John Collins, Chief Building Official Town of South Windsor 1540 Sullivan Ave. South Windsor, Ct. 06074 Recently we talked about issues that exist between South Windsor Estates and Burr Meadow Condominium. Specifically when Burr Meadow Condominium entered into an agreement to grant an easement to South Windsor Estates for storm and sanitary to cross their property it was agreed that some screen type planting would be provided. It was further agreed that lawn restoration in the easement area would take place. In addition, during the installation of the pipe the underground electric line serving street lights at Burr was damaged twice. We have billed South Windsor Estates several times on this matter and have not been paid. I ask your help as this development nears the stage of C.O. to assist us in the above matters. Yours Tr , I Patrick T Hankard Property Manager cc: Board of Directors i rT_ Hankard Management Company P.O. Box 521 South Windsor, CT. 06074 CT. Lic#005 August 2, 2000 Mr. Mark N Kislyuk South Windsor Estates LLC South Windsor, Ct. 06074 Dear Mr. Kislyuk: Twice during the recent sewer installation the site contractor dug up the power lines for our streetlights. We had them repaired and have paid our electrician $728.75. Please reimburse us in that amount. Your check should be made payable to Burr Meadow Society and mailed to Hankard Management Co., Box 521, South Windsor, Ct. 06074. Thank You Yours Truly; Patrick T Hankard Property Manager cc: Board of Directors Bookkeeping Engineering Department Memo To: Michael J. Gantick, Director of Public Works From: Tracy A. LaPiene, Project Engineer CC: Date: 06/26/01 Re: Pleasant Meadows 2000-7P Pleasant Meadows has requested final inspections for certificate of occupancies from the Building Department for the two end units of the first building. Pleasant Meadows will be requesting C.O.'s within the next couple of days. I believe it would be in both the Town's and the developer's best interests to send a letter to the developer spelling out what items remain to be addressed prior to an issuance of a certificate of occupancy A.S.A.P.. I request that the Engineering, Building and Planning departments including the department heads meet to address the desired level of completion and any outstanding items on this project. In the past such as Collins Crossing the Engineering department has required a site plan as-built for the building and surrounding area of the unit requesting a C.O. showing grading, utilities and building location. The Engineering department also ensured that turf was established and all drainage and sanitary structures including detention basins were installed and approved. Based on the history of this project I have a major concern that the Town's options may be limited in the event that a C.O. is issued for these two units and the developer folds up or no further site improvements are made. The following is a partial list of items that need to be addressed: 1. Pavement is not accepted until compaction test results are received 2. Site plan for units and surrounding area to be received 3. Monumentation remains to be placed 4. Change Order is required for Garden Circle realignment 5. Grading around building is not acceptable—swale to be formed around building- may require slabs in rear to be replaced 6. No turf establishment 7. Detention basin remains to be built 8. A number of retaining walls remain to be designed and constructed including 3 within detention basin. 9. Detention basin outlet structure remains to be completed 10. Sight line hazard at Pleasant Valley Rd remains to be cleared 11. Top course of pavement remains to be placed 12. Common parking area striping remains to be placed 13. Handicapped parking delineation and signage remains to be placed. 14. Landscaping structures remain to be built Again, due to the magnitude and character of some of these outstanding items I would like to address this as soon as possible. \\TOWN_HALL\VOL2\ENGINEER\Proj.-PU Wetland Applicatlons\Pleasant Meadows\LaPieneV&=MG 062WlTL.doc Page 1 of 1 TOWN OF SOUTH WINDSOR INSPECTION REPORT coll tom. -?1�s��`-2: � J e1-�� �. yuc� �''S;y�-e fy�o� �ia� �� ),,, (��-E�S)•.�+ei �l?r F-swdk, ►�3�,^c�1. + AAftj ,tG. 4c rCo 'My fig S- /rr• ^e. %oc c 9 S �` y _ .�rrw'C'J' �'�� a�. B<✓f/'f�cE r�it�-�� �,Ad, ram'='�P "�"' L`�' ►µ 3 �k �`a p d k%rc T2 r^os E be red c—LP o l k e cl 0^P� ,sin 14 -I1+73 r - L��o•N N "4, `¢ e 7own 0-""es'ou� .a � . 45` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 e-co AREA CODE 860 / 644-2511 Post-it®Fax Note June 15, 2001 TO ArZk 7671 Date 6 # e<lS is c�j Paof j Co./Dept. From ges Phone# Co..._ � en✓A I Aviv pF Fax# Phone# Mr. Mark Kislyuk 1' �6=�_� F �' ' � �-r-• South Windsor Estates LLC -4--zs11 x24-o 84 Willowbrook Road Longmeadow, MA 01106 Dear Mr. Kislyuk: Re: Pleasant Meadow Senior Residence Development Please be advised that the Town staff has a concern with the construction of the entrance drive to this project. Specifically, the grade of the drive at the entrance appears to steep which may cause a safety hazard to the future residents of this development. We have notified your site contractor and made him aware of our concern and suggested that he discontinue the construction of the entrance drive up to the first building until this issue can be resolved. We recommend that you have your engineer prepare a profile of this section of the roadway with a more gradual design grade for our review. Once we receive the revised plan, we will expedite the approval process so that your contractor may keep to his construction schedule. I can be reached at the South Windsor Town Hall at (860) 644-2511, extension 240 if you have any questions regarding this matter. Sincerely, (e�4 seph J. Kerna Project Engineer cc: Michael J. Gantick, P.E., Director of Public Works Tracy Lapiene, Project Engineer Design Professionals, Inc. Y TRANSMISSION VERIFICATION REPORT TIME 06/15/2001 15:43 DATE DIME 06/15 15:42 FAX NO./NAME 914135678033 DURATION 00:00:35 PACES? 01 RESULT OK MODE STANDARD ECM r SSA INSPECTION SUMMARY-06/12/01 PLEASANT MEADOW I BEGAN NIIN PfXT4e 019 THIS PROJECT THIS SPRING. AT THAT TIME ALL STORM AND NS7� ITARY PIPE AND STRUCTURES (MANHOLES AND CATCH BASINS) HAD BEEN INSTALLED WITH THE EXCEPTION OF THE SANITARY MANHOLE ADDED TO THE END OF THE LINE IN FRONT OF THE FIRST BUILDING. ON MY FIRST VISIT TO THE SITE TRACY LAPIENE WAS WITH ME AND HE DIRECTED THAT THE SANITARY LINE BETWEEN SMH (TF = 107.89)AND SMH (TF = 111.42) (CHANGE ORDER 8) BE EXPOSED BECAUSE IT HAD BEEN INSTALLED WITH OUT INSPECTION. A CLEANOUT WAS INSTALLED IN THE MIDDLE OF THE LINE AND WARNING TAPE WAS INSTALLED BEFORE THE TRENCH WAS BACKFILLED, I INSPECTED THE INSTALLATION OF THE NEW SMH AND THE NEW LATERAL TO THE FIRST BUILDING(CHANGE ORDER 10). WITH THE EXCEPTION OF THESE TWO INSPECTIONS I HAVE NO PERSONAL KNOWLEDGE OF THE CONDITION OF ANY OF THE UNDERGROUND CONSTRUCTION ON THIS SITE. JEFF FOLGER HAS BEEN DOING THE INSPECTION OF EROSION AND SEDIMENTATION MEASURES AND BASINS. YOU CAN CHECK WITH HIM AS TO THEIR STATUS. TWO RETAINING WALLS ARE BEING DESIGNED FOR INSTALLATION IN THE LAST BASIN. I DON'T HAVE ANY INFORMATION ON THE STATUS OF THESE WALLS OTHER THAN THE VERBAL ASSURANCES AT SEVERAL JOB MEETINGS THAT THE T.S.W STAFF HAS HAD WITH THE OWNER/DEVELOPER(MARK KISLYK)AND FIJOL CONSTRUCTION (SITE CONTRACTOR)THAT THEY WERE BEING DESIGNED BY A PROFESIONAL ENGINEER. I WAS TOLD THAT PARTIAL PAVING OF THIS PROJECT COULD BE DONE BEFORE THE RETAINING WALLS ARE INSTALLED. A PROGRESS AS BUILT WAS SUBMITTED THAT SHOWED SOME PROBLEMS THAT HAVE BEEN RESOLVED WITH THE EXCEPTION OF NOT SHOWING THE ADDITIONAL S.M.H. IN FRONT OF THE FIRST BUILDING AND A 15"DRAINAGE PIPE AT THE ENTRANCE OF THE PROJECT WHICH HAS NO PITCH. I DELIVERED A MEMO TO THE SITE ON 6/11/01 (A COPY OF THIS LETTER IS IN THE PROJECT FILE) DIRECTING THAT THE 15"DRAINAGE BE RELAID. A SURVEY CREW WAS AT THE SITE ON 6/11/01 DOING LOCATION AND I WAS TOLD THAT A REVISED AS BUILT WAS BEING PREPARED. KAREN FROM DESIGN PROFESSIONALS IS ALSO PREPARING A CHANGE ORDER FOR THE MINOR RELOCATION OF THE ROAD TO MEET THE LOCATIONS OF THE INSTALLED CATCH BASINS WHICH ARE SLIGHTLY OUT OF ALIGNMENT. SEE REVISED AS BUILT DATED: SHE IS ALSO DRAWING A PROFILE OF THE GRADING AT THE ENTRANCE TO THE SITE WHICH SHOWS THE INTENT FOR GUTTERLINE DRAINAGE ALONG PLEASANT VALLEY ROAD. THE BEST THING THAT HAS HAPPENED AS FAR AS THE COMPACTION OF THE EARTH WORK AT THIS SITE IS THAT IT HAS HAD MORE THAN 6 MONTHS TO SETTLE. COMPACTION TESTS ON THE SUBGRADE EXCEEDED 95%. A STRINGLINE INSPECTION OF THE SUBGRADE ELEVATIONS REVEALED THAT IT WAS SEVERAL INCHES LOW WITH THE EXCEPTION OF ONE AREA 50'+/-PAST THE FIRST SET OF CATCH BASINS AT THE ENTRANCE. THIS AREA WAS REGRADED AND THE EDGES OF THE ROAD BOX WERE CLEANED WHILE I WAS ON THE JOB. I WARNED THE CONTRACTOR THAT THE SUBGRADE AND SUBBASE HAD TO BE WIDE ENOUGH TO SUPPORT THE PAVEMENT UNDER THE CURB. I SPECIFICALY SHOWED HIM THE AREA THAT HE WAS PREPARING FOR THE PARKING AREA AND TOLD HIM THAT IT WOULD HAVE TO BE BIG ENOUGH TO FIT THE REQUIRED 18' PARKING SPACE AND CURB. THE SITE CONTRACTOR IS GOING TO USE ADDITIONAL GRAVEL BEYOND THE REQUIRED 6"FOR THE SUBBASE IN THE LOW AREAS. SOIL SAMPLES OF THE GRAVEL HAVE BEEN TAKEN BY THE CONTRACTORS TESTING COMPANY BUT AS OF THIS DATE I HAVE NOT RECEIVED THEM. IN MY MEMO OF 06/11/01 1 INFORMED THE CONTRACTOR THAT COMPACTION TESTS ON THE SUBGRADE WOULD HAVE TO DONE WHILE T.S.W INSPECTION PERSONNEL WERE PRESENT. AT THIS TIME ADDITIONAL TESTING SHOULD BE DONE AT THE DRAINAGE STRUCTURES. IF AREAS NEAR THE DRAINAGE STRUCTURES DO NOT MEET THE 95% COMPACTION REQUIREMENT THE CONTRACTOR SHOULD BE MADE TO COME UP WITH A SOLUTION. A HOE-PACK COULD BE USED IF THE JUMPING JACK THEY HAVE ON THE JOB FAILS BUT I HAVE NOT RECOMMENDED USING ONE BECAUSE I CAN SEE THEM SAYING THAT IT WAS OUR FAULT IF DAMAGE WAS CAUSED TO THE PIPE OR DRAINAGE STRUCTURE. A SANITARY MANHOLE WAS RAISED AT THE END OF THE TEMPORAR CUL-DU-SAC. THE CONCRETE LEVELING COURSE MUST BE REBUILT BEFORE BACKFILLING THAT STRUCTURE. (NOT DONE AS OF 06/12/01) A MAJOR PROBLEM WITH THIS PROJECT HAS BEEN THE LACK OF CONSISTANT SUPERVISION BY THE SITE CONTRACTOR(SEVERAL JOB SUPERVISORS HAVE COME AND GONE), CONSTRUCTION WITHOUT INSPECTION BY TOWN STAFF THAT HAS HAD TO BE REDONE AND THE LACK OF KNOWLEDGE OF THE BASIC REQUIREMENTS OF THE T. S. W. AS RECENTLY AS THIS WEEK THE SITE CONTRACTOR HAD NO BOOK OF SPECIFICATIONS AND WAS OPERATING WITH AN INCOMPLETE SET OF PLANS. SPECIFICALY THE DETAIL SHEET WAS MISSING AT THIS TIME. SOME(NOT ALL) MAJOR ITEMS REQUIRED BEFORE PAVING ARE: 1. PROGRESS AS BUILTS Z 2. MANDREL TEST OF SANITARY LINE./ 3. COMPACTION TESTS OVSUB BASE AND AREAS AROUND DRAINAGE STRUCTURESJ. 4. ENTRANCE GRADING. 5. CHANGE ORDER FOR ROAD REALIGNMENT. 6. APPROVAL OF SUBBASE AND BASE COURSE MATERIALS. 2 SOME (NOT ALL) MAJOR ITEMS COMING UP PRIOR TO FINAL APPROVAL ARE: 1. CLEANING CATCH BASIN SUMPS. 2. CUTTING DRAINAGE PIPES IN CATCH BASINS FLUSH WITH WALL. 3. ACCEPTANCE OF INVERT CONSTRUCTION IN SANITARY MANHOLES. 4 Town of South Engineering Department Memo To: Mr.Mark Kislyk From: Edward K. Beale, Engineer Assistant CC: File,M. Gantick, M. Banach Date: 06/11/01 Re: Progress Inspection, Pleasant Meadows When I inspected the construction project referenced above on 06/11/01, 1 was able to talk with Mr. Mark Kislyk (owner and developer of this project) and representatives of Fijol Construction, the site contractor. We discussed the following issues at that time: S q 1. 15"pipe between C.B.X&xwill have to be installed properly. 2. Gravel specifications for material to be used in subbase course must be forwarded to T.S.W. Engineering Department. 3. Mandrel Test must be done prior to paving. 4. Inspector from T.S.W. Engineering Department must be on site when compaction tests are done on subbase. Notify T.S.W. Engineering Department 24 hours prior to test. 5. Revised progress as builts showing omitted sanitary man hole must be submitted. 6. Change order showing road realignment must be submitted prior to paving. 7. Additional compaction testing of subgrade must be done beyond Sta 2+00. These items listed above do not constitute a complete or final punch list for this project but are provided so that the site work can proceed and comply with Town of South Windsor requirements. If you have any questions, please contact me at 1-860-644-2511, Ext.241. Edward K. Beale Engineer Assistant Page 1 of 2 HTOWN_HALL\VOL2ENGINEERUaleWLEASANT MEADOWS611.doc Town of • • • Engineering Department Memo To: Mr.Mark IGslyk From: Edward K.Beale,Engineer Assistant CC: File M.Gantick,M.Banach Date: 06/08/01 Re: Progress Inspection,Pleasant Meadows I inspected the construction project referenced above on 06/08101: 1. Fijol Construction is changing water valves in the concrete vault near the site entrance. 2. Fijol Construction is final grading the parking area between C.B.2 and C.B.5. Edward K. Beale Engineer Assistant Page 1 of 1 \%TOWN RAU%V0LZeMINEB%mlelpLEA&ANTMEADOWS6,pg.doc Town of • • • Engineering Department Memo To: Mr.Mark IGslyk From: Edward K. Beale, Engineer Assistant CC: Fil M.Gantick,M.Banach Date: 06/06/01 Re: Progress Inspection,Pleasant Meadows I inspected the construction project referenced above on 06/06101: 1. Catch basin tops: The Town of South Windsor requires that all catch basin grates be galvanized. Galvanized grates have been delivered to the site and are being installed. 2. Catch basins 8, 1 and 4 are having leveling courses rebuilt so that the tops will have full bearing on the underlying structure. 3. Sanitary sewerhole 4 has been raised to meet the revised grades and the top precast cone as been removed and the new riser inserted below it. Leveling courses will have to be rebuilt as they were damaged during this process. 4. Air test of the sanitary sewer was completed today. All sections passed. Fjol Construction's foreman was told that a mandrel test was also required before paving. 5. Fijol Construction has called a testing lab to conduct compaction tests on the subgrade, subbase and base course. (Material Testing Lab., Inc., 1-203-949-7733). Subgrade was tested on 5/25/1. Test results were faxed to this office on 5/30/01. Additional soils information was faxed to this office on 6107/01. 6. Progress as builts were delivered to this office on 6/05/01. They showed that the 15"pipe between C.B.8 and C.B.9 has no pitch. 7. Offset stakes have been set at 2' off face of curb line and marked with centerline finished grade. Fijol Construction is dressing up the edges of the road box and doing a 4"+/-cut between C.B.9 and a point 50'towards C.B. 1 &2 where the grade was high. In the other areas of the subgrade box, a check of the offset grades with a string line shows that the subgrade is 4 to 6 inches low. The foreman from Fijol Construction said he intended to put in additional gravel to reach the subgrade elevation. Edward K. Beale Engineer Assistant Page 1 of 2 \\TOWN WLLLWOL2IENGINEER\bwleWLEASANT MEADOWs607.dac Town of • • • Engineering Department Memo To: Mr. Mark Kislyk From: Edward K. Beale, Engineer Assistant CC: Fil .Gantick,M. Banach Date: 06/05/01 Re: Progress Inspection,Pleasant Meadows I inspected the site referenced above on the moming of 06/04/01 with Ryan McEvoy. Employees of Fijol construction were air testing the sanitary sewer line with their own equipment. I informed that the air test would have to be observed by an inspector from the Town of South Windsor. They informed me that they were only testing the equipment that they had purchased and would call the engineering department when they were ready to do the actual test. Edward K. Beale Engineer Assistant Page 1 of 1 %kTOWN HALL\VOL2IENGINEERtmieWLEASANi MEADowssw.doc PLANNING DEPARTMENT r/%CGrj TRANSMITTAL , DATE: S WE ARE SENDING YOU: � PZC initial plans I7 PZC revised plans Drainage computations O Bond estimate request t OSNNM HirloS 0 PZC Final plans for review O PZC Final plans for filing O Bond reduction request 1003 9 � 0 Nn Correspondence r o Iw�vcc plans a3/113�3� L7 Other NO.OF COPIES APPLICATION NL1MgER PROJECT/ApPLICANl' TBESE ITEMS ARE TRANSMMM: For review and continent - 0 For your files O For your use O Other As requested PLEASE RETURN/COMMENT BY: COMMENTS: Copy to: From: Flaming Department 1.0 Ash ,�)t, /98 � . DESIGN PROFESSIONALS, INC. civil engineers -planners - surveyors - gis RECEIVED LETTER OF TRANSMITTAL JUN 0 5 2001 SOUTH MNDSOR PLANNING DEPT. TO: Marcia Banach, Director of Planning DATE: June 4, 2001 Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: Pleasant Meadow S.R.D. DPI PROJ. NO.: 99-1272 1140 Pleasant Valley Road South Windsor, Connecticut WE ARE SENDING YOU: ❑ for your use ❑ at your request ® for approval ❑ for your files ® for review and comment ❑ other THE FOLLOWING: One(1)progress as-built survey for the above-referenced property. Thank YOUN DESIGN PROFESSIONALS, INC. By: Richard P. Martel, P.E., L.S. 165 South Satellite Road South Windsor,CT 06074 Tel:(860)291-8755 Fax:(860)291-8757 z1 'o ,�• 0� 1 NIP ADOW 1 20. SSORR EA EMENS HU RR 1 pR0 SA E�ARY SEA A14R REgS ASES• l.�C' SpUSH OADS0 10 BE Sft h 70 I �4T8 18 O --� 21a, 2s.5• 11 R• '-- / 12 2s• I O � I R.15' 7 t Rz5 �i r tr, � �R:S• ry O R-43• R.20• � Rac15 Cb zn R�5 \ I� b ._ Romeo' 20 ~� 18 26.5' ol wz • sp�3 �ATp • Town of • Windsor Engineering Department Memo To: Mr.Mark IGslyk From: Edward K. Beale, Engineer Assistant CC: File,J. lazzetta,M.Gantick,M. Banach Date: 05/29/01 Re: Progress Inspection, Pleasant Meadows When I inspected the construction project referenced above on 05/25/01, 1 was able to talk with Mr. Mark IGslyk (owner and developer of this project) and representatives of Fijol Construction, the site contractor. We discussed the following issues at that time: 1. Catch basin tops: The Town of South Windsor requires that all catch basin grates be galvanized and of a type meeting the public improvement specifications of the Town South Windsor. The grates on the site do not meet this requirement and should be replaced 2. The construction of catch basins 8, 1 and 4 will have to be redone so that the tops will have full bearing on the underlying structure. 3. When sanitary sewer 4 is raised to meet the revised grades,the top precast cone will have to be removed and the new riser inserted below it. Raising the metal top of frame with masonry on top of the existing precast cone will not be allowed. (Ma)dmum of 6"to 12°of masonry below top of frame is allowed). 4. Air test and mandrel tests of the sanitary sewer will be required in accordance with the public improvement specifications of the Town of South Windsor before paving. 5. Fijol Construction has called a testing lab to conduct compaction tests on the subgrade, subbase and base course. (Material Testing Lab., Inc., 1-203-949-7733) 6. There was confusion as to what areas would have to be paved to meet the requirements for the first phase of paving. I have attached a sketch,which shows what is required. 7. Progress as builts will be required. These items listed above do not constitute a complete or final punch list for this project but are provided so that the site work can proceed and comply with Town of South Windsor requirements. If you have any questions, please contact me at 1-860-644-2511,Ext.241. Edward K. Beale Engineer Assistant Page 1 of 2 S:IENGINEERIbwWPLEASANi MEADOWS.doc s a Town of SouthWindsor Engineering Department Memo To: ___fiAr.Mark KID From: Edward K.Beale, Engineer Assistant CC: File,J. lazzetta,M.Gantick,M. Banach Date: 05/29/01 Re: Progress Inspection,Pleasant Meadows 1,1ir77NG When I inspected the construction project referenced above on 05/25/01, 1 was able to talk with Mr. Mark 1Gslyk (owner and developer of this project) and representatives of Fijol Construction, the site contractor. We discussed the following issues at that time: 1. Catch basin tops: The Town of South Windsor requires that all catch basin grates be galvanized and of a type meeting the public improvement specifications of the Town South Windsor. The grates on the site do not meet this requirement and should be replaced. '# 2. The construction of catch basins 8, 1 and 4 will have to be redone so that the tops will have full bearing on the underlying structure. 3. When sanitary sewer 4 is raised to meet the revised grades,the top precast cone will have to be removed and the new riser inserted below it. Raising the metal top of frame with masonry on top of the existing precast.cone will not be allowed. (Ma)imum of 6"to 12"of masonry below top of frame is allowed). 4. Air test and mandrel tests of the sanitary sewer will be required in accordance with the public improvement specifications of the Town of South Windsor before paving. 5. Fijol Construction has called a testing lab to conduct compaction tests on the subgrade, subbase and base course. (Material Testing Lab., Inc., 1-203-949-7733) V4( 6. There was confusion as to what areas would have to be paved to meet the requirements for the first phase of paving.-I have attached a sketch,which shows what is required. 7. Progress as builts will be required. These items listed above do not constitute a complete or final punch list for this project but are provided so that the site work can proceed and comply with Town of South Windsor requirements. If you have any questions, please contact me at 1-860-644-2511,Ext.241. 01 o� Edward K. Beale Engineer Assistant l Page 1 of 2 - S:IENGINEERUxxL lPLEASANTMEADowsdoc . , t C ,o 0 J O� 0. NSF QW ` STORM DRAINAGT M E A D t H , ROP OSED 20 R EASEN EN V 1`R , P pR F �•�•0' � SANS N R p ESTATES, SOOTN `►nN050R 0.9C ig3.g2. I (4�g 18 � T�TALC 1Y. 210..7 12 �� 7 R R�3 R.5 2� O Rm5 / r R=5, R- - O N 5 1 i Rv43. � R�2020, Rc15 4 ` 2B.5' R' R'5 PROJECT: DEVELOPER:- STREET. �,so,•r �L�Y j�,�� CONTRACTOR: DAZE. S TIME: /a--7 WEATFm. INSP: WORK IN PROGRESS: 77 tier Ce-62 e Oiv /lc�✓ fir/dvv ,c% lies /V.7- Gfrs r �d�6��� T�.,.,,� S/,o�� F'�.—r��.��J /✓,a.� c,.,Ti-1 Si Tc'' Co.,.T � lip T/,Jr I=c U:c,s;,.��,✓E" /i`t�� s ,G}'2�- �% v�"s t'�ary i� �/.s /f%'..�Y ��- j N/S ,I�.o,�--, /r- 2. �rct� v..o..r// z�'✓r To,o c ���vti2�rJ � ri�.ra.Q,� �c — G✓d� ,C/,e vim'' T /,�� /� d�yQa-rJ A-v Zt-7-6rwev 7v ew f/ 7-6r- CO v7-;O d G 7-v�2 0-/� Gi/i< CIV S'AA11i,a,2 %O Ao✓,(- o,- v✓b a t✓J Ad eltr .T dc;.7- A 'rz l�(/ls'�j �•vd /�'/S�'f� �G�c�10 1Tc°-LU w - G.vz �- �- ��E- �Ti.ac�t6rrJ. C��/� �9/'�1 .�a�� j�ST�.✓� L'.4� SPECIAL INSTRUCTIONS: e y) A6/- J/ re' l�Gr'T�<< ,SNGs"LsT 0� C7. /J CO)"y S rG-�r�,d c�c�vt Gain S /��✓,n r2� P,e�S5 Gt¢.rr c� 5'� l/' �1 �� t�WN SE, t� C CIO - Q 9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 AV e•coP� AREA CODE 860 / 644-2511 Mark Kislyuk c1 South Windsor Estates LLC 7 84 Willowbrook Road East Longmeadow, MA 01106 May 29, 2002 Re: Pleasant Meadows SRD list of concerns Dear Mr. Kislyuk The South Windsor Engineering Department has reviewed our files and visitied the Pleasant Meadows SRD site. As a result, we have developed the following list of construction items to be corrected and finished with the Pleasant Meadows SRD. This list is not complete and should not be taken as a final punch list, but is a list of concerns with this project to date. The first group of items need to be completed before Engineering can approve any Certificate of Occupancy requests. 1. The swale behind the buildings needs to be graded, foamed and seeded. This swale needs to be graded to drain to the detention basin and should not hold water. As previously stated, some of the concrete slabs for the deck stairs may need to be replaced in conjunction with this re-grading. 2. Soil stockpiles need to be removed or secured and stabilized. The soil stockpile behind the second building should be removed. The other piles need to be secured with silt fence and,hay bales and stabilized by hydroseeding to prevent further erosion. 3. The area of the third building where the foundation hole is dug and soil stockpiles are located needs to be secured with construction fence. This fence must run around this entire area and tie into the natural barrier on the south side and the retaining wall on the north side. 4. The catch basin and sediment structure near the inlet to.the detention basin needs to be uncovered (soil removed) and ringed with silt fence and/or hay bales so it does not get buried again. 5. The detention basin outlet structure elevation needs to be raised per change order 10 and the plans. This needs to be shown and certified at the correct elevation on a revised as-built plan. 6. The berm on the north side needs to be constructed to the design elevation, to provide 1 foot minimum freeboard above the outlet structure elevation. This needs to be shown and certified at the correct elevation on a revised as-built plan. 7. The brick and mortar inverts in the sanitary manholes must be rebuilt to function properly. A new sanitary sewer permit is required for this work. 8. A revised as-built plan is needed for review and approval before a C.O. can be issued for the second building. This needs to include the grading and elevations on the site around the first and second buildings and the detention basins. Locations and elevations must be shown for the detention basins, drainage structures, sanitary sewer manholes, retaining walls, roads, driveways and all other site improvements completed. t�WN d�1 � . 0s� �• 5 � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 �OSOR.c° TELEPHONE (860) 644-2511 Other items that must be corrected or completed as soon as possible are: 9. The storm drainage and sanitary sewer pipes on Burr Meadow Condominium property need to be checked for settlement and damage near where the storm drainage pipes and sanitary sewer pipes from this project were connected to existing pipes. Any damage must be repaired to the satisfaction of the property owner. 10. The catch basin sumps must all be cleaned 11. The drainage pipes in the catch basins must be cut flush and mortared to blend in with the inside walls. 12. The 15" pipe between CB8 and CB9 has no pitch according to the as-built plan for the first building. This must be re-laid so it has at least 0.5% slope or certified that it has at least 0.5% slope on a revised as-built plan. 13. The cast iron frames on the sanitary manholes must be grouted in place. 14. The lifting holes in the sanitary manholes must be filled with mortar. 15. The CB tops must be grouted in place. 16. The retaining wall between the detention basin and third building must be built according to the approved engineering plans. We are concerned because this was built and then disturbed by the excavation for the foundation of the third building. Engineering needs to inspect this wall and its final construction. Additional inspections may also be necessary 17. The pavement top course must be 2"thick Class II (after compaction). The compaction of this top course must conform with Town Standards as verified by an approved testing laboratory. 18. The large detention basin needs to be cleaned of soil from the stockpile, and debris, regraded and seeded as necessary. This is not a complete list of outstanding items but includes the items identified by the Engineering Department to date. All site improvements need to be completed according to the approved plans and approved change orders. Additional items may need to be addressed based on further site inspections prior to Engineering signing-off on future certificates of occupancy or building permits. We can arrange to meet on the site with you and/or the contractors to review these items. Please call me at 644-2511 x 245 if you have any questions. We look forward to a successful completion of this project. Sincerely, Jeffrey Doolittle, P.E. Town Engineer cc. Marcia Banach, Director of Planning Barry Guliano, Town Attorney Attorney William Breslau TRANSMISSION VERIFICATION REPORT TIME 05/30/2002 15:48 DATEJIME 05/30 15:47 FAX NO./NAME 96481025 DURATION 00:01:28 PAGE(S) 02 RESULT OK MODE STANDARD TRANSMISSION VERIFICATION REPORT TIME 05/30/2002 15:50 DATE DIME 05/30 15:49 FAX NO./NAME 96478302 DURATION 00:00:52 PAGE(S) 02 RESULT OK MODE STANDARD ECM MEMORANDUM To: File From: Jeffrey Doolittle Date 5/23/02 Re: Pleasant Meadows list of concerns This is a list of construction items to be corrected and finished with the Pleasant Meadows SRD. This list is not complete and should not be taken as a final punch list. 1. The pavement top course must be 2" thick Class II (after compaction). The �d compaction of this top course must conform with Town Standards as verified by an approved testing laboratory. - The catch basin sumps must all be cleaned Ve drainage pipes in the catch basins must be cut flush and mortared to blend in h the inside walls o a,(,1�� e 15" pipe between CB8 and C69 ha 8 pitc . This must be re-laid so it has at ast 0.5% slope. 6r �� � o ` ,j P �'w= bu`1L�t�„ The brick and mortar inverts in the sanitary manholes must be rebuilt. A new rd C sanitary sewer permit is required for this work. The cast iron frames on the sanitary manholes must be grouted in place o' The lifting holes in the sanitary manholes must be filled with mortar ( IAPI S The retaining wall between the detention basin and third building must built ' he CB tops must be grouted in place ! 1 . Soil stockpiles need to be removed or secured with silt fence and hay bales (most CC/ J can be removed) The soil stockpile behind the second building and the pile beside /the driveway should be removed �"'The swale behind the buildings needs to be graded, loamed and seeded. As C' /// previously stated,some of the concrete slabs for the deck stairs may need to be replaced in conjunction with this re-grading. 26 Th��tention basin (2) needs to be cleaned of soil from the stockpile, and debrisrw and regraded. ,'as ✓� The outlet structure needs to be raised per change order 10 and the plans C,O The berm on the north side needs to be constructed to the design elevation, provide 1 foot minimum freeboard above the outlet structure elevation. + �An as-built plans is needed for review and approval before a C.O. can be issued for the second building. This needs to include the grading on the site around the first and second buildings and the detention basins. Locations and elevations must be shown for the detention baisns, drainage structures, sanitary sewer manholes, retaining walls, roads, driveways and all other site improvements completed. This is not a complete list of outstanding items but is the most of the items identified by the Engineering Department to date. Additional items may be required to be addressed base on further site inspections prior to Engineering signing-off on future certificate of occupancies or building permits. �i So•NN Sf•,` slau11� ?A�Z� s G 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR-C-0 v AREA CODE 860 / 644-2511 May 15, 2001 Mr. Robert J. Fijol R. J. Fijol Inc. P O Box 396 600 Old West Warren Road West Warren, MA 01092 Dear Mr. Fijol, This letter is in regards to the sanitary permits taken out for the Pleasant Meadows Development in South Windsor. When Mr. Donald C. Lewandoski had taken the sanitary sewer permits out he had stated that he was an employee of R.J. Fijol not a subcontractor. After these permits were issued we were told that Mr. Lewandoski was a private contractor. The Town of South Windsor is requiring that you send a letter to us stating that Mr. Lewandoski is an employee along with a copy of a pay stub as proof of employment so that we can clear up this issue. Furthermore, no permits will be issued to Mr. Lewandoski under R. J. Fijol until this proof of employment is supplied. If Mr. Lewandoski is not an employee but a subcontractor, a drain layers bond in the amount of $5,000.00 on the Town's form and a certificate of insurance of$2 Mil/$1 Mil is required from Mr. Lewandoski prior to any further permits being issued and Mr. Lewandoski will be required to take out new permits for those previously taken out under R.J. Fijol. If you any questions regarding this matter you may contact me at (860) 644-2511 ext. 257. Sincerely, Tracy LaPiene Project Engineer cc: Jerry lazzetta, Town Engineer Joseph Perna, Project Engineer Edward Beele, Engineering Technician Mark Kislyuk, Creative Developers TUcm Post-ItTm brand fax transmittal memo•7671 #of pages ► From To &DIge(t T 1 1 Co. Co. Dept. Phone# S:\ENGINEER\Pioj.-P&Z Wetland Applications\Pleasai Fax# Fax# �.r ,�o*N SE,` _1, C r Toulon �s� w• .� y ` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 �GyaSOR.Co��w AREA CODE 860 / 644-2511 'W May 15, 2001 Mr. Robert J. Fijol R. J. Fijol Inc. P O Box 396 600 Old West Warren Road West Warren, MA 01092 Dear Mr. Fijol, This letter is in regards to the sanitary permits taken out for the Pleasant Meadows Development in South Windsor. When Mr. Donald C. Lewandoski had taken the sanitary sewer permits out he had stated that he was an employee of R.J. Fijol not a subcontractor. After these permits were issued we were told that Mr. Lewandoski was a private contractor. The Town of South Windsor is requiring that you send a letter to us stating that Mr. Lewandoski is an employee along with a copy of a pay stub as proof of employment so that we can clear up this issue. Furthermore, no permits will be issued to Mr. Lewandoski under R. J. Fijol until this proof of employment is supplied. If Mr. Lewandoski is not an employee but a subcontractor, a drain layers bond in the amount of $5,000.00 on the Town's form and a certificate of insurance of$2 Mil/$1 Mil is required from Mr. Lewandoski prior to any further permits being issued and Mr. Lewandoski will be required to take out new permits for those previously taken out under R.J. Fijol. If you any questions regarding this matter you may contact me at (860) 644-2511 ext. 257. Sincerely, Tracy LaPlene Project Engineer cc: +ferry lazzetta, Town Engineer Joseph Perna, Project Engineer Edward Beele, Engineering Technician Mark Kislyuk, Creative Developers TL/cm S:\ENGINEER\Proj.-P8Z Wetland Applicabons\Pleasant Meadows\LaPiene\Fijol Itr TAL051501.doc e 4 4 �,1 V i 1 I i IN\ i IS 14 f i , Jer lazzetta - PLeasant meadows H" Ng From: Jerry lazzetta To: Banach, Marcia; Beale, Edward; Collins, John; Folger, Jeff; Guliano, Barry; Lipe, Michele Date: 4/6/01 9:08AM Subject: PLeasant meadows I have set up a meeting with the new superintendent(Don Gillette) ,the owner,and his lawyer for April 17, 2001 at 2:00pm in the Caucus Room to discuss the project. CC: Gantick, Mike °Jerry lazzetta Re:'Pleasant Meadows Pa e 1 From: Marcia Banach To: Jerry lazzetta Date: 4/5/01 11:42AM Subject: Re: Pleasant Meadows Can you check with Barry first before setting anything up to see if we should even be having a meeting with the new site super without the principals and their attorneys involved? I am a little hesitant to have yet another meeting with yet another rep when there is so much already messed up at that site (so much opportunity for misquotes, misunderstandings, etc.). >>>Jerry lazzetta 04/05/01 10:38AM>>> The new Superintendent for Pleasant Meadows has asked for a meeting to discuss the site work before he starts. 1.Are you available on Tues Apr. 10? If so what times are good? 2. Should we have Barry involved? 3. Is there anyone else we should have at the meeting? 4. If Tues is not good ,when would be a good day and time? ;Jerry lazzetta- Re Pleasant Meadows .. .. .. ,. ,,.. . .., ... ,,�.. Page 1 From: Michele Lipe To: Jerry lazzetta Date: 4/5/01 10:40AM Subject: Re: Pleasant Meadows The 10th looks good. Should someone from the building department be there? mmrl >>>Jerry lazzetta 04/05/01 10:38AM >>> The new Superintendent for Pleasant Meadows has asked for a meeting to discuss the site work before he starts. 1.Are you available on Tues Apr. 10? If so what times are good? 2. Should we have Barry involved? 3. Is there anyone else we should have at the meeting? 4. If Tues is not good , when would be a good day and time? racy aPiene-Pleasant Peaaows age 1 r� From: Tracy LaPiene To: Jerry lazzetta Date: /01 3:33P Subject: Pleasant Meadows Jerry, A new site foreman for Fijol Construction stopped in to ask our requirements for air testing the sewers and to let us know that they were having compaction tests done on the subgrade the next day. I had looked in our and Plannings files and spoke with Fred and Michelle and the last two change orders have yet to be approved. He stated that they were planning to pave up to the last driveway on the first set of units. 1 informed him that I he would have to speak with you as to what was the minimum area that was required to be paved prior to a C.O. being issued. In addition I informed him that: 1)sections of the sewer needed to be excavated and marking tape placed, 2)connection charges, permit fees and prorated sewer user charges were required prior to connecting sewer and cutting and abandoning placed sewer pipes, 3)sedimentation basins needed to be established prior to any paving and to coordinate with Jeff Folger 4)sieve analysis and proctor of the subgrade material, sieve of the subbase and base was required 5)Compaction tests of the subgrade,subbase, bas and pavement was required 6)As-built drawing was required prior to placing any gravel 7)Staking was required with grades marked on prior to placing any gravel 8)outstanding change orders to be approved prior to proceding further I told him to stop in and see you when you get back on Thursday prior to placing any gravel. He stated that he was still planning on testing subgarde. I told him that it was still private property and that he could do what he wanted but that we would probably make him do them over again at a later time. He was going to give Jeff and you a call. It appears that this person was brought in from one of there other jobs in the north (and seems to know what he is doing)to straighten out the site. However he is not aware of the history and oustanding issues on this site. Trace to•NN St,` r `own oic Spa& V&z&at s ` 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074 AREA CODE 860/644-2511 SOR-CO��� May 15, 2001 Mr. Robert J. Fijol R. J. Fijol Inc. P O Box 396 600 Old West Warren Road West Warren, MA 01092 Dear Mr. Fijol, This letter is in regards to the sanitary permits taken out for the Pleasant Meadows Development in South Windsor. When Mr. Donald C. Lewandoski had taken the sanitary sewer permits out he had stated that he was an employee of R.J. Fijol not a subcontractor. After these permits were issued we were told that Mr. Lewandoski was a private contractor. The Town of South Windsor is requiring that you send a letter to us stating that Mr. Lewandoski is an employee along with a copy of a pay stub as proof of employment so that we can clear up this issue. Furthermore, no permits will be issued to Mr. Lewandoski under R. J. Fijol until this proof of employment is supplied. If Mr. Lewandoski is not an employee but a subcontractor, a drain layers bond in the amount of $5,000.00 on the Town's form and a certificate of insurance of$2 Mil/$1 Mil is required from Mr. Lewandoski prior to any further permits being issued and Mr. Lewandoski will be required to take out new permits for those previously taken out under R.J. Fijol. If you any questions regarding this matter you may contact me at (860) 644-2511 ext. 257. Sincerely, Tracy Lea 'IeP ne Project Engineer cc: >Jerry lazzetta, Town Engineer Joseph Perna, Project Engineer Edward Beele, Engineering Technician Mark Kislyuk, Creative Developers TL/cm SAENGINEEMProj.-P8Z Wetland ApplicationslPleasant Meadows%LaPierwTijol Itr TAL051501.doc Pleasant Meadows Cronology Date Event 2/27/01 C.O. No 8 to provide two 8" dia sewer laterals from SMH 5 to building 2 for common sewer headers inside of building foundation. 5/8/01 Sewer main installed from SMH 2 to SMH 3 5/9/01 Working on sewer line from SMH 2 south. They did not have a permit and were told to stop work. 5/15/01 Last SMH being installed per C.O. 10 (change in elevation) 6/12/01 Memo from Ed Beale that all sanitary and storm pipe and structures were installed before he began inspections. Tracy and Ed asked that the pipe between SMH 2 and SMH 3 be exposed for inspection. Ed inspected the installation of SMH 1 and the lateral to the first building per CO 10. (see above note) 6/13/01 Mandrel tests being done on sewer mains 6/20-21/-1 Galasso installing processed aggregate, grading and compacting 6/22/01 Galasso installing pavement binder course. Driveways for building 2 were not paved We believe the sewer laterals from SMH4 to building 2 were installed in late september and Ed may have inspected to pipes. 10/1/01 Sewer permits taken for laterals to all 8 units in building 2. None signed-off by Engineering Staff, No as-built plans submitted by contractor for these laterals. 5/29/02 Letter from JBD to Kislyuk summarizing site work items to be finished prior to approval for C.O. Mentioned reconstruction of sewer inverts. 6/18/02 Inspection of Sewer inverts reveals 5 pipes into SMH 4 asked DPI to check sources and verify inverts. 6/27/02 Revised as-built submitted. Laterals from building 2 still not complete or correct. Asked DPI to get correct information. i 17, tows sEs r T-Own ayc S-OUA ?I s 1540 SULLIVAN AVENUE • SOUTH 1 f��SOR•CO� AREA CODI January 3,2001 Mr. Mark Kislyuk r.. South Windsor Estates LLC 84 Willowbrook Rd. Longmeadow,MA 01106 - I Dear Mr. Kislyuk: RE: PLEASANT MEADOW SENIOR RESIDENCE DEVELOPMENT STAFF CONCERNS There are several site issues occurring at the above-noted development that need to be addressed, as follows. 1. Garages. The one-car garages as constructed in the first building do not appear to be able to function as garages. The intrusion of stairs and ducts into already-marginal garage spaces have resulted in garages that are smaller than required under current zoning requirements (minimum 180 square feet). It also appears that the intrusion of the stairs into the garage space renders it difficult if not impossible for a vehicle to actually park inside the garage and allow the vehicle's occupants to exit the vehicle. These problems need to be resolved in such a manner that the garages are able to be used as garages. 2. "Dead space"in units. Spaces shown as dead space on the building plans, necessitated by the original over-sizing of units above the maximum allowed by zoning, must be inaccessible and cannot be converted into useable space. 3. Second building foundation. Both the horizontal and vertical locations of the foundation need to be established, as it is our understanding that the foundation was not staked out prior to construction by the site designers (land surveyor). It is also our understanding that the foundation was raised during construction. A change order for a raised foundation was not submitted prior to construction (and has not been submitted as yet), so the implications for utilities and storm drainage have not been addressed. In addition, non-useable garages (similar to building 1) needs to be prevented. 4. As indicated in Mr.Jerry C. Iazzetta's letter of December 29, 2000, the Engineering Dept. has several issues: a. The sanitary sewer main within your project was not installed in accordance with approved plans. This work was not inspected by the Town, and the permit for this work expired. b. A permit is required for each unit and the connection charges for each unit must be paid in addition to the pro-rated sewer use fee. OWN sf� t < -Gwn oiesiguA v&'d U s 61 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074 �l�OsoR•co AREA CODE 860 /644-2511 December 29, 2000 Mr. Mark Kislyuk Creative Developers 84 Willow Brook Road Long Meadow, MA 01106 Re: Pleasant Meadows SRD Dear Mr. Kislyuk: On November 29, 2000, a meeting was held at the South Windsor Town Hall with representatives of your firm and Town staff(C. Fred Shaw, Superintendent of Pollution Control, Jerry C. Iazzetta, P.E., Town Engineer, and Tracy A. LaPiene, Project Engineer)to discuss problems concerning the installation of the sanitary sewer at Pleasant Meadows. It was indicated that your contractors did not install the sanitary sewer main or the laterals to units 1-4 as per either the approved plans or the approved change order. Mr. Shaw stated that the installation is unacceptable and must be rectified to comply with the approved change order plans. It was also indicated that part of the sanitary main was installed without any inspection by the Town. Mr. Iazzetta stated that test pits must be dug at several locations to determine if this part of the main was installed in accordance with Town Standards. We stated that the permit for the sanitary sewer installation had expired and a new permit was required before any other work, including test pits, was started. In addition, it was stated that before any sanitary pipe is brought into any unit, a permit will be required for each unit, and in addition to the permit fee, a connection charge of$750 plus the pro rated sewer user fee must be paid for each unit. To date, none of the corrective work, test pits or permits for connection to the units has been completed. If you have any questions, please call me at 644-2511, extension 245. V truly yours, Je Ia tta, P.E. T n En ' r JCl/awp c: Michael J. Gantick, P.E., Director of Public Works Barry Guliano, Esq. Marcia A. Banach, Director of Planning C.Fred Shaw, Superintendent of Pollution Control Tracy A. LaPiene, Project Engineer File ;i s:\ENGINEER\Prof:P&Z Wetland App\Pleasant Meadow\7CIIMdec29 ._� toL old .1 Vie le ------------ toots 4u�v<4& ---,L �- UNU,�ryw AA �1101N SF44� Sotzl% ?d&u:l s ` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 '�pSOR-CO AREA CODE 860 /644-2511 December 14, 2000 RE: Pleasant Meadows Street Excavation Permit # 3056 Mr. Robert J. Fijol R.J. Fijol, Inc. P.O. Box 396, 600 Old West Warren Rd West Warren MA 01092 Dear Mr. Fijol: This letter is to act as a confirmation of our phone conversation on 12/13/00 at approx. 12:50 pm. During our conversation I informed you that the Director of Public Works had expressed that your street cut for the water main connection in Pleasant Valley Road represents a traffic safety hazard. Per the Town's specifications this area must be restored by your firm within 12 hours after our phone conversation or the Town will have the work done and bill your firm for the work and may attach your bond to ensure payment. The open excavation is required to be backfilled, the material piled in the roadway is to be removed and the temporary patch is to be placed. You stated that you would ensure that this work will be done in the time allotted. If you have any questions please call me at (860) 644-2511 ext 257. Sincerely, �0 Mr. Tracy A. LaPiene Project Engineer tal cc: Jerry C. lazzetta, Town Engineer Joseph Perna, Project Engineer Melvin Stead, Director of Public Works TRANSMISSION VERIFICATION REPORT TIME 12/14/2000 15:26 DATEJIME 12/14 15:25 FAX NO./NAME 914134367668 PAGE(S) DURATION 00:00:41 01 RESULT 0K MODE STANDARD i 0 • • �/ u 0 wn 0 S'ou 9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 e•Co�'�� AREA CODE 860 /644-2511 November 14, 2000 A� R. J. Fijol, Inc. Excavating Contractors P.O. Box 396 600 Old West Warren Road West Warren, MA 01092 RE: PAVING AFTER OCTOBER 15, 2000 Dear Mr. Fijol: Please be advised that this Department is in receipt of your request to pave after October 15"at Pleasant Meadow Senior Housing. Paving will be permitted only if the following conditions are met. 1. Weather conditions must be favorable-no paving in adverse weather. Temperature must be 40'F or warmer at start of paving. 2. Base surface of road/driveway must be 40'F or warmer. NO paving if there is frozen ground, snow/wet base conditions. 3. Owner must notify Town Engineering Division 24 hours in advance of anticipated paving date. 4. NO paving is to begin until Town has inspected site the day of paving. 5. Paving operation to follow DOT Form 814A specifications. 6. Per the Town of South Windsor Public Improvement Specifications, two (2) inches of binder course and one and one-half (1-1/2) inches minimum surface course shall be placed if paving is done after October 15'or before April 15'. Should you fail to follow the conditions noted above, we may not accept/approve the improvements to your project. Should you have any questions regarding this matter, please feel free to contact this office. Very truly yours, Michael J. Gantick, P.E. Director of Public Works MJCCJjsv cc: Jerry C. Iazzetta, Town Engineer Melvin C. Stead,Jr., Supt. of Street Services Scott C. Lappen, Street Service Specialist Tracy A. LaPiene, Project Engineer Joseph J. Perna, Project Engineer R. J. FIJOL, INC . EXCAVATING CONTRACTORS P.O. BOX 396, 600 OLD WEST WARREN RD. WEST WARREN, MASS. 01092 TELEPHONE 436-5674 Av.FA C,09E 413 ~~ C KU November 9, 2000 NOV 13 200o WRHWIM 61 Michael Gantick O G Director of Public Works So. Windsor, Ct 06074 Dear Sir: We are hereby requesting permission to pave the base coat, after the October 15th deadline, on Pleasant Valley Road for the Pleasant Meadow Senior Housing Project. Sincerely, E!reT&ident R. J. Fijol, Inc. y 011H 34rq4 0 y ` 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 { OR•CO AREA CODE 860 / 644-2511 �S September 13,2000 Ms.Karen Isherwood Design Professionals,Inc. 165 South Satellite Road South Windsor,CT 06074 RE: Change Order for Pleasant Meadow Senior Residence Development 1140 Pleasant Valley Road South Windsor,CT Dear Ms.Isherwood: The South Windsor Water Pollution Control Authority,at its regular meeting of September 5,2000,gave approval for the change order for Pleasant Meadow Senior Residence Development at 1140 Pleasant Valley Road,as more specifically shown on plans entitled"Pleasant Valley Senior Residence Development", prepared by Design Professionals,Inc,Project No.99-1272,Drawing No(s).d:991272/991272-sp,dated 2-1-2000,revised 3-8-00,3-13-00,3-31-00,5-9-00,Sheet#3 of 7 and subject to the following conditions: 1. Technical approval of the Town Engineering Department. 2. Final Authority approval and acceptance of the sanitary sewerage connection will be given once the sewer line has been installed and inspected by the Town staff,and based upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans previously approved by the Authority,and meeting all Town regulations and appropriate technical specifications relating to sanitary sewer construction. 3. Approval includes a stipulation that the common pipes against the leading wall in the basement shall be 8"and exposed. 4. A financial statement be provided,including a draft of budgetary provisions showing that money will be set aside to cover maintenance,repair and replacement of the private sewer system. This approval letter must be superimposed on the final approval plans. Very truly yours, Thomas Hindson,Chairman Water Pollution Control Authority TH:dd CC: Matthew Galligan,Town Manager Michael J.Gantick,Director of Public Works t Jerry Iazzetta,Town Engineer / �r Marcia Banach,Director of Planning ! John Collins,Chief Building Inspector South Windsor Estates,LLC WPCA Robert Lugh,Plant Supervisor JUN-22-00 07 : 11 AM R J FIJOL INC 14134367668 P. 01 i . 1 R . J . RJOL, INC . EXCAVA*nNG CONTRACTORS 600 Old West Warren Rd. . WEST WARREN, MASS 01002 oil TEL 436.5674 �? DATE: NAME OF COMl°ANY: { 0 � NUMBER OF PAGES: ATTENT ION: e - `.. MESSAGE OR COMMENTS s � (�*o2 �s Vl u 5 � 3 1—.ow � S� � v� O� �l.� ;�� •. sex ar 1 �7T�Y .•p.���ir • .�.ipi .,..r�r.1�11Pimm�il�w.� ( t 1 OUR FAX NpMBZt, IS: 4.13c436;7668 PLEASE NOTE: WE ARE NOT IN A TOUCH TONE AREA AND MUST MAN ALLY' }� •• OPERATE OUR FAX MACHINE. YOU MUST CALL AND SPEAK TO SC)MEONE.PRIOR TO FAXING. i �4pWN SF,<� r e � co 9 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 e � �'�psoR•c0N��v AREA CODE 860/644-2511 May 12, 2000 South Windsor Estates LLC 85 Willowbrook Rd. Longmeadow, MA 01106 MAY 15 2000 SOR Dear Sir/Madam: sc;,G.DE T. Re:Preconstruction Meeting—App100-07P, Pleasant Meadow IN ATTENDANCE Michele Lipe Town of South Windsor 644-2511 Jerry Iazzetta Town of South Windsor 644-2511 Tadeus Bukowski Contractor 413-596-3914 Mark N. Kislyuk Developer Karen Isherwood Design Professionals, Inc. The following is a brief summary of points discussed during the meeting: Erosion and Sedimentation Control 1. All erosion and sedimentation control measures_are to be in glace prior to earth moving operations in each area and maintained/cleaned out during construction. Call Jeffrey Folger, Zoning/Wetlands Enforcement Officer for inspection when measures are in place, prior to commencement of site work or if any problems/concerns arise during construction. 2. All topsoil stockpile areas to be protected(ringed with haybales or equal). 3. During construction of the driveway a crushed stone tracking pad is to be installed and maintained to minimize tracking of dirt/gravel on to Pleasant Valley Rd. Calcium chloride or water is to be used for dust control as required. Public Works 1. Three complete sets of approved/revised plans to be provided to Town prior to start of construction. They will be stamped by the Planning Department along with plans developer needs. Only approved plans are to be used on the job site. 2. The Public Works Department is to be notified forty-eight (48) hours prior to the start of major construction work with inspections and testing per Developers Checklist required for the following: a. After site is staked out 20. Extra care must be taken when compacting around structures such as catch basins and manholes. These spots often become problem areas in the future due to settling, therefore, the town staff/inspectors will be requesting additional compaction tests in these areas. 21. Sanitary lateral locations should be tied down to existing structures and shown on the progress as-builts. 22. During construction of individual sanitary sewer house laterals, the contractor shall prepare an as-built sketch on standard form provided by the Engineering Department. This form should be submitted to the design engineer/surveyor for their use in preparing the as-built plan. The Engineering Department suggests that the contractor also show locations of foundation drains and water laterals on this form. Planning Doa=ent 1. Landscaping is to be installed in accordance with the approved landscaping plan. If there are changes required, contact the Planning Dept. Additional landscaping installed on one part of a site will not preclude planting all of the remaining items shown on the landscaping plan. Landscape plan must be modified to reflect the approval conditions. 2. Revised floor plan showing the 1400 sq. ft. maximum for all units. 3. A copy of the restrictive covenants governing the age of the occupants must be submitted. 4. A landscape bond in the amount of$3,000 and IWA/CC bond in the amount of$8,000 and quantity estimate form must be submitted prior to the filing of mylars. 5. No building permits will be issued until the mylar is on file. 6. Army Corp. approval must be submitted before any activity is started. SNE 1. Contact utilities for coordination of utilities connection. Fire Marshal 1. Blasting(if required)to be coordinated with the Fire Marshal. Police Service 1. Emergency phone numbers for the duration of the construction must be provided to Police Services on a company letterhead. If the developer occupies or owns the building after construction emergency numbers must be provided to Sgt. Tom Field in Police Services. 2. All buildings located on property that abuts a public highway must be numbered and visible from the street. All numbering shall comply with Town Ordinance 6-800 through 6-802. �p PLANNING DEPARTMENT 'TRANSMITTAL DATE: 4r/,L/jt,0 WE ARE SENDING YOU: O PZC initial plans O Drainage computations O PZC revised plans O Bond estimate request t PZC Final plans for review O Bond reduction request O PZC Final plans for filing O Correspondence O IWA/CC plans O Other NO.OF COPIES APPLICATION NUMBER PROJECT/APPLICANT THESE ITEMS ARE TRANSMITTED: RFor review and comment - O For your files O For your use O As requested O Other PLEASE RETURN/COMMENT BY: CO S: j, 2000 y 7 _ � t Copy to: From: Planning Department- 10/98 q�W N sf� pCl) F 9 w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 �IN�SoR-CO AREA CODE 203/644-2511 •� r April 6, 2000 South Windsor Estates, LLC �.. 84 Willowbrook Road - Longmeadow, MA 01106 ®®Q APR �- RE: Pleasant Meadow Pleasant Valley Road SOUTH WINDSOR, CT Gentlemen: The South Windsor Water Pollution Control Authority, at its regular meeting of April 4, 2000, gave approval for the connection to the Burr Meadows sewer of a 20-unit Senior Residence Development at Pleasant Valley Road, as more specifically shown on plans entitled "Pleasant Meadow—Senior Residence Development— 1140 Pleasant Valley Road—South Windsor- Connecticut" prepared by Design Professionals, Inc., Job No. 99-1272, Drawings No. 3/6 and 4/6 dated February 1, 2000,.revised 3-8-00 (Rev. 1), 3-13-00 (Rev. 2), and 3-31-00 (Rev. 3) , and subject to the following conditions: 1. Technical approval of the Town Engineering Department. 2. Final Authority approval and acceptance of the sanitary sewerage connection will be given once the sewer line has been installed and inspected by the Town staff, and based upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans previously approved by the Authority, and meeting all Town regulations and appropriate technical specifications relating to sanitary sewer construction. 3. Applicant shall provide final drawings incorporating revisions discussed during the April 4, 2000 WPCA meeting: the name change to Pleasant Meadow, the elevation change at Manhole#6 from 91.65' to 97', and the elevation change at Manhole#7 from 91' to 95.35'. 4. Easements between the Burr Meadow and Pleasant Meadow Condominium Associations shall be reviewed by and to the satisfaction of the Town Attorney. r :j �i SowN 8E,`� Tawn O-P sou& CA s 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 R•co �w AREA CODE 860 /644-2511 CERTIFIED MAIL April 6, 2000 APR South Windsor Estates LLC 6 ZQQQ 84 Willowbrook Rd. SDUNWINDSOR Longmeadow, MA 01106 Dear Madam/Sir: ' Re: Appl#00-07P,Pleasant Meadow Special Exception and Site Plan We are pleased to advise you that the Planning&Zoning Commission voted on March 28, 2000, to approve with modifications the above referenced application for a Special Exception and Site Plan of Development. This approval is for the construction of a senior residence development on property located on the north side of Pleasant Valley Rd., RR zone as shown on plans prepared by Design Professionals, Inc., Job No. 99-1272 dated 2/1/00, as revised. This approval is subject to the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. -No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission, including a bond in the amount of$8,000. 4. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.10 of the Zoning Regulations. 5. Footing drains are required if the building has a basement. 6. Landscape bond in the amount of$3,000 is required and must be submitted prior to filing of mylars. 7. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 8. WPCA approval is required. 9. Engineering comments of 2/16/00 addressed to the Town Engineer's satisfaction.