HomeMy WebLinkAboutWPCA 233 Sullivan Avenue (2) Cn
C011
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074
f�OSOR-CO TELEPHONE (860) 644-2511
May 15, 2015
Daniel W. Kellner
389 Slater Street
South Windsor, CT 06074
Re: 233 Sullivan Avenue, South Windsor, CT
WPCA Approval
Dear Mr. Kellner:
The South Windsor Water Pollution Control Authority, at its special meeting of May 5, 2015,
approved the application as presented for connection to the Town's sewerage system for existing
office building located at 233 Sullivan Avenue, South Windsor, CT. This approval is subject to
the following conditions:
1. Installation of a water utility meter;
2. Installation of a monitoring manhole is not required;
3. Payment of a commercial connection charge in the amount of $3,811 if connection
made before Julyl, 2015;
4. Technical approval of the Town of South Windsor Engineering Department;
5. Final Authority approval and acceptance of the sanitary sewerage connection will be
conditional upon the installed sewer line having been inspected by the Town staff,
and upon the written verification of the Town staff that said sanitary sewer line was
installed in substantial conformance with the design plans approved by the Authority,
and meeting all regulations and appropriate technical specifications relating to
sanitary sewer construction.
This approval letter must be superimposed on the final approval plans.
Very truly yours,
and Aries, Chairman
Water Pollution Control Authority
RA:ead
cc: Michael J. Gantick,Director of Public Works
Jeff Doolittle, Town Engineer
Michele Lipe, Director of Planning
Chris Dougan, Chief Building Inspector
TOWN OF SOUTH WINDSOR
WATER POLLUTION CONTROL AUTHORITY
APPLICATION FORM
Application No.:
Date Received
Date Scheduled For
Applicant nanlel GU.. ,eelln r
Address 33 SWZZ(/Cf/9 e)/
Telephone No.: &400-Y30 119,,2V
Owner of Record on Land Records po/?ja IV- ,ee/f/7 .1'
Owner's Address .30-9 SIQ16- 3f -00,1h C T 4Qe7-`/
Property Description:
Assessor's Map #97.300a Parcel# l - Vol. ?L12q Page 1-1 S
Project Title: a33 Su>o®tlan due
Inquiries to be Directed to: (Name,Address,Telephone No.) wn) i YMner - ?sq Sla/`e-r-
�f l,[)i n-YJOr, 6 T Q YO7 V ELM-N310
Approvals Previously Received(Check) IWA P&Z ZBA
Purpose of Application: (Check all that apply)
1. Sewer Extension/Connection- -Residential Use
a. Subdivision
b. Single Unit
c. Other Explain
d. Type of Approval: Concept Final
2. Sewer Extension/Connection - - Industrial/Commercial User
a. New Connection X
b. Request to Increase Flow Rate
c. Change in Nature of Waste Discharge
d. Other Explain
e. Type of Approval: Concept Final
3. Appeal of Sewer User Charge
a. Residential
b. Industrial/Commercial
4. Sewer Assessment
a. Establish Sewer Assessment
b. Appeal of Sewer Assessment
c. Change in Use of Property
5. Regulatory Appeal , Explain
6. Other Explain
k1Z2
a A6
Ypp'licant's Signature Date
c,� LCe 3 y//S--
7
Owner's Signature Date
(See Reverse Side for Application Submittal Procedures)
z
KELLa
9 now ft%mv bbwetmiav, %efft
-A GIMB
488 Sullivan A".
South Windsor, Goren. 00074
Tel.M].
VWIA oAvt
10'°
` she d
IL
oil
vbottecf by
U
f