HomeMy WebLinkAboutApp15-20P Shea & Company Real Estate TOWN OF SOUTH WINDSOR
PLANNING &ZONING COMMISSION
APPLICATION FORM
Application Number: 15-00P RECEIVED
Official Receipt Date: - j5 MAR ', 12015
t.'
Munis ApplicationJ#: a®, CAD r
SOUTH WI NDSOR PLANNING DEPT.
APPLICANT: Shea &Company Real Estate, LLC G ( G '7 70 Q
PROJECT NAME: Shea &Company Real Estate, LLC
COMPLETE LOCATION OF PROPERTY: 49 Oakland Road
OWNER OF RECORD ON LAND RECORDS: K&M Partners, LLC
OWNER ADDRESS: 1750 Ellington Road South Windsor,CT 06074
GIS PIN # 65700049 ZONE RC
NAME, ADDRESS, TELEPHONE & EMAIL ADDRESS OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED:
Benjamin P.Wheeler, PLA Design Professionals, Inc. 21 Jeffrey Drive South Windsor, CT 06074
860-291-8755 bwheeler@dpinc.co ►'D C.0B 14 Cn!&� Estimated presentation time: 10 min.
THIS APPLICATION IS FOR: (Check all that apply):
❑ Zone Change to (Public Hearing and Certificate of Mailing Required)
❑ Open Space Subdivision/Resubdivision (Public Hearing and Certificate of Mailing Required)
❑ Subdivision ❑ Minor ❑ Major
❑ Resubdivision (Public Hearing Required) ❑ Minor ❑ Major
❑ Conditional Subdivision
❑ Special Exception to Table (Public Hearing and Certificate of Mailing Required)
❑✓ Site Plan of Development New ❑ Modification Building(s) Sq Ft 0
❑ General Plan of Development
❑ Dept of Motor Vehicle License - State Hearing per Section 14-55 for
❑ Earth Filling (Sec. 7.6) and/or Earth Removal (Sec. 7.16) (Public Hearing and Certificate of Mailing Required)
❑ Regulation Amendment ❑ Zoning ❑ Subdivision -Attach proposed amendment (Public Hearing Required)
❑ Temporary and Conditional Permit (Public Hearing and Certificate of Mailing Required) for
❑ Temporary and Conditional Permit Renewal (Certificate of Mailing Required) for
Detached In Law Apartment or ❑Accessory Apartment (Public Hearing and Certificate of Mailing Required)
❑ Major Home Occupation (Certificate of Mailing Required) for
❑ Other (explain in detail)
*An Application Pending Sign is required to be posted on the property for all applications ten(10) days
prior to being heard by the Commission.
Signature of Applicant Signature of Property roperty Owner
RECEIVED
P.O.BOX 1167
Mri t/ 2015 21 JEFFREY DRIVE
SOUTH WINDSOR,CT 06074
�n SOUTH MNDSOR PLAWNG DEFT. PHONE:860.291.8755
FAX:8onalsi .8757
c.com
vwvw.designprofessionalsinc.com
CIVIL & TRAFFIC ENGINEERS / PLANNERS / SURVEYORS / GIS ANALYSTS / LANDSCAPE ARCHITECTS
Serving Connecticut, Massachusetts, *Rhode is/and
•
•
•
•
• LETTER OF TRANSMITTAL
To: Michele Lipe Date: 3/17/2015 DPI Project No. 3297
Director of Planning Re: Shea&Company Real Estate, LLC
Town of South Windsor 49 Oakland Road
South Windsor, CT
• 06074
WE ARE SENDING YOU: ® Attached ❑ Under separate cover via the following items:
❑ Shop Drawings ❑ Prints ❑ Renderings ❑ Specifications
: ❑ Copy of Letter ❑ Change Order ® P&Z, I.W., &W.P.C.A.Applications
COPIESDATE NO. DESCRIPTION
5 3/17/2015 1 Site Plans
2 3/17/2015 2 Storm Drainage Report
1 3/17/2015 3 P&Z Application
1 3/17/2015 4 W.P.C.AApplication
15 3/17/2015 5 Inland Wetlands Application
1 3/17/2015 6 Checks for$160 and$260
• These are transmitted as checked below:
® For Approval ❑ No exceptions taken ❑ Resubmit copies for approval
• ❑ For your use ❑ Make corrections ❑ Submit copies for distribution
❑ As requested ❑ Revise and Submit ❑ Return corrected prints
❑ For review and comment ❑ Forbids due ❑ Prints returned after loan to us
REMARKS:
RECEIVED RECEIVED
MAR a 2Q 15
• MAR 1 l 201 5
SOUTH Mf INDSOR PLANNING DEFT. s.out
SIGNED: CC:
Page of
ar.
htt
e'
f st
• ' • 1• -b•. . • dg' 11 11 1 ' 3/18/2015
15 - 7 0, fP
RECEIVED
1
MAR 17 2015
South Wintlsor
U."WETI ANDS AGENCY
CONSERVATION COMAMSSION
SOH WINDS0�4 PtANt� DEPT.
' Storm Drainage Report
Shea & Company Real Estate, LLC
' 49 Oakland Road
South Windsor, Connecticut
�0XI Illfllr.
e ` �
Prepared by: .l �
° :,
Design Professionals, Inc. ;, " �+
' 21 Jeffrey Drive, PO Box 1167
South Windsor, CT 06074
'
March 17, 2015 Is
1
1 Table of Contents
Section
Pa e
1 Introduction 1
Pre-Development Site Conditions 1
1 Post-Development Site Conditions 1
Analysis of Results 2
Conclusion 3
1
1 Appendices
A Watershed Computations (Pre-Development Conditions)
1 B Watershed Computations (Post-Development Conditions)
C Design Criteria
D Drainage Area Maps
1 Existing Conditions (DA-1)
Proposed Conditions (DA-2)
E SC-740 Technical Data
1
1
i
1
1
1
1
1
1
1 1. Introduction
Shea&Company Real Estate,LLC is proposing to develop a 0.928 acre parcel located at
49 Oakland Road in South Windsor, Connecticut. The proposed development will
include the construction of a 5000 square foot parking lot with a stormtech drainage
1 system. Refer to the site plan drawings, entitled—"Shea& Company Real Estate, LLC,
49 Oakland Road, South Windsor, Connecticut, prepared by Design Professionals, Inc,
dated March 17, 2015", as amended, for information regarding the proposed property
development.
2. Pre-Development Site Conditions
The surficial characteristics of the site can primarily be classified as grass and impervious
surfaces. A vast majority of the site drains to a wetland area located to the east of the
parcel. All other stormwater flows drain to the west abutting property or north to
catchbasins located along Oakland Road. Refer to the Existing Conditions Drainage
Area Map included in Appendix D for watershed delineations.
I In order to establish a hydrologic comparison between re- and post-
development
conditions, an evaluation was performed to quantify the peak rate of stormwater
discharge to each of the designated areas within and off the site. The Rational Method as
Outlined in the 2000 Connecticut Department of Transportation Drainage Manual, was
' followed in predicting the peak rates of runoff and volumes. Hydraflow Hydrographs
(version 2012) computer modeling software was used as application. Refer to Appendix
C for design criteria implemented.
The peak rate of stormwater runoff discharging to the wetland systems, and neighboring
properties were determined for the 2-, 10-, 25-, and 100-year storm events. Refer to
Appendix A for the pre-developed conditions watershed computations.
3. Post Development Site Conditions
Shea& Company Real Estate, LLC is proposing to remove the existing paved driveway
and replace it with a new driveway serving a 10 space parking lot. The right of way area
that fronts the site to the north will be graded to reduce the peak flows to Oakland Road.
Grading of the parking lot will direct all stormwater to a catchbasin located at the
northeast corner of the lot. The catchbasin will be linked to a Stormtech infiltration
system comprised of three SC-740 units. Technical data for the SC-740 units can be
found in Appendix E. The units have been selected based on their ability to retain runoff
volumes for up to a 100 year storm. If flows exceed the storage capacity of the system, an
emergency overflow pipe is proposed to convey all overflow to the wetland area. A
riprap swale is proposed as outlet protection to reduce the velocity of water,thus
decreasing the energy available to cause erosion as the overflow drains to the wetland
area. Due to proposed grading of the parking lot area,the total area that drained to the
west abutting property under existing conditions was reduced. Therefore,there will be a
reduction of peak flows to the west abutting property. Refer to the Proposed Drainage
1
Area Map located in Appendix D for proposed watershed delineations. All proposed
drainage watershed analysis computations can be found in Appendix B.
4. Analysis of Results
The proposed drainage system discussed above and existing conditions were modeled in
Hydraflow Hydrographs (version 2012) computer modeling software to generate peak
discharge rates for runoff leaving the site. Based on modeling from existing conditions,
three discharge locations were identified as locations of interest for assessing effects to
peak discharge flows. The following tables contain the data generated from the
Hydraflow software. Peak discharge rates and total stormwater volumes were recorded as
follows:
TABLE 1
Peak Rate of Stormwater Discharge&Runoff Volume
Runoff Rate
Pre-developed Post-developed Net Change
Watershed Storm Event Condition Condition Rate of Runoff
Area (Year) (ft3/second) (ft3/second) (ft3/second)
2 0.05 0.04 -0.01
Discharge to 10 0.07 0.05 -0.02
Oakland Road 25 0.08 0.06 -0.02
i
100 0.09 0.07 -0.02
Discharge to 2 0.35 0.15 -0.20
West Abutting 10 0.46 0.19 -0.27
Property 25 0.51 0.22 -0.29
100 0.59 0.25 -0.34
2 0.45 0.45 0.00
Discharge to 10 0.60 0.59 -0.01
Wetland Area 25 0.68 0.66 -0.02
100 0.79 0.77 -0.02
2
2
droara h Return Period Re �
kyqg l�1.Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk,Inc.v10
!yd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph
. type hyd(s) Description
(origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr
1 Rational ---- ------- 0.049 ------ 0.061 0.068 0.079 0.086 0.094 NORTH WEST DRAINAGE TO OAKL
2 Rational ------ ----- 0.346 ----- 0.414 0.452 0.505 0.550 0.588 EXISTING DRIVEWAY DRAINAGE T
3 Rational --- ------- 0.024 ------ 0.030 0.036 0.042 0.048 0.053 SOUTH WEST ROOF DRAINAGE T
4 Rational ----- ------ 0.171 ------ 0.216 0.255 0.300 0.339 0.379 SOUTH DRAINAGE TO WETLAND A
5 Rational ---- ------- 0.125 ------ 0.150 0.164 0.183 0.199 0.213 SOUTH EAST DRAINAGE TO WETL
6 Rational ---- ------ 0.327 --- 0.395 0.433 0.488 0.532 0.570 NORTH EAST DRAINAGE TO WETL
7 Rational ---- -- 0.028 - 0.033 0.036 0.040 0.044 0.047 NORTH EAST DRAINAGE TO OAKL
8 Combine 1,7 ------ 0.049 ------- 0.061 0.068 0.079 0.086 0.094 Flow To Oakland Road
9 Combine 2,3, ------ 0.348 ----- 0.417 0.455 0.509 0.555 0.593 Flow to West Abutting Property
10 Combine 4,5,6, ------ 0.452 -- 0.545 0.600 0.677 0.740 0.794 Flow to Wetland Area
Proj. file: Existing Conditions-3297.gpw Tuesday, 03/ 17/2015
3
Summary Re ortkiydrograph Hydraflow Hydrographs Extension for AUtoCAD®Civil 3D®2013 by Autodesk,Inc.v10
yd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
o. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cult) (ft) (cuft)
1 Rational 0.049 1 12 34 ----- ---- ---- NORTH WEST DRAINAGE TO OAKL
2 Rational 0.346 1 5 104 --- ----- ---- EXISTING DRIVEWAY DRAINAGE T
3 Rational 0.024 1 52 74 ----- ------ ----- SOUTH WEST ROOF DRAINAGE T
4 Rational 0.171 1 42 431 ----- ----- -- - SOUTH DRAINAGE TO WETLAND A
5 Rational 0.125 1 5 38 ---- --- --- SOUTH EAST DRAINAGE TO WETL
6 Rational 0.327 1 6 118 ------ --- -- NORTH EAST DRAINAGE TO WETL
7 Rational 0.028 1 5 8 ---- -- ---- NORTH EAST DRAINAGE TO OAKL
8 Combine 0.049 1 12 40 1,7 ------ ------ Flow To Oakland Road
9 Combine 0.348 1 5 178 2,3, --- ---- Flow to West Abutting Property
10 Combine 0.452 1 6 587 4,5,6, -- -- Flow to Wetland Area
Existing Conditions-3297.gpw Return Period: 2 Year Tuesday, 03/17/2015
Hydrograph Report 4
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3130 2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 1
NORTH WEST DRAINAGE TO OAKLAND ROAD
Hydrograph type = Rational Peak discharge = 0.049 cfs
' Storm frequency = 2 yrs Time to peak = 12 min
Time interval = 1 min Hyd. volume = 34 cuft
Drainage area = 0.030 ac Runoff coeff. = 0.5*
' Intensity = 3.250 in/hr Tc by TR55 = 11.59 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
*Composite(Area/C)_[(0.010 x 0.90)+(0.020 x 0.30)]/0.030
NORTH WEST DRAINAGE TO OAKLAND ROAD
Q (cfs) Q (cfs)
Hyd. No. 1 --2 Year
I0.10 - - -- _ 0.10
-
-
0.08 0.08
0.07 0.07
0.06 0.06
0.05 0.05
0.04 - _ 0.04
-- -
0.03 0.03
0.02 0.02
0.01 0.01
0.00 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24
Hyd No. 1 Time(min)
TR55 Tc Worksheet 5
1 �
Hydraflow Hydrographs Extension for AUtoCAD®Civil 3D®2013 by Autodesk, Inc.v10
Hyd. No. 1
' NORTH WEST DRAINAGE TO OAKLAND ROAD
Description A B C Totals
' Sheet Flow
Manning's n-value = 0.240 0.011 0.011
' Flow length (ft) = 33.1 23.2 0.0
Two-year 24-hr precip. (in) = 3.20 3.20 0.00
Land slope (%) = 0.40 2.00 0.00
' Travel Time (min) = 11.21 + 0.38 + 0.00 = 11.59
' Shallow Concentrated Flow
Flow length (ft) = 0.00 0.00 0.00
Watercourse slope (%) = 0.00 0.00 0.00
' Surface description = Paved Paved Paved
Average velocity (ft/s) =0.00 0.00 0.00
' Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Channel Flow
' X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter(ft) = 0.00 0.00 0.00
' Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
0.00
0.00
Flow length (ft) ({0})0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Total Travel Time,Tc.............................................................................. 11.59 min
Hydrograph Report 6
' Hydraflow Hydrographs Extension for AUtoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 2
EXISTING DRIVEWAY DRAINAGE TO WEST
Hydrograph type = Rational Peak discharge = 0.346 cfs
' Storm frequency = 2 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 104 cuft
Drainage area = 0.130 ac Runoff coeff. = 0.58*
Intensity = 4.590 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' *Composite(Area/C)_[(0.060 x 0.90)+(0.070 x 0.30)]/0.130
EXISTING DRIVEWAY DRAINAGE TO WEST
Q (cfs) Hyd. No. 2--2 Year Q (cfs)
0.50 - - - 0.50
0,45 -_ - - 0.45
0.40 - - - - - 0.40
0.35 0.35
0.30 --
0.30
0.25 0.25
-
-
' 0.20 - 0.20
0.15 - - -- -
- -- 0.15
0.10 0.10
- -
0.05 0.05
0.00 0.00
0 1 2 3 4 5 6 7 8 9 10
' Hyd No. 2 Time(min)
Hydrograph Report 7
Hydraflow Hydrographs Extension for AutoCAM Civil 3D®2013 by Autodesk,Inc.v10 Tuesday,03!17 12015
Hyd. No. 3
' SOUTH WEST ROOF DRAINAGE TO WEST
Hydrograph type = Rational Peak discharge = 0.024 cfs
Storm frequency = 2 yrs Time to peak = 52 min
Time interval = 1 min Hyd. volume = 74 cuft
Drainage area = 0.040 ac Runoff coeff. = 0.45*
' Intensity = 1.324 in/hr Tc by TR55 = 52.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' Composite(Area/C)_[(0.010 x 0.90)+(0.030 x 0.30)]/0.040
SOUTH WEST ROOF DRAINAGE TO WEST
Q (cfs) Q (cfs)
Hyd. No. 3--2 Year
0.10 0.10
0.09 0.09
0.08 0.08
0.07 0.07
0.06 - - - 0.06
0.05 - 0.05
.._..... .. .......
' 0.04 - - -
-- -- 0.04
0.03 0.03
0.02
-
0.02
0.01
0.01
0.00 - - - 0.00
0 10 20 30 40 50 60 70 80 90 100 110
' Hyd No. 3 Time(min)
TR55 Tc Worksheet 8
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10
Hyd. No. 3
SOUTH WEST ROOF DRAINAGE TO WEST
Description A B C Totals
' Sheet Flow
Manning's n-value = 0.011 0.240 0.011
' Flow length (ft) = 10.0 290.0 0.0
Two-year 24-hr precip. (in) = 3.20 3.20 0.00
Land slope (%) = 2.00 0.70 0.00
' Travel Time (min) = 0.19 + 50.90 + 0.00 = 51.10
Shallow Concentrated Flow
Flow length (ft) = 77.04 0.00 0.00
Watercourse slope (%) = 0.70 0.00 0.00
' Surface description = Unpaved Paved Paved
Average velocity(ft/s) =1.35 0.00 0.00
' Travel Time (min) = 0.95 + 0.00 + 0.00 = 0.95
' Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter(ft) = 0.00 0.00 0.00
' Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
0.00
0.00
' Flow length (ft) ({0})0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
' Total Travel Time,Tc.............................................................................. 52.00 min
Hydrograph Report 9
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3130 2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 4
SOUTH DRAINAGE TO WETLAND AREA
Hydrograph type = Rational Peak discharge = 0.171 cfs
Storm frequency = 2 yrs Time to peak = 42 min
Time interval = 1 min Hyd. volume = 431 cult
Drainage area = 0.350 ac Runoff coeff. = 0.32*
' Intensity = 1.528 in/hr Tc by TR55 = 42.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' *Composite(Area/C)_[(0.010 x 0.90)+(0.340 x 0.30)]/0.350
SOUTH DRAINAGE TO WETLAND AREA
Q (cfs) Q (cfs)
Hyd. No. 4--2 Year
' 0.50 0.50
0.45 _ -_ 0.45
0.40 0.40
0.35 0.35
0.30
0.25 _ 0.25
' 0.20 0.20
0.15 -
__ - 0.15
0.10 0.10
0.05001 0.05
0.00 - 0.00
0 10 20 30 40 50 60 70 80 90
' - Hyd No. 4 Time(min)
TR55 Tc Worksheet 10
' Hydraflow Hydrographs Extension for AutoCAD RU Civil 3D®2013 by Autodesk, Inc.v10
Hyd. No. 4
SOUTH DRAINAGE TO WETLAND AREA
Description A B C Totals
' Sheet Flow
Manning's n-value = 0.011 0.240 0.011
Flow length (ft) = 14.8 285.2 0.0
Two-year 24-hr precip. (in) = 3.20 3.20 0.00
Land slope (%) = 1.50 1.50 0.00
' Travel Time (min) = 0.29 + 37.03 + 0.00 = 37.33
' Shallow Concentrated Flow
Flow length (ft) = 520.48 0.00 0.00
Watercourse slope (%) = 1.50 0.00 0.00
' Surface description = Unpaved Paved Paved
Average velocity (ft/s) =1.98 0.00 0.00
' Travel Time (min) = 4.39 + 0.00 + 0.00 = 4.39
Channel Flow
' X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter(ft) = 0.00 0.00 0.00
Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
0.00
0.00
' Flow length (ft) Q0D0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
TotalTravel Time, Tc.............................................................................. 42.00 min
Hydrograph Report 11
' Hydraflow Hydrographs Extension for AutoCADS Civil 3D®2013 by Autodesk, Inc.A 0 Tuesday,03/17!2015
Hyd. No. 5
' SOUTH EAST DRAINAGE TO WETLAND AREA
Hydrograph type = Rational Peak discharge = 0.125 cfs
Storm frequency = 2 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 38 cuft
Drainage area = 0.070 ac Runoff coeff. = 0.39*
' Intensity = 4.590 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' *Composite(Area/C)_[(0.010 x 0.90)+(0.060 x 0.30)]/0.070
SOUTH EAST DRAINAGE TO WETLAND AREA
Q (cfs) Hyd. No. 5--2 Year Q (cfs)
' 0.50 0.50
0.45 0.45
0.40 0.40
0.35 0.35
0.30 0.30
' 0.25 0.25
' 0.20 - 0.20
0.15
0.10 0.10
0.05 0.05
0.00 - - - 0.00
0 1 2 3 4 5 6 7 8 9 10
' Hyd No. 5 Time(min)
Hydrograph Report 12
' Hydraflow Hydrographs Extension for AutoCADO Civil 3130 2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 6
' NORTH EAST DRAINAGE TO WETLAND AREA
Hydrograph type = Rational Peak discharge = 0.327 cfs
' Storm frequency = 2 yrs Time to peak = 6 min
Time interval = 1 min Hyd. volume = 118 cuft
Drainage area = 0.230 ac Runoff coeff. = 0.33*
Intensity = 4.308 in/hr Tc by TR55 = 6.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
*Composite(Area/C)_[(0.220 x 0.30)+(0.010 x 0.90)]/0.230
NORTH EAST DRAINAGE TO WETLAND AREA
Q (cfs) Q (cfs)
Hyd. No. 6 --2 Year
' 0.50 0.50
' 0.45 0.45
0.40 0.40
0.35 0.35
0.30 -
0.30
' 0.25 0.25
0.20 - - 0.20
0.15 --
- _ - 0.15
... ... ....._....._-
0.10 0.10
0.05
' 0.00 - 0.00
0 1 2 3 4 5 6 7 8 9 10 11 12
' - Hyd No. 6 Time(min)
TR55 Tc Worksheet 13
' Hydraflow Hydrographs Extension for AutoCAD@ CIA 3D®2013 by Autodesk,Inc.00
Hyd. No. 6
' NORTH EAST DRAINAGE TO WETLAND AREA
Description A B C Totals
' Sheet Flow
Manning's n-value = 0.240 0.240 0.011
' Flow length (ft) = 33.5 28.0 0.0
Two-year 24-hr precip. (in) = 3.20 3.20 0.00
Land slope (%) = 4.00 46.00 0.00
' Travel Time (min) = 4.51 + 1.47 + 0.00 = 5.98
' Shallow Concentrated Flow
Flow length (ft) = 0.00 0.00 0.00
Watercourse slope (%) = 0.00 0.00 0.00
ISurface description = Paved Paved Paved
Average velocity(ft/s) =0.00 0.00 0.00
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
' Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter(ft) = 0.00 0.00 0.00
' Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
0.00
0.00
' Flow length (ft) ({0})0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Total Travel Time,Tc .............................................................................. 6.00 min
Hydrograph Report 14
' Hydraflow Hydrographs Extension for AutoCAM Civil 3D®2013 by Autodesk,Inc.v10 Tuesday,03/17/2015
Hyd. No. 7
NORTH EAST DRAINAGE TO OAKLAND ROAD
Hydrograph type = Rational Peak discharge = 0.028 cfs
' Storm frequency = 2 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 8 cuft
Drainage area = 0.020 ac Runoff coeff. = 0.3
' Intensity = 4.590 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
Q (cfs) NORTH EAST DRAINAGE TO OAKLAND ROAD
Hyd. No. 7--2 Year Q (cfs)
0.10
0,09 - - 0.09
0.08 - 0.08
0.07 0.07
0.06
0.06
-
' 0.05
0.05
' 0.04 _ - 0.04
_ _ 0.03
0.02 _ - _ 0.02
0.01 -
0.01
r o.00 -
0.00
0 1 2 3 4 5 6 7 8 9 10
Hyd No. 7
Time(min)
II
Hydrograph Report 16
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk,Inc.v10 Tuesday,03 117/2015
Hyd. No. 9
Flow to West Abutting Property
Hydrograph type = Combine Peak discharge = 0.348 cfs
Storm frequency = 2 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 178 cuft
Inflow hyds. = 2, 3 Contrib. drain. area = 0.170 ac
1
1
r
Flow to West Abutting Property
Q (cfs) Q (cfs)
Hyd. No. 9--2 Year
0.50 0.50
0.45 0.45
0.40
0.35 0.35
0.30 0.30
0.25 0.25
r 0.20 _ -
0.20
1
0.10 0.10
0.05 - - 0.05
0.00 0.00
0 10 20 30 40 50 60 70 80 90 100
Time(min)
Hyd No. 9 Hyd No. 2 Hyd No. 3
r
Hydrograph Report 17
rHydraflow Hydrographs Extension for AutoCAD®Civil 3138 2013 by Autodesk,Inc.v10 Tuesday,03/17/2015
Hyd. No. 10
' Flow to Wetland Area
Hydrograph type = Combine Peak discharge = 0.452 cfs
rStorm frequency = 2 yrs Time to peak = 6 min
Time interval = 1 min Hyd. volume = 587 cuft
Inflow hyds. = 4, 5, 6 Contrib. drain. area = 0.650 ac
i
r
r
Flow to Wetland Area
Q (cfs) Q (cfs)
Hyd. No. 10--2 Year
' 0.50 0.50
0.45 - 0.45
0.40 - _
0.40
0.35 0.35
1 Al
0.30 0.30
0.25 0.25
0.20 - - 0.20
0.15 0.15
r
0.10 - - 0.10
0.05 - _
0.05
0.00 0.00
0 10 20 30 40 50 60 70 80 90
Time(min)
Hyd No. 10 Hyd No. 4 Hyd No. 5 - Hyd No. 6
r
Hydraflow Rainfall Report 18
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3138 2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Return Intensity-Duration-Frequency Equation Coefficients(FHA)
' Period
(Yrs) B D E (N/A)
1 1 0.0000 0.0000 0.0000 =_---
2 30.1225 6.6000 0.7676
3 0.0000 0.0000 0.0000 --------
' 5 52.3308 9.8000 0.8367 ----
10 54.7383 10.8000 0.8016 --------
25 101.9813 15.8000 0.8971 -------
50 98.1551 15.7000 0.8577 ------
' 100 106.5909 17.0000 0.8462 --------
File name:Connecticut IDF.idf
Intensity=B/(Tc+ D)^E
' Return Intensity Values(in/hr)
Period
(Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60
' 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 4.59 3.49 2.85 2.43 2.13 1.90 1.72 1.58 1.46 1.36 1.27 1.20
' 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 5.49 4.30 3.57 3.06 2.69 2.40 2.17 1.99 1.84 1.71 1.60 1.50
10 5.99 4.81 4.04 3.51 3.11 2.80 2.55 2.35 2.18 2.03 1.91 1.80
25 6.70 5.52 4.71 4.12 3.66 3.30 3.01 2.76 2.56 2.38 2.23 2.10
' 50 7.30 6.06 5.20 4.57 4.09 3.70 3.38 3.12 2.90 2.71 2.54 2.40
100 7.79 6.55 5.68 5.02 4.51 4.10 3.76 3.48 3.24 3.04 2.86 2.70
Tc=time in minutes.Values may exceed 60.
Preci .file name:Hartford County.pcp
' Rainfall Precipitation Table(in)
Storm
Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr
' SCS 24-hour 0.00 3.20 0.00 4.10 4.70 5.50 6.20 6.90
SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
' Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
' Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1HYdrograph19
Summary/ Re ortHydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.00
114yd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft) (ft) (cuft)
1 Rational 0.068 1 12 47 ------ ----- ------ NORTH WEST DRAINAGE TO OAKL
2 Rational 0.452 1 5 135 -- - --- ---- EXISTING DRIVEWAY DRAINAGE T
3 Rational 0.036 1 52 111 ------ ------ ---- SOUTH WEST ROOF DRAINAGE T
4 Rational 0.255 1 42 643 ---- ------ ------ SOUTH DRAINAGE TO WETLAND A
5 Rational 0.164 1 5 49 -- ---- ----- SOUTH EAST DRAINAGE TO WETL
6 Rational 0.433 1 6 156 --- ---- ----- NORTH EAST DRAINAGE TO WETL
7 Rational 0.036 1 5 11 ------ ----- --- NORTH EAST DRAINAGE TO OAKL
8 Combine 0.068 1 12 56 1,7 ------ ------ Flow To Oakland Road
9 Combine 0.455 1 5 247 2,3, ------ ------ Flow to West Abutting Property
10 Combine 0.600 1 6 848 4,5,6, ---- — Flow to Wetland Area
Existing Conditions-3297.gpw Return Period: 10 Year Tuesday, 03/ 17/2015
Hydrograph Report 20
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 1
' NORTH WEST DRAINAGE TO OAKLAND ROAD
Hydrograph type = Rational Peak discharge = 0.068 cfs
' Storm frequency = 10 yrs Time to peak = 12 min
Time interval = 1 min Hyd. volume = 47 cuft
Drainage area = 0.030 ac Runoff coeff. = 0.5*
' Intensity = 4.530 in/hr Tc by TR55 = 11.59 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
"Composite(Area/C)_[(0.010 x 0.90)+(0.020 x 0.30)]/0.030
Q (cfs) NORTH WEST DRAINAGE TO OAKLAND ROAD
Hyd. No. 1 -- 10 Year Q (cfs)
- 0.10
0.08 -
0.08
0.07 0.07
0.06
0.06
' 0.05 -
-_ 0.05
0.04
0.04
0.03 __ __
0.03
0.02
- - _ 0.02
- -
0.01 - _
0.01
0.00 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24
- Hyd No. 1
Time(min)
TR55 Tc Worksheet 21
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10
Hyd. No. 1
' NORTH WEST DRAINAGE TO OAKLAND ROAD
Description A B C Totals
' Sheet Flow
Manning's n-value = 0.240 0.011 0.011
' Flow length (ft) = 33.1 23.2 0.0
Two-year 24-hr precip. (in) = 3.20 3.20 0.00
Land slope (%) = 0.40 2.00 0.00
' Travel Time (min) = 11.21 + 0.38 + 0.00 = 11.59
' Shallow Concentrated Flow
Flow length (ft) = 0.00 0.00 0.00
Watercourse slope (%) = 0.00 0.00 0.00
' Surface description = Paved Paved Paved
Average velocity (ft/s) =0.00 0.00 0.00
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter(ft) = 0.00 0.00 0.00
' Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
0.00
0.00
' Flow length (ft) ({0})0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
TotalTravel Time, Tc.............................................................................. 11.59 min
Hydrograph Report 22
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3DO 2013 by Autodesk, Inc.v10 Tuesday,03/17 12015
Hyd. No. 2
' EXISTING DRIVEWAY DRAINAGE TO WEST
Hydrograph type = Rational Peak discharge = 0.452 cfs
Storm frequency = 10 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 135 cuft
Drainage area = 0.130 ac Runoff coeff. = 0.58*
' Intensity = 5.990 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
*Composite(Area/C)_[(0.060 x 0.90)+(0.070 x 0.30)]/0.130
' EXISTING DRIVEWAY DRAINAGE TO WEST
Q (cfs) Hyd. No. 2-- 10 Year Q (cfs)
' 0.50 - 0.50
0.45 0.45
0.40 0.40
0.35 0.35
0.30 - - - - - - -
0.30
-
' 0.25 - 0.25
0.20 _ 0.20
0.15 - -- -
- - _ - 0.15
0.10 0.10
0.05 0.05
' 0.00 - - 0.00
0 1 2 3 4 5 6 7 8 9 10
' Hyd No. 2 Time(min)
Hydrograph Report 23
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.00 Tuesday,03/17/2015
Hyd. No. 3
SOUTH WEST ROOF DRAINAGE TO WEST
Hydrograph type = Rational Peak discharge = 0.036 cfs
' Storm frequency = 10 yrs Time to peak = 52 min
Time interval = 1 min Hyd. volume = 111 cuft
Drainage area = 0.040 ac Runoff coeff. = 0.45*
Intensity = 1.982 in/hr Tc by TR55 = 52.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
*Composite(Area/C)_[(0.010 x 0.90)+(0.030 x 0.30)]/0.040
SOUTH WEST ROOF DRAINAGE TO WEST
Q (cfs) Hyd. No. 3-- 10 Year Q (cfs)
' 0.10 0.10
0.09 -- - 0.09
-
0.08 0.08
-
0.07 0.07
0.06 - - - -
0.06
' 0.05 - 0.05
0.03 - - - - - -
- - - 0.03
0001-
0.02 -- -- - - - 0.02
0.01 -
0.01
0.00 0.00
0 10 20 30 40 50 60 70 80 90 100 110
' Hyd No. 3 Time(min)
' TR55 Tc Worksheet 24
Hydraflow Hydrographs Extension for AUtoCAD®Civil 3130 2013 by Autodesk, Inc.v10
Hyd. No. 3
' SOUTH WEST ROOF DRAINAGE TO WEST
Description A B C Totals
' Sheet Flow
Manning's n-value = 0.011 0.240 0.011
' Flow length (ft) = 10.0 290.0 0.0
Two-year 24-hr precip. (in) = 3.20 3.20 0.00
Land slope (%) = 2.00 0.70 0.00
' Travel Time (min) = 0.19 + 50.90 + 0.00 = 51.10
' Shallow Concentrated Flow
Flow length (ft) = 77.04 0.00 0.00
Watercourse slope (%) = 0.70 0.00 0.00
' Surface description = Unpaved Paved Paved
Average velocity (ft/s) =1.35 0.00 0.00
' Travel Time (min) = 0.95 + 0.00 + 0.00 = 0.95
' Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter(ft) = 0.00 0.00 0.00
' Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
0.00
' 0.00
' Flow length (ft) QOD0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
TotalTravel Time, Tc.............................................................................. 52.00 min
Hydrograph Report 25
' Hydraflow Hydrographs Extension for AutoCADO Civil 3130 2013 by Autodesk, Inc.A 0 Tuesday,03/17!2015
Hyd. No. 4
' SOUTH DRAINAGE TO WETLAND AREA
Hydrograph type = Rational Peak discharge = 0.255 cfs
' Storm frequency = 10 yrs Time to peak = 42 min
Time interval = 1 min Hyd. volume = 643 cuft
Drainage area = 0.350 ac Runoff coeff. = 0.32*
' Intensity = 2.277 in/hr Tc by TR55 = 42.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
Composite(Area/C)_[(0.010 x 0.90)+(0.340 x 0.30)]/0.350
SOUTH DRAINAGE TO WETLAND AREA
Q (cfs) Hyd. No. 4 -- 10 Year Q (cfs)
' 0.50 _ 0.50
0.45 -- - -- - 0.45
0.40 0.40
0.35
0.35
0.30 - -
0.30
0.25 0.25
4e"000 or
0.20 - _ - 0.20
0.15 0.15
0.10 0.10
0.05 0.05
' 0.00 - 0.00
0 10 20 30 40 50 60 70 80 90
' Hyd No. 4 Time(min)
' TR55 Tc Worksheet 26
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10
Hyd. No. 4
' SOUTH DRAINAGE TO WETLAND AREA
Description A B C Totals
' Sheet Flow
Manning's n-value = 0.011 0.240 0.011
' Flow length (ft) = 14.8 285.2 0.0
Two-year 24-hr precip. (in) = 3.20 3.20 0.00
Land slope (%) = 1.50 1.50 0.00
' Travel Time (min) = 0.29 + 37.03 + 0.00 = 37.33
' Shallow Concentrated Flow
Flow length (ft) = 520.48 0.00 0.00
Watercourse slope (%) = 1.50 0.00 0.00
' Surface description = Unpaved Paved Paved
Average velocity (ft/s) =1.98 0.00 0.00
' Travel Time (min) = 4.39 + 0.00 + 0.00 = 4.39
' Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter(ft) = 0.00 0.00 0.00
Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
' 0.00
0.00
' Flow length (ft) ({0})0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
' Total Travel Time,Tc.............................................................................. 42.00 min
1
Hydrograph Report 27
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 5
SOUTH EAST DRAINAGE TO WETLAND AREA
Hydrograph type = Rational Peak discharge = 0.164 cfs
' Storm frequency = 10 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 49 cuft
Drainage area = 0.070 ac Runoff coeff. = 0.39*
' Intensity = 5.990 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' Composite(Area/C)_[(0.010 x 0.90)+(0.060 x 0.30)]/0.070
SOUTH EAST DRAINAGE TO WETLAND AREA
Q (cfs) Q (cfs)
Hyd. No. 5-- 10 Year
0.45 - - - _ --__ 0.45
0.40 -
0.40
0.35 0.35
0.30 _ 0.30
0.25 0.25
0.20 - _ - - 0.20
0.15 - -_ 0.15
0.10 0.10
0.05 0.05
0.00 0.00
0 1 2 3 4 5 6 7 8 9 10
Hyd No. 5 Time(min)
Hydrograph Report 28
' Hydraflow Hydrographs Extension for AUtoCAD®Civil 3D®2013 by Autodesk,Inc.v10 Tuesday,03/17!2015
Hyd. No. 6
' NORTH EAST DRAINAGE TO WETLAND AREA
Hydrograph type = Rational Peak discharge = 0.433 cfs
Storm frequency = 10 yrs Time to peak = 6 min
Time interval = 1 min Hyd. volume = 156 cuft
Drainage area = 0.230 ac Runoff coeff. = 0.33*
' Intensity = 5.702 in/hr Tc by TR55 = 6.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
Composite(Area/C)_[(0.220 x 0.30)+(0.010 x 0.90)]/0.230
Q (cfs)
NORTH EAST DRAINAGE TO WETLAND AREA Hyd. No. 6-- 10 Year Q MS)
' 0.50 0.50
-
0.45 0.45
0.40 0.40
-
0.35 0.35
-
0.30 - - 0.30
0.25 - - 0.25
0.20 - - - - -
0.20
0.10 0.10
0.05
0.05
' 0.00 0.00
0 1 2 3 4 5 6 7 8 9 10 11 12
' Hyd No. 6 Time(min)
TR55 Tc Worksheet 29
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10
Hyd. No. 6
NORTH EAST DRAINAGE TO WETLAND AREA
Description A B C Totals
Sheet Flow
Manning's n-value = 0.240 0.240 0.011
Flow length (ft) = 33.5 28.0 0.0
Two-year 24-hr precip. (in) = 3.20 3.20
0.00
Land slope (%) = 4.00 46.00 0.00
' Travel Time min
(min) = 4.51 + 1.47 + 0.00 = 5.98
Shallow Concentrated Flow
Flow length (ft) = 0.00 0.00 0.00
Watercourse slope (%) = 0.00 0.00 0.00
Surface description = Paved Paved Paved
Average velocity (ft/s) =0.00 0.00 0.00
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
' Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter(ft) = 0.00 0.00 0.00
1 Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
0.00
0.00
' Flow length (ft) ({0})0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
TotalTravel Time,Tc.............................................................................. 6.00 min
Hydrograph Report 30
Hydraf low Hydrographs Extension for AutoCAD@ Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 7
NORTH EAST DRAINAGE TO OAKLAND ROAD
Hydrograph type = Rational Peak discharge = 0.036 cfs
Storm frequency = 10 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 11 cuft
Drainage area = 0.020 ac Runoff coeff. = 0.3
Intensity = 5.990 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
Q (cfs) NORTH EAST DRAINAGE TO OAKLAND ROAD
Hyd. No. 7-- 10 Year Q (cfs)
0.10
0.10
0.09
0,09
. ...... ._.. .....
0.08 - - -
-. 0.08
0.07
- 0.07
0.06 --
0.06
' 0.05
0.05
0.04 _
- 0.04
0.03
- - - - - 0.03
0.02 -
- - 0.02
0.01 0.01
- -
0.00 0.00
0 1 2 3 4 5 6 7 8 9 10
- Hyd No. 7
Time(min)
Hydrograph Report 31
Hydraflow Hydrographs Extension for AutoCADO Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 8
' Flow To Oakland Road
Hydrograph type = Combine Peak discharge = 0.068 cfs
Storm frequency = 10 yrs Time to peak = 12 min
Time interval = 1 min Hyd. volume = 56 cuft
Inflow hyds. = 1, 7 Contrib. drain. area = 0.050 ac
Q (cfs) Flow To Oakland Road
Hyd. No. 8-- 10 Year Q (cfs)
- 0.10
0.09
0.09
0.08
0.08
0.07
0.07
0.06
0.05
0.05
0.04
- 0.04
0.03
0.02
__ 0.02
00o
0.01
0.01
0.00 -
0.00
0 2 4 6 8 10 12 14 16 18 20 22 24
Hyd No. 8 - Hyd No. 1 - Hyd No. 7
Time(min)
Hydrograph Report 32
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17 J 2015
Hyd. No. 9
' Flow to West Abutting Property
Hydrograph type = Combine Peak discharge = 0.455 cfs
Storm frequency = 10 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 247 cuft
Inflow hyds. = 2, 3 Contrib. drain. area = 0.170 ac
Q (cfs) Flow to West Abutting Property
Hyd. No. 9-- 10 Year Q (cfs)
0.50 -
0.50
0.45
- - _ 0.45
0.40
- - _ - - 0.40
0.35 -
-- 0.35
0.30 --
- _ 0.30
0.25 -
- --- 0.25
0.20
-- 0.20
0.15 - _ - - -- -- -
0.15
0.10
-- - - - - - - - 0.10
0.05
- - _ - - - - 0.05
0.00 - 0.00
0 10 20 30 40 50 60 70 80 90 100
- Hyd No. 9 - Hyd No. 2 - Hyd No. 3 Time(min)
Hydrograph Report 33
Hydraflow Hydrographs Extension for AutoCAD RO Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17 J 2015
Hyd. No. 10
1 Flow to Wetland Area
Hydrograph type = Combine Peak discharge = 0.600 cfs
Storm frequency = 10 yrs Time to peak = 6 min
Time interval = 1 min Hyd. volume = 848 cuft
Inflow hyds. = 4, 5, 6 Contrib. drain. area = 0.650 ac
1
1
Q (cfs) Flow to Wetland Area
Hyd. No. 10-- 10 Year Q (cfs)
1.00 1.00
-
0.90 -- - -_ -- -
- 0.90
0.80 - _ --
- 0.80
0.70
- - - _ 0.70
' 0.60
0.60
0.50
0.50
-
- _ 0.40
0.30 _ - - -- - - - -_ - - -
0.30
0.20 -- -
- - - - -- - 0.20
0.10
- - 0.10
0.00 - 0.00
0 10 20 30 40 50 60 70 80 90
- Hyd No. 10 - Hyd No. 4 - Hyd No. 5 - Hyd No. 6 Time(min)
Hydrograph Summary Report 34
Hydraflow Hydrographs Extension for AutoCAD®Civil 3130 2013 by Autodesk,Inc.v10
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cult)
(ft) (cuft)
1 Rational 0.079 1 12 55 -- ---- -- NORTH WEST DRAINAGE TO OAKL
2 Rational 0.505 1 5 152 ------ ------ ---- EXISTING DRIVEWAY DRAINAGE T
3 Rational 0.042 1 52 130 ------ ----- - SOUTH WEST ROOF DRAINAGE T
4 Rational 0.300 1 42 756 ------ ----- ----- SOUTH DRAINAGE TO WETLAND A
5 Rational 0.183 1 5 55 ---- ------ ----- SOUTH EAST DRAINAGE TO WETL
6 Rational 0.488 1 6 176 --- --- NORTH EAST DRAINAGE TO WETL
7 Rational 0.040 1 5 12 ---- --- ----- NORTH EAST DRAINAGE TO OAKL
8 Combine 0.079 1 12 64 1,7 ----- ----- Flow To Oakland Road
9 Combine 0.509 1 5 282 2,3, ------ ----- Flow to West Abutting Property
10 Combine 0.677 1 6 986 4,5,6, --- -- Flow to Wetland Area
Existing Conditions-3297.gpw Return Period: 25 Year Tuesday, 03/17/2015
Hydrograph Report 35
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 1
' NORTH WEST DRAINAGE TO OAKLAND ROAD
Hydrograph type = Rational Peak discharge = 0.079 cfs
' Storm frequency = 25 yrs Time to peak = 12 min
Time interval = 1 min Hyd. volume = 55 cuft
Drainage area = 0.030 ac Runoff coeff. = 0.5*
iIntensity = 5.234 in/hr Tc by TR55 = 11.59 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
Composite(Area/C)_[(0.010 x 0.90)+(0.020 x 0.30)]/0.030
Q (cfs)
NORTH WEST DRAINAGE TO OAKLAND ROAD
cfs Q
Hyd. No. 1 --25 Year ( )
- - 0.10
0.09
- - 0.09
0.08
- - 0.08
' 0.07 -
0.07
0.06
0.06
' 0.05
_-_ 0.05
1 0.04
- - 0.04
- _ 0.03
0.02 - - _
0.02
0.01
0.01
0.00 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24
- Hyd No. 1 Time(min)
Hydrograph Report 36
Hydraflow Hydrographs Extension for AutoCAD®Civil 3130 2013 by Autodesk, Inc.00 Tuesday,03/17/2015
Hyd. No. 2
EXISTING DRIVEWAY DRAINAGE TO WEST
Hydrograph type = Rational Peak discharge = 0.505 cfs
' Storm frequency = 25 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 152 cuft
Drainage area = 0.130 ac Runoff coeff. = 0.58*
' Intensity = 6.700 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' *Composite(Area/C)_[(0.060 x 0.90)+(0.070 x 0.30)]/0.130
EXISTING DRIVEWAY DRAINAGE TO WEST
Q (cfs) Hyd. No. 2--25 Year Q (cfs)
1.00 _ 1.00
0.90 0.90
0.80 _ - 0.80
0.70 0.70
' 0.60 - _ - -
0.60
' 0.50 0.50
0.40
_ _ 0.30
0.20 0.20
0.10 0.10
' 0.00 - - _
0.00
0 1 2 3 4 5 6 7 8 9 10
1 Hyd No. 2 Time(min)
Hydrograph Report 37
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk,Inc.v10 Tuesday,03/17/2015
Hyd. No. 3
' SOUTH WEST ROOF DRAINAGE TO WEST
Hydrograph type = Rational Peak discharge = 0.042 cfs
' Storm frequency = 25 yrs Time to peak = 52 min
Time interval = 1 min Hyd. volume = 130 cuft
Drainage area = 0.040 ac Runoff coeff. = 0.45*
' Intensity = 2.321 in/hr Tc by TR55 = 52.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
*Composite(Area/C)_[(0.010 x 0.90)+(0.030 x 0.30)]/0.040
SOUTH WEST ROOF DRAINAGE TO WEST
Q (cfs) Q (cfs)
Hyd. No. 3--25 Year
' 0.10 0.10
' 0.09 - - 0.09
0.08 0.08
0.07 0.07
0.06 0.06
' 0.05 -
-- - 0.05
' 0.04 - 0.04
-- -
0.03 - 0.03
0.02 0.02
- e0000, - - - -
0.01 0.01
0.00
0.00
0 10 20 30 40 50 60 70 80 90 100 110
' - Hyd No. 3 Time(min)
Hydrograph Report 38
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 4
SOUTH DRAINAGE TO WETLAND AREA
Hydrograph type = Rational Peak discharge = 0.300 cfs
' Storm frequency = 25 yrs Time to peak = 42 min
Time interval = 1 min Hyd. volume = 756 cuft
Drainage area = 0.350 ac Runoff coeff. = 0.32*
' Intensity = 2.678 in/hr Tc by TR55 = 42.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 111
' Composite(Area/C)_[(0.010 x 0.90)+(0.340 x 0.30))/0.350
SOUTH DRAINAGE TO WETLAND AREA
Q (cfs) Q (cfs)
Hyd. No. 4--25 Year
0.50 _ - -
- 0.50
' 0.45
-- 0.45
0.40 -_ --
- -__ - 0.40
0.35
_ - - _ 0.35
.... ....... . ... ......... ..
0.30
0.30
' 0.25
0.25
' 0.20 - -
- - - 0.20
0.15 --
- - - 0.15
0.10
0.05
- 0.05
0.00
0 10 20 30 40 50 60 70 80 90
' Hyd No. 4 Time(min)
-
Hydrograph Report 39
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3DO 2013 by Autodesk, Inc.00 Tuesday,03/17/2015
Hyd. No. 5
SOUTH EAST DRAINAGE TO WETLAND AREA
Hydrograph type = Rational Peak discharge = 0.183 cfs
' Storm frequency = 25 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 55 cuft
Drainage area = 0.070 ac Runoff coeff. = 0.39*
' Intensity = 6.700 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
Composite(Area/C)_[(0.010 x 0.90)+(0.060 x 0.30)]/0.070
SOUTH EAST DRAINAGE TO WETLAND AREA
Q (cfs) Q (cfs)
Hyd. No. 5--25 Year
' 0.50 0.50
0.45 _ _ - - -- -_ 0.45
0.40 __ 0.40
0.35 0.35
0.30 - --
0.30
' 0.25 - 0.25
0.20 - - 0.20
0.15 0.15
-
0.10 - - - 0.10
0.05 0.05
0.00 0.00
0 1 2 3 4 5 6 7 8 9 10
' Hyd No. 5 Time(min)
Hydrograph Report 40
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03!17/2015
Hyd. No. 6
' NORTH EAST DRAINAGE TO WETLAND AREA
Hydrograph type = Rational Peak discharge = 0.488 cfs
' Storm frequency = 25 yrs Time to peak = 6 min
Time interval = 1 min Hyd. volume = 176 cuft
Drainage area = 0.230 ac Runoff coeff. = 0.33*
' Intensity = 6.423 in/hr Tc by TR55 = 6.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' Composite(Area/C)_[(0.220 x 0.30)+(0.010 x 0.90)]/0.230
' NORTH EAST DRAINAGE TO WETLAND AREA
Q (cfs) Hyd. No. 6--25 Year Q (cfs)
0.50 0.50
0.45 - _ 0.45
0.40 0.40
0.35 0.35
0.30 0.30
' 0.25 - 0.25
0.20 - 0.20
0.15 - 0.15
0.10 0.10
0.05 0.05
0.00 0.00
0 1 2 3 4 5 6 7 8 9 10 11 12
' - Hyd No. 6 Time(min)
Hydrograph Report 41
' Hydraflow Hydrographs Extension for AUtoCAD®Civil 3130 2013 by Autodesk,Inc.v10 Tuesday,03/17/2015
Hyd. No. 7
' NORTH EAST DRAINAGE TO OAKLAND ROAD
Hydrograph type = Rational Peak discharge = 0.040 cfs
' Storm frequency = 25 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 12 cuft
Drainage area = 0.020 ac Runoff coeff. = 0.3
' Intensity = 6.700 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' NORTH EAST DRAINAGE TO OAKLAND ROAD
Q (cfs) Q (cfs)
Hyd. No. 7--25 Year
' 0.10 _ - -- - - 0.10
0.09 0.09
0.08 0.08
0.07 0.07
0.06 0.06
' 0.05 -- 0.05
0.04 0.04
0.03 0.03
0.02 0.02
0.01 - 0.01
-
0.00 0.00
0 1 2 3 4 5 6 7 8 9 10
' - Hyd No. 7 Time(min)
Hydrograph Report 42
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 8
Flow To Oakland Road
Hydrograph type = Combine Peak discharge = 0.079 cfs
' Storm frequency = 25 yrs Time to peak = 12 min
Time interval = 1 min Hyd. volume = 64 cuft
Inflow hyds. = 1, 7 Contrib. drain. area = 0.050 ac
Flow To Oakland Road
Q (cfs) Hyd. No. 8--25 Year Q (cfs)
' 0.09 - 0.09
0.08 0.08
0.07 0.07
0.06 0.06
' 0.05 All 0.05
0.04 0.04
0.03 0.03
0.02 0.02
0.01 - - - - 0.01
0.00 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24
' Time(min)
Hyd No. 8 Hyd No. 1 - Hyd No. 7
' Hydrograph Report 43
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.00 Tuesday,03/17/2015
Hyd. No. 9
' Flow to West Abutting Property
Hydrograph type = Combine Peak discharge = 0.509 cfs
' Storm frequency = 25 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 282 cuft
Inflow hyds. = 2, 3 Contrib. drain. area = 0.170 ac
Flow to West Abutting Property
Q (cfs) Q (cfs)
Hyd. No. 9--25 Year
1.00 1.00
0.90 0.90
0.80 0.80
0.70 0.70
0.60 0.60
' 0.50 _ - 0.50
0.40 - - 0.40
. ......_._.... .
0.30 - _ 0.30
0.20 0.20
0.10 - - 0.10
0.00 - 0.00
0 10 20 30 40 50 60 70 80 90 100
' Time(min)
Hyd No. 9 Hyd No. 2 Hyd No. 3
Hydrograph Report 44
Hydraflow Hydrographs Extension for AutoCADO Civil 3130 2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 10
' Flow to Wetland Area
Hydrograph type = Combine Peak discharge = 0.677 cfs
' Storm frequency = 25 yrs Time to peak = 6 min
Time interval = 1 min Hyd. volume = 986 cuft
Inflow hyds. = 4, 5, 6 Contrib. drain. area = 0.650 ac
' Flow to Wetland Area
Q (cfs) Q (cfs)
Hyd. No. 10--25 Year
1.00
0.90
0.80 - - - - - --
0.80
0.70 0.70
0.60 0.60
' 0.50
0.50
0.40 _
' _ 0.40
0.300.30
0.20
_ _ - 0.20
- -
0.10 1A 0.10
0.00 0.00
0 10 20 30 40 50 60 70 80 90
Time(min)
Hyd No. 10 Hyd No. 4 Hyd No. 5 Hyd No. 6
1Hydrograph Summary Report 45
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk,Inc.v10
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cult) (ft) (cuft)
1 Rational 0.094 1 12 65 — - ----- ------ NORTH WEST DRAINAGE TO OAKL
2 Rational 0.588 1 5 176 ----- ---- --- EXISTING DRIVEWAY DRAINAGE T
3 Rational 0.053 1 52 166 ----- - -- ------ SOUTH WEST ROOF DRAINAGE T
4 Rational 0.379 1 42 955 ----- ------ ------ SOUTH DRAINAGE TO WETLAND A
5 Rational 0.213 1 5 64 ----- --- ----- SOUTH EAST DRAINAGE TO WETL
6 Rational 0.570 1 6 205 ------ ------ ----- NORTH EAST DRAINAGE TO WETL
7 Rational 0.047 1 5 14 ----- ----- -- NORTH EAST DRAINAGE TO OAKL
8 Combine 0.094 1 12 76 1,7 ------ ------ Flow To Oakland Road
9 Combine 0.593 1 5 343 2,3, ----- ----- Flow to West Abutting Property
10 Combine 0.794 1 6 1,224 4,5,6, ----- ----- Flow to Wetland Area
' Existing Conditions-3297.gpw Return Period: 100 Year Tuesday, 03/17/2015
Hydrograph Report 46
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3130 2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 1
NORTH WEST DRAINAGE TO OAKLAND ROAD
Hydrograph type = Rational Peak discharge = 0.094 cfs
Storm frequency = 100 yrs Time to peak = 12 min
Time interval = 1 min Hyd. volume = 65 cuft
Drainage area = 0.030 ac Runoff coeff. = 0.5*
Intensity = 6.244 in/hr Tc by TR55 = 11.59 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
Composite(Area/C)_[(0.010 x 0.90)+(0.020 x 0.30)]/0.030
Q (cfs)
NORTH WEST DRAINAGE TO OAKLAND ROAD Hyd. No. 1 -- 100 Year Q (cfs)
0.10 -_- 0.10
0.09 -- - - -
0.09
0.08 - -
- - 0.08
0.07 0.07
0.06
' 0.05 -
-- _ 0.05
0.04
0.04
0.03 1 0.03
-
0.02 -_ _- -
-- - -- - 0.02
-
0.01 - -
-_ - - 0.01
0.00 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24
- Hyd No. 1
Time(min)
Hydrograph Report 47
Hydraflow Hydrographs Extension for AutoCADD Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 2
EXISTING DRIVEWAY DRAINAGE TO WEST
Hydrograph type = Rational Peak discharge = 0.588 cfs
' Storm frequency = 100 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 176 cult
Drainage area = 0.130 ac Runoff coeff. = 0.58*
Intensity = 7.794 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
Composite(Area/C)_[(0.060 x 0.90)+(0.070 x 0.30)]10.130
Q (cfs) EXISTING DRIVEWAY DRAINAGE TO WEST
Hyd. No. 2 -- 100 Year Q (cfs)
1.00
1.00
0.80
--- -- - - - - - - 0.80
0.70
0.60 -
- 0.60
- - -
0.50 - -
- 0.50
0.40 _ - -
0.40
0.30 _ - -
-- - 0.30
0.20 - - -
- - - 0.20
0.10
0.00 0.00
0 1 2 3 4 5 6 7 8 9 10
' Hyd No. 2 Time(min)
--
i Hydrograph Report 48
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03!17/2015
Hyd. No. 3
SOUTH WEST ROOF DRAINAGE TO WEST
Hydrograph type = Rational Peak discharge = 0.053 cfs
Storm frequency = 100 yrs Time to peak = 52 min
Time interval = 1 min Hyd. volume = 166 cult
Drainage area = 0.040 ac Runoff coeff. = 0.45*
Intensity = 2.963 in/hr Tc by TR55 = 52.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
"Composite(Area/C)_[(0.010 x 0.90)+(0.030 x 0.30)]/0.040
Q (cfs) SOUTH WEST ROOF DRAINAGE TO WEST
Hyd. No. 3-- 100 Year Q (cfs)
-__ 0.10
-
0.09
0*09
0.08
- - 0.08
0.07 0.07
0.06 - - - -
0.06
' 0.05 - - -
-_ - 0.05
' 0.04 - - -
-- - - 0.04
-- - - -
0.03
0.02 - -
0.02
0.01 - -
0.01
0.00 0.00
0 10 20 30 40 50 60 70 80 90 100 110
- Hyd No. 3
Time(min)
Hydrograph Report 49
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03 117/2015
Hyd. No. 4
SOUTH DRAINAGE TO WETLAND AREA
Hydrograph type = Rational Peak discharge = 0.379 cfs
Storm frequency = 100 yrs Time to peak = 42 min
Time interval = 1 min Hyd. volume = 955 cuft
Drainage area = 0.350 ac Runoff coeff. = 0.32*
tIntensity = 3.382 in/hr Tc by TR55 = 42.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' Composite(Area/C)_[(0.010 x 0.90)+(0.340 x 0.30)]/0.350
SOUTH DRAINAGE TO WETLAND AREA
Q (cfs) Q (cfs)
Hyd. No. 4-- 100 Year
1 0.50 _
0.50
0.45
0.45
0.40 _ 0.40
II
0.35
0.35
0.30 -
0.30
1 0.25
_ 0.25
0.20
- 0.20
0.15 _ -
- 0.15
0.10 OF
-
0.10
0.05
0.05
0.00
0.00
0 10 20 30 40 50 60 70 80 90
- Hyd No. 4 Time(min)
1
Hydrograph Report 50
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3DO 2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 5
' SOUTH EAST DRAINAGE TO WETLAND AREA
Hydrograph type = Rational Peak discharge = 0.213 cfs
Storm frequency = 100 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 64 cuft
Drainage area = 0.070 ac Runoff coeff. = 0.39*
Intensity = 7.794 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
Composite(Area/C)_[(0.010 x 0.90)+(0.060 x 0.30)]/0.070
1
Q (cfs)
SOUTH EAST DRAINAGE TO WETLAND AREA
Hyd. No. 5-- 100 Year Q (cfs)
1 0.50
- 0.50
0.45 - -- - -- - __ -
1 - - 0.45
0.40 __
0.40
0.35
- _ 0.35
0.30
-
0.30
0.25 -
-- 0.25
0.20 -
-- - -- - - 0.20
-
-
0.15 - - -
-_ -- 0.15
0.10 -
0.10
0.05
- -_ 0.05
0.00 0.00
0 1 2 3 4 5 6 7 8 9 10
1 Hyd No. 5 Time(min)
-
Hydrograph Report 51
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03!17/2015
Hyd. No. 6
' NORTH EAST DRAINAGE TO WETLAND AREA
Hydrograph type = Rational Peak discharge = 0.570 cfs
Storm frequency = 100 yrs Time to peak = 6 min
Time interval = 1 min Hyd. volume = 205 cuft
Drainage area = 0.230 ac Runoff coeff. = 0.33*
Intensity = 7.506 in/hr Tc by TR55 = 6.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
"Composite(Area/C)_[(0.220 x 0.30)+(0.010 x 0.90)]/0.230
' Q (cfs) NORTH EAST DRAINAGE TO WETLAND AREA
Hyd. No. 6-- 100 Year Q (cfs)
1 1.00 1.00
0.90
0.90
0.80 _ __
0.80
0.70
- 0.70
0.60
' 0.50
OOF 0.50
' 0.40 - 0.40
0.30
0.30
0.20 -
0.20
1
0.10
0.00
0.00
0 1 2 3 4 5 6 7 8 9 10 11 12
' Hyd No. 6 Time(min)
-
Hydrograph Report 52
' Hydraflow Hydrographs Extension for AutoCAM Civil 3D®2013 by Autodesk,Inc.A 0 Tuesday,03/17/2015
Hyd. No. 7
' NORTH EAST DRAINAGE TO OAKLAND ROAD
Hydrograph type = Rational Peak discharge = 0.047 cfs
' Storm frequency = 100 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 14 cuft
Drainage area = 0.020 ac Runoff coeff. = 0.3
Intensity = 7.794 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
1
Q (cfs)
NORTH EAST DRAINAGE TO OAKLAND ROAD Hyd. No. 7-- 100 Year Q (cfs)
- 0.10
0.09 0.09
0.08 _ -
- 0.08
1
0.07
_ 0.07
-_ - 0.06
0.05 -
0.05
' 0.04 _ -
- 0.04
- - 0.03
0.02 - - - -
0.02
0.01 0.01
0.00 0.00
0 1 2 3 4 5 6 7 8 9 10
1 Hyd No. 7 Time(min)
Hydrograph Report 53
' Hydraflow Hydrographs Extension for AutoCADO Civil 3D®2013 by Autodesk,Inc.v10 Tuesday,03/17/2015
Hyd. No. 8
' Flow To Oakland Road
Hydrograph type = Combine Peak discharge = 0.094 cfs
Storm frequency = 100 yrs Time to peak = 12 min
Time interval = 1 min Hyd. volume = 76 cuft
Inflow hyds. = 1, 7 Contrib. drain. area = 0.050 ac
Flow To Oakland Road
Q (cfs) Hyd. No. 8-- 100 Year Q (cfs)
0.10
' 0
- 0.09
.09
0.08 -- -
_- 0.08
0.07
0.07
0.06
' 0.05
0.05
0.04 -
_ - _- 0.04
0.03 - -
0.03
0.02 __ - -
- 0.02
0.01 0.01
-
0.00 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24
Hyd No. 8 Hyd No. 1 - Hyd No. 7
Time(min)
Hydrograph Report 54
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.A 0 Tuesday,0311712015
Hyd. No. 9
Flow to West Abutting Property
Hydrograph type = Combine Peak discharge = 0.593 cfs
Storm frequency = 100 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 343 cuft
Inflow hyds. = 2, 3 Contrib. drain. area = 0.170 ac
Q (cfs) Flow to West Abutting Property
Hyd. No. 9-- 100 Year Q (cfs)
1.00 1.00
0.90
0,90
- - - - - - - 0.80
0.70
0.70
-
0.60 0.60
0.50 - -- - -
- - 0.50
' 0.40 - - -
0.40
0.30 0.30
- 0.20
0.10 -- -
- - 0.10
0.00 0.00
0 10 20 30 40 50 60 70 80 90 100
' Hyd No. 9 Hyd No. 2 - Hyd No. 3 Time(min)
Hydrograph Report 55
Hydraflow Hydrographs Extension for AUtoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17 12015
Hyd. No. 10
' Flow to Wetland Area
Hydrograph type = Combine Peak discharge = 0.794 cfs
Storm frequency = 100 yrs Time to peak = 6 min
Time interval = 1 min Hyd. volume = 1,224 cuft
Inflow hyds. = 4, 5, 6 Contrib. drain. area = 0.650 ac
Q (cfs) Flow to Wetland Area
Hyd. No. 10-- 100 Year Q (cfs)
- - 0.90
0,90
0.80 -- - - - _
_ 0.80
0.70 - A
_ 0.70
0.60 _ 0.60
' 0.50
_ 0.50
' 0.40
0.40
0.30 0.30
:
I/\ _ - 0.20
0.10
0.10
0.00 0.00
0 10 20 30 40 50 60 70 80 90
Time(min)
- Hyd No. 10 Hyd No. 4 Hyd No. 5 Hyd No. 6
APPENDIX B
Watershed Computations
' (Post-Development Conditions)
lWatershed Model Schematic 1
Hydraflow Hydrographs Extension for AutoCAD®Civil 31D®2013 by Autodesk, Inc.v10
' 1 7 4 5 6 2
3 9
1 11
0
8
' 12
' Project: \\DPROSBS2K11\G-Drive\jobs\3297\Storm Drainage\Hydraflow\Proposed Con itioS F4b4v17/2015
lHydrograph Return Period Re 2
Hydi4�low Hydrographs Extension for AutoCAD@)Civil 3D®2013 by Autodesk, Inc.v10
'Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph
No. type hyd(s) Description
(origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr
1 Rational ----- ----- 0.037 ------- 0.044 0.048 0.054 0.058 0.062 NORTH WEST DRAINAGE TO OAKL
2 Rational - ---- 0.483 Y-- 0.578 0.631 0.705 0.768 0.821 PROPOSED PARKING DRAINAGET
3 Rational 0.024 --- 0.030 0.036 0.042 0.048 0.053 SOUTH WEST ROOF DRAINAGE T
' 4 Rational _ =--= 0.171 -------
_ 0.216 0.255 0.300 0.339 0.379 SOUTH DRAINAGE TO WETLAND A
5 Rational 0.125 0.150 0.164 0.183 0.199 0.213 SOUTH EAST DRAINAGE TO WETL
6 Rational ----- ----- 0.303 - 0.362 0.395 0.442 0.482 0.514 NORTH EAST DRAINAGE TO WETL
7 Rational ---- -- 0.009 ---- 0.011 0.013 0.015 0.017 0.018 NORTH EAST DRAINAGE TO OAKL
8 Combine 1,7 ------ 0.040 ------- 0.048 0.053 0.059 0.065 0.069 Flow To Oakland Road
' 9 Rational -_-_ --___ 0.142 ----- 0.172 0.188 0.212 0.231 0.248 WEST OF PROPOSED PARKING A
10 Combine 3,9 -- 0.145 -- 0.175 0.192 0.217 0.237 0.254 DRAINAGE TO WEST ABUTTING P
11 Reservoir 2 ------ 0.000 ---- 0.000 0.000 0.000 0.000 0.000 Storm Tech Overflow
12 Combine 4,5,6, ------ 0.449 ------- 0.538 0.589 0.661 0.721 0.772 Flow to Wetland Area
11
Proj. file: \\DPROSBS21<11\G-Drive\jobs\3297\Storm Drainage\Hydraflow\Prop sT dayUtg2ibl732QD.Ipw
1HYdrograph Summary Report
3
+ p Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10
'Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cult) (ft) (cuft)
1 ------
Rational 0.037 1 5 11 ------ ----- NORTH WEST DRAINAGE TO OAKL
' 2 Rational 0.483 1 5 145 ------ ---- ---- PROPOSED PARKING DRAINAGET
3 Rational 0.024 1 52 74 ----- ----- ----- SOUTH WEST ROOF DRAINAGE T
' 4 Rational 0.171 1 42 431 -- __---- -A=- SOUTH DRAINAGE TO WETLAND A
5 Rational 0.125 1 5 38 SOUTH EAST DRAINAGE TO WETL
6 Rational 0.303 1 5 91 ------ ------ ---- NORTH EAST DRAINAGE TO WETL
' 7 Rational 0.009 1 13 7 ---- ---- ----- NORTH EAST DRAINAGE TO OAKL
8 Combine 0.040 1 5 18 1,7 ------ ------ Flow To Oakland Road
' 9 Rational 0.142 1 6 51 ------ ------ ------ WEST OF PROPOSED PARKING A
10 Combine 0.145 1 6 126 3,9 ---- --- DRAINAGE TO WEST ABUTTING P
' 11 Reservoir 0.000 1 n/a 0 2 102.74 145 Storm Tech Overflow
12 Combine 0.449 1 5 560 4,5,6, ------ ------ Flow to Wetland Area
11
J\0PROSIBS2K1 1\G-Drive\jobs\3297\Storm r@li1, a alf1d&@Imposed Con RFC13sda9 3g'pV/2015
Hydrograph Report 4
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17!2015
Hyd. No. 1
' NORTH WEST DRAINAGE TO OAKLAND ROAD
Hydrograph type = Rational Peak discharge = 0.037 cfs
' Storm frequency = 2 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 11 cuft
Drainage area = 0.010 ac Runoff coeff. = 0.8*
' Intensity = 4.590 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' *Composite(Areatc)_[(0.010 x 0.90)]/0.010
' Q (cfs) NORTH WEST DRAINAGE TO OAKLAND ROAD Hyd. No. 1 --2 Year Q (cfs)
0.10
0.09 - - - _ - - - 0.09
0.08 -
0.08
0.07
-- 0.07
0.06
' 0.05 -
0.05
'
0.04 -
- _- 0.04
0.03
- - - - - - 0.03
0.02 - - 0.02
0.01
0.01
0.00 0.00
0 1 2 3 4 5 6 7 8 9 10
' T
- Hyd No. 1 Time(min)
Hydrograph Report 5
' Hydraflow Hydrographs Extension for AutoCADO Civil 3D®2013 by Autodesk,Inc.00 Tuesday,03 117/2015
Hyd. No. 2
' PROPOSED PARKING DRAINAGETO STORM TECH.
Hydrograph type = Rational Peak discharge = 0.483 cfs
' Storm frequency = 2 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 145 cuft
Drainage area = 0.130 ac Runoff coeff. = 0.81*
' Intensity = 4.590 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' Composite(Area/C)_[(0.110 x 0.90)+(0.020 x 0.30)]/0.130
' Q (cfs) PROPOSED PARKING DRAINAGETO STORM TECH.
Hyd. No. 2--2 Year Q (cfs)
0.50
0.45
0.45
0.40 - - -
-_ 0.40
0.35
0.35
0.30 0.30
' 0.25
0.25
0.20 _ -
0.20
0.15
- - - - __ - - 0.15
0.10
0.05
- -_ 0.05
0.00 0.00
0 1 2 3 4 5 6 7 8 9 10
' Hyd No. 2 Time(min)
Hydrograph Report 6
' Hydraflow Hydrographs Extension for AutoCAM Civil 3D®2013 by Autodesk,Inc.A 0 Tuesday,03/17/2015
Hyd. No. 3
' SOUTH WEST ROOF DRAINAGE TO WEST
Hydrograph type = Rational Peak discharge = 0.024 cfs
' Storm frequency = 2 yrs Time to peak = 52 min
Time interval = 1 min Hyd. volume = 74 cuft
Drainage area = 0.040 ac Runoff coeff. = 0.45*
Intensity = 1.324 in/hr Tc by TR55 = 52.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' Composite(Area/C)_[(0.010 x 0.90)+(0.030 x 0.30)]/0.040
SOUTH WEST ROOF DRAINAGE TO WEST
Q (cfs) Q (cfs)
Hyd. No. 3--2 Year
' 0.09 - - 0.09
0.08 - 0.08
0.07 0.07
0.06 -
0.06
-
-
0.05 - 0.05
' 0.04 0.04
0.03 - __
0.03
0.02 0.02
0.01 - 0.01
L
0.00 0.00
0 10 20 30 40 50 60 70 80 90 100 110
' Hyd No. 3 Time(min)
TR55 Tc Worksheet 7
' Hydraflow Hydrographs Extension for AUtoCAD®Civil 3D®2013 by Autodesk, Inc.A
Hyd. No. 3
' SOUTH WEST ROOF DRAINAGE TO WEST
Description A B C Totals
' Sheet Flow
Manning's n-value = 0.011 0.240 0.011
' Flow length (ft) = 10.0 290.0 0.0
Two-year 24-hr precip. (in) = 3.20 3.20 0.00
Land slope (%) = 2.00 0.70 0.00
Travel Time (min) = 0.19 + 50.90 + 0.00 = 51.10
' Shallow Concentrated Flow
Flow length (ft) = 77.04 0.00 0.00
Watercourse slope (%) = 0.70 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =1.35 0.00 0.00
' Travel Time (min) = 0.95 + 0.00 + 0.00 = 0.95
' Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter(ft) = 0.00 0.00 0.00
' Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
' 0.00
0.00
' Flow length (ft) Q0})0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Total Travel Time,Tc.............................................................................. 52.00 min
Hydrograph Report 8
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.A 0 Tuesday,03/17/2015
Hyd. No. 4
' SOUTH DRAINAGE TO WETLAND AREA
Hydrograph type = Rational Peak discharge = 0.171 cfs
' Storm frequency = 2 yrs Time to peak = 42 min
Time interval = 1 min Hyd. volume = 431 cuft
Drainage area = 0.350 ac Runoff coeff. = 0.32*
' Intensity = 1.528 in/hr Tc by TR55 = 42.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
Composite(Area/C)_[(0.010 x 0.90)+(0.340 x 0.30)]/0.350
Q (cfs) SOUTH DRAINAGE TO WETLAND AREA
Hyd. No. 4--2 Year Q (cf s)
0.50
0,45 _ _ 0.45
0.40 - - -
0.40
0.35 0.35
0.30 - - -
0.30
.. ___. _ .....
' 0.25
0.25
' 0.20 - _ - 0.20
0.15 _ - - -
0.15
0.10 -
- 0.10
-
0.05
0.05
' 0.00 oe�< 1 0.00
0 10 20 30 40 50 60 70 80 90
- Hyd No. 4 Time(min)
TR55 Tc Worksheet 9
' Hydraflow Hydrographs Extension for AutoCADO Civil 3D®2013 by Autodesk, Inc.v10
Hyd. No. 4
' SOUTH DRAINAGE TO WETLAND AREA
Description A B C Totals
' Sheet Flow
Manning's n-value = 0.011 0.240 0.011
' Flow length (ft) = 14.8 285.2 0.0
Two-year 24-hr precip. (in) = 3.20 3.20 0.00
Land slope (%) = 1.50 1.50 0.00
Travel Time (min) = 0.29 + 37.03 + 0.00 37.33
' Shallow Concentrated Flow
Flow length (ft) = 520.48 0.00 0.00
Watercourse slope (%) = 1.50 0.00 0.00
' Surface description = Unpaved Paved Paved
Average velocity (ft/s) =1.98 0.00 0.00
' Travel Time (min) = 4.39 + 0.00 + 0.00 = 4.39
' Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter(ft) = 0.00 0.00 0.00
Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
' 0.00
0.00
Flow length (ft) ({0})0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
' Total Travel Time,Tc.............................................................................. 42.00 min
Hydrograph Report 10
Hydraflow Hydrographs Extension for AutoCADU Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03 117/2015
Hyd. No. 5
' SOUTH EAST DRAINAGE TO WETLAND AREA
Hydrograph type = Rational Peak discharge = 0.125 cfs
' Storm frequency = 2 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 38 cuft
Drainage area = 0.070 ac Runoff coeff. = 0.39*
Intensity = 4.590 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
Composite(Area/C)_[(0.010 x 0.90)+(0.060 x 0.30)]/0.070
Q (cfs)
SOUTH EAST DRAINAGE TO WETLAND AREA Hyd. No. 5--2 Year Q (cfs)
0.50
0.45 - - - -_- - - _
- - - 0.45
0.40 - -
- _ 0.40
0.35
- - - 0.35
-
0.30 -- - - - -
0.30
0.25
0.25
0.20
- - 0.20
0.15 _ -
- - _ - - - - 0.15
0.10
- -- --- _ - _ 0.10
0.05 -
- 0.05
0.00 0.00
0 1 2 3 4 5 6 7 8 9 10
' Hyd No. 5 Time(min)
Hydrograph Report 11
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 6
' NORTH EAST DRAINAGE TO WETLAND AREA
Hydrograph type = Rational Peak discharge = 0.303 cfs
Storm frequency = 2 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 91 cuft
Drainage area = 0.200 ac Runoff coeff. = 0.33*
' Intensity = 4.590 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
Composite(Area/C)_[(0.190 x 0.30)+(0.010 x 0.90)]/0.200
' Q (cfs) NORTH EAST DRAINAGE TO WETLAND AREA Hyd. No. 6--2 Year Q (cfs)
0.50 0.50
0.45 - -- 0.45
0.40
0.35 0.35
0.30
0.25
_ 0.25
0.20 _ -
0.20
0.15 - - -- -
0.15
--
0.10 _ 0.10
0.05 - _
0.05
0.00 0.00
0 1 2 3 4 5 6 7 8 9 10
' Hyd No. 6 Time(min)
Hydrograph Report 12
' Hydraflow Hydrographs Extension for AutoCADC)Civil 3130 2013 by Autodesk, Inc.A 0 Tuesday,03!17/2015
Hyd. No. 7
' NORTH EAST DRAINAGE TO OAKLAND ROAD
Hydrograph type = Rational Peak discharge = 0.009 cfs
' Storm frequency = 2 yrs Time to peak = 13 min
Time interval = 1 min Hyd. volume = 7 cuft
Drainage area = 0.010 ac Runoff coeff. = 0.3
Intensity = 3.069 in/hr Tc by TR55 = 13.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' Q (cfs) NORTH EAST DRAINAGE TO OAKLAND ROAD
Hyd. No. 7--2 Year Q (cfs)
0.10
0.09
0.09
0.08 - - __ -
- - 0.08
0.07
- - 0.07
0.06
- 0.06
-
0.05
0.05
' 0.04 - - - -
- - - 0.04
0.03 - - - - -
-
0.03
0.02
_ 0.02
' 0.01
- 0.01
0.00 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26
' Hyd No. 7 Time(min)
' TR55 Tc Worksheet 13
' Hydraflow Hydrographs Extension for AUtoCAD®Civil 3D®2013 by Autodesk, Inc.v10
Hyd. No. 7
' NORTH EAST DRAINAGE TO OAKLAND ROAD
Description A B C Totals
' Sheet Flow
Manning's n-value = 0.240 0.011 0.011
' Flow length (ft) = 71.7 0.0 0.0
Two-year 24-hr precip. (in) = 3.20 0.00 0.00
Land slope (%) = 1.40 0.00 0.00
Travel Time (min) = 12.61 + 0.00 + 0.00 = 12.61
' Shallow Concentrated Flow
Flow length (ft) = 0.00 0.00 0.00
Watercourse slope (%) = 0.00 0.00 0.00
' Surface description = Paved Paved Paved
Average velocity (ft/s) =0.00 0.00 0.00
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
' Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter(ft) = 0.00 0.00 0.00
' Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
' 0.00
0.00
' Flow length (ft) ({0})0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
TotalTravel Time,Tc.............................................................................. 13.00 min
Hydrograph Report 14
' Hydraflow Hydrographs Extension for AutoCAD@ Civil 3138 2013 by Autodesk, Inc.v10 Tuesday,03/17 12015
Hyd. No. 8
' Flow To Oakland Road
Hydrograph type = Combine Peak discharge = 0.040 cfs
' Storm frequency = 2 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 18 cuft
Inflow hyds. = 1, 7 Contrib. drain. area = 0.020 ac
' Flow To Oakland Road
Q (cfs) Q (cfs)
Hyd. No. 8--2 Year
- 0.10
0.09 ___ _ 0.09
0.08 _
0.08
0.07
0.06 0.06
' 0.05
0.05
0.04 0.04
0.03
0.02
0.01
0.01
0.00 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26
' - Hyd No. 8 Hyd No. 1 - Hyd No. 7 Time(min)
Hydrograph Report 15
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk,Inc.v10 Tuesday,03/17/2015
Hyd. No. 9
' WEST OF PROPOSED PARKING AREA DRAINAGE WEST
Hydrograph type = Rational Peak discharge = 0.142 cfs
' Storm frequency = 2 yrs Time to peak = 6 min
Time interval = 1 min Hyd. volume = 51 cuft
Drainage area = 0.050 ac Runoff coeff. = 0.66*
' Intensity = 4.308 in/hr Tc by TR55 = 6.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' *Composite(Area/C)_[(0.030 x 0.90)+(0.020 x 0.30)]10.050
Q (cfs)
WEST OF PROPOSED PARKING AREA DRAINAGE WEST Hyd. No. 9--2 Year Q (cfs)
- 0.50
0.45 -
' - - -_ - 0.45
0.40
0.40
0.35
_ 0.35
0.30 _ - - - -
0.30
' 0.25 - -.
0.25
-
' 0.20 -
- - - - 0.20
- - - - 0.15
0.10 -
- - - 0.10
0.05 - _ -
- - 0.05
0.00 - - 0.00
0 1 2 3 4 5 6 7 8 9 10 11 12
' - Hyd No. 9 Time(min)
TR55 Tc Worksheet 16
' Hydraf low Hydrographs Extension for AutoCAD RU Civil 3D®2013 by Autodesk,Inc.00
Hyd. No. 9
' WEST OF PROPOSED PARKING AREA DRAINAGE WEST
Description A B C Totals
' Sheet Flow
Manning's n-value = 0.240 0.011 0.240
' Flow length (ft) = 9.0 26.3 17.3
Two-year 24-hr precip. (in) = 3.20 3.20 3.20
Land slope (%) = 0.40 2.00 9.00
' Travel Time (min) = 3.96 + 0.42 + 1.92 = 6.30
' Shallow Concentrated Flow
Flow length (ft) = 0.00 0.00 0.00
Watercourse slope (%) = 0.00 0.00 0.00
' Surface description = Paved Paved Paved
Average velocity(ft/s) =0.00 0.00 0.00
' Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
' Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter(ft) = 0.00 0.00 0.00
' Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
0.00
0.00
' Flow length (ft) PD0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
' Total Travel Time,Tc.............................................................................. 6.00 min
Hydrograph Report 17
' Hydraflow Hydrographs Extension for AUtoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 10
' DRAINAGE TO WEST ABUTTING PROPERTY
Hydrograph type = Combine Peak discharge = 0.145 cfs
' Storm frequency = 2 yrs Time to peak = 6 min
Time interval = 1 min Hyd. volume = 126 cuft
Inflow hyds. = 3, 9 Contrib. drain. area = 0.090 ac
I
' Q (cfs) DRAINAGE TO WEST ABUTTING PROPERTY
Hyd. No. 10--2 Year Q (cfs)
' 0.50
-- _ 0.50
..._._._...
0.45
0.45
0.40 - -
-- - - - 0.40
0.35
0.30
' 0.25 - - - -
- - 0.25
0.20 -
- 0.20
0.15 0.15
-
0.10 - - -
- - 0.10
0.05 _. -
- - 0.05
L
0.00 0.00
0 10 20 30 40 50 60 70 80 90 100 110
- Hyd No. 10 Hyd No. 3 - Hyd No. 9
Time(min)
Hydrograph Report 18
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk,Inc.v10 Tuesday,03/17/2015
Hyd. No. 11
' Storm Tech Overflow
Hydrograph type = Reservoir Peak discharge = 0.000 cfs
' Storm frequency = 2 yrs Time to peak = nla
Time interval = 1 min Hyd. volume = 0 cuft
Inflow hyd. No. = 2 - PROPOSED PARKING DPAIftAl3reSfi&TORM TERU02.74 ft
' Reservoir name = SC-740 Max. Storage = 145 cuft
Storage Indication method used.
Storm Tech Overflow
Q (cfs) Hyd. No. 11 --2 Year Q (cfs)
0.50
0,45 - -
' - - - �- 0.45
0.40 - 0.40
0.35 -- - 0.35
0.30 - - --
- - - 0.30
0.25 � --
0.25
-
0.20 - -_
- - 0.20
0.15
0.15
f
0.10
- ( 0.10
0.05
0.05
0.00 I - -
0.00
0 1 2 3 4 5 6 7 8 9 10
' Time(min)- Hyd No. 11 Hyd No. 2 � Total storage used= 145 cuft
Pond Report 19
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
' Pond No. 1 - SC-740
Pond Data
UG Chambers-Invert elev.=101.50 ft , Rise x Span=2.50 x 3.83 ft , Barrel Len=7.12 ft, No.Barrels=3, Slope=0.00%, Headers=No
' Encasement-Invert elev.=101.00 ft , Width=5.82 ft, Height=4.00 ft, Voids=40.00%
Stage/Storage Table
Stage(ft) Elevation(ft) Contour area(sgft) Incr.Storage(cuft) Total storage(cult)
0.00 101.00 n/a 0 0
0.40 101.40 n/a 20 20
0.80 101.80 n/a 35 54
1.20 102.20 n/a 39 94
' 1.60 102.60 n/a 38 132
2.00 103.00 n/a 37 168
2.40 103.40 n/a 34 203
2.80 103.80 n/a 30 233
' 3.20 104.20 n/a 22 256
3.60 104.60 n/a 20 275
4.00 105.00 n/a 20 295
1 Culvert/Orifice Structures Weir Structures
[A] [B] [C] [PrfRsr] [A] [B] [C] [D]
Rise(in) = 6.00 0.00 0.00 0.00 Crest Len(ft) = 0.00 0.00 0.00 0.00
Span(in) = 6.00 0.00 0.00 0.00 Crest El.(ft) = 0.00 0.00 0.00 0.00
No.Barrels = 1 0 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33
Invert El.(ft) = 104.50 0.00 0.00 0.00 Weir Type = --- --- --- ---
Length(ft) = 10.15 0.00 0.00 0.00 Multi-Stage = No No No No
Slope(%) = 4.90 0.00 0.00 n/a
N-Value = .013 .013 .013 n/a
1 Orifice Coeff. = 0.60 Exfil.(in/hr) = 0.000(by Wet area)
Multi-Stage = n/a No No No TW Elev.(ft) = 0.00
Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control.Weir risers checked for orifice conditions(ic)and submergence(s).
Stage(ft) Stage/Discharge Elev(ft)
5.00 _ 106.00
4.00 105.00
3.00 104.00
2.00 103.00
1.00 102.00
0.00 101.00
0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50
' Total Q
Discharge(cfs)
Hydrograph Report 20
Hydraflow Hydrographs Extension for AutoCADO Civil 31302013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 12
' Flow to Wetland Area
Hydrograph type = Combine Peak discharge = 0.449 cfs
Storm frequency = 2 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 560 cuft
Inflow hyds. = 4, 5, 6, 11 Contrib. drain. area = 0.620 ac
Flow to Wetland Area
Q (cfs) Hyd. No. 12--2 Year Q (cfs)
0.45 - - - - - - - _ - - 0.45
0.40 - _ -_
0.40
0.35 0.35
0.30 0.30
1A1
0.25 - 0.25
' 0.20
0.15 0.15
0.10 - 0.10
e000
0.05EA 0.05
0.00 0.00
0 10 20 30 40 50 60 70 80 90
Time(min)
Hyd No. 12 Hyd No. 4 Hyd No. 5 Hyd No. 6
Hyd No. 11
Hydraflow Rainfall Report 21
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Return Intensity-Duration-Frequency Equation Coefficients(FHA)
Period
(Yrs) B D E (N/A)
1 0.0000 0.0000 0.0000 - --
' 2 30.1225 6.6000 0.7676 --------
3 0.0000 0.0000 0.0000 -------
' 5 52.3308 9.8000 0.8367 ----
10 54.7383 10.8000 0.8016 - --
25 101.9813 15.8000 0.8971 --------
50 98.1551 15.7000 0.8577 -------
' 100 106.5909 17.0000 0.8462 -----
File name:Connecticut IDF.idf
Intensity= B/(Tc+ D)^E
Return Intensity Values(in/hr)
Period
(Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60
1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 4.59 3.49 2.85 2.43 2.13 1.90 1.72 1.58 1.46 1.36 1.27 1.20
' 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 5.49 4.30 3.57 3.06 2.69 2.40 2.17 1.99 1.84 1.71 1.60 1.50
' 10 5.99 4.81 4.04 3.51 3.11 2.80 2.55 2.35 2.18 2.03 1.91 1.80
25 6.70 5.52 4.71 4.12 3.66 3.30 3.01 2.76 2.56 2.38 2.23 2.10
50 7.30 6.06 5.20 4.57 4.09 3.70 3.38 3.12 2.90 2.71 2.54 2.40
100 7.79 6.55 5.68 5.02 4.51 4.10 3.76 3.48 3.24 3.04 2.86 2.70
Tc=time in minutes.Values may exceed 60.
Preci .file name:Hartford County.pcp
Rainfall Precipitation Table(in)
Storm
Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr
1 SCS 24-hour 0.00 3.20 0.00 4.10 4.70 5.50 6.20 6.90
SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
' Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
i Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
' Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1HYdrograph Summary/ Report
22
+ Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft) (ft) (cuft)
1 Rational 0.048 1 5 14 —-- ---- -- NORTH WEST DRAINAGE TO OAKL
2 Rational 0.631 1 5 189 ----- ----- ----- PROPOSED PARKING DRAINAGET
3 Rational 0.036 1 52 111 ---- ---- ------ SOUTH WEST ROOF DRAINAGE T
4 Rational 0.255 1 42 643 ------ - -- ------ SOUTH DRAINAGE TO WETLAND A
5 Rational 0.164 1 5 49 -- ---- ------ SOUTH EAST DRAINAGE TO WETL
6 Rational 0.395 1 5 119 ---- -- --- NORTH EAST DRAINAGE TO WETL
7 Rational 0.013 1 13 10 --- ---- ---- NORTH EAST DRAINAGE TO OAKL
8 Combine 0.053 1 5 24 1,7 ----- ---- Flow To Oakland Road
9 Rational 0.188 1 6 68 ----- ----- ---- WEST OF PROPOSED PARKING A
10 Combine 0.192 1 6 179 3,9 -- --- DRAINAGE TO WEST ABUTTING P
11 Reservoir 0.000 1 n/a 0 2 103.24 189 Storm Tech Overflow
12 Combine 0.589 1 5 810 4,5,6, ---- ------ Flow to Wetland Area
11
\\DPROSBS2K11\G-Drive\jobs\3297\Storm rlRirt eF*dafldO\PeWosed Con iTCW-d*903g'W 12015
Hydrograph Report 23
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 1
NORTH WEST DRAINAGE TO OAKLAND ROAD
Hydrograph type = Rational Peak discharge = 0.048 cfs
' Storm frequency = 10 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 14 cuft
Drainage area = 0.010 ac Runoff coeff. = 0.8*
' Intensity = 5.990 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' *Composite(Area/C)_[(0.010 x 0.90)]/0.010
' Q (cfs) NORTH WEST DRAINAGE TO OAKLAND ROAD
Hyd. No. 1 -- 10 Year Q (cfs)
0.10
0.09
' - - 0.09
0.08 -
-_ 0.08
0.07
- - - 0.07
0.06
0.06
-
0.05
0.05
' 0.04 - -
- - 0.04
0.03 - - --
0.03
0.02 -
- - 0.02
0.01 0.01
-
0.00 0.00
0 1 2 3 4 5 6 7 8 9 10
Hyd No. 1
Time(min)
Hydrograph Report 24
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.A 0 Tuesday,03!17!2015
Hyd. No. 2
' PROPOSED PARKING DRAINAGETO STORM TECH.
Hydrograph type = Rational Peak discharge = 0.631 cfs
' Storm frequency = 10 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 189 cuft
Drainage area = 0.130 ac Runoff coeff. = 0.81
' Intensity = 5.990 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' *Composite(Area/C)_[(0.110 x 0.90)+(0.020 x 0.30)]/0.130
PROPOSED PARKING DRAINAGETO STORM TECH.
Q (cfs) Q (cfs)
Hyd. No. 2-- 10 Year
- - - 1.00
0.90 - - -
- 0.90
0.80 0.80
0.70
0.70
- 0.60
0.50 - -
- - - 0.50
0.40
- - - OF 0.40
....._.......... ....-..__._
- - - 0.30
0.20 -__ _ - - -
-- ---- - - -- __ 0.20
0.10 - - _
- 0.10
0.00 - 0.00
0 1 2 3 4 5 6 7 8 9 10
' - Hyd No. 2 Time(min)
Hydrograph Report 25
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 3
' SOUTH WEST ROOF DRAINAGE TO WEST
Hydrograph type = Rational Peak discharge = 0.036 cfs
Storm frequency = 10 yrs Time to peak = 52 min
Time interval = 1 min Hyd. volume = 111 cult
Drainage area = 0.040 ac Runoff coeff. = 0.45*
Intensity = 1.982 in/hr Tc by TR55 = 52.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' *Composite(Area/C)_[(0.010 x 0.90)+(0.030 x 0.30)]/0.040
' Q (cfs) SOUTH WEST ROOF DRAINAGE TO WEST
Hyd. No. 3-- 10 Year0.10 Q (cfs)
0.10
0.09
- _ 0.09
0.08 - _ -
0.08
0.07 0.07
0.06 0.06
0.05 - -
0.05
...._...... ..
0.04 - - - _
0.04
0.03
-- - - 0.03
0.02 - - - _ _ __
-- _- -_ — 0.02
' 0.01
_ _ _ 0.01
0.00
0 10 20 30 40 50 60 70 80 90 100 110
' Hyd No. 3 Time(min)
-
TR55 Tc Worksheet 26
' Hydraflow Hydrographs Extension for AutoCADO Civil 3D®2013 by Autodesk, Inc.v10
Hyd. No. 3
SOUTH WEST ROOF DRAINAGE TO WEST
Descril2tion A B C Totals
' Sheet Flow
Manning's n-value = 0.011 0.240 0.011
' Flow length (ft) = 10.0 290.0 0.0
Two-year 24-hr precip. (in) = 3.20 3.20 0.00
Land slope (%) = 2.00 0.70 0.00
' Travel Time (min) = 0.19 + 50.90 + 0.0 =0 51.10
' Shallow Concentrated Flow
Flow length (ft) = 77.04 0.00 0.00
Watercourse slope (%) = 0.70 0.00 0.00
' Surface description = Unpaved Paved Paved
Average velocity (ft/s) =1.35 0.00 0.00
' Travel Time (min) = 0.95 + 0.00 + 0.00 = 0.95
' Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter(ft) = 0.00 0.00 0.00
Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
' 0.00
0.00
Flow length (ft) QOD0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
' Total Travel Time,Tc.............................................................................. 52.00 min
Hydrograph Report 27
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 4
' SOUTH DRAINAGE TO WETLAND AREA
Hydrograph type = Rational Peak discharge = 0.255 cfs
' Storm frequency = 10 yrs Time to peak = 42 min
Time interval = 1 min Hyd. volume = 643 cuft
Drainage area = 0.350 ac Runoff coeff. = 0.32*
' Intensity = 2.277 in/hr Tc by TR55 = 42.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' Composite(Area/C)_[(0.010 x 0.90)+(0.340 x 0.30)]/0.350
' Q (cfs) SOUTH DRAINAGE TO WETLAND AREA
Hyd. No. 4-- 10 Year Q (cfs)
0.50
0.50
0.45 - _ -_ -
' - _ - 0.45
0.40 -- - 0.40
0.35
- - _ 0.35
0.30
0.30
' 0.25
0.25
0.20 -
- 0.20
0.15 __ --
0.15
0.10 -
0.10
0.05
- 0.05
' 0.00
0.00
0 10 20 30 40 50 60 70 80 90
- Hyd No. 4
Time(min)
TR55 Tc Worksheet 28
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10
Hyd. No. 4
SOUTH DRAINAGE TO WETLAND AREA
Description A B C Totals
' Sheet Flow
Manning's n-value = 0.011 0.240 0.011
' Flow length (ft) = 14.8 285.2 0.0
Two-year 24-hr precip. (in) = 3.20 3.20 0.00
Land slope (%) = 1.50 1.50 0.00
' Travel Time (min) = 0.29 + 37.03 + 0. _00 37.33
' Shallow Concentrated Flow
Flow length (ft) = 520.48 0.00 0.00
Watercourse slope (%) = 1.50 0.00 0.00
' Surface description = Unpaved Paved Paved
Average velocity (ft/s) =1.98 0.00 0.00
' Travel Time (min) = 4.39 + 0.00 + 0.00 = 4.39
' Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter(ft) = 0.00 0.00 0.00
Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
' 0.00
0.00
' Flow length (ft) PD0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
' Total Travel Time,Tc.............................................................................. 42.00 min
1
Hydrograph Report 29
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 5
' SOUTH EAST DRAINAGE TO WETLAND AREA
Hydrograph type = Rational Peak discharge = 0.164 cfs
' Storm frequency = 10 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 49 cuft
Drainage area = 0.070 ac Runoff coeff. = 0.39*
' Intensity = 5.990 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' Composite(Area/C)_[(0.010 x 0.90)+(0.060 x 0.30)]10.070
' Q (cfs) SOUTH EAST DRAINAGE TO WETLAND AREA
Hyd. No. 5-- 10 Year Q (cfs)
- 0.50
0.45 - _ - - _ _ -
' _ - - - 0.45
0.40 -_ __
0.40
0.35
- 0.35
0.30 - -
- - - - 0.30
0.25
0.25
0.20 - -
- -- 0.20
-
- 0.15
0.05 - -
- 0.05
0.00 0.00
0 1 2 3 4 5 6 7 8 9 10
- Hyd No. 5 Time(min)
Hydrograph Report 30
Hydrafiow Hydrographs Extension for AutcCADU Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 6
NORTH EAST DRAINAGE TO WETLAND AREA
Hydrograph type = Rational Peak discharge = 0.395 cfs
' Storm frequency = 10 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 119 cuft
Drainage area = 0.200 ac Runoff coeff. = 0.33*
' Intensity = 5.990 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
Composite(Area/C)_[(0.190 x 0.30)+(0.010 x 0.90)]/0.200
NORTH EAST DRAINAGE TO WETLAND AREA
Q (cfs) Hyd. No. 6-- 10 Year Q (cfs)
' 0.50
0.50
' 0.45 -
0.45
0.40 _ 0.40
0.35
0.35
0.30 _ - -
0.30
0.25 -
- _ 0.25
'
0.20 _ -
_ - - - 0.20
0.15 _ __
0.15
0.10 -
- __ 0.10
' 0.05 - _
0.05
0.00
0.00
0 1 2 3 4 5 6 7 8 9 10
' Hyd No. 6 Time(min)
Hydrograph Report 31
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D@ 2013 by Autodesk,Inc.v10 Tuesday,03/17 12015
Hyd. No. 7
NORTH EAST DRAINAGE TO OAKLAND ROAD
Hydrograph type = Rational Peak discharge = 0.013 cfs
' Storm frequency = 10 yrs Time to peak = 13 min
Time interval = 1 min Hyd. volume = 10 cuft
Drainage area = 0.010 ac Runoff coeff. = 0.3
' Intensity = 4.313 in/hr Tc by TR55 = 13.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' Q (cfs) NORTH EAST DRAINAGE TO OAKLAND ROAD
Hyd. No. 7-- 10 Year Q (cfs)
0.10
0.09 0.09
0.08
0.08
0.07
0.06 _ -
- 0.06
0.05
0.05
' 0.04 - 0.04
0.03
0.02
0.01
_ _ _
0.00 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26
'
Hyd No. 7 Time(min)
i TR55 Tc Worksheet 32
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10
Hyd. No. 7
' NORTH EAST DRAINAGE TO OAKLAND ROAD
Description A B C Totals
' Sheet Flow
Manning's n-value = 0.240 0.011 0.011
' Flow length (ft) = 71.7 0.0 0.0
Two-year 24-hr precip. (in) = 3.20 0.00 0.00
Land slope (%) = 1.40 0.00 0.00
' Travel Time (min) = 12.61 + 0.00 + 0.00 = 12.61
' Shallow Concentrated Flow
Flow length (ft) = 0.00 0.00 0.00
Watercourse slope (%) = 0.00 0.00 0.00
Surface description = Paved Paved Paved
Average velocity (ft/s) =0.00 0.00 0.00
' Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter(ft) = 0.00 0.00 0.00
' Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
0.00
0.00
' Flow length (ft) ({0})0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
TotalTravel Time,Tc.............................................................................. 13.00 min
Hydrograph Report 33
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03 1 17/2015
Hyd. No. 8
' Flow To Oakland Road
Hydrograph type = Combine Peak discharge = 0.053 cfs
' Storm frequency = 10 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 24 cuft
Inflow hyds. = 1, 7 Contrib. drain. area = 0.020 ac
' Q (cfs) Flow To Oakland Road
Hyd. No. 8-- 10 Year Q (cfs)
- - 0.10
-
-
0.08
- - - - - - - -- 0.08
0.07
- _-- - - - 0.07
0.06
- - 0.06
0.05
_- 0.05
0.04 - - - -
- -_ 0.04
03
' 0.03
- -- -- - 0.02
0.01 :
- _ 0.01
0.00 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26
' - Hyd No. 8 - Hyd No. 1 - Hyd No. 7 Time(min)
Hydrograph Report 34
' Hydraflow Hydrographs Extension for AUtoCAD®Civil 3DO 2013 by Autodesk, Inc.00 Tuesday,03/17!2015
Hyd. No. 9
' WEST OF PROPOSED PARKING AREA DRAINAGE WEST
Hydrograph type = Rational Peak discharge = 0.188 cfs
' Storm frequency = 10 yrs Time to peak = 6 min
Time interval = 1 min Hyd. volume = 68 cuft
Drainage area = 0.050 ac Runoff coeff. = 0.66*
Intensity = 5.702 in/hr Tc by TR55 = 6.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
Composite(Area/C)_[(0.030 x 0.90)+(0.020 x 0.30)]/0.050
Q (cfs) WEST OF PROPOSED PARKING AREA DRAINAGE WEST
Hyd. No. 9-- 10 Year Q(cfs)
' 0.50 - - -
_- 0.50
0.45 - - - - - -- - - - -
' - - - 0.45
0.40
0.40
0.35
- _ _ -- 0.35
0.30 - -
0.30
' 0.25
0.25
0.200.20
-
- 0.15
1
0.10
0.10
0.05
0.00 -
0.00
0 1 2 3 4 5 6 7 8 9 10 11 12
' - Hyd No. 9 Time(min)
i TR55 Tc Worksheet 35
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.A 0
Hyd. No. 9
WEST OF PROPOSED PARKING AREA DRAINAGE WEST
Description A B C Totals
Sheet Flow
Manning's n-value = 0.240 0.011 0.240
1 Flow length (ft) = 9.0 26.3 17.3
Two-year 24-hr precip. (in) = 3.20 3.20 3.20
Land slope (%) = 0.40 2.00 9.00
1 Travel Time min = 3.96 + 0.42 + _(min) 1.92 6.30
Shallow Concentrated Flow
Flow length (ft) = 0.00 0.00 0.00
Watercourse slope (%) = 0.00 0.00 0.00
Surface description = Paved Paved Paved
Average velocity (ft/s) =0.00 0.00 0.00
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter(ft) = 0.00 0.00 0.00
Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
1 0.00
0.00
Flow length (ft) QOD0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
' Total Travel Time,Tc.............................................................................. 6.00 min
Hydrograph Report 36
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3130 2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 10
DRAINAGE TO WEST ABUTTING PROPERTY
Hydrograph type = Combine Peak discharge = 0.192 cfs
Storm frequency = 10 yrs Time to peak = 6 min
Time interval = 1 min Hyd. volume = 179 cuft
Inflow hyds. = 3, 9 Contrib. drain. area = 0.090 ac
i
Q (cfs) DRAINAGE TO WEST ABUTTING PROPERTY
Hyd. No. 10-- 10 Year Q (cfs)
0.50
0.45 - _ 0.45
0.40
0.40
0.35
0.35
0.30 - 0.30
0.25
0.25
' 0.20
0.20
0.15
0.15
1
0.10
0.05
0.00 0.00
0 10 20 30 40 50 60 70 80 90 100 110
- Hyd No. 10 Hyd No. 3 Hyd No. 9 Time(min)
Hydrograph Report 37
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3DO 2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 11
Storm Tech Overflow
Hydrograph type = Reservoir Peak discharge = 0.000 cfs
' Storm frequency = 10 yrs Time to peak = n/a
Time interval = 1 min Hyd. volume = 0 cuft
Inflow hyd. No. = 2 - PROPOSED PARKING DRMIUAGfeTOWORM TE-C1-D3.24 ft
' Reservoir name = SC-740 Max. Storage = 189 cult
Storage Indication method used.
Q (cfs) Storm Tech Overflow
Hyd. No. 11 -- 10 Year Q (cfs)
1.00 1.00
0.90 - - 0.90
-
0.80 _ __
0.80
0.70
- _ 0.70
0.60 -
0.60
1 0.50
0.50
- I -
0.40 -
- 0.40
0.30
0.30
0.20
i
- - - - _ - - 0.20
0.10 f I 0.10
' 0.00 0.00
0 1 2 3 4 5 6 7 8 9 10
' Hyd No. 11 - Hyd No. 2 � Total storage used = 189 cuft Time(min)
Hydrograph Report 38
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 12
Flow to Wetland Area
Hydrograph type = Combine Peak discharge = 0.589 cfs
' Storm frequency = 10 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 810 cuft
Inflow hyds. = 4, 5, 6, 11 Contrib. drain. area = 0.620 ac
Q (cfs) Flow to Wetland Area
Hyd. No. 12 -- 10 Year Q (cfs)
1.00
- 0.80
0.70
0.70
0.60 -
0.60
' 0.50
0.50
0.40 - -
0.40
0.30 _ _ __
0.30
0.20 -
0.20
0.10
1A
0.10
0.00 0.00
0 10 20 30 40 50 60 70 80 90
'
Hyd No. 12 Hyd No. 4 - Hyd No. 5 - Hyd No. 6 Time(min)
Hyd No. 11
kiydrograph Summary Report 39
Hydraflow Hydrographs Extension for AUtoCAD®Civil 3D®2013 by Autodesk, Inc.v10
!yd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft) (ft) (cuft)
1 Rational 0.054 1 5 16 ------ ----- ----- NORTH WEST DRAINAGE TO OAKL
2 Rational 0.705 1 5 212 --- ----- ----- PROPOSED PARKING DRAINAGET
3 Rational 0.042 1 52 130 ---- ---- ----- SOUTH WEST ROOF DRAINAGE T
4 Rational 0.300 1 42 756 ----- ----- ----- SOUTH DRAINAGE TO WETLAND A
5 Rational 0.183 1 5 55 ------ ----- ----- SOUTH EAST DRAINAGE TO WETL
6 Rational 0.442 1 5 133 ---- ----- --- NORTH EAST DRAINAGE TO WETL
7 Rational 0.015 1 13 12 ----- -- -- NORTH EAST DRAINAGE TO OAKL
8 Combine 0.059 1 5 28 1,7 ------ ------ Flow To Oakland Road
9 Rational 0.212 1 6 76 ------ ----- ------ WEST OF PROPOSED PARKING A
10 Combine 0.217 1 6 207 3,9 ---- ---- DRAINAGE TO WEST ABUTTING P
11 Reservoir 0.000 1 n/a 0 2 103.52 212 Storm Tech Overflow
12 Combine 0.661 1 5 943 4,5,6, ------ ------ Flow to Wetland Area
11
\\DPR0SBS2Kl l\G-Drive\jobs\3297\Storm I DrIlittageF4dodlamPe2posed Con iliaesdayrMg'pW/2015
Hydrograph Report 40
' Hydraflow Hydrographs Extension for AUtoCAD®Civil 3D@ 2013 by Autodesk,Inc.00 Tuesday,03/17/2015
Hyd. No. 1
NORTH WEST DRAINAGE TO OAKLAND ROAD
Hydrograph type = Rational Peak discharge = 0.054 cfs
' Storm frequency = 25 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 16 cuft
Drainage area = 0.010 ac Runoff coeff. = 0.8*
rIntensity = 6.700 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' *Composite(Area/C)_[(0.010 x 0.90)]/0.010
NORTH WEST DRAINAGE TO OAKLAND ROAD
Q (cfs) Hyd. No. 1 --25 Year Q (cfs)
0.10
0.09 - - - 0.09
0.08
0.08
0.07
-_ 0.07
------ ----
0.06 -
0.06
' 0.05
0.05
0.04
0.03 _ - - 0.03
0.02
_ 0.02
0.01
0.01
' 0.00 -Z. 0.00
0 1 2 3 4 5 6 7 8 9 10
' Hyd No. 1 Time(min)
Hydrograph Report 41
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.A Tuesday,03 117/2015
Hyd. No. 2
PROPOSED PARKING DRAINAGETO STORM TECH.
Hydrograph type = Rational Peak discharge = 0.705 cfs
' Storm frequency = 25 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 212 cuft
Drainage area = 0.130 ac Runoff coeff. = 0.81
' Intensity = 6.700 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' Composite(Area/C)_[(0.110 x 0.90)+(0.020 x 0.30)]/0.130
' Q (cfs) PROPOSED PARKING DRAINAGETO STORM TECH.
Hyd. No. 2--25 Year Q (cfs)
' 1.00 1.00
0.80
0.80
0.70
- 0.70
0.60 - - -
0.60
0.50
0.50
' 0.40
- - - -- 0.40
0.30
0.20 -
- 0.20
0.10 0.10
' 0.00
0.00
0 1 2 3 4 5 6 7 8 9 10
' Hyd No. 2 Time(min)
-
Hydrograph Report 42
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk,Inc.00 Tuesday,03/17/2015
Hyd. No. 3
' SOUTH WEST ROOF DRAINAGE TO WEST
Hydrograph type = Rational Peak discharge = 0.042 cfs
' Storm frequency = 25 yrs Time to peak = 52 min
Time interval = 1 min Hyd. volume = 130 cuft
Drainage area = 0.040 ac Runoff coeff. = 0.45*
Intensity = 2.321 in/hr Tc by TR55 = 52.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' *Composite(Area/C)_R0.010 x 0.90)+(0.030 x 0.30)]/0.040
' Q (cfs) SOUTH WEST ROOF DRAINAGE TO WEST
Hyd. No. 3--25 Year Q (cfs)
' 0.10
0.10
0.09
-
0.09 --
0.08 - -
0.08
0.07
- 0.07
0.06 - _ -
0.06
0.05 _
0.05
' 0.04 0.04
0.03 _ _ _
0.03
0.02
- 0.02
0.01 -
- - 0.01
0.00 0.00
0 10 20 30 40 50 60 70 80 90 100 110
' - Hyd No. 3 Time(min)
Hydrograph Report 43
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03!17/2015
Hyd. No. 4
' SOUTH DRAINAGE TO WETLAND AREA
Hydrograph type = Rational Peak discharge = 0.300 cfs
' Storm frequency = 25 yrs Time to peak = 42 min
Time interval = 1 min Hyd. volume = 756 cuft
Drainage area = 0.350 ac Runoff coeff. = 0.32*
' Intensity = 2.678 in/hr Tc by TR55 = 42.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
Composite(Area/C)_[(0.010 x 0.90)+(0.340 x 0.30)]/0.350
Q (cfs) SOUTH DRAINAGE TO WETLAND AREA
Hyd. No. 4--25 Year Q (cfs)
_- 0.50
' 0.45 _
- - 0.45
0.40
- - - - 0.40
0.35
- - - 0.35
0.30 -- -
-- 0.30
' 0.25 -
0.25
' 0.20 - -
- - - 0.20
0.15
0.10
--. - - 0.10
-
0.05
0.05
0.00 0.00
0 10 20 30 40 50 60 70 80 90
' T
Hyd No. 4 Time(min)
Hydrograph Report 44
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 5
' SOUTH EAST DRAINAGE TO WETLAND AREA
Hydrograph type = Rational Peak discharge = 0.183 cfs
' Storm frequency = 25 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 55 cuft
Drainage area = 0.070 ac Runoff coeff. = 0.39*
' Intensity = 6.700 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
Composite(Area/C)_[(0.010 x 0.90)+(0.060 x 0.30)]/0.070
Q (cfs)
SOUTH EAST DRAINAGE TO WETLAND AREA Hyd. No. 5--25 Year Q (cfs)
' 0.50 - -
-__ _ 0.50
0.45 - - - - - -
- - -- - 0.45
0.40 -
- - - 0.40
0.35
- - - - --- 0.35
0.30
- 0.30
' 0.25 -
0.25
0.15 - - -_ - 0.15
0.10
_- - - 0.10
0.05 _ 0000 - -
0.05
0.00 0.00
0 1 2 3 4 5 6 7 8 9 10
Hyd No. 5 Time(min)
Hydrograph Report 45
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03!17/2015
Hyd. No. 6
' NORTH EAST DRAINAGE TO WETLAND AREA
Hydrograph type = Rational Peak discharge = 0.442 cfs
' Storm frequency = 25 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 133 cuft
Drainage area = 0.200 ac Runoff coeff. = 0.33*
Intensity = 6.700 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
"Composite(Area/C)_[(0.190 x 0.30)+(0.010 x 0.90)]/0.200
Q (cfs)
NORTH EAST DRAINAGE TO WETLAND AREA Hyd. No. 6--25 Year Q (cfs)
' 0.50
0.50
' 0.45 - _
- 0.45
0.40 -
0.40
0.35
0.35
0.30 -
0.30
' 0.25
0.25
' 0.20
- - 0.20
0.15 - - - -
- 0.15
----00,- 0.10
0.05
0.05
_
0.00 0.00
0 1 2 3 4 5 6 7 8 9 10
' Hyd No. 6 Time(min)
Hydrograph Report 46
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03 117/2015
Hyd. No. 7
NORTH EAST DRAINAGE TO OAKLAND ROAD
Hydrograph type = Rational Peak discharge = 0.015 cfs
rStorm frequency = 25 yrs Time to peak = 13 min
Time interval = 1 min Hyd. volume = 12 cuft
Drainage area = 0.010 ac Runoff coeff. = 0.3
' Intensity = 5.003 in/hr Tc by TR55 = 13.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
Q (cfs)
NORTH EAST DRAINAGE TO OAKLAND ROAD Hyd. No. 7--25 Year Q (cfs)
_ 0.10
0.09 -_ _
0.09
-
0.08 _ - - 0.08
0.07
_ 0.07
-
0.06
0.06
' 0.05
0.05
' 0.04
- - - 0.04
0.03 _ _
___ 0.03
0.02 -
- -- 0.02
0.01 0.01
0.00 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26
' Hyd No. 7 Time(min)
Hydrograph Report 47
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.00 Tuesday,03/17/2015
Hyd. No. 8
Flo
w To Oakland Road
Hydrograph type = Combine Peak discharge = 0.059 cfs
' Storm frequency = 25 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 28 cuft
Inflow hyds. = 1, 7 Contrib. drain. area = 0.020 ac
' Q (cfs)
Flow To Oakland Road cfs
Hyd. No. 8--25 Year Q ( )
0.10
0.10
0.09 -
0.09
0.08 -- -
0.08
0.07
- _ 0.07
0.06 - -
- 0.06
AA
' 0.05 _ -
0.05
0.04
- 0.04
0.03 -
_ - - - 0.03
-
0.02 _ _
- - 0.02
0.01
- - 0.01
0.00
0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26
' - Hyd No. 8 Hyd No. 1 - Hyd No. 7 Time(min)
Hydrograph Report 48
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17!2015
Hyd. No. 9
WEST OF PROPOSED PARKING AREA DRAINAGE WEST
Hydrograph type = Rational Peak discharge = 0.212 cfs
' Storm frequency = 25 yrs Time to peak = 6 min
Time interval = 1 min Hyd. volume = 76 cult
Drainage area = 0.050 ac Runoff coeff. = 0.66*
' Intensity = 6.423 in/hr Tc by TR55 = 6.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
Composite(Area/C)_[(0.030 x 0.90)+(0.020 x 0.30)]10.050
Q (cfs) WEST OF PROPOSED PARKING AREA DRAINAGE WEST
Hyd. No. 9--25 Year Q (cfs)
' 0.50 -
0.50
0.45
0.40 - - - -- 0.40
0.35
-- - 0.35
0.30
- _ - 0.30
0.25
0.25
' 0.20 -
- 0.20
0.15 - -
- 0.15
- _ __ 0.10
0.05
0.05
' 0.00
0.00
0 1 2 3 4 5 6 7 8 9 10 11 12
- Hyd No. 9
Time(min)
Hydrograph Report 49
Hydraflow Hydrographs Extension for AutoCAD@ Civil 313820113 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 10
DRAINAGE TO WEST ABUTTING PROPERTY
Hydrograph type = Combine Peak discharge = 0.217 cfs
Storm frequency = 25 yrs Time to peak = 6 min
Time interval = 1 min Hyd. volume = 207 cuft
Inflow hyds. = 3, 9 Contrib. drain. area = 0.090 ac
Q (cfs) DRAINAGE TO WEST ABUTTING PROPERTY
Hyd. No. 10--25 Year Q (cfs)
0.50
0.40 - - - -
- - - - 0.40
0.35
- - - - - -_ - 0.35
0.30 - - - - -
- - 0.30
0.25 --
0.25
-
' 0.20 -
- - 0.20
0.15 -
- - 0.15
- -- 0.10 05
0.05 -
- -_ . 0.
0.00
0.00
0 10 20 30 40 50 60 70 80 90 100 110
' - Hyd No. 10 - Hyd No. 3 Hyd No. 9 Time(min)
Hydrograph Report 50
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.00 Tuesday,03/17!2015
Hyd. No. 11
Storm Tech Overflow
Hydrograph type = Reservoir Peak discharge = 0.000 cfs
Storm frequency = 25 yrs Time to peak = n/a
Time interval = 1 min Hyd. volume = 0 cuft
Inflow hyd. No. = 2 - PROPOSED PARKING DRI*lk*A6eS;0i&TORM TE-C1-D3.52 ft
Reservoir name = SC-740 Max. Storage = 212 cuft
Storage Indication method used.
Storm Tech Overflow
Q (cfs) Q (cfs)
Hyd. No. 11 --25 Year
1.00
0.90 _ -- - -- -- 0.90
- 0.80
0.70 0.70
0.60 - - -
-_ 0.60
-
- - -
0.50 �
- 0.50
' 0.40 0.40
- - --
0.30 - -_
0.30
0.20 0.20
0.10 - 0.10
f -
0 1 2 3 4 5 6 7 8 9 10
' Hyd No. 11 Hyd No. 2 � Total storage used=212 tuft Time(min)
Hydrograph Report 51
' Hydraflow Hydrographs Extension for AutoCADO Civil 3D®2013 by Autodesk, Inc.00 Tuesday,03/17/2015
Hyd. No. 12
Flow to Wetland Area
Hydrograph type = Combine Peak discharge = 0.661 cfs
Storm frequency = 25 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 943 cuft
Inflow hyds. = 4, 5, 6, 11 Contrib. drain. area = 0.620 ac
1
1
1
Flow to Wetland Area
Q (cfs) Hyd. No. 12--25 Year Q (cfs)
0.90 0.90
0.80 - - - - - - 0.80
0.70 0.70
0.60 0.60
' 0.50 0.50
' 0.40 - 0.40
0.30 _ 0.30
0.20 0.20
0.10 0.10
0.00 -
0.00
0 10 20 30 40 50 60 70 80 90
' Time(min)
Hyd No. 12 Hyd No. 4 Hyd No. 5 Hyd No. 6
Hyd No. 11
Summary Re ort52
kydrograph Hydraflow Hydrographs Extension for AutoCAD®Civil 3130 2013 by Autodesk, Inc.00
lHyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
o. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft) (ft) (cuft)
1 Rational 0.062 1 5 19 ---- ------ --- - NORTH WEST DRAINAGE TO OAKL
2 Rational 0.821 1 5 246 --- ----- ---- PROPOSED PARKING DRAINAGET
3 Rational 0.053 1 52 166 - --- ------ ------ SOUTH WEST ROOF DRAINAGE T
4 Rational 0.379 1 42 955 ------ ------ ------ SOUTH DRAINAGE TO WETLAND A
5 Rational 0.213 1 5 64 ------ ------ ------ SOUTH EAST DRAINAGE TO WETL
6 Rational 0.514 1 5 154 ----- ------ ____ NORTH EAST DRAINAGE TO WETL
7 Rational 0.018 1 13 14 - --- ----- ----- NORTH EAST DRAINAGE TO OAKL
8 Combine 0.069 1 5 33 1,7 ------ ------ Flow To Oakland Road
9 Rational 0.248 1 6 89 ------ ------ ----- WEST OF PROPOSED PARKING A
10 Combine 0.254 1 6 256 3,9 ------ --- DRAINAGE TO WEST ABUTTING P
11 Reservoir 0.000 1 n/a 0 2 104.03 246 Storm Tech Overflow
12 Combine 0.772 1 5 1,173 4,5,6, ------ ------ Flow to Wetland Area
11
\\DPROS BS2K1 1\G-Drive\jobs\3297\Storm I Dr@iA V*daff1d00:Yqwsed Con i1Fd8Sd* 3YpW/2015
Hydrograph Report 53
' Hydraf low Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 1
NORTH WEST DRAINAGE TO OAKLAND ROAD
Hydrograph type = Rational Peak discharge = 0.062 cfs
IStorm frequency = 100 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 19 cuft
Drainage area = 0.010 ac Runoff coeff. = 0.8*
' Intensity = 7.794 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' *Composite(Area/C)_[(0.010 x 0.90)]/0.010
' Q (cfs) NORTH WEST DRAINAGE TO OAKLAND ROAD
Hyd. No. 1 -- 100 Year Q (cfs)
0.10
0.09 _ -_
0.09
0.08 - --
- 0.08
0.07
- _ 0.07
0.06 - -
-
0.06
' 0.05 _ -
0.05
-
' 0.04
- 0.04
0.03 - - -
- 0.03
0.02 -
- - - 0.02
0.01
0.01
0.00 0.00
0 1 2 3 4 5 6 7 8 9 10
' Hyd No. 1 Time(min)
Hydrograph Report 54
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3DO 2013 by Autodesk, Inc.00 Tuesday,03/17/2015
Hyd. No. 2
PROPOSED PARKING DRAINAGETO STORM TECH.
Hydrograph type = Rational Peak discharge = 0.821 cfs
' Storm frequency = 100 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 246 cuft
Drainage area = 0.130 ac Runoff coeff. = 0.81*
Intensity = 7.794 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' Composite(Area/C)_[(0.110 x 0.90)+(0.020 x 0.30)]/0.130
Q (cfs) PROPOSED PARKING DRAINAGETO STORM TECH.
Hyd. No. 2-- 100 Year Q (cfs)
1.00
1.00
0.90
0,90
0.80 - - - -
- 0.80
0.70 0.70
-
0.60
' 0.50 -
- 0.50
' 0.40 -- __
- - 0.40
- - - -- - 0.30
0.20 -
-- - 0.20
0.10
0.00 _ -
0.00
0 1 2 3 4 5 6 7 8 9 10
- Hyd No. 2
Time(min)
Hydrograph Report 55
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 3
SOUTH WEST ROOF DRAINAGE TO WEST
Hydrograph type = Rational Peak discharge = 0.053 cfs
Storm frequency = 100 yrs Time to peak = 52 min
Time interval = 1 min Hyd. volume = 166 cuft
Drainage area = 0.040 ac Runoff coeff. = 0.45*
Intensity = 2.963 in/hr Tc by TR55 = 52.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
Composite(Area/C)_[(0.010 x 0.90)+(0.030 x 0.30)]/0.040
Q (cfs)
SOUTH WEST ROOF DRAINAGE TO WEST Hyd. No. 3-- 100 Year Q (cfs)
0.10
' 0 -
- - 0.09
.09
- 0.08
0.07
0.07
0.06 -
- - 0.06
0.05 -
- - 0.05
0.04 -
' - 0.04
- -
- _ 0.03
0.02
-_ - - 0.02
-
0.01
- - 0.01
0.00
0.00
0 10 20 30 40 50 60 70 80 90 100 110
' Hyd No. 3 Time(min)
Hydrograph Report 56
' Hydraflow Hydrographs Extension for AutoCAM Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 4
SOUTH DRAINAGE TO WETLAND AREA
Hydrograph type = Rational Peak discharge = 0.379 cfs
' Storm frequency = 100 yrs Time to peak = 42 min
Time interval = 1 min Hyd. volume = 955 cuft
Drainage area = 0.350 ac Runoff coeff. = 0.32*
' Intensity = 3.382 in/hr Tc by TR55 = 42.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
Composite(Area/C)_[(0.010 x 0.90)+(0.340 x 0.30)]/0.350
SOUTH DRAINAGE TO WETLAND AREA
Q (cfs) Hyd. No. 4-- 100 Year Q (cfs)
- 0.50
0.45 _ _ -
- - - 0.45
0.40 -
- - - - 0.40
0.35
- 0.35
0.30 - -
0.30
' 0.25 -
0.25
0.20 _ _ - - -
0.20
0.15 -
__ 0.15
0.10 - - -
- - - 0.10
0.05
-_ 0.05
0.00 0.00
0 10 20 30 40 50 60 70 80 90
- Hyd No. 4
Time(min)
Hydrograph Report 57
' Hydraf low Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 5
SOUTH EAST DRAINAGE TO WETLAND AREA
Hydrograph type = Rational Peak discharge = 0.213 cfs
Storm frequency = 100 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 64 cuft
Drainage area = 0.070 ac Runoff coeff. = 0.39*
' Intensity = 7.794 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' *Composite(Area/C)_[(0.010 x 0.90)+(0.060 x 0.30)]/0.070
' Q (cfs) SOUTH EAST DRAINAGE TO WETLAND AREA
Hyd. No. 5-- 100 Year Q (cfs)
' 0.50
0.50
0.45 -
' 0.45
0.40
- 0.40
........ .......... . . ....._-
0.35
0.35
0.30
- 0.30
' 0.25 -
0.25
0.20 - -
0.20
00�
-
-_ _ 0.15
0.10 -
0.10
0.05
0.05
0.00 0.00
0 1 2 3 4 5 6 7 8 9 10
Hyd No. 5
Time(min)
Hydrograph Report 58
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3130 2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 6
' NORTH EAST DRAINAGE TO WETLAND AREA
Hydrograph type = Rational Peak discharge = 0.514 cfs
Storm frequency = 100 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 154 cuft
Drainage area = 0.200 ac Runoff coeff. = 0.33*
Intensity = 7.794 in/hr Tc by User = 5.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
' Composite(Area/C)_[(0.190 x 0.30)+(0.010 x 0.90)]/0.200
Q (cfs)
NORTH EAST DRAINAGE TO WETLAND AREA Hyd. No. 6-- 100 Year Q (cfs)
- 1.00
0.90
0,90
0.80 - -
- - _ _ . 0.80
0.70
0.60 - - - - - - -
0.60
' 0.50 -
- - __ 0.50
0.40 - _
0.40
0.30 _ -
- - 0.30
0.20 _ _
- _- - 0.20
0.10 --
0.10
' 0.00 _
0.00
0 1 2 3 4 5 6 7 8 9 10
- Hyd No. 6
Time(min)
' Hydrograph Report 59
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3DO 2013 by Autodesk,Inc.v10 Tuesday,03/17/2015
Hyd. No. 7
' NORTH EAST DRAINAGE TO OAKLAND ROAD
Hydrograph type = Rational Peak discharge = 0.018 cfs
' Storm frequency = 100 yrs Time to peak = 13 min
Time interval = 1 min Hyd. volume = 14 cuft
Drainage area = 0.010 ac Runoff coeff. = 0.3
' Intensity = 5.995 in/hr Tc by TR55 = 13.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
Q (cfs)
NORTH EAST DRAINAGE TO OAKLAND ROAD
Hyd. No. 7-- 100 Year Q (cf s)
0.10
0
- 0.09
.09
0.08 0.08
0.07 0.07
-
- 0.06
0.05 - -_ - -
0.05
0.04
- - - 0.04
0.03
:
0.02 - - -___-
0.02
0.01 14 - 0.01
0.00 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26
- Hyd No. 7
Time(min)
Hydrograph Report 60
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 8
Flow To Oakland Road
Hydrograph type = Combine Peak discharge = 0.069 cfs
' Storm frequency = 100 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 33 cuft
Inflow hyds. = 1, 7 Contrib. drain. area = 0.020 ac
Q (cfs)
Flow To Oakland Road Hyd. No. 8-- 100 Year Q (cfs)
- 0.10
0.09
0,09
0.08 -- - -
- -- 0.08
0.07
- 0.07
AA --
- 0.06
' 0.05 --
- - - - 0.05
0.04 _ _ - -
0.04
0.02 - - _ - - -_
0.02
0.01 -
- 0.01
0.00 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26
' - Hyd No. 8 Hyd No. 1 - Hyd No. 7 Time(min)
Hydrograph Report 61
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.00 Tuesday,03/17/2015
Hyd. No. 9
WEST OF PROPOSED PARKING AREA DRAINAGE WEST
Hydrograph type = Rational Peak discharge = 0.248 cfs
' Storm frequency = 100 yrs Time to peak = 6 min
Time interval = 1 min Hyd. volume = 89 cuft
Drainage area = 0.050 ac Runoff coeff. = 0.66*
Intensity = 7.506 in/hr Tc by TR55 = 6.00 min
IDF Curve = Connecticut IDF.idf Asc/Rec limb fact = 1/1
Composite(Area/C)_[(0.030 x 0.90)+(0.020 x 0.30))/0.050
' Q (cfs) WEST OF PROPOSED PARKING AREA DRAINAGE WEST
Hyd. No. 9-- 100 Year Q (cfs)
' 0.50
0.50
0.45
' 0.45
0.40 -
_ 0.40
0.35
0.35
0.30 0.30
' 0.25
- 0.25
' 0.20 -
- 0.20
0.15
0.10 - _-
0.10
' 0.05
- - 0.05
' 0.00
0.00
0 1 2 3 4 5 6 7 8 9 10 11 12
'
Hyd No. 9 Time(min)
Hydrograph Report 62
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D8 2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 10
DRAINAGE TO WEST ABUTTING PROPERTY
Hydrograph type = Combine Peak discharge = 0.254 cfs
Storm frequency = 100 yrs Time to peak = 6 min
Time interval = 1 min Hyd. volume = 256 cuft
Inflow hyds. = 3, 9 Contrib. drain. area = 0.090 ac
DRAINAGE TO WEST ABUTTING PROPERTY
Q (cfs) Hyd. No. 10-- 100 Year Q (cfs)
' 0.50 -
_ 0.50
0.45 __ -_
- - --- 0.45
0.40 0.40
0.35
-_ 0.35
0.30 - - - -
0.30
' 0.25 - - -
- - 0.25
-
' 0.20
- 0.20
0.15
0.10
0.05
- 0.05
0.00 0.00
0 10 20 30 40 50 60 70 80 90 100 110
' Hyd No. 10 Hyd No. 3 Hyd No. 9 Time(min)
Hydrograph Report 63
' Hydraflow Hydrographs Extension for AUtoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,03/17/2015
Hyd. No. 11
' Storm Tech Overflow
Hydrograph type = Reservoir Peak discharge = 0.000 cfs
Storm frequency = 100 yrs Time to peak = n/a
Time interval = 1 min Hyd. volume = 0 cuft
Inflow hyd. No. = 2 - PROPOSED PARKING DPAMAGETOWORM TE�K4.03 ft
Reservoir name = SC-740 Max. Storage = 246 cuft
Storage Indication method used.
Q (cfs)
Storm Tech Overflow
�
Hyd. No. 11 -- 100 Year Q (cfs)
1.00
0.90
0.90
0.80
_
0.70
0.70
0.60 - -
0.60
' 0.50
0.50
0.40 _ 0.40
0.30 _ - -
0.30
0.20
0.20
0.10 -
0.10
' 0.00 0.00
0 1 2 3 4 5 6 7 8 9 10
Time(min)
Hyd No. 11 Hyd No. 2 Total storage used= 246 cuft
Hydrograph Report 64
' Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.00 Tuesday,03 117/2015
Hyd. No. 12
Flow to Wetland Area
Hydrograph type = Combine Peak discharge = 0.772 cfs
' Storm frequency = 100 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 1,173 cuft
Inflow hyds. = 4, 5, 6, 11 Contrib. drain. area = 0.620 ac
1
Flow to Wetland Area
Q (cfs) Hyd. No. 12-- 100 Year Q (cfs)
' 1.00 _ : 1.00
0.90 -_ 0.90
0.80 0.80
0.70 0.70
0.60 0.60
0.50 _ 0.50
1A
' 0.40 _ - _
- - _ 0.40
0.30 - _ _ -__ _ 0.30
0000
0.20 -- 0.20
0.10 - - 0.10
0.00 - 0.00
0 10 20 30 40 50 60 70 80 90
' Time(min)
Hyd No. 12 - Hyd No. 4 Hyd No. 5 Hyd No. 6
Hyd No. 11
U •�
r
� U
W �o
a
A
Se ri t,.ion of Arg Runoff Coefficients
Business: Downtown areas 0.7 -0. "
Neighborhood arm 0,50-0.70,
l ,residential: Single-family areas 0.30-0.5
Multi its, detached0.40-0.60
Multi units, attached .b -0,. '
Suburban .25-0A
Residential (0.5 ha (1.2 ac) lots or more) 0. 0-0.45
Apartment dwelling areas . -0.,70
Industrial- Light areas 0.510480
Heavy areas 0. 0- .9
Parks, cemeteries 0. 10- .25
Playgrounds- 0. 4:4
Railroad yard arm 0. 0-0. 0
Unimproved areas 0.10-0. 0
ou :e Hydrology, Federal Highway Administration, HEC No. 19, 1984
October 2000 ConnDOT Drainage Manual
6,9-6 Hydroloev
Table Coefficients For Composite runoff Analysis
Surface Runoff Coefficients,
Street. It ..7 -0.
Concrete .8 - . 5
Drives and walks .7 -0. 5
Roofs 0.75-0-95
Source, Hydrology, Federal Highway, dminis t +gin, HEC No. 19, 1 4
' APPENDIX
Drainage Area Maps
1
1
1
1
1
1
1
I WATERSHED
NORTH EAST DRAINAGE
WETLAND AREA
AREA=0.23 ACRES
II I IGO s COVER RESIDENTIAL=0.22 ACRI
I I I I APPROX. IMPERVIOUS=0.01
S I I I I I III OF WEL L C= 0.33
1 LVq�� Cq IIIIIIII I I (SEE NOTE #4� TC= 6 MINS
1 PA /4 /08 02/l /-� I I I I I I i 1 I TO DISCHARGE POINT 13 TC.• DRAINAGE TO
DRAINAGE TO WETLAND AREA WETLAND AREA
SHEET FLOW
\� - - -107
n=a24 (DENSE GRASS)
- -I06- - - - — — — — i I I Igi I 94.22 ��1��/ S=0.04
I I I p I I I LHEET 28.01 LOW
I MAPLE I n-I _I 0.24 (DENSE GRASS)
�rt�ryl I I I S=a46
105�
"'10A _ I I I I M DRAINAGE TO
WERAND AREA
26 / I I I I I I I I SHEET FLOW
WATERSHED
SOUTH EAST DRAINAGE TO L=0.24
I I I I I I WETLAND AREA S=0» (DENSE GRASS)
AREA=0.07 ACRES
COVER
� SHEET FLOW
RESIDENTIAL=0.06 ACRES L=20.75'
IMPERVIOUS=0.01 ACRES S_0.4
C= (DENSE GRASS)
l02 —�� ice / I I
// / 100' /� // // ' I I I 0.39 4 MINS
101 TO
q �
DR DISCHARGE
TO POINT D AREA
\cp
/
HOUSE #49
T F .10 I I / / (n NORTH WATERSHED
EAST DRAINAGE TO
GAR AR FF/07.48 I I I I WETLAND AREA
I I I Q I AREA=0.20 ACRES�
toe
HM BA ROE SDENIIAL=0.19 ACRES
APPI�OX. IMPERVIOUS=0.01
I I I OF NEL LN C= 0.33
I (SEE NOTE #4,) TC= 5 MINS
TO DISCHARGE POINT#3
DRA/NAGE TO WETLAND AREA
-107-
104
I I M DRAIN G
/03 i I TO
WETLAND AREASEET
I I WATERSHED LH28.33'OW
102 I I I SOUTH EAST DRAINAGE TO n=0.24 (DENSE GRASS)
WETLAND I I S=0.11
/0/ AREA=0.07 ACRES
SHEET FLO
COVER W
L=20.75'
RESIDENTIAL=0.06 ACRES
V�( I I IMPERVIOUS=0.01 ACRES S=0.52 (DENSE GRASS)
I 0.39 TC= 4 MINS
TO DISCHARGE POINT#3
DRAINAGE TO WETLAND AREA
' APPENDIX E
SC-740 Technical Data
t
1
1
1
1
1
SC-740 TECHNICAL SPECIFICATION
NTS
' 90.7"(2304 mm)ACTUAL LENGTH 85.4" 2169 mm INSTALLED LENGTH
G5 BUILD ROW IN THIS DIRECTION
MSTART END
OVERLAP NEXT CHAMBER HERE
(OVER SMALL CORRUGATION)
' ACCEPTS 4"(100 mm)SCH 40 PVC PIPE FOR INSPECTION
PORT.FOR PIPE SIZES LARGER THAN 4"(100 mm)UP TO
10"(250 mm)USE INSERTA TEE CONNECTION CENTERED
ON A CHAMBER CREST CORRUGATION
of vv
' 29.3" 30.0"
(744 mm) o o (762 mm)
( 10 mm) I _ 45.9"(1166 mm) --I 1295 mm
310 mm I` ( )
' NOMINAL CHAMBER SPECIFICATIONS
SIZE(W X H X INSTALLED LENGTH) 51.0"X 30.0"X 85.4" (1295 mm X 762 mm X 2169 mm)
CHAMBER STORAGE 45.9 CUBIC FEET (1.30 m')
MINIMUM INSTALLED STORAGE* 74.9 CUBIC FEET (2.12 m')
WEIGHT 75.0 lbs. (33.6 kg)
*ASSUMES 6"(152 mm)STONE ABOVE,BELOW,AND BETWEEN CHAMBERS A I A �{
1 1
B �
' STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH"B" C
STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH"T"
' PART# STUB A B C
SC740EPE06T/SC740EPE06TPC 6"(150 mm) 10.9"(277 mm) 18.5"(470 mm)
SC740EPE06B/SC740EPE06BPC - 0.5"(13 mm)
SC740EPE08T/SC740EPE08TPC 8"(200 mm) 12.2"(310 mm) 16.5"(419 mm)
' SC740EPE08B/SC740EPE08BPC -- 0.6"(15 mm)
SC740EPE10T/SC740EPE10TPC 10"(250 mm) 13.4"(340 mm) 14.5"(368 mm)
SC740EPE10B/SC740EPE10BPC - 0.7"(18 mm)
SC740EPE12T/SC740EPE12TPC 12"(300 mm) 14.7"(373 mm) 12.5"(318 mm)
1 SC740EPE12B/SC740EPE12BPC --- 1.2" 30 mm
SC740EPE15T/SC740EPE15TPC 15"(375 mm) 18.4"(467 mm) 9.0"(229 mm)
SC740EPE15B/SC740EPE156PC - 1.3"(33 mm)
SC740EPE18T/SC740EPE18TPC' 5.0"(127 mm)18"(450 mm) 19.7"(500 mm}
SC740EPE18B/SC740EPE18BPC 1.6"(41 mm)
SC740EPE24B* 24"(600 mm) 18.5"(470 mm) 0.1"(3 mm)
ALL STUBS,EXCEPT FOR THE SC740EPE24B ARE PLACED AT BOTTOM OF END CAP SUCH THAT THE OUTSIDE DIAMETER OF
' THE STUB IS FLUSH WITH THE BOTTOM OF THE END CAP.FOR ADDITIONAL INFORMATION CONTACT STORMTECH AT
1-888-892-2694.
*FOR THE SC740EPE24B THE 24"(600 mm)STUB LIES BELOW THE BOTTOM OF THE END CAP APPROXIMATELY 1.75"(44 mm).
BACKFILL MATERIAL SHOULD BE REMOVED FROM BELOW THE N-12 STUB SO THAT THE FITTING SITS LEVEL.
' NOTE:ALL DIMENSIONS ARE NOMINAL
PAYMENT SUMMARY RECEIPT
TOWN OF SOUTH WINDSOR
1540 SULLIVAN AVENUE
SOUTH WINDSOR CT 06074
DATE: 03/18/15 CUSTOMER#: 000000000
TIME: 14:26
CLERK: laurenlz
RECPT#: 20772531 PREV BAL:
TP/YR: MS/2015 AMT PAID: 310.00
BILL: ADJSTMNT:
EFF DT: 03/18/15 BAL DUE:
PERMITS/INSP PAYMENT
-----------------TOTALS-----------------
PRINCIPAL PAID: 310.00
INTEREST PAID: .00
ADJUSTMENTS: .00
DISC TAKEN: .00
AMT TENDERED: 310.00
AMT APPLIED: 310.00
CHANGE: .00
PAID BY: DESIGN PROFESSIONALS
PAYMENT METH: MULTIPLE
PAYMENT REF:
PLANNING DEPARMENT
IN-HOUSE REFERRAL FORM
DATE: 3-18-15
TO: Matt Galligan, Fred Shaw, Michael Gantick, Walter Summers, Jeff Doolittle
Ray Favreau, Mark Owens, Chris Dougan, Heather Oatis, Ron Asselin,
John Caldwell, Andrea Confrancesco, Glen Buonanducci
FROM: Michele Lipe, AICP, Director of Planning
The Planning &Engineering Departments have received plans for the following projects:
Appl 15-20P, Shea& Company Site Plan
Location: 49 Oakland Road
® Site Plan ❑ Subdivision No. Acres 1 Zone RC
❑ Industrial ® Commercial ❑ Residential No. Lots/Units
Water: ® Public ® Private Well Sewerage: ® Public ❑ Septic System
Project Description: Convert existing house into professional office—approx. 1,500 sf
Future Town-owned property involved? ❑ Yes ®No
❑ new street(s) ❑ new detention area
❑ new open space/recreation area ❑ active ❑passive
Planning Department notes:
Please comment by 4-1-15 and return to the Planning Department.
Page 1 of 1
Zarambo, Lauren L.
From: Shaw, Fred
Sent: Wednesday, March 18, 2015 2:40 PM
To: Zarambo, Lauren L.
Subject: RE: In House Referral Form
This project will require WPCA approval; owner will need to provide their own refuse and recyclables collection.
The applicant should describe how refuse and recyclables will be handled, and show on site plan where these
containers will be located.
C. Frederick Shaw
Superintendent Pollution Control
Town Hall
1540 Sullivan Avenue
South Windsor, CT 06074
TEL: (860) 644-2511 EXT. 247
CELL: (860) 803-8886
FAX: (860)644-7280
EMAIL: fred.shawCabsouthwindsor.org
From: Zarambo, Lauren L.
Sent: Wednesday, March 18, 2015 12:11 PM
To: Asselin, Ronald; Buonanducci, Glenn; Caldwell, John; Cofrancesco, Andrea; Doolittle, Jeffrey; Dougan,
Christopher; Favreau, Raymond; Galligan, Matthew; Gantick, Michael; McGann, Sherry; Owens, Mark; Shaw,
Fred; Summers, Walter
Subject: In House Referral Form
Please find attached In House Referral form for Appl. 15-20P, Shea& Company Real Estate, LLC, 49 Oakland
Road.
Please forward any comments or questions to the Planning Department.
Thank you,
Lauren L Zarambo
Planning Department Secretary
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT o6074
86o.644.2511 ext 253
3/18/2015
I,
Page 1 of 1
Zarambo, Lauren L.
From: Buonanducci, Glenn
Sent: Wednesday, March 18, 2015 2:50 PM
To: Zarambo, Lauren L.
Cc: Custer, Scott
Subject: RE: In House Referral Form
I would suggest the removal of some of the low brush on the east side of the property to improve the sight line
looking east. I would also ask that the parking plan allow for enough space for a vehicle to turn around and pull
out of the driveway to avoid backing onto Rt. 30. Thank you.
SGT. Buonanducci 156
This transmission is intended for the sole use of the individual or entity to whom it is addressed,and may contain information that is for official
use only,law enforcement sensitive,privileged,confidential and/or exempt from disclosure under applicable law.You are hereby notified that
any dissemination,distribution or duplication of this transmission by someone other than the intended addressee or its designated agent is
strictly prohibited.If your receipt of this transmission is in error,please reply to the sender of this transmission.
From: Zarambo, Lauren L.
Sent: Wednesday, March 18, 2015 12:11 PM
To: Asselin, Ronald; Buonanducci, Glenn; Caldwell, John; Cofrancesco, Andrea; Doolittle, Jeffrey; Dougan,
Christopher; Favreau, Raymond; Galligan, Matthew; Gantick, Michael; McGann, Sherry; Owens, Mark; Shaw,
Fred; Summers, Walter
Subject: In House Referral Form
Please find attached In House Referral form for Appl. 15-20P, Shea& Company Real Estate, LLC, 49 Oakland
Road.
Please forward any comments or questions to the Planning Department.
Thank you,
Lauren L Zarambo
Planning Department Secretary
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT o6074
86o.644.25n ext 253
3/18/2015
Page 1 of 1
r
Lipe, Michele
From: Lipe, Michele
Sent: Monday, March 23, 2015 9:46 AM
To: 'Ben Wheeler'; 'Peter DeMallie'
Subject: Appl 15-20 P, Shea &Co. Site Plan comments
Attachments: Appl 15-20P, Shea & Co..pdf
See attached Planning comments.
Michele R. Lipe, AICP
Director of Planning
Town of South Windsor
South Windsor, CT 06074
(860) 644-2511, ext. 252
3/23/2015
y
Appl 15-20P, Shea & Company Site Plan Comments
Planning Comments
• Site lines must be shown at the site drive
• Dumpster area must be shown on the plans
• Access Management provisions for the property to the west must be addressed on
the plans
• Consideration should be given for burying of overhead wires
• Turnaround stub at the western end of the parking area appears to be too short for
cars to be able to adequately use as a turnaround
• Site lighting does not appear to be evenly distributed throughout parking area
SWPD Traffic Authority
Suggest the removal of some of the low brush on the east side of the property to improve
the sight line looking east. Parking plan allow for enough space for a vehicle to turn
around and pull out of the driveway to avoid backing onto Rt. 30.
Health Department Comments
See well information which was forwarded by email earlier
WPCA Comments
WPCA approval required; owner will need to provide their own refuse and recyclables
collection. The applicant should describe how refuse and recyclables will be handled,
and show on site plan where these containers will be located.
RECEIVED
` t P.O. BOX 1 167
APR
21 Jeffrey Drive
SOUTH WINDSOR,CT 06074
esign SOUTH WINDSOR PLANNING DEPT. PHONE: 860.291.8755
.8757
��omft FAX: 8onalsi c.com
www.designprofessionalsinc.com
CIVIL & TRAFFIC ENGINEERS / PLANNERS / SURVEYORS / GIS ANALYSTS / LANDSCAPE ARCHITECTS
Serving Connecticut, Massachusetts, Rhode/B/and
April 9, 2015
Town of South Windsor, Connecticut
Attn: Michele R. Lipe, AICP
1540 Sullivan Avenue
South Windsor, CT 06074
Re: Responses to Site Plan Comments DPI No.: 3297
Received 3/23/15
Shea & Company Real Estate, LLC
49 Oakland Road
Application: 1 5-20P
Dear Michele:
:
Our office has received your planning comments regarding Site Plan Application 1 5-20P for the
: new construction of a 5,000 square foot parking lot and remodeling of the existing residential
building to become office space for Shea & Company Real Estate, LLC. Abbreviated responses are
: provided below responding to comments made by the Planning Commission, SWPD Traffic
Authority, Health Department, & WPCA:
Planning Comments:
:
1. Site lines shown on SP-1. The proposed site drive location meets the DOT requirement
for 441 feet of sight line for a 40 mph road.
:
2. Refuse and Recycle area shown on SP-1 and LA-1.
:
3. Access management easement in favor of the west abutting property shown on SP-1 .
4. Note calling for removal of existing overhead electrical wires shown on SP-1 . Proposed
underground electrical connection shown on GR-1
:
5. Turn around stub was extended to 5 feet.
6. The light poles were designed to be in proportion with the existing structure. The
only way to provide better light distribution would be to utilize much taller poles.
Also, the photometrics provided do not account for the existing street lighting on
Oakland Road, which will also help with light distribution.
Y•
•
•
SWPD Traffic Authority Comments:
:
7. The applicant has cleared enough brush to satisfy DOT site line requirements. And the
turnaround stub was extended to 5 feet.
Health Department Comments:
8. We submitted a Public Water System Screening Form to Patricia Bisacky from the State
of Connecticut Department of Public Health on March 23ra, 2015. We are now waiting
for the comments from their review. We do believe that we do not meet their definition
of a public water supply.
• WPCA Comments:
:
• 9. A WPCA application has been submitted for change of the existing building's usage
from residential to office use.
Should you have any questions or require any additional information. Please feel free to contact
our office.
• Sincerely,
• Daniel H.Jameson, E.I.T
•
•
•
•
t p.NN SC4
t�
a V
w� 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074
r�OSOR-CO TELEPHONE (860) 644-2511
April 13, 2015
Benjamin Wheeler
Design Professionals, Inc.
P.O. Box 1167
South Windsor, CT 06074
Dear Mr. Wheeler:
Re: Appl. 15-20P, Shea & Company Real Estate, LLC - request for site plan
approval for conversion of an existing house into a real estate office at 49 Oakland
Road, RC zone
Please be advised that the above referenced matter has been scheduled on the
Planning & Zoning Commission Regular Meeting agenda for Tuesday, April 28, 2015
at 7:30 p.m. in the Madden Room of the South Windsor Town Hall, 1540 Sullivan
Avenue. Someone must be present at the meeting to represent the application.
One sign advertising the meeting must be posted on the property for ten (10)
consecutive days prior to the meeting and must be clearly visible from a town street.
The sign must be posted on Oakland Road by Friday, April 17, 2015.
Signs can be obtained in the Planning Department, Monday through Friday, 8:00
a.m. - 4:30 p.m. If you have any questions regarding this letter, please call 860-644-
2511, Ext 253.
Sincerely,
Lauren Zarambo
Administrative Secretary
ZOWN
SBq _ ..
To�
w� 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074
SOR-CO TELEPHONE(860) 644-2511
Certified #7011 1570 0000 6332 8437
April 21, 2015 �
Margaret Shea
Shea& Company Real Estate, LLC °
1750 Ellington Road NN1NGa�P�•
South Windsor, CT 06074 W1NQRPIA
RE: Appl. #15-20P-Shea—49 Oakland Road
Dear Ms. Shea:
At the April 15, 2015 regular meeting, the Inland Wetlands Agency/Conservation Commission Appl.#15-
20P-Shea & Company Real Estate LLC—49 Oakland Rd—Inland Wetlands/Conservation Commission
application for approval for the construction of a parking lot on property located south of Oakland Rd,
Restricted Commercial (RC)Zone, with the following conditions:
1. The final approved copy of the entire set of plans and this letter reproduced thereon must be
submitted to the Planning Department. This must be completed within 65 days of approval prior
to any construction activity on the site. Plans submitted to Planning & Zoning Commission shall
be considered having met this requirement.
2. The application shall indemnify and hold harmless the Town of South Windsor against any
liability, which might result from the proposed operation or use.
3. The permit is valid for five years and shall expire on April 15, 2020. It is the
landowners)/applicant(s) responsibility to track expiration dates and notify the Commission of a
renewal request at least 65 days prior to expiration.
4. A bond shall be collected in the amount of $2,000.00 for establishment and maintenance of
erosion and sediment controls.
5. All approvals required must be obtained and submitted prior to any activity on the site.
6. A contact person shall be identified on the plans.
7. Creation of a stone lined channel from the level spreader to the toe of the slope must be included
on the plan.
Very truly yours,
INLAND WETLANDS AGENCY/
CONSERVATION COMMISSION
WYL
__ __._----Elizabe-th_A._WarrQn,Chairperson_
EAW/dt
cc: Director of Planning .
Chief Building Official
Appl #15-20P, Shea Realty Site
Planning Department Report
1. Request for site plan modification for the conversion of an existing house into a real
estate office for [property located at 49 Oakland Road, RC zone.
2. The existing lot size is .9; minimum lot size allowed is 30,000. Frontage requirement
is 150 feet, 211 feet provided. Front yard setback is required is 65 feet; 69 feet
proposed. Impervious coverage is 15.6%, maximum impervious coverage allowed is
60%.
3. The square footage of office space after the conversion of the house will be
approximately 1580 sf. This office use will require 8 parking spaces under zoning,
and 10 spaces have been provided.
4. The proposed site lighting includes two new pole lights that are dark sky compliant
led fixtures, and proposed to be 12 feet in height to maintain the residential feel of
the property.
5. Parking lot landscaping requirements have been met with the shade tree and the
screening along the parking lot perimeter facing Oakland Road.
6. Signage for the business is proposed on the building as well as a free stranding sign
out by the street. Both sign are designed in conformance with the zoning
requirements. The street signage is solid panel with up lighting and the building
signage will be an internally lit box sign.
7. The Architecture Design Review Committee reviewed this application on Thursday
April 2 and forwarded a favorable review of the project.
8. There are regulated wetlands on the eastern portion of the property. The applicant
received IWA/CC approval on April 15 requiring a $2000 Erosion and
Sedimentation bond and standard conditions.
9. The property will be served by a private on-site well and public sewers. The
applicant is required to apply to the State Health Department for determination of
how the well will be classified and testing requirements. WPCA approval is required
for the s ' n. cA ,. , + 4L— o4=."
10.The applicant intends to keep the refuse containers behind the building and will
make private arrangements for pick up.
11.South Windsor Police Department has reviewed the plans. They commented on the
need to keep the site line looking eastward clear. Since Oakland Road is a state road,
the applicant will be required to get a state encroachment permit for the widening of
the drive at the roadway.
C J Ti� V I S_V� W
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074
ox•co TELEPHONE (860) 644-2511
CERTIFIED MAIL 70111570 0000 63371310
April 30, 2015
Shea&Company Real Estate, LLC
K&M Partners, LLC
1750 Ellington Road
South Windsor, CT 06074
To Whom It May Concern:
Re: Appl.15-20P, Shea&Company Real Estate, LLC Site Plan of Development
We are pleased to advise you that the Planning & Zoning Commission voted on April 28, 2015 to approve with
modifications the above referenced application for a Site Plan of Development.
This approval is for Shea & Company Real Estate, LLC on property located at 49 Oakland Road, RC zone, as
shown on plans prepared by Design Professionals, Inc. dated March 17, 2015 as revised. This approval is
subject to the following modifications:
1. Prior to commencement of any site work, a meeting must be held with Town Staff.
2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office.
3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation
Commission, including bonds in the amount of$2,000.
4. A landscape bond in the amount of$2,000 is required and must be submitted prior to the issuance of a
certificate of occupancy if work is not completed.
5. All bonds must be in one of the forms described in the enclosed Bond Policy.
6. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 9.1.3 of the Zoning
Regulations.
7. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of
South Windsor.
8. This approval does not constitute approval of the sanitary sewer, which can only be granted by the Water
Pollution Control Authority.
9. The applicant shall provide water by well and comply with Department of Health Requirements.
10. The building street number must be included on the final plan.
11. Pavement markings must be maintained in good condition throughout the site drives and parking areas.
12. All free standing signs and/or building signs require the issuance of a sign permit before they are erected.
13. If a State Traffic Commission certificate is required,no building permits will be issued until the certificate
has been issued (per CGS §14-311).
14. In accordance with Section 5 and access management requirements,this approval is subject to the
following:
• An easement allowing cross access to and from the adjacent property to the west on Oakland Road must
be shown granting irrevocable permission to enter upon and perform all activities needed to construct
the driveway, on both properties on which the driveway will be constructed.
At such time as a site plan is approved for the property to the immediate west, an interconnection shall be
constructed in the area shown on the subject site plan OR as agreed by the two property owners and further
approved by the Planning and Zoning Commission. Failure to construct the site interconnection shall be
construed as a zoning violation and shall be pursued via the remedies available to the Town of zoning
violations.
Also, in accordance with the provisions of Section 5.5.4E, the applicant shall record on the land records an
agreement that remaining access rights along Oakland Road will be dedicated to the Town.
Black and white transparent mylars of Sheet#SP-1 and LA-1 with the above modifications, together with three
blueprint copies of the entire set of plans with live signatures and raised seals (including architectural elevations
and landscaping plans)must be submitted to this Commission to be stamped and signed. The letters of approval
of this Commission as well as the Inland Wetlands Agency/Conservation Commission and the Water Pollution
Control Authority must be reproduced on the mylars.
After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the
Town Clerk.
Very Truly Yours,
Bart Pacekonis, Chairman
Planning and Zoning Commission
BP/llz
Enclosure
cc: Town Engineer
Chief Building Official
Assessor
Superintendent of Pollution Control
Fire Marshal
Benjamin Wheeler,Design Professionals, Inc.
"Lo N Sf4
O
a
9 c,
• w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074
�l�OsoR•CO TELEPHONE (860) 644-2511
May 15, 2015
Daniel Jameson
Design Professionals, Inc.
21 Jeffrey Drive
South Windsor, CT 06074
RE: Shea&Company Real Estate, LLC—49 Oakland Road, South Windsor, CT
WPCA Approval—Change from Residential to Office Use
Dear Mr. Jameson:
The South Windsor Water Pollution Control Authority, at its special meeting on May 5,
2015, gave approval to the change the use from residential to commercial of the property
located at 49 Oakland Road, South Windsor, CT as more specifically shown on plans
entitled "Shea & Company Real Estate, LLC, 49 Oakland Road, South Windsor,
Connecticut, Site Plan", Prepared by Design Professionals, South Windsor, CT; Dated
March 17, 2015; Revised Date: April 8, 2015; Project No. 3297. This approval is subject
to the following conditions:
1. Payment of a commercial connection charge in the amount of$2,654.00.
2. Installation of a water utility meter is required for purposes of measuring the
amount of water that goes into the Town's sewer system; the applicant shall
submit to the Town in January of each year a written meter reading report on
company letterhead for the previous calendar year.
3. Technical approval of the Town of South Windsor Engineering Department.
This approval letter must be superimposed on the final approval plans.
Very truly yours,
R chard Aries, Chairman
ater Pollution Control Authority
cc: Michael J. Gantick,Director of Public Works
Jeff Doolittle,Town Engineer
Michele Lipe, Director of Planning
Chris Dougan, Chief Building Inspector
Peter DeMallie,Design Professionals, Inc.
SCW N Sf4
° c 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074
r�OSOR•c°� TELEPHONE(860) 644-2511
June 25, 2015
Margaret Shea
Shea&Company Real Estate, LLC
1750 Ellington Road
South Windsor, CT 06074
Dear Ms. Shea,
Re: Preconstruction Meeting for Appl. 15-20P, Shea& Company Real Estate,LLC
IN ATTENDANCE
Name Company E-MAIL Phone number
Michele R. Lie SW Planning michele.lipe@southwindsor.org 644-2511 x252
Jeffrey Folger SW Planning jeffrey.folger@southwindsor.org 644-2511 x229
Jeffrey Doolittle SW Engineering ,jeffrey.doolittle@southwindsor.org 644-2511 x245
Heather Oatis SW Health heather.oatis@southwuidsor.ora 644-2511 x250
Margaret Shea Shea&Company mmshea72 @ amail.com 860-644-0688
Peter DeMallie Design pdemallie@dpinc.co 860-291-8755
Professionals, Inc.
Daniel Jameson Design diameson@dpinc.co 860-291-8755
Professionals, Inc.
Joseph Charette Quality Paving Co. jkcharette@live.com 860-6044705
The following is a brief summary of points discussed during the meeting:
Erosion and Sedimentation Control
1. All erosion and sedimentation control measures are to be in erosion and sedimentation control measures are to be place to earth moving operations into earth movin��erations in
each area and maintained/cleaned out during construction. Call Jeffrey Folger, Senior Environmental
Planner for inspection when measures are in place, prior to commencement of site work or if any
problems/concerns arise during construction at 860-644-2511 Ext. 229.
2. All topsoil stockpile areas to be protected(ringed with haybales or equal).
3. Use existing pavement and minimize tracking of dirt/gravel on to Oakland Road. Calcium chloride or
water is to be used for dust control as required.
4. Install and stabilize the rip rap storm drainage outlet.
Public Works
1. Three complete sets of approved/revised plans have been provided to Town prior to start of
construction. Only approved plans are to be used on the job site.
2. The Engineering Department is to be notified forty-eight (48) hours prior to the start of major
construction with inspections and testing per Developers Checklist for the following:
a. After site is staked out
b. All drainage work
3. Certification of gravel used as subbase and processed stone for base will be required from an
approved testing company
4. Certification of all products used -- storm pipe, structures, pavement, oil/grit separator and sewer
grinder pump system shall be presented to the Town Engineer prior to installation.
5. An as built plan will be required for the improvements to the site.
6. As built plans are to include horizontal and vertical location of all underdrains, footing drains
located as per as-built checklist.
7. All pipe and structures to be backfilled with free draining material compacted in maximum one
foot lifts with approved compaction equipment or approved equal if deep trench is encountered.
Any pipe or structure work requires inspection prior to backfilling.
8. Any problems and/or questions regarding construction of this project will be directed to Joe
Charette in the field at cell phone 860-604-4705.
9. All filling to be done in accordance with Department of Transportation specifications. To be
compacted in maximum lifts and tested as necessary.
10. Job meetings will be held as needed, and can be called by the developer or Town.
11. Seventy-two (72) hours' notice needed for certificate of occupancy inspection and a $35 C.O.
inspection fee is due at that time.
12. Any proposed changes are to be presented to the Engineering or Planning Department prior to
implementation on change order form in quadruplicate with 4 copies of the drawing. Town will
attempt to turn around within 24 hours.
13. Normal hours of operation 7:00 a.m. —5:00 p.m., no work on Sunday.
14. DOT permit needed for all work within state road. Copy must be given to the Engineering
Department.
15. The new commercial sewer connection fee is due before a Certificate of Occupancy is issued.
16. Sanitary lateral locations should be tied down to existing structures and shown on the as built.
Planning Department
1. Landscaping is to be installed in accordance with the approved landscaping plan. If there are
changes required, contact the Planning Department. Additional landscaping installed on one part
of a site will not preclude planting all of the remaining items shown on the landscaping plan.
2. The mylar is to go on file prior to issuance of building permit.
3. All easements must be submitted for review prior to filing of mylars.
4. Sign permits are required for all temporary and permanent signs.
Utilities
1. Contact utilities for coordination of utilities connection.
Fire Marshal(Commercial Facilities)
1) Documents—Complete set of stamped plans with the following:
a. Plan review paid
b. Code information sheet
c. Exiting plans with travel distances
d. Wall types
e. Door schedule
f. Mechanical,Electrical,reflected ceiling
g. Fire alarm
h. Basic sprinkler layout
** PLAN REVIEW COULD TAKE 30 DAYS FOR APPROVALS **
2) Inspections:
a. Above ceiling
b. Penetrations and separations
c. Sprinkler system
A. Hydraulic calculations and cut sheets
B. Underground flush and hydrostatic test
C. System hydrostatic test
D. Main drain test/inspectors test
E. Outside bell
F. NFPA 13 paperwork
d.. Fire Alarm
e. Emergency lighting test
f. Final Inspection
** PLEASE NOTE THE FOLLOWING**
1. Consulting inspection will be welcomed
2. Multiple inspections can be done on the same day
3. Stocking/addition of fixtures to occupancy will only be allowed if the life safety systems are on
line.
Police Services
1. Emergency phone numbers for the duration of the construction must be provided to Police Services on
a company letterhead. If the developer occupies or owns the building after construction emergency
numbers must be provided to Police Services.
2. All buildings located on property that abuts a public highway must be numbered and visible from the
street. All numbering shall comply with Town Ordinance 6-800 through 6-802.
3. Erect temporary sign on the site during construction identifying the project.
4. If an alarm is to be installed contact Police Services.
Building Department
1. Plan review with Building Official/Fire Marshal required prior to application for building permit.
Coordinate with Chief Building Official.
Sincerely,
Michele R. Lipe,AICP
Director of Planning
MRL/ilz
cc: Jeffrey Doolittle, Town Engineer
Bernie Drabek, Engineering Inspector
Michael Gantick,Public Works
Christopher Dougan, Chief Building Official
Fred Shaw, Superintendent of Pollution Control
Walter Summers, Fire Marshal
Utilities
PRECONSTRUCTION MEETING SIGN-IN SHEET
PLEASE Print Clearly
r� `l e,6; ).. ?"Q$av,.t,.Ls dja.•440 dp,ryc. Cog7Ss-
`PG 4-,,,C .D J_kJ
S r'u Us �J x
RECEIVED
TOWN OF SOUTH WINDSOR
STAFF SITE CHANGE JUN 2 6 Z0I5
FOR SITE & SUBDIVISION
GENERAL: Ben Wheeler SOUTH WMlDSO�PL•ANNING DEFT.
CHANGE ORDER CONTACT PERSON Design Professionals, Inc. Phone No.860-291-8755
Address 21 Jeffrey Drive South Windsor,CT 06074
Site Name Shea &Company Real Estate p&Z No. 15-20P
Owner K&M Partners LLC Phone No. 860-644-0067
Contractor Quality Paving
Signature of Owner gate: 6
Signature of Design ngr. b --
119 Date: r.10.4115
CHANGE: (Describe location an, nature of change. Include
Four (4) copies of plan/profile of Change. )
Change style of parking lot lights. Number,location,and height remain unchanged.
Reason for Change: (Why is change required)
Owner preference.
APPROVALS: (As R uire )
Dir. Of Planning , Date: 612 i
Town Engineer Date:
Dir. of Public Works Date:
Others Date:
STAFF COMMENTS:
white - Town Engineer APP.Lzce
Fink - Director of Planning
P.O.BOX 1167
E
21 JEFFREY DRIVE
is- Nn SOUTH VANDSOR,CT 06074
PHONE:860.291.8755
fF
FAX:860.291.8757
www.designprofessionalsinc.com
CIVIL & TRAFFIC ENGINEERS / PLANNERS/ SURVEYORS / GIS ANALYSTS / LANDSCAPE ARCHITECTS
Serving Connecticut, Massachusetts, Rhode Island
LETTER OF TRANSMITTAL
To: Michele Lipe Date: 6/26/2015 DPI Project No. 3297
Director of Planning Re: Shea&Company Real Estate
1540 Sullivan Avenue 49 Oakland Road
South Windsor,CT 06074
:
: WE ARE SENDING YOU: ® Attached ❑ Under separate cover via the following items:
❑ Shop Drawings ® Prints ❑ Renderings ❑ Specifications
: ❑ Copy of Letter ❑ Change Order ❑
• COPIES DATE NO.
4 6/26/15 lighting plan change order(sheet LS-1)
These are transmitted as checked below:
: ® For Approval ❑ No exceptions taken ❑ Resubmit copies for approval
❑ For your use ❑ Make corrections ❑ Submit copies for distribution
❑ As requested ❑ Revise and Submit ❑ Return corrected prints
❑ For review and comment ❑ For bids due ❑ Prints returned after loan to us
REMARKS:
:
p
:
• JUN 26 Z015
• SIGNED: 'din, CC:
Be min P.Wheeler, PLA
BOND TRANSMITTAL
DATE: July 8, 2015
APPLICANT NAME Shea & Company Real Estate, LLC
ADDRESS 266 Abbe Road
South Windsor, CT 06074
PROJECT LOCATION/ADDRESS LOT 49 Oakland Road
SUBDIVISION
P&Z OR IWA/CC APPLICATION NUMBER 15-20P
AMOUNT OF BOND _$_2,000 E & S Bond
CHECK NUMBER 38548
DEPARTMENT PLANNING
SUBMITTED BY Lauren Zarambo _7/8/15
NAME DATE
PROCESSED BY FINANCE � . I0 �5
NAME u DATE
SUB ACCOUNT NUMBER 570 ®2-1.3
MUNIS APPLICATION 201500198
WAPlanning Admin\PZC\Bonds\2015 Bonds\15-20P Shea Real Estate BondTrans.doc
PERMITS/INSP PAYMENT RECPT#: 20783824
TOWN OF SOUTH WINDSOR
1540 SULLIVAN AVENUE
SOUTH WINDSOR CT 06074
DATE: 07/09/15 TIME: 13:36
CLERK: laurenlza DEPT:
CUSTOMER#: 0
PARCEL:
CHG: BONDPL BOND FEE - PLAN 2000.00
AMOUNT PAID: 2000.00
PAID BY: SHEA & COMPANY REAL
PAYMENT METH: CHECK
38548
REFERENCE:
AMT TENDERED: 2000.00
AMT APPLIED: 2000.00
CHANGE: .00
ORIGINAL
TOWN ROUTE N0. PMT 2B-REV 8/00 DATE OF ISSUE PERMIT NO.
SOUTH WINDSOR 30 (302-06-0386) 6/16/2015 1013125
DEPARTMENT OF TRANSPORTATION
NAME OF HIGHWAY BUREAU of HIGHWAY OPERATIONS DATE EFFECTIVE Page 1 of 3
49 Oakland Road STATE OF CONNECTICUT
ENCROACHMENT PERMIT
LOCATION OF WORK OR BEGINNING AND ENDING POINTS DATE OF EXPIRATION AMT.OF SURETY BOND
Rt.30,49 Oakland Rd. 6/16/2016 CERTIFY CHECK
south btwn poles#1779۴ 10,000.00
1 mi.e/o BUckland Rd. SURETY COMPANY/BANK
Hartford Fire Ins co
TO: QUALITY PAVING CO. K&M PARTNERS LLC BOND NUMBER: 02BSBGM6420
194 SOUTH MAIN STREET 266 ABBE ROAD PERMIT IS NOT VALID UNTIL SIGNATURE COPY IS
EAST WINDSOR,CT 06088 SOUTH WINDSOR,CT 06074 SIGNED AND RETURNED TO THE OFFICE.
PLEASE RETURN AT ONCE.
FEE:$10.00 DATE REC'D:5/1 512 0 1 5
PO/WO NO:
Permission is hereby granted to do the following work under the control and direction of the Department of Transportation,Bureau of Engineering and Highway
Operations at the location designated hereon,subject to the statements made on the application for permit,and to the pertinent provisions of the current Highway
Encroachment Permit Regulations manual,including amendments thereto.
This permit does not become effective until all necessary local and State licenses and permits are obtained by the Permittee or designated agent,and further the
Permittee shall be subject to all Federal,State and local regulations.
This permit is issued in strict compliance with,but not limited by,the following specific requirements,referenced attachments,and the current edition of
Department of Transportation's Standard Specifications for Roads,Bridges and Incidental Construction as applicable.
The Department of Transportation Permit Inspector, Stephen C. Barone 860-258-4543, MUST BE NOTIFIED AND
HE CALL BEFORE YOU DIG REQUEST NUMBER RECORDED 48 HOURS IN ADVANCE OF STARTING
WORK ON THE PROJECT. REQUEST NO.
Permission is granted to work within the highway right of way to reconstruct and pave a commercial drive as delineated on the plans
entitled"SHEA&COMPANY REAL ESTATE,LLC"with permit application received on 5115/15.All work shall be in accordance with the
current publication of the Department of Transportation"Standard Specifications for Roads,Bridges,and Incidental Construction",the
latest Department Standard Details,and the following stipulations:
A copy of this permit must be available on site at all times.
Vehicular and pedestrian traffic must be adequately protected through the use of appropriate traffic control patterns.Uniformed police
officers or personnel who are certified for traffic control to a level equivalent to the National Safety Council shall be utilized to direct
traffic through the work area.All traffic control signing and appurtenances shall be in accordance with the latest edition of the"Manual
on Uniform Traffic Control Devices"and must meet NCHRP 350 requirements.
No work that will interfere with the flow of traffic will be permitted before 8:30 a.m.and after 4:00 p.m.,Monday through Friday.
-Holiday Restrictions-No permit work within the highway right of way will be permitted the day before a legal holiday and no work shall
be resumed until 12:00 noon the day following the holiday,unless otherwise approved or indicated.Weekends shall be considered as
part of the holiday when the legal holiday falls on either Friday or Monday.
Permittee shall keep the state highway free of mud,stones,debris,etc.
The required minimum sightline distance must be obtained as the first phase of construction.Tree and brush must be trimmed and/or
removed as directed by the Permit Inspector to obtain adequate sight line.The property owner will be responsible for all future
maintenance of the sightline and the drive
The Permit Inspector must be notified upon completion of work for final inspection and approval.
CALL Before you DIG! TOLL FREE, STATEWIDE 1-800-922-4455
ny and all liability for injury,damage or loss resulting from such work as may be undertaken under the terms of this permit is assumed by the Permittee.The
Permittee is hereby designated responsible for all future maintenance of all installations or encroachments constructed under this Permit,which in the sole
judgement of the State are not part of the highway appurtenances normally maintained by the State.
The Permittee hereby agrees to indemnify and hold harmless the State of Connecticut for any and all such injury,damage,or loss that may be incurred,either
directly,or as a result of said work,and to reimburse the Department of Transportation for any expenses incurred due to the performance of any such work
undertaken under the terms of this permit.
This permit is revocable at the discretion of the Department of Transportation Commissioner or designated representative.
Pt�ml,' _'S S DAYE DEPARTMENT OF TRANSPORTATION
IS
OF HIGHWAY OPERATIONS
BY Ala R.White
--� DISTRICT MAINTENANCE DIRECTOR
ORIGINAL
TOWN ROUTE NO. PMT 28-REV 8/00 DATE OF ISSUE PERMIT NO.
SOUTH WINDSOR 30 (302-06-0386) 6/16/2015 1013125
DEPARTMENT OF TRANSPORTATION
NAME OF HIGHWAY BUREAU OF HIGHWAY OPERATIONS DATE EFFECTIVE Page 2 of 3
49 Oakland Road STATE OF CONNECTICUT
ENCROACHMENT PERMIT
LOCATION OF WORK OR BEGINNING AND ENDING POINTS DATE OF EXPIRATION AMT.OF SURETY BOND
Rt.30,49 Oakland Rd. 6/16/2016 CERTIFY CHECK
south btwn poles#1779۴ 10,000.00
.1 mi.e/0 BUckland Rd. SURETY COMPANY/BANK
Hartford Fire Ins co
TO: QUALITY PAVING CO. K&M PARTNERS LLC BOND NUMBER:02BSBGM6420
194 SOUTH MAIN STREET 266 ABBE ROAD PERMIT IS NOT VALID UNTIL SIGNATURE COPY IS
EAST WINDSOR,CT 06088 SOUTH WINDSOR,CT 06074 SIGNED AND RETURNED TO THE OFFICE.
PLEASE RETURN AT ONCE.
FEE:$10.00 DATE REC'D:5/15/2015
PO/WO NO:
Permission is hereby granted to do the following work under the control and direction of the Department of Transportation,Bureau.of Engineering and Highway
Operations at the location designated hereon,subject to the statements made on the application for permit,and to the pertinent provisions of the current Highway
Encroachment Permit Regulations manual,including amendments thereto.
This permit does not become effective until all necessary local and State licenses and permits are obtained by the Permittee or designated agent,and further the
Permittee shall be subject to all federal,State and local regulations.
This permit is issued in strict compliance with,but not limited by,the following specific requirements,referenced attachments,and the current edition of
Department of Transportation's Standard Specifications for Roads,Bridges and Incidental Construction as applicable.
The Department of Transportation Permit Inspector, Stephen C.Barone 860-258-4543, MUST BE NOTIFIED AND
HE CALL BEFORE YOU DIG REQUEST NUMBER RECORDED 48 HOURS IN ADVANCE OF STARTING
WORK ON THE PROJECT. REQUEST NO.
Full depth pavement replacement will be required in all roadway trench excavations.This will include 10"(compacted)of processed
gravel base,6"of Hot Mix Asphalt Superpave 1.0 Design Level 2 and 3"of Hot Mix Asphalt Superpave 0.50 Design Level 2 top
course,installed in 2 equal lifts.All edges must be tack coated and the surface joints sealed.If the pavement depth measures less
than 9",the requirements for binder and top course depths will be determined by the permit inspector.
At the end of each workday all trenches will be back filled and patched.The use of steel plates to cover open trenches within the
highway right of way will NOT be allowed.
The limits of the final pavement restoration will be determined by the inspector.This shall include milling and paving of the asphalt
surface,surrounding and including the excavation,to a depth of 2".The milled area shall extend a minimum of 10 feet beyond the
edges of the original trench line with vertically faced edges,not tapered.The entire milled area including the edges shall be swept and
tack coated with an approved material at the appropriate rate.The area will then be paved with Hot Mix Asphalt Superpave 0.50
(machine laid)and compacted to a depth of 2".All excavations may be included into one milled area.
All liability is assumed by the permittee.All areas disturbed as a result of this operation will be restored to the equivalency of their
original condition or better at permittee's expense.The permittee will be billed in full by the Department for engineering and
replacement costs of any area disturbed or destroyed by the permitted operations.
Requirements of the permit are subject to change as field condition warrant.Any change will require a review and prior approval by
the District Office.
Sidewalk must be in conformance with the most current ADA Requirements.
INSURANCE EXPIRES:7/1115
The Permit Inspector must be notified upon completion of work for final inspection and approval.
CALL Before you DIG! TOLL FREE, STATEWIDE 1-800-922-4455
Any and all liability for injury,damage or loss resulting from such work as may be undertaken under the terms of this permit is assumed by the Permittee.The
Permittee is hereby designated responsible for all future maintenance of all installations or encroachments constructed under this Permit,which in the sole
judgement of the State are not part of the highway appurtenances normally maintained by the State.
The Permittee hereby agrees to indemnify and hold harmless the State of Connecticut for any and all such injury,damage,or loss that may be incurred,either
directly,or as a result of said work,and to reimburse the Department of Transportation for any expenses incurred due to the performance of any such work
undertaken under the terms of this permit.
his permit:i evocable Pthe discretion of the De artment of Transportation Commissioner or designated representative.
PER E ' ATURE DA 'E DEPARTMENT OF TRANSPORTATION
BUREAU OF HIGHWAY OPERATIONS
BY,. Ian R.White
_._.. . .. ... ..... r. . -
.-.,� I 0157'RIOT.MAINTENANCE DIRECTOR
�s -70
After Recording Return To: r�
Devlin,Peters& Tarpey, LLC 003634
P.O.Box 400
Somers, CT 06071
EASEMENT AND DEDICATION OF RIGHTS REGARDING ACCESS AND TRAVEL
THIS EASEMENT AND DEDICATION OF RIGHTS ("Agreement"), dated this
day of 2015 is by K&M Partners, LLC (hereinafter referred to as"K&M") a
Connecticut limited liability company with a business address in the Town of South Windsor,
County of Hartford and State of Connecticut.
WHEREAS, K&M is the owner of certain property situated on the south side of
Oakland Road in the Town of South Windsor, County of Hartford and State of Connecticut,
known and designated as 49 Oakland Road (hereinafter referred to as "49 Oakland"), and
OAKLAND ROAD ASSOCIATES, L.L.C., a Connecticut limited liability company with a
business address in the Town of South Windsor, County of Hartford and State of Connecticut
(hereinafter "ORA") is the owner of certain property situated in the Town of South Windsor,
County of Hartford and State of Connecticut, known and designated as 41 Oakland Road
(hereinafter "41 Oakland"), which parcels are adjacent to each other, with 49 Oakland being
generally east of 41 Oakland; and
WHEREAS, K&M has made application to the South Windsor Planning and Zoning
Commission, Application #15-20P, for the approval of the Site Plan of Development for the
conversion of 49 Oakland from residential to office use(hereinafter"Project"); and
WHEREAS, in reference to the Project, 49 Oakland is shown on a certain map or plan
entitled "SHEA & COMPANY REAL ESTATE, LLC 49 OAKLAND ROAD SOUTH
WINDSOR, CONNECTICUT PROJECT NO.: 3297 DATE 03/17/15 DESIGN BY: DHJ
DRAWN BY: DHJ CHECKED BY: AK PREPARED FOR: Margaret Shea 1750 Ellington
Road South Windsor, CT Design Professionals Civil&Traffic Engineers/Planners/Surveyors/
GIS Analysts/Landscape Architects 21 Jeffrey Drive P.O. Box 1167 South Windsor, CT 06074
860-291-8755 -- T 860-291-8757 — F APPLICANT: Shea & Company Real Estate, LLC 1750
Ellington Road South Windsor, CT 860-644-0067 PROPERTY OWNER: K&M Partners, LLC
1750 Ellington Road South Windsor, CT 860-644-0067 SHEET SP-1 OVERALL SITE PLAN
SCALE 1" = 20' Revised 4/8/2015 SITE DISTANCES AND ACCESS EASEMENT ADDED
Revised 5/29/2015STOPPING DISTANCE AND 2 FOOT RIPRAP SWALE TO WETLAND
AREA ADDED"
WHEREAS, as part of the Approval of the Project by the Town of South Windsor,
acting through its Planning and Zoning Commission (hereinafter "Town"), in its approval letter
dated April 30, 2015 (hereinafter "Approval"), and in order to effectively continue the
implementation of the Town's Access Management Plan, at such future time as a site plan is
approved for 41 Oakland, an interconnection shall be constructed in the area shown on the
"�
a 2-1471 PA Ge 3 `11
Project site plan as "ACCESS EASEMENT IN FAVOR OF 41 OAKLAND ROAD
ASSOCIATES, LLC" or as agreed to by the two property owners and further approved by the
South Windsor Planning and Zoning Commission, provided that such interconnection does not
reasonably impair the Project for its intended use and does not diminish the value of the Project;
and
WHEREAS, as a further part of the Approval, and in order to effectively continue the
implementation of the Town's Access Management Plan, the aforementioned interconnection
shall include easements from K&M to ORA allowing cross travel and access over the easement
area to and from 41 Oakland and 49 Oakland, to include, but not be limited to, granting
irrevocable permission to enter upon the easement area and perform all activities needed to
construct said driveway/interconnection,provided that said cross travel and access easements do
not unreasonably impair the Project for its intended use and does not diminish the value of the
Project; and
WHEREAS, as a further part of the approval, and in order to effectively continue the
implementation of the Town's Access Management Plan, K&M shall dedicate all remaining
access rights along Oakland Road to the Town, provided that said dedication of access rights
does not unreasonably impair the Project for its intended use and does not diminish the value of
the Project.
NOW THEREFORE, for good and valuable consideration, which specifically includes
the granting of the Approval by the Town, the receipt of which is acknowledged, and in
consideration of the promises contained herein, K&M agrees as follows:
1. K&M hereby assigns all its right title and interest to its respective access rights to
Oakland Road from 49 Oakland to the Town specifically subject to the requirement that any
future modification of said access by the Town shall be done in accordance with the Town's
Access Management Plan subject to such legal authority to implement any such modifications as
the Town may possess at the time, and further subject to the requirement that any such
modification shall provide for reasonable alternative access to Oakland Road for K&M, does not
unreasonably impair the 49 Oakland parcel for its intended uses and does not unreasonably
diminish the value of the 49 Oakland parcel.
2. K&M hereby agrees to provide cross access and travel easements to all abutters to
the 49 Oakland parcel over all appropriate travel portions of the 49 Oakland parcel upon the
request of the Town for same in writing, specifically provided that all such requested easements
shall be specifically delineated on a site plan approved by the Town, with the easement
document to be utilized in each instance being a format approved by the Town and prepared at
the sole cost and expense of the abutter seeking such easement; and further provided that the
granting of such easement shall not unreasonably impair the 49 Oakland parcel for its intended
uses and shall not unreasonably diminish the value of the 49 Oakland parcel. Any easement
requested of K&M in accordance with this Agreement,together with all appropriate transfer tax
documentation, shall be executed in a timely fashion by K&M, and its failure to do so, as
provided for in the Approval, shall hereby be deemed a zoning violation for which the Town
- Vol 24 'TI PA G F 3-7.2-
may seek enforcement of compliance in accordance with its usual rights and powers relating to
any other zoning violation.
3. Upon the Town's approval of any site plan for the development or construction of
the 41 Oakland parcel, K&M hereby grants a cross travel and access easement to ORA over,
under and through the easement area of the 49 Oakland parcel for all purposes consistent with
the development and construction of the 41 Oakland parcel pursuant to and in accordance with
said approved site development plan, and thereafter such easement rights shall continue as a
permanent easement in favor of ORA to provide all access and cross travel rights over, under and
through the easement area of the 49 Oakland parcel as are customary and usual for the continued
operation of the facilities, operation, events, businesses and any other lawful uses that may be
located or occur on the 41 Oakland parcel, provided that the exercise of any such right by ORA
shall not unreasonably impair the 49 Oakland parcel for its intended use and shall not
unreasonably diminish the value of the 49 Oakland parcel.
4. All of the foregoing rights and obligations of K&M shall hereby be binding upon
and run to the benefit of their respective heirs, executors,administrators, successors and assigns.
K&M PARTNERS, LLC
C�-
1 Slv► l J ( By: M garet M. Shea
Its Member, duly authorized
STATE OF CONNECTICUT:
ss. South Windsor July 7,2015
COUNTY OF HARTFORD
Personally appeared,MARGARET M. SHEA, duly authorized signer and sealer of the
foregoing instrument, and acknowledged the same to be her free act and deed and the free act
and deed of K&M PARTNERS,LLC,before me.
Received for Record o f�415 J . Bond,Jr.
C ssioner of the Superior Court
Recorded iu South Winds r,CT
By U a
�{ Town Ck*
TOWN OF SOMH WINDSOR.
STAFF SITE CHANGE
FOR SITE & SUBDIVISION
GENERAL: Ben Wheeler
MANGE ORDER CONTACT PERSON Design Professionals, Inc. Phone No. 860-291-8755
Address 21 Jeffrey Drive South Windsor,CT 06074
Site: Name Shea&Company Real Estate, LLC p&Z No. 15-20P
Owner Margaret Shea Phone: No. 860-644-0067
Contractor Quality Paving Co., Inc.
Signature of Owner car Date:
Signature of Design Engr< /��-�-� Date:__ �f7/iS
C; ANGE (Describe location and nature of change, Include
Pour (4) copies of plan/profile of Change. )
Additional 3 FT concrete walk proposed.This will connect the proposed sloped walk to the west side building entrance.
Reason for Change: (Why is change required)
The existing garage will be converted to office space.3 FT concrete walk proposed to Rrovide handicap access to west
portion of building.
APPROVALS:s (As Required '
Dir. Of Planning `' Date; 4 __'�v
Town Engineer �— Date
Dr.. of Public or .s Date:
Others Date
STAFF +FOMENTS:
White - Town Engineer Yellow - Applicant
Pink - Director of Panning
�O%qN Sfq
7awn 0-Psi 0
�i
w° 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074
SOR-Co TELEPHONE (860) 644-2511
January 22,2016
Margaret Shea
Shea&Company Real Estate, LLC
266 Abbe Road
South Windsor, CT 06074
Re: Appl. 15-20P, Shea& Company Real Estate LLC E&S Bond Release
Dear Ms. Shea:
This is to advise you that the Planning and Zoning Commission voted on January 19, 2016 to release the
following bond as follows:
MI. 15-20P, Shea&CompanyReal Estate LLC $2 000 E&S Bond15-20P, Shea&Company Real Estate LLC $2 000 E&S Bond reduced by$2,000 to leave a balance
of-0-
A check will be mailed to you from the Town of South Windsor. If you have any further questions,
please contact the Planning Department at 860-644-2511, ext. 253. Thank you.
Sincerely,
i
Bart Pacekonis, Chairman
PLANNING&ZONING COMMISSION
BP/llz
cc: Jeff Doolittle, Town Engineer
Jeff Folger, Senior Environmental Planner
BOND RELEASE TRANSMITTAL
DATE: January 22, 2016
APPLICANT NAME Shea & Company Real Estate, LLC
ADDRESS 266 Abbe Road
South Windsor, CT 06074
PROJECT LOCATION/ADDRESS LOT 49 Oakland Road
P&Z OR IWA/CC APPLICATION NUMBER 15-20P
MUNIS APPLICATION NUMBER 201500198
SUB ACCOUNT NUMBER 500213
ORIGINAL BOND AMOUNT $ 2,000 E&S Bond
Please Release $ 2,000
Please release the bond indicated above as all of the required
work has been completed.
_Lauren L Zaram6o januaa 22, 2016
NAME DATE
BX G C�.
CHECK # ISSUED DATE
W:\Planning Admin\PZC\Bonds\2016 Bonds\I5-20P Shea RealBstate E&S BondRelease Trans.doc