TOWN OF SOUTH WINDSOR ,
i G DEPT.
INLAND WETLANDS, WATERCOURSES AND CONSERVATION APPLICATION
Application#Xp—)
Date Received c / �
INSTRUCTIONS
1. Fifteen applications (15) with map and plans (2 copies) shall be submitted together with the fee set forth
in the Inland Wetlands, Watercourses and Conservation Regulations, Town of South Windsor. (See
Regulations, Section VII—X)
2. The South Windsor Inland Wetlands, Watercourses and Conservation Regulations should be reviewed with
respect to the standards and criteria for application Evaluation. (See Regulations, Sections VII—X)
3. The applicant understands that this application is to be considered complete only when all information and
documents required by the Agency have been submitted. The.applicant shall also complete the state filing
form.
A. Applicant's Name: Mr. Jeffrey B. Doolittle P.E Town Engineer
Address: - Town of South Windsor, 1540 Sullivan Road South Windsor CT 06074
Phone: (home) (work) 860-644-2511 (fax) 860-644-7280
B. Legal owner's name: Town of South Windsor
Address: 1540 Sullivan Avenue South Windsor CT 06074
Phone(home) (work) Same as above (fax) Same as above
(List additional owners, addresses, and phone numbers on back of application)
C. If the applicant is not the owner of the subject property; a letter by the owner(s) authorizing the proposed
regulated activity set forth in the application must accompany this form and will be part of the application.
D. Project Name(if any) Reconstruction of Avery Street
Project Address Avery Street between Cray Road and Beelzebub Road/Woodland Drive
I. Contact Person(if further information is needed)
Mr.Jeffrev B. Doolittle P E Town Engineer (work) Same as above (fax) Same as above
E. The geographical location of the property which is to be affected by the proposed regulated activities including
a description of the land in sufficient detail to allow identification of the property on the Inland Wetland and
Watercourse Map.
Assessor's map# N/A Parcel# N/A Zone N/A
(See attached map—Figure 1)
1
F. Names of all abutting property owners from records in Town Clerk's office. (use separate-sheet if necessary)
(See attached) 1
G. Have you notified all abutting property owners (from records in Town Clerk's office)by certified letter that
an application is pending before the Agency? Yes
❑ ** (you are required to supply a copy of the letter with the list of the names of the abutters).**
H. Purpose and description of all proposed regulated activity(s) including amount of disturbance in square feet
and types of fill and the time element involved:
See Attachment A.
I. A class A-2 map of the property drawn to 1"=40', showing the area to be developed, extent of the wetlands
and watercourses affected, topography, existing and proposed activities and names and locations of adjacent
property owners must be submitted.
J. Amount of regulated area disturbance(within upland review area or regulated buffers): 1.45 ac. (63 009 s f)
K. Acreage of wetlands and watercourses in regulated areas to be altered: 0.10 ac. (4,573 s.f)
L. Acreage of wetlands and watercourses to.be created: 0.00 ac. (0 s.f)
M. Lineal feet of proposed stream alteration: 428 Lf.
N. Total land area of project and percentage, which is wetlands:_ Total Project Area=4.24 ac (184,761 s f)
%Wetlands =2.47%
O. Identify all other permits or approvals that have been issued, applied for, or required with respect to the
proposed activity set forth in this application. (These may include but not be limited to, local Planning&
Zoning, Zoning Board of Appeals, D.E.P., F.E.M.A., D.O.T., The Army Corps of Engineers, and any other
State,Local or Federal Permits.) See Attachment A.
P. The applicant (or designated representative) hereby attests that a sign will be posted at the following
location(s) Avery_Brook Crossing(Avery St) Dart Brook headwall(Avery St /Beelzebub Rd _
By South Windsor Name . Mr. Jeffrev B.Doolittle P E Town Engineer
on or before the following date Ten days prior to meeting date
Signature:
2
i
These signs must be displayed continuously for at least ten (10) days prior to scheduled meeting (see
Regulations, Section 7.3a)
The undersigned hereby applies for the regulated activities listed in paragraph H above, for a Inland Wetlands,
Watercourses and Conservation permit for the property described herein and confirms that:
I. She/he is familiar with the currently effective Inland Wetlands, Watercourses and Conservation Regulations
of the Town of South Windsor.
2. She/he understands that at any time during the review period,the Agency may require the applicant to provide
more information about the wetlands and/or watercourses in question and/or any proposed activity.
I All information submitted in the application for review shall be considered factual,or in the case of anticipated
activity,binding. A knowing failure of the applicant or any.of her/his agents to provide correct information,
or performance exceeding the levels of activity anticipated, shall be sufficient grounds for revocation of any
permit under these regulations.
4. By making this application, the applicant
pp gives permission to the. Inland Wetlands, Watercourses and
Conservation Commission members and/or its representative to enter the portions of the premises which are
subject of the application for the purpose of inspection and investigation and otherwise evaluating the merits
of the ap ication both before and after a final decision has been issued.
V t
Signature of Owner of Property
Date
AAL G
Signa e IA4pplic t
Date
3
Attachment A
RECONSTRUCTION OF AVERY STREET
SOUTH WINDSOR,CONNECTICUT
February 11,2015
MMI 42186-24
The Town of South Windsor has received federal funding to reconstruct Avery Street beginning just
south of the intersection with Gray Road and extending northerly to a point approximately 320 feet
north of Beelzebub Road,a total distance of approximately 2,150 feet. Improvements will also be made
at the Avery Street intersections with Gray Road (50 feet)and Kelly Road (50 feet)and at the offset
intersection with Woodland Drive(80 feet)and Beelzebub Road (650 feet).
This project is in the vicinity of two streams and their associated wetlands: Avery Brook and Dart Brook.
Avery Brook crosses Avery Street at Sta. 17+40 through a pair of 38"x 57"corrugated metal pipe (CMP)
arch culverts. Dart Brook runs south along the west side of Avery Street north of Beelzebub Road and
enters a 30"reinforced concrete pipe(RCP)through a concrete headwall. It is then conveyed within the
road drainage system east along Woodland Drive,then south in a 42" RCP,and is eventually discharged
through a concrete headwall where it continues south and joins Avery Brook at the downstream
discharge of the Avery Brook culvert crossing. These culverts will be replaced or modified as part of the
reconstruction of Avery Street. This work along with general roadway replacement falls within wetlands
flagged by Mr. Matt Sanford,Certified Soil Scientist,of Milone&MacBroom, Inc. (MMI).
The overall regulated activity for the project,subject to review, has been divided into four areas as
described below. These areas are shown on the attached plans.
Wetland Activity Area#1
This activity is associated with removal of the existing pair of 38"k 57"CMP arch culverts and replacing
them with a 65"x 40"and 73"x 45"reinforced concrete pipe (RCP)arch culverts. The new culverts will
be installed at a slightly greater skew to improve inlet hydraulics. The outlet side remains at
approximately the same location as the existing outlet. New concrete headwalls will be installed,and
the inlet and outlet sides will be protected with riprap. An existing 10-inch sanitary sewer main will be
replaced on the east side of the road to facilitate excavation for and installation of the concrete
headwall: The sewer main will be bypassed while the headwall is installed. A water handling plan is
included in the attached plans to manage the flow during construction.
Area of Wetland and Watercourse Disturbance=0.04 ac. (1,907 s.f.)
Lineal Feet of Proposed Stream Alteration=45 I.f.
�41 MILONL&MACBRoom"
ATTACHMENT A February il,2015
RECONSTRUCTION OF AVERY STREET,SOUTH WINDSOR,CONNECTICUT PAGE 2
Wetland Activity Area#2
This activity is associated with relocating the Dart Brook inlet on the west side of Avery Street to the
north approximately 80 feet. The existing endwall will be removed,and the existing 30-inch RCP will be
plugged and the channel filled. The new Dart Brook inlet will be located at Sta. 30+45 L where the inlet
and pipe can be oriented perpendicular to the roadway. A new concrete endwall fitted with a trash rack
will be installed and the channel regraded. Riprap will be installed at the inlet to provide erosion
protection. Dart Brook is an intermittent stream and does dry up during the summer months.
Area of Wetland and Watercourse Disturbance=0.06 ac. (2,666 s.f.)
Lineal Feet of Proposed Stream Alteration= 383 I.f.
Upland Review Activity Area#1
This activity is associated with the activities within the 80-foot Upland Review Area adjacent to the new
Avery Brook culvert replacement. It includes impacts on the north and south sides of the crossing. The
primary activities in this area are roadway excavation, paving,trenching,sidewalks,and driveway repair.
Total Regulated Area Disturbance(within 80-foot upland review area)=1.01 ac. (43,892 s.f.)
Upland Review Activity Area#2
This activity is associated with the activities within the 80-foot Upland Review Area adjacent to the new
Dart Brook inlet at approximately Sta. 30+45 L. It includes impacts for the reconstruction of Avery Street
and the realignment of Beelzebub Road. Activities include roadway excavation, paving,trenching,
sidewalks,and driveway repair.
Total Regulated Area Disturbance (within 80-foot upland review area)=0.44 ac. (19,117 s.f.)
The work will not commence until receipt of regulatory approvals. The culvert replacement work will be
conducted during the low-flow summer months. Erosion controls will be installed in compliance with
state and local guidelines. These details are included on the site plans and are described within the
submitted water handling plan. Once the culverts have been installed,the work area will be paved,and
any disturbed areas will be stabilized with seed and/or riprap as necessary.
The following permits are either pending or will be required prior to construction:
• U.S.Army Corps of Engineers Category I Permit(pending)
i General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction
Activities
2186-2441115-rpt
���MILONB&MACBROOM°
r30
wiA
ia r
y lq.l� 2� �f ! i� t 3 1�4�r :Y�/ • � ��- }E +`�� y�!} }!� I t� '_ ;�y, E � -
,tf"
�fy t Itk tt4 5�.-: , �+� } � � ti taB�" �a f: _,,.- � i .`C• rs c:
88 � f F
It ` ;y + g,r-
Al
b L 3E a rix' L �ft',y�
x -
�'
-ter - � at '`�: 1 ` tiY: c� �h.'�ri ! s, 5y
� r t`z P� �� d / > el p ��� �.-. > >!)i t {��.- � �t�� '•0.' ��! t �' B"t!t ''' � �1 �'_�2
t
t r} , a I e S1 'r 5
f t y T
\a-2'[ } a v{ ..i i'x g 'at' :� K♦ i t '+ _ �� ' z r�'
t a FA 00� P v S t i r r f 7! p y ti"d3 ' S_ t•i : ( .
' k ! - t _ i. `. ` � -� t t a° C`w y s,i�c_vy��•-rJ�� c`.ma`s.. r`� ��n`' ,� L
* t �ti r3t>L- 5 S t�-t av t�dj}'�} + •e• P' h'7° `�'1 •vyyke�. t'. �.� h` r
s - x 3 '', -r;, '�a r, 1-a ay-1. �, * a x '"4 q y .• 5
E ��' �, 't v L -3 i t`, t' S 't d'1 :s•," F h _{ bvt G`T,, i{
` °E` -k r b„ r�L �?,r..4 •i•r b „d t
r�k :' y. d e a
ld
t's - - C '�a4e* 1`' ti. r V I r .1r"�w
l * ., "•n< a ,.,� _ ��• , - w y9'! L �'.4-3�y '3� "r -t �F�64 5' 1 14 � �•� �: ��.7��j ta5 'z
.� a.Fs. �, '
9 s$ a bst tt�s rb cy - a �
F '-�
;I ,� 1 - �� � •� y�i�' a �`�t $' F.,,�s d �5��`�k k�� F .aX�'6 4�N+ 5! �,Xti �i ? ,%
,.� � �v l i6• ,ii{j, ° � t rir a'� si't ms�L Eta �� k '� `�,.�? � �� e
'f as r n.s• v F � ��' i� �Ya'"�u"'S teak ��H� `h�wx,• �`s���%.��,�' b`t� - ! ��� � tnli�ii°�.
+Ply®.IECT'.S/TE t� � p , � Y
qFq 4 4 tr 4� f 4° temdx - v�R 9 fr 'jY gee '
E :tF Y i ,r F la ''s $tea n¢I ` ` -S"E'*# 4•`�w. / -� :. �#
- � �'� i�_ �#+rt
fr k r 1 z 4r, b E
+ `e �� .�•o� `; kgf. t,s "' ''�.L
,yxt
at 'M' n4 t jr 'd i u,{1
cA,
%4S
'R.rgl lti'N' 4' i i ;"- .•ra t c ! r 1
r a marks fi, 4.4" +/ �gF{ a >to
f
• ' r�- 1` M1S WY.LL 3r.' lk,.A� §`I r •ja't� _
'AIN
IerF It t t #r•.•, [ d f�G
�'a�.CA i.s_. r- 1r1 �" .r`ti•�. sb a+.>:tr�t '4 �.v..,r
If �- .:- .,, 4 't�•`71 B't«e 1 ,[c�� �gU``P o y �ihi�t ��-,, w'�ax•,� �� 4���-- tr �t tqa
i '
L�B !��d a° �`�' , ;�'�,`th,'�i.n�'��',•t.C, .i�xJt �4c�:.�' �� ' ,�
r .
,�y`' F.. ��.:��t '4`'d Pl- ✓ - g1 r n5 r�tg B 3'd�
r;" r .i Y tw r r �i• �, k " "
'U'},. t r •5fy� -tt� s aU p e;7ryyy �•e •7.,. �i`�`•zin y klf'tIS JT l _ I .rf t p M #4l 'dit5 d S. A q
q� j} �rY _},t s{�Ia, �' t .}d y a r� ,;.,� bi�Y ky: At F�D�e1r4F t ,x_.R '•a°4f t,� ,�� �.�. �.,
a a ti`i,�` �,�'rr s t -5`' � [ s Af �.�+�, �'F•®�;va 'Lv ti.L.�� H� p �.§�°�"'S�P b c E�T,@,JT ,���,�:N j;e tr,-,��,�.,. t l
P- s r x i _�� -� 1 __'�t� ! ru�x� r'c7 1 k.'tE`•Y'�tt!Y.p;: �-V �PT�,y�� �.�i..� ? ! Y
4- aj-C f� +'�'.ti t fief'• t 1� y+3i q�ts.,E•, .•- $F �, * -+.
'•k; a+ t'tC fr 3 #
-�r�T. `^t'4.{ Y u, sae"` �er -
k �' r55da� i k tick ,� �, a 4 •s ti 1 ,p F.� P a i .
�",l•Y; ,� �. �1` 1 t t �..n'n'il "'.14".� } a<7. +� S5•Fri $� k� y+"6,t�'
•ti.,�7 �''- b > > n` Y°- �. 4ya°` a'4 k a' r, a. a ;. t
jy i� � fS�
� d � � �tL�ta � �-ei4na��sL ,k d+$-c t�P I •k�try .Sz' pg�"rse -t� q:;.
X
- r ',�- r :•,f ��-,y .ice" ��� i�.d'�acE
4 �`,� t'1 -"i k e r "tr:s yT's' i � -dv�j"� •¢,.�", �.�,��Y.r •�i �,} s.- t"•.,ZS: ,}
tE L ,,.� u- ., •sa rf e 45�' r A, s �raw � •„rr!Ui
k s� ��-�ti� jar 3 fs{.�'�'��T,. �� ,:- ,•j'' ,�{ � ���--, .
}_� 4'cp �;�` `2��� L ..,,NS Fr`h�. M%S# �£f� '- 1 G �_� _-' • V
e :c5,_. ��3'+ -`c,�.l�-`eA i,�",r �8,.n�i �f��,is/ ,.,11 1.� •,�
�, 'ai ptitgs'_ •f: i4fi ` !k t -
1
Ph
USGS
Figur
w x'(• Yx
� �` ✓t C w 4 y,t=t u.exP}��� ak>' �� �'�'i s¢ � y A fir,• -
11
Location 1' South Windsor, •
Reconstruction Of Avery Street Map BY: MILONE
SouthWindsor, Connecticut 11 1., ,'i
I I I.
�pW N Sf4
C0 0 7e SaU� ?V&U&0 t
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074
soa•co TELEPHONE (860) 644-2511
February 11, 2015
Re: Notification of Adjacent Property Owners
Local Inland Wetland Application
Reconstruction of Avery Street
South Windsor, Connecticut
Dear Property Owner:
In accordance with Section 7.3b of the"Town of South Windsor Inland Wetlands,Watercourses
and Conservation Regulations", we are required to notify you that an application has been filed
regarding the Reconstruction of Avery Street for the replacement of the cross culvert at Avery
Brook north of Kelly Road, and the reconstruction of the existing storm sewer at Dart Brook by
the intersection with Beelzebub Road and is subject to a hearing by the Inland Wetlands
Agency/Conservation Commission. The application and plans are on file with the South
Windsor Planning Department.
As an abutting property owner you are invited to the hearing to ask questions and/or give
comments, however, you are not required to attend. You may also submit written comments
regarding the application prior to the hearing if you so desire. For further information regarding
the specific date this will be heard, please contact Jeff Folger, Environmental
Planner/Conservation Officer, Planning Department, 644-2511, ext 253.
Sincerely,
PIVAL-1
Jeffrey B. Doolittle, P.E.
Town Engineer
cc: Jeff Folger, Environmental Planner
Joe Perna, Project Engineer
Mike Joyce, Milone & MacBroom
BIRCH JAMES C&SUSAN LENTZ GREGORY T&ELAINE D DYAL HILDA
678 AVERY STREET 11 KELLY ROAD 670 AVERY STREET
SOUTH WINDSOR,CT 06074 SOUTH WINDSOR,CT 06074 SOUTH WINDSOR,CT 06074
WELLES THOMAS A POWELL RENEE M PELATI THOMAS S&NANCI M
639 AVERY STREET 23 WOODLAND DRIVE 648 AVERY STREET
SOUTH WINDSOR,CT 06074 SOUTH WINDSOR,CT 06074 SOUTH WINDSOR,CT 06074
CURYLO MATTHEW D&JAIME L BUKOWY DAVID M&LINDA A LUANGPRASEUTH PEI&LIGIA
26 WOODLAND DRIVE 620 AVERY STREET 614 AVERY STREET
SOUTH WINDSOR,CT 06074 SOUTH WINDSOR,CT 06074 SOUTH WINDSOR,CT 06074
DEHAY MARION R KHADIJAH-HAJDU FRANCIS P&EBONY STOLAR DREW B&LAURA R
8 GRAY ROAD 604 AVERY STREET 630 AVERY STREET
SOUTH WINDSOR,CT 06074 SOUTH WINDSOR,CT 06074 SOUTH WINDSOR,CT 06074
WELLES EDITH W& TILLEM CHARLES&LESLIE JONES RYAN M&ELLEN A
623 AVERY STREET 16 KELLY ROAD 702 AVERY STREET
SOUTH WINDSOR,CT 06074 SOUTH WINDSOR,CT 06074 SOUTH WINDSOR,CT 06074
JONES ALEXANDER F JR&LYNN A FORKO SAMUAL&DANIELLE YOUNG KENNETH J&GRETCHEN
571 AVERY STREET 12 KELLY ROAD 595 AVERY STREET
SOUTH WINDSOR,CT 06074 SOUTH WINDSOR,CT 06074 SOUTH WINDSOR,CT 06074
GRZESIAK WALTER J&DIANE L MAHER RICHARD J KENNEDY ERWIN E JR&TERESA D
410 BEELZEBUB ROAD 545 AVERY STREET 656 AVERY STREET
SOUTH WINDSOR,CT 06074 SOUTH WINDSOR,CT 06074 SOUTH WINDSOR,CT 06074
AVERY STREET CHRISTIAN REFORMED
399 BEELZEBUB ROAD
SOUTH WINDSOR,CT 06074
February 4,2015
Mr. Jeffrey Folger,Environmental Planner
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
Re: Reconstruction ofAvery Street
South Windsor, Connecticut
Dear Mr.Folger:
Please be advised that I authorize the Town of South Windsor to submit applications to
the Inland Wetlands Agency/Conservation Commission, and any other land use agency
pursuant to improvements on my property located on Avery Street associated with the
reconstruction of the roadway and culverts at Avery Brook.
Very truly yours,
9
Alexander Jr. ynn A. Jones
571 Avery Street
South Windsor, CT 06074
February 4,2015
Mr. Jeffrey Folger,Environmental Planner
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
Re: Reconstruction of Avery Street
South Windsor, Connecticut
Dear Mr. Folger:
Please be advised that I authorize the Town of South Windsor to submit applications to
the Inland Wetlands Agency/Conservation Commission, and any other land use agency
pursuant to improvements on my property located on Kelly Road/Avery Street associated
with the reconstruction of the roadway and culverts at Avery Brook.
Very truly yours,
Samuel S. Jr. &Danielle Forko
12 Kelly Road
South Windsor, CT 06074
SOIL SCIENTIST REPORT
RECONSTRUCTION OF AVERY STREET
SOUTH WINDSOR,CONNECTICUT
March 27,2014
State Project No. 132-131
FAP No. 1132(108)
MMI#2186-24-9
Prepared for:
Town of South Windsor
1540 Sullivan Avenue
South Windsor, Connecticut 06074
Prepared by:
MILONE&MACBROOM,INC.
99 Realty Drive
Cheshire,Connecticut 06410
(203)271-1773
www.miloneandmacbroom.com
Copyright 2014 Milone&MacBroom,Inc.
� MILONE&MACBROC�M'
0
1.0 INTRODUCTION
On November 16, 2012, Matthew Sanford, a professional wetland scientist and certified soil
scientist with Milone&MacBroom, Inc. (MMI), delineated wetlands and conducted a wetland
assessment along the Avery Street corridor from Kelly Road to just north of Beelzebub Road.
Inland wetlands and watercourses along this corridor were delineated in accordance with the
regulations of the Town of South Windsor, Connecticut, the State of Connecticut Inland
Wetlands and Watercourses Act(CGS 22a-36 through 45), the regulations of the U. S. Army
Corps of Engineers (USACE) "Wetlands Delineation Manual' dated 1987, and the "Interim
Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Northcentral and
Northeast Region"dated October 2009. State-regulated wetland areas consist of any of the soil
types designated by the National Cooperative Soils Survey as poorly drained,very poorly
drained, alluvial, or floodplain. Regulated watercourses consist of rivers; streams;brooks;
waterways; lakes;ponds;marshes; swamps;bogs; and all other bodies of water,natural or
artificial,vernal or intermittent,public or private,not regulated pursuant to sections 22a-28 to
22a-35, inclusive(tidal wetlands). Federal jurisdictional wetlands were delineated using the
three-parameter approach,which consists of the presence of hydric soils,hydrology,and
hydrophytic vegetation.
Weather conditions were clear and dry. Site conditions were suitable for wetland delineation
work. Soils were examined using a spade and Dutch auger. Geospatial data was accessed via
the United States Department of Agriculture-Natural Resources Conservation Service(USDA-
NRCS)web soil survey mapping for the project site. The web soil survey mapping is appended.
The following soil units were mapped for the project site:
-4 Raypol series
-4 Ninigret and Tisbury complex
Haven and Enfield complex
-� Wapping series
Cheshire series
SOIL SCIENTIST REPORT
RECONSTRUCTION OF AVERY STREET
MARCH 2O14 PAGE l �
f��MILONE&MACBRoow
-� Saco series
Udorthents
1.1 Upland Soils
The upland soils are derived from both glaciofluvial and glacial till deposits consisting of both
stratified and unstratified sand and gravel. The parent material of these soils consists of schist,
granite, gneiss,red sandstone, shale, and conglomerate. Upland soils were not fully delineated in
the field.
The Ninigret and Tisbury series consists of very deep,moderately well drained soils formed in
loamy over sandy and gravelly glacial outwash. They are nearly level to strongly sloping soils
on glaciofluvial landforms,typically in slight depressions and broad drainageways. Slope ranges
from 0 to 15 percent. Saturated hydraulic conductivity is moderately high or high in the solum
and high or very high in the substratum. Land uses associated with these areas typically include
idle,wooded, or used for community development. Common trees are red,white, and black oak;
red and sugar maple; white pine; gray birch;white ash; and hemlock.
The Haven and Enfield complex series consists of very deep, well drained loamy soils formed
in a silty mantle overlying glacial outwash. They are nearly level to sloping soils on outwash
plains and terraces. Slope ranges from 0 to 15 percent. Permeability is moderate or moderately
rapid in the surface layer and subsoil and rapid or very rapid in the substratum. Land uses
associated with these areas typically include idle,wooded, or used for community development.
Common trees are red,white, and black oak;red and sugar maple; white pine; gray birch; white
ash; and hemlock.
The Cheshire series consists of very deep,well drained loamy soils formed in supraglacial till on
uplands. They are nearly level through very steep soils on till plains and hills. Slope ranges
from 0 to 60 percent. Saturated hydraulic conductivity is moderately high or high throughout.
Typically,this soil series is used for community development. Stony areas are mostly wooded.
SOIL SCIENTIST REPORT
RECONSTRUCTION OF AVERY STREET
MARCH 2O14 PAGE 2
Q`MTLONB&MACBRoow
Common trees are northern red,white, and black oak;hickory; ash; sugar and red maple; gray
birch; eastern white pine; and eastern hemlock.
The Wapping series consists of very deep,moderately well drained loamy soils formed in silty
mantled friable or firm till on uplands. They are nearly level to gently sloping soils on till plains,
low ridges, and hills, typically on lower slopes and in slight depressions. Slope ranges from 0 to
8 percent. Saturated hydraulic conductivity is moderately high or high in the surface layer and
subsoil and high or very high in the substratum. Some areas are wooded, and scattered areas are
used for community development. Common trees are red and white oak, white pine,hemlock,
black cherry,white ash, and red and sugar maple.
The Udorthent series consists of those soils that have been significantly disturbed by
anthropogenic activities, and these soils have either been cut and/or filled by more than 2 feet.
These soils typically lack a natural soil horizon profile and cannot be taxonomically classified
into one of the official soil series or complexes.
1.2 Wetland Soils and Ordinary High Watermark
The soil resource mapping does show bands of wetland soils within the project limits and,during
our investigations, several wetland soil pockets were found within the project area. The wetland
soils belong to the Saco series and Raypol series.
The Saco series consists of very deep,very poorly drained soils formed in silty alluvial deposits.
They are nearly level soils on floodplains, subject to frequent flooding. Slope ranges from 0 to 2
percent. Permeability is moderate in the silty layers and rapid or very rapid in the underlying
sandy materials. Most areas are in brushy woodland. Common trees are red maple,elm,willow,
pin oak,and alder. Fir and spruce are common in the northern areas.
The Raypol series consists of very deep,poorly drained soils formed in loamy over sandy and
gravelly outwash. They are nearly level to gently sloping soils in shallow drainageways and
SOIL SCIENTIST REPORT
RECONSTRUCTION OF AVERY STREET
MARCH 2O14 PAGE 3
��MILONE&MACBPoow
low-lying positions on terraces and plains. Slope ranges from 0 to 5 percent. The soils have a
water table at or near the surface much of the year. Permeability of the Raypol soils is moderate
in the surface layer and subsoil and rapid or very rapid in the substratum.
The wetland and watercourse boundaries are depicted on the project plans.
1.3 Wetland and Watercourse Classification
The wetland and watercourse resources along Avery Street are described herein using the U. S.
Fish and Wildlife Service's wetland classification system described in Classification of Wetlands
and Deepwater Habitats of the United States(Cowardin,et al., 1979). All of the wetlands
delineated along Avery Street belong to the palustrine ecological unit.
Avery Brook and Associated Forested Floodplain Wetlands
Avery Brook originates northwest of Avery Street and flows through a flood control dam and
outlet control structure. The brook flows under Avery Street via twin corrugated metal pipe
culverts. Avery Brook is flanked by forested floodplain wetlands both upstream and downstream
of Avery Street. The brook has a riffle/run geomorphology with a substrate consisting of stones,
cobbles,pebbles, and coarse sand.
SOIL SCIENTIST REPORT
RECONSTRUCTION OF AVERY STREET
MARCH 2O14 PAGE 4
lV:MILONE&MACBROOAC
The forested floodplain
� , la�
wetland upstream of } w'
Avery Street consists predominantly of red - 't
maple and is intermixed
with American elm,
spicebush, silky
dogwood, multiflora
rose,Japanese barberry,
privet, Oriental
bittersweet,pokeweed,
skunk cabbage, and
sensitive fern. The
topography is relatively
flat, and hydrology is Forested Floodplain Upstream of Avery Street Cross Culverts
supported by the brook and high groundwater. No pools or areas of standing water were
observed within this portion of the forested wetland. No significant habitat for amphibian
breeding was observed.
Downstream of Avery Street, the brook is flanked by narrower bands of forested wetlands and
forested uplands. The vegetation includes red and sugar maple,black cherry, winged euonymus,
multiflora rose,privet,wineberry,Japanese barberry,wild grape, Oriental bittersweet, and garlic
mustard.
SOIL SCIENTIST REPORT
RECONSTRUCTION OF AVERY STREET
MARCH 2O14 PAGES
��MILONB&MACBF-oow
x Left Photo:Forested Floodplain
- _ Downstream of Avery Street
.1
z
Right Photo:Avery Brook
Looking Upstream from Kelly
Road
SOIL SCIENTIST REPORT
RECONSTRUCTION OF AVERY STREET
MARCH 2OI4 PAGE b
���MILONE&MACBROOM°
Dart Brook and Associated Forested Wetlands
Dart Brook, a tributary to Avery
Brook,was delineated north of
ry
Beelzebub Road. The watercourse
has a riffle run geomorphology
with a cobble,pebble, and coarse
sand substrate. The watercourse is
piped beneath Avery Street and
Woodland Drive and eventually
daylights behind residential
properties located on the south side
of Woodland Drive.
Dart Brook Looking Downstream
The watercourse then flows south,
eventually meandering north
toward Avery Street and then flows ,
parallel to Avery Street before ;
discharging into Avery Brook.
The channel has been heavily
impacted over the years by ".
anthropogenic activities. Portions
of the channel, specifically the
section located parallel to Avery
Dart Brook View Looking Upstream from Avery Street
Brook, are lined with riprap.
Vegetation varies along the watercourse with nonnative vegetation being dominant including box
elder,Norway Spruce,Norway maple, sugar maple,red maple,privet,multiflora rose,Japanese
barberry, Oriental bittersweet,wild grape, silky dogwood,pokeweed,wineberry,garlic mustard,
goldenrod, soft rush, and various grasses.
SOIL SCIENTIST REPORT
RECONSTRUCTION OF AVERY STREET
MARCH 2O14 PAGE 7
���MILONE&MACBROQM'
e Mel r cr r ' •
r -r r r• - r- -r � � � -- r rrr r �
• - r .• r r-- r r-r r rrr \ -
fit;+1�/,s};alai >��. �i� �#• �� {�j �w! � 3! {f` ,n � y \7�\f
15.6q �>•1--�� �t�ly iS i �'� `S ; <•,,, � �
1 1 s
� �/• � � L�If 1 { r]
I1 I t
{ i
(
'� y �r:k(• Iti� 1 iy ti rtr�� sr r�' ';i r s��:l..r e
A+4? Y V ,
� Y 1
r r
r r r
I
1.4 Evaluation of Wetland and Watercourse Functions
Wetlands and watercourses possess the capacity to perform a variety of ecological and societal
functions. These vary depending on the specific characteristics of the wetland and/or
watercourse being evaluated. The wetlands and watercourses along the project corridor were
evaluated in order to identify the functions that they provide.
The following tables provide a summary of the functions and values of the watercourses and
wetlands along the project corridor.
SOIL SCIENTIST REPORT
RECONSTRUCTION OF AVERY STREET
MARCH 2O14 PAGE 9
���MILONB&MACBROOM°
TABLE 1
Avery Brook and Associated Forested Floodplain Wetlands
Functions and Values Assessment
Functions and Values Comments
- Yes—A high groundwater table was observed within the
Groundwater Recharge/Discharge bordering forested wetland with likely discharge to the
watercourse.
Floodflow Alteration(Storage& Yes—Avery Brook and the bordering forest are designated
Desynchronization) as a FEMA 100-year flood zone and floodway.
Yes—Avery Brook can support fish during most of the
Fish&Shellfish Habitat year;however,there may be low base flow impairments
during the drier months.
Limited—The forested wetlands upstream of Avery Street
F have the potential to accumulate sediment due to the
�r
Sediment/Toxicant Retention restrictive culvert outlets. Forested wetlands downstream
have fewer opportunities for sediment collection and
retention due to narrower wetland widths.
Limited—The forested wetlands upstream of Avery Street
Nutrient have the potential to accumulate sediment due to the
Removal/Retention/Transformation restrictive culvert outlets. Forested wetlands downstream
have fewer opportunities for sediment collection and
retention due to narrower wetland widths.
Yes—The bordering forested floodplain does support high
Production Export(Nutrient) stem density and/or berry-producing shrubs and does
provide allochthonous materials for downstream habitats.
Sediment/Shoreline Stabilization Yes—The banks of Avery Brook appear stable.
Wildlife Habitat Yes—Bordering forested floodplain serves as a wildlife
corridor.
Recreation(Consumptive&Non- No—Avery Brook is bordered by private property.
Consumptive)
Educational Scientific Value No
Uniqueness/Heritage No
Visual Quality/Aesthetics No—Avery Brook is bordered by private property.
ESEndangered Species No
The principal functions/values of Avery Brook and its associated forested floodplain wetlands
include floodflow attenuation, fishery, and wildlife habitat.
SOIL SCIENTIST REPORT
RECONSTRUCTION OF AVERY STREET
MARCH 2O14 PAGE 10
1��MILONE&MACBROOM®
TABLE 2
Dart Brook and Associated Forested Wetlands
Functions and Values Assessment
Functions and Values Comments
VGroundwater Recharge/Discharge No—No groundwater seeps or discharges were observed during field
investigations.
Floodflow Alteration(Storage& Yes—Tributary has a mapped FEMA designated 100-year floodplain
Desynchronization) and does provide localized floodflow alteration.
No—Dart Brook has several culverts and may experience low base
Fish&Shellfish Habitat flow impairments during the drier months,thereby limiting the fish
habitat.
Limited—The forested wetlands upstream of Avery Street have the
potential to accumulate sediment due to the restrictive culvert outlets.
Sediment/Toxicant Retention Forested wetlands downstream have fewer opportunities for sediment
collection and retention due to narrower wetland widths.
Limited—The forested wetlands upstream of Avery Street have the
Nutrient potential to accumulate sediment due to the restrictive culvert outlet.
Removal/Retention/Transformation Forested wetlands downstream have fewer opportunities for sediment
collection and retention due to narrower wetland widths.
Yes—The bordering forested floodplain does support high stein
Production Export(Nutrient) density and/or bevy-producing shrubs and does provide
allochthonous materials for downstream habitats.
Sediment/Shoreline Stabilization Yes—The banks of Dart Brook appear stable
Wildlife Habitat Yes—Bordering forested floodplain serves as a wildlife corridor.
Recreation(Consumptive&Non- No—Dart Brook is bordered by private property and Avery Street.
Consumptive)
Educational Scientific Value No
Uniqueness/Hentage No
qP Visual Quality/Aesthetics No—Dart Brook is bordered by private property.
ESEndangered Species No
The principal functions/values of Dart Brook and its associated forested wetlands include
wildlife habitat and floodflow alteration.
SOIL SCIENTIST REPORT
RECONSTRUCTION OF AVERY STREET
MARCH 2O14 PAGE I
�.�MILONE&MACBROOM`
TABLE 3
Isolated Wetland Pocket
Functions and Values Assessment
Functions and Values Comments
Groundwater Recharge/Discharge Yes—Groundwater discharge was observed during field
investigation.
Floodflow Alteration(Storage& No—The wetland pocket is not located within a FEMA
Desynchronization) designated floodplain.
ANWAPA Fish&Shellfish Habitat No—No watercourse or open water areas are associated with
the wetland.
Sediment/Toxicant Retention No—The isolated wetland pocket is too small to provide
f(,i sediment retention.
Nutrient No—The isolated wetland pocket is too small to provide
Removal/Retention/Transformation nutrient retention.
Production Export(Nutrient) No—The wetland lacks native berry-producing vegetation.
g Sediment/Shoreline Stabilization No—The wetland is not associated with a watercourse or open
^- water.
Wildlife Habitat Limited—The wetland is too small and fragmented to provide
any wildlife habitat other than urbanized wildlife species.
Recreation(Consumptive&Non- No—The wetland is located on private property.
Consumptive)
Educational Scientific Value No
Uniqueness/Heritage No
Visual Quality/Aesthetics No—The wetland is surrounded by residential private
properties.
ESEndangered Species No
The principal function/value of the isolated wetland pocket is groundwater discharge.
SOIL SCIENTIST REPORT
RECONSTRUCTION OF AVERY STREET
MARCH 2O14 PAGE 12
�:MILONE&MACBROOAC
References
Ammann,A. P., R. W. Frazen, and J. L. Johnson, 1986,Method for the Evaluation of Inland
Wetlands in Connecticut—A Watershed Approach, Connecticut Department of Environmental
Protection,DEP Bulletin Number 9.
Cowardin, et al., 1979, Classification of Wetlands and Deepwater Habitats of the United States,
U. S. Fish and Wildlife Service.
Magee,D. W. and G. G. Hollands, 1998,A Rapid Procedure for Assessing Wetland Functional
Capacity,Normandeau Associates and ENSR.
Mehrhoff, L. J.,K. J. Metzler, and E. E. Corrigan,2001,Non-native Invasive and Potentially
Invasive Vascular Plants of Connecticut, Center for Conservation and Biodiversity,University of
Connecticut, Storrs.
Metzler,K. J. and R. W. Tiner, 1992, Wetlands of Connecticut, State Geological and Natural
History Survey of Connecticut.
USACE, 1995, Wetland Functions and Values—A Descriptive Approach,. NEDEP-360-1-30a.
2186-24-9-mu2714-rpt
SOIL SCIENTIST REPORT
RECONSTRUCTION OF AVERY STREET
MARCH 2O14 PAGE 13 1
� "MIr om&MACBRoow
USDA-NRCS Web Soil Survey Mapping
���MILONE&MACBRoow
3 Soil Map—State of Connecticut ;
(Avery Street,South Windsor,C1)
7099W 706000 M6100 7062M 706300 706400 706500
41-wrN 41^WrK
�7
41"49'32"N 41"4'3r N
705900 706000 706100 706100 706300 706400 706500
Map Sde:IAS30 If onAportrait AY x 11")street. �
N 0 50 100 200 300
A 0 200 400 800 =0
Map pmJeWm:Web Me wb OymoDmdinams:WGSB4 Edge tkL UlM Zorre 18N WGw
Natural Resources Web Soil Survey 3/1912014
Conservation Service National Cooperative Sal Survey Page 1 of 3
Sofi Map—State of Connecticut
(Avery Street,South Windsor,CT)
MAP LEGEND MAP INFORMATION
Area of Interest(AOQ Spoll Area The soil surveys that comprise your AOI were mapped at 1:12,000.
Q Area of Interest(Aol) Stony Spot
Waning:Soil Map may not be valid at this scale.
Solis
[� Sol Map unit Polygons Very Stour Spot Enlargement of maps beyond the scale of mapping can cause
y wet Spot misunderstanding of the detail of mapping and accuracy of soil line
+v Sol Map unit Lines placement.The maps do not show the small areas of contrasting
Other Sol Map Unit Points soils that could have been shown at a more detailed scale.
�
Special Point Features Special Line Features
Water Features Please rely on the bar scale on each map sheet for map
V Blowout measurements.
Streams and Canals
IN Borrow Pit Transportation Web
of Map: Natural Resources Conservation Service
x day spot Web Soil Survey URL: httpJ/websoNsurvey.nres.usda.gov
+44 Rals Coordinate System: Web Mercator(EPSG:3857)
( dosed Depression Interstate Highways i9 waYs Maps from the Web Soil Survey are based on the Web Mercator
Gravel Pit ,.� US Routes projection,which preserves direction and shape but distorts
Gravelly Spot distance and area.Aprojection that preserves area,such as the
Major Roads Albers equal-area conic projection,should be used if more accurate
Landfill Local Roads calculations of distance or area are required.
is Lava Flow Background This product Is generated from the USDA-NRCS certified data as of
the version date(s)listed below.
Marsh or swamp . Aerial Photography
Mtrro or Quarry Soil Surrey Area: State of Connecticut
Survey Area Data: Version 11,Nov 19,2013
Q Miscellaneous water
Soil map units are labeled(as space allows)for map scales 1:50,000
Q Perennial water or larger.
V Rock Outcrop Date(s)aerial images were photographed: Mar 28,2011—May
+ Saline Spot 12,2011
Sandy Spot The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
Severely Eroded Spot imagery displayed on these maps.As a result,some minor shifting
Sinkhole
of map unit boundaries may be evident.
Slide or Slip
Soft spot
IwA Natural Resources Web Soil Survey
Conservation Service National CooperativeSo I Surrey Page of 3
Soil Map-State of Connecticut Avery Street,South Windsor,CT
Map Unit Legend
State of Connecticut(CT600)
Map Unit Symbol Map Unit Name Acres in AO1 Percent of AOI
12 Raypol sift loam 2.7 2.6%
21A Ninigret and Tisbury soils,0 to 5 2.5 2.3%
percent slopes
32B Haven and Enfield soils,3 to 8 14.1 12.6%
percent slopes
32C Haven and Enfield soils,8 to 15 5.2 4.7%
percent slopes
53B Wapping very fine sandy loam, 2.5 2.2%
3 to 8 percent slopes
63B Cheshire fine sandy loam,3 to 4.0 3.5%
8 percent slopes
63C Cheshire One sandy loam,8 to 6.6 6.0%
15 percent slopes
63D Cheshire fine sandy loam,15 to 3.2 2.9%
25 percent slopes
64B Cheshire fine sandy loam,3 to 2.6 2.3%
8 percent slopes,very stony
64C Cheshire fine sandy loam,8 to 6.3 5.6%
15 percent slopes,very stony
65D Cheshire fine sandy loam,16 to 1.0 0.9%
35 percent slopes,extremely
stony
108 Saco sift loam 6.9 6.1%
221A Ninigret-Urban land complex,0 5.3 4.8%
to 5 percent slopes
232B Haven-Urban land complex,0 13.7 12.3%
to 8 percent slopes
237C Manchester-Urban land 18.5 16.5%
complex,3 to 15 percent
slopes
263B Cheshire-Urban land complex, 11.4 10.2%
3 to 8 percent slopes
306 Udorthents-Urban land 6.3 6.7%
complex
Totals for Area of Interest 112.0 100.0%
Natural Resources Web Soil Survey 3/19/2014
Conservation Service National Cooperative Soil Survey Page 3 of 3
a
I � o
o
WETLAND ACTIVITY AREA #1
t i oa o
(S DRAINAGE PLANS FOR MORE INFORMATION r - - - - _
AN ACTIVITIES WITHIN UPLAND REVIEW AREA) EX-5
1 PLN-5 1
1 it y SPM-51
Nb 1 WETLAND ACTIVITY AREA #2
1 I' 7 w 1 (SEE DRAINAGE PLANS FOR MORE INFORMATION
- 114 AND ACTIVITIES WITHIN UPLAND REVIEW AREA)
or
EX-1 / EX-2 EX-3 1
/ t
PLN-1
PLN-2 PLN-
1 —+ DRN-1 1
i DRN-2 DRN-
1 t, SPM-1 SPM-21 SPMEl
-
I
Q 1
I
+60
Zc. �� 1
1 d
oo o �.25+00 �
z
20+0
•L �J
c �
�.
I � I � EX-4
1 I o 10 o PLN-4
1 CF DRN-4
JJ •"�,. ''� „� ,� �SPM-4
J I Y a — O e3 �! 1•
I $£ + `� 1
It c i
o "-I
1
GENERAL NOTES 1
9. THE RELOCATION OF MAIL BOXES IS PAID FOR UNDER ITEM"CLEARING AND GRUBBING"WHICH SHALL 1
1. SURVEY INFORMATION IS BASED UPON FIELD SURVEY PERFORMED BY MILONE&MACBROOM,INC.IN INCLUDE REPLACEMENT OF EXISTING SUPPORTS IF NECESSARY AND THE PERMANENT RELOCATION OF
FEBRUARY 2013. ALL ELEVATIONS REFER TO THE NORTH AMERICAN VERTICAL DATUM(NAVD 1988). EXISTING SIGNS IS PAID FOR UNDER THE ITEM"REMOVAL AND RELOCATION OF EXISTING SIGNS". -6
STREETLINE INFORMATION HAS BEEN SHOWN ON THE PLANS BASED UPON HORIZONTAL ACCURACY CLASS S0. ALL CONSTRUCTION MATERIALS AND METHODS SHALL CONFORM TO THE APPLICABLE SECTIONS OF THE
A-2,PERFORMED BY MILONE&MACBROOM,INC.IN FEBRUARY 2013.NORTH ARROW AND BEARINGS ARE t PLN-6 1
BASED UPON THE CONNECTICUT STATE PLANE COORDINATE SYSTEM(NAD 1983). STATE OF CONNEC71CUT DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROADS, t ,, Q DRN-6,
BRIDGES,AND INCIDENTAL CONSTRUCTION,FORM 816,2004 AND ADDENDA AND AS SUPPLEMENTED IN
2. INFORMATION REGARDING THE LOCATION OF EXISTING UTILITIES HAS BEEN BASED UPON AVAILABLE THE SPECIAL PROVISIONS. ( o SPM-6
INFORMATION AND MAY BE INCOMPLETE,AND WHERE SHOWN SHOULD BE CONSIDERED APPROXIMATE. I — — — — �
THE LOCATION OF ALL EXISTING UTILITIES SHOULD BE CONFIRMED PRIOR TO BEGINNING CONSTRUCTION. 11. ANY MAINTENANCE OR REFUELING OF EQUIPMENT AND VEHICLES SHALL BE PERFORMED AT LEAST 50,
CALL"CALL BEFORE YOU DIG",811 OR VISIT WWW.CBYD.COM. ALL UTILITY LOCATIONS THAT DO NOT FROM WETLANDS OR WATERCOURSES. OIL,GASOLINE,AND CHEMICALS NEEDED AT THE SITE SHALL BE
MATCH THE VERTICAL OR HORIZONTAL CONTROL SHOWN ON THE PLANS SHALL IMMEDIATELY BE BROUGHT STORED IN A SECONDARY CONTAINER AT LEAST 50'FROM WETLANDS OR WATERCOURSES AND OUTSIDE
TO THE ATTENTION OF THE ENGINEER FOR RESOLUTION. OF FLOODPLAIN AND FLOODWAY LIMITS TO PREVENT CONTAMINATION FROM POSSIBLE LEAKS.
3. MILONE&MACBROOM INC.ACCEPTS NO RESPONSIBILITY FOR THE ACCURACY OF MAPS AND DATA WHICH 12. THE PLANS REQUIRE A CONTRACTOR'S WORKING KNOWLEDGE OF LOCAL,MUNICIPAL,WATER AUTHORITY,
HAVE BEEN SUPPLIED BY OTHERS. AND STATE CODES FOR UTILITY SYSTEMS. ANY CONFLICTS BETWEEN MATERIALS AND LOCATIONS SHOWN,
AND LOCAL REQUIREMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO THE
4. ALL DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED IN THE FIELD BY THE CONTRACTOR,PRIOR TO EXECUTION OF WORK. THE ENGINEER WILL NOT BE HELD LIABLE FOR COSTS INCURRED TO IMPLEMENT
CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER OR CORRECT WORK WHICH DOES NOT CONFORM TO LOCAL CODE. \IMMEDIATELY FOR DETERMINATION. 13. THE CONTRACTOR SHALL TAKE PRECAUTION TO PREVENT DAMAGE TO EXISTING UNDERGROUND UTILITIES
S. SEDIMENT AND EROSION CONTROL MEASURES AS DEPICTED ON THESE PLANS SHALL BE IMPLEMENTED WHEN OPERATING HEAVY MACHINERY SUCH AS VIBRATORY ROLLERS.
PRIOR TON CONSTRUCTION&MAINTAINED UNTIL PERMANENT COVER STABILIZATION IS ESTABLISHED. ALL 14. THE CONTRACTOR SHALL RESET ANY DISTURBED MONUMENTS TO THE PROPER ELEVATION AND LOCATION SEDIMENT&EROSION CONTROL MEASURES SHALL CONFORMS THE MAN MANAGEMENT
PRACICUTTICES
GUIDELINES AT HIS OWN EXPENSE. THE ENGINEER MUST BE NOTIFIED WHEN THIS IS DONE.) JI FOR SOIL EROSION &SEDIMENT CONTROL",AND IN ALL CASES BEST MANAGEMENT PRACTICES SHALL ( I
PREVAIL. THE DESIGNATED INLAND WETLANDS ENFORCEMENT OFFICER SHALL BE NOTIFIED PRIOR TO 15. CONTRACTOR TO PLUG ALL EXISTING PIPES WHERE CURRENT DRAINAGE SYSTEM IS TO BE ABANDONED 20. CONTRACTOR SHALL RESET ALL WATER GATE BOXES WITHIN LIMITS OF CONSTRUCTION TO BE PAID FOR
IMPLEMENTATION OF ANY SOIL&EROSION CONTROL MEASURES NOT DEPICTED ON THE PLANS. UNLESS OTHERWISE NOTED ON PLANS.THIS WILL NOT BE MEASURED FOR PAYMENT. (WATER)".
UNDER"ADJUST GATE BOX )
6. THE CONTRACTOR SHALL RELOCATE OR ADJUST PRIVATELY OWNED UTILITY SERVICE CONNECTIONS 16. ALL SLOPES OR DISTURBED AREAS ARE TO BE STABILIZED WITH 4"TOPSOIL AND TURF MUST BE 21. CONTRACTOR SHALL RESET ALL GAS VALVE BOXES WITHIN LIMITS OF CONSTRUCTION TO BE PAID FOR
ENCOUNTERED DURING CONSTRUCTION UNLESS OTHERWISE NOTED. ELEVATIONS OF ALL RELOCATED OR ESTABLISHED UNLESS OTHERWISE NOTED ON THE PLANS. CONTRACTOR SHALL YORK RAKE TOPSOIL (GAS)".
ADJUSTED UTILITIES TO MATCH THE PROPOSED GRADE,UNLESS OTHERWISE NOTED ON THE PLANS. UNDER"ADJUST GATE BOX )
PRIOR TO TURF ESTABLISHMENT. COST OF YORK RAKING SHALL BE INCLUDED IN THE ITEM"FURNISHING
7. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH APPROPRIATE UTILITY COMPANIES AND PLACING TOPSOIL". 22. THE CONTRACTOR SHALL HAND DIG AROUND EXISTING UTILITIES AND MUST PROVIDE TEMPORARY
REGARDING RELOCATIONS OF THEIR FACILITIES AND SCHEDULING OF SUCH WORK. SUPPORT FOR EXISTING UTILITIES AS REQUIRED TO ACCOMPLISH THE WORK.THERE SHALL BE NO
17. CALCIUM CHLORIDE TO BE PLACED FOR DUST CONTROL ONLY WHEN ORDERED BY THE ENGINEER. SEPARATE PAYMENT FOR THIS WORK,BUT SUCH WORK SHALL BE INCLUDED IN THE VARIOUS ITEMS
8. THE CONTRACTOR SHOULD NOTE THAT ALL PRIVATE AND COMMERCIAL MAIL BOXES,SIGNS,ETC. ARE TO COMPROMISING THE WORK.
BE RELOCATED USING EXISTING SUPPORTS. WHERE EXISTING SUPPORTS ARE NOT SUITABLE FOR 18. REMOVAL OF ALL TREES SHALL BE PAID UNDER"CLEARING AND GRUBBING".
" RELOCATION,THE CONTRACTOR SHALL PROVIDE A SIMILAR APPLICATION. 23. WHERE NEW SIDEWALK ABUTS EX.CONC.RETAINING WALLS,STEPS AND OTHER RIGID SURFACES,
19. ITEM FOR SILT SACK SHALL BE PAID UNDER"SEDIMENTATION CONTROL SYSTEM AT CATCH BASIN". EXPANSION JOINT MATERIAL SHALL BE FURNISHED AND INSTALLED WITH NO SEPARATE PAYMENT.
.w DESIGNER: PROJECT TITLE: TOWN: PROJECT NO.:
o GRAPHIC SCALE D. PATEL T® ®�° �® $��
DRAFTER:S. BURNS WIzwolammilm Dspim° SOUTH NNDSOR oRAWNG86 24
' —� ? - 1540 SULLIVAN AVE, SOUTH NDSOR CT 06074 RECONSTRUCTION OF
(860)644-2511 /FAX (860)644-7280 DRAWING TITLE:
s (�FE=) CHECKED BY: MJJ ENGINEER: SOUTH WINDSOR ENGINEERING DEPARTMENT AVERY STREET IND-1
REV. DATE DESCRIPTION SHEET.NO. 1 Inch-100 & INDEX PLAN SHEET NO.:
REVISIONS DATE CHECKED:02/11/15 APPROVED BY: J. DOOLITTLE DATE: CADD FILE: AS-Index.dwg PLOTTED DATE: 2 11 15 03
REGULATORY PERMIT SUBMISSION
U€
of i
rry: REMOVE EXISTING
' DRAINAGE STRUCTURE
oq Q a i
PLUG PIPE
J: 1 n O `
} - '_,ype"C"CB DBL GRATE
- tG=210.86
Type"C"CB DBL GRATE C7 ; j NV-206.26 E N/f
TG=210.83 ; NV_205.78 S Marion Dehay
ZNV=207.83 NV=200.56 NW 8 Gray Rd #559
N/f N/f
Joseph Richard Maher
Burke o 545 Avery St N/f
515 Avery St \� Town of South Windsor
-Type"C"CB
�TG-206.8.2
N/f -'�_� '�P UPLAND REVIEW AREA
James Sicord INV=200.42-N
9 GrayRd �"�� I: INV=199.67 5 --
;
i
11.0
INVTG=Z199. 4 Planter.
Type„C"CB
1 INII-19995j F _ r'r ���\ { ., _ �1 / // ��
/ V A
,� _� '' /r ,. - - ,.
i
czsi -- --�� 'A -- i s� -15"CMP
l �
.. 9
36"RCP '' / - _
, s
Ln
Box Sul e ., 14 0._0 _ ,♦♦ 15tOO -CONSTRUCT jQIV BASELINE,-- 16 00 _ +
-T .._.._- ----- -_�_ 12 0�- 0 _- �-- \ �3t00-o -nc.INV=2fk71.01- - --- --- - - - - - -#
0
-1.-10 0'�0 -_ /- '__.- J ---=1 ��= - -------- --- .t - -.o ---- - `� f o
- / I,/ AVE STREET � � __ _ _ _ ♦ v
:�
40
Bit.Sidewalk- "-I i / Bit.Sidewalk n~ m
21
El ,- .•..,.---' -_" _,> - - --� �� � is ,•� _ a
Mon
r
-
r
_ _ -� ---_-_ U:� / _ _: �' "'v.."- -_.-_. -_'-• 1 ice_-yye;'. r ''s.... Yr 5�, �.� \ .'x .. _ \,, \ i M. N
Q / .�.,- -
f �.} Dp
I '.
- R
g
� v
��_- _ _-- \ - ���.,!x�- •. � "-Electric�Vault
V-19�.34 SE
z \� ZNV=199.28 NW
t!
--- - - \V
Q Gary Carlin
--Type„C"CS
524 Avery St _
ZNV=194.62"-�S �� ;r. - � - -�� `i� � TG=202.12 N/f
\ a Samue .Jr.
INV=200.02 SEA
1 �
1 60"RCP 1 c � � \ }� � ��'�: � - INV=199.67 NW Da 'Ile Forko
_ I INV=19.4.33' - Fes' \ _io '`Y�� \\ „p-+" Kelly Rd
N/fGregory&Elaine
Lentz 60"RCP/
0 11 Kelly Rd INV�1 4� i 60"RCP
-15"RCP
r
INV-194.67 .r_ REMOVE CATCH BASIN
10a Type"C C860"RCP PLUG PIPE
TG=200.99 \ 1 �t( I\ r� ZNV=194.54
o INV=195.64 ` I i a t t \��'*'
.-.,... Storm MH \
It �60"RCP
,TF-200.85 INV=194.67
LEGEND NV=19'5:75 EW
S00-YEAR FLOOD PLAIN Recess@d.N ;f U � j f\ _ +
Q ! �--Type"C"CB
Storm MH Q \ TG=200.94
rr, FLOODWAY TF200.79 ;�I N t, i Mon--- Storm MH Filter Fabric
INV7196.79 E 1 t \� kF-)01.19
PROPERTY LINE I I
IW=195.79 E J f Top of Platform=197.49
/Recessed W �' �, � 1 � _�\
- - STREET LINE �--Storm MH
i
-w-v��-w^ WETLAND LIMIT Type"C"CB BTM=i92.29
TG=199.93
y --- WATERCOURSE INV=195.93 1 ;IType"C"CB
ii TG=1 93
---- UPLAND REVIEW AREA UPLAND REVIEW ACTIVITY AREA#1 1 INV=195.98 NW
REGULATED ACTIVITIES SUMMARY TABLE f f t INV=195.88 SE
SEDIMENTATION CONTROL SYSTEM TOTAL REGULATED AREA DISTURBANCE(WITHIN 80 FT.UPLAND
REVIEW AREA)=1.01 AC.(43,892 S.F.) t I t f
SEDIMENTATION CONTROL SYSTEM AT i
CATCH BASIN 1f 1I
EI it
' GRAPHIC SCALE DESIGNER:D. PATEL w® ®�° x® �®� PROJECT TITLE: TOWN: PROJECT NO.:
a o W m 3DNV SOUTH WINDSOR 2186-24
DRAFTER: 1540 SULLIVAN AVE, SOUTH WINDSOR CT 06074 DRAWING NO.:
S. BURNS 4 RECONSTRUCTION OF
(860)644-2511 /FAX(860)844-7280 DRAWING TITLE: DRN-1
J a (W Fm) CHECKED BY: MJJ ENGINEER: SOUTH WINDSOR ENGINEERING DEPARTMENT AVERY STREET
REV. DATE DESCRIPTION SHEET.No. i Inch=zo n. soxz. DRAINAGE PLAN SHEET NO.:
REVISIONS DATE CHECKED: APPROVED BY: J. DOOLITTLE DATE: CADD FILE: AS-DRN-t.dwg PLOTTED DATE: 2 11 15 29
REGULATORY PERMIT SUBMISSION
s 65"X 40"R,C.PIPE ARCH TYPE'C'CB(4'SUMP)
(SEE NOTES 4&5) T.G.=206.22 / TYPE'C'CB(4'SUMP)
j INV.=202.60( tN
V.=2W.70(E) /z
73"X 45"R.C.PIPE ARCH � INV.=202.60(N)N) cf
(SEE NOTES 4&5)
V.=2a7.70(S)
REMOVE EX.CMP PIPES
(SEE NOTE 4) f,E+ 251'-15"RCP
j /
N/f /V Kenneth&Gretchen
Town ofsouth Windsor Young
+I N/f
I N/f 559 Avery St a e 595 Avery St Edith Welles
Alexander F. 623 Avery St
Jr.&Lynn A.Jones J� i N/f
571 Avery St r ; i Edith Welles
623 Avery St
00�
-Jones rye m �rG� i %'Ewsting House,
Stand P -Off P Ff=214.85
rZ k?
\ 15"RCP 18"Tree f i' / i ` - r ,r / - r :48"
\ _ I / 15" win i / % / /
\INV=204.10 `. /, /. 4.8"Tree Yl'tee ,, i - �..�= f i Tee ! ,
{ 24"Treel f.: -, l 36 Treee M pie }-- $ide �� �� / / - F
i5';Maple I `-.� eOle r'�'' f'TI"ee .� r�..:� i Gonc \\ / 48'Tree
z 1..,.-Tree 18"Maple
Tree �,18"Tree
1$"Tree
Tree
a } e
_ - -- _
- '- ----:2.. �,.,.� %v fir_ - ,�.✓:,r i % 20"Maple
w - ----�' n :',S'.,r_, - p 24"Maple i - 3---_I - = i = T- i 18 ee'.
' ZP
w _
n ,rJ --- 18"Tree % - { 36 Maple _ / 3
-^ -c s- -� _ 36"Tree ( guble)`
w = - F -Wood PostsTree. 36 Tree' ,-�/ �i 18 Tree/ f i
0 38 5e5l7 CMP Arch ,/% f� _ - _ i _ 12"Tree
+---'� INV-202.1217-�00 ! 18 AO "y
i
- 19 00'� -� --� m
201.98 - CONSTRUCRODI-BASELINE 20+- r
,
' _ N
r
T
p
STREETAVERY ;
1 _
/ -
y-
Ul
/r 12"Pine f�
(quad) :�\ f w"Tree �✓ ��� �� `12"Tr p
Jfize ,�I11)x57 CMP Ar 2„c \\ 1 e
j J��--
Pine 36"Tree / 12 Tree `
(quad)i O
/•/ '✓ 30'-15"RCP co
38'x�S`"CMP Arch-
j/ INV= 01 28 TYPE'C B
� 'C (4'SUMP)
N/f T.G.=205.92
Samuel S.Jr.& INV.=202.30(SE) ��I -- Existi g House _
Danielle Forko INV.=202.30(NW) J 36"Tree Ff= 22.48
J 12 Kelly Rd I Gf= 17.41
i (Double)
11'48"RCP
REMOVE PIPE
TF=221.75
Nlf/,�� ` Charles
23'-15"RCP N& BTM=219.34
\` Char/es& Francis&Ebony N/f
Leslie Tillem Khadijah-Hajdu 289'-15"RCP Jamie&Jennifer
LEGEND
16 Kelly Rd 604 Avery St Fraga
T.G.=211.32 y
TYPE CB(4'SUMP) 614 Aver St
� �
+m-m 100-YEAR FLOOD PLAIN INV.=207.90(N)
INV.=207.90(W)
rr FLOODWAY ❑
PROPERTY LINE
i
- - STREET LINE
WETLAND LIMIT
— -- WATERCOURSE
S
------------ UPLAND REVIEW AREA
WETLAND ACTIVITY AREA#1
• SEDIMENTATION CONTROL SYSTEM REGULATED ACTIVITIES SUMMARY TABLE
SEDIMENTATION CONTROL SYSTEM AT AREA OF WETLAND AND WATERCOURSE DISTURBANCE_
CATCH BASIN
0.04 AC.(1,908 S.F.)
LINEAL FEET OF PROPOSED STREAM ALTERATION=45 FT.
GRAPHIC SCALE
DESIGNER:D. PATEL womw or sou%w vrXIM801t PROJECT TITLE: TOWN: PROJECT NO.:
wwEMww
DRAFTER:S. BURNS s D AR RECONSTRUCTION OF SOUTH MNDSOR 2186-24
—� 1540 SULLIVAN AVE, SOUTH WINDSOR CT 06074
a (860)644-2511 /FAX (860)644-7280 DRANING NO.:
DRAWING TITLE:
} I Inch-2o n.I9oxz CHECKED BY: MJJ ENGINEER: SOUTH WNDSOR ENGINEERING DEPARTMENTDESCRIPTIO AVERY STREET SHEETDNO.N-2
REV. DATE REVISIONS DATE
sRtET.No. DATE CHECKED:02/11/15 APPROVED BY: J. DOOLITTLE DATE: CADD FILE: AS-DRN-2.dw DRAINAGE PLAN
9 PLOTTED DATE: 2 11 15 30
REGULATORY PERMIT SUBMISSION
WETLAND ACTIVITY AREA#2 UPLAND REVIEW ACTIVITY AREA#2
•` hIATCM MA I,, ACTIVITIES SUMMARY TABLE REGULATED ACTIVITIES SUMMARY TABLE
Bit �` i RK 3TA.46+g0 AREA OF WETLAND AND WATERCOURSE DISTURBANCE= REGULATED AREA DISTURBANCE(WITHIN 80 FT.UPLAND
Parking Lot I _ I( ( ` SEE SHED. RN. N 0.06 AC.(2666 S.F.) REVIEW AREA)=0.44 AC.(19,117 S.F.)
LINEAL FEET OF PROPOSED STREAM ALTERATION=383 FT.
REMOVE CATCH BASIN �-
r TYPE'C'CB(4'SUMP)
I r t 1ectricV l on r ' T.G.=243.60
i I; Pad Ax) / ;/ ��f�'�\ .L irx'' 6„Trees--- INV.=239,38(S)
/ ! ;4/4 I - i0 / ! ('' _ --_- _.�' - INV.-239.38(NE)
Avery Sltre
54'-15"RCP W/6"UNDERDRAIN I t'hnwiafi jefd medN� • 24
Chch I �'.� 7 _ ( Ir _ Tree
399 BeelFeb Rd 18'Tre
e
TYPE'C'CB(4'SUMP) . j f r,3 o f
T.G.=243.31 i /o/ W - \ .� _.i.- 'Z4 IS/RCP1W/6"UNDERDRAIN
INV.=239.65(N) I �yl/4 u / / i - `,r�Ji e' i'J -," yPE'C'CB(4'SUMP)
.li- T G 243.29
REMOVE PIPE i j� /LLJ ! -x s �"IIV `3Y�P(SW)
f
/ /( -
/ In
i• i I _ ree
� � 8 T e�, � SIN 239 Z6«�30"MCP
_ Tree END FULL-DEPTH
i
//- 3i'-15"�RCPdfi(V 239.89� �-%I//-
24"Tree 12"F Z2 Tree t ZS"
/ / / ---/ - is �'' _ ,, Tree, _
_ try stre j - PLUCvPff \�\ /;;- f �--Y -- . ONSTRUC 'ION _-
. 32+410 rr ef .49ee'ib RCiS -Type„C"CB'
42" rye /� r•'1 / J 8„ 12"-Tree - / '" INV=2-65j„
-
\ / r
- __ - ✓ 7...ree 5„ 27 e� i _ 1 T e f/
nafree
-
,. �� / 5i� 'i 2„T-ree
\ ;'
/ 12 n7
i i 15 � i� , TrP�� 5 Tree
f Tr�
Tree
INV=Z91_45-- ' _ -- _
------ - f
r
r
1 � =i•//
^ ` ` 8 Tree
"Tre ,, 15"T- /
m 28 00 - i _- `- GP Jl / /' ✓ZS" __ �i / / ! /
- - - �! 29 00 � & ��30 0 _ j' / 3100 ice( i I Pl rc i /'I j j / AVERY STREET
- CONSyRU 'BASELINE
-jam -3,z a+ 0 OQ`
,-
' ♦ •�.• -- _AVERY STREET \1s'cPP
� „Tree _ � <\ \ "� � � v \ � '• r
�36"T -6 f _ 2„Tree �, Ma e \ / ! I \ ; ice" i✓ / / / /'
or
- - - _ - - -
8"Tree
i
--- - - e - ON a^ -
-'' � i v c \ 15"Tree 3 ee 4 �48
IP
\ \ `Type"C"CB DBL G are a \ ,�. i �, ,r v TG 251.�'Z / 5"_,a-- /,<��--/ •-�- / / _,
_ J.� ,�' G=243.41 �` m \ .zc•' 3s._, \\7 is. 3 rr
m 3 Q IN 246 1
V=238.11 i v Y \ 24 Tree I .,,,, ff �� °' I
,�F _ {I .` t� T�243.73r.�.� - \ INV 245�6
'1 I ♦ 4 � q \ T.._ it m ;\ INV 245. 1 E
.A�"Tree ` 5"Tree
1
I ' I-Tye"C-CB ro �. 1rR I IS"Tre \ in ,` 1 J 27"Pine(Tnp) i /
-fi'as Control Box TG 242.20 i < _ ;_� 1 �'V`y - '� \ cat/!
m /
IN 239.501� - _ -- --z r 1Z One;
-'t
/ A
4
INV= 35.80 SE -- 12 S
/ I /
-� -m INV= 0
�
42"Birch
v
- \ Existing ouse I 16'-1 "PU Benchmark /i�/f
Z • - I ` \\ j Ff=24 54 Railroad Spike In Snet
"}�'1 "Pine 121'-36"RCP Typc"C
514 CB 12'Pine -'1 4'-15"C P(TYpr&v=249.59 ;
k I \(D uble) i TG=251.03
W _ TYPE'C'C -_ INV=248.69
-Underground Gq DEL GR PE I(NO SUMP) N/f
Vault with Metal', ROUND TY E'C'CB-5'DIAMETER T.G.=245 64 Ryan&EllenCO
\ i Access Doors N� (NO SUMP INV.=Z36 11(S)) 702JAves St
Hil D I T.G.=243. 8 Avery
LIMIT OF FULL-DEPTH z4"Pine `` Z5"Tree 670A ery t INV.=2351151(N) N�f INV.=241.87(N) Nlf
j �\ r,.•<_ INV.=235 51(S) James&Susan Birch James Allen
CONSTRUCTION r 24"IPine l 1 INV-2391O(W) 678 Avery St 710 Avery St
STATION 48+00 J I LEG ND I
i 24'• � ` 24"Tree REMOVE PP PE(25'k)
\ 3., im-rrs 100-YEAR FLOOD PLAIN
54"Pine <�"% ��� \
Double
.. 42'- "RCP �r FLOODWAY
\ 15"Tree
iV
36
J/r \ -- - PROPERTY LINE
30"Ptn6' MANHOLE-5'DIAMETER
2'Tree,Shed T.F.=243.37 I STREET LINE
27" ne ] � INV.-235.30(N)
INV.=235.30(SE) --W--W-- WETLAND LIMIT
' 9-NNO
133HS 33S 00+6y•VES}I'dVW HO1VW ✓\\ WATERCOURSE
y —...
- 155'-36"RCP
a
------------ UPLAND REVIEW AREA
SEDIMENTATION CONTROL SYSTEM
SEDIMENTATION CONTROL SYSTEM AT
CATCH BASIN
DESIGNER: PROJECT TITLE: TOWN: PROJECT NO.:
GRAPHIC SCALE D. PATEL a ® or �� � E®� SOUTH WINDSOR 2186-24
a o is m ���
DRAFTER: 1540 SULLIVAN UTH AVE,, WINDSOR CT 06074 WING NO.:
S. BURNS RECONSTRUCTION OF DRAWING
(860)644-2511 /FAX(860)644-7280 DRAWING TITLE: DRN-4
c 1861/ AVERY STREET SHEET NO.:
x I inch-zo fL eoaz. CHECKED BY: MJJ ENGINEER: SOUTH WINDSOR ENGINEERING DEPARTMENT DRAINAGE PLAN
a REV. DATE DESCRIPTION SHEET.NO.
REVISIONS DATE CHECKED:02/11/15 APPROVED BY: J. DOOLITTLE DATE: CADD FILE: AS-DRN-4.dwg I PLOTTED DATE: 2 11 15 32
HYDRAULIC DATA
KV Tsx, Drainage Area 0.87 mil
36"Tree _3 ? �3�'., \ \4c \\\ \ 60 LF-4r0"H X 65"W R.C.PIPE ARCH
? G L Vfir. \\ y \\v
� \� / Design Frequency 100 Yr Storm
,ti ff 12"Tree J( Design Discharge 76 cfs
3i f' t:5 S ( `R'
4 "I � ;1 w � `a p2 � \�., \ a�� `\ � SOS
>;>'._ve'Jz �?"- � �5? ,j 1 \\_\ �� �9 �(� \ •` -\ c, j� Upstream Design Water Surface El. 204.03 Ft
S
cZ," $„T � \2 F4 \\ \ \ � \ \\ // SANITARY SEWER MH Downstream Design Water Surface El. 203.98 Ft
10'-18"RCP CONCRETE HEADWALL"B"
SEE NOTE(3)
CONCRETE DISTRIBUTION
4 'r e "�� Ig"Tr e \�o,. \\ \ \\ METAL BEAM RAIL R-B 3SO DESCRIPTION UNIT QTY
' \ \
(TYPE I)SECTION
f-,
SUPERSTRUCTURE CY -
li f
SEE NOTE(1)
\
------- c3 \ `• S \\ �''-- m� \ \\ `� SUBSTRUCTURE CY 45
18"Tree f - V A C�, s� v 0 A\ 3S^xS7"CMP Ar ch
CATCH BASIN(��11''- P.) `.�"' y_. \ '\ % \ \\ \\ INV=20i.49 FOOTINGS
S CY 45
O SEE N TE'(�3)r"s- � V A\ r �� AV � A MODIFIED RIPRAP TOTAL CY 90
24"Tree AV A A V v\
.38'x57"CMP Arch
2 s` do \ \\\ _ \ INV=201.28
\ - NOTES:
\ / 30"Tre
BORRB-B , iti� \\ C (1)ROADWAY ITEM
LE\V�296.06 J \ (2)SEE DRAWINGS#####THRU#####FOR ROADWAY ITEMS,AND CALLOUTS.
asts \ - __ ____ \ -3 + (3)SEE DRAINAGE PLANS FOR DRAINAGE ITEMS AND CALLOUTS
2 (4)SEE SIGNING AND PAVEMENT MARKING PLANS FOR FINAL LANE CONFIGURATIONS
Q � (6)SEE DRAWING######FOR BORING LOGS AND STRUCTURAL NOTES.
' \� - -- -' � "- ' _ � O EE MAINTENANCE AND PROTECTION OF TRAFFIC NOTES AND PLANS
AGE 2 CONSTRUCTION AND WATER HANDLING PLAN
d
� �\ V A v \ � �48"-Tree12
In
CONCRETE HEA,DWALL"A" —z0s '- —� '%C 2�6 \\ \ \ \\ �� \�J•�
Anch
Po
/ 38'xS7"CMP Arch
INV=201.9$ SANITARY SEWER MH
BOR
ELEV 2
38"xS7"CMP Arch
/\ INV=202.12 \�e�a� ® / \ tt
37 c/,' r ZS"RCP �\
INV=204.10 METAL BEAM RAIL
(TYPE R-B 350 SYSTEM 5)
SEE NOTE(1)
CULVERT-GENERAL PLAN 60 LF-45"H X 73"W R.C.PIPE ARCH
SCALE:1"=10' x' ',
BITUMINOUS CONCRETE METAL BEAM RAIL R-B 350(TYPE I)
CURB(TYP.) SECTION(POSTS BEYOND CULVERT)
irl C R.C.PIPE ARCHES
CONCRETE SIDWALK
PROPOSED GRADE(TYP.) m v PROPOSED GRADE
H
rI CONCRETE HEADWALL(TYP.) AVERY STREET
us PROTECTIVE FENCE(4'HIGH) w'o 215
STA.17+44.7
Q J 210 210
W
210 210
EXISTING CHANNEL
—......— 2os zas 20s
_______________
18"RCP
195 - _40"H_X_65"W R.C.PIPE ARCH _ _ 40"H X 65"W R.C._PIPE ARCH 195
INV.201.70 INV.201.30 19s 40"H X 65"W 2'-W 45"H X 73"W 19s
45"H X 73"W R.C.PIPE ARCH EX.6"H.P.GAS MAIN 45"H X 73"W R.C.PIPE ARCH R.C.PIPE ARCH R.C.PIPE ARCH
190 INV.200.70 (TO BE RELOCATED BY YANKEE GAS) INV.200.30 190 190 190
EX.12"C.I.WATER MAIN REMOVE AND REPLACE
CONCRETE FOOTING(TYP.) (APPROX.LOCATION) EX.SAN(10"PVC) EXISTING SANITARY PIPE
(TO BE RELOCATED BY CT WATER) (ROADWAY ITEM) SHOWN BEYOND
CULVERT ELEVATION s9 SECTION
SCALE:1"=10' 6TR-0 SCALE:'As"=V-0"
DESIGNER: PROJECT TITLE: TOWN: PROJECT NO.:
T. BLOOH �'® ® ° ®� ��vv SOUTH WINDSOR 2186-24
1540 SULUVAN AVE, SOUTH WINDSOR CT 06074 DRAWING NO.:
SCALE AS NOTED DRAFTER: T. BLOCH �` ,, " (860)644-2511 /FAX(860)644-7280 RECONSTRUCTION OF
AVERY STREET DRAWNG TITLE: STR-
NI O1
REV. DATE DESCRIPTION SHEET.No. CHECKED BY: K. PATEL ENGINEER: SOUTH NOSOR ENGINEERING DEPARTMENT CULVERT - GENERAL PLAN, SHEET NO.:
REV. DATE DESCRIPTION SHEET.NO.
9 REVISIONS DATE CHECKED:11/12/14 APPROVED BY: J. DOOLITTLE DATE: CADD FILE: AS-STR-01.dwg I PLOTTED DATE: 2/11/15 SECTION, AND ELEVATION 59
REGULATORY PERMIT SUBMISSION
SOW N SE4
C ' , 7-0� ale �e
G U..7
wQ 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074
SOR-CO TELEPHONE (860) 644-2511
HAND DELIVERED
March 10, 2015
Mr. Matthew B. Galligan
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
RE: Appl. #15-13W—Avery St Reconstruction
Dear Mr. Galligan:
At the March 4, 2015 regular meeting, the Inland Wetlands Agency/Conservation Commission approved
Appl. #15-13W, with the following conditions:
1. The final approved copy of the entire set of plans and this letter reproduced thereon must be
submitted to the Planning Department. This must be completed within 65 days of approval prior
to any construction activity on the site. Plans submitted to Planning & Zoning Commission shall
be considered having met this requirement.
2. The application shall indemnify and hold harmless the Town of South Windsor against any
liability, which might result from the proposed operation or use.
3. The permit is valid for five years and shall expire on March 4, 2020. It is the
Ian downer(s)/appl icant(s) responsibility to track expiration dates and notify the Commission of a
renewal request at least 65 days prior to expiration.
4. A planting plan incorporating a shade tolerant ground cover to be determined by Town Staff.
5. All approvals required must be obtained and submitted prior to any activity on the site.
6. A contact person shall be identified on the plans.