April 9, 2014
Karen Isherwood,P.E.
Isherwood Civil Engineering
58 Ordway Drive
South Windsor, CT 06074
RE: WPCA Approval
Anixter, 1315 John Fitch Blvd.
Dear Ms. Isherwood:
The South Windsor Water Pollution Control Authority, at its regular meeting on April 1, 2014,
approved the application as presented for connection to the Town's sewerage system for the existing
commercial building located at 1315 John Fitch Boulevard, South Windsor, CT as more specifically
shown on plans entitled "Anixter, Inc., Site Plan Modification, 1315 John Fitch Boulevard (CT RTE
5), South Windsor, CT" Prepared by Isherwood Civil Engineering, South Windsor, CT; Project No.
1059, Sheet C-1 "Site Plan" - Dated 2/24/2014; Revision Dates: 3/10/14 and 3/18/14; also, Sheet C-2
"Topographic &Utilities Plan" -Dated 2/24/2014; Revision Dates: 3/10/14, 3/14/14, and 3/18/14.
This approval is subject to the following conditions:
1) A draft of an easement allowing the Town access to the proposed sanitary manhole on Strong
Road for monitoring purposes, must be provided to be reviewed and approved by the Town
Attorney.
2) Final technical approval of the Town of South Windsor Engineering Department; and
3) Final Authority approval and acceptance of the sanitary sewerage connection will be
conditional upon the installed sewer line having been inspected by the Town staff, and upon the
written verification of the Town staff that said sanitary sewer line was installed in substantial
conformance with the design plans approved by the Authority, and meeting all regulations and
appropriate technical specifications relating to sanitary sewer construction.
This approval letter must be superimposed on the final approval plans.
Very truly yours,
Richard Aries, Chairman
Water Pollution Control Authority
RA:ead
cc: Michael J. Gantick,Director of Public Works
Jeff Doolittle, Town Engineer
Michele Lipe, Director of Planning
Chris Dougan, Chief Building Inspector
TOWN OF SOUTH WINDSOR
WATER POLLUTION CONTROL AUTHORITY
APPLICATION FORM
Application No.:
Date Received
Applicant Anixter, Inc. (c/o Jeff Merrill) Date Scheduled For
Address 1315 John Fitch Boulevard,South Windsor,CT 06074
Telephone No.: (224)521-8498
Owner of Record on Land Records 1315 J F Associates,LLC
Owner's Address 1315 John Fitch Boulevard, South Windsor,CT 06074
Property Description: GIS Pin:47701315
Assessor's Map# Parcel# Vol. 2389 page 257 I
Project Title: Anixter
i
Inquiries to be Directed to: (Name,Address,Telephone No.) Karen Isherwood,P.E.
Isherwood Civil Engineering,58 Ordway Drive,South Windsor,CT 06074(860)6404064
Approvals Previously Received(Check) IWA P&Z X ZBA
Purpose of Application: (Check all that apply)
I
1. Sewer Extension/Connection--Residential Use
a.Subdivision
b. Single Unit
c. Other Explain
d. Type of Approval:Concept Final
I
2. Sewer Extension/Connection--Industrial/Commercial User
a. New Connection
b. Request to Increase Flow Rate X
c. Change in Nature of Waste Discharge i
d. Other Explain
e. Type of Approval: Concept Final X
3. Appeal of Sewer User Charge
a. Residential
b. Industrial/Commercial
4. Sewer Assessment
a. Establish Sewer Assessment
b. Appeal of Sewer Assessment
c. Change in Use of Property j
i
5. Regulatory Appeal ,Explain
6. Other Explain
is ignature Date
0wner' Si a Date
h� 00(,
Yl
£ Yt
r � .L - �- {tFi+»�"n` r ,. .t . .54
Isherwood Civil Engineering TIQIMISMYTAL
58 Ordway Dr.
S. Windsor, CT 06074
(860) 640-4064
www.iandscivil.com
March 20, 2014
Michele Lipe, Town Planner
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
Re: 1315 John Fitch Boulevard;Anixter, Inc. Site Plan Modification
I am submitting(6) complete sets of plans revised to address town staff comments from Town
Engineer, Jeffrey Doolittle, in his memo dated 3/13/14. Revisions include:
1) An additional storage area has been provided as requested to detain the increase in runoff
for improvements located on the south side of the building. Two copies of the revised
Stormwater Management Plan are included for review.
2) An access easement has been provided, as requested, and is depicted on sheet C-1.
3) Sheet C-2 has been revised as requested, for clarity.
4) We understand that WPCA approval is required.An application has been submitted, and
we expect to be before the Commission at their next scheduled meeting.
Additional revisions were made to address comments raised via email from Planning staff
including:
1) The parking calculations have been modified and broken down by use for the
applicant, as requested. Calculations can be found on Sheet C-1.
2) Lighting has been reviewed and a new light pole is being proposed along the
southerly boundary, adjacent to the 6 proposed parking spaces.A 14'high pole
"The Archetype"by Kim Lighting is specified. This is a full cutoff fixture.A copy
of the specification sheet has been included with this packet for review.
3) Plant material within the rain garden has been modified, as discussed with Jeff
Folger.
4) Landscape area calculations have been included on the landscaping plan(C-3)
and depict 5.9%provided for the 20 relocated spaces, and 1.4%where one
parking space from the rear of the building is being located adjacent to the
existing unapproved spaces east of the building. Please note that this application
proposes a total of 4 more parking spaces than are available today. The goal of
this application was to provide a minimum of 40 spaces along the front of the
building for Anixter. They anticipate 35 office employees entering from the front
and need additional spaces available for visitors.As the site is currently over the
maximum impervious coverage limit(at 66.5%)the applicant will be removing an
equal amount of pavement they are proposing to compensate, as well as an
additional 4200 sf of pavement in areas west of the building, adjacent to Strong
Road, in order to bring the site into compliance.We understand that the existing
parking spaces along John Fitch Boulevard were never approved,however,the
applicant is hopeful that the town will consider the additional work and expense
involved with this proposal to be found acceptable. They would also be amenable
to providing additional plantings (shrubs and/or 5'x5'beds) along the boundary if
desired.
Please review the plans and let me know if you have any questions. The applicant is anxious to
bring new business into South Windsor.Again, we appreciate your continued assistance and
support throughout the process and look forward to our meeting before Planning&Zoning on
March 25, 2014.
Thank you.
Sincerely,
Karen Ish rwood, P.E., Principal