August 2,2001
Design Professionals
165 South Satellite Road
South Windsor,CT 06074
Attn: Galen Semprebon
RE: Strawberry Fields—approval to connect
Dear Mr. Semprebon:
The South Windsor Water Pollution Control Authority,at its regular meeting of July 31,2001,gave
approval for the connection,of an elderly condominium complex being constructed on Sullivan Avenue,to
the Town's sewerage system,as more specifically shown on Drawing No.7 entitled"Plot Plan—
Strawberry Fields Adult Condominium",prepared by Design Professionals,Inc.,South Windsor,CT.,
Project No.00-1280,dated 11-17-00,with revisions dated 5-31-01 and 6-6-01,and Drawing No. 8,entitled
"Topographic Plan",dated 4-26-01,with revisions dated 5-31-01 and 6-6-01,Drawing No. 11 entitled
"Plan/Profile Dzen Way,dated 5-29-01,with revision dated 6-6-01 and Drawing No. 16 entitled"Pump
Station Plan",dated 5-31-01,with revision dated 6-6-01subject to the following conditions:
1. Elevation is sufficient to handle the complete subdivision and design is such that the line is laid at a
level to allow extension of the line on Sullivan Avenue.
2. The Town Attorney will approval of the two necessary easements to be obtained,one from the Town
and one from the private property owner involved
3. Profile and final review subject to the technical approval of the Town of South Windsor Engineering
Department.
4. Final Authority approval and acceptance of the sanitary sewerage connection will be given once the
sewer line has been installed and inspected by the Town staff,and based upon the written verification
of the Town staff that said sanitary sewer line was installed in substantial conformance with the design
plans previously approved by the Authority,and meeting all Town regulations and appropriate
technical specifications relating to sanitary sewer construction.
This approval letter must be superimposed on the final approval plans.
Very truly yours,
ThWasginoon,Chairman
Water Pollution Control Authority
TH:dd
CC:Matthew Galligan,Town Manager
Michael J.Gantick,Director of Public Works
Town Engineer
Marcia Banach,Director of Planning
John Collins,Chief Building Inspector
Sullivan Town Homes,L.L.C.
TOWN OF SOUTH WINDSOR
WATER POLLUTION CONTROL AUTHORITY
APPLICATION FORM
Application No.
Date Received
Date Scheduled For
Applicant SullivanHJacobs, Esq.
Address146 Main St. , P.O. Box 470, Manchester, c'ITelephone No. 646-0121
Owner of Record on Land Recordq,4ari 1vn Katz;A.Lbina Lata,Marion Gegetskas,Ludwia&Rovice Savitsky
Owners Address Katz: (same as applicant) ;Lata, et..al,1641 King St. , Enfield, CT 06082
Property Description: 38 1132 22 (1101 Sullivan Ave.)
Assessor's Map # 88 Parcel # 2 Vol. 1156 Page_143 (1135 Sullivan Ave.)
Project Title:
Inquiries to be Directed to: (name, address, telephone no-)pPtPr R_ Demallie, Design Professionals, Inc
1 61ii Rrnii-h Rnarl f Snuth Windsor., CT 060741, 291-A755; Fax 291-8757
Approvals Previously Received (Check) IWA _X P & Z WXdiagZBA
Purpose of Application: (Check all that apply)
1. Sewer Extension/Connection -- Residential Use
a. Subdivision
b. Single Unit
c. Other MTxpTain Eld=lv Condominium
d. Type o Af pproval: Concept - Final x
2. Sewer Extension/Connection -- Industrial/Commercial User
a. New Connection
b. Request to Increase o ate
c. Change in Nature of Waste Discharge
d. Other Explain
e. Type o Approval: Concept Final
3. Appeal of Sewer User Charge
a. Residential
b. Industrial/Commercial
al
4. Sewer Assessment
a. Establish Sewer Assessment
b. Appeal of Sewer Assessment 'J U L 2 240
c. Change in Use of Property
5. Regulatory Appeal ; Explain
a
6. Other Explain
ZAK
Ap 1 t's t na ate
I )
f
fi
er's igna re ate
(See Reverse Side for Application Submittal Procedures)
1WS01"C414pplicxwn
11126M
r DESIGN PROFESSIONALS, INC.
civil engineers .planners . surveyors . gis J U N 2 9 2001
LETTER OF TRANSMITTAL
TO: Mr.Fred Shaw DATE:June 29,2001
Town Hall
1540 Sullivan Avenue
South Windsor,CT
RE: WPCA Application DPI PROJ.NO.: 99-1280
Strawberry Fields,Sullivan Avenue
South Windsor,Connecticut
WE ARE SENDING YOU:
❑ for your use ❑at your request
® for approval by WPCA ❑ for your files
❑ for review and comment ❑ other
THE FOLLOWING:Two(2)blueprint sets of engineering plans and WPCA application(final approval)for the
Strawberry Fields elderly condominium development on Sullivan Avenue. We have submitted applications to the
Planning and Zoning Commission(general plan,zone change,special exception&site plan),however,approvals are
pending(first PZC approval expected on 7/17/01). We have received final project approval from the Inland Wetlands
Agency. I understand that we will be placed on the July 31 agenda,and we will be in attendance.Please call me at
your earliest convenience to confirm the meeting date. Thank you.
DESIGN P SSIONALS,INC.
By:
Peter R.DeMa lie
Principal
cc: Nathan Kahn
Leonard Jacobs,Esq.
Galen B. Semprebon,P.E.
Barry Ellison
165 South Satellite Road, South Windsor, Connecticut 06074
Tel: (860) 291-8755 •Fax: (860) 291-8757