Loading...
HomeMy WebLinkAboutWPCA 280 Sullivan Avenue (3) 4 N Sfq<� To� �siou� V&U&D�-t O G U 6 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 Soe•co� AREA CODE 860/644-2511 October 21,2005 David A. Caron 312 Deming Street South Windsor, CT 06074 Re: 280 Sullivan Avenue South Windsor,CT Dear Mr.Caron: The South Windsor Water Pollution Control Authority, at its regular meeting of October 4, 2005, gave approval for the relocation of the monitoring manhole as presented, for 280 Sullivan Avenue, South Windsor,CT as more specifically shown on plans entitled "280 Sullivan Avenue,LLC,280-302 Sullivan Avenue,South Windsor, CT",Prepared by Design Professionals, Inc., South Windsor, CT; Job No. 1581, Drawing No. 1581A(SH#), Sheet No. 3/4"Topographic Plan",Dated 3/7/02,with revision dates: 8/05/02, 10/03/05;and subject to the following conditions. 1. An easement allowing the Town access to manhole for monitoring purposes must me executed and submitted to the Town before issuance of the permit. 2. Technical approval of the Town Engineering Department. 3. Final Authority approval and acceptance of the sanitary sewerage connection will be given once the sewer line has been installed and inspected by the Town staff, and based upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans approved by the Authority, and meeting all Town regulations and appropriate technical specifications relating to sanitary sewer construction. This approval letter must be superimposed on the final approval plans. Very truly yours, ge Joseph J.Carino,Chairman Water Pollution Control Authority JC:ead Cc: Michael J.Gantick,Director of Public Works Jeffrey Doolittle,Town Engineer Marcia Banach,Director of Planning Christopher Dougan,Chief Building Inspector Becky Meyer, Design Professionals w a TOWN OF SOUTH WINDSOR WATER POLLUTION CONTROL AUTHORITY APPLICATION FORM Application No. Date Received Date Scheduled For Applicant z aJ /Zi>— Address � c-� Telephone S^7,-?t A- Owner of Record on Land Rec ds�� �r D ,,I �,v� ,OAL: = �J,C Owners Address Property Description: Assessor's Map# /d2 Parcel# I S Vol. /'b 17 Page Project Title: I/C_ 1 Inquiries to be directed to: (Name, Address, Phone) �6 o4 Ca fff� Approvals Previously Received: (Check) IWA P &Z ZBA Purpose of Application: (Check all that apply) 1. Sewer Extension/Connection—Residential Use a. Subdivision b. Single Unit c. Other Explain d. Type of Approval: Concept Final 2. Sewer Extension/Connection—Industrial/Commercial User a. New Connection b. Request to Increase Flow Rate c. Change in Na of Waste Discharge d. Other Explain L/ T_ on C f I (V e. Type of Approval: Conce t Final 9 1f 3. Appeal of Sewer User Charge �. a. Residential REEUVE0 b. Industrial/Commercial ` A SEP 2 6 2005 4. Sewer Assessment so V09MR a. Establish Sewer Assessment p1B1w�owcs b. Appeal of Sewer Assessment c. Change in Use of Property , r eo 5. Regulatory Appeal : Explain 6. Other Explain App ' 's Signa re Da 0 IV"' is Signature Da e (See Reverse side for Application Submittal Procedures) s TOWN OF SOUTH WINDSOR �� STAFF SITE CHANGE "'� OCT $ FOR SITE & SUBDIVISION GENERAL: �'�� P BL�I7") CHANGE ORDER CONTACT PERSON P e No� Address ° Site Name .P&Z No /V7" 3�3 P Owner2&0 y1111 ko n aver LL . Phone No. Contractor Signature of Owner o 10, Signature of Design gr. Date: O CHANGE: (Describe location and nature f change. Include i Four (4 ) copies of plan/profile of Change. ) Iot rk.,IIo"g nth° r CIA yer mlmhole_ S' i Reason for Change: (Why is change required) i APPROVALS: (As Required) Dir. Of Planning Date: Town Engineer Date: Dir. of Public Works Date: Other: Date: STAFF COMMENTS: White - Town Engineer Yellow - Applicant I \ Pink - Director of Planning Goldenrod - Engineering Department