Loading...
HomeMy WebLinkAboutWPCA 648 Sullivan Avenue (2) �py1N Sf4 a y 710v� O-P S-0� ?d&U&Ot 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 r�dsox•co� AREA CODE 860/644-2511 January 18, 2006 Mr. Ed Havens, Jr. 981 Sullivan Avenue South Windsor, CT 06074 RE: Imperial Oil, 648 Sullivan Avenue Approval to connect to the Town sewer system Dear Mr. Havens,Jr.: The South Windsor Water Pollution Control Authority, at its regular meeting of January 10, 2006, gave approval for the connection to the Town's sewerage system to the proposed new Imperial Oil facility located at 648 Sullivan Avenue, South Windsor, CT and as more specifically shown on plans entitled"Imperial Oil Company, South Windsor, Connecticut", Prepared by PDS Engineering &Construction, Inc, Bloomfield, Cr; Drawing #: C-102, Drawing Title: Site grading &Utility Plan, Dated: 10-25-05, 12-2-05, 12-12-05, and 12-21-05; also Drawing #: C-104, Drawing Title: Site Plan Details, Dated: 10-25-05, 12-12-05, and 12-21-05., and subject to the following conditions: 1. Oil and grit separator must be provided according to DEP and Town regulations. 2. Permit must.be obtained from the State of Connecticut Department of.Environmental Protection. 3. Technical approval of the Town Engineering Department. 4.. Payment of a connection charge in the amount of$3,108 at time of connection. I 5. Final Authority approval and acceptance of the sanitary sewerage connection will be given once 1 the sewer line has been installed and inspected by the Town staff, and based upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans approved by the Authority, and meeting all Town regulations and appropriate technical specifications relating to sanitary sewer construction. i This approval letter must be superimposed on the final approval plans. j Very truly yours, Joseph J. Carino, Chairman Water Pollution Control Authority JC:ead Cc: Michael J. Gantick, Director of Public Works Jeff Doolittle,Town Engineer Marcia Banach, Director of Planning Chris Dougan, Chief Building Inspector i 'A 860 644 7280 South Windsor Town Hall . 003/003 TOWN OF SOUTH WINDSOR WATER POLLUTION CONTROL AUTHORITY APPLICATION FORM Application No. qi Date Received 16710J ,e Date Scheduled For Applicant SN r 4 cower&".Z,., Address /0 7 61- 0 IW,4,� R gelephone 2. -kj ,,f' - Owner of Record on Land Records L. L Owners Address 9 8 f az&y-i1� ft,Z Property Description: Assessor's Map# J Parcel# Vol. Page Project Title: Inquiries to be directed : (Name,Add ess, Phon Approvals Previously Received: (Check) IWA ✓ P &Z ✓ ZBA Purpose of Application: (Check all that apply) 1. Sewer Extension/Connection—Residential Use a. Subdivision b. Single Unit c. Other Explain d. Type of Approval: Concept Final 2. Sewer Extension/Connection—Industrial/Commercial User a. New Connection X _ b. Request to Increase Flow Rate c. Change in Nature of Waste Discharge d. Other Explain e. Type of Approval: Concept Final �_ �. 3. Appeal of Sewer User Charge E,Q a. Residential b. Industrial/Commercial s 2 4. Sewer Assessment a. Establish Sewer Assessment °E b. Appeal of Sewer Assessment c. Change in Use of Property 5. Regulatory Appeal : Explain 6. er WE plain p e Date! Z _2 7— 9J Owner's Signature Date (See Reverse side for Application Submittal Procedures) 12/27/05 TUE 11:15 [TX/RX NO 75471