HomeMy WebLinkAboutWPCA 283 Sullivan Avenue (2) t�%1N Sr
70w:n O-Psotd/7, ?di
R.m 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
�j OR-CO���V AREA CODE 860/644-2511
April 12,200
Karen Isherwood,Project Engineer
Design Professionals,Inc.
165 South Satellite Road
South Windsor,CT 06074
i
Re: AMK Welding i
283 Sullivan Avenue
South Windsor,CT
Dear Ms.Isherwood:
i
i
The South Windsor Water Pollution Control Authority, at its regular meeting of April 4, 2006, gave approval j
for the connection to the Town's sewerage system for commercial property located at 283 Sullivan Avenue;as j
more specifically shown on plans entitled"AMK Welding, Division of Dynamic Materials Corporation, Site
Plan, 283 Sullivan Avenue, South Windsor, Connecticut; Prepared by Design Professionals, Inc., South
Windsor, CT; Job No.: 1650,.Drawing No.: Jobs/I 650/1650-2.DWG, Sheet No.:. 2/4, Dated 2-10-06 with
Revision Dates: 3-9-06, 3-16-06; also Drawing No.: Jobs/1650/1650-3.DWG , Sheet No.: 3/4, Dated 1-31-06
with Revision Date: 3-9-06";and subject to the following conditions:
1. An easement must be submitted and approved by the Town Attorney permitting the Town access to the
property for manhole monitoring purposes. i
2. This connection charge will be the minimum commercial charge in effect at the time of connection.
I
I
3. Technical approval of the Town Engineering Department. ,
4. Final Authority approval and acceptance of the sanitary sewerage connection will be given once the
sewer line has been installed and inspected by the Town staff,and based upon the written verification of
the Town staff that said sanitary sewer line was installed in substantial conformance with the design j
plans approved by the Authority, and' meeting all Town regulations and appropriate technical
specifications relating to sanitary sewer construction.
i
This approval letter must be superimposed on the final approval plans.
Very truly yours,
i
Josep7hJ.Carino,Chairman
Water Pollution Control Authority
JC:ead
Cc: Michael J.Gantick,Director of Public Works
Jeff Doolittle,Town Engineer
Marcia Banach,Director of Planning
Chris Dougan,Chief Building Inspector
Robert C. Sanborn,Applicant
41 16
N, TOWN OF SOUTH WINDSOR
cb, REC VE0 WATER POLLUTION CONTROL AUTHORITY
ea
MAR 2 j r20061 APPLICATION FORM
SO MnNDSOR QD PUBLIC WORKS Application No.
`• OEPT Date Received d U
`"✓� _ v Date Scheduled For L{
Applicant r r .c- (tri2arldi/p . Gln Rolp=i LScuNfoar
Address s,jituna (Ave., S W;n ' Telephone No. _.2y1-S�,3q
Owner of Record on Land Recordsz c�c �,�►�
Owners Address
Property Description:OY3 vz
Assessor's Map # Parcel # Vol. Page
Project Title: Y-- V\gldinQ
Inquiries to be Directed to: (naihe, address, tele hone no.)
E . ro i G� i
Approvals Previously Received (Check) IWA ✓ P & Z ✓ ZBA
Purpose of Application: (Check all that apply)
1. Sewer Extension/Connection -- Residential Use
a. Subdivision
b. Single Unit
c. Other Explain
d. Type o Approval: Concept Final
2. Sewer Extension/Connection -- Industrial/Commercial User
a. New Connection
b. Request to Increase�ow Rate
c. Change in Nature of Waste Discharge
d. Other Explain
e. Type o Approval: Concept Final
3. Appeal of Sewer User Charge
a. Residential
b. Industrial/Comm rcial
4. Sewer Assessment
a. Establish Sewer Assessment
b. Appeal of Sewer Assessment
c. Change in Use of Property
5. Regulatory Appeal ; Explain
6. Other Explain
pplicant's Sigm ee ate
,'Owner's Signature Date
(See Reverse Side for Application Submittal Procedures)
/nISSO/W CA/appacadon
!i/z6/%
DESIGN PROFESSIONALS, INC.
civil engineers ♦ planners ♦ surveyors
landscape architects ♦ gis ♦ gps
LETTER OF TRANSMITTAL
Fred Shaw, Water Pollution Control Authority March 17, 2006
Town of South Windsor
1540 Sullivan Ave
South Windsor, CT 06074
DPI Project No. 1650
Re: WPCA Application
AMK Welding
283 Sullivan Avenue
South Windsor, Connecticut
WE ARE SENDING YOU:
❑ for your use ❑ at your request i
® for approval ❑ for your files
❑ for review ❑ for your payment
i
THE FOLLOWING: Two sets of plans and one copy of the application for the above-
referenced project. Please call me to confirm this application will be on the agenda for the April 4rh
meeting. Planning&Zoning is hearing this project on March 281', however they will not be able to
act on the application until April I I'h. We respectfully request that WPCA review and decide on
this application at the April e meeting, as time is of the essence and the client must go to
construction by April 15th. Thank you.
I
i
Sincerely,
DESIGN PROFESSIONALS, INC.
i
B , LAM
Andrea M. Momnie
Executive Coordinator
I
i
i
i
165 South Satellite Road,South Windsor,Connecticut 06074 {
Tel: (860)291-8755•Fax: (860)291-8757 J