1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074
l�OSOR-ca`' TELEPHONE (860) 644-2511
April 25,2013
Mr.Phil Forzley
Fuss&O'Neill,Inc.
146 Hartford Road
Manchester,CT 06040
Re: Town Square at Evergreen Walk
Relocate portion of trunk sewer(WPCA Approval)
Dear Mr.Forzley:
The South Windsor Water Pollution Control Authority, at its regular meeting of April 2, 2013, approved the
application as presented for relocation of a portion of the existing trunk sewer at Evergreen Walk; as more
specifically shown on plans entitled "Town Square at Evergreen Walk, Tamarack Avenue, South Windsor,
Connecticut, Final Development Plan" Prepared by Fuss & O'Neill, Manchester, CT; Project No.:
02000481.A60; "Utility Plan", Page Cu-102, Dated 04/25/2011; Revised on 8/5/2011, 9/9/2011. This approval
is subject to the following conditions:
1. A draft of an easement allowing the Town access to the public sewer for maintenance purposes must be
submitted,reviewed and approved by the Town Attorney;
2. Final technical approval of the Town of South Windsor Engineering Department;and
3. Final Authority approval and acceptance of the sanitary sewerage connection will be conditional upon
the installed sewer line having been inspected by the Town staff,and upon the written verification of the
Town staff that said sanitary sewer line was installed in substantial conformance with the design plans
approve by the Authority,and meeting all regulations and appropriate technical specifications relating to
sanitary sewer construction.
It was noticed in the minutes for this meeting that there was some discussion of the proposed building locations
that made it necessary to relocate the existing trunk sewer; and the motion included requirements for water
meters, grease interceptors, and commercial office buildings which were inappropriate for the purposes of this
application. It will be necessary to reapply for approval of any proposed residential and commercial sewer
connections following the submittal of the appropriate plans for staff review and comment.
This approval letter must be superimposed on the final approval plans.
Very truly yours,
Ric and Aries, Chairman
Water Pollution Control Authority
Richard Aries:ead
cc: Michael J. Gantick,Director of Public Works
Jeff Doolittle,Town Engineer
Michele Lipe,Director of Planning
Chris Dougan, Chief Building Inspector
TOWN OF SOUTH WINDSOR y _
WATER POLLUTION CONTROL AUTHORITY
APPLICATION FORM l_ ;
Application No.: -
Date Received mar
Date Scheduled For CCQn 91ad
Applicant Evergreen Walk, LLC
Address 1109 Rose Lane, Virginia Beach, VA 23451
Telephone No.: (757)449-1606
Owner of Record on Land Records Evergreen Walk, LLC
Owner's Address 1109 Rose Lane, Virginia Beach, VA 23451
Property Description:
Assessor's Map# 27 Parcel# 15 Vol. 1169 page_ 4
Project Title: Town Square at Evergreen Walk
Inquiries to be Directed to: (Name,Address,Telephone No.) Phil Forzley, Fuss &O'Neill, Inc.
146 Hartford Road, Manchester, CT 06040 (860)646-2469 x 5235
Approvals Previously Received (Check) IWA X P&Z X ZBA
Purpose of Application: (Check all that apply)
1. Sewer Extension/Connection- - Residential Use
a. Subdivision
b. Single Unit
c. Other Explain
d. Type of Approval: Concept Final
2. Sewer Extension/Connection - - Industrial/Commercial User
a. New Connection
b. Request to Increase Flow Rate X Additional 50,000 gpd
c. Change in Nature of Waste Discharge
d. Other X Explain Relocate portion of Evergreen Walk trunk sewer
e. Type of Approval: Concept Final X _
3. Appeal of Sewer User Charge
a. Residential
b. Industrial/Commercial
4. Sewer Assessment
a. Establish Sewer Assessment
b. Appeal of Sewer Assessment
c. Change in Use of Property
5. Regulatory Appeal , Explain
6. Ot r Explain
Ap 'cant s Signatu t,�(ssdt`� Date
WAP&9/ ve, ��,k
Owner's Signature Date